[Technical Field]
[0001] The present invention discloses a molten iron manufacturing method which improves
a fuel charging method and a molten iron manufacturing apparatus using the same.
[Background of the Invention]
[0002] Generally, about 60% of the world's iron production is produced through the blast
furnace process developed from the 14th century. In the blast furnace process, iron
ore and cokes are charged onto layers from the upper side of the blast furnace, and
hot air and powdered coal are blown through the tuyere to produce molten iron. Cokes
and powdered coal are used as a fuel or a reducing material, and cokes which is coal-dried
is charged through the upper side of the blast furnace in the form of a lump, and
the powdered coal which is not dried is supplied through the tuyere.
[0003] The so-called FINEX or COREX process is a direct iron ore smelting and reduction
process for solving the problems of the blast furnace process. It directly uses ordinary
coal as a fuel and reducing material, and directly uses iron ore as an iron source
to the melting and gasifying furnace to produce molten iron. The coal used as a fuel
is directly charged into the upper side of the melting and gasifying furnace in the
form of lump, or coal in the form of powder is made into brequet and charged into
the upper side of the melting and gasifying furnace. Powdered coal is blown through
the tuyere of a blast furnace.
[0004] When the coal is heated above 500°C, volatile components are released through the
carbonization process and become a char composed of fixed carbon and ash. The furnace
temperature in the blast furnace is not as high as 200°C, but the temperature of the
dome part is maintained at over 1000°C in the melting and gasifying furnace. Therefore,
when undried coal is charged into the melting and gasifying furnace, during the process
of releasing volatile components from bed and making a char, coal is divided into
small particles.
[0005] If a small sized char is produced, the gas flow and melt flow in the melting and
gasifying furnace deteriorate. Thus, the productivity and efficiency of the melting
and gasifying furnace are lowered.
[0006] Conventionally, in order to increase the productivity and efficiency of the melting
and gasifying furnace, coal is pre-dried and charged with coal and raw materials that
have not been dry. In case of dry coal, the productivity in the melting and gasifying
furnace can be increased because the division is relatively less than that of an undried
coal.
[0007] In order to stabilize the operation of the melting furnace, the flow in which the
high-temperature reducing gas generated from the combustion zone passes through the
bed, heat-exchanges, reduces the raw material, and then flows out to the dome portion,
and the flow in which the melted material flows to the bottom of the melting and gasifying
furnace and discharges to the iron notch should be stable.
[0008] However, for the conventional structure above, since the dried coal is mixed with
the un-dried coal and the pores between the dried coal particles having a large size,
which are not divided, are filled with un-dried coal particles having a small size,
which are divided, there was a problem in that the size of the pores through which
the gas and the melt can flow is reduced and the ratio of the pores is reduced to
increase the resistance of the melting furnace bed and thus the flow of the reducing
gas and the molten material is not smooth.
[0009] Therefore, the molten material cannot flow down to the bottom of the melting and
gasifying furnace, so that the molten material fills the pores and the flow of the
reducing gas is biased toward the reduced pores. As a result, the gas flow is not
stabilized, so that the productivity is deteriorated and the operation cost is increased.
[Description]
[Problems to be solved]
[0010] A molten iron manufacturing method and a molten iron manufacturing apparatus using
the same, which can stabilize the flow of the molten material and the reducing gas
by improving the coal charging structure into the melting and gasifying furnace are
provided.
[Means to Solve Problems]
[0011] In the embodiment, a method of manufacturing molten iron by charging a reduced material
and a reducing material supplied from a reducing furnace into a melting and gasifying
furnace, blowing oxygen to manufacture molten iron, and supplying a reducing gas to
a reducing furnace to reduce iron ore, may include a reduced material preparation
step of preparing a reduced material, a reducing material preparation step of preparing
a first reducing material which is pre-dried and a second reducing material which
is not pre-dried without being mixed with each other as a reducing material, and a
charging step of charging the reduced material and the reducing material into the
melting and gasifying furnace, wherein the charging step includes a separation charging
step of charging the first reducing material and the second reducing material into
the melting and gasifying furnace without being mixed with each other.
[0012] In the embodiment, a method of manufacturing molten iron by charging a reduced material
and a reducing material supplied from a reducing furnace into a melting and gasifying
furnace, blowing oxygen to manufacture molten iron, and supplying a reducing gas to
a reducing furnace to reduce iron ore, may include: a reduced material preparation
step of preparing a reduced material, a reducing material preparation step of preparing
a first reducing material having a relatively large size and a second reducing material
having a relatively small size as a reducing material, and a charging step of charging
the reduced material and the reducing material into the melting and gasifying furnace,
wherein the charging step includes a separation charging step of charging the first
reducing material and the second reducing material into the melting and gasifying
furnace without being mixed with each other.
[0013] In the separation charging step, the first reducing material may be charged into
the center of the melting and gasifying furnace and the second reducing material may
be charged into the periphery of the melting and gasifying furnace.
[0014] The charging step may include a step of mixing the reduced material with the second
reducing material to mix the reduced material with the second reducing material and
charge to the periphery of the melting and gasifying furnace.
