TECHNICAL FIELD
[0001] The present invention relates to a foundation or a pile driven foundation for an
overhead line mast, power line mast or the like, comprising a reinforced concrete
pile including pile threaded bolt connectors, a number of gaskets and a corresponding
number of tightening nuts.
BACKGROUND OF THE INVENTION
[0002] Prefabricated concrete piles are normally used for foundations at location where
the upper soil layers are not suitable for accommodating a shallow foundation. At
location where the bearing capacity of the ground is weak in relation to the construction,
piles are preferred option compared to shallow foundations. Through the use a piling
foundation the load from the construction may be transferred from the weaker upper
layers of the soil to lower stronger layers, which are typically found deeper level
in the ground. The piles are driven into the ground by using a pile driver or hammer
or the like.
[0003] The piles are intended for embedment deep into the ground for providing a stable
foundation for various structures such as buildings, bridges and similar constructions.
The pile foundation can be used in soil layers along railways.
[0004] For purposes where prefabricated concrete foundations used with threaded bolt connections
it is necessary to protect the reinforcement from water penetrating into the concrete
at the bolt shaft. The water will penetrate the foundations, more precisely the water
will penetrate into the reinforced concrete piles between the bolt shaft and the reinforcing
concrete causing the reinforcement elements of the reinforced concrete piles to corrode
and eventually cause the reinforced concrete supporting the bolt shaft to break, which
will reduce the stability of the overlying construction. The penetrating water may
also freeze when subjected to temperatures below 0° C and cause damage to the pile.
There is consequently a need for technologies for avoiding water penetration into
the concrete foundation, especially reinforced concrete bolt-foundations for railway
powerlines, or similar with demand for long durability being exposed to outside weather
conditions.
[0005] Such prior art piles are disclosed in e.g.
PL67224Y1 which discloses a foundation suitable for an overhead line mast and comprising a
reinforced concrete pile including threaded bolt connectors being embedded in the
concrete pile, each connector having an exposed part extending beyond a first end
part and connected to reinforcement elements of the pile. The document does not disclose
any improvement to the sealing capability and the prevention penetration of water
into the reinforced concrete pile at the bolt shaft.
[0006] The general object of the present invention is to provide a foundation, which is
able to withstand the environment impact and exposure accruing over time on the structure
at the installation location.
[0007] The above need and object together with numerous other needs and objects, which will
be evident from below detailed description, are according to a first aspect of the
present invention obtained by a foundation for an overhead line mast, power line mast
or the like, comprising a reinforced concrete pile including threaded bolt, a number
of gaskets and a corresponding number of tightening nuts:
- the reinforced concrete pile defining an elongated structure having a first end part
including a planar abutment surface of a first polygonal geometry and a second end
part, steel reinforcement elements extending between the first end part and the second
end parts, the threaded bolt connectors being embedded in the reinforced concrete
pile and each having an exposed part extending beyond the first end part and positioned
in a second polygonal geometry and connected to the steel reinforcement elements of
the reinforced concrete pile, the second polygonal geometry being equivalent to the
first polygonal geometry,
- each of the exposed part of the pile threaded bolt connectors having a first portion
including a threaded portion, a second portion having a circular cross sectional configuration
of a first outer diameter and a transition portion interconnecting the first portion
and the second portion,
- a first interface being located between the first portion and the transition portion
of each of the pile threaded bolt connectors at a first distance from the planar abutment
surface,
- a second interface being located between the transition portion and the second portion
of each of the pile threaded bolt connectors at a second distance from the planar
abutment surface, the first distance being larger than the second distance,
- each of the gaskets having an annual shape forming a second inner diameter and second
outer diameter,
- the tightening nuts having a first end surface, a second end surface and a central
aperture including a tapered portion at the second surface end for providing a larger
opening compared to the central aperture, the central aperture further including an
internal threaded portion at the first end surface complimenting the threaded portion
of the pile threaded bolt connectors,
- the second inner diameter of the gasket being congruent to the first outer diameter
of each of the second portions of each the pile threaded bolt connectors and the second
outer diameter being larger than the inner diameter of the internal threaded part
of the tightening nuts,
- the tightening nuts being configured to be rotated relative to the threaded portion
of the pile threaded bolt connectors for allowing the gaskets to be compressed towards
the pile threaded bolt connectors, the inner tapered portion of the tightening nuts
and the planar abutment surface for providing sealing relative to the pile threaded
bolt connectors and the planar abutment surface.
[0008] The reinforced concrete pile is an elongated prefabricated concrete piles. The reinforced
concrete pile is provided in various lengths.
[0009] The pile threaded bolt connectors would preferably be made from a stainless steel
material, as the pile threaded bolt connectors are exposed to the environment and
have to be able to withstand the weather. Stainless steel is the preferred material
due to its corrosion resistance as stainless does not corrode or rust as ordinary
steel (carbon steel) does. However, it is possible to use carbon steel for the steel
reinforcement elements as the steel reinforcement element are embedded into the reinforcement
concrete pile,
[0010] The gasket is preferably made from an elastomer material with a round cross-section
and being designed to be compressed during assembly and would create a sealing at
the interface between the plain unthreaded surface of the pile threaded bolt connectors
and the planar abutment surface. Each gasket has an annual shape forming a second
inner diameter being congruent to the first outer diameter of the pile threaded bolt
connectors and second outer diameter being larger than the inner diameter of the internal
threaded part of the tightening nut.
[0011] Each of the tightening nuts is configured to be rotated relative to the threaded
portion of a pile threaded bolt connector and by rotating the tightening nut the tapered
portion of the tightening nuts will be moved towards the gasket. Rotation of the tightening
nut would cause the gasket to be compressed towards the outer surface of the pile
threaded bolt connectors and the planar abutment surface and the compression of the
gasket will provide a sealing between the pile threaded bolt connectors and the planar
abutment surface.
[0012] In a further embodiment according to the first aspect, the transition portions having
threaded portions being tapered over two revolutions from a fully threaded shaft to
a plain unthreaded shaft. Through the use of pile threaded bolt connectors having
a threaded portions being tapered over two revolutions from a fully threaded shaft
to a plain unthreaded shaft, it is possible to obtain a sealing for preventing water
to penetrate into the structure.
[0013] In a further embodiment according to the first aspect, the central aperture of the
tightening nuts having an intermediate section having a second threaded section, the
second threaded section extending between the tapered portion and the internal threaded
portion, the second threaded section having a diameter being larger than the threaded
diameter of the internal threaded portion. Through the use of tightening nuts having
a second threaded section with a diameter being larger than the inner diameter of
the internal threaded portion, it is possible for the tightening nut to be rotated
beyond the threaded portion of the pile threaded bolt connectors. The second threaded
section being an inner threaded section and the diameter of the second threaded section
corresponds to the major diameter.
[0014] In a further embodiment according to the first aspect, wherein the internal threaded
portion being tapered over two revolutions. Through the use of tightening nuts having
internal threaded portion being tapered over two revolutions, it is possible to improve
the sealing capability further and prevent penetration of water into the reinforced
concrete pile.
[0015] In a further embodiment according to the first aspect, the second portions of the
pile threaded bolt connectors being plain unthreaded portions. By using a pile threaded
bolt connectors with a second portions having a plain unthreaded surface, it is possible
to enhance the sealing capability at the interface between the outer surface of the
gasket and the plain surface of the pile threaded bolt connectors. The plain contact
surface improves the sealing capability compared to a threaded contact surface, hereby
serving a first function. The plain unthreaded portion of the pile threaded bolt connectors
will prevent, that the gasket from getting damaged or torn during tightening of tightening
nuts during installation, where the overhead line mast is installed on top of the
reinforced concrete pile, hereby serving a second function.
