[0001] The subject of the invention is a device for trenchless forming of concrete partitions
in the ground, in particular heat accumulating tanks, using horizontal directional
drilling (HDD) techniques.
[0002] The construction of a heat energy accumulating tank is known from
Polish patent application No. 414847. The tank is designed for cooperation with the solar heat acquisition system and
the system of heat receivers in the building. The tank has at least one chamber made
of concrete or other structural material, containing a heat energy carrier. As a thermal
energy carrier, it is used a two-phase mixture consisting of a liquid mobile phase
and a substantially immobile phase, which is a sand fraction. Grains of the stationary
phase create a porous structure separating the interior space of the chamber with
the formation of numerous connected microspheres filled with a mobile phase, with
the limitation of convective heat exchange within the mobile phase. The liquid mobile
phase may contain conditioning and stabilizing additives, e.g. ethylene or propylene
glycol. The tank can be provided with other chambers. The lateral walls and bottoms
of the tank should be tight and provided with a layer of thermally insulating material.
Such tanks are usually made in the open space in close proximity to the building.
In some locations, it is possible to use the natural geological layers of the ground
at the tank site. It is a prerequisite for the native soil to have parameters allowing
relatively free flow (percolation) of water through the entire volume of the future
tank. The decision on the location of the reservoir must be preceded by geological
surveys.
[0003] There are known methods of making watertight baffles made of concrete or other materials
by trenchless method in the ground, using horizontal directional or microtunneling
techniques, consisting of drilling parallel channels and filling them with appropriate
mortar, which after curing is part of the baffle.
[0004] In the description of the patent
EP2009225 a method for manufacturing an underground plate partition is shown. Firstly, a horizontal
drilling is carried out running underground to the outlet opening, and the injection
head is dragged through the channel made, which fills at least part of the channel
with the appropriate mortar. Then similar channels filled with mortar are made in
parallel. The channels are made at a certain distance from each other so that the
filling of the channels is in contact with each other and after hardening it forms
a tight plate.
[0005] The patent application
DE 3424545 describes a method for producing underground concrete slabs formed by mining methods
as concrete strips departing from horizontal parallel tunnels with a circular cross-section.
To produce these slabs, a machine for tunneling was used with a drilling disk and
lateral wings equipped in the front part with a scraper conveyor excavating the ground.
At the rear of the wings there are channels supplying the concrete mortar to the outlets.
[0006] From the description of the patent
DE 4226643 a method for underground forming of sealing baffles is disclosed, which consists
in excavating the soil through an excavating device consisting of a series of flat
modular working segments connected to each other with a height not exceeding 300 mm.
Each working segment is equipped with a head part with a cutting head, and a hydraulic
impulse actuator or electric powering is located inside the segment body. The head
can be equipped with adjustable blades with small powerings, with the possibility
of remote switching. In addition, the body is provided with power lines for the powering
assembly and horizontal supply channels connected to the outlet openings in the rear
wall of the body, through which the material forming the baffle is fed to the cavity
hollowed behind the device. All segments are connected by lateral walls with the same
spacing of the power lines and channels connections. In lateral ditches on both sides
of the device there are lateral powering units forcing the feed drive, as well as
guides and devices supplying the material to the supply channels. The cutting head
can be provided with water nozzles. The device is laid in a starting trench and by
means of lateral powering units, pressed through the ground up to a target trench.
This is done by compacting the soil without removing the spoil. This limits the use
of the device to light loose or plastic soils. In addition, the use of lateral powering
for a larger number of working segments is associated with the occurrence of high
stress on joints, particularly in the middle segments, and the possibility of failure
in the case of work performed in compact soils or increased local resistance when
pressing through the ground.