[0015] The reducing material preparation step may include a step of alternately discharging
the first reducing material and the second reducing material from each of the first
reducing material storage bin containing the first reducing material and the second
reducing material storage bin containing the second reducing material and transferring,
along the reducing material transferring line.
[0016] The charging step may sequentially charge the first reducing material and the second
reducing material, which are alternately transferred to the melting and gasifying
furnace, through a distributor installed in the melting and gasifying furnace.
[0017] The charging step may include a step of separating the first reducing material and
the second reducing material and transferring to the melting and gasifying furnace,
and a step of simultaneously charging the first reducing material and the second reducing
material through a additional distributor installed in the melting and gasifying furnace.
[0018] In the embodiment, an apparatus for manufacturing a molten iron may include: a reducing
furnace for reducing iron-containing material to convert to a reduced material; a
melting and gasifying furnace manufacturing molten iron by charging a reduced material
and a reducing material; a reduced material storage bin containing the reduced material
converted in the reducing furnace; a reduced material transfer line for supplying
the reduced material discharged from the reduced material storage bin to the melting
and gasifying furnace; a reducing material storage bin containing a reducing material;
a reducing material transfer line for supplying the reducing material discharged from
the reducing material storage bin to the melting and gasifying furnace; and a distributor
installed in the melting and gasifying furnace for charging the transferred reduced
material and the lump carbon material into the melting and gasifying furnace,
[0019] The reducing material storage bin may include the first reducing material storage
bin containing a first reducing material which is pre-dried and the second reducing
material storage bin containing a second reducing material which is not pre-dried
and the first reducing material and the second reducing material are separately supplied,
and wherein the distributor charges the first reducing material and the second reducing
material into the melting and gasifying furnace without being mixed with each other.
[0020] In the embodiment, an apparatus for manufacturing a molten iron may include: a reducing
furnace for reducing iron-containing material to convert to a reduced material; a
melting and gasifying furnace manufacturing molten iron by charging a reduced material
and a reducing material; a reduced material storage bin containing the reduced material
converted in the reducing furnace; a reduced material transfer line for supplying
the reduced material discharged from the reduced material storage bin to the melting
and gasifying furnace; a reducing material storage bin containing a reducing material;
a reducing material transfer line for supplying the reducing material discharged from
the reducing material storage bin to the melting and gasifying furnace; and a distributor
installed in the melting and gasifying furnace for charging the transferred reduced
material and the lump carbon material into the melting and gasifying furnace,
[0021] The reducing material storage bin may include a first reducing material storage bin
containing a first reducing material having a relatively large size, and a second
reducing material storage bin containing a second reducing material having a relatively
small size, and the first reducing material and the second reducing material are separately
supplied and wherein the distributor charges the first reducing material and the second
reducing material into the melting and gasifying furnace without being mixed with
each other.
[0022] The distributor may be configured to charge the first reducing material to the center
of the melting and gasifying furnace and the second reducing material to the periphery
of the melting and gasifying furnace.
[0023] The reducing material storage bin may alternately discharge the first reducing material
and the second reducing material by alternately opening and closing the first reducing
material storage bin and the second reducing material storage bin, along the reducing
material transfer line.
[0024] The apparatus may further include a charging material transfer pipe connected to
the reduced material transfer line and the reducing material transfer line and installed
in the melting and gasifying furnace to supply the reduced material and the lump carbon
material to the distributor,
wherein the reduced material transfer line may be configured to be opened when the
second reducing material is transferred to the charging material transfer pipe to
supply the reduced material to the charging material transfer pipe and charge into
the melting and gasifying furnace with the second reducing material.
[0025] The distributor may be configured to sequentially charge the first reducing material
and the second reducing material, which are alternately transferred through the charging
material transfer pipe, to the melting and gasifying furnace.
[0026] The reducing material transfer line may further comprise an additional first transfer
line transferring the first reducing material to separately transferring the first
reducing material and the second reducing material through the first transfer line
and the reducing material transfer line, and the apparatus may further comprise an
additional first distributor installed in the melting and gasifying furnace and connected
to the first transfer line to separate the first reducing material and the second
reducing material by the first distributor and the distributor to simultaneously charge
into the melting and gasifying furnace
[0027] The apparatus may further include a reducing gas supply line for supplying the reducing
gas discharged from the melting and gasifying furnace to the reducing furnace.
[0028] The reducing furnace may be a fluidized bed type reducing furnace or a packed bed
type reducing furnace.
[Effects of the Invention]
[0029] As described in the above, according to the present invention, the coal, that is
pre-dried, may be charged to the center of the melting and gasifying furnace and the
coal, that is not pre-dried, may be charged to the periphery of the melting and gasifying
furnace to reduce the resistance against the flow of the molten material and the flow
of the reducing gas and thus the flow may be smoothly maintained.
[0030] Accordingly, it is possible to increase the productivity by increasing the heat exchange
efficiency while reducing the amount of fuel used in the melting and gasifying furnace.
[Brief Descriptions of the Drawings]
[0031]
FIG. 1 is a schematic view of showing an apparatus for manufacturing molten iron according
to an embodiment of the present invention.
FIG. 2 is a schematic view of showing a structure for charging a charging material
into a melting and gasifying furnace of a molten iron manufacturing apparatus according
to an embodiment of the present invention.
