TECHNICAL FIELD
[0001] The present invention mainly relates to a yarn winding machine having a yarn joining
cart capable of traveling with respect to a winding unit.
BACKGROUND ART
[0002] Conventionally, in a yarn winding machine, a configuration in which a yarn joining
cart travels and performs a yarn joining operation based on a yarn joining signal
outputted by a winding unit has been known. Patent Document 1 (Japanese Patent Application
Laid-Open No.
1998-001259) discloses a spinning machine with this type of configuration.
[0003] The spinning machine in Patent Document 1 includes a plurality of units (winding
units) that wind a yarn spun by an air spinning nozzle into a package.
[0004] When a yarn breakage occurs in a unit, such unit sends a signal requiring a yarn
joining (yarn joining signal). Upon receipt of the signal, a work cart (yarn joining
cart) stops at an operation position with respect to the unit, and performs a yarn
joining operation.
SUMMARY OF THE INVENTION
[0005] In the spinning machine, when a yarn breakage occurs, a cleaning operation of a spinning
device may be performed for the purpose of removing fiber waste etc. clogged in a
spinning nozzle before the yarn joining operation and resumption of winding, but this
is not mentioned in Patent Document 1.
[0006] Although Patent Document 1 does not disclose it, the spinning machine may include
a yarn accumulation device that temporarily accumulates the yarn before winding the
yarn into the package. In such spinning machine, when the yarn breakage occurs, it
is necessary to remove the yarn remained in the yarn accumulation device before the
yarn joining operation and resumption of winding.
[0007] Conventionally, when the yarn breakage occurs, each of the winding units sends the
yarn joining signal after completion of a preparation operation for joining the yarn
(for example, the cleaning operation of the spinning device, and a residual yarn removing
operation of the yarn accumulation device). Therefore, a time from occurrence of the
yarn breakage to the yarn joining operation and resumption of winding is prolonged,
which causes decrease in working efficiency.
[0008] An object of the present invention is to provide a yarn winding machine capable of
efficiently performing a yarn joining work and reducing a waiting time for the yarn
joining.
[0009] According to a first aspect of the present invention, a yarn winding machine with
the following configuration is provided. That is, the yarn winding machine includes
a plurality of winding units and at least one yarn joining cart. Each of the winding
units winds a yarn. The yarn joining cart performs a yarn joining operation with respect
to each of the winding units. After occurrence of a yarn breakage, a relevant winding
unit performs a preparation operation to be prepared for the yarn joining operation.
The yarn joining cart performs a yarn joining travel so as to be positioned at an
operating position to perform the yarn joining operation with respect to the winding
unit in which the yarn breakage has occurred. The yarn joining travel is to start
traveling toward the operating position, to cancel a current traveling and stop at
the operating position, or to travel at a decelerated speed from a current traveling
speed. If there is no completion winding unit that is the winding unit in which the
preparation operation has been completed and if there is a preparation winding unit
that is the winding unit during the preparation operation, the yarn joining cart performs
the yarn joining travel with respect to the preparation winding unit.
[0010] As such, the yarn joining cart performs the yarn joining travel during a time when
the winding unit performs the preparation operation. Thereby, a yarn joining work
including the yarn joining travel and the yarn joining operation can be more efficiently
performed and a waiting time for the yarn joining can be reduced.
[0011] In the yarn winding machine, when a current position where the yarn joining cart
is stopped coincides with the operating position where the yarn joining operation
is to be performed with respect to the winding unit in which the yarn breakage has
occurred, it is preferable that the yarn joining cart maintains the current position
without performing the yarn joining travel.
[0012] Accordingly, a cart positioning in view of the current position and the operating
position of the yarn joining cart can be reasonably performed.
[0013] In the yarn winding machine, it is preferable that each of the winding units includes
a control section for transmitting a yarn joining notice signal after occurrence of
the yarn breakage and before completion of the preparation operation.
[0014] Accordingly, a start timing of the yarn joining travel of the yarn joining cart with
respect to the operating position at which the yarn joining operation is scheduled
to be performed can be instructed with a simple configuration.
[0015] The yarn winding machine is preferably configured as follows. That is, each of the
winding units includes a detection section. The detection section detects success
or failure of the preparation operation. The control section cancels the yarn joining
notice signal if the detection section detects the failure of the preparation operation
after transmission of the yarn joining notice signal.
[0016] Accordingly, the yarn joining travel with respect to the preparation winding unit
in which the preparation operation has failed after transmission of the yarn joining
notice signal can be promptly canceled, and the yarn joining cart can prepare to respond
to a yarn joining request from other winding units.
[0017] In the yarn winding machine, it is preferable that the control section transmits
a preparation completion signal after the preparation operation is completed.
[0018] Accordingly, the yarn joining cart can be informed that the yarn joining operation
with respect to the winding unit can be started.
[0019] In the yarn winding machine, provided that a first preparation winding unit is one
of the preparation winding units, and a second preparation winding unit is another
one of the preparation winding units that is located in a range, which the yarn joining
cart can reach from a current traveling position within a predetermined first traveling
time, during the yarn joining travel of the yarn joining cart with respect to the
first preparation winding unit, when the second preparation winding unit transmits
the yarn joining notice signal, it is preferable that the yarn joining cart cancels
the yarn joining travel with respect to the first preparation winding unit and performs
the yarn joining travel with respect to the second preparation winding unit.
[0020] Accordingly, depending on a situation of each winding unit, the yarn joining cart
can preferentially perform the yarn joining work with respect to the winding unit
that is located at a position close to the current traveling position. Therefore,
the yarn joining work with respect to the plurality of preparation winding units can
be more efficiently performed.
[0021] In the yarn winding machine, when the preparation winding unit transmits the yarn
joining notice signal and the completion winding unit transmits the preparation completion
signal, it is preferable that the yarn joining cart preferentially performs the yarn
joining travel based on the preparation completion signal.
[0022] Accordingly, when the preparation winding unit and the completion winding unit exist
at the same time, the yarn joining work by the yarn joining cart can be more efficiently
performed for the entire yarn winding machine.
[0023] In the yarn winding machine, during the yarn joining travel of the yarn joining cart
with respect to the preparation winding unit which has transmitted the yarn joining
notice signal, when the completion winding unit, which is located in a range, which
the yarn joining cart can reach from the current traveling position within a second
traveling time determined based on an operation time of the preparation operation
of the preparation winding unit, transmits the preparation completion signal, it is
preferable that the yarn joining cart cancels the yarn joining travel with respect
to the preparation winding unit and performs the yarn joining travel with respect
to the completion winding unit which has transmitted the preparation completion signal.
[0024] Accordingly, a priority order of the yarn joining work can be flexibly changed depending
on a situation of each winding unit.
[0025] The yarn winding machine is preferably configured as follows. That is, the yarn winding
machine includes an air spinning device. The air spinning device forms a yarn by applying
twists to a fiber bundle by using a swirling airflow current. During a period after
occurrence of the yarn breakage and before the yarn joining operation by the yarn
joining cart, the winding unit performs a cleaning operation of the air spinning device
as the preparation operation. When the preparation winding unit transmits the yarn
joining notice signal, a time interval from start to end of the cleaning operation
performed by the preparation winding unit at least partly overlaps a time interval
from start to end of the yarn joining travel performed by the yarn joining cart with
respect to the preparation winding unit.
[0026] Accordingly, the cleaning operation of the air spinning device and the yarn joining
travel of the yarn joining cart can be performed concurrently, thereby the yarn joining
work can be performed more efficiently.
[0027] The yarn winding machine is preferably configured as follows. That is, the yarn winding
machine includes a yarn accumulation roller. The yarn accumulation roller temporarily
accumulates the yarn. During a period after occurrence of the yarn breakage and before
the yarn joining operation to be performed by the yarn joining cart, the winding unit
performs a residual yarn removing operation as the preparation operation, for removing
the yarn remaining on the yarn accumulation roller from the yarn accumulation roller.