[0007] Device for trenchless forming of concrete partitions in the ground, equipped with
a forming arm comprising modular working segments, where each segment has supply channel
for feeding concrete mortar through a supply manifold and outlet openings in the segments
rear wall to space hollowed in the ground, which arm is moved in the ground using
tension ropes arranged in parallel in the ground in casing tubes and ends of the arm
are connected with guides and feed drive powering in line with the direction of action
of tension ropes is characterized in that the forming arm is U-shaped, and the forming
arm consists of at least two lateral working segments connected to a lower working
segment through underground lateral and lower driving segments, and each driving segment
has a holder of tension rope, a rotating cutting head for milling the casing tube,
a powering assembly of the cutting head and a rinser channel, wherein each segment
of the forming arm has a return duct for extracting the spoil, located between the
rinser channel and the supply channel, and in the working segments the return duct
is connected via a collector receiving spoil with inlet openings located at the head
portion of the segment, and the head portion of the working segments is provided with
movable longitudinal excavating elements and rinser nozzles, and further an electrical
connector is installed in the lateral walls of each segment.
[0008] It is advantageous if the forming arm comprises corner working segments positioned
between lateral working segments and lower working segments, in which corner segments
the rinser channel, the return channel and the supply channel have the channels end
holes located in two perpendicular planes.
[0009] It is advantageous if in the working segments the rinser nozzles are connected to
the rinser channel through a rinser collector and a rinser electrovalve, the collector
receiving spoil is connected to the return duct through an output electrovalve, the
supply channel is connected to the supply manifold through a supply electrovalve,
and a pressure sensor is mounted in the rear wall of the segment.
[0010] It is advantageous if at least one underground driving segment is connected to a
flexible rinser duct, flexible return duct for removing the spoil, and a flexible
supply duct for supplying concrete mortar, and the ducts are led through the casing
tube and connected through a hole in a fixing nipple to the corresponding ducts made
in this segment.
[0011] It is also advantageous if the longitudinal excavating elements are provided with
force sensors, in particular strain gauges, connected via an electrical connector
to a monitoring and control system.
[0012] The device according to the invention makes it possible to construct a partition
entering the tank by a trenchless method and to use the ground layer above the partition
as the stationary phase of the heat accumulating tank. Execution of two partitions
with a similar outline at different depths of the ground makes it possible to use
the natural geological layer of the soil located between the partitions as a stationary
phase. The use of above-ground and underground driving segments powering the forming
arm and the adaptation of working segments for the extraction of soil increases the
ability to overcome the resistance of the soil, and thus increases the scope of application
of the device. The use of force sensors, a pressure sensor in the zone forming the
partition, a supply electrovalve regulating the outflow of the mortar and an output
electrovalve, allows monitoring and changing the process parameters depending on the
sensor's indications.
[0013] The invention is explained in the embodiment in the drawing, in which fig. 1 shows
the forming arm in a rear view, fig. 1a shows the forming arm in section A-A of fig.
1; fig. 2a, 2b schematically shows the trajectory of drilling at the first stage of
work using the HDD technique, fig. 2c-2h show the successive stages of the work using
the forming arm, fig. 2i shows the outline of the partition with added lateral walls,
fig. 2j schematically shows two partitions in a front view, fig. 3 shows a lower working
segment of the forming arm in perspective, fig. 5 - lower working segment in longitudinal
section, fig. 6 - driving segment in cross-section, fig. 6a - casing tube in section
B-B of fig. 6, fig. 7 - another driving segment with attached flexible ducts in cross-section,
fig. 7a - a casing tube in section C-C of fig. 7, and fig. 8 shows a driving segment
connected to the working segments in perspective.
[0014] As shown in fig. 1, the apparatus for trenchless forming of concrete partitions is
provided with a U-shaped forming arm 2. The forming arm 2 comprises working segments
2a, 2b, 2c, lateral, lower, and corner, and underground driving segments 4, 5, lateral
and lower. The lower driving segments 5 are connected to the lower working segment
2b and the corner working segment 2c, and the lateral working segments 2a are connected
to the corner working segment 2c via the lateral driving segment 4. At the ends 13
of the forming arm 2 above-ground driving segments 3 are mounted. Working segments
2a, 2b, 2c, have the supply channel 33, shown in figs. 4, 5, feeding the concrete
mortar through the supply manifold 35 and the outlet openings 24 in the rear wall
to the space hollowed in the ground.