[0016] In a further embodiment according to the first aspect, the reinforcement elements
including additional steel reinforcement elements extending in the circumference of
the reinforced concrete. By using an additional steel reinforcement elements extending
in the circumference, it is possible to obtain a steel mesh structure, which allows
easier handling and positioning of the steel mesh structure during casting and fabrication
of the reinforcement concrete pile. The of additional steel reinforcement elements
forms a steel mesh or mesh cage together with the steel reinforcing bar.
[0017] The mesh cage or reinforcement cage consisted of two parts: longitudinal bars and
transverse bars or spiral bar. The steel bar has vertical rib and transverse rib on
surface for better application in concrete reinforcement and the steel bar is preferable
made from cold drawn or hot drawn carbon steel wire rod, galvanized or mill black
finish.
[0018] The longitudinal steel bars confines the core concrete, and the transverse steel
bars or spiral bars fit around the longitudinal bars. The steel mesh cage provides
reinforcement in the longitudinal and lateral strength to prevent cracking, and reduce
the deflections occurrence probability.
[0019] The reinforcement cage has a polygonal geometry e.g. triangle or square and the reinforcement
cages is positioned in the casting mould before the concrete is poured the casting
form. The steel reinforcement elements are spot welded to form a reinforcement cage,
preferably by an automatic spot welding machine and the spot welding machine furthermore
is able to program for being able to adjust the spacing and opening of the reinforcement
cage.
[0020] In a further embodiment according to the first aspect, the reinforced concrete pile
is a prefabricated structure. Through the use of a prefabricated reinforced concrete
pile, it is faster to establish the foundation as the reinforced concrete does not
need to casted in-situ and await the hardening of the concrete before the overhead
line mast can be connected to the foundation.
[0021] In a further embodiment according to the first aspect, the second polygonal geometry
and the first polygonal geometry being 3-12, preferably 4. By using a polygonal geometry
it is optional, where the geometry should be rectangular, pentagonal, hexagonal etc.
[0022] In a further embodiment according to the first aspect, the reinforced concrete pile
having visual markings on the outer surface for positioning the end part 0.1-1 meter
above ground level, when the reinforced concrete pile is being driven into the ground.
By using a visual markings on the reinforced concrete pile, the installation of the
reinforced concrete pile can be done in a more precise manner, as the worker at the
installation site can visual determine and inspect whether the reinforced concrete
pile needs to be driven further into the ground.
[0023] In a further embodiment according to the first aspect, the pile threaded bolt connectors
being connected to the steel reinforcement elements of the reinforced concrete pile
by welding, preferably friction welding. By welding the each pile threaded bolt connectors
to the steel reinforcement bars, the structural loads from the mast can be transferred
from the pile threaded bolt connectors to the steel reinforcement elements embedded
in the reinforced concrete pile.
[0024] The term pile foundation should in this context be understood as a prepared ground
or base on which the overhead line mast, the power line mast or the like structure
can be mounted. The pile foundation consists of an elongated structural element being
driven or drilled into the deep of the ground and belong to the category also referred
to as deep foundation.
[0025] The term deep foundation should in the context be understood as the type of foundation,
which transfers load into the soil farther down from the ground level in contrast
to shallow foundation, which primarily transfers loads from the structure to the surface
layer at the vicinity of the ground level.
[0026] The term congruent is used in this context to describe a gasket being able to provide
a tight fit relative to the outer diameter of the second portion of the pile threaded
bolt connectors. Each gasket would have an inner diameter being identical to the outer
diameter of the second portion of each of the pile threaded bolt connectors or an
inner diameter substantial smaller than the outer diameter of the second portion of
each of the pile threaded bolt connectors.
[0027] The term internal threaded portion is used in this context to describe an internal
thread of the tightening nut is divided into two sections, which both have a major
diameter and a minor diameter. The diameter of the internal threaded portion would
in this context refer to the major diameter.
DETAILED DESCRIPTION
[0028] The invention will now be explained in more detail by means of examples of embodiments
with reference to the schematic drawing.
Figure 1 shows a foundation installed along a railway track.
Figure 2 shows of a first and presently preferred embodiment of the reinforced concrete
pile.
Figure 3 shows the steel reinforcement elements embedded inside the reinforced.
Figure 4A-4D shows the tightening of the tightening nut.
Figure 5A-5E shows a first and presently preferred embodiment of the pile threaded
bolt connectors and a tightening nut.
Figure 6A-6D shows a second preferred embodiment of casting a reinforced concrete
pile according to first embodiment of the invention.
Fig. 1 shows foundation 10 comprising a reinforced concrete pile 20 having threaded
bolt connectors for allowing an overhead line mast 12 to be connected to the reinforced
concrete pile 20 of the pile foundation.
[0029] The overhead power line 16 is suspended above the railway track 14 between the overhead
line mast, supporting posts or arched catenary support or other carrying structures
spaced along the railway track 14. The overhead power line 16 is kept at a high electric
potential for suppling electric power to the train. The reinforced concrete pile 20
penetrates the upper soil layers and will be embedded in the lower, more rigid lower
soil layers. The reinforced concrete pile 20 is a precasted element and the reinforced
concrete pile 20 is casted in a standardized length between 4 meter and 20 meter.
[0030] Fig. 2 and 3 show a reinforced concrete pile 20 having an elongated structure with
a first end part 22 including a planar abutment surface of a first polygonal geometry
and a second end part 26. Steel reinforcement elements 28 extends between the first
end part 22 and the second end parts 28.
[0031] Four pile threaded bolt connectors 30 are embedded in the reinforced concrete pile
20 and each of pile threaded bolt connectors 30 has an exposed part extending beyond
the first end part 22. The four pile threaded bolt connectors 30 are positioned in
a second polygonal geometry and connected to the steel reinforcement elements 28 of
the reinforced concrete pile 20.
[0032] The connection between each of the pile threaded bolt connectors 30 and the steel
reinforcement elements 28 of the reinforced concrete pile 20 is obtained by welding
process e.g. friction welding and the connection will be embedded inside the reinforced
concrete pile 20.The pile threaded bolt connectors 30 would be made from a stainless
steel material, as the pile threaded bolt connectors is exposed to the environment
and have to be able to withstand the corrosion.
[0033] The steel reinforcement elements 28 are fabricated from an assembly of steel reinforcing
bar 28', also commonly referred to as rebars, held together in the desired configuration
by means of additional steel reinforcement elements 28" extending in the circumference
of the reinforced concrete pile 20. The additional steel reinforcement elements 28"
forms a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'.
[0034] Two lifting sockets 29 are embedded into the reinforced concrete pile 20 and the
lifting sockets 29 are placed at equal distance from the center of gravity of the
reinforced concrete pile 20 for allowing as stable lifting of the reinforced concrete
pile 20. Each of the lifting sockets 29 is connected to the steel reinforcement elements
28 by welding.
[0035] The lifting sockets 29 comprise an inner threaded portion and the threaded portion
makes it possible for a worker to insert a swivel lifting eye into the lifting socket
prior to lifting the reinforced concrete pile 20. The lifting socket could also be
formed as tubular lifting socket, flat plate lifting socket or the like. Each of the
lifting sockets 29 is covered by a sealing cap for preventing any foreign objects
from entering the socket and the sealing cap fits inside the lifting socket 29.
[0036] The steel reinforcement elements 28 have the same polygonal geometry as the reinforced
concrete pile 20 and the 28' steel reinforcing bars are placed along the circumference
of the reinforced concrete pile 20 more specific near the edges of the polygonal geometry.
[0037] The second polygonal geometry is defined by the number of pile threaded bolt connectors
embedded in the reinforced concrete pile 20 and the first polygonal geometry corresponds
the outer geometry of the reinforced concrete pile 20. The first polygonal geometry
is equivalent to the second polygonal geometry in fig. 2.