FIG. 3 is a schematic cross-sectional view of showing a charge state of a charging
material charged into the melting and gasifying furnace according to FIG. 2.
FIG. 4 is a schematic view of showing a structure for charging a charging material
into a melting and gasifying furnace of a molten iron manufacturing apparatus according
to another embodiment of the present invention.
FIG. 5 is a schematic cross-sectional view of showing a charge state of a charging
material charged into the melting and gasifying furnace according to FIG 4.
[Detailed Descriptions of the Invention]
[0032] The terminology used herein is for the purpose of describing particular embodiments
only and is not intended to limit the invention. The singular forms as used herein
include plural forms unless the phrases specifically state the opposite meaning thereof.
The "comprises" means that a particular characteristic, region, integer, step, motion,
element and/or component is specified and that does not exclude the presence or addition
of other characteristics, regions, integers, steps, motions, elements, and/or components.
[0033] Hereinafter, embodiments of the present invention will be described with reference
to the accompanying drawings so that those skilled in the art can easily carry out
the present invention. It will be apparent to those skilled in the art that various
modifications and variations can be made in the present invention without departing
from the spirit or scope of the invention. Accordingly, the present invention may
be embodied in many different forms and should not be construed as limited to the
embodiments set forth herein.
[0034] The terminology used herein is for the purpose of describing particular embodiments
only and is not intended to limit the invention. The singular forms as used herein
include plural forms as long as the phrases do not specifically state the opposite
meaning thereof. The "comprises" means that a particular characteristic, region, integer,
step, motion, element and/or component is specified and that does not exclude the
presence or addition of other characteristics, regions, integers, steps, motions,
elements, and/or components.
[0035] In the following description, the iron-containing material may be iron itself or
all materials including iron. For example, the iron-containing material may further
include an additive. The iron-containing material may include iron ore. Iron may also
be pure iron, iron oxide or reduced iron. The particle size of the iron-containing
material may not be limited. Thus, the iron-containing material may include pellets,
fine iron ore, iron ore assemblies, lump irons, and the like.
[0036] The reducing furnace means a manufacturing device by reducing the iron-containing
material. The reducing furnace may include a fluidized-bed reducing furnace or packed-bed
reducing furnace.
[0037] FIG. 1 schematically shows an apparatus for manufacturing molten iron according to
the present embodiment. The molten iron manufacturing apparatus shown in Fig. 1 is
merely for illustrating the present invention, and the present invention is not limited
thereto. Therefore, the apparatus for manufacturing molten iron can be modified into
another form.
[0038] The molten iron manufacturing apparatus 100 illustrated in Figure 1 includes a reducing
furnace 10; a melting and gasifying furnace 20; a reduced material storage bin 30
for containing a reduced material discharged from the reducing furnace 10 and supplying
the reduced material to the melting and gasifying furnace; a reduced material transfer
line 32 for transferring the reduced material; a reducing material storage bin 40
for containing the lump carbon material as a reducing material; and a reducing material
transfer line 46 for transferring the lump carbon material. Other devices may also
be included if desired.
[0039] An iron-containing material is charged into the reducing furnace 10 to reduce the
iron-containing material. The iron-containing material to be charged into the reducing
furnace 10 is pre-dried and prepared. If necessary, a powdered raw material can be
mixed. The iron-containing material is converted into a reduced material in the reducing
furnace 10. The reducing furnace 10 may be a fluidized-bed reducing furnace or a packed-bed
reducing furnace. The reducing furnace 10 is supplied with the reducing gas from the
melting and gasifying furnace 20 through the reducing gas supply line 22 and reduces
and fires the iron-containing material. The iron-containing material is converted
into the reduced material through the reducing furnace 10. The reduced material may
be manufactured as HCI (Hot Compacted Iron) by compression molding of a HCI manufacturing
apparatus.
[0040] The melting and gasifying furnace 20 may manufacture a molten iron from the reduced
material. For this, a reduced material is charged into the melting and gasifying furnace
20 together with the reducing material. As a reducing material, lump carbon materials
may be used. In order to form a coal packed bed in the melting and gasifying furnace
20, a lump carbon material is prepared and charged into the melting and gasifying
furnace 20. Examples of lump carbon materials may include lumpy coal or coal briquette.
Coal briquette is manufactured by compression molding of powdered coal. In addition,
cokes can be charged if necessary. The melting and gasifying furnace 20 has a structure
in which a large number of tuyeres are installed on the outer wall. And oxygen is
blown into the melting and gasifying furnace 20 through the tuyere.
[0041] At upper end of the dome portion of the melting and gasifying furnace 20, a charging
material transfer pipe 50 connected to the reduced material transfer line 32 and the
reducing material transfer line 46 to supply a reduced material and a lump carbon
material to the melting and gasifying furnace 20 is installed. In addition, a distributor
60 connected to the charging material transfer pipe 50 for charging the reduced material
and the lump carbon material into the melting and gasifying furnace 20 is installed
inside the upper end of the melting and gasifying furnace 20.