[0015] As shown in fig. 3, the lower working segment 2b has a connector 19 of return channel
30 for extracting the spoil, a connector 20 of supply channel 33, a connector 18 of
rinser channel 26, and an electrical connector 21. The body 16 of the lower working
segment 2b has a constriction between the front part and a flat part in which inlet
openings 23 receive spoil from the excavation zone. In the rear wall of the body,
outlet openings 24 are made, through which the concrete mortar is fed into the hollow
space. In addition, a pressure sensor 25 for controlling the pressure in the zone
forming the partition is mounted in the rear wall. The working segments have the same
spacing of connectors 18, 19, 20 on the lateral walls, which allows them to be combined
in various configurations, depending on the width of the partition being designed
and its depth in the ground. The electrical connectors 21 are hermetic. All segments
of the forming arm 2 are connected to each other by lateral surfaces 17 in a manner
ensuring the tightness of the connection of the channels.
[0016] As shown in figs. 4, 5, the head portion of the lower working segment 2b has movable
longitudinal hollow elements 22 forming an arcuate rake face. In addition, the rinser
nozzles 29 are connected to the rinser collector 28 in a head portion of the body
16. The rinser collector 28 is connected through a rinser electrovalve 27 to the rinser
channel 26 terminated by the connector 18 in the lateral walls of the body 16. The
inlet openings 23 are connected to the collector 32 receiving spoil, which is connected
via an output electrovalve 31 to a return channel 30 terminated by the connector 19
in the lateral walls of the body 16. Outlet openings 24 are connected to a supply
manifold 35 which is connected by a supply electrovalve 34 to a supply channel 33
terminated by the connector 20 in the lateral walls of the body 16.
[0017] As shown in figs. 6, 6a, the driving segments 4, 5, lateral and lower, have a holder
of tension rope, a rotating cutting head 40 for milling the casing tube 42, a powering
assembly 44 of the cutting head 40 with a powering shaft 45, a return channel 30 to
the supply channel 33, the rinser channel 26, and the electrical connector 21. The
cutting head 40 has a conical head portion with circumferentially attached blades
41, and the head base is pivotally mounted in the bearing 43. The ring gear 46, attached
to the head base, is powered by a powering shaft 45 connected to a powering assembly
44 incorporated in the body 36. The guide sleeve 39 of the tension rope 38 is mounted
in the axis of the cutting head 40 and secured to the body 36 by a fastening 37.
[0018] The driving segment 4, 5 in the embodiment shown in figs. 7, 7a differs from that
of fig. 6, that inside the casing tube 42 there is arranged the flexible rinser duct
47 feeding the rinse flux to the rinser channel 26, the flexible return duct 48 for
removing the spoil and the flexible supply duct 49 for supplying the concrete mortar.
The guide sleeve 39 of fig. 7 has a larger diameter and includes a tension rope 38
end and ends of three flexible ducts 47, 48, 49, the ends parts of which are attached
to the fixing connector 50. The flexible ducts in the casing tube 42 are connected
through openings in the fastening connector 50 with corresponding channels made in
the body 51 of this segment. The driving segment 4, 5 thus provided can feed other
segments of the forming arm 2, regardless of the feed through the upper ends 13, especially
when the number of lower working segments 2b is increased, and when pressure drops
in the channels can affect the device malfunction.
[0019] Fig. 8 shows the lower part of the forming arm 2 with the lower driving segment 5
attached to the lower working segments 2b. All segments have the same spacing of connectors
18, 19, 20 on the lateral walls, which allows them to combine in different configurations,
depending on the designed width of the partition.