When the preparation winding unit transmits the yarn joining notice signal, a time
interval from start to end of the residual yarn removing operation performed by the
preparation winding unit at least partly overlaps a time interval from start to end
of the yarn joining travel performed by the yarn joining cart with respect to the
preparation winding unit.
[0028] Accordingly, the residual yarn removing operation and the yarn joining travel of
the yarn joining cart can be performed concurrently, thereby the yarn joining work
can be performed more efficiently.
[0029] The yarn winding machine is preferably configured as follows. That is, in occurrence
of two preparation winding units, when the yarn is remaining on the yarn accumulation
roller of one of the preparation winding units and the yarn is not remaining on the
yarn accumulation roller of a different preparation winding unit, the yarn joining
cart performs the yarn joining travel with respect to the different preparation winding
unit.
[0030] Accordingly, the priority order of the yarn joining work can be flexibly determined
depending on a residual state of the yarn on the yarn accumulation roller of the preparation
winding unit.
[0031] The yarn winding machine is preferably configured as follows. That is, each of the
winding units further includes a detection device for detecting the length of a yarn
defect included in the yarn. In occurrence of the two preparation winding units, the
yarn joining cart performs the yarn joining travel with respect to the preparation
winding unit in which the detected length of the yarn defect is shorter.
[0032] Accordingly, the priority order of the yarn joining work can be flexibly determined
depending on the length of the yarn defect in the preparation winding unit.
[0033] In the yarn winding machine, each of the winding units preferably has a display for
displaying that the yarn joining notice signal has been transmitted.
[0034] Accordingly, an operator can easily identify the winding unit which has transmitted
the yarn joining notice signal.
[0035] According to a second aspect of the present invention, the following yarn winding
method is provided. That is, in the yarn winding method, a package is formed by winding
the yarn while traversing the yarn in each of a plurality of winding units. The yarn
winding method includes a preparation step and a yarn joining travel step. In the
preparation step, the winding unit is prepared to be ready for the yarn joining operation
after occurrence of the yarn breakage in the winding unit. In the yarn joining travel
step, in order to position the yarn joining cart, which performs the yarn joining
operation with respect to the winding unit, at an operating position where the yarn
joining cart performs the yarn joining operation with respect to the winding unit
in which the yarn breakage has occurred, the yarn joining cart starts traveling toward
the operating position, cancels the current traveling and stops at the operating position,
or travels at a decelerated speed from the current traveling speed. If there is no
completion winding unit that is the winding unit in which the preparation step is
completed and if there is the preparation winding unit that is the winding unit during
the preparation step, the yarn joining travel step with respect to the preparation
winding unit is performed.
[0036] Accordingly, the yarn joining travel step is performed during the period of the preparation
step in the winding unit, thereby shortening the waiting time for the yarn joining.
BRIEF DESCRIPTION OF THE DRAWINGS
[0037]
Fig. 1 is a front view showing an overall configuration of a spinning machine according
to one embodiment of the present invention.
Fig. 2 is a side view showing a spinning unit and a yarn joining cart.
Fig. 3 is a schematic view showing a travel of the yarn joining cart with respect
to a yarn joining notice signal.
Fig. 4 is a schematic view showing a state in which two preparation spinning units
appeared at different timings.
Fig. 5 is a schematic view showing a state in which the preparation spinning unit
and a completion spinning unit exist at the same time.
Fig. 6 is a schematic view showing a state in which the preparation spinning unit
and the completion spinning unit appeared at different timings.
Fig. 7 is a schematic view showing a variation of work areas of yarn joining carts.
EMBODIMENT FOR CARRYING OUT THE INVENTION
[0038] Next, a spinning machine (yarn winding machine) 1 according to one embodiment of
the present invention will be described with reference to the drawings. In the following
description, the terms "upstream" and "downstream" refer to upstream and downstream,
in a traveling direction of a sliver 15, a fiber bundle 8, and a spun yarn 10, at
a time of winding the spun yarn (yarn) 10.
[0039] The spinning machine 1 shown in Fig .1 includes a blower box 80, a motor box 5, a
plurality of spinning units (winding units) 2 arranged side by side in one line, and
a yarn joining cart 3.
[0040] The spinning machine 1 includes a central control device 4 which controls each component.
The central control device 4 is connected to a unit control section 50 (see Fig. 2),
which will be described later, provided in each of the spinning units 2 via a signal
line (not shown). One unit control section 50 may be provided for every predetermined
number of spinning units 2, and may not be provided for every single spinning unit
2.
[0041] A negative pressure source, etc. for supplying negative pressure to each spinning
unit 2 is arranged inside the blower box 80 shown in Fig. 1. A common driving source
for each of the spinning units 2 is arranged in the motor box 5.
[0042] In the spinning machine 1 of this embodiment, a unit number as an identifier is assigned
to each of the spinning units 2 so as to identify each of the spinning units 2. Specifically,
as indicated by circled numbers in Fig. 3, the unit numbers 1, 2, 3, ... are assigned
to each of the spinning units 2 from one end of a machine frame of the spinning machine
1. Although not all the spinning units 2 are shown in the drawings, the spinning machine
1 of this embodiment has ninety-six spinning units 2, for example.
[0043] As shown in Fig. 1, each of the spinning units 2 mainly includes a spinning device
9 and a winding device 13, which are arranged in order from upstream to downstream.
[0044] Each of the spinning units 2 further includes a draft device 7 and a yarn accumulation
device 12.
[0045] The draft device 7 is provided near an upper end of a frame 6 of the spinning machine
1. As shown in Fig. 2, the draft device 7 has four pairs of draft rollers, which are
a pair of back rollers 16, a pair of third rollers 17, a pair of middle rollers 19,
and a pair of front rollers 20, in order from an upstream side. An apron belt 18 is
provided with respect to each roller in the pair of middle rollers 19.
[0046] The draft device 7 transports the sliver 15 that is supplied from a sliver case (not
shown) while sandwiching the sliver 15 between the rollers included in the pair of
draft rollers. Thereby, the sliver 15 is stretched (drafted) to a predetermined fiber
amount (or thickness) and the fiber bundle 8 is formed. The fiber bundle 8 formed
by the draft device 7 is supplied to the spinning device 9.
[0047] The spinning device (air spinning device) 9 includes a spinning nozzle (not shown)
and forms the spun yarn (yarn) 10 by applying twists to the fiber bundle 8 that is
supplied from the draft device 7 by using a swirling airflow current that is generated
by injecting compressed air from the spinning nozzle into the spinning device 9.
[0048] In this embodiment, the spinning device 9 includes a nozzle block (not shown) and
a hollow guide shaft (not shown). The nozzle block has a fiber guide section, the
spinning nozzle, and a spinning chamber. The hollow guide shaft has a yarn passage
and a second nozzle. An operation of the spinning device 9 is controlled by the unit
control section 50.
[0049] The fiber guide section is a member for guiding the drafted fiber bundle 8 into the
spinning device 9 (spinning chamber). The spinning device 9 injects the air from the
spinning nozzle into the spinning chamber and makes the swirling airflow current to
act on the fiber bundle 8 inside the spinning chamber. As a result of the action of
such swirling airflow current, each fiber end of the plurality of fibers that constitute
the fiber bundle 8 is reversed and swirled. The hollow guide shaft is a cylindrical
member. A yarn passage is formed inside the hollow guide shaft. The hollow guide shaft
guides the spun yarn 10 from the inside of the spinning chamber to the outside of
the spinning device 9.
[0050] When performing a yarn discharge spinning for starting a spinning operation, the
spinning device 9 injects the air from the second nozzle into the yarn passage to
generate a swirling airflow current inside the yarn passage. A direction of the swirling
airflow current generated inside the yarn passage at this time is opposite to the
direction of the swirling airflow current in the spinning chamber. Accordingly, the
fiber bundle 8 is introduced from the draft device 7 into the spinning device 9, and
then forming of the spun yarn 10 is started.
