(19)
(11) EP 3 497 984 B8

(12) CORRECTED EUROPEAN PATENT SPECIFICATION
Note: Bibliography reflects the latest situation

(15) Correction information:
Corrected version no 1 (W1 B1)

(48) Corrigendum issued on:
05.10.2022 Bulletin 2022/40

(45) Mention of the grant of the patent:
03.08.2022 Bulletin 2022/31

(21) Application number: 17781171.8

(22) Date of filing: 27.07.2017
(51) International Patent Classification (IPC): 
H04W 52/14(2009.01)
H04W 52/28(2009.01)
H04W 72/04(2009.01)
H04B 7/0452(2017.01)
H04W 52/24(2009.01)
(52) Cooperative Patent Classification (CPC):
H04B 7/0452; H04W 52/143; H04W 52/242; H04W 52/243; H04W 52/283
(86) International application number:
PCT/IB2017/001211
(87) International publication number:
WO 2018/029541 (15.02.2018 Gazette 2018/07)

(54)

COMMUNICATION METHOD, NETWORK DEVICE AND TERMINAL DEVICE

KOMMUNIKATIONSVERFAHREN, NETZWERKVORRICHTUNG UND ENDGERÄTEVORRICHTUNG

PROCÉDÉ DE COMMUNICATION, DISPOSITIF DE RÉSEAU ET DISPOSITIF TERMINAL


(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

(30) Priority: 09.08.2016 CN 201610647599

(43) Date of publication of application:
19.06.2019 Bulletin 2019/25

(73) Proprietors:
  • Alcatel Lucent
    91620 Nozay (FR)
  • Nokia Solutions and Networks Oy
    02610 Espoo (FI)

(72) Inventors:
  • WU, Zhuo
    Shanghai 201206 (CN)
  • WANG, Jun
    Shanghai 201206 (CN)
  • SHEN, Gang
    Shanghai 201206 (CN)
  • SCHOBER, Karol
    00440 Helsinki (FI)

(74) Representative: DREISS Patentanwälte PartG mbB 
Postfach 10 37 62
70032 Stuttgart
70032 Stuttgart (DE)


(56) References cited: : 
EP-A1- 3 386 243
   
  • "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on Downlink Multiuser Superposition Transmission (MUST) for LTE (Release 13)", 3GPP STANDARD; 3GPP TR 36.859, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. V13.0.0, 8 January 2016 (2016-01-08), pages 1-48, XP051294865, [retrieved on 2016-01-08]
  • "Considerations of Efficient Control Signaling for MUST", 3GPP DRAFT; R1-162562, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE , vol. RAN WG1, no. Busan, Korea; 20160411 - 20160415 1 April 2016 (2016-04-01), XP051079621, Retrieved from the Internet: URL:http://www.3gpp.org/ftp/tsg_ran/WG1_RL 1/TSGR1_84b/Docs/ [retrieved on 2016-04-01]
  • ASUSTEK: "Discussion on Downlink Control Signaling for MUST", 3GPP DRAFT; R1-157239, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE , vol. RAN WG1, no. Anaheim, USA; 20151116 - 20151120 15 November 2015 (2015-11-15), XP051003460, Retrieved from the Internet: URL:http://www.3gpp.org/ftp/Meetings_3GPP_ SYNC/RAN1/Docs/ [retrieved on 2015-11-15]
   
Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention).