[0001] The invention relates to a supply system for supplying elongate elements. In particular,
the supply system of the invention allows storage of a desired number of elongate
elements which are stacked one on the other and automatic supply thereof one at a
time to an operating machine which is positioned downstream of the supply device of
the invention.
[0002] The term "elongate element" is intended to be understood in the context of the present
description to be a planar element having a very small thickness and having an extent
in the longitudinal direction which is considerably greater than the individual extent
in the transverse direction.
[0003] Such elongate elements can be produced from flexible material and are, in this case,
generally referred to as strips or can be produced from rigid material and are, in
this case, usually referred to in the sector in question as bands or straps. The elongate
elements are usually stacked so as to form a pile having a desired number of elongate
elements and, by means of an extraction device, are successively extracted from this
pile and supplied to an operating machine, such as, for example, a punch or a press
which shapes and cuts them in order to obtain an object having the desired form.
[0004] The elongate elements have to be supplied to the operating machine at a speed and
frequency corresponding to the work cycle of the operating machine itself. This machine,
as a result of individual characteristics of the working operations which it carries
out, draws back the elongate elements at a variable speed. Conversely, the extraction
devices are usually configured to work at a constant speed.
[0005] A problem of the known devices is that of coordinating the operation of the extraction
device and conveying the elongate elements and the operation of the operating machine,
preventing, on the one hand, too many elongate elements from being conveyed to the
operating machine and, on the other hand, the operating machine from having to be
stopped to wait for a new elongate element. In the first case, the elongate elements
would tend to become bent and deformed while, in the second case, there would be undesirable
breaks of the operating machine and, therefore, slow-downs of production.
[0006] In both cases, the intervention of an operator would be required in order to stop
the extraction device or the operating machine, respectively.
[0007] There are known, for example, from
WO2017148216 apparatuses for automatically supplying strip-like material to an operating machine
in which an adjustment system for the advance of the strips is provided.
[0008] However,
WO2017148216 does not address the problem of coordination of the operation of the supply apparatus
with an automatic conveying device of the material strips.
[0009] Furthermore, the extraction of the elongate elements from the pile of elongate elements
presents substantial problems.
[0010] In fact, the extraction has to be carried out in a precise manner avoiding undesirable
occurrences of dragging of the elongate element or the elongate elements which is/are
positioned in contact with the elongate element to be extracted.
[0011] EP2226123A1 relates to an apparatus for the production of one or more containers of custom-marked
microscope slides, the apparatus comprising a dispensing carousel disposed with two
or more discrete reservoirs for microscope slides, which carousel is configured to
select a reservoir and remove a slide therefrom responsive to the order; a processing
platform configured to receive a slide dispensed from a reservoir and slidably advance
it to a laser marking system, and subsequently to an ejection system; and an ejection
system configured to slidably eject the marked slide into the container.
[0012] US 3 583 699 A discloses a supply system for elongate elements according to the preamble of claim
1.
[0013] An object of the invention is to provide a system for supplying elongate elements
to an operating machine which allows the limitations indicated above with reference
to the cited prior art to be overcome.
[0014] This object is achieved by means of a supply system which is constructed according
to the independent claim 1.
[0015] Preferred features of the invention are defined in the dependent claims.
[0016] The features and advantages of the invention will be better appreciated from the
following detailed description of some preferred embodiments thereof which are illustrated,
by way of non-limiting example, with reference to the appended drawings, in which:
- Figure 1 is a perspective view of a system according to the invention in an operating
configuration;
- Figures 2, 3 and 6 are views as in Figure 1 but in relation to different operating
configurations of the system of the invention;
- Figures 4 and 5 are enlarged, interrupted views of the system of Figure 1 in additional
operating configurations;
- Figure 7 is a side view of a detail of the system of the invention;
- Figure 8 is a bottom view of a detail of the system of the invention;
- Figure 9 is an enlarged perspective view of a detail of the system of the invention;
- Figures 10 and 11 are a front view and a perspective, schematic view of an elongate
element to be supplied with the system of the invention, respectively. The appended
Figures show a supply system according to the invention which is generally designated
1 and which is intended to supply elongate elements in an advance direction which
is indicated by the arrow F in Figure 1.