[0051] If the spinning unit 2 is configured to join the spun yarn 10 by piecing, the hollow
guide shaft does not have the second nozzle, but has another nozzle. The air is injected
from such another nozzle in order to reversely feed the spun yarn 10 from a package
45 back into the spinning device 9.
[0052] A yarn accumulation device 12 is provided downstream of the spinning device 9. As
shown in Fig. 2, the yarn accumulation device 12 has a yarn accumulation roller 14,
a motor 25 for rotationally driving the yarn accumulation roller 14, a first accumulated
yarn detection sensor 21, and a second accumulated yarn detection sensor 22.
[0053] The yarn accumulation roller 14 temporarily accumulates the spun yarn 10 by winding
a certain amount of the spun yarn 10 on an outer peripheral surface thereof. The yarn
accumulating roller 14 pulls the spun yarn 10 from the spinning device 9 and transports
the spun yarn 10 to the downstream side at a predetermined speed by being rotated
at a predetermined rotational speed with the spun yarn 10 wound on the outer peripheral
surface thereof.
[0054] As such, since the yarn accumulating device 12 can temporarily accumulate the spun
yarn 10 on the outer peripheral surface of the yarn accumulating roller 14, the yarn
accumulating device 12 can function as a kind of buffer of the spun yarn 10. The buffering
function of the yarn accumulating device 12 avoids troubles (for example, slackening
and the like of the spun yarn 10) caused by a mismatch in a spinning speed of the
spinning device 9 and a winding speed (a traveling speed of the spun yarn 10 being
wound into the package 45 which will be described later) due to some reason.
[0055] Each of the first accumulated yarn detection sensor 21 and the second accumulated
yarn detection sensor 22 includes a reflective type of photo sensor with a light emitting
element and a light receiving element. The first accumulated yarn detection sensor
21 detects whether an accumulated amount of the spun yarn 10 accumulated on the yarn
accumulation roller 14 is equal to or more than a predetermined amount or not. The
second accumulated yarn detection sensor 22 that is arranged downstream than the first
accumulated yarn detection sensor 21, detects whether the accumulated amount of the
spun yarn 10 accumulated on the yarn accumulation roller 14 is equal to or less than
a limit value (predetermined maximum amount) or not.
[0056] The first accumulated yarn detection sensor 21 and the second accumulated yarn detection
sensor 22 have a function as a detection section for detecting success or failure
of a preparation operation which will be described later, performed after the yarn
breakage occurs.
[0057] A yarn monitoring device 59 is provided between the spinning device 9 and the yarn
accumulation device 12. The spun yarn 10 that is formed by the spinning device 9 passes
through the yarn monitoring device 59 before being wound by the yarn accumulation
device 12.
[0058] The yarn monitoring device (detection device) 59 monitors the quality (thickness
and the like) of the traveling spun yarn 10 by a light transmission sensor, and detects
a yarn defect included in the spun yarn 10 (portions having abnormality in the thickness
and the like of the spun yarn 10, foreign matters etc.) and the length of the yarn
defect. The yarn monitoring device 59 transmits a yarn defect detection signal to
the unit control section 50 when the yarn defect of the spun yarn 10 is detected.
The yarn monitoring device 59 may monitor the quality of the spun yarn 10 by using
a capacitance sensor, for example, not limited to the light transmission sensor.
[0059] Upon receipt of the yarn defect detection signal from the yarn monitoring device
59, the unit control section 50 causes the spun yarn 10 to be cut by stopping the
drive of the spinning device 9. That is, the spinning device 9 has the function as
a cutting section for cutting the spun yarn 10 when the yarn monitoring device 59
detects a yarn defect. The spun yarn 10 may be cut by using a cutter.
[0060] The winding device 13 includes a cradle arm 71, a winding drum 72, and a traverse
guide 76. The cradle arm 71 is swingably supported around a supporting shaft 73. The
cradle arm 71 can rotatably support a bobbin 48 (that is, the package 45) for winding
the spun yarn 10. The winding drum 72 is rotated in contact with the outer peripheral
surface of the bobbin 48 or the package 45, and thereby the package 45 is rotationally
driven in a winding direction. The winding device 13 drives the winding drum 72 by
an electric motor (not shown) while causing the traverse guide 76 to reciprocatingly
move by using a driving member (not shown). As a result, the spun yarn 10 is wound
into the package 45 while being traversed.
[0061] As shown in Fig. 1, a rail 41 is provided on the frame 6 of the spinning machine
1 along the direction in which the spinning units 2 are arranged side by side. The
yarn joining cart 3 is configured to travel on the rail 41.
[0062] In the spinning machine 1 of this embodiment, four yarn joining carts 3 are provided
for ninety-six spinning units 2. Each of the four yarn joining carts 3 has an exclusive
work area. For example, the exclusive work area of the yarn joining cart 3 shown in
Fig. 3 is an area where the spinning units 2 having each unit number of 1 to 24 are
arranged. If there is no yarn joining request from the spinning units 2, each of the
yarn joining carts 3 stands by at a center position of the respective work area. However,
each of yarn joining carts 3 may stand by at a position where the yarn joining operation
has just been completed. Alternatively, each of the yarn joining carts 3 may stand
by at a position moved for a predetermined distance from the position where the yarn
joining operation has just been completed.
[0063] Each of the yarn joining carts 3 performs a yarn joining work with respect to the
spinning unit 2 in which the yarn breakage has occurred. For example, when a yarn
traveling sensor (not shown) that is arranged downstream of the yarn accumulation
device 12 detects that there is no spun yarn 10, the unit control section 50 determines
that the yarn breakage has occurred. Other sensors may detect occurrence of the yarn
breakage. The yarn joining work includes a cart positioning and a yarn joining operation.
The cart positioning includes a current position maintenance for a case where the
current position where the yarn joining cart 3 under a stopped state coincides with
an operating position where the yarn joining operation is to be performed, and a yarn
joining travel for cases other than such a case where the current position coincides
with the operating position. The current position maintenance is to maintain the current
position of the yarn joining cart 3 under the stopped state. The yarn joining travel
is to travel from a position where a signal related to the yarn joining has been received
to the operating position where the yarn joining operation is to be performed. The
yarn joining operation is an operation for catching a yarn end and performing yarn
joining.
[0064] As shown in Fig. 1 etc., the yarn joining cart 3 includes a traveling wheel 42, a
yarn joining device 43, a yarn catching section (a suction pipe 44 and a suction mouth
46), a cart control section 70, and a position detection section (a signal transmitter
61 and a not-shown dock sensor).
[0065] The traveling wheel 42 is rotationally driven by a motor (not shown). By driving
the traveling wheel 42, the yarn joining cart 3 can travel along the rail 41 with
respect to the plurality of spinning units 2.
[0066] The suction pipe 44 generates a suction air stream at its tip, which can suck and
catch the spun yarn 10 from the spinning device 9. The suction mouth 46 generates
a suction air stream at its tip, which can suck and catch the spun yarn 10 from the
package 45 that is supported by the winding device 13. The suction pipe 44 and the
suction mouth 46 are swung with the caught spun yarn 10, and thereby guide the spun
yarn 10 to a position where the spun yarn 10 can be introduced into the yarn joining
device 43.
[0067] The yarn joining device 43 joins the spun yarn 10 from the spinning device 9 that
is guided by the suction pipe 44 and the spun yarn 10 from the package 45 that is
guided by the suction mouth 46. In this embodiment, the yarn joining device 43 is
a splicer device in which the yarn ends are twisted by using the swirling airflow
current. The yarn joining device 43 is not limited to the above-described splicer
device. For example, a mechanical knotter etc. may be adopted.
