BACKGROUND OF THE INVENTION
1. Field of the Invention
[0001] The present invention relates to a yarn winding machine and a method of operating
the yarn winding machine.
2. Description of the Related Art
[0002] As a technique related to a conventional yarn winding machine, for example, Japanese
Unexamined Patent Publication No.
2017-002415 describes an automatic winder including a plurality of winder units (winding units)
adapted to wind a yarn from a yarn supplying bobbin formed with a spinning machine
to form a package.
[0003] Each of the plurality of winding units is not necessarily limited to operating in
the same manner, and it was found that each operation amount of the plurality of winding
units varies among the winding units. Thus, in the yarn winding machine described
above, when performing maintenance on the plurality of winding units all at once (all
together), the plurality of winding units sometimes includes a winding unit that operates
in excess of a defined limit operation amount. In this case, the function of the winding
unit becomes difficult to sufficiently be exhibited, the quality and part performance
may lower, and the reliability may lower.
BRIEF SUMMARY OF THE INVENTION
[0004] It is an object of the present invention to provide a yarn winding machine and a
method of operating the yarn winding machine capable of further enhancing the reliability.
[0005] A yarn winding machine according to the present invention includes a plurality of
winding units adapted to wind a yarn to form a package; a storage section adapted
to store information relating to an operation amount from a last predetermined maintenance
targeting on the plurality of winding units has been performed for each of the plurality
of winding units; and a control section adapted to control at least either of startup
and stop of the plurality of winding units based on the information stored in the
storage section.
[0006] In such a yarn winding machine, at least either of startup and stop of the plurality
of winding units is controlled based on the information relating to an operation amount
from the last predetermined maintenance had been performed immediately before (previously).
Thus, the plurality of winding units can be controlled so that a winding unit operating
in excess of the limit operation amount does not exist when performing the next predetermined
maintenance. As a result, the lowering of the quality and part performance can be
suppressed, and the reliability can be further enhanced.
[0007] In the yarn winding machine according to the present invention, the operation amount
may include at least one of an operation time and a number of operations. In this
configuration, at least either of the startup and the stop of the plurality of winding
units can be controlled using the information on at least either of the operation
time and the number of operations of the winding unit.
[0008] In the yarn winding machine according to the present invention, the control section
may control at least either of the startup and the stop of the plurality of winding
units so that the operation amounts of the plurality of winding units are equalized
(averaged). In such a configuration, when performing the predetermined maintenance,
not only a winding unit operating in excess of the limit operation amount but also
a winding unit having excessive margin until the limit operation amount can be avoided.
The lowering in the quality and the part performance can be avoided, and the excessive
maintenance can be reduced. The usage period of the part can be extended by extending
the period of maintenance.
[0009] In the yarn winding machine according to the present invention, the control section
may execute a first control of starting up the plurality of winding units in an order
of small operation amount. The operation amounts of the plurality of winding units
can be equalized by executing the first control.
[0010] In the yarn winding machine according to the present invention, the control section
may execute a second control of temporarily stopping some winding units having a large
operation amount of the plurality of winding units. The operation amounts of the plurality
of winding units can be equalized by executing the second control.
[0011] In the yarn winding machine according to the present invention, the winding unit
may be a winder unit adapted to wind the yarn from a yarn supplying bobbin transferred
from a spinning machine by way of a bobbin transferring device to form the package;
and the control section may calculate a spinning waiting time of the plurality of
winder units based on operation information of the spinning machine, and execute the
second control when the spinning waiting time is greater than or equal to a predetermined
time. In this case, the operation amounts of the plurality of winding units can be
equalized using the spinning waiting time.
[0012] In the yarn winding machine according to the present invention, the predetermined
maintenance is a maintenance performed at a same timing among the plurality of winding
units; and the predetermined maintenance may include at least one of a regular maintenance
that is repeatedly performed periodically and an irregular maintenance that is performed
at a time of occurrence of abnormality or at a time of predicting abnormality.
[0013] In the yarn winding machine according to the present invention, the winding unit
may include a cradle adapted to support the package; and the maintenance may include
at least one of lubrication, cleaning, and part replacement of the cradle. In the
maintenance of long performing interval, sufficient margin is often taken into consideration
until the limit operation amount, and even if each operation amount of the plurality
of winding units varies, a winding unit operating in excess of the limit operation
amount is less likely to exist. In the maintenance of short performing interval, on
the other hand, there is a high possibility that a winding unit operating in excess
of the limit operation amount exists for opposite reasons from the maintenance of
long performing interval. With regards to this, when the predetermined maintenance
includes at least one of lubrication, cleaning, and part replacement of the cradle,
the operation effect in that the reliability can be enhanced is effective as the performing
interval is relatively short.