[0020] The construction of the tank consists in making a watertight concrete partition with
a U-shaped forming arm moving through the ground. The operation of the arm consists
in removing the soil from its front zone, defined by arcuate rake faces, and filling
the resulting space with concrete mortar or other mixture with watertight properties
and with increased thermal insulation. The shape of the forming arm 2 forms a surface
defining the shape of the partition. The U-shaped forming arm 2 creates a trough-shaped
partition with open laterals. The walls closing the laterals of the channel are made
in the last stage in a traditional manner from the surface of the earth, as a narrow-space
excavation filled with a concrete mix.
[0021] As shown in figs. 2a, 2b, in the first stage of the execution works under the surface
1 of the ground, drillings 6 with the use of horizontal directional drilling (HDD)
are performed. Drilling is performed along the first trajectory 7 corresponding to
the position of the lateral powering segments 4, and along the second parallel trajectory
8 corresponding to the position of the lower driving segments 5. The trajectory 7,
8 of the drillings corresponds to the future position of the longitudinal walls and
the base of the formed divider. Steel tensioning ropes 38 in plastic casing tubes
42 are inserted into the drills. The inner surface of the casing tube 42 can be coated
with a lubricant to reduce friction.
[0022] As shown in figs. 2c-2h, on the outlet side of the drills the tension ropes 38 are
fastened to the respective driving segments 4, 5 of the forming arm 2, so that the
casing tube 42 abuts the cutting head 40. The upper ends 13 of the forming arm 2 are
fastened above the ground surface 1 to the guides 9 by means of above-ground driving
segments 3. The guides 9 are provided with a mechanism for powering the forming arm
2. On the entry side, the tensioning ropes 38 are fastened to the driving device 10,
for example a winch. The simultaneous tensioning of the tension ropes 38 and the cutting
of the casing tube 42 through the rotating cutting head 40 results in a transfer of
force from the tension ropes 38 to the forming arm 2. The upper ends 13 of the forming
arm 2 above the ground surface are powered by a driving mechanism, for example by
a toothed or tractive gear. A flexible pressure line supplying a rinser, a flexible
pressure duct supplying concrete mortar, a flexible vacuum duct receiving a rinser,
electric conduits for powering the cutting heads 40 and energizing electrovalves,
and electric conduits of the monitoring and control system are connected to each upper
end 13 of the forming arm 2. The forming arm 2 is then drawn in the ground by means
of a driving device 10 along a trajectory 7, 8 of drillings, the upper ends 13 of
the forming arm 2 being guided by means of guides 9. In order to move the guide arm
2 evenly, both the overground and the underground powering must be operate in a synchronized
manner. The shifting of the forming arm 2 in the soil occurs as a result of the simultaneous
exertion of force by the above-ground driving segments 3 and underground driving segments
4, 5, while feeding the rinser, reciprocating motion of the excavating elements 22
and collecting the rinser with the spoil. The rinser and spoil are collected from
the return duct 30 via a vacuum line.
[0023] Initially, until the planned depth is reached, the forming arm 2 penetrates into
the ground without introducing the mortar. The space created behind the arm can be
filled with bentonite. After the forming arm 2 has reached the position corresponding
to the beginning of the formed partition 11, the concrete mortar is pumped to the
supply channel 33.
[0024] In each working segment there is an output electrovalve 31 and a supply electrovalve
34 located between the respective channel and collector. The valves can be opened
simultaneously - when the forming arm 2 moves unimpeded by the continuous outflow
of the concrete mortar forming the partition 11. It is possible to separately control
each electrovalve, for example in a situation where the outflow of the concrete mortar
from the selected segment of the forming arm 2 is not indicated.
[0025] The pressure sensor 25 allows measurement of the pressure at which the concrete mortar
is located in the rear zone of the forming arm 2. Pressure monitoring from all segments
of the forming arm 2 gives the operator the opportunity to assess the regularity or
disturbance in the forming of the partition. It should be added that the pressure
of the concrete mortar exerts an additional force on the forming arm 2, thus facilitating
its advancement to the front.
[0026] The longitudinal excavating elements 22 are fastened in the front part of the working
segments 2a, 2b, 2c of the forming arm 2 in a manner allowing the measurement of the
mechanical load resulting from the soil cutting process. By means of force sensors
mounted in the front part, in particular tensiometric ones, loads in the direction
of movement of the longitudinal excavating elements 22 and in the perpendicular direction
are measured according to the travel direction of the forming arm 2. Signals from
individual force sensors are transmitted to the monitoring and control system. Thanks
to this, it is possible to locate a possible obstacle preventing further movement
of the arm, for example a large stone. The location is accurate to the dimension of
the longitudinal excavating element 22, whose motion has been hindered or stopped,
and whose sensor transmits a signal indicating an increase in the mechanical load.
Such information allows you to make a decision on how to overcome the obstacle. This
can be, for example, drilling a vertical well and removing obstacles.
[0027] As shown in fig. 2i, lateral walls 12 are added to the formed partition 11 in the
final step. The heat accumulating tank then constructed makes it possible to use the
natural geological layer of the soil from the formed partition 11 as a stationary
phase.
[0028] As shown in fig. 2j, a second partition 14 of greater width may be formed below the
first formed partition 11 to which the side walls 15 having a greater height are added.
The technology of making the second partition 14 is the same as the first partition
11. The number of partitions made in this technology can be greater. The heat accumulating
tank constructed in this way enables the use of natural geological layers of soil
located between the partitions as a stationary phase.
1. A device for trenchless forming of concrete partitions in the ground, equipped with
a forming arm (2) comprising modular working segments (2a, 2b), where each segment
has a supply channel (33) for feeding concrete mortar through a supply manifold (35)
and outlet openings (24) in the segments rear wall to a space hollowed in the ground,
which arm is moved in the ground using tension ropes (38) arranged in parallel in
the ground in casing tubes (42) and ends (13) of the arm (2) are connected with guides
(9) and a feed drive powering in line with the direction of action of the tension
ropes (38), characterized in that the forming arm (2) is U-shaped, and the forming arm (2) consists of at least two
lateral working segments (2a) connected to a lower working segment (2b) through underground
lateral and lower driving segments (4, 5), and wherein each driving segment (4, 5)
has a holder of tension rope, a rotating cutting head (40) for milling the casing
tube (42), a powering assembly (44) of the cutting head (40) and a rinser channel
(26), wherein each segment of the forming arm (2) has a return duct (30) for extracting
the spoil, located between the rinser channel (26) and the supply channel (33), and
in the working segments (2a, 2b) the return duct (30) is connected via a collector
(32) receiving spoil with inlet openings (23) located at the head portion of the segment,
and the head portion of the working segments (2a, 2b) is provided with movable longitudinal
excavating elements (22) and rinser nozzles (29), and further an electrical connector
(21) is installed in lateral walls of each segment.
2. The device according to claim 1, wherein the forming arm (2) comprises corner working
segments (2c) positioned between lateral working segments (2a) and lower working segments
(2b), in which corner segments (2c) the rinser channel (26), the return channel (30)
and the supply channel (33) have the channels end holes located in two perpendicular
planes.
3. The device according to claim 1, wherein in the working segments (2a, 2b) the rinser
nozzles (29) are connected to the rinser channel (26) through a rinser collector (28)
and a rinser electrovalve (27), the collector (32) receiving spoil is connected to
the return duct (30) through an output electrovalve (31), the supply channel (33)
is connected to the supply manifold (35) through a supply electrovalve (34), and a
pressure sensor (25) is mounted in the rear wall of the segment.
4. The device according to claim 1, wherein at least one underground driving segment
(4, 5) is connected to a flexible rinser duct (47), flexible return duct (48) for
removing the spoil, and a flexible supply duct (49) for supplying concrete mortar,
and the ducts are led through the casing tube (42) and connected through a hole in
a fixing nipple (50) to the corresponding ducts made in this segment.
5. The device according to claim 1, wherein the longitudinal excavating elements (22)
are provided with force sensors, in particular strain gauges, connected via the electrical
connector (21) to a monitoring and control system.