[0068] In a case where the yarn joining cart 3 has the yarn joining device 43, the yarn
joining operation includes an operation in which the spun yarn 10 from the spinning
device 9 is guided to the yarn joining device 43 by the suction pipe 44, an operation
in which the spun yarn 10 from the package 45 is guided to the yarn joining device
43 by the suction mouth 46, and an operation in which the spun yarns 10 are joined
by the yarn joining device 43.
[0069] The yarn joining cart 3 may be configured to join the spun yarn 10 by performing
piecing as the yarn joining operation. In this case, the yarn joining cart 3 does
not have the yarn joining device 43.
[0070] The cart control section 70 is configured as a known computer having a CPU (Central
Processing Unit), a ROM (Read Only Memory), and a RAM (Random Access Memory), etc.
(not shown). The cart control section 70 controls the operations of each component
included in the yarn joining cart 3, and thereby controls the yarn joining work performed
by the yarn joining cart 3.
[0071] The signal transmitter 61 wirelessly transmits a predetermined position confirmation
signal to the spinning unit 2 that is located at a position facing the signal transmitter
61. As shown in Fig. 3, each of the spinning units 2 has a receiving section 62 for
receiving the position confirmation signal.
[0072] When the yarn joining cart 3 stops traveling, the cart control section 70 transmits
the position confirmation signal from the signal transmitter 61 with respect to the
spinning unit 2 facing the signal transmitter 61 at such stopped position of the yarn
joining cart 3. When the receiving section 62 receives the position confirmation signal
from the yarn joining cart 3, the unit control section 50 of the spinning unit 2 transmits
a response signal including the unit number of such spinning unit 2 to the yarn joining
cart 3. Accordingly, the yarn joining cart 3 obtains its current position. The unit
control section 50 may transmit the response signal including the unit number of the
spinning unit 2 to the yarn joining cart 3 via the central control device 4.
[0073] The dock sensor detects a dock (not shown) provided in each of the spinning units
2. When the yarn joining cart 3 travels on the rail 41, the cart control section 70
counts the number of docks detected by the dock sensor, thereby obtaining a distance
corresponding to the number of units through which the yarn joining cart 3 has moved.
Accordingly, the yarn joining cart 3 can obtain its position (traveling position).
[0074] Next, the yarn joining travel (yarn joining travel step) that is performed by the
yarn joining cart 3 will be described with reference to drawings. The yarn joining
travel that is performed by the yarn joining cart 3 is traveling performed in the
following cases, for example.
[0075] As a first example, while the yarn joining cart 3 is under standby, when the signal
related to the yarn joining is received from the spinning unit 2 that is located at
a position away from the standby position, the yarn joining travel that is performed
by the yarn joining cart 3 is to travel from the current position to the operating
position with respect to the spinning unit 2 which has transmitted the signal related
to the yarn joining.
[0076] As a second example, during a time when the yarn joining cart 3 is traveling toward
one of the spinning units 2 (that is, during a time when the yarn joining cart 3 is
traveling based on a certain predetermined plan), when another spinning unit 2 with
a higher priority order appeared, the yarn joining cart 3 cancels the traveling toward
the spinning unit 2 of the initial destination, and travels toward the spinning unit
2 with the higher priority order.
[0077] As a third example, during a time when the yarn joining cart 3 is traveling toward
one of the spinning units 2 (that is, during a time when the yarn joining cart 3 is
traveling based on the certain predetermined plan), when another spinning unit 2 with
a higher priority order appeared near the current traveling position and ahead of
the current traveling direction, the yarn joining cart 3 travels at a decelerated
speed from the current traveling speed so as to be able to stop at an operating position
with respect to the spinning unit 2 with the higher priority order.
[0078] When the yarn joining cart 3 is under standby at a position associated with one of
the spinning units 2, and when the signal related to the yarn joining is received
from such one of the spinning units 2, the yarn joining cart 3 does not perform the
yarn joining travel and maintains the current position. That is, the yarn joining
cart 3 does not travel and stands by as it is.
[0079] Although three examples of the yarn joining travel have been described above, the
yarn joining cart 3 may merely perform at least one of three examples. In other words,
the yarn joining cart 3 may be configured so as to perform only one example of three
examples as the yarn joining travel.
[0080] The signal related to the yarn joining includes a yarn joining notice signal for
notifying that the yarn joining operation will be required soon, and a preparation
completion signal for indicating that the preparation operation is completed and the
yarn joining operation can be started.
[0081] In the spinning machine 1 of this embodiment, when the yarn breakage occurs in the
spun yarn 10 between the spinning device 9 and the package 45 due to some reason,
the unit control section 50 performs the preparation operation (preparation step)
as a pre-operation of the yarn joining operation that is performed by the yarn joining
cart 3. The unit control section 50 transmits the yarn joining notice signal to the
cart control section 70 of the yarn joining cart 3, during the preparation operation.
The unit control section 50 may transmit the yarn joining notice signal to the cart
control section 70 of the yarn joining cart 3 before performing the preparation operation.
[0082] The preparation operation includes a cleaning operation performed by the spinning
nozzle of the spinning device 9, and a residual yarn removing operation for removing
the spun yarn 10 remaining on the yarn accumulation roller 14. In this embodiment,
the cleaning operation and the residual yarn removing operation are started at the
same time. However, either one of the preparation operations may be started in advance.
[0083] One example of the cleaning operation will be described in more detail. When the
unit control section 50 determines that the yarn breakage has occurred, the unit control
section 50 stops the spinning operation of the draft device 7 and the spinning device
9. Then, the spinning chamber is opened by separating the hollow guide shaft from
the nozzle block. In this state, the cleaning operation is performed by injecting
air from the spinning nozzle for a predetermined time. When such air injection from
the spinning nozzle is stopped and the cleaning operation ends, the hollow guide shaft
returns to its original position.
[0084] One example of the residual yarn removing operation will be described in more detail.
When the yarn breakage occurs, the spun yarn 10 located downstream of the yarn accumulation
device 12 is wound into the package 45. However, the spun yarn 10 that is wound on
the yarn accumulation roller 14 is not wound into the package 45 and remains on the
yarn accumulation roller 14. In this embodiment, the yarn accumulation device 12 has
a residual yarn removing device (not shown) that is arranged so as to face a downstream
end portion of the yarn accumulation roller 14. The yarn accumulation device 12 rotates
the yarn accumulation roller 14 in a direction opposite to the direction in which
the yarn accumulation roller 14 is rotated during winding of the package 45, and a
suction flow is generated in a suction port of a suction pipe of the residual yarn
removing device. Accordingly, the residual yarn on the yarn accumulation roller 14
can be sucked and removed by means of the residual yarn removing device.
[0085] After completion of the cleaning operation and the residual yarn removing operation,
when the yarn joining cart 3 reached the operating position, the unit control section
50 restarts the operation of the draft device 7 and the spinning device 9, catches
the spun yarn 10 from the spinning device 9 by the suction pipe 44, and guides the
spun yarn 10 to a position where the yarn joining can be performed by the yarn joining
device 43. The yarn joining device 43 joins the spun yarn 10 from the spinning device
9 guided by the suction pipe 44 and the spun yarn 10 from the package 45 guided by
the suction mouth 46. After the yarn joining is completed by the yarn joining device
43, the yarn winding operation is restarted in the spinning unit 2.
[0086] After the start of the spinning operation of the spinning device 9, the unit control
section 50 determines success or failure of the cleaning operation (preparation operation)
based on the detection result of the yarn monitoring device 59, for example. If the
spun yarn 10 is not detected by the yarn monitoring device 59 despite starting the
spinning operation of the spinning device after the preparation operation, the unit
control section 50 determines that the cleaning operation has failed. The unit control
section 50 may determine success or failure of the cleaning operation based on a detection
result of a sensor (not shown) that is provided inside the suction pipe 44 and/or
a sensor that is provided in the spinning device 9, in addition to or instead of the
yarn monitoring device 59.
