Background of the invention
[0001] The invention concerns a method for vital coupling (in particular coupling which
complies with SIL4) of a first protection system and a second protection system for
railway traffic on a railway track wherein the first protection system is a route-based
protection system and comprises a route capable interlocking and wherein the second
protection system is incompatible with the first protection system, wherein the railway
track comprises block protected track sections and/or route protected track sections,
wherein each track section can assume several states, the states of the block protected
track sections being represented by line block sections and the states of the route
protected track sections being represented by route sections.
[0002] A method for coupling of a route-based protection system and a block-based protection
system is known from existing interlocking and line bock systems, e.g. ESTW Simis
W/D, ESTW L90/L90 5, ESTW EBILOCK 950, central block system EB L2000, block system
NSI-63/NSB-87, SbL60, RbII60.
[0003] Train movements can be protected by using route-based protection or block-based protection
technology. Adaptation between a route-based protection system and a block-based protection
system (mostly at the gateways to/from a station to a line) is complex because of
the different approaches of protecting train movements which are used in the different
protection systems.
[0004] The known ESTW L90/L 90 5 interlocking system for example is a route-based protection
system. It can be coupled to a legacy block-based protection system via a line interface,
which is the last element of an outgoing route of the route-based interlocking system.
As disclosed in [1] - [5] the physical adaptation of the route-based protection system
to the block-based protection system is done at a block interface element, wherein
a line interface element and the block interface element are positioned in a serial
order. A disadvantage of this kind of coupling is that the outgoing route (from a
station to a line) has to be adapted every time to a specific version of the block
interface element and the legacy block-based protection system which has to be adapted.
[0005] Further a relays/electronical-based adaption of ESTW L90/L90 5 interlocking system
(which is a route-based protection system) to the centralized EB L2000/ZbS600 block-adapted
protection system is known from [4] and [7]. Adaption elements of ESTW L90 and adaption
elements of EB L2000/ZbS600 work together in a serial order and also require specific
adaptions.
[0006] From [6] it is known to provide special adaption groups (block adaption, block group
station) in order to adapt ESTW L90 to the automatic working block-based protection
system SbL60. The adaption groups are working together in a serial order.
[0007] The known adaption methods for coupling a route-based protection system and a block-based
protection system define special outgoing and incoming routes which are specific to
the requested external block-based protection system to which the route-based protection
system is to be adapted, thus in each case individual settings are required.
Object of the invention
[0008] It is therefore an object of the invention to suggest a method for vital coupling
of a route-based protection system and a second protection system, which is incompatible
to the first protection system without applying specific adaptions of the protection
systems.
Description of the invention
[0009] This object is solved by a method according to claim 1 and a train movement protection
system according to claim 7.
[0010] According to the invention at least one route section and at least one line block
section is provided for a transition section. The route section is provided by means
of a block adaption device. The line block section is provided by means of the block
based protection system or can be simulated by means of the block adaption device
(e.g. in case of an interface-point directly at the second interlocking). The block
adaption device communicates with the route-capable interlocking (in particular an
electronic interlocking) and with the second protection system.
[0011] The route-based first protection system and the (in particular block-based) second
protection system are part of a train movement protection system. The second interlocking
can be a block-based interlocking or a legacy route based interlocking.
[0012] The inventive method can be used for a railway track, which is limited by the route
capable first interlocking and the second interlocking. The railway track comprises
a multitude of track sections, in particular block protected track sections and route
protected track sections. The block protected track sections as well as the route
protected track sections are arranged in sequence.
[0013] In general, the track comprises not only block-protected track sections but also
route-protected track sections, which can assume different states.
The states of the route sections and line block sections can be changed (manipulated)
during operation.
[0014] Route protected track sections are secured by means of the route-based protection
system, which sets the state of the specific track section. Information concerning
the state of a route protected track section is provided in form of (represented by)
a route section. A route section comprises route section information (incl. the information
concerning the state of the respective track section, e.g. "free" or "occupied" and
information concerning the direction of a set route for this track section). A route
comprises one or more route sections, i.e. concerns one or more track sections.
[0015] Block protected track sections are secured by means of the block based protection
system, which sets the state of the specific track section. Information concerning
the state of a block protected track section is provided in form of (represented by)
a line block section. A line block section comprises line block section information
(incl. information concerning the state of the respective track section, e.g. "not
blocked" or "blocked" and information concerning the direction of the overall line
for this track section). A line block comprises one or more line block sections, i.e.
concerns one or more track sections.
[0016] The block protected track section which is adjacent to the route protected track
sections is called "transition section", since the protection system changes from
block based protection to route based protection or vice versa. The transition section
is block-protected by means of the second protection system. In case the block adaption
device is located adjacent to the station of the second interlocking the transition
section is a block protected track section of length 0.
[0017] The inventive block adaption device represents a functional connection between the
second interlocking and the route-capable first interlocking. Therefore, route sections
for the transition section are stored in the block adaption device. For the same transition
section line block sections are provided. Thus, the transition section is a track
section, which is secured by means of the route-incapable interlocking and the block
adaption device, which communicates with the block based protection system as well
as with the route-capable first interlocking. The transition section (and thus the
border between block based protection and route based protection) may be located anywhere
along the railway track. The location of the transition section can be defined according
to existing equipment, topology and/or customer wishes and is independent from the
location of the equipment (e.g. at the start station just behind the respective interlocking,
at the destination station just before the respective interlocking or somewhere else
along the track).
[0018] In contrast to the state of the art, the inventive method provides at least one route
section for the transition section as well as a line block section for the same transition
section. Thereby two securing principles (block based protection and route based protection)
are associated with the transition section at the same time, thereby providing a "parallelization"
of route section and line block section for the transition section. Information concerning
protection of train movement at the transition section will be transformed/translated
from route based train movement protection principles to block-based train movement
protection principles or the other way around (depending on the direction of movement)
by means of the block adaption device. The block adaption device thereby serves as
an interlocking "emulator".
[0019] Thus, according to the invention route section information and line block section
information concerning the transition section are coupled by parallelization of logical
views at the transition section from perspective of the route-based protection system
and of the block-based protection system.
[0020] The inventive method allows a route-based coupling between the interlocking of the
route-based protection system and the block adaption device while using a standardized
interface for coupling external train moving protection systems.
Preferred Variants
[0021] In a preferred variant, the block adaption device receives line block section information
concerning the transition section from the second protection system. Line block section
information are transmitted from the second protection system to the block adaption
device, in particular continuously or event-driven.
[0022] For securing a railbound vehicle from the second protection system to the route-based
first protection system (safe movement in direction towards route based protected
track sections) it is preferred that the block adaption device sends a route request
to the route-capable interlocking if, preferably only if, the line block section information
received by the block adaption devices has changed. The route request is send to the
route-capable first interlocking in order to receive a route for the route-based protected
track sections to be used for movement of the railbound vehicle.
[0023] For securing a railbound vehicle from the route-based first protection system to
the second protection system, the block adaption device receives a route request from
the route-capable interlocking.
[0024] In other words: Route requests are exchanged between the route-based first protection
system and the block adaption device. The block adaption device thereby enables a
route-route-coupling of the route-based protection system and the second protection
system along the transition section.
[0025] For train movement from second protection system to route based first protection
system the block adaption device can set the state of the line block section of the
transition section in dependence of the route request received from the route based
protection system in case the block section information does not comply with the route
request. I. e. the line block section information is manipulated by changing the state
of the line block section such that the manipulated line block section information
complies with the route request.
[0026] In a preferred variant for train movement from route based first protection system
to second protection system the block adaption sets the state of the route section
provided by the block adaption device in dependence of the received line block section
information. Therefore, the block adaption device checks whether the conditions required
for the route section provided by the block adaption device are met.
[0027] The invention also concerns a train movement protection system for securing railbound
vehicles on a railway track, the train movement protection system comprising a route-based
first protection system with a route-capable interlocking, in particular an electronic
interlocking and a second protection system, which is incompatible with the first
protection system. The inventive train movement protection system is characterized
in that the train movement protection system further comprises a block adaption device
with a standardized interface via which the second protection system is connected
to the route-based first protection system. I.e. the block adaption device is (electrically)
located between the second protection system and the route-based first protection
system.