1. Eine Vorrichtung zum grabenlosen Formen von Betontrennwänden im Erdreich, ausgestattet
mit einem Formungsarm (2), der mit modularen Arbeitssegmenten (2a, 2b) ausgestattet
ist, wobei jedes Segment einen Zufuhrkanal (33) zum Zuführen von Betonmörtel durch
einen Zufuhrverteiler (35) und Auslassöffnungen (24) in der Segmentrückwand zu einem
im Boden ausgehöhlten Raum aufweist, wobei der Arm im Boden mit Hilfe von Zugseilen
(38) bewegt wird, die parallel im Boden in Futterrohren (42) angeordnet sind, und
die Enden (13) des Arms (2) sind mit Führungen (9) und einem Vorschubantrieb verbunden,
der in der Wirkungsrichtung der Zugseile (38) angetrieben wird, dadurch gekennzeichnet, dass der Formungsarm (2) U-förmig ist und der Formungsarm (2) aus mindestens zwei seitlichen
Arbeitssegmenten (2a) besteht, die über unterirdische seitliche und untere Antriebssegmente
(4, 5) mit einem unteren Arbeitssegment (2b) verbunden sind, und wobei jedes Antriebssegment
(4, 5) einen Halter für ein Spannseil, einen rotierenden Schneidkopf (40) zum Fräsen
des Futterrohrs (42), eine Antriebseinheit (44) des Schneidkopfs (40) und einen Spülkanal
(26) aufweist, wobei jedes Segment des Formungsarms (2) einen Rückführungskanal (30)
zum Abziehen des Abfalls aufweist, der zwischen dem Spülkanal (26) und dem Zufuhrkanal
(33) angeordnet ist, und in den Arbeitssegmenten (2a, 2b) der Rückführungskanal (30)
über einen Abfallsammler (32) mit Einlassöffnungen (23) verbunden ist, die sich am
Kopfteil des Segments befinden, und der Kopfteil der Arbeitssegmente (2a, 2b) ist
mit beweglichen, längsgerichteten Aushubelementen (22) und Spüldüsen (29) versehen,
und außerdem ist in den Seitenwänden jedes Segments ein elektrischer Anschluss (21)
installiert.
2. Vorrichtung nach Anspruch 1, wobei der Formungsarm (2) Eck-Arbeitssegmente (2c) umfasst,
die zwischen den seitlichen Arbeitssegmenten (2a) und den unteren Arbeitssegmenten
(2b) angeordnet sind, wobei die Endlöcher der Ecksegmente (2c) des Spülkanals (26),
des Rücklaufkanals (30) und des Zufuhrkanals (33) in zwei senkrecht zueinander verlaufenden
Ebenen liegen.
3. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass in den Arbeitssegmenten (2a, 2b) die Spüldüsen (29) über einen Spülsammler (28) und
ein Spülelektroventil (27) mit dem Spülkanal (26) verbunden sind, der Sammler (32),
der den Abraum aufnimmt, ist über ein Ausgangselektroventil (31) mit dem Rücklaufkanal
(30) verbunden, der Zufuhrkanal (33) ist über ein Zufuhrelektroventil (34) mit dem
Zufuhrverteiler (35) verbunden, und in der Rückwand des Segments ist ein Drucksensor
(25) angebracht.
4. Vorrichtung nach Anspruch 1, bei der mindestens ein unterirdisches Antriebssegment
(4, 5) mit einer flexiblen Spülleitung (47), einer flexiblen Rückführleitung (48)
zum Entfernen des Aushubs und einer flexiblen Zufuhrleitung (49) zum Zuführen von
Betonmörtel verbunden ist und die Leitungen durch das Hüllrohr (42) geführt und durch
ein Loch in einem Befestigungsnippel (50) mit den entsprechenden in diesem Segment
hergestellten Leitungen verbunden sind.