[0087] The unit control section 50 determines success or failure of the residual yarn removing
operation (preparation operation) based on the detection result of the first accumulated
yarn detection sensor 21 and/or the second accumulated yarn detection sensor 22. If
the first accumulated yarn detection sensor 21 and the second accumulated yarn detection
sensor 22 detect that the spun yarn 10 is remaining on the yarn accumulation roller
14 despite the residual yarn removing operation, the unit control section 50 determines
that the residual yarn removing operation has failed.
[0088] If the preparation operation has failed, the unit control section 50 transmits a
notice cancellation signal that is a signal for canceling the yarn joining notice
signal to the cart control section 70. In this case, the yarn joining cart 3 may stop
and stand by at the current traveling position, or may return to and stand by at the
center position in the work area.
[0089] The unit control section 50 transmits the preparation completion signal to the cart
control section 70 after completion of the preparation operation for the yarn joining
operation (after success of the preparation operation).
[0090] As shown in Fig. 3, each of the spinning units 2 has a display 60 for displaying
that the yarn joining notice signal or the preparation completion signal has been
transmitted. When the yarn joining notice signal or the preparation completion signal
is transmitted by the unit control section 50, the display 60 lights up an LED (lamp)
provided in each of the spinning units 2. When the yarn joining notice signal is canceled
by the unit control section 50 or when the yarn joining operation is completed, the
display 60 turns off the LED. Accordingly, the operator can easily check the state
of each of the spinning units 2.
[0091] In the following description, after occurrence of the yarn breakage, the spinning
unit 2 which is performing the preparation operation is referred to as a preparation
spinning unit (preparation winding unit) 2a, and the spinning unit 2 in which is the
preparation operation has been completed and which is ready for the yarn joining operation
is referred to as a completion spinning unit (completion winding unit) 2b.
[0092] As shown in Fig. 3, when there is no completion spinning unit 2b which has transmitted
the preparation completion signal and when the yarn joining notice signal is received
from the preparation spinning unit 2a, the cart control section 70 controls the yarn
joining cart 3 to start the yarn joining travel toward the operating position with
respect to the preparation spinning unit 2a. That is, the yarn joining cart 3 starts
the yarn joining travel before completion of the preparation operation of the preparation
spinning unit 2a.
[0093] In other words, the yarn joining cart 3 starts the yarn joining travel before the
preparation spinning unit 2a starts the preparation operation or during the preparation
operation. As such, the time interval from the start to the end of the preparation
operation in the preparation spinning unit 2a at least partly overlaps the time interval
from the start to the end of the yarn joining travel performed by the yarn joining
cart 3 with respect to the preparation spinning unit 2a.
[0094] As such, in the spinning machine 1, the preparation operation of the preparation
spinning unit 2a and the yarn joining travel of the yarn joining cart 3 can be performed
concurrently. The yarn joining cart 3 starts traveling toward the operating position
with respect to the preparation spinning unit 2a before completion of the preparation
operation in such preparation spinning unit 2a. When the yarn joining cart 3 reaches
the operating position, if the preparation operation has not been completed yet, the
yarn joining cart 3 stops and stands by at the operating position. When the yarn joining
cart 3 reaches the operating position, if the preparation operation has already been
completed, the yarn joining cart 3 immediately starts the yarn joining operation.
As such, the preparation step and the yarn joining travel step are performed at the
same time, thereby the yarn joining work can be efficiently performed and the time
of a yarn joining cycle from occurrence of the yarn breakage to completion of the
yarn joining can be shortened.
[0095] With reference to Fig. 4, a description will be made on a case where the preparation
spinning unit 2a having the unit number 24 firstly transmits the yarn joining notice
signal and the preparation spinning unit 2a having the unit number 20 transmits the
yarn joining notice signal at a later timing. Although the yarn joining cart 3 starts
traveling toward the preparation spinning unit 2a having the unit number 24, the yarn
joining cart 3 receives the yarn joining notice signal from the preparation spinning
unit 2a having the unit number 20 before reaching the preparation spinning unit 2a
having the unit number 24. In this situation, the cart control section 70 determines
whether or not to change a target spinning unit based on whether or not the preparation
spinning unit 2a having the unit number 20 is located in a range in which the yarn
joining cart 3 can reach from a current traveling position within a first traveling
time.
[0096] When the preparation spinning unit 2a having the unit number 20 is located in the
range in which the yarn joining cart 3 can reach from the current traveling position
within the first traveling time, the cart control section 70 changes the target spinning
unit for the yarn joining cart 3, from the preparation spinning unit 2a having the
unit number 24 to the preparation spinning unit 2a having the unit number 20. The
yarn joining cart 3 cancels the yarn joining travel with respect to the preparation
spinning unit 2a having the unit number 24, and starts the yarn joining travel with
respect to the preparation spinning unit 2a having the unit number 20.
[0097] When the preparation spinning unit 2a having the unit number 20 is not located in
the range in which the yarn joining cart 3 can reach from the current traveling position
within the first traveling time, the cart control section 70 does not change the target
spinning unit of the yarn joining cart 3, and the yarn joining cart 3 continues to
travel to the preparation spinning unit 2a having the unit number 24.
[0098] The first traveling time is preferably defined based on an operation time of the
preparation operation of the preparation spinning unit 2a which has firstly transmitted
the yarn joining notice signal, and based on the operation time of the preparation
operation of the preparation spinning unit 2a which has transmitted the yarn joining
notice signal at a later timing. The first traveling time is preferably defined in
view of a time required for the yarn joining cart 3 to travel from the current traveling
position to the operating position with respect to the preparation spinning unit 2a
which has firstly transmitted the yarn joining notice signal.
[0099] As such, when the plurality of preparation spinning units 2a has transmitted the
yarn joining notice signal, the cart control section 70 of this embodiment controls
the yarn joining travel of the yarn joining cart 3 so as to prioritize the yarn joining
operation of the preparation spinning unit 2a capable of firstly starting the yarn
joining operation, regardless of whether any one of the preparation spinning units
2a has firstly transmitted the yarn joining notice signal.
[0100] With reference to Fig. 5, a description will be made on a case where both the completion
spinning unit 2b and the preparation spinning unit 2a appeared during the yarn joining
operation with respect to one of the spinning units 2. In this case, after completion
of the yarn joining operation of the spinning unit 2, the cart control section 70
controls the yarn joining travel of the yarn joining cart 3 so as to prioritize the
yarn joining operation of the completion spinning unit 2b which has transmitted the
preparation completion signal, over the preparation spinning unit 2a which has transmitted
the yarn joining notice signal. That is, after completion of the current yarn joining
operation, the yarn joining cart 3 starts the yarn joining travel to the completion
spinning unit 2b.
[0101] However, this embodiment is not limited to the above-described example. For example,
when the time of the yarn joining travel with respect to the completion spinning unit
2b is longer than the operation time of the preparation operation of the preparation
spinning unit 2a, and when the yarn joining cart 3 can reach the operating position
with respect to the preparation spinning unit 2a before completion of the preparation
operation of the preparation spinning unit 2a, the yarn joining work with respect
to the preparation spinning unit 2a may be preferentially performed.
[0102] With reference to Fig. 6, a description will be made on a case where the preparation
spinning unit 2a having the unit number 24 firstly transmits the yarn joining notice
signal and then the completion spinning unit 2b having the unit number 2 transmits
the preparation completion signal at a later timing. Although the yarn joining cart
3 starts traveling to the preparation spinning unit 2a having the unit number 24 which
has firstly transmitted the yarn joining notice signal, the yarn joining cart 3 receives
the preparation completion signal from the completion spinning unit 2b having the
unit number 2 before reaching the preparation spinning unit 2a. In this situation,
the cart control section 70 determines whether or not to change the target spinning
unit based on whether or not the completion spinning unit 2b having the unit number
2 is located in a range in which the yarn joining cart 3 can reach from the current
traveling position within a second traveling time.