[0028] According to the invention, the block adaption device is adapted
o to provide at least one route section for a transition section;
o to receive information (in particular block section information and route requests)
from the second protection system and the route-based first protection system and
to transmit information (in particular route requests) to the second protection system
and the route-based first protection system;
o to set the state of the at least one route section or the at least one line block
section (10'); and
[0029] The route-capable interlocking of the route-based first protection system is adapted/connected
to the second protection system via the block adaption device. The block adaption
device handles the adaption autarkicly by using both railway protection principles:
route based protection principles and block-based protection principles, i.e. the
block adaption device is adapted to process data according to route-based technology
and data according to block-based technology. Thus, a line block section as well as
a route section can be provided for the transition section in parallel with the inventive
train movement protection system.
[0030] This has the effect that the first interlocking of the route-based first protection
system does not need to be adapted to the specific block-based protection system.
This involves a simplification for the route-capable first interlocking of the route-based
protection system, since no line block technical, operational, safety specific stuff
is required.
[0031] According to the invention, the block adaption device is adapted to carry out a transformation
between route section information and line block section information. For doing this,
the block adaption device sets the state of the route section of the transition section
and/or the line block section according to the received route request.
[0032] In a preferred embodiment the block adaption device comprises a driver device which
is adapted to set the state of the at least one route section in dependence of the
line block section information received from the second protection system. The driver
device is further adapted to set the state of the line block section of the transition
section in dependence of the route request received from the route-capable interlocking
in case the block section information does not comply with the route request.
[0033] In a special embodiment, the second protection system comprises block groups, which
are connected to a route incapable second interlocking, the block groups being adapted
for transmission of block information (e.g. direction of train movement, blocking
information, signaling information).
[0034] In an alternative embodiment the block-based protection system comprises an adaption
groups line interface (Blockanpassgruppe) which is part of a second interlocking,
the adaption groups line interface being adapted for transmission of block information.
[0035] In a highly preferred embodiment of the train protection system, the standardized
interface is an SCI-ILS interface.
It is preferred that the train movement protection system is adapted to carry out
the method described before.
[0036] Further advantages can be extracted from the description and the enclosed drawing.
The features mentioned above and below can be used in accordance with the invention
either individually or collectively in any combination. The embodiments mentioned
are not to be understood as exhaustive enumeration but rather have exemplary character
for the description of the invention.
Drawings
[0037] The invention is shown in the drawing.
- Fig. 1a
- shows a schematic depiction of a train movement protection system according to the
invention with an interface between block based protection system and route base d
protection system situated near the route capable first interlocking of the route
based protection system (variant 1).
- Fig. 1b
- shows a schematic depiction of the train movement protection system of Fig. 1a in
which parallelization of route section and line block section within the block adaption
device is shown.
- Fig. 2
- shows a schematic depiction of a train movement protection system according to the
invention with an interface between block based protection system and route base d
protection system situated near the second interlocking of the block based protection
system (variant 2).
- Fig. 3
- shows a detailed flow chart with the method steps of a method according to the invention
for a train moving from a route-based protection system to a block-based protection
system.
- Fig. 4
- shows a detailed flow chart with the method steps of a method according to the invention
for a train moving from a block-based protection system to a route-based protection
system.
[0038] In
Fig. 1a,
1b, 2 a track
1 is shown comprising track sections
TS1, TS2, TS1',
TS2', TS3'. The track 1 is limited by a route-capable interlocking
2 of a route-based protection system
3 and a second (legacy) interlocking
4 which communicates with a block-based protection system
5.
[0039] The block-based protection system 5 further comprises block groups
6 for processing block information and for transmitting block section information.
The block groups 6 can be set up as external devices, as shown in Fig. 1, 2 or can
be integrated in the second interlocking 4 as an adaption groups line interface, if
the second interlocking is a route based interlocking
[0040] According to the invention, a block adaption device
7 is provided which connects the route-based protection system 3 and the block-based
protection system 5. The block adaption device 7 is connected to the route-capable
interlocking 2 via a standardized interface
8 and to the block-based protection system 5 via in/out-interface
9.
[0041] In the embodiment shown in
Fig. 1 track sections TS1, TS2 are block protected by means of the block-based protection
system 5. The block-based protection of the track 1 ends at an interface-point
S. The interface-point S is located directly at the border of route-capable interlocking
2 and track section TS1. Yet, this is not mandatory. In fact, between route-capable
interlocking 2 and interface-point S route-based protected track sections can be present.