[0014] In the yarn winding machine according to the present invention, the winding unit
may include a yarn joining device adapted to carry out a yarn joining process; and
the predetermined maintenance may include at least one of lubrication and cleaning
of the yarn joining device. When the predetermined maintenance includes lubrication
and cleaning in the yarn joining device, the operation effect in that the reliability
can be enhanced is effective as the performing interval is relatively short.
A method of operating a yarn winding machine according to the invention comprises:
a plurality of winding units winding a yarn to form a package; and the following steps:
- storing information relating to an operation amount from when a last predetermined
maintenance targeting on the plurality of winding units had been performed immediately
before for each of the plurality of winding units; and
- controlling at least either of startup and stop of the plurality of winding units
based on the information stored in the storage section.
[0015] In the method according to the invention, the operation amount may include at least
either of an operation time and a number of operations.
[0016] The method according to the invention may comprise controlling at least either of
the startup and the stop of the plurality of winding units so that the operation amounts
of the plurality of winding units are equalized.
[0017] The method according to the invention may comprise executing a first control of starting
up the plurality of winding units in an order of small operation amount.
[0018] The method according to the invention may comprise executing a second control of
temporarily stopping some winding units having a large operation amount of the plurality
of winding units.
[0019] In the method according to the invention, the winding unit may be a winder unit winding
the yarn from a yarn supplying bobbin transferred from a spinning machine by way of
a bobbin transferring device to form the package; with the step of
calculating a spinning waiting time of the plurality of winder units based on operation
information of the spinning machine, and executing the second control when the spinning
waiting time is greater than or equal to a predetermined time.
[0020] In the method according to the invention, the predetermined maintenance may be a
maintenance performed at a same timing among the plurality of winding units; and
the predetermined maintenance may include at least one of a regular maintenance that
is repeatedly performed periodically and an irregular maintenance that is performed
at a time of occurrence of abnormality or at a time of predicting abnormality.
[0021] In the method according to the invention, the winding unit may include a cradle adapted
to support the package; and
the predetermined maintenance may include at least one of lubrication, cleaning, and
part replacement of the cradle.
[0022] In the method according to the invention, the winding unit may include a yarn joining
device adapted to carry out a yarn joining process; and
the predetermined maintenance may include at least one of lubrication and cleaning
of the yarn joining device.
[0023] According to the present invention, a yarn winding machine and a method of operating
the yarn winding machine capable of further enhancing the reliability can be provided.
BRIEF DESCRIPTION OF THE DRAWINGS
[0024]
FIG. 1 is a front view of a yarn winding system according to one embodiment of the
present invention;
FIG. 2 is a side view of a winder unit of the yarn winding system of FIG. 1;
FIG. 3 is a function block diagram of an automatic winder of FIG. 1;
FIG. 4A is a flowchart illustrating a startup control by a winder control section
of the automatic winder of FIG. 1; and
FIG. 4B is a flowchart illustrating a stop control by the winder control section of
the automatic winder of FIG. 1.
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
[0025] One embodiment will be hereinafter described with reference to the accompanying drawings.
The same components are denoted with the same reference numerals in the following
description, and redundant description will be omitted.
[0026] As illustrated in FIG. 1, a yarn winding system 1 includes a spinning machine 3,
an automatic winder (yarn winding machine) 4, and a bobbin transferring device 5.
The spinning machine 3 is a ring spinning machine. The spinning machine 3 is adapted
to produce a yarn from a rove, and wind the yarn to form a yarn supplying bobbin 11.
The automatic winder 4 is adapted to wind the yarn from the yarn supplying bobbin
11 to form a package 15. The bobbin transferring device 5 is adapted to transfer the
yarn supplying bobbin 11 from the spinning machine 3 to the automatic winder 4, and
transfer an empty bobbin 12 (bobbin around which a yarn is not wound) from the automatic
winder 4 to the spinning machine 3. The bobbin transferring device 5 is provided with
a bobbin preparing device, a remaining yarn processing device, and the like. The bobbin
preparing device is adapted to carry out a preliminary preparation for the automatic
winder 4 to process the yarn of the yarn supplying bobbin 11. If the yarn remains
on the bobbin 12 discharged from the yarn supplying bobbin 11, the remaining yarn
processing device removes the yarn to obtain an empty bobbin 12. The yarn supplying
bobbin 11 and the empty bobbin 12 are respectively transferred while being set on
a tray 6.