[0017] An elongate element 100 which can better be seen in Figures 10 and 11 is a planar
element having a very small thickness "d" which is delimited by a pair of longitudinal
walls A, A' which extend along a longitudinal axis Z1 of the elongate element 100
and a pair of transverse walls B, B' which extend along a transverse axis X1 of the
elongate element 100 which is perpendicular to the longitudinal axis Z.
[0018] The length L of the elongate element 100, that is to say, the extent of the longitudinal
walls A, A', is considerably greater than the width L1 of the elongate element 100
itself, that is to say, the extent of the transverse walls B, B'.
[0019] In accordance with the final use, the elongate element may be constructed from a
suitable desired material.
[0020] Advantageously, the elongate element is produced from metal.
[0021] In a particularly preferred form, the elongate element is produced from aramid fibre,
advantageously without asbestos.
[0022] In the supply system 1 of the invention, a desired number of elongate elements 100
are positioned one on the other so as to form a pile 10 of elongate elements 100 having
a desired number of elongate elements which are positioned one on the other, as can
be seen, for example, in Figure 9.
[0023] There can be formed piles which have a desired number of elongate elements depending
on the dimensions, weight, etc., thereof.
[0024] The supply system 1 comprises a support body 2 having a support base 3 and a work
plane 4 which can be closed with a covering element 5 and on which the elongate elements
100 are positioned and moved.
[0025] In a Cartesian reference system XYZ, the work plane 4 is positioned in a transverse
plane XZ which is defined by a longitudinal axis Z and a transverse axis X.
[0026] In the version shown, the advance direction F is substantially parallel with the
longitudinal axis Z of the work plane 4 and the extraction direction F1 is substantially
parallel with the transverse axis X of the work plane 4, as will be better explained
below.
[0027] The pile 10 of elongate elements 100 is positioned in such a manner that the longitudinal
axis Z1 of the elongate elements 100 is arranged parallel with the advance direction
F and the transverse axis X1 of the elongate elements 100 is arranged parallel with
the extraction direction F1.
[0028] In the version shown, the covering element 5 comprises a first cover 5A and a second
cover 5B which are beside each other in the advance direction F and which are intended
to be moved independently of each other in order to open and close the work plane
4.
[0029] The first cover 5A and the second cover 5B are provided with a respective handle
6A, 6B in order to make opening/closing by an operator easier.
[0030] The support base 3 is internally hollow and intended to receive instruction and control
devices of the supply system 1, which are not shown in the Figures.
[0031] The first cover 5A is normally kept closed during the operation of the system 1,
is usually opened for carrying out adjustment operations, for example, to adapt the
system to supply elongate elements having different dimensions, or for maintenance
operations.
[0032] There may further be provided a stopping device which stops the operation for the
system 1 if the first cover 5A is open.
[0033] The supply system 1 further comprises an operating interface 7 which is positioned
near the work plane 4 so as to be accessible by an operator in order to control and
adjust the operation of the supply system 1. The operating interface 7 is provided
with a plurality of buttons 70 or other control elements which are operatively connected
to the instruction and control devices of the supply system in order to control and
adjust the supply system 1, in a manner known in the field.
[0034] The work plane 4 comprises at least one cavity 4A which is intended to cooperate
with an extraction device 30 of the supply system 1 in order to extract the elongate
elements 100 from the pile 10 of elongate elements 100, as will be better explained
below.
[0035] In the version shown, the work plane 4 comprises a plurality of cavities 4A which
are shown in greater detail in Figure 9 and which are spaced apart in the advance
direction F and which are intended to cooperate with an extraction device 30 of the
supply system 1 in order to extract the elongate elements 100 from the pile 10 of
elongate elements 100, as will be better explained below. The supply system 1 comprises
a containment device 20 which is positioned on the work plane 4 and which is intended
to contain a pile 10 of elongate elements 100 which is inserted into the containment
device 20 by an operator, as will be better explained below.