[0038] It is contemplated, that the tightening the tightening nut 501, 502, 503, 504 can
be done in two steps, 'Initial Torque' and 'Final torque' using a calibrated torque
wrench. This can be either a manual wrench or power tool fitted with a torque cut-out
that must first be calibrated on a bolt from the job batch using a bolt load meter
or similar device for determining bolt tension.
[0039] Fig. 4-5 show the pile threaded bolt connectors 30 having a first portion 32 including
a threaded portion 33, a second portion 34 having a circular cross sectional configuration
of a first outer diameter and a transition portion 38 interconnecting the first portion
32 and the second portion 32. The gaskets 40 having an annual shape forming a second
inner diameter 42 and second outer diameter 44.
[0040] Fig. 4A shows a pile threaded bolt connectors 30 connected to the steel reinforcement
elements 28 in the reinforced concrete pile 20. The second portion 34 of the pile
threaded bolt connectors 30 has a circular cross sectional and the second portion
34 is connected to the steel reinforcing bar 28' by welding. The second portion 34
of the pile threaded bolt connectors 30 has a plain unthreaded portions. 6. The steel
reinforcement elements 28 comprising of a number of steel reinforcing bars 28' and
additional steel reinforcement elements 28" extending in the circumference of the
reinforced concrete pile 20. The additional steel reinforcement elements 28" forms
a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'.
[0041] In fig. 4A-4D, the gasket 40 has a second inner diameter 42 being congruent to the
first outer diameter of the second portions 36 of the pile threaded bolt connectors
and the second outer diameter 44 is larger than the inner diameter of the internal
threaded part of the tightening nuts 59.
[0042] In Fig. 4D, the first interface 60 is located between the first portion 32 and the
transition portion 38 the pile threaded bolt connectors at a first distance d
1 from the planar abutment surface 24. The second interface 62 is located between the
transition portion 38 and the second portion 34 of the pile threaded bolt connectors
30 at a second distance d
2 from the planar abutment surface 24
[0043] As indicated in fig. 4D, the first distance d
1 is larger than the second distance d
2 and the second distance d
2 is also larger the height h
g of the gasket. The height h
g of the gasket 40 corresponds to the thickness of the gasket 40. The second portion
34 of the pile threaded bolt connectors 30 has a plain unthreaded portion, which will
prevent, that the gasket 40 from getting damaged or torn during tightening of tightening
nut 50 during installation of the mast on top of the reinforced concrete pile.
[0044] Fig. 4B-4D show the sequence of tightening the tightening nut 50, where the tightening
nut is configured to be rotated relative to the threaded portion of the pile threaded
bolt connectors .
[0045] Fig. 4B shows the tightening nut 50, where the tightening nut 50 does not exert any
compression force on the gasket 40 and the gasket 40 is positioned around the plain
unthreaded portion of the pile threaded bolt connectors 30 and abuts the planar abutment
surface of the first end part 22.
[0046] Fig. 4C shows the tightening nut 50, where the tightening nut 50 is rotated further
towards the planar abutment surface of the first end part 22. The tightening nut 50
begins to compress onto the gasket 40. The gasket 40 is positioned around the plain
unthreaded portion of the pile threaded bolt connectors 30 and abuts the planar abutment
surface of the first end part 22.
[0047] Fig. 4D shows a final position, where the tightening nut 50 is rotated relative to
the threaded portion of the pile threaded bolt connectors 30 to the position, where
the tightening nut 50 exerts the full compression load on the gasket. The amount of
load on the gasket 40 causes the gasket to deform and the deformation of the gasket
results in the gasket 40 being compressed towards the pile threaded bolt connectors,
the inner tapered portion 55 of the tightening nuts and the planar abutment surface
24 for providing sealing relative to the pile threaded bolt connectors 30 and the
planar abutment surface 24.
[0048] As shown in fig. 5B, the tightening nut 50 has an intermediate section including
a second threaded section 56 and the second threaded section 56 extends between the
tapered portion 55 and the internal threaded portion 58. The second threaded section
56 has a threaded diameter d
4 being larger than the threaded diameter d
3 of the internal threaded portion 58. By using a tightening nut 50 having an inner
second threaded section 56 having a threaded diameter d
4 being larger than the inner diameter d
3 of the internal threaded portion, it is possible for the tightening nut 50 to be
rotating beyond the threaded portion 33 of the pile threaded bolt connectors. The
second threaded section being an inner threaded section and the threaded diameter
corresponds to the major diameter of an internal thread.
[0049] As indicated in fig. 5B-5D, the tightening nut has first end surface 51, a second
end surface 52 and a central aperture 54 including a tapered portion 55 at the second
end surface 52 for providing a larger opening compared to the central aperture.
[0050] The central aperture 54 further includes a internal threaded portion 58 at the first
end surface 54 complimenting the threaded portion 33 of the pile threaded bolt connectors
30.
[0051] Fig. 5D shows a first embodiment of the tightening nut 50 having a internal threaded
portion being tapered over two revolutions.
[0052] Fig. 5C shows a first embodiment of the transition portions having threaded portions
being tapered over two revolutions from a fully threaded shaft to a plain unthreaded
shaft.
[0053] Fig. 6A-6D shows a second preferred embodiment of casting of the reinforced concrete
pile. The method of casting a foundation, wherein the foundation comprising a reinforced
concrete pile including pile threaded bolt connectors, a number of gaskets and a corresponding
number of tightening nuts, comprising the step of:
- providing a casting mould 70 having two mould side walls 72, a first mould end part
74 including apertures 75, a second mould end part 76 and a bottom mould part 78,
- inserting a number of anti-adherent elements 80 made of a synthetic material, Teflon
or the like into the apertures 75 of the first mould end part 74,
- placing corresponding gasket 40 and tightening nut 501, 502, 503, 504 to said pile
threaded bold connectors 30 (not shown).
- placing steel reinforcement elements into the casting mould, the steel reinforcement
elements extending between the first end part and the second end parts of the casting
mould and a number of pile threaded bolt connectors being connected to the steel reinforcement
elements and allowing the pile threaded bolt connectors to extend beyond the first
mould end part,
- pouring concrete into the casting mould.
- casting a reinforced concrete pile defining an elongated structure having a first
end part including a planar abutment surface of a first polygonal geometry and a second
end part, steel reinforcement elements extending between the first end part and the
second end parts, the pile threaded bolt connectors being embedded in the reinforced
concrete pile and each having an exposed part extending beyond the first end part
and positioned in a second polygonal geometry and connected to the steel reinforcement
elements of the reinforced concrete pile, the second polygonal geometry being equivalent
to the first polygonal geometry.
[0054] By using a number of anti-adherent elements 80 made of a synthetic material, Teflon
or the like into the apertures 75 of the first mould end part 74, it is possible to
establish a reinforced concrete pile having a smooth planar abutment surface. By having
a smooth planar abutment surface, the sealing capability is enhanced and the smooth
surface of first end part 22 prevent water from gathering in void created in an otherwise
uneven first end part 22.
[0055] In figure 6A-6D, the four pile threaded bolt connectors 30 are placed in the casting
mould 70 and each of pile threaded bolt connectors 30 has an exposed part extending
into the apertures 75 of the first mould end part 74 and beyond the first end part
22.
[0056] The steel reinforcement elements 28 consists of steel bars 28' 28" forming a steel
reinforcement cage 28'" fabricated from an assembly of longitudinal steel reinforcing
bar 28' and transverse steel reinforcement bar 28" extending in the circumference
of the reinforced concrete pile 20. The four pile threaded bolt connectors 30 are
positioned in a second polygonal geometry and connected to the steel reinforcement
bars 28' of the steel reinforcement cage. The steel reinforcement cage 28'" forms
a recgtangular polygonal geometry.
[0057] Two lifting sockets 29 are placed at equal distance in the casting mould 70 and the
lifting sockets 29 is connected to the steel reinforcement elements 28 by welding.