[0042] For each block protected track section TS1, TS2 a line block section
10, 11 is generated by means of the block-based protection system 5, the line block sections
10, 11 comprising block section information for the respective track sections TS1,
TS2.
[0043] Track section TS1, which is adjacent to the route-based protection system 3, is called
"transition section". The line block section 10 (comprising line block section information
for the transition section TS1) which has been generated by the block-based protection
system 5 is fed to the block adaption device 7 via the in/out-interface 9. According
to the invention, the block adaption device 7 additionally provides a route section
12 for the transition section TS1, wherein the route section 12 is generated by means
of a driver device
13 of the block adaption device 7. In a special embodiment the block adaption device
may comprise two driver devices for supporting different legacy protection systems.
Thus, for the transition section TS1 both, a line block section 10 as well as a route
section 12, are provided in parallel, thereby enabling transition from block-based
protection to route-based protection and vice versa over the whole transition section
TS1. Therewith a vital coupling of different movement technologies is provided. This
is schematically depicted in
Fig. 1b. The route section 12 can adopt different states. According to the invention, the
state of the transition section TS1 is set by the block adaption device 7. By setting
the state of the route section 12, block section information is translated into route
section information and vice versa.
[0044] In the embodiment shown in
Fig. 2 the track sections
TS1', TS2' are route protected by means of the route-based protection system 3. The route-based
protection of the track 1 ends at an interface-point
S'. The interface-point S' is located directly at the border of second interlocking 2
and track section TS2'.
[0045] Here, the transition section
TS3', which is adjacent to the route-based protection system 3 and within which the train
is transferred from route based protection to block based protection and vice versa
has the length 0 and is located at interface S'.
[0046] Route section
12' (comprising route section information for the transition section TS3') is provided
by means of the block adaption device 7. Line block section
11' for transition section TS3' is either generated by means of the block based protection
system or can be provided by means of the driver device
13 of the block adaption device 7. Thus, for the transition section TS3' both, a line
block section 11' as well as a route section 12' are provided in parallel, thereby
enabling transition from block-based protection to route-based protection and vice
versa within the transition section TS3'. Therewith, a vital coupling of different
movement technologies can be realized.
[0047] Fig. 3 and
Fig. 4 show the different steps for train movement protection for train movement from route-based
protection system 3 to block-based protection system 5 (Fig. 3) and vice versa (Fig.
4).
[0048] In case of an intended train movement from the route-based protection system 3 to
the block based protection system 5 (Fig. 3), the block adaption device 7 is interacting
in the following way to transit the train from the route-based protection system 3
to the block based protection system 5:
- 1. Block adaption device 7 receives block section information concerning line block
section 10, 11' from block-based protection system 5 (Check_1).
- 2. The route capable interlocking 2 sends a route request to the block adaption device
7, thereby requesting to set a route from interface-point S into the transition section
TS1, TS3' (Req_1).
- 3. The block adaption device 7 checks by means of driver 13 the compliance of the
block section information received from the block groups 6 with the requested route
from interface-point S into the transition section TS1, TS3' (Comp_1).
- 4. In case of an positive compliance, block adaption device 7:
- a. sets the state of line block section 10, 11' to state "blocked" (Block_1),
- b. sets the state (determination) of the route section 12, 12' to state "locked" (Set_1),
and
- c. reports a locked route section 12, 12' from interface-point S into transition section
TS1, TS3' to the route capable interlocking 2 (Report_1).
- 5. If the route capable interlocking 2 can set a route to interface-point S too, it
is now allowed to open an outgoing traffic signal, for starting the train run.
- 6. As soon as the train occupies transition section TS1, TS3', driver 13 of the block
adaption device 7:
- a. sets the state of line block section 10, 11' to "occupied" (Block_2), and
- b. reports state information concerning line block section 10, 11' to 2 (Report_5).
- 7. As soon as the train has completely left the route based protection system 2 (in
Fig. 1a the station) the block adaption device 7:
- a. receives information about clearance and sets the state "unlocked" for the route
section of the outgoing track section, i.e. the track section preceding the transition
section TS1, TS3' outgoing from route capable interlocking 2 (Report_3), and
- b. stores the information that the outgoing route section of the track section preceding
the transition section TS1, TS3' is set to state "unlocked" (Set_3).