[0036] The containment device 20 comprises a first and a second lateral containment wall
21A, 21B which project from the work plane 4 and which extend in a vertical direction
Y, perpendicularly thereto. The first and the second lateral containment walls 21A,
21B extend in the advance direction F and are mutually spaced apart in the direction
of the transverse axis X of the work plane 4 in such a manner that the pile 10 of
elongate elements 100 can be received between them. Advantageously, at least one of
the first and second lateral containment walls 21A, 21B can be moved along the transverse
axis X in order to vary the transverse dimensions of the containment device 20 in
order to receive elongate elements 100 having mutually different transverse dimensions.
[0037] The first and the second lateral containment walls 21A, 21B are intended to interact
with the opposite longitudinal walls A, A' of the elongate elements 10. The first
and the second lateral containment walls 21A, 21B are positioned in such a manner
that the second lateral containment wall 21B is interposed between the first lateral
containment wall 21A and a conveying device 40 of the supply system 1 of the invention,
as will be better explained below.
[0038] The first lateral containment wall 21A is fixed by means of a bracket 22A to the
work plane 4. The bracket 22A is provided with an adjustment element 23A which can
be seen in Figure 9 and which is intended to adjust the position of the first containment
wall 21A on the work plane 4 in the transverse direction X relative to the advance
direction F.
[0039] In this manner, by acting on the adjustment element 23A, it is possible to vary the
distance between the lateral containment walls 21A, 21B and to contain, with the containment
device 20, elongate elements having mutually different widths L1.
[0040] The second lateral containment wall 21B is fixed to the work plane 4 in an adjustable
manner.
[0041] The second lateral containment wall 21B is positioned on the work plane 4 in such
a manner that a gap 26, which can better be seen in Figure 7, is defined between the
second lateral containment wall 21B. The gap 26 is capable of allowing the passage
of the elongate elements 100 between the second lateral containment wall 21B and the
work plane 4, as will be better explained below.
[0042] The gap 26 advantageously has a dimension D2 which is greater than the thickness
"d" of the elongate elements 100 to be supplied and less than double the thickness
"d" of the elongate elements, as explained by the following relationship: d<D2<2*d.
[0043] This allows at the same time the elongate elements to be readily passed into the
gap 26 so that they can be extracted from the pile 10 and moved towards the conveying
device 40, as will be better explained below, and prevention of undesirable dragging
of the elongate elements which are adjacent to the elongate element to be extracted
from the pile 10, as will be better explained below. In this manner, one elongate
element at a time is extracted from the pile 10.
[0044] Adjustment elements are provided to adjust the position of the second lateral containment
wall 21B along the vertical axis Y with respect to the work plane 4, that is to say,
the dimensions of the gap 26.
[0045] The supply system 1 further comprises an accompanying device which is intended to
receive the elongate elements 100 from an extraction device 30 and to cooperate with
the conveying device 40 in order to convey the elongate elements 100, as will be better
explained below.
[0046] In the version shown, the accompanying device comprises a plurality of support brackets
46 which are spaced apart from each other along the longitudinal axis Z. The second
lateral containment wall 21B is fixed at a plurality of support brackets 46 to the
work plane 4.
[0047] Each support bracket 46 comprises a body which is L-shaped with a base 48 which is
fixed to the work plane 4 and which projects therefrom in a vertical direction Y and
an arm 49 which extends from the base 48 parallel with the work plane 4 in a transverse
direction X as far as the second lateral containment wall 21B which is positioned
so as to define with the work plane 4 a sliding cavity 49A for the elongate elements
100.
[0048] The base 48 is formed in such a manner that the arm 49 is arranged at a distance
"01" from the work plane 4 which is greater than or equal to the thickness "d" of
the elongate element 100.
[0049] In this manner, the elongate element 100 can be inserted and can slide between the
work plane 4 and the arm 49, as will be better explained below.
[0050] The brackets 46 are advantageously adjustable in a vertical direction Y with respect
to the work plane 4 in order to vary the dimension D1 of the sliding cavity 49A.
[0051] There are provided adjustment means which are not visible in the Figures for adjusting
the position of the base 48 of each support bracket 46 along the vertical axis Y in
order to consequently adjust the dimension of the distance D1, and of the gap 26 and
to adapt the supply system 1 to elongate elements 100 having mutually different thicknesses.