[0027] The spinning machine 3 includes a spinning control section 31 adapted to control
the operation of the spinning machine 3, and a plurality of spinning units 32 adapted
to form the yarn supplying bobbin 11. The spinning control section 31 includes a display
portion 31a such as a display, and an operating portion 31b such as input keys. The
display portion 31a displays an operating status of each spinning unit 32, and the
like. The operating portion 31b is a portion for a worker (operator or maintenance
worker) to carry out setting of the operating conditions of each spinning unit 32,
and the like. The display portion 31a and the operating portion 31b may be configured
by a touch panel.
[0028] The spinning machine 3 including a plurality of spinning units 32 is configured as
a so-called simultaneous doffing type. In other words, the spinning machine 3 stocks
a plurality of empty bobbins 12 transferred from the automatic winder 4 by the bobbin
transferring device 5, simultaneously sets the empty bobbin 12 in each spinning unit
32, and simultaneously starts the winding of the yarn. When the winding of the yarn
is completed in each spinning unit 32 and the yarn supplying bobbin 11 is formed,
the spinning machine 3 simultaneously doffs (doffing) all the yarn supplying bobbins
11. Then, the spinning machine 3 extracts the empty bobbins 12 stocked in the meantime
from the tray 6, and again simultaneously sets such an empty bobbin 12 in each spinning
unit 32, and simultaneously sets the doffed yarn supplying bobbins 11 on the tray
6 instead.
[0029] The automatic winder 4 includes a winder control section (control section) 41 adapted
to control the operation of the automatic winder 4, and a plurality of winder units
(winding units) 42 adapted to form packages 15. The winder control section 41 includes
a display portion 41a such as a display, and an operating portion 41b such as input
keys. The display portion 41a displays an operating status of each winder unit 42,
and the like. The operating portion 41b is a portion for a worker to carry out setting
of the operating conditions of each winder unit 42, and the like. The winder control
section 41 also controls the operation of the bobbin transferring device 5.
[0030] As illustrated in FIGS. 2 and 3, the winder unit 42 winds the yarn from the yarn
supplying bobbin 11 transferred from the spinning machine 3 by way of the bobbin transferring
device 5 to form the package 15. The winder unit 42 includes a winding device 43,
a tension applying device 44, a yarn monitoring device 45, a first yarn catching device
46, a second yarn catching device 47, a yarn joining device 48, and a unit control
section 52.
[0031] The winding device 43 includes a cradle 43a and a winding drum 43b. The cradle 43a
supports the package 15. The winding drum 43b rotates the package 15 while traversing
the yarn 14. The yarn 14 is thereby wound from the yarn supplying bobbin 11 set at
a predetermined position to form the package 15. The structure of the winding device
43 is not limited thereto. For example, the winding device 43 may include the cradle
43a, a touch roller that comes into contact with the package 15, and a traverse mechanism
provided separate from the touch roller to traverse the yarn 14. The package 15 may
be directly rotationally driven. The tension applying device 44 applies a predetermined
tension on the yarn 14 travelling from the yarn supplying bobbin 11 to the package
15.
[0032] The yarn monitoring device 45 is adapted to monitor the travelling yarn 14 to detect
yarn defects (e.g., thickness abnormality of the yarn 14, mixing of foreign substance
into the yarn 14, etc.). When the yarn defect is detected, the yarn 14 is cut with
a cutter. The cutter may be provided on the yarn monitoring device 45, or may be provided
separate from the yarn monitoring device 45. When the yarn 14 is cut, the first yarn
catching device 46 catches a yarn end of the yarn 14 from the package 15 and guides
the yarn end to the yarn joining device 48. When the yarn 14 is cut, the second yarn
catching device 47 catches a yarn end of the yarn 14 from the yarn supplying bobbin
11 and guides the yarn end to the yarn joining device 48. The yarn joining device
48 carries out a yarn joining process of joining the yarn ends guided by the first
yarn catching device 46 and the second yarn catching device 47.
[0033] The unit control section 52 controls the operations of the winding device 43, the
tension applying device 44, the yarn monitoring device 45, the first yarn catching
device 46, the second yarn catching device 47, the yarn joining device 48, and the
like in the winder unit 42. For example, the unit control section 52 performs a cutting
process of the yarn 14, and controls the yarn joining device 48 to connect the yarn
end of the yarn 14 from the yarn supplying bobbin 11 and the yarn end of the yarn
14 from the package 15 that have been cutting processed.
[0034] As illustrated in FIG. 1, the bobbin transferring device 5 supplies the yarn supplying
bobbin 11 from the spinning machine 3 to the automatic winder 4.
[0035] The winder control section 41 and the processing thereof will now be described with
reference to FIGS. 3 and 4.