[0042] As illustrated in Figure 2, the charging material transfer pipe 50 is vertically
extended to the upper end of the dome portion of the melting and gasifying furnace
20 and the reduced material transfer line 32 and the reducing material transfer line
46 are connected along the charging material transfer pipe 50. The reduced material
transfer line 32 and the reducing material transfer line 46 are respectively provided,
on the exit side, with a reduced material discharging screw 39 and a reducing material
discharging screw 49. They are connected to the charging material transfer pipe 50,
for supplying the reduced material and reducing material in a fixed quantity or shutting
off the supply.
[0043] If necessary, the reduced material discharge screw 39 is rotated, and the reduced
material transferred along the reduced material transfer line 32 is supplied to the
charging material transfer pipe 50 in a fixed amount. And when the reducing material
discharging screw 49 is rotated, the reducing material transferred along the reducing
material transfer line 46 is supplied to the charging material transfer pipe 50 in
a fixed amount. The charging material transfer pipe 50 may mix the reduced material
supplied through the reduced material transfer line 32 and the reducing material supplied
through the reducing material transfer line 46 to supply the mixture to the distributor
60 connected to the lower end.
[0044] The distributor 60 may be, for example, a device (Gimbal Distributor) for controlling
the distribution while charging raw materials and coal briquette in a molten iron
manufacturing facility called FINEX. The distributor 60 may include a rotation chute
for switching the direction of introduction of the raw material at the lower end and
a driving unit for rotating the rotation chute and varying the tilting angle so as
to vary the tilting angle of the rotation chute along the circumferential direction.
Thus, the charging material is introduced into a desired region in the melting and
gasifying furnace 20 by controlling the dropping position of the charging material.
[0045] The reduced material and the lump carbon material of the reducing material are supplied
to the charging material transfer pipe 50 through the reduced material transfer line
32 and the reducing material transfer line 46 and are distributed and charged through
the distributor 60 connected to the charging material transfer pipe 50, into the melting
and gasifying furnace 20 to form a packed bed.
[0046] In the present embodiment, the lump carbon material of a reducing material may be
divided into a lump carbon material that has been pre-dried and a lump carbon material
that has not been pre-dried according to whether it has been pre-dried, and charged
into the melting and gasifying furnace 20 without being mixed with each other.
[0047] To this end, in the molten iron manufacturing apparatus 100 of the present embodiment,
the reducing material storage bin 40 may include a first reducing material storage
bin 42 for containing the first reducing material which is pre-dried and a second
reducing material storage bin 44 for containing the second reducing material which
is not pre-dried. Thus, the first reducing material and the second reducing material
are separately supplied. The distributor 60 is configured to charge the first reducing
material and the second reducing material to the melting and gasifying furnace 20
without being mixed with each other.
[0048] The first reducing material and the second reducing material are separated from each
other in the melting and gasifying furnace 20 without being mixed with each other
and charged in the respective regions. The problem that the pores of the dried first
reducing material having a large size, which are not divided, are filled with the
un-dried second reducing material having a small size, which are divided, is minimized,
so that the flow of the gas and the molten material can be smoothly maintained.
[0049] In the conventional case, the pre-dried reducing material and the un-dried reducing
material, in the melting and gasifying furnace, were mixed and charged into the melting
and gasifying furnace 20. Thus, the pores between the particles having a large size,
which are not divided, were filled with the particles having a small size, which are
divided, so that the size of the pores where reducing gas and the melt can flow was
reduced and the porosity was reduced. Therefore, the flow of the gas or the molten
material was not smooth.
[0050] As described in the present embodiment, the first reducing material and the second
reducing material can be determined by whether coal is dried or not. As already known,
the division of pre-dried coal is less than that of un-dried coal in the melting and
gasifying furnace.
[0051] In addition, the lump coal material can be sorted by size and differentiated as the
first reducing material and the second reducing material. For example, a relatively
large-sized lump carbon material may mean the upper 20% level of the particle size,
when the prepared lump carbon material is sorted by particle size. For large-sized
lump carbon materials, the division can be made less than the relatively small-sized
lump carbon material in the melting and gasifying furnace.
[0052] Therefore, the first reducing material can be understood as a lump carbon material
having a relatively larger size than the second reducing material or a pre-dried carbon
material having less division in the melting and gasifying furnace. Further, the second
reducing material can be understood as a lump carbon material having a relatively
small size than the first reducing material or an un-pre-dried carbon material having
more division in the melting and gasifying furnace.
[0053] By charging the lump carbon materials separately in the melting and gasifying furnace
20 as described above, it becomes possible to effectively stabilize the flow of the
gas and the molten material in the melting and gasifying furnace 20 while ensuring
the space between the lump carbon materials.
[0054] In the present embodiment, for separately charging the first reducing material and
the second reducing material into the melting and gasifying furnace 20 without being
mixed, the first reducing material is charged to the center of the melting and gasifying
furnace 20 and the second reducing material is charged to the periphery of the melting
and gasifying furnace 20.
[0055] The central portion of the melting and gasifying furnace 20 refers to an inner central
region, and the peripheral portion refers to an inner wall region of the melting and
gasifying furnace 20.
[0056] FIG. 2 shows a structure for charging a charging material into the melting and gasifying
furnace 20 according to the present embodiment.