[0052] There may be provided additional adjustment means, not shown in the Figures, in order
to adjust the position of the base 48 of each support bracket 46 along the transverse
axis X of the work plane 4 in order to consequently adjust the distance between the
first and the second lateral containment walls 21A, 21B and to adapt the supply system
1 to elongate elements 100 having mutually different widths L1.
[0053] The containment device 20 further comprises a front wall 25 which projects perpendicularly
from the work plane 4 in a vertical direction Y and which is intended to interact
with a transverse wall B, B' of the elongate elements 100. The front wall 25 extends
in a transverse direction X1 and is fixed by means of an additional bracket 27 to
the work plane 4.
[0054] The front wall 25 may be provided with a front adjustment element which cannot be
seen in the Figures in order to move the front wall 25 in the advance direction F
on the work plane 4 in order to contain with the containment device 20 elongate elements
100 having mutually different lengths L.
[0055] As a result of it being possible to vary the position of at least one of the lateral
containment walls 21A, 21B and one of the front walls 25, it is possible to receive
in the containment device 20 elongate elements 100 having mutually different dimensions.
[0056] The front wall 25 is intended to act as an abutment wall during insertion of a pile
10 of elongate elements 100 in the supply system 1, as will be better explained below.
[0057] Advantageously, the elongate elements 100 are positioned in the containment device
20 in such a manner that the longitudinal axis Z thereof is parallel with the advance
direction F.
[0058] The supply system 1 further comprises an extraction device 30 in order to extract
the elongate elements 100 from the containment device 20 and to move them towards
a conveying device 40.
[0059] The conveying device 40 receives the elongate elements 100 from the extraction device
30 and conveys them towards an operating machine 200 which is only partially visible
in Figure 7, as will be better explained below.
[0060] The extraction device 30 is configured so as to move the longitudinal elements 100
in an extraction direction which is indicated with the arrow F1 in Figure 9 and which
is positioned substantially perpendicularly to the advance direction F, that is to
say, parallel with the transverse axis X of the work plane 4.
[0061] The extraction device 30 comprises at least one extraction element 31 which is movable
along the transverse axis X of the work plane 4 in both the directions of the extraction
direction, as indicated by the arrow F1, between an extraction configuration W, which
is visible in Figure 9 and in which the extraction device 30 is positioned in the
region of the pile 10 of elongate elements 100 and can take the elongate element 100'
which is positioned in a lower position in the pile 10, and a release configuration
W', which is visible in Figures 2 and 5 and in which the extraction device 30 is positioned
externally relative to the pile 10 and the extracted elongate element 100' is positioned
in the region of the conveying device 40, as will be better explained below.
[0062] Advantageously, in the release configuration W', the elongate elements 100 are positioned
in the region of the accompanying device, that is to say, inserted in the sliding
cavity 49A.
[0063] The at least one extraction element 31 of the extraction device 30 is formed to engage
with the lower elongate element 100', that is to say, the elongate element 100' which
is positioned in a lower position in the pile 10, that is to say, supported on the
work plane 4, and to extract it from the pile 10 by moving it in the extraction direction
F1 towards the conveying device 40.
[0064] In the version shown, the extraction device 30 comprises a plurality of extraction
elements 31 which are spaced apart in the advance direction F and which are intended
to engage with the lower elongate element 100' in mutually spaced-apart positions
along the longitudinal axis Z1 thereof.
[0065] Each extraction element 31A of the plurality of extraction elements 31 is formed
so as to be connected with positive-locking connection to a cavity 4A which is provided
in the work plane 4 in order to be able to interact with the lower elongate element
100' of the pile 10.
[0066] Each extraction element 31A is slidable in a corresponding cavity 4A which is provided
in the work plane 4 during the movement between the extraction configuration W and
the release configuration W'.
[0067] This allows the positioning of the elongate elements 100 to be made more stable on
the work plane 4 and, at the same time, the extraction of the lower elongate element
100' by means of the plurality of extraction elements 31 to be made more precise.
[0068] In fact, the work plane 4 provides a stable support for the elongate elements 100
which is not impaired by the presence of the cavities 4A and at the same time the
extraction elements 31A can freely move in the cavities 4A without risking dragging
a plurality of elongate elements.