[0036] The winder control section 41 is an electronic control unit including, for example,
a Central Processing Unit (CPU), a Read Only Memory (ROM), a Random Access Memory
(RAM), an Electrically Erasable Programmable Read Only Memory (EEPROM), a communication
unit, and the like. The winder control section 41 loads the program stored in the
ROM in the RAM, and executes the program with the CPU using numerical values and the
like stored in the EEPROM to execute various processes. The winder control section
41 may be configured as hardware by an electronic circuit, and the like. The winder
control section 41 includes a storage section 41c such as hard disc, flash memory,
or the like.
[0037] The storage section 41c stores information relating to an operation amount from a
last predetermined maintenance for each of the plurality of winder units 42. The information
relating to the operation amount is transmitted from each winder unit 42 in a wired
or wireless manner. The operation amount includes an operation time (hereinafter referred
to as "post-maintenance operation time") from a last predetermined maintenance. The
post-maintenance operation time is, for example, an accumulation of time in which
the winder unit 42 is winding the yarn 14 to form the package 15. The operation time
is also referred to as operating hours. In other words, the post-maintenance operation
time is a number of operating hours in which the winder unit 42 is operating to form
the package 15, and is also referred to as operating hours of each winder unit 42
accumulated after the last predetermined maintenance had been performed. The predetermined
maintenance is, for example, maintenance targeted on the plurality of winder units
42, and performed at the same timing (simultaneously) among the plurality of winder
units 42. In other words, the predetermined maintenance includes simultaneous maintenance
that is simultaneously carried out on the plurality of winder units 42. The predetermined
maintenance includes regular maintenance that is repeatedly (every predetermined period)
performed periodically. The predetermined maintenance includes an irregularly performed
maintenance. For example, the predetermined maintenance is performed regularly at
a predetermined interval corresponding to the type of maintenance. For example, when
occurrence of abnormality is recognized or predicted (at the time of occurrence of
abnormality or at the time of predicting abnormality), the predetermined maintenance
is performed irregularly. A performing interval of the predetermined maintenance (time
interval from when the previous predetermined maintenance is performed until the next
predetermined maintenance is performed) is estimated as a predetermined interval of
longer than or equal to one month and shorter than or equal to one year. The performing
interval of the regular maintenance is set (scheduled) to an interval determined in
advance.
[0038] From the current condition in which one or a few workers basically perform the maintenance
on one automatic winder 4, in the predetermined maintenance, the maintenance work
is to be performed substantially at the same timing in all the winder units 42 of
one automatic winder 4. Substantially the same timing does not include only the timing
same in time and minute, but also includes timing shifted by a tolerable extent. In
view of the period of the assumed predetermined maintenance being an interval of a
few months to one year, the timing of maintenance on the plurality of winder units
42 may be a few dozen minutes to a few hours between the winder units 42 or may be
shifted by about 1% with respect to the maintenance period. Such shift is a range
that can be equalized in the equalization, to be described later. The machine refers
to the entire single automatic winder 4.
[0039] In the predetermined maintenance, each winder unit 42 is sequentially subjected to
the maintenance work in a state where all the winder units 42 arranged in the single
automatic winder 4 are stopped, and the operation (winding) may be sequentially started
from the winder unit 42 which maintenance work is completed. As the number of winder
units 42 in which the operation can be started at the same time is limited by the
limitation of air pressure for carrying out the yarn joining operation at the start
of the operation (e.g., in the automatic winder 4 including sixty winder units 42,
only ten winder units 42 can start the operation at the same time), the timing to
start the operation of each winder unit 42 may shift. Thus, the timing to start the
operation of each winder unit 42 in the predetermined maintenance includes a case
where the timing is exactly the same and a case where the timing has a time lag. In
the predetermined maintenance, each winder unit 42 (or a group of predetermined number
of winder units 42) is sequentially stopped, and the maintenance work is sequentially
performed from the stopped winder unit 42, and then the winder unit 42 subjected to
the maintenance work may sequentially start the operation.
[0040] The information of the predetermined maintenance may be input to the winder control
section 41 through the operating portion 41b (see FIG. 1) by the worker, and the like,
may be input to the winder control section 41 by communication from an external high-order
control section, may be acquired by automatic determination of the winder control
section 41, and may be acquired by a combination of the above. For example, the information
of the predetermined maintenance includes performed date and time, information relating
to portion to perform maintenance, maintenance content, and the like.
[0041] The predetermined maintenance is at least one of inspection, adjustment, lubrication,
cleaning, and part replacement (e.g., replacement of consumable goods) of a predetermined
device including each winder unit 42, a predetermined area of each winder unit 42,
or a predetermined operation mechanism of each winder unit 42. For example, the predetermined
maintenance includes at least one of lubrication, cleaning, and part replacement of
the cradle 43a, as well as lubrication and cleaning in the yarn joining device 48.