[0057] As illustrated in FIG. 2, in the present embodiment, the first reducing material
storage bin 42 and the second reduction material storage bin 44 may be configured
to be alternately opened and closed in sequence along the reducing material transfer
line 46 to alternately discharge the first reducing material and the second reducing
material. That is, upon discharging the first reducing material, the second reducing
material storage bin 44 may be closed to prevent discharging the second reducing material.
Upon discharging the second reducing material, the first reducing material storage
bin 42 may be closed to prevent discharging the first reducing material.
[0058] Accordingly, the respective storage bins are alternately opened in sequence so that
the first reducing material and the second reducing material can be alternately transferred
to the charging material transfer pipe 50 connected to the reducing material transfer
line 46 in a separated state without being mixed with each other.
[0059] In addition, when the first reducing material and the second reducing material, which
are alternately supplied through the charging material transfer pipe 50, are charged
into the melting and gasifying furnace 20, the distributor 60 is configure to sequentially
charge the first reducing material and the second reducing material. The first reducing
material may be charged to the center portion of the melting and gasifying furnace
20 and the second reducing material may be charged to the periphery portion of the
melting and gasifying furnace 20.
[0060] As described in the above, by varying the tilting angle of the rotation chute, the
distributor 60 may finally control the falling position of the charging material discharged
through the rotation chute.
[0061] Accordingly, the distributor 60 may vary the tilting angle of the rotation chute
in accordance with the supply timing of the first reducing material and the second
reducing material alternately supplied along the charging material transfer pipe 50.
Thus, the first reducing material and the second reducing material can be separately
charged at desired positions.
[0062] That is, when the first reducing material reaches the charging material transfer
pipe 50 or the reducing material discharging screw 49, the distributor 60 directs
the rotation chute toward the center of the melting and gasifying furnace 20. When
the second reducing material reaches the charging material transfer pipe 50 or the
reducing material discharging screw 49 after the completion of charging the first
reducing material, the rotation chute is directed to the periphery of the melting
and gasifying furnace 20. Thus, the respective reducing materials are separately charged.
[0063] The control operation of the distributor 60, for example, may calculate, in accordance
with the opening and closing timings of the first reducing material storage bin 42
and the second reducing material storage bin 44 and the moving speed of the reducing
material transfer line 46, the timing at which the first reducing material and the
second reducing material are supplied to the reducing material transfer pipe 50. Further,
the rotation chute of the distributor 60 may be controlled in accordance with the
supply timing of the respective reducing materials. Thereby, the first reducing material
and the second reducing material may be charged into a desired region in the melting
and gasifying furnace 20.
[0064] In the present embodiment, the reduced material charged into the melting and gasifying
furnace 20 may be configured to be charged into the periphery of the melting and gasifying
furnace 20 along with the second reducing material.
[0065] To this end, the reduced material transfer line 32 may be opened when the second
reducing material is transferred to the charging material transfer pipe 50 to supply
the reduced material to the charging material transfer pipe 50. The reduced material
discharge screw 39 installed in the reduced material transfer line 32 may be operated
to supply the reduced material to the charging material transfer pipe 50 and, together
with the second reducing material supplied to the charging material transfer pipe
50, may be charged into the periphery of the gasifying furnace 20.
[0066] In a state in which the first reducing material is transferred along the reducing
material transfer line 46 and supplied to the charging material transfer pipe 50,
the reducing material discharging screw 39 installed in the reduced material transfer
line 32 stops the operation to prevent the reduced material from being supplied to
the first reducing material. Thus, the reduced material may be supplied only when
the second reducing material is supplied and mixed with the second reducing material,
and the mixture is charged into the periphery of the melting and gasifying furnace
20.
[0067] As illustrated by FIG. 2, a plurality of storage bins 45, middle bins 47, and charging
bins 48 may be further provided along the reducing material transfer line 46 for smooth
and quantitative supply of the reducing material and may be sequentially connected.
In the present embodiment, the first reducing material and the second reducing material
which are alternately supplied along the reducing material transfer line 46 are loaded
and transferred, in the same order, while passing through the storage bins, the middle
bins, and the charging bins. Thus, the first reducing material and the second reducing
material may be separately supplied to the reducing material transfer pipe 50. Finally,
the first reducing material and the second reducing material may be differentiated
and separated through the distributor 60.
[0068] A plurality of storage bins 35, intermediate bins 37, and charging bins 38 may be
further provided along the reduced material transfer line 32 for more smoothly and
quantitatively supplying the reduced material, and may be sequentially connected.
[0069] Hereinafter, a process of manufacturing molten iron according to the present embodiment
will be described.
[0070] The reduced material went through the reducing furnace 10 is contained in the reduced
material storage bin 30 and is prepared and supplied to the charging material transfer
pipe 50 through the reduced material transfer line 32. The reducing material is differentiated
by a first reducing material and a second reducing material, which are separately
stored in a first reducing material storage bin 42 and a second reducing material
storage bin 44, respectively.
[0071] The first reducing material storage bin 42 and the second reducing material storage
bin 44 are alternately opened in order to sequentially supply the first reducing material
and the second reducing material along the reducing material transfer line 46. The
first reducing material and the second reducing material supplied along the reducing
material transfer line 46 are alternately supplied to the charging material transfer
pipe 50 connected to the exit side of the reducing material transfer line 46.