[0058] The lifting socket 29 comprises an inner threaded portion and the threaded portion
makes it possible for a worker to insert a swivel lifting eye into the lifting socket
prior to lifting the casted reinforced concrete pile 20 out of the casting mould 70.
[0059] The casting mould 70 is used for casting reinforced concrete pile 20 having an elongated
structure with a first end part 22 including a planar abutment surface of a first
polygonal geometry and a second end part 26.
[0060] The reinforced concrete piles are preferably precasted concrete elements manufactured
in at a larger manufacturing facility and delivered, ready to use, to the installation
site. Pre-casted reinforced concrete piles can also be fabricated on site and tilted
or lifted into position.
[0061] Fig 6A shows the step of placing the steel reinforcement cage 28'" into the casting
mould 70 and steel reinforcement cage 28" comprising of a number of steel reinforcing
bars 28' and additional steel reinforcement elements 28" extending in the circumference
of the steel reinforcement cage 28"'.
[0062] The inserts 80 is made of anti-adherent synthetic material, without or with a built-in
supporting body, made of metal or synthetic material.
[0063] The method further comprising the step of:
- arranging the pile threaded bolt connectors in the casting mould for providing a reinforced
concrete pile having a first interface being located between the first portion and
the transition portion of each of the pile threaded bolt connectors at a first distance
from the planar abutment surface, and a second interface being located between the
transition portion and the second portion of each of the pile threaded bolt connectors
at a second distance from the planar abutment surface, the first distance being larger
than the second distance.
REFERENCE NUMBERS
[0064]
- 10
- foundation
- 12
- mast
- 14
- railway track
- 16
- overhead line, power line mast or the like,
- 18
- support structure
- 20
- reinforced concrete pile
- 22
- first end part
- 24
- planar abutment surface
- 26
- second end part,
- 28
- steel reinforcement elements
- 28'
- steel reinforcing bar
- 28"
- additional steel reinforcement elements steel reinforcement cage 28'"
- 29
- lifting socket
- 30
- pile threaded bolt connectors
- 31
- exposed part
- 32
- first portion,
- 33
- threaded portion
- 34
- second portion
- 36
- first outer diameter of the second portion
- 38
- transition portion
- 40
- gaskets
- 42
- second inner diameter
- 44
- second outer diameter
- 50
- tightening nut
- 501, 502, 503, 504
- tightening nuts
- 51
- first end surface
- 52
- second end surface
- 54
- central aperture
- 55
- tapered portion
- 56
- second threaded section
- 57
- intermediate section
- 58
- internal threaded portion
- 59
- inner diameter of the internal threaded
- 60
- first interface
- 62
- second interface
- d1
- first distance
- d2
- second distance
- d3
- diameter, third distance
- d4
- diameter, fourth distance
- hg
- height of the gasket
- 70
- casting mould
- 72
- mould side wall
- 73
- mould side wall
- 74
- first mould end part
- 75
- apertures
- 76
- second mould end part
- 78
- bottom mould part
- 80
- anti-adherent element
1. A foundation (10) for an overhead line mast, power line mast (12) or the like, comprising
a reinforced concrete pile (20) including pile threaded bolt connectors (30):
- said reinforced concrete pile (20) defining an elongated structure having a first
end part (22) including a planar abutment surface (24) of a first polygonal geometry
and a second end part (26), steel reinforcement elements (28) extending between said
first end part (22) and said second end part (26), said pile threaded bolt connectors
(30) being embedded in said reinforced concrete (20) pile and each having an exposed
part extending beyond said first end part (22) and positioned in a second polygonal
geometry and connected to said steel reinforcement elements (28) of said reinforced
concrete pile (20), said second polygonal geometry being equivalent to said first
polygonal geometry, characterized in said foundation further comprising a number of gaskets (40) and a corresponding number
of tightening nuts (501), (502), (503), (504);
- each of said exposed parts of said pile threaded bolt connectors (30) having a first
portion (32) including a threaded portion (33), a second portion (34) having a circular
cross sectional configuration of a first outer diameter (36) and a transition portion
(38) interconnecting said first portion (32) and said second portion (34),
- a first interface (60) being located between said first portion (32) and said transition
portion (38) of each of said pile threaded bolt connectors (30) at a first distance
(d1) from said planar abutment surface (24),
- a second interface (62) being located between said transition portion (38) and said
second portion (34) of each of said pile threaded bolt connectors (30) at a second
distance (d2) from said planar abutment surface (24), said first distance d1 being
larger than said second distance (d2),
- each of said gaskets (40) having an annual shape defining a second inner diameter
(42) and second outer diameter (44),
- said tightening nuts (501), (502), (503), (504) having a first end surface (51),
a second end surface and a central aperture (54) including a tapered portion (55)
at said second surface (52) end for providing a larger opening compared to said central
aperture (54), said central aperture (54) further including an internal threaded portion
at said first end surface (51) complimenting said threaded portion (33) of said pile
threaded bolt connectors (30),
- said second inner diameter (42) of said gasket (40) being congruent to said first
outer diameter (44) of each of said second portions (34) of each of said pile threaded
bolt connectors 30 and said second outer diameter (44) being larger than said inner
diameter (59) of said internal threaded part of said tightening nuts (501), (502),
(503), (504),
- said tightening nuts (501), (502), (503), (504) being configured to be rotated relative
to said threaded portion (33) of said pile threaded bolt connectors (30) for allowing
said gaskets (40) to be compressed towards said pile threaded bolt connectors (30),
said tapered portion (55) of said tightening nuts (501), (502), (503), (504) and said
planar abutment surface (24) for providing sealing relative to said pile threaded
bolt connectors (30) and said planar abutment surface (24).
2. A foundation (10) according to claim 1, wherein said transition portions (38) having
threaded portions being tapered over two revolutions from a fully threaded shaft to
a plain unthreaded shaft.
3. A foundation (10) according to any of the preceding claims, said central aperture
(54) of said tightening nuts (501), (502), (503), (504) having an intermediate section
having a second threaded section, said second threaded section extending between said
tapered portion (55) and said internal threaded portion, said second threaded section
having a diameter being larger than the thread angle of the said internal threaded
portion.
4. A foundation (10) according to claim 1, wherein said internal threaded portion being
tapered over two revolutions.
5. A foundation (10) according to any of the preceding claims, wherein said second portions
(34) of said pile threaded bolt connectors (30) being plain unthreaded portions.
6. A foundation (10) according to any of the preceding claims, wherein said reinforcement
elements including additional steel reinforcement elements (28) extending in the circumference
of said reinforced concrete pile (20).
7. A foundation (10) according to any of the preceding claims, wherein said reinforced
concrete pile (20) is a prefabricated structure.
8. A foundation (10) according to any of the preceding claims, wherein said second polygonal
geometry and said first polygonal geometry being 3-12, preferably 4.
9. A foundation (10) according to any of the preceding claims, wherein said reinforced
concrete pile (20) having visual markings on the outer surface for positioning said
first end part (22) 0,1-1 meter above ground level, when said reinforced concrete
pile (20) is being driven into the ground.
10. A foundation (10) according to any of the preceding claims, wherein said pile threaded
bolt connectors (30) being connected to said steel reinforcement elements (28) of
said reinforced concrete pile (20) by welding, preferably friction welding.