5. Vorrichtung nach Anspruch 1, wobei die Längsaushubelemente (22) mit Kraftsensoren,
insbesondere Dehnungsmessstreifen, versehen sind, die über den elektrischen Anschluss
(21) mit einem Überwachungs- und Steuerungssystem verbunden sind.
1. L'invention concerne un dispositif pour le coffrage sans tranchée de cloisons en béton
dans le sol, équipé d'un bras de coffrage (2) comprenant des segments de travail modulaires
(2a, 2b), chaque segment comprenant un canal d'alimentation (33) pour alimenter du
mortier à travers un collecteur d'alimentation (35) et des ouvertures (24) dans la
paroi arrière des segments vers un espace creusé dans le sol, lequel bras est déplacé
dans le sol à l'aide de câbles de tension (38) disposés en parallèle dans le sol dans
des tubes (42) et des extrémités (13) du bras (2) sont reliées à des guides (9) et
à une alimentation en énergie en ligne avec la direction d'action des câbles de tension
(38), caractérisé en ce que le bras de coffrage (2) est en forme de U, et en ce que le bras de coffrage (2) est constitué d'au moins deux segments de travail latéraux
(2a) reliés à un segment de travail inférieur (2b) par l'intermédiaire de segments
d'entraînement latéraux et inférieurs (4, 5), et en ce que chaque segment d'entraînement (4, 5) comporte un support de câble de traction, une
tête de coupe rotative (40) pour fraiser le tube (42), un ensemble d'alimentation
(44) de la tête de coupe (40) et un canal de rinçage (26), chaque segment du bras
de coffrage (2) comportant un canal de retour (30) pour extraire le déblai, situé
entre le canal de rinçage (26) et le canal d'alimentation (33), et dans les segments
de travail (2a, 2b), le conduit de retour (30) est connecté par l'intermédiaire d'un
collecteur (32) recevant les déblais avec des ouvertures d'entrée (23) situées au
niveau de la partie de tête du segment, et la partie de tête des segments de travail
(2a, 2b) est pourvue d'éléments d'excavation longitudinaux mobiles (22) et de buses
de rinçage (29), en outre un connecteur électrique (21) est installé dans les parois
latérales de chaque segment.
2. Dispositif selon la revendication 1, dans lequel le bras de coffrage (2) comprend
des segments de travail d'angle (2c) positionnés entre les segments de travail latéraux
(2a) et les segments de travail inférieurs (2b), dans lesquels les segments d'angle
(2c) le canal de rinçage (26), le canal de retour (30) et le canal d'alimentation
(33) ont les trous d'extrémité de canaux situés dans deux plans perpendiculaires.
3. Dispositif selon la revendication 1, dans lequel, dans les segments de travail (2a,
2b), les buses de rinçage (29) sont reliées au canal de rinçage (26) par l'intermédiaire
d'un collecteur de rinçage (28) et d'une électrovanne de rinçage (27), le collecteur
(32) recevant les déchets est relié au canal de retour (30) par l'intermédiaire d'une
électrovanne de sortie (31), le canal d'alimentation (33) est relié au collecteur
d'alimentation (35) par l'intermédiaire d'une électrovanne d'alimentation (34), et
un capteur de pression (25) est monté dans la paroi arrière du segment.
4. Dispositif selon la revendication 1, dans lequel au moins un segment d'entraînement
souterrain (4, 5) est raccordé à un conduit de rinçage flexible (47), un conduit de
retour flexible (48) pour enlever les déblais, et un conduit d'alimentation flexible
(49) pour fournir du mortier, et les conduits sont conduits à travers le tube (42)
et raccordés à travers un trou dans un point de fixation (50) aux conduits correspondants
réalisés dans ce segment.
5. Dispositif selon la revendication 1, dans lequel les éléments d'excavation longitudinaux
(22) sont munis de capteurs de force, en particulier de jauges de contrainte, reliés
par l'intermédiaire du connecteur électrique (21) à un système de surveillance et
de commande.