[0072] The distributor 60 installed in the melting and gasifying furnace 20 separates the
first reducing material and the second reducing material supplied through the charging
material transfer pipe 50 and alternately charges them in the melting and gasifying
furnace 20. In the present embodiment, the distributor 60 is controlled and driven
in accordance with the supply timing of the first reducing material and the second
reducing material. It sequentially charges the first reducing material to the center
of the melting and gasifying furnace 20 and the second reducing material to the periphery
of the melting and gasifying furnace 20.
[0073] In this process, the reduced material is supplied to the charging material transfer
pipe 50 through the reduced material transfer line 32 in accordance with the timing
when the second reducing material is charged into the melting and gasifying furnace
20 in order. Thus, the reduced material is mixed with the second reducing material
and charged into the melting and gasifying furnace 20.
[0074] Thus, the first reducing material and the second reducing material are separated
from each other, and the first reducing material is distributed in the center of the
melting and gasifying furnace 20 and the second reducing material is distributed in
the peripheral portion.
[0075] FIG. 3 schematically shows the charging state of the charging material charged in
the melting and gasifying furnace according to the present embodiment.
[0076] As shown in FIG. 3, without mixing the first reducing material and the second reducing
material, the first reducing material is charged into the center of the melting and
gasifying furnace 20, and the second reducing material mixed with the reduced material
is charged into the periphery of the melting and gasifying furnace 20. The distributor
sequentially charges the first reducing material and the second reducing material.
Thus, although a certain level of mixing occurs at the boundary portion between the
central portion and the peripheral portion of the melting and gasifying furnace, the
distribution regions of the first reducing material and the second reducing material
are divided, and charged without being mixed.
[0077] In the center of the melting and gasifying furnace, only the pre-dried first reducing
material is charged, which causes less division compared to the peripheral portion,
and thus the size of the pores is large and the porosity is also large.
[0078] The first reducing material charged in the center of the melting and gasifying furnace
replace the lower bed as time passes by and fills the hearth area under the tuyere
of the melting and gasifying furnace. Thus, the molten material can be more easily
flowed down to the bottom of the melting and gasifying furnace.
[0079] As is known, since oxygen may be blown through a tuyere on the outer wall side, it
is difficult for the gas to flow toward the center of the melting and gasifying furnace.
However, according to the present embodiment, as only the first reducing material
is charged in the central portion, the gas can flow more easily to the central portion
of the melting and gasifying furnace. Further, the charging material at the center
of the melting and gasifying furnace is heated to increase the temperature. Then,
due to the lower viscosity, the molten material may flow down more easily.
[0080] The second reducing material is charged in the peripheral portion of the melting
and gasifying furnace. Thus, the size of the pores is not increased but the porosity
is larger than that of the conventional mixed packing structure. That is, in the melting
and gasifying furnace, the resistance of the entire bed with respect to the flowing
down of molten material and the resistance of the entire bed with respect to the flowing
up of the reducing gas are reduced. Due to the reduced resistance, the gas flow is
stabilized, and the discharge of the molten material is smooth. Thus, the operation
of the melting and gasifying furnace can be stabilized and the productivity can be
increased.
[0081] The reduced material as a raw material is charged to the peripheral portion of the
melting and gasifying furnace together with the second reducing material. In the melting
and gasifying furnace, oxygen may be blown through the tuyere on the outer wall. Thus,
the gas flows up mainly to the peripheral portion of the melting and gasifying furnace,
so that the reducing gas may easily reduce and heat the raw material.
[0082] As described in the above, according to this embodiment, the first reducing material
and the second reducing material are separated from each other and charged in the
melting and gasifying furnace. Thus, the gas flow may be stabilized and the flow of
the molten material is smooth so that the productivity can be increased and the fuel
consumption can be reduced. In addition, the production cost can be lowered by minimizing
the amount of pre-dried coal that is expensive to produce.
[0083] FIG. 4 and FIG. 5 illustrate the charging structure of charging material according
to another embodiment.
[0084] In the following description, the same symbols are used for the parts already mentioned
in the above among the parts of the apparatus, and a detailed description thereof
will be omitted.
[0085] As illustrated in FIG. 4, in the present embodiment, the reducing material transfer
line 46 is further provided with an additional first transfer line 70 transferring
the first reducing material to separately transferring the first reducing material
and the second reducing material through the first transfer line 70 and the reducing
material transfer line 46. Further, in the melting and gasifying furnace 20, an additional
first distributor 80 connected to the first transfer line 70 may be further provided
in addition to the distributor 60 connected to the reducing material transfer line
46 to separate the first reducing material and the second reducing material by the
first distributor 80 and the distributor 60 and simultaneously charge into the melting
and gasifying furnace 20.
[0086] Since the first distributor 80 supplies only the first reducing material to the center
of the melting and gasifying furnace 20 unlike the distributor 60, the first reducing
material discharge angle may be fixed to the center of the melting and gasifying furnace.
Or the first distributor 80 may have the same structure as that of the distributor
60 and may be configured in which the angle of the rotation chute is set to center.
It is sufficient that the first distributor 80 can charge the first reducing material
to the center of the melting and gasifying furnace, and its structure and installation
position can be variously modified.