11. A method of establishing a foundation (10) for an overhead line mast (12), power line
mast or the like, comprising a reinforced concrete pile including pile threaded bolt
connectors (30):
- providing said reinforced concrete pile (20) defining an elongated structure having
a first end part (22) including a planar abutment surface (24) of a first polygonal
geometry and a second end part (26), steel reinforcement elements (28) extending between
said first end part (22) and said second end part (26), said pile threaded bolt connectors
(30) being embedded in said reinforced concrete pile (20) and each having an exposed
part extending beyond said first end part (22) and positioned in a second polygonal
geometry and connected to said steel reinforcement elements (28) of said reinforced
concrete pile (20), said second polygonal geometry being equivalent to said first
polygonal geometry, characterized in said foundation further comprising a number of gaskets (40) and a corresponding number
of tightening nuts (501), (502), (503), (504):
- providing each of said exposed part of said pile threaded bolt connectors (30) having
a first portion (32) including a threaded portion, a second portion (34) having a
circular cross sectional configuration of a first outer diameter (36) and a transition
portion (38) interconnecting said first portion (32) and said second portion (34),
- providing a first interface (60) being located between said first portion (32) and
said transition portion (38) of each of said pile threaded bolt connectors (30) at
a first distance d1 from said planar abutment surface (24),
- providing a second interface (62) being located between said transition portion
(38) and said second portion (34) of each of said pile threaded bolt connectors (30)
at a second distance (d2) from said planar abutment surface (24), said first distance
(d1) being larger than said second distance (d2),
- each of said gaskets (40) having an annual shape forming a second inner diameter
(42) and second outer diameter (44),
- providing said tightening nuts (501), (502), (503), (504) having a first end surface
(51), a second end surface (52) and a central aperture including a tapered (55) portion
at said second surface (52) end for providing a larger opening compared to said central
aperture (54), said central aperture (54) further including an internal threaded portion
at said first end surface (51) complimenting said threaded portion of said pile threaded
bolt connectors (30),
- said second inner diameter (42) of said gasket (40) being congruent to said first
outer diameter (44) of each of said second portions (34) of each said pile threaded
bolt connectors (30) and said second outer diameter (44) being larger than the inner
diameter (36) of said internal threaded part of said tightening nuts (501), (502),
(503), (504),
- rotating said tightening nuts (501), (502), (503), (504) relative to said threaded
portion of said pile threaded bolt connectors (30), compressing said gaskets (40)
towards said pile threaded bolt connectors (30), said inner tapered portion (55) of
said tightening nuts and said planar abutment surface (24) and establishing sealing
relative to said pile threaded bolt connectors (30) and said planar abutment surface
(24).
12. A method of establishing a foundation (10) according to claim 11 further rotating
said tightening nuts (501), (502), (503), (504) in a predetermined tightening sequence
providing a preloaded connecting between said reinforced concrete pile (20) and the
overhead line mast (12), power line mast or the like.
13. A method of casting a foundation (10) as claimed in any of claims 1-10, wherein said
method comprises the steps of:
- providing a casting mould having two mould side walls, a first mould end part (74)
including apertures (75), a second mould end part (76) and a bottom mould part,
- inserting a number of anti-adherent elements made of a synthetic material, Teflon
or the like into the apertures (75) of the first mould end part (74),
- placing steel reinforcement elements (28) into the casting mould and said steel
reinforcement elements (28) extending between said first end part (22) and said second
end part (26) of the casting mould, a number of pile threaded bolt connectors (30)
being connected to said steel reinforcement elements (28) and allowing said pile threaded
bolt connectors (30) to extend beyond said first mould end part (74),
- placing corresponding gasket (40) and tightening nut (501), (502), (503), (504)
to said pile threaded bold connectors (30),
- pouring concrete into the casting mould.
- casting a reinforced concrete pile (20) defining an elongated structure having a
first end part (22) including a planar abutment surface (24) of a first polygonal
geometry and a second end part (24), steel reinforcement elements (28) extending between
said first end part (22) and said second end part (24), said pile threaded bolt connectors
(30) being embedded in said reinforced concrete pile (20) and each having an exposed
part extending beyond said first end part (22) and positioned in a second polygonal
geometry and connected to said steel reinforcement elements (28) of said reinforced
concrete pile (20), said second polygonal geometry being equivalent to said first
polygonal geometry.
14. A method of casting a foundation (10) according to claim 13, wherein said method further
comprising the step of:
- arranging said pile threaded bolt connectors (30) in the casting mould for providing
a reinforced concrete pile (20) having a first interface (60) being located between
said first portion (32) and said transition portion (38) of each of said pile threaded
bolt connectors (30) at a first distance (d1) from said planar abutment surface (24),
and a second interface (62) being located between said transition portion and said
second portion (34) of each of said pile threaded bolt connectors (30) at a second
distance (d2) from said planar abutment surface (24), said first distance (d1) being
larger than said second distance (d2).
1. Fundament (10) für einen Freileitungsmast, Stromleitungsmast (12) oder dergleichen,
umfassend einen Stahlbetonpfahl (20) mit Pfahlgewindebolzenverbinder (30):
- wobei der Stahlbetonpfahl (20) eine langgestreckte Struktur mit einem ersten Endteil
(22) mit einer ebenen Anlagefläche (24) einer ersten polygonalen Geometrie und einem
zweiten Endteil (26) definiert, wobei Stahlverstärkungselemente (28) sich zwischen
dem ersten Endteil (22) und dem zweiten Endteil (26) erstrecken, wobei die Pfahlgewindebolzenverbinder
(30) in den Stahlbetonpfahl (20) eingebettet sind und jeweils einen freiliegenden
Teil aufweisen, der sich über den ersten Endteil (22) hinaus erstreckt, und in einer
zweiten polygonalen Geometrie positioniert und mit den Stahlverstärkungselementen
(28) des Stahlbetonpfahls (20) verbunden sind, wobei die zweite polygonale Geometrie
der ersten polygonalen Geometrie äquivalent ist,
dadurch gekennzeichnet, dass das Fundament ferner eine Anzahl von Dichtungen (40) und eine entsprechende Anzahl
von Spannmuttern (501), (502), (503), (504) umfasst;
- jeder der freiliegenden Teile der Pfahlgewindebolzenverbinder (30) umfasst: einen
ersten Abschnitt (32) mit einem Gewindeabschnitt (33); einen zweiten Abschnitt (34)
mit einer kreisförmigen Querschnittskonfiguration eines ersten Außendurchmessers (36);
und einen Übergangsabschnitt (38), der den ersten Abschnitt (32) und den zweiten Abschnitt
(34) verbindet,
- wobei eine erste Schnittstelle (60), die sich zwischen dem ersten Abschnitt (32)
und dem Übergangsabschnitt (38) jedes der Pfahlgewindebolzenverbinder (30) in einem
ersten Abstand (d1) von der ebenen Anlagefläche (24) befindet,
- wobei eine zweite Schnittstelle (62), die sich zwischen dem Übergangsabschnitt (38)
und dem zweiten Abschnitt (34) jedes der Pfahlgewindebolzenverbinder (30) in einem
zweiten Abstand (d2) von der ebenen Anlagefläche (24) befindet, wobei der erste Abstand
(d1) größer als der zweite Abstand (d2) ist,
- wobei jede der Dichtungen (40) eine Kreisform hat, die einen zweiten Innendurchmesser
(42) und einen zweiten Außendurchmesser (44) definiert,
- wobei die Spannmuttern (501), (502), (503), (504) umfassen: eine erste Endfläche
(51), eine zweite Endfläche und eine zentrale Öffnung (54) mit einem konischen Abschnitt
(55) an der zweiten Endfläche (52) zum Bereitstellen einer größeren Öffnung im Vergleich
zu der zentralen Öffnung (54), wobei die zentrale Öffnung (54) ferner einen Innengewindeabschnitt
an der ersten Endfläche (51) umfasst, der den Gewindeabschnitt (33) des Pfahlgewindebolzenverbinder
(30) ergänzt,
- wobei der zweite Innendurchmesser (42) der Dichtung (40) kongruent, mit dem ersten
Außendurchmesser (44) jedes der zweiten Abschnitte (34) jedes der Pfahl-gewindebolzenverbinder
(30) ist und wobei der zweiten Außendurchmesser (44) größer als der Innendurchmesser
(59) des Innengewindeteils der Spannmuttern (501), (502), (503), (504) ist,
- wobei die Spannmuttern (501), (502), (503), (504) so konfiguriert sind, dass sie
relativ zu dem Gewindeabschnitt (33) der Pfahlgewindebolzenverbinder (30) gedreht
werden, um zu ermöglichen, dass die Dichtungen (40) gegen die Pfahlgewindebolzen (30),
den konischen Abschnitt (55) der Spannmuttern (501), (502), (503), (504) und die ebene
Anlagefläche (24) zusammengedrückt sind, um eine Abdichtung gegenüber dem bereitzustellen
Pfahlgewindebolzenverbinder (30) und der ebenen Anlagefläche (24) bereitzustellen.
2. Fundament (10) nach Anspruch 1, wobei die Übergangsabschnitte (38) Gewindeabschnitte
aufweisen, die sich über zwei Umdrehungen von einer Welle mit Vollgewinde zu einer
ebenen Welle ohne Gewinde verjüngen.
3. Fundament (10) nach einem der vorhergehenden Ansprüche, wobei die zentrale Öffnung
(54) der Spannmuttern (501), (502), (503), (504) einen Zwischenabschnitt mit einem
zweiten Gewindeabschnitt aufweist, wobei sich der zweite Gewindeabschnitt zwischen
dem konischen Abschnitt (55) und dem Innengewindeabschnitt erstreckt, wobei der zweite
Gewindeabschnitt einen Durchmesser hat, der größer als der Gewindewinkel des Innengewindeabschnitts
ist.
4. Fundament (10) nach Anspruch 1, wobei der Innengewindeabschnitt sich über zwei Umdrehungen
verjüngt.
5. Fundament (10) nach einem der vorhergehenden Ansprüche, wobei die zweiten Abschnitte
(34) der Pfahlgewindebolzenverbinder (30) einfache Abschnitte ohne Gewinde sind.
6. Fundament (10) nach einem der vorhergehenden Ansprüche, wobei die Bewehrungselemente
zusätzliche Stahlbewehrungselemente (28) umfassen, die sich im Umfang des Stahlbetonpfahls
(20) erstrecken.
7. Fundament (10) nach einem der vorhergehenden Ansprüche, wobei der Stahlbetonpfahl
(20) eine vorgefertigte Struktur ist.
8. Fundament (10) nach einem der vorhergehenden Ansprüche, wobei die zweite polygonale
Geometrie und die erste polygonale Geometrie 3-12, vorzugsweise 4 betragen.
9. Fundament (10) nach einem der vorhergehenden Ansprüche, wobei der Stahlbetonpfahl
(20) auf der Außenfläche sichtbare Markierungen zum Positionieren des ersten Endteils
(22) 0,1-1 Meter über dem Bodenniveau aufweist, wenn der Stahlbetonpfahl (20) in den
Boden gerammt wird.
10. Fundament (10) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Pfahlgewindebolzen (30) mit den Stahlbewehrungselementen (28) des Stahlbetonpfahls
(20) durch Schweißen, vorzugsweise Reibschweißen, verbunden sind.
11. Verfahren zum Herstellen eines Fundaments (10) für einen Freileitungsmast (12), Stromleitungsmast
oder dergleichen, umfassend einen Stahlbetonpfahl mit Pfahlgewindebolzenverbindern
(30):
- Bereitstellen des Stahlbetonpfahls (20), der eine längliche Struktur mit einem ersten
Endteil (22) mit einer ebenen Anlagefläche (24) einer ersten polygonalen Geometrie
und einem zweiten Endteil (26) definiert, wobei sich Stahlverstärkungselemente (28)
zwischen dem ersten Endteil (22) und dem zweiten Endteil (26) erstrecken, wobei die
Pfahlgewindebolzenverbinder (30) in den Stahlbetonpfahl (20) eingebettet sind und
jeweils einen freiliegenden Teil aufweisen, der sich über den ersten Endteil (22)
hinaus erstreckt und in einer zweiten polygonalen Geometrie positioniert und mit den
Stahlverstärkungselementen (28) des Stahlbetonpfahls (20) verbunden sind, wobei die
zweite polygonale Geometrie der ersten polygonalen Geometrie äquivalent ist,
dadurch gekennzeichnet, dass das Fundament ferner eine Anzahl von Dichtungen (40) und eine entsprechende Anzahl
von Spannmuttern (501), (502), (503), (504) umfasst;
- Bereitstellen jedes der exponierten Teile der Pfahlgewindebolzenverbinder (30) mit
einem ersten Abschnitt (32), der einen Gewindeabschnitt enthält, einem zweiten Abschnitt
(34) mit einer kreisförmigen Querschnittskonfiguration eines ersten Außendurchmessers
(36) und einem Übergangsabschnitt (38), der den ersten Abschnitt (32) und den zweiten
Abschnitt (34) verbindet,
- Bereitstellen einer ersten Schnittstelle (60), die sich zwischen dem ersten Abschnitt
(32) und dem Übergangsabschnitt (38) jedes der Pfahlgewindebolzenverbinder (30) in
einem ersten Abstand (d1) von der ebenen Anlagefläche (24) befindet,
- Bereitstellen einer zweiten Schnittstelle (62), die sich zwischen dem Übergangsabschnitt
(38) und dem zweiten Abschnitt (34) jedes der Pfahlgewindebolzenverbinder (30) in
einem zweiten Abstand (d2) von der ebenen Anlagefläche (24) befindet, wobei der erste
Abstand (d1) größer ist als der zweite Abstand (d2) ist,
- wobei jede der Dichtungen (40) eine Kreisform hat, die einen zweiten Innendurchmesser
(42) und einen zweiten Außendurchmesser (44) bildet,
- Bereitstellen der Spannmuttern (501), (502), (503), (504) mit einer ersten Endfläche
(51), einer zweiten Endfläche (52) und einer zentralen Öffnung, die einen sich verjüngenden
(55) Abschnitt an dem zweiten Oberflächenende (52) aufweist, zum Bereitstellen einer
größeren Öffnung im Vergleich zu der zentralen Öffnung (54), wobei die zentrale Öffnung
(54) ferner einen Innengewindeabschnitt an der ersten Endfläche (51), der den Gewindeabschnitt
der Pfahl-gewindebolzenverbinder (30) ergänzt, umfasst,
- wobei der zweite Innendurchmesser (42) der Dichtung (40) mit dem ersten Außendurchmesser
(44) jedes der zweiten Abschnitte (34) jedes der Pfahlgewindebolzenverbinder (30)
kongruent ist, und wobei der zweite Außendurchmesser (44) größer als der Innendurchmesser
(36) des Innengewindeteils der Spannmuttern (501), (502), (503), (504) ist,
- Drehen der Spannmuttern (501), (502), (503), (504) relativ zu dem Gewindeabschnitt
der Pfahlgewindebolzenverbinder (30), Zusammendrücken der Dichtungen (40) in Richtung
der Pfahlgewindebolzenverbinder (30), wobei der innere sich verjüngende Abschnitt
(55) der Spannmuttern und der ebenen Anlagefläche (24) eine Abdichtung relativ zu
den Pfahlgewindebolzenverbindern (30) und der ebenen Anlagefläche (24) herstellt.
12. Verfahren zum Einrichten eines Fundaments (10) nach Anspruch 11, wobei ferner die
Spannmuttern (501), (502), (503), (504) in einer vorbestimmten Spannsequenz gedreht
werden, um eine vorgespannte Verbindung zwischen den Stahlbetonpfählen (20) und dem
Freileitungsmast (12), dem Stromleitungsmast oder dergleichen bereitzustellen.