[0069] Each extraction element 31A of the plurality of extraction elements 31 comprises
an engagement tooth 35 which is provided on the face of the extraction element 31A
which is directed towards the lower elongate element 100' and which is intended to
engage with the lower elongate element 100' in order to extract it from the pile 10,
as will be better explained below.
[0070] The engagement tooth 35 projects from the face of the extraction element 31A which
is directed towards the lower elongate element 100' so as to engage with the lower
elongate element 100' and to move it, during the movement of the extraction device
30, in the extraction direction F1 towards the conveying device 40.
[0071] Advantageously, the engagement tooth is intended to engage with the lower elongate
element 100' in the region of one of the longitudinal walls A, A' thereof. The engagement
tooth 35 has such dimensions as to project in the vertical direction Y with respect
to the work plane 4 in order to be able to engage with the lower elongate element
100'.
[0072] In one version, the face of the extraction element 31A which is directed towards
the lower elongate element 100' is arranged substantially at the same level as the
work plane 4, but in other versions it may be slightly projecting with respect to
the work plane towards the lower elongate element 100'.
[0073] The presence of the engagement tooth 35 allows a more effective grip on the lower
elongate element 100'.
[0074] Furthermore, the presence of the engagement tooth 35 prevents the lower elongate
element 100' from losing adhesion with respect to the extraction element 31A, for
example, if a particularly high extraction speed is required. Furthermore, the engagement
with one of the longitudinal walls A, A' of the lower elongate element 100' allows
further stabilization of the positioning of the lower elongate element 100 and a reduction
of undesirable movements thereof. The engagement teeth 35 of each extraction element
31A are provided in a mutually corresponding position in the transverse direction
X so as to keep the elongate element 100 correctly aligned.
[0075] The term "correctly aligned" is intended to be understood to mean the positioning
in which the longitudinal axis Z1 of the elongate element 100 is parallel with the
advance direction F.
[0076] Each extraction element 31A comprises an engagement tooth 35 which is positioned
in the region of an edge 31B of the extraction element 31A which is provided in a
distal position with respect to the lower elongate element 100', that is to say, distal
with respect to the first lateral containment wall 21A.
[0077] Each extraction element 31A defines an extraction seat for the lower elongate element
100'.
[0078] In the version shown, in accordance with the invention, each extraction element 31A
comprises a pair of engagement teeth 35 which are arranged in the region of opposite
edges 31B, 31C of the extraction element 31A so as to define a C-shaped extraction
element 31A.
[0079] This configuration allows the engagement of the lower elongate element 100' to be
made particularly precise, avoiding undesirable occurrences of dragging of other elongate
elements and/or undesirable movements of the lower elongate element 100'.
[0080] Furthermore, the C-shaped formation allows the lower elongate element 100' to be
received in a stable manner inside each extraction element 31A.
[0081] In this version, in fact, each extraction element 31A defines a receiving seat for
the lower elongate element 100'.
[0082] An advantage of this configuration is that of further increasing the stability of
the grip of the extraction element 31A on the lower elongate element 100.
[0083] Another advantage, if there are provided two conveying devices 40 which are positioned
at the opposite sides with respect to the containment device 20, is that of being
able to move the lower elongate element 100' in two different directions so as to
supply the different conveying devices 40 as required.
[0084] In this case, both the lateral containment walls 21A, 21B are spaced apart in the
containment device 20 with respect to the work plane 4 in order to allow the passage
of an elongate element 100.
[0085] The extraction device 30 further comprises a connection element 32, which can be
seen in Figure 8, for mutually connecting the extraction elements 31A of the plurality
of extraction elements 31 in order to fixedly join them to each other. The extraction
device 30 further comprises a drive motor 33 which is intended to move the plurality
of extraction elements 31 in both directions of the extraction direction F1.
[0086] The drive motor 33 is connected to the connection element 32 in order to move all
the extraction elements 31 simultaneously.
[0087] The drive motor 33 is provided with a speed variator 33A in order to be able to vary
the actuation speed of the motor 33 itself.
[0088] The drive motor 33 is operatively connected to the interface 7 in order to be adjusted
by an operator.