[0087] The first transfer line 70 may be connected to the melting and gasifying furnace
20 by branching from one side of the reducing material transfer line 46. In this case,
the first reducing material and the second reducing material may be sequentially supplied
to the reducing material transfer line 46 upon opening the first reducing material
storage bin 42 and the second reducing material storage bin 44. During the transfer
process, the first reducing material is transferred through the first transfer line
70, and only the second reducing material can be transferred through the reducing
material transfer line 46.
[0088] The first reducing material storage bin 42 containing the first reducing material
and the second reducing material storage bin 44 containing the second reducing material
may be connected to the first transfer line 70 and the reducing material transfer
line 46, respectively. Thus, the reducing material can be separately supplied.
[0089] Like the reducing material transfer line 46, the first transfer line 70 also may
be further provided with a plurality of storage bins 72, intermediate bins 74, and
charging bins 76, along the first transfer line 70, for a smoother and a fixed amount
supply of the first reducing material, which may be sequentially connected. A discharge
screw 78 for discharging the first reducing material in a fixed amount may further
be provided on the exit side of the first transfer line.
[0090] The reducing material transfer line 46 is connected to the charging material transfer
pipe 50 and the charging material transfer pipe 50 is connected to the distributor
60. A reduced material transfer line 32 for supplying a reduced material is connected
to the charging material transfer pipe 50.
[0091] A first distributor 80 may be installed on the upper portion of the melting and gasifying
furnace 20 in addition to the distributor 60. The first transfer line 70 may be connected
to the first distributor 80 to supply the first reducing material to the first distributor
80.
[0092] The distributor 60 may charge only the second reducing material and the reduced material
to the melting and gasifying furnace 20, and the first distributor 80 may charge only
the first reducing material transferred along the first transfer line 70 to the melting
and gasifying furnace 20.
[0093] Therefore, for the distributor 60, the tilting angle of the rotation chute can be
set to the periphery of the melting and gasifying furnace 20 so that the second reducing
material can be charged into the periphery of the melting and gasifying furnace 20.
Since the first distributor 80 also charges only the first reducing material, the
tilting angle of the rotation chute can be set to the center of the melting and gasifying
furnace 20 so that the first reducing material can be charged to the center of the
melting and gasifying furnace 20.
[0094] Accordingly, in this embodiment, as the first reducing material and the second reducing
material are charged through the first distributor 80 and the distributor 60, respectively,
the charging of the first reducing material and the second reducing material is performed
at the same time and continuously.
[0095] Thus, the first reducing material and the second reducing material are continuously
charged into the melting and gasifying furnace 20, and the first reducing material
is distributed to the central portion of the melting and gasifying furnace 20, and
the second reducing material is distributed to the peripheral portion.
[0096] Fig. 5 schematically shows the charging state of the charging material charged into
the melting and gasifying furnace according to the present embodiment.
[0097] As shown in FIG. 5, without mixing the first reducing material and the second reducing
material, the first reducing material is charged into the center of the melting and
gasifying furnace 20, and the second reducing material mixed with the reduced material
is charged into the periphery of the melting and gasifying furnace 20. Further, as
the first reducing material and the second reducing material are continuously charged
without interruption, the mixing of the first reducing material and the second reducing
material can be minimized at the boundary between the center and the periphery of
the melting and gasifying furnace. Thus, the fluctuation of the temperature and the
gas composition in the dome portion of the melting and gasifying furnace can be minimized,
and the amount of the first reducing material charged into the center portion can
be further reduced.
[0098] As explained in the above, while the illustrative embodiments of the present invention
have been shown and described, various modifications and alternative embodiments may
be made by those skilled in the art. Such variations and other embodiments will be
considered and included in the appended claims, without departing from the true spirit
and scope of the invention.
[Description of Symbols]
[0099]
10 : The reducing furnace 20 : The melting and gasifying furnace
30 : The reduced material storage bin 32 : The reduced material transfer line
40 : The reducing material storage bin 42 : The first reducing material storage bin
44 : The second reducing material storage bin 46 : The reducing material transfer
line
50 : Charging material transfer pipe 60 : Distributor
70 : The first transfer line 80 : The first distributor
1. A method of manufacturing molten iron by charging a reducing material and a reduced
material supplied from a reducing furnace into a melting and gasifying furnace, blowing
oxygen to manufacture molten iron, and supplying a reducing gas to a reducing furnace
to reduce iron ore, comprises:
a reduced material preparation step of preparing a reduced material,
a reducing material preparation step of preparing a first reducing material which
is pre-dried and a second reducing material which is not pre-dried without being mixed
with each other as a reducing material, and
a charging step of charging the reduced material and the reducing material into the
melting and gasifying furnace,
wherein the charging step comprises a separation charging step of charging the first
reducing material and the second reducing material into the melting and gasifying
furnace without being mixed with each other.