13. Verfahren zum Gießen eines Fundaments (10) nach einem der Ansprüche 1 bis 10, wobei
das Verfahren die Schritte umfasst:
- Bereitstellen einer Gießform mit zwei Formseitenwänden, einem ersten Formendteil
(74) mit Öffnungen (75), einem zweiten Formendteil (76) und einem unteren Formteil,
- Einsetzen mehrerer Antihaftelemente aus Kunststoff, Teflon oder dergleichen in die
Öffnungen (75) des ersten Formendteils (74),
- Einbringen von Stahlverstärkungselementen (28) in die Gießform und der sich zwischen
dem ersten Endteil (22) und dem zweiten Endteil (26) der Gießform erstreckenden Stahlverstärkungselemente
(28), wobei einer Anzahl von pfahlprofilierten Bolzenverbindern (30) mit den Stahlverstärkungselementen
(28) verbunden ist und es den mit Pfahlgewinden versehenen Bolzenverbindern (30) ermöglicht,
sich über das erste Formendteil (74) hinaus zu erstrecken,
- Anordnen der entsprechenden Dichtung (40) und Festziehen der Spannmuttern (501),
(502), (503), (504) an den schraubenförmigen Pfahlgewindeverbindern (30),
- Beton in die Gießform gießen,
- Gießen eines Stahlbetonpfahls (20), der eine langgestreckte Struktur mit einem ersten
Endteil (22) mit einer ebenen Anschlagfläche (24) einer ersten polygonalen Geometrie
und einem zweiten Endteil (24) definiert, wobei sich Stahlverstärkungselemente (28)
zwischen dem ersten Endteil (22) und dem zweiten Endteil (24) erstrecken, wobei die
Pfahlgewindebolzenverbinder (30) in den Stahlbetonpfahl (20) eingebettet sind und
jeweils einen freiliegenden Teil aufweisen, der sich über den ersten Endteil (22)
hinaus erstreckt und in einer zweiten polygonalen Geometrie positioniert und mit den
Stahlverstärkungselementen (28) des Stahlbetonpfahls (20) verbunden ist, wobei die
zweite polygonale Geometrie der ersten polygonalen Geometrie äquivalent ist.
14. Verfahren zum Gießen eines Fundaments (10) nach Anspruch 13, wobei das Verfahren ferner
den Schritt umfasst:
- Anordnen der Pfahl-Gewindebolzenverbinder (30) in der Gießform, um einen Stahlbetonpfahl
(20) mit einer ersten Grenzfläche (60) bereitzustellen, die zwischen dem ersten Abschnitt
(32) und dem Übergangsabschnitt (38) jedes der Pfahlgewindebolzenverbinder (30) in
einem ersten Abstand (d1) von der ebenen Anlagefläche (24) angeordnet ist, und eine
zweite Schnittstelle (62), die zwischen dem Übergangsabschnitt und dem zweiten Abschnitt
(34) jedes der Pfahlgewindebolzenverbinder (30) in einem zweiten Abstand (d2) von
der ebenen Anlagefläche (24) angeordnet ist, wobei der erste Abstand (d1) größer als
der zweite Abstand (d2) ist.
1. Fondation (10) pour un mât de ligne aérienne, un mât de ligne électrique (12) ou similaire,
comprenant un pieu en béton armé (20) incluant des connecteurs de pieu à boulon fileté
(30) :
- ledit pieu en béton armé (20) définissant une structure allongée ayant une première
partie d'extrémité (22) incluant une surface d'appui planaire (24) d'une première
géométrie polygonale et une deuxième partie d'extrémité (26), des éléments de renforcement
en acier (28) s'étendant entre ladite première partie d'extrémité (22) et ladite deuxième
partie d'extrémité (26), lesdits connecteurs de pieu à boulon fileté (30) étant incorporés
dans ledit pieu en béton armé (20) et ayant chacun une partie exposée s'étendant au-delà
de ladite première partie d'extrémité (22) et positionnés dans une deuxième géométrie
polygonale et reliés auxdits éléments de renforcement en acier (28) dudit pieu en
béton armé (20), ladite deuxième géométrie polygonale étant équivalente à ladite première
géométrie polygonale, caractérisée en ce que ladite fondation comprend en outre un certain nombre de joints (40) et un nombre
correspondant d'écrous de serrage (501), (502), (503), (504) ;
- chacune desdites parties exposées desdits connecteurs de pieu à boulon fileté (30)
ayant une première portion (32) incluant une portion filetée (33), une deuxième portion
(34) ayant une configuration de section transversale circulaire d'un premier diamètre
extérieur (36) et une portion de transition (38) interconnectant ladite première portion
(32) et ladite deuxième portion (34),
- une première interface (60) étant située entre ladite première portion (32) et ladite
portion de transition (38) de chacun desdits connecteurs de pieu à boulon fileté (30)
à une première distance (d1) de ladite surface d'appui planaire (24),
- une deuxième interface (62) étant située entre ladite portion de transition (38)
et ladite deuxième portion (34) de chacun desdits connecteurs de pieu à boulon fileté
(30) à une deuxième distance (d2) de ladite surface d'appui planaire (24), ladite
première distance d1 étant supérieure à ladite deuxième distance (d2),
- chacun desdits joints (40) ayant une forme annulaire définissant un deuxième diamètre
intérieur (42) et un deuxième diamètre extérieur (44),
- lesdits écrous de serrage (501), (502), (503), (504) ayant une première surface
d'extrémité (51), une deuxième surface d'extrémité et un orifice central (54) incluant
une portion effilée (55) au niveau de ladite deuxième extrémité de surface (52) pour
fournir une ouverture supérieure par rapport audit orifice central (54), ledit orifice
central (54) incluant en outre une portion intérieure filetée au niveau de ladite
première surface d'extrémité (51) complémentant ladite portion filetée (33) desdits
connecteurs de pieu à boulon fileté (30),
- ledit deuxième diamètre intérieur (42) dudit joint (40) étant congruent audit premier
diamètre extérieur (44) de chacune desdites deuxièmes portions (34) de chacun desdits
connecteurs de pieu à boulon fileté 30 et ledit deuxième diamètre extérieur (44) étant
supérieur audit diamètre intérieur (59) de ladite partie intérieure filetée desdits
écrous de serrage (501), (502), (503), (504),
- lesdits écrous de serrage (501), (502), (503), (504) étant configurés pour être
tournés par rapport à ladite portion filetée (33) desdits connecteurs de pieu à boulon
fileté (30) pour permettre auxdits joints (40) d'être compressés vers lesdits connecteurs
de pieu à boulon fileté (30), ladite portion effilée (55) desdits écrous de serrage
(501), (502), (503), (504) et ladite surface d'appui planaire (24) pour fournir un
scellement par rapport auxdits connecteurs de pieu à boulon fileté (30) et ladite
surface d'appui planaire (24).
2. Fondation (10) selon la revendication 1, dans laquelle lesdites portions de transition
(38) ayant des portions filetées étant effilées sur deux révolutions d'un arbre complètement
fileté à un arbre lisse non fileté.
3. Fondation (10) selon l'une quelconque des revendications précédentes, ledit orifice
central (54) desdits écrous de serrage (501), (502), (503), (504) ayant une section
intermédiaire ayant une deuxième section filetée, ladite deuxième section filetée
s'étendant entre ladite portion effilée (55) et ladite portion intérieure filetée,
ladite deuxième section filetée ayant un diamètre étant supérieur à l'angle de filetage
de ladite portion intérieure filetée.
4. Fondation (10) selon la revendication 1, dans laquelle ladite portion intérieure filetée
étant effilée sur deux révolutions.
5. Fondation (10) selon l'une quelconque des revendications précédentes, dans laquelle
lesdites deuxièmes portions (34) desdits connecteurs de pieu à boulon fileté (30)
étant des portions lisses non filetées.
6. Fondation (10) selon l'une quelconque des revendications précédentes, dans laquelle
lesdits éléments de renforcement incluant des éléments de renforcement en acier (28)
supplémentaires s'étendant sur la circonférence dudit pieu en béton armé (20).