For example, the predetermined maintenance includes at least one of the following
maintenances. The storage section 41c stores the post-maintenance operation time of
each winder unit 42.
[Regular maintenance]
[0042]
- (1) Lubrication to a slide portion of a bearing center of the cradle 43a for every
three months
- (2) Disassembling and cleaning of the slide portion of the bearing center of the cradle
43a for every six months
- (3) Lubrication to a bearing center portion of the bearing center of the cradle 43a
for every six months
- (4) Grease application to a cradle lifter and a damper of the cradle 43a for every
six months
- (5) Lubrication to a cutter of the yarn joining device 48 for every three months
- (6) Cleaning of the yarn joining device 48 for every six months
- (7) Cleaning of inner surface of untwisting pipe of the yarn joining device 48 for
every twelve months
[Irregular maintenance/replacement of consumable goods]
[0043]
(8) Replacement of a brake shoe incorporated in the bearing center of the cradle 43a
(at the time of occurrence of abnormality, stop of the package 15 is delayed).
(9) Replacement of a bearing of the cradle 43a (at the time of occurrence of abnormality,
abnormal noise or rattling occurs)
(10) Replacement of a bush of the cradle 43a (at the time of occurrence of abnormality,
vibration becomes greater)
[0044] The winder control section 41 controls at least either of the startup and the stop
of the plurality of winder units 42 based on the post-maintenance operation time stored
in the storage section 41c. Specifically, the winder control section 41 controls at
least either of the startup and the stop of the plurality of winder units 42 so that
the post-maintenance operation time of the plurality of winder units 42 is equalized
(averaged).
[0045] The winder control section 41 executes a startup control (first control) of starting
up the plurality of winder units 42 in the order of small post-maintenance operation
time. The startup of the winder unit 42 is, for example, the execution of the operation
for starting the winding in the winder unit 42.
[0046] The startup control is executed at the time of startup (time of rise) of the automatic
winder 4. In the startup control, for example, as illustrated in FIG. 4A, the post-maintenance
operation time of each winder unit 42 is read from the storage section 41c (step S1).
The plurality of winder units 42 are then started up one at a time in order from the
winder unit 42 of smaller post-maintenance operation time (step S2).
[0047] In step S2, the plurality of winder units 42 may be started up for every group of
winder units 42 in the order of smaller post-maintenance operation time. In the automatic
winder 4, the plurality of winder units 42 are sequentially started up for one or
every group of winder units 42, but this is because all of the plurality of winder
units 42 cannot be started up at the same time due to the limitation for ensuring
the pressure of the driving air, and the like.
[0048] The winder control section 41 executes a spinning waiting time stop control (second
control) of temporarily stopping some of the plurality of winder units 42 having a
large post-maintenance operation time. The stop of the winder unit 42 means having
the winding speed at zero. The stop of the winder unit 42 means not performing the
operation for forming the package 15.
[0049] The spinning waiting time stop control is executed during the operation of the automatic
winder 4. In the spinning waiting time stop control, for example, as illustrated in
FIG. 4B, operation information indicating the operation state of the spinning machine
3 is acquired from the spinning machine 3 in a wired or wireless manner (step S11).
The operation information includes a doffing waiting time, which is a time until the
spinning machine 3 doffs the next yarn supplying bobbin 11. The operation information
may include information on whether the spinning machine 3 is operating or stopping.
The information on stopping may include a state in which the operation is stopped
to wait for the replacement of the bobbin, and a state in which the operation is stopped
due to malfunction. The operation information may include offline information indicating
that communication cannot be made with the spinning machine 3. The operation information
may include an operation efficiency in the spinning machine 3, a production amount
of the yarn, a time stopped for malfunction, and the like, by way of example.
[0050] After step S11, the spinning waiting time, which is a standby time until the spinning
machine 3 can supply the yarn supplying bobbin 11 to the automatic winder 4 next,
is calculated based on the acquired operation information (step S12). The spinning
waiting time can be calculated based on, for example, at least one of doffing waiting
time included in the operation information, time necessary to wind the yarn supplying
bobbin 11 in the spinning machine 3, and time the spinning machine 3 is stopped for
malfunction.
[0051] After step S12, whether or not the spinning waiting time is greater than or equal
to a constant time (predetermined time) defined in advance) is determined (step S13).