- 8. As soon as the train left the transition section TS1, TS3' completely, block adaption
device 7:
- a. removes the state "occupied" from line block section 10, 11' (set state "unblocked")
(Block_3), and
- b. reports clearance of transition section TS1, TS3' to the route capable interlocking
2 (Report_6).
- 9. Further, block adaption device 7 verifies via block section information, that block
section 10, 11' is in state "unblocked"(Check_2) and checks the compliance of determination
of route at 12 to state "unlocked" - Comp_2.
In case of a positive compliance the block adaption device 7:
- a. sets the state of the route section 12, 12' to "unlocked" (Set_2) and
- b. reports the unlocked state for the route section 12, 12' to route capable interlocking
2 (Report_3).
- 10. Now the procedure for a new train run can be started.
[0049] In case of an intended train movement from the block-based protection system 5 to
the route-based protection system 3 (Fig. 4), the block adaption device 7 is interacting
in the following way to transit the train from the block-based protection system 5
to the route-based protection system 3:
- 1. The block-based protection system 5 sets the state of block section 10, 11' to
state "blocked". The block adaption device 7 receives block section information concerning
information (in particular state information) concerning line block section 10, 11'
from block-based protection system 5 (Check_1).
- 2. Block adaption device 7 is checks by means of driver 13 the compliance of the block
section information received from the block groups 6 with the state of the route section
12, 12' for a route from transition section TS1, TS3' to interface-point S (Comp_1).
- 3. In case of an positive compliance, block adaption device 7:
- a. sets the state of the route section 12, 12' with direction from transition section
TS1, TS3' to interface-point S to state "locked" (Set_1)
- b. sends a route request for entrance route (from interface-point S into route capable
interlocking 2) to the route capable interlocking 2 (Request 1).
- 4. As soon as the route section of an entrance route (from interface-point S into
route capable interlocking 2) is in state "locked", an according report is transmitted
to block adaption device 7 - Report_2.
- 5. As soon as the train:
- a. occupies track sections behind interface-point S (Report_6) and
- b. completely leaves transition section TS1, TS3' in direction to the route capable
interlocking 2,
the driver 13 of the block adaption device 7 sets the state of the route section 12
to state "unlocked" (Set_2), then sends an according report to the route capable interlocking
2 (Report_4) and sets the state of line block section 10, 11' at the block based protection
system 5 to "unblocked" (Block_1). Now a new train run into transition section TS1,
TS3' is possible.
- 6. As soon as the state of the entrance route is set to "unlocked", this is reported
to block adaption device 7 (Report_5). Now a new train run from transition section
TS1, TS3' to the route based protection system 2 is possible.
List of Reference Signs
[0050]
- 1
- track
- 2
- route-capable interlocking
- 3
- route-based protection system
- 4
- different route-based protection system
- 5
- block-based protection system
- 6
- block groups/adaption groups line interface
- 7
- block adaption device
- 8
- standardized interface
- 9
- in/out-interface
- 10
- line block section for transition section
- 11
- line block section for block protected track section
- 11'
- line block section for transition section
- 12, 12'
- route section for transition section
- 13
- driver device of block adaption device
- 14
- route section for transition section
- TS1
- block-protected track section (transition section)
- TS1'
- route protected track section
- TS2
- block-protected track section
- TS2'
- route protected track section
- TS3'
- transition section of length 0
- S
- interface-point of block-based protection
References
[0051]
- [1] Becker, B. (2010, 08 04). Detailed Design Document (DDD) Line Interface (LI) of ESTW
L90 5.
- [2] Günther, P. (1963). Reilais- und Selbstblockanlagen Teil II Selbstblockanlagen. (H.
d. Bundesbahn, Ed.) Starnberg: Josef Keller Verlag.
- [3] Günther, P. (1965). Relaisblockanlagen Teil I. (H. d. Bundesbahn, Hrsg.) Starnberg:
Josef Keller Verlag.
- [4] Haug, T. (2016, 02 01). Firmenneutrale Zentralblock-Schnittstelle.