[0103] When the completion spinning unit 2b having the unit number 2 is located in the range
in which the yarn joining cart 3 can reach from the current traveling position within
the second traveling time, the cart control section 70 changes the target spinning
unit of the yarn joining cart 3, from the preparation spinning unit 2a having the
unit number 24 to the completion spinning unit 2b. The yarn joining cart 3 travels
to the completion spinning unit 2b having the unit number 2.
[0104] When the completion spinning unit 2b having the unit number 2 is not located in the
range in which the yarn joining cart 3 can reach from the current traveling position
within the second traveling time, the cart control section 70 does not change the
target spinning unit of the yarn joining cart 3, and the yarn joining cart 3 continues
to travel to the preparation spinning unit 2a having the unit number 24.
[0105] The second traveling time is preferably defined based on the operation time of the
preparation operation of the preparation spinning unit 2a. The second traveling time
is preferably defined in view of a time required for the yarn joining cart 3 to travel
from the current traveling position of the yarn joining cart 3 to the operating position
with respect to the preparation spinning unit 2b. Accordingly, even if a completion
spinning unit 2b to be basically prioritized appeared, from the viewpoint of shortening
the time of the yarn joining cycle, the yarn joining work can be performed by the
yarn joining cart 3 while appropriately prioritizing each of the spinning units 2,
based on the current traveling position of the yarn joining cart 3 and each position
of the preparation spinning unit 2a and the completion spinning unit 2b.
[0106] A textile machinery such as the spinning machine 1 may include a doffing cart for
doffing the fully wound package 45. Therefore, as with the case of the yarn joining
cart 3, the unit control section 50 may transmit a doffing notice signal to the doffing
cart at a timing to some extent before the package 45 is fully wound, and then transmit
the preparation completion signal to the doffing cart at a timing when the package
45 is actually fully wound.
[0107] In case of the doffing cart, since the operation from the doffing notice signal to
the preparation completion signal has less fluctuating elements, the order of the
spinning units 2 which transmit the doffing notice signal may be almost same as that
of the spinning units 2 which transmit the preparation completion signal. However,
in case of the yarn joining cart 3, the order of the spinning units 2 which transmit
the yarn joining notice signal does not match frequently with the order of the spinning
units 2 which transmit the preparation completion signal, due to failure of the preparation
operation or the like. Therefore, the above-described control of the cart is more
effective to be applied to the yarn joining cart 3 as in this embodiment.
[0108] As described above, the spinning machine 1 of this embodiment includes the plurality
of spinning units 2, and at least one yarn joining cart 3. Each of the spinning units
2 winds the spun yarn 10. The yarn joining cart 3 performs the yarn joining operation
with respect to the spinning units 2. After occurrence of a yarn breakage, the spinning
unit 2 performs the preparation operation to be prepared for the yarn joining operation.
The yarn joining cart 3 performs the yarn joining travel so as to be positioned at
the operating position to perform the yarn joining operation with respect to the spinning
unit 2 in which the yarn breakage has occurred. The yarn joining travel is to start
traveling toward the operating position, to cancel a predetermined scheduled traveling
and stop at the operating position, or to travel at a decelerated speed from the predetermined
scheduled traveling speed. If there is no completion spinning unit 2b that is the
spinning unit 2 in which the preparation operation has been completed and if there
is the preparation spinning unit 2a that is the spinning unit 2 during the preparation
operation, the yarn joining cart 3 performs the yarn joining travel with respect to
the preparation spinning unit 2a.
[0109] As such, the yarn joining cart 3 performs the yarn joining travel during a time when
the spinning unit 2 performs the preparation operation. Thereby, the yarn joining
work including the yarn joining travel and the yarn joining operation can be efficiently
performed and a waiting time for the yarn joining in the spinning unit 2 can be reduced.
[0110] In the spinning machine 1, when the current position where the yarn joining cart
3 is stopped coincides with the operating position where the yarn joining operation
is performed with respect to the spinning unit 2 in which the yarn breakage has occurred,
the yarn joining cart 3 maintains the current position without performing the yarn
joining travel.
[0111] Accordingly, a cart positioning in view of the current position and the operating
position of the yarn joining cart 3 can be reasonably performed.
[0112] In the spinning machine 1, the spinning unit 2 includes the unit control section
50 for transmitting the yarn joining notice signal after occurrence of the yarn breakage
and before completion of the preparation operation.
[0113] Accordingly, a start timing of the yarn joining travel of the yarn joining cart 3
with respect to the operating position at which the yarn joining operation is scheduled
to be performed can be instructed with a simple configuration.
[0114] In the spinning machine 1, the spinning unit 2 includes the first accumulated yarn
detection sensor 21 and the second accumulated yarn detection sensor 22. The first
accumulated yarn detection sensor 21 and the second accumulated yarn detection sensor
22 detect success or failure of the preparation operation. The unit control section
50 cancels the yarn joining notice signal if the first accumulated yarn detection
sensor 21 and the second accumulated yarn detection sensor 22 detect the failure of
the preparation operation after transmission of the yarn joining notice signal.
[0115] Accordingly, the yarn joining travel with respect to the preparation spinning unit
2a in which the preparation operation has failed after transmission of the yarn joining
notice signal can be promptly canceled, and the yarn joining cart 3 can prepare to
respond to the yarn joining requests from the other spinning units 2.
[0116] In the spinning machine 1, the unit control section 50 transmits the preparation
completion signal after completion of the preparation operation.
[0117] Accordingly, the yarn joining cart 3 can be informed that the yarn joining operation
with respect to the spinning unit 2 can be started.
[0118] In the spinning machine 1, provided that a first preparation winding unit is one
preparation spinning unit 2a, and a second preparation winding unit is another preparation
spinning unit 2a that is positioned in a range, which the yarn joining cart 3 can
reach from the current traveling position within a predetermined first traveling time,
during the yarn joining travel with respect to the first preparation winding unit,
when the second preparation winding unit transmits the yarn joining notice signal,
the yarn joining cart 3 cancels the yarn joining travel with respect to the first
preparation spinning unit 2a and performs the yarn joining travel with respect to
the second preparation spinning unit 2a.
[0119] Accordingly, depending on a situation of each spinning unit 2, the yarn joining cart
3 can preferentially perform the yarn joining work with respect to the spinning unit
2 that is located at a position close to the current traveling position. Therefore,
the yarn joining work with respect to the plurality of preparation spinning units
2a can be more efficiently performed.
[0120] In the spinning machine 1, when the preparation spinning unit 2a transmits the yarn
joining notice signal and the completion spinning unit 2b transmits the preparation
completion signal, the yarn joining cart preferentially performs the yarn joining
travel based on the preparation completion signal.
[0121] Accordingly, when the preparation spinning unit 2a and the completion spinning unit
2b exist at the same time, the yarn joining work of the yarn joining cart 3 can be
more efficiently performed for the entire spinning machine 1.
[0122] In the spinning machine 1, during the yarn joining travel of the yarn joining cart
3 with respect to the preparation spinning unit 2a which has transmitted the yarn
joining notice signal, when the completion spinning unit 2b, which is located in the
range, which the yarn joining cart 3 can reach from the current traveling position
within a second traveling time determined based on an operation time of the preparation
operation of the preparation spinning unit 2a, transmits the preparation completion
signal, the yarn joining cart 3 cancels the yarn joining travel with respect to the
preparation spinning unit 2a and performs the yarn joining travel with respect to
the completion spinning unit 2b which has transmitted the preparation completion signal.
[0123] Accordingly, the priority order of the yarn joining work can be flexibly changed
depending on a situation of each spinning unit 2.