When YES in step S13, the post-maintenance operation time of each winder unit 42 is
read from the storage section 41c (step S14). Some of the plurality of winder units
42 with long post-maintenance operation time are stopped (temporarily stopped) (step
S15). In step S15, the number and stopping time of the winder units 42 to be temporarily
stopped may be determined according to the spinning waiting time, may be defined in
advance, may be fixed values, or may be variable values that vary according to the
spinning waiting time. The number and stopping time of the winder units 42 to be temporarily
stopped are determined such that the production amount of the automatic winder 4 and
the production amount of the spinning machine 3 are balanced (not greatly diverged).
The high-order N (N is a predetermined integer) winder units 42 with long post-maintenance
operation time may be temporarily stopped.
[0052] When the temporarily stopped winder units 42 are returned (restarted) from the temporarily
stopped state (YES in step S16) or when NO in step S13, the process returns to step
S11 to continue the process.
[0053] Therefore, the automatic winder 4 controls at least either of the startup and the
stop of the plurality of winder units 42 based on the post-maintenance operation time.
Thus, the plurality of winder units 42 can be controlled so that a winder unit 42
operating in excess of the limit operation amount does not exist in the next maintenance.
As a result, the lowering of the quality and part performance can be suppressed, and
the reliability can be enhanced. When performing the maintenance related to regular
maintenance in the automatic winder 4, maintenance without excess or deficiency can
be realized even if a common (one) maintenance period is adopted in the plurality
of winder units 42. The period of maintenance does not need to be adjusted or set
for every winder unit 42.
[0054] In the automatic winder 4, the post-maintenance operation time is adopted as the
operation amount of the winder unit 42 from when the last maintenance had been performed
immediately before. At least either of the startup and the stop of the plurality of
winder units 42 can be controlled using the post-maintenance operation time.
[0055] In the automatic winder 4, the winder control section 41 controls at least either
of the startup and the stop of the plurality of winder units 42 so that the post-maintenance
operation time of the plurality of winder units 42 is equalized. In such a configuration,
in the maintenance, the existence of not only a winder unit 42 operating in excess
of the limit operation amount but also a winder unit 42 having excessive margin until
the limit operation amount can be avoided. The lowering in the quality and the part
performance can be avoided, and the excessive maintenance can be reduced. The usage
period of the part can be extended by extending the period of maintenance.
[0056] In the automatic winder 4, the winder control section 41 executes the startup control
of starting up the plurality of winder units 42 in the order of small post-maintenance
operation time. According to the execution of the startup control, the winder unit
42 with smaller post-maintenance operation time is preferentially started up. The
post-maintenance operation time of the plurality of winder units 42 can be equalized.
[0057] In the automatic winder 4, the winder control section 41 calculates the spinning
waiting time of the plurality of winder units 42 based on the operation information
of the spinning machine 3. When the spinning waiting time is greater than or equal
to a predetermined time, the spinning waiting time stop control of temporarily stopping
some winder units 42 with large operation amount of the plurality of winder units
42 is executed. In this case, in the spinning waiting time stop control, a winder
unit 42 with long post-maintenance operation time is preferentially stopped when the
spinning waiting time is greater than or equal to a predetermined time. The operation
amounts of the plurality of winder units 42 can be equalized using the spinning waiting
time.
[0058] In the maintenance of long performing interval, sufficient margin is often taken
into consideration until the limit operation amount, and even if each operation amount
of the plurality of winder units 42 varies, a winder unit 42 operating in excess of
the limit operation amount is less likely to exist. In the maintenance of short performing
interval, on the other hand, there is a high possibility a winder unit 42 operating
in excess of the limit operation amount exists for opposite reasons from the maintenance
of long performing interval.
[0059] With regards to this, the target maintenance of the automatic winder 4 includes at
least one of the lubrication, cleaning, and part replacement of the cradle 43a, or
at least one of the lubrication and cleaning in the yarn joining device 48. In this
case, the operation effects described above in which the reliability can be enhanced
are effective as the performing interval of the maintenance is relatively short.
[0060] One embodiment has been described above, but the present invention is not limited
to the above embodiment.
[0061] In the embodiment described above, the operation amount of the winder unit 42 from
the last maintenance immediately before is not limited to the post-maintenance operation
time. The operation amount may include, in place of or in addition to the post-maintenance
operation time, for example, at least either of the number of operations of the winder
unit 42, and the number of yarn joining operations of the yarn joining device 48 of
the winder unit 42.
[0062] In other words, the operation amount of the winder unit 42 merely needs to include
at least one of the operation time (post-maintenance operation time) and the number
of operations (number of post-maintenance operations). The number of operations (number
of post-maintenance operations) is preferably a number of operations (number of post-maintenance
operations) of a predetermined device, a predetermined area, or a predetermined operation
mechanism counted after the previous predetermined maintenance had been performed.