2. A method of manufacturing molten iron by charging a reducing material and a reduced
material supplied from a reducing furnace into a melting and gasifying furnace, blowing
oxygen to manufacture molten iron, and supplying a reducing gas to a reducing furnace
to reduce iron ore, comprises:
a reduced material preparation step of preparing a reduced material,
a reducing material preparation step of preparing a first reducing material having
a relatively large size and a second reducing material having a relatively small size
as a reducing material, and
a charging step of charging the reduced material and the reducing material into the
melting and gasifying furnace,
wherein the charging step comprises a separation charging step of charging the first
reducing material and the second reducing material into the melting and gasifying
furnace without being mixed with each other.
3. The method according to Claims 1 or 2,
wherein the first reducing material is charged into the center of the melting and
gasifying furnace and the second reducing material is charged into the periphery of
the melting and gasifying furnace in the separation charging step.
4. The method according to Claim 3,
wherein the charging step comprises a step of mixing the reduced material with the
second reducing material to mix the reduced material with the second reducing material
and charge a mixture to the periphery of the melting and gasifying furnace.
5. The method according to Claim 3,
wherein the reducing material preparation step comprises a step of alternately discharging
the first reducing material and the second reducing material from each of the first
reducing material storage bin containing the first reducing material and the second
reducing material storage bin containing the second reducing material and transferring,
along the reducing material transfer line.
6. The method according to Claim 5,
wherein the charging step sequentially charges the first reducing material and the
second reducing material, which are alternately transferred to the melting and gasifying
furnace, through a distributor installed in the melting and gasifying furnace.
7. The method according to Claim 3,
wherein the charging step comprises a step of separating the first reducing material
and the second reducing material and transferring to the melting and gasifying furnace,
and a step of simultaneously charging the first reducing material and the second reducing
material through an additional distributor installed in the melting and gasifying
furnace.
8. An apparatus for manufacturing a molten iron comprises: a reducing furnace for reducing
iron-containing material to convert to a reduced material; a melting and gasifying
furnace manufacturing molten iron by charging a reduced material and a reducing material;
a reduced material storage bin containing the reduced material converted in the reducing
furnace; a reduced material transfer line for supplying the reduced material discharged
from the reduced material storage bin to the melting and gasifying furnace; a reducing
material storage bin containing a reducing material; a reducing material transfer
line for supplying the reducing material discharged from the reducing material storage
bin to the melting and gasifying furnace; and a distributor installed in the melting
and gasifying furnace for charging the transferred reduced material and the lump carbon
material into the melting and gasifying furnace,
wherein the reducing material storage bin comprises the first reducing material storage
bin containing a first reducing material which is pre-dried and the second reducing
material storage bin containing a second reducing material which is not pre-dried
and the first reducing material and the second reducing material are separately supplied,
and wherein the distributor charges the first reducing material and the second reducing
material into the melting and gasifying furnace without being mixed with each other.
9. An apparatus for manufacturing a molten iron comprises:
a reducing furnace for reducing iron-containing material to convert to a reduced material;
a melting and gasifying furnace manufacturing molten iron by charging a reduced material
and a reducing material; a reduced material storage bin containing the reduced material
converted in the reducing furnace; a reduced material transfer line for supplying
the reduced material discharged from the reduced material storage bin to the melting
and gasifying furnace; a reducing material storage bin containing a reducing material;
a reducing material transfer line for supplying the reducing material discharged from
the reducing material storage bin to the melting and gasifying furnace; and a distributor
installed in the melting and gasifying furnace for charging the transferred reduced
material and the lump carbon material into the melting and gasifying furnace,
wherein the reducing material storage bin comprises a first reducing material storage
bin containing a first reducing material having a relatively large size, and a second
reducing material storage bin containing a second reducing material having a relatively
small size, and the first reducing material and the second reducing material are separately
supplied and wherein the distributor charges the first reducing material and the second
reducing material into the melting and gasifying furnace without being mixed with
each other.
10. The apparatus according to Claims 8 or 9,
wherein the distributor is configured to charge the first reducing material to the
center of the melting and gasifying furnace and the second reducing material to the
periphery of the melting and gasifying furnace.
11. The apparatus according to Claim 10,
further comprising a charging material transfer pipe connected to the reduced material
transfer line and the reducing material transfer line and installed in the melting
and gasifying furnace to supply the reduced material and the lump carbon material
to the distributor,
wherein the reduced material transfer line is configured to be opened when the second
reducing material is transferred to the charging material transfer pipe to supply
the reduced material to the charging material transfer pipe and charge into the melting
and gasifying furnace with the second reducing material.
12. The apparatus according to Claim 10,
wherein the reducing material storage bin alternately discharges the first reducing
material and the second reducing material by alternately opening and closing the first
reducing material storage bin and the second reducing material storage bin, along
the reducing material transfer line.
13. The apparatus according to Claim 12,
wherein the distributor is configured to sequentially charge the first reducing material
and the second reducing material, which are alternately transferred through the charging
material transfer pipe, to the melting and gasifying furnace.
14. The apparatus according to Claim 10,
wherein the reducing material transfer line further comprises an additional first
transfer line transferring the first reducing material to separately transferring
the first reducing material and the second reducing material through the first transfer
line and the reducing material transfer line, and wherein the apparatus further comprises
an additional first distributor installed in the melting and gasifying furnace and
connected to the first transfer line to separate the first reducing material and the
second reducing material by the first distributor and the distributor and to simultaneously
charge into the melting and gasifying furnace.