[0124] The spinning machine 1 includes the spinning device 9. The spinning device 9 forms
the spun yarn 10 by applying twists to the fiber bundle 8 by using the swirling airflow
current. During the period after occurrence of the yarn breakage and before the yarn
joining operation by the yarn joining cart, the spinning unit 2 performs the cleaning
operation of the spinning device 9 as the preparation operation. When the preparation
spinning unit 2a transmits the yarn joining notice signal, a time interval from the
start to the end of the cleaning operation performed by the preparation spinning unit
2a at least partly overlaps the time interval from the start to the end of the yarn
joining travel performed by the yarn joining cart 3 with respect to the preparation
spinning unit 2a.
[0125] Accordingly, the cleaning operation of the spinning device 9 and the yarn joining
travel of the yarn joining cart 3 can be performed concurrently, thereby the yarn
joining work can be performed more efficiently.
[0126] The spinning machine 1 includes the yarn accumulation roller 14. The yarn accumulation
roller 14 temporarily accumulates the spun yarn 10. During the period after occurrence
of the yarn breakage and before the yarn joining operation to be performed by the
yarn joining cart 3, the spinning unit 2 performs the residual yarn removing operation
as the preparation operation, for removing the spun yarn 10 remaining on the yarn
accumulation roller 14 from the yarn accumulation roller 14. When the preparation
spinning unit 2a transmits the yarn joining notice signal, the time interval from
the start to the end of the residual yarn removing operation performed by the preparation
spinning unit 2a at least partly overlaps the time interval from the start to the
end of the yarn joining travel performed by the yarn joining cart 3 with respect to
the preparation spinning unit 2a.
[0127] Accordingly, the residual yarn removing operation and the yarn joining travel of
the yarn joining cart 3 can be performed concurrently, thereby the yarn joining work
can be performed more efficiently.
[0128] In the spinning machine 1, each of the spinning units 2 has the display 60 for displaying
that the yarn joining notice signal has been transmitted.
[0129] Accordingly, the operator can easily identify the spinning unit 2 which has transmitted
the yarn joining notice signal.
[0130] Although a preferred embodiment of the present invention has been described above,
the above-described configuration can be modified, for example, as follows. Even when
any one of the following examples is adopted, the yarn joining cart 3 performs the
above-described yarn joining travel. The following examples can be appropriately combined.
[0131] The cleaning operation and the residual yarn removing operation are examples of the
preparation operation. Alternately, the spinning unit 2 may perform an operation other
than the above-described operations, as the preparation operation. The spinning unit
2 may not perform at least any one of the cleaning operation and the residual yarn
removal operation as the preparation operation. If the spinning unit 2 does not perform
the cleaning operation, the hollow guide shaft may not be provided to be movable away
from the nozzle block.
[0132] Each device may be arranged in each of the winding units such that a yarn path where
the spun yarn 10 travels is oriented from bottom to top with respect to the machine
frame. In this case, the yarn joining cart 3 travels while being guided by a rail
provided in an upper portion of the spinning machine 1.
[0133] The spinning machine 1 may be configured as an open end spinning machine which applies
twists to fibers by using a rotor, etc. In this case, when the yarn breakage occurs,
the yarn joining cart 3 performs the yarn joining operation by reversely feeding the
yarn from the package 45 to the rotor and then restarting a spinning operation by
the rotor.
[0134] If there is no yarn joining request from the spinning units 2, the yarn joining cart
3 may perform the predetermined scheduled traveling for reciprocatingly traveling
at a predetermined speed between both ends of the work area. In this case, when the
yarn joining cart 3 receives the yarn joining notice signal or the preparation completion
signal, the yarn joining cart 3 cancels the predetermined scheduled traveling and
stops at the operating position with respect to the spinning unit 2 which has transmitted
the signal.
[0135] The unit control section 50 may be provided for each group of the plurality of spinning
units 2. The unit control section 50 may be omitted, and the central control device
4 may directly control each configuration of each of the spinning units 2.
[0136] The unit control section 50 may be configured to transmit the yarn joining notice
signal, the preparation completion signal, and the notice cancellation signal to the
central control device 4, for example. In this case, the central control device 4
transmits the information on which spinning unit 2 has transmitted which signal, to
the cart control section 70 of the yarn joining cart 3.
[0137] The unit control section 50 may determine success or failure of the preparation operation
only based on the detection result of the first accumulated yarn detection sensor
21.
[0138] Each of the spinning units 2 may pull out the spun yarn 10 from the spinning device
9 by using a pair of delivery rollers. In this case, the yarn accumulation device
12 may be provided downstream of the pair of delivery rollers. Alternately, instead
of the yarn accumulation device 12, a slack tube using the suction air stream and/or
a mechanical compensator for absorbing slackening in the spun yarn 10 may be provided
downstream of the pair of delivery rollers. When the yarn accumulation device 12 is
not provided, for example, the cleaning operation is performed as the preparation
operation without performing the residual yarn removing operation.
[0139] In the display 60, the LED may emit different colors, or LEDs may be arranged at
different positions and each LED may emit light such that transmission of the yarn
joining notice signal and transmission of the preparation completion signal can be
distinguished. The display 60 may be, instead of the LED, a liquid crystal panel capable
of displaying a message, and may be a seven-segment indicator showing a state with
alphanumeric characters.
[0140] At least one and three or less, or five or more yarn joining carts 3 may be provided.
The yarn joining cart 3 may have a doffing function to doff the package 45 and a supplying
function to supply a new bobbin 48 when the package 45 is fully wound in the spinning
unit 2.
[0141] The yarn joining carts 3 may stand by in a state where the plurality of yarn joining
carts 3 are equally arranged in a direction of the length of the machine frame of
the spinning machine 1.
[0142] When two preparation spinning units 2a have transmitted the yarn joining notice signal,
there is a case where the spun yarn 10 is remaining on the yarn accumulation roller
14 provided in one of the preparation spinning units 2a and the spun yarn 10 is not
remaining on the yarn accumulation roller 14 provided in the other preparation spinning
unit 2a. When the spun yarn 10 is not remaining on the yarn accumulation roller 14,
it can be predicted that the preparation operation can be completed earlier than the
case where the spun yarn 10 is remaining on the yarn accumulation roller 14. Therefore,
the cart control section 70 can control the yarn joining cart 3 to perform the yarn
joining travel with respect to the preparation spinning unit 2a in which the spun
yarn 10 is not remaining on the yarn accumulation roller 14. Such control enables
the yarn joining work to be more efficiently performed as a whole.
[0143] In a case where each of the two preparing spinning units 2a detects a yarn defect
by using the yarn monitoring device 59 and thereby transmits the yarn joining notice
signal, the cart control section 70 can determine the priority order for performing
the yarn joining operation based on the length of the yarn defect detected by the
yarn monitoring device 59 provided in each preparation spinning unit 2a. Specifically,
if the length of the yarn defect is short, the time required for removing the yarn
defect is also short, and a prediction can be made that the preparation operation
would be completed earlier. Therefore, the cart control section 70 controls the yarn
joining cart 3 to perform the yarn joining travel with respect to the preparation
spinning unit 2a which has detected the yarn defect having a relatively short length.
Such control enables the yarn joining operation to be more efficiently performed as
a whole.
[0144] As with a spinning machine 1x shown in Fig. 7, both the exclusive work area and the
overlapping work area may be provided with respect to the plurality of yarn joining
carts 3.
[0145] Specifically, as shown in Fig. 7, a first yarn joining cart 3a is assigned with the
exclusive work area where the spinning units 2 having the unit number 1 to 16 are
arranged and the overlapping work area where the spinning units 2 having the unit
number 17 to 24 are arranged.
[0146] A second yarn joining cart 3b is assigned with the exclusive work area where the
spinning units 2 having the unit number 25 to 40 are arranged and the overlapping
area where the spinning units 2 having the unit number 17 to 24 are arranged.