[0063] The operation amount of the winder unit 42 may be an operation amount related to
one predetermined maintenance or may be an operation amount related to a plurality
of predetermined maintenances.
[0064] When a target operation amount of the control (equalization) of the present invention
is an operation amount related to one predetermined maintenance, one value is preferably
stored for every winder unit 42 as the operation amount in the storage section 41c.
The winder control section 41 preferably controls at least one of the startup and
the stop of the winding unit based on the stored operation amount.
[0065] When a target operation amount of the control (equalization) of the present invention
is an operation amount related to a plurality of predetermined maintenances, a plurality
of values are preferably stored for every winder unit 42 as the operation amount in
the storage section 41c. The operation amount is preferably stored for every type
of maintenance with respect to each winder unit 42.
[0066] The winder control section 41 preferably extracts one arbitrary type of operation
amount for every winder unit from the stored plurality of types of operation amounts.
For example, the winder control section 41 calculates a varying amount among the winder
units 42 for every operation amount based on the stored plurality of types of operation
amounts, specifies the type of maintenance having the largest variation, and extracts
the operation amount of the maintenance as the control operation amount for every
winder unit 42.
[0067] Furthermore, the winder control section 41 may extract the control operation amount
(e.g., total operation amount) for every winder unit 42 from the stored plurality
of types of operation amounts based on a predetermined equation.
[0068] The winder control section 41 preferably controls at least one of the startup and
the stop of the winder unit 42 based on the extracted or calculated one value for
every winder unit 42.
[0069] The operation amount stored in the storage section 41c is preferably reset after
the previous predetermined maintenance is performed.
[0070] Thus, in the embodiment described above, the operation amount (post-maintenance operation
amount) of the winder unit 42 from the last maintenance performed immediately before
may be assumed as the operation amount for every device mounted on each winder unit
42, every predetermined area of each winder unit 42, or every predetermined operation
mechanism of each winder unit 42. The storage section 41c may store at least one of
each operation time and each number of operations of a predetermined device, a predetermined
area, and a predetermined operation mechanism, as the post-maintenance operation amount
of each winder unit 42. In this case, for example, as will be described below, the
control with respect to the variation in the operation amount for every device, area
and operation mechanism mounted on the winder unit 42 may be carried out by the winder
control section 41.
1) When the worker selects the target
[0071] The target is a predetermined device, a predetermined area, or a predetermined operation
mechanism (e.g., yarn joining device 48, cradle lifter, etc.), or a predetermined
operation (e.g., yarn joining operation, upper yarn finding operation, replacement
of yarn supplying bobbin 11, etc.). The automatic winder 4 is configured such that
the worker can select one or a plurality of arbitrary devices, areas, operation mechanisms,
or operations (e.g., so as to include a selection input section). When selecting plurals,
it is preferable to be able to set priorities. The priority of the operation amount
to suppress the variation of a plurality of types of devices, and the like can be
set. The stop control of temporarily stopping the winder unit is carried out from
a winder unit 42 of a large operation amount of the arbitrary device, area, operation
mechanism, or operation selected by the worker. Alternatively, the startup control
of sequentially starting up from a winder unit 42 of small operation amount of the
selected device, area, operation mechanism, or operation is carried out. The upper
yarn finding operation is the operation of picking out the yarn end of the yarn 14
wound into the package 15 with the first yarn catching device 46, and the like.
2) When automatically selecting the target
[0072] The winder control section 41 obtains an in-machine standard deviation of the operation
amount of each device, area, or operation mechanism, and assumes the device, area,
and operation mechanism in which the variation of the operation amount is large among
the winder units 42 as the target. Alternatively, the winder control section 41 obtains
the total operation amount (information relating to operation amount) for every winder
unit 42 based on a predetermined equation from the operation amount for every device,
area, and operation mechanism in each winder unit 42 and the operation amount for
every operation, and carries out the stop control of temporarily stopping the winder
unit from a winder unit 42 in which the obtained total operation amount is large.
Alternatively, the startup control of sequentially starting up from a winder unit
42 in which the obtained total operation amount is small is carried out.
[0073] In the embodiment described above, the winder control section 41 includes the storage
section 41c, but where the storage section 41c is located is not particularly limited.
For example, the high-order control section configured to communicate with the automatic
winder 4 may include the storage section 41c.
[0074] In the embodiment described above, the automatic winder 4 is applied as the yarn
winding machine, but the yarn winding machine according to the present invention is
not limited to the automatic winder 4. A textile machine (e.g., pneumatic spinning
machine and open end spinning machine) in which a plurality of winding units having
the same configuration are set but each winding unit does not operate in the same
manner may be applied as the yarn winding machine. In the embodiment described above,
in a case where the automatic winder 4 has a configuration of not being coupled with
the spinning machine 3 by way of the bobbin transferring device 5, that is, in a case
where the yarn supplying bobbin 11 is manually transferred from the spinning machine
3 to the automatic winder 4, only the startup control described above may be performed.