- [5] Maschek, U. (2013). Sicherung des Schienenverkehrs (ISBN 978-3-8348-2653-4) (2. ed.).
Wiesbaden: Springer Fachmedien Wiesbaden.
- [6] Natterer, R. (1997, 03 11). ESTW L90 Blockanpassungsgruppe.
- [7] Schmal, A. (2009, 12 09). Schnittstelle L90 (EAM) / EB L2000.
1. Method for vital coupling of a first protection system (3) and a second protection
system (5) for railway traffic on a railway track (1) wherein the first protection
system (3) is a route-based protection system and comprises a route capable interlocking
(2) and wherein the second protection system (5) is incompatible with the first protection
system,
wherein the railway track (1) comprises block protected track sections (TS1, TS2)
and/or route protected track sections (TS1', TS2'), wherein each track section (TS1,
TS2, TS1', TS2') can assume several states, the states of the block protected track
sections (TS1, TS2) being represented by line block sections (10, 11) and the states
of the route protected track sections being represented by route sections;
characterized in
that a block adaption device (7) provides at least one route section (12, 12') for a transition
section (TS1, TS3'),
that at least one line block section (11, 11') is provided for the transition section,
and
that the block adaption device (7) communicates with the route-capable interlocking (2)
and with the second protection system at an interface (S, S').
2. Method according to claim 1, characterized in that the block adaption device receives (7) line block section information concerning
the transition section (TS1, TS3') from the second protection system (5).
3. Method according to claim 2, characterized in that for securing a railbound vehicle from the second protection system (5) to the route-based
first protection system (3) the block adaption device (7) sends a route request to
the route-capable interlocking (2) if, preferably only if, the line block section
information received by the block adaption device (7) has changed.
4. Method according to claim 2 or 3, characterized in that for securing a railbound vehicle from the route-based first protection system (3)
to the second protection system (5) the block adaption device (7) receives a route
request from the route-capable interlocking (2).
5. Method according to claim 4, characterized in that that for train movement from second protection system (5) to route based first protection
system (3) the block adaption device (7) sets the state of the line block section
of the transition section (TS1, TS3') in dependence of the route request received
from the route-capable interlocking (2) in case the block section information does
not comply with the route request.
6. Method according to any one of the claims 2 through 5, characterized in that for train movement from route based first protection system (3) to second protection
system (5) the block adaption device (7) sets the state of the route section (12,
12') provided by the block adaption device (7) in dependence of the received line
block section information.
7. Train movement protection system for securing railbound vehicles on a railway track
(1), the train movement protection system comprising a route-based first protection
system (3) with a route-capable interlocking (2), in particular an electronic interlocking
and a second protection system (5) which is incompatible with the first protection
system (3),
characterized in
that the train movement protection system further comprises a block adaption device (7)
with a standardized interface (8) via which the second protection system (5) is connected
to the first protection system (3); wherein the block adaption device (7) is adapted
o to provide at least one route section (12) for a transition section(TS1, TS3');
o to receive information from and to transmit information to the second protection
system (5) and the first protection system (3);
o to set the state of the at least one route section (12) or the at least one line
block section (10').
8. Train movement protection system according to claim 7, characterized in that the block adaption device (7) comprises a driver device (13) which is adapted to
set the state of the at least one route section in dependence of the line block section
information received from the second protection system (5) and is adapted to set the
state of the line block section (10, 11') of the transition section (TS1, TS3') in
dependence of the route request received from the route-capable interlocking (2) in
case the block section information does not comply with the route request.
9. Train movement protection system according to claim 7 or 8, characterized in that the second protection system (5) comprises block groups (6) which are connected to
a route incapable second interlocking (4), the block groups (6) being adapted for
transmission of information.
10. Train movement protection system according to according to claim 7 or 8, characterized in that that the block-based protection system (5) comprises a adaption groups line interface
(6) which is part of the second interlocking (4), the adaption groups line interface
(6) being adapted for transmission of line block section information.
11. Train movement protection system according to any one of the claims 7 through 10,
characterized in that the standardized interface (8) is an SCI-IL interface.
12. Train movement protection system according to any one of the claims 7 through 11,
characterized in that the train protection system is adapted to carry out the method according to one of
the claims 1 through 6.