7. Fondation (10) selon l'une quelconque des revendications précédentes, dans laquelle
ledit pieu en béton armé (20) est une structure préfabriquée.
8. Fondation (10) selon l'une quelconque des revendications précédentes, dans laquelle
ladite deuxième géométrie polygonale et ladite première géométrie polygonale étant
3-12, de préférence 4.
9. Fondation (10) selon l'une quelconque des revendications précédentes, dans laquelle
ledit pieu en béton armé (20) ayant des marquages visuels sur la surface extérieure
pour positionner ladite première partie d'extrémité (22) 0,1-1 mètres au-dessus du
sol, lorsque ledit pieu en béton armé (20) est enfoncé dans le sol.
10. Fondation (10) selon l'une quelconque des revendications précédentes, dans laquelle
lesdits connecteurs de pieu à boulon fileté (30) étant reliés auxdits éléments de
renforcement en acier (28) dudit pieu en béton armé (20) par soudage, de préférence
soudage par friction.
11. Procédé d'établissement d'une fondation (10) pour un mât de ligne aérienne (12), un
mât de ligne électrique ou similaire, comprenant un pieu en béton armé incluant des
connecteurs de pieu à boulon fileté (30) :
- fournir ledit pieu de béton armé (20) définissant une structure allongée ayant une
première partie d'extrémité (22) incluant une surface d'appui planaire (24) d'une
première géométrie polygonale et une deuxième partie d'extrémité (26), des éléments
de renforcement en acier (28) s'étendant entre ladite première partie d'extrémité
(22) et ladite deuxième partie d'extrémité (26), lesdits connecteurs de pieu à boulon
fileté (30) étant incorporés dans ledit pieu en béton armé (20) et ayant chacun une
partie exposée s'étendant au-delà de ladite première partie d'extrémité (22) et positionnés
dans une deuxième géométrie polygonale et reliés auxdits éléments de renforcement
en acier (28) dudit pieu en béton armé (20), ladite deuxième géométrie polygonale
étant équivalente à ladite première géométrie polygonale, caractérisée en ce que ladite fondation comprend en outre un certain nombre de joints (40) et un nombre
correspondant d'écrous de serrage (501), (502), (503), (504) :
- fournir chacune de ladite partie exposée desdits connecteurs de pieu à boulon fileté
(30) ayant une première portion (32) incluant une portion filetée, une deuxième portion
(34) ayant une configuration de section transversale circulaire d'un premier diamètre
extérieur (36) et une portion de transition (38) interconnectant ladite première portion
(32) et ladite deuxième portion (34),
- fournir une première interface (60) étant située entre ladite première portion (32)
et ladite portion de transition (38) de chacun desdits connecteurs de pieu à boulon
fileté (30) à une première distance d1 de ladite surface d'appui planaire (24),
- fournir une deuxième interface (62) étant située entre ladite portion de transition
(38) et ladite deuxième portion (34) de chacun desdits connecteurs de pieu à boulon
fileté (30) à une deuxième distance (d2) de ladite surface d'appui planaire (24),
ladite première distance (d1) étant supérieure à ladite deuxième distance (d2), chacun
desdits joints (40) ayant une forme annulaire formant un deuxième diamètre intérieur
(42) et un deuxième diamètre extérieur (44),
- fournir lesdits écrous de serrage (501), (502), (503), (504) ayant une première
surface d'extrémité (51), une deuxième surface d'extrémité (52) et un orifice central
incluant une portion effilée (55) au niveau de ladite deuxième extrémité de surface
(52) pour fournir une ouverture supérieure par rapport audit orifice central (54),
ledit orifice central (54) incluant en outre une portion intérieure filetée au niveau
de ladite première surface d'extrémité (51) complémentant ladite portion filetée desdits
connecteurs de pieu à boulon fileté (30),
- ledit deuxième diamètre intérieur (42) dudit joint (40) étant congruent audit premier
diamètre extérieur (44) de chacune desdites deuxièmes portions (34) de chacun desdits
connecteurs de pieu à boulon fileté (30) et ledit deuxième diamètre extérieur (44)
étant supérieur au diamètre intérieur (36) de ladite partie intérieure filetée desdits
écrous de serrage (501), (502), (503), (504),
- tourner lesdits écrous de serrage (501), (502), (503), (504) par rapport à ladite
portion filetée desdits connecteurs de pieu à boulon fileté (30), compresser lesdits
joints (40) vers lesdits connecteurs de pieu à boulon fileté (30), ladite portion
effilée (55) desdits écrous de serrage et ladite surface d'appui planaire (24) et
établir un scellement par rapport auxdits connecteurs de pieu à boulon fileté (30)
et ladite surface d'appui planaire (24).
12. Procédé d'établissement d'une fondation (10) selon la revendication 11 tournant en
outre lesdits écrous de serrage (501), (502), (503), (504) dans une séquence de serrage
prédéterminée fournissant une connexion précontrainte entre ledit pieu en béton armé
(20) et le mât de ligne aérienne (12), mât de ligne électrique ou similaire.
13. Procédé pour couler une fondation (10) telle que revendiquée dans l'une quelconque
des revendications 1-10, dans lequel ledit procédé comprend les étapes de :
- fournir un moule de coulée ayant deux parois latérales de moule, une première partie
d'extrémité de moule (74) incluant des orifices (75), une deuxième partie d'extrémité
de moule (76) et une partie de fond de moule,
- insérer un certain nombre d'éléments anti-adhérents faits d'un matériau synthétique,
Téflon ou similaire, dans les orifices (75) de la première partie d'extrémité de moule
(74),
- positionner les éléments de renforcement en acier (28) dans le moule de coulée et
lesdits éléments de renforcement en acier (28) s'étendant entre ladite première partie
d'extrémité (22) et ladite deuxième partie d'extrémité (26) du moule de coulée, un
certain nombre de connecteurs de pieu à boulon fileté (30) étant reliés auxdits éléments
de renforcement en acier (28) et permettre auxdits connecteurs de pieu à boulon fileté
(30) de s'étendre au-delà de ladite première partie d'extrémité de moule (74),
- positionner un joint (40) correspondant et un écrou de serrage (501), (502), (503),
(504) correspondant auxdits connecteurs de pieu à boulon fileté (30),
- déverser du béton dans le moule de coulée.
- couler un pieu en béton armé (20) définissant une structure allongée ayant une première
partie d'extrémité (22) incluant une surface d'appui planaire (24) d'une première
géométrie polygonale et une deuxième partie d'extrémité (24), des éléments de renforcement
en acier (28) s'étendant entre ladite première partie d'extrémité (22) et ladite deuxième
partie d'extrémité (24), lesdits connecteurs de pieu à boulon fileté (30) étant incorporés
dans ledit pieu en béton armé (20) et ayant chacun une partie exposée s'étendant au-delà
de ladite première partie d'extrémité (22) et positionnés dans une deuxième géométrie
polygonale et reliés auxdits éléments de renforcement en acier (28) dudit pieu en
béton armé (20), ladite deuxième géométrie polygonale étant équivalente à ladite première
géométrie polygonale.
14. Procédé pour couler une fondation (10) selon la revendication 13, dans equel ledit
procédé comprenant en outre les étapes de :
- disposer lesdits connecteurs de pieu à boulon fileté (30) dans le moule de coulée
pour fournir un pieu en béton armé (20) ayant une première interface (60) étant située
entre ladite première portion (32) et ladite portion de transition (38) de chacun
desdits connecteurs de pieu à boulon fileté (30) à une première distance (d1) de ladite
surface d'appui planaire (24), et une deuxième surface (62) étant située entre ladite
portion de transition et ladite deuxième portion (34) de chacun desdits connecteurs
de pieu à boulon fileté (30) à une deuxième distance (d2) de ladite surface d'appui
planaire (24), ladite première distance (d1) étant supérieure à ladite deuxième distance
(d2).