[0075] An automatic winder (4) includes a plurality of winder units (42) adapted to wind
a yarn (14) to form a package (15), a storage section (41c) adapted to store a post-maintenance
operation time, which is an operation time from when a simultaneous maintenance is
performed immediately before, for each of the plurality of winder units (42), and
a winder control section (41) adapted to control at least either of startup and stop
of the plurality of winder units (42) based on the post-maintenance operation time
stored in the storage section (41c).
1. A yarn winding machine (4) comprising:
a plurality of winding units (42) adapted to wind a yarn (14) to form a package (15);
characterized by
a storage section (41c) adapted to store information relating to an operation amount
from when a last predetermined maintenance targeting on the plurality of winding units
(42) had been performed immediately before for each of the plurality of winding units
(42); and
a control section (41) adapted to control at least either of startup and stop of the
plurality of winding units (42) based on the information stored in the storage section
(41c).
2. The yarn winding machine (4) according to claim 1, wherein the operation amount includes
at least either of an operation time and a number of operations.
3. The yarn winding machine (4) according to claim 1 or 2, wherein the control section
(41) controls at least either of the startup and the stop of the plurality of winding
units (42) so that the operation amounts of the plurality of winding units (42) are
equalized.
4. The yarn winding machine (4) according to claim 3, wherein the control section (41)
executes a first control of starting up the plurality of winding units (42) in an
order of small operation amount.
5. The yarn winding machine (4) according to claim 3 or 4, wherein the control section
(41) executes a second control of temporarily stopping some winding units (42) having
a large operation amount of the plurality of winding units (42).
6. The yarn winding machine (4) according to claim 5, wherein
the winding unit (42) is a winder unit (42) adapted to wind the yarn (14) from a yarn
supplying bobbin (11) transferred from a spinning machine (3) by way of a bobbin transferring
device (5) to form the package (15); and
the control section (41) calculates a spinning waiting time of the plurality of winder
units (42) based on operation information of the spinning machine (3), and executes
the second control when the spinning waiting time is greater than or equal to a predetermined
time.
7. The yarn winding machine (4) according to any one of claims 1 to 6, wherein
the predetermined maintenance is a maintenance performed at a same timing among the
plurality of winding units (42); and
the predetermined maintenance includes at least one of a regular maintenance that
is repeatedly performed periodically and an irregular maintenance that is performed
at a time of occurrence of abnormality or at a time of predicting abnormality.
8. The yarn winding machine (4) according to any one of claims 1 to 7, wherein
the winding unit (42) includes a cradle (43a) adapted to support the package (15);
and
the predetermined maintenance includes at least one of lubrication, cleaning, and
part replacement of the cradle (43a).
9. The yarn winding machine (4) according to any one of claims 1 to 8, wherein
the winding unit (42) includes a yarn joining device (48) adapted to carry out a yarn
joining process; and
the predetermined maintenance includes at least one of lubrication and cleaning of
the yarn joining device (48).
10. A method of operating a yarn winding machine (4) comprising:
a plurality of winding units (42) winding a yarn (14) to form a package (15);
characterized by the following steps:
- storing information relating to an operation amount from when a last predetermined
maintenance targeting on the plurality of winding units (42) had been performed immediately
before for each of the plurality of winding units (42); and
- controlling at least either of startup and stop of the plurality of winding units
(42) based on the information stored in the storage section (41c).
11. The method according to claim 10, wherein the operation amount includes at least either
of an operation time and a number of operations.
12. The method according to claim 10 or 11, characterized by controlling at least either of the startup and the stop of the plurality of winding
units (42) so that the operation amounts of the plurality of winding units (42) are
equalized.
13. The method according to claim 12, characterized by executing a first control of starting up the plurality of winding units (42) in an
order of small operation amount.
14. The method according to claim 12 or 13, characterized by executing a second control of temporarily stopping some winding units (42) having
a large operation amount of the plurality of winding units (42).
15. The method according to claim 14, wherein
the winding unit (42) is a winder unit (42) winding the yarn (14) from a yarn supplying
bobbin (11) transferred from a spinning machine (3) by way of a bobbin transferring
device (5) to form the package (15); characterized by
calculating a spinning waiting time of the plurality of winder units (42) based on
operation information of the spinning machine (3), and executing the second control
when the spinning waiting time is greater than or equal to a predetermined time.