[0147] Both the first yarn joining cart 3a and the second yarn joining cart 3b can perform
the yarn joining work with respect to the spinning units 2 arranged in the overlapping
work area. When receiving the yarn joining notice signal or the preparation completion
signal from the spinning units 2 arranged in the overlapping work area, the cart control
section 70 of each of the yarn joining carts 3 determines whether the relevant yarn
joining cart 3 should perform the yarn joining work or whether another yarn joining
cart 3 should perform the yarn joining work, based on the current position of the
relevant yarn joining cart 3, and based on the current position of other yarn joining
carts 3 and a working state of other yarn joining carts 3 (whether or not such other
yarn joining carts 3 are in operation).
1. A yarn winding machine (1) comprising:
a plurality of winding units (2) adapted to wind a yarn (10); and
at least one yarn joining cart (3) adapted to perform a yarn joining operation with
respect to each of the winding units (2), wherein
after occurrence of a yarn breakage, a relevant winding unit (2) is adapted to perform
a preparation operation to be prepared for the yarn joining operation to be started,
the yarn joining cart (3) is adapted to perform a yarn joining travel so as to be
positioned at an operating position appropriate to perform the yarn joining operation
with respect to the winding unit (2) in which the yarn breakage has occurred, the
yarn joining travel being starting traveling toward the operating position, canceling
a current traveling and stopping at the operating position, or traveling at a decelerated
speed from a current traveling speed, characterized in that
if there is no completion winding unit (2b) that is the winding unit (2) in which
the preparation operation has been completed and if there is a preparation winding
unit (2a) that is the winding unit (2) during the preparation operation, the yarn
joining cart (3) is adapted to perform the yarn joining travel with respect to the
preparation winding unit (2a).
2. The yarn winding machine (1) according to claim 1, wherein
if a current position where the yarn joining cart (3) is stopped coincides with the
operating position where the yarn joining operation is to be performed with respect
to the winding unit (2) in which the yarn breakage has occurred, the yarn joining
cart (3) is adapted to maintain the current position without performing the yarn joining
travel.
3. The yarn winding machine (1) according to claim 1 or 2, wherein
each of the winding units (2) includes a control section (50) adapted to transmit
a yarn joining notice signal after occurrence of the yarn breakage and before completion
of the preparation operation.
4. The yarn winding machine (1) according to claim 3, wherein
each of the winding units (2) includes a detection section (21, 22) adapted to detect
success or failure of the preparation operation, and
the control section (50) is adapted to cancel the yarn joining notice signal if the
detection section (21, 22) detects failure of the preparation operation after transmission
of the yarn joining notice signal.
5. The yarn winding machine (1) according to claim 3 or 4, wherein
the control section (50) is adapted to transmit a preparation completion signal after
the preparation operation is completed.
6. The yarn winding machine (1) according to claim 5, wherein
provided that a first preparation winding unit (2a) is one of preparation winding
units (2a), and a second preparation winding unit (2b) is another one of the preparation
winding units (2a) that is located in a range, which the yarn joining cart (3) can
reach from a current traveling position within a predetermined first traveling time,
during the yarn joining travel of the yarn joining cart (3) with respect to the first
preparation winding unit (2a), when the second preparation winding unit (2a) transmits
the yarn joining notice signal, the yarn joining cart (3) is adapted to cancel the
yarn joining travel with respect to the first preparation winding unit (2a) and performs
the yarn joining travel with respect to the second preparation winding unit (2b).
7. The yarn winding machine (1) according to claim 5 or 6, wherein
when the preparation winding unit (2a) transmits the yarn joining notice signal and
when the completion winding unit (2b) transmits the preparation completion signal,
the yarn joining cart (3) is adapted to preferentially perform the yarn joining travel
based on the preparation completion signal.
8. The yarn winding machine (1) according to any one of claims 5 to 7, wherein
during the yarn joining travel of the yarn joining cart (3) with respect to the preparation
winding unit (2a) which has transmitted the yarn joining notice signal, when the completion
winding unit (2b), which is located in a range, which the yarn joining cart (3) can
reach from the current traveling position within a second traveling time determined
based on an operation time of the preparation operation of the preparation winding
unit (2a), transmits the preparation completion signal, the yarn joining cart (3)
is adapted to cancel the yarn joining travel with respect to the preparation winding
unit (2a) and to perform the yarn joining travel with respect to the completion winding
unit (2b) which has transmitted the preparation completion signal.
9. The yarn winding machine (1) according to any one of claims 3 to 8, comprising an
air spinning device (9) adapted to form a yarn (10) by applying twists to a fiber
bundle (8) by using a swirling airflow current,
wherein each of the winding units (2) is adapted to perform a cleaning operation of
the air spinning device (9) as the preparation operation, during a period after occurrence
of the yarn breakage and before the yarn joining operation by the yarn joining cart
(3), and
when the preparation winding unit (2a) transmits the yarn joining notice signal, a
time interval from start to end of the cleaning operation performed by the preparation
winding unit (2a) at least partly overlaps a time interval from start to end of the
yarn joining travel performed by the yarn joining cart (3) with respect to the preparation
winding unit (2a).
10. The yarn winding machine (1) according to any one of claims 3 to 9, comprising a yarn
accumulation roller (14) adapted to temporarily accumulate the yarn (10),
wherein each of the winding units (2) is adapted to perform a residual yarn removing
operation as the preparation operation, for removing the yarn (10) remaining on the
yarn accumulation roller (14) from the yarn accumulation roller (14), during a period
after occurrence of the yarn breakage and before the yarn joining operation to be
performed by the yarn joining cart (3),
when the preparation winding unit (2a) transmits the yarn joining notice signal, a
time interval from start to end of the residual yarn removing operation performed
by the preparation winding unit (2a) at least partly overlaps a time interval from
start to end of the yarn joining travel performed by the yarn joining cart (3) with
respect to the preparation winding unit (2a).
11. The yarn winding machine (1) according to claim 10, wherein
in occurrence of two preparation winding units (2a), when the yarn (10) is remaining
on the yarn accumulation roller (14) of one of the preparation winding units (2a)
and the yarn (10) is not remaining on the yarn accumulation roller (14) of a different
preparation winding unit (2a), the yarn joining cart (3) is adapted to perform the
yarn joining travel with respect to the different preparation winding unit (2).
12. The yarn winding machine (1) according to any one of claims 3 to 11, wherein
each of the winding units (2) further includes a detection device (59) adapted to
detect a length of a yarn defect included in the yarn (10), and
in occurrence of two preparation winding units (2a), the yarn joining cart (3) is
adapted to perform the yarn joining travel with respect to the preparation winding
unit (2a) in which the detected length of the yarn defect is shorter.
13. The yarn winding machine (1) according to any one of claims 3 to 12, wherein
each of the winding units (2) includes a display (60) adapted to display that the
yarn joining notice signal has been transmitted.
14. A yarn winding method for forming a package (45) by winding a yarn (10) while traversing
the yarn (10) in each of a plurality of winding units (2), the method comprising:
a preparation step for preparing the winding unit (2) to be ready for a yarn joining
operation after occurrence of a yarn breakage; and
a yarn joining travel step for positioning a yarn joining cart (3), which performs
the yarn joining operation with respect to each of the winding units (2), at an operating
position where the yarn joining cart (3) performs the joining operation with respect
to the winding unit (2) in which the yarn breakage has occurred, by having the yarn
joining cart (3) to start traveling toward the operating position, to cancel a current
traveling and stop at the operating position, or to travel at a decelerated speed
from a current traveling speed, characterized in that
if there is no completion winding unit (2b) that is the winding unit (2) in which
the preparation step is completed and if there is a preparation winding unit (2a)
that is the winding unit (2) during the preparation step, the yarn joining travel
step with respect to the preparation winding unit (2a) is performed.