[0089] The supply system 1 further comprises a conveying device 40 which is intended to
receive the elongate elements 100 from the extraction device 30 and to convey them
to an operating machine 200 which is only partially visible in Figure 7.
[0090] The operating machine 200 is intended to carry out predetermined operations on the
elongate elements 100, depending on the product to be produced. The operating machine
200 attracts the elongate elements 100 at a speed dependent on the type of processing
to be carried out.
[0091] The removal device 80 removes the elongate element 100 from the conveying device
40 at a speed which depends on the operating cycle of the operating machine 200 and
moves it towards the operating machine 200 at this speed, which is also variable over
time.
[0092] As will be better explained below, the conveying device 40 comprises an automatic
adjustment device 75 which is intended to automatically vary the conveying speed of
the elongate elements 100 with the conveying device 40 on the basis of the speed at
which the elongate element 100 is removed by the removal device 80.
[0093] The conveying device 40 comprises a movement device 45 which is capable of moving
the elongate element 100 in the advance direction F from the extraction device 30
towards the removal device 80 of the operating machine 200.
[0094] The movement device 45 comprises a drive roller 42 which can rotate about an individual
rotation axis and which is intended to engage with the elongate element 100 and to
convey it in the advance direction F.
[0095] The movement device 45 further comprises an idle roller 41 which is positioned in
a position facing the drive roller 42 so that there is defined therebetween a through-hole
43 for the elongate element 100 and which is intended to cooperate with the drive
roller 42 in order to convey the elongate element 100.
[0096] The elongate element 100 is gripped between the external surfaces of the drive roller
and the idle roller and conveyed by means of the rotation thereof in the advance direction
F.
[0097] The movement device 45 is further provided with an adjustment system 70 in order
to adjust the position of the idle roller 41 with respect to the drive roller 42,
as will be better explained below.
[0098] The idle roller 41 is engaged in a sliding manner with a support 71 which is fixed
in turn to the work plane 4 and which is provided with a slot 72, in which the pin
41A of the idle roller 41 can slide in the direction of the vertical axis Y in both
directions of the arrow F3 in Figure 7.
[0099] The automatic adjustment system 70 comprises a spring which cannot be seen in the
Figures and which is preloaded so as to urge the idle roller 41 towards the drive
roller 42.
[0100] The spring is preloaded in order to urge the idle roller 41 so that there is defined
between the idle roller 41 and the drive roller 42 a through-hole 43 which has a size
less than the thickness "d" of the elongate elements 100 being conveyed. When an elongate
element 100 is inserted in the through-hole 43, the idle roller 41 is urged away from
the drive roller 42 counter to the action of the spring, and the pin 41A thereof slides
in the slot 72.
[0101] If, during the conveying of the elongate element 10, resistance is encountered, for
example, because the elongate element 100 being conveyed with the conveying device
40 is urged into abutment against the elongate element moved by the removal device
80, there is generated a resistant force counter to the urging force generated by
the drive roller 42. When the resistant force is greater than the urging force, the
drive roller continues to rotate but the idle roller 41 slides on the elongate element
100 and the conveying is in fact interrupted.
[0102] The idle roller 41 no longer engages with the elongate element 100, the element is
no longer gripped between the drive roller 42 and the idle roller 41 and, even if
the drive roller 42 continues to rotate, this does not bring about movement of the
elongate element in the advance direction.
[0103] Therefore, obstructions of the operating machine or damage to the elongate elements
are prevented in an immediate and simple manner.
[0104] There are provided adjustment elements which are associated with at least one of
the drive roller 42 and the idle roller 41 in order to adjust the mutual spacing thereof
and, therefore, the dimensions D3 of the hole 43 which is defined therebetween and,
therefore, to adapt the conveying system 40 to elongate elements 100 having mutually
different thicknesses "d". The movement device 45 further comprises a motor 44 which
is operatively connected to the drive roller 42 in order to actuate it and to a speed
variator, which is not visible in the Figures, so that it is possible to vary the
speed of rotation of the drive roller 42 and therefore the conveying speed of the
elongate element 100. Advantageously, the external surface of the drive roller 42
is provided with knurling or other elements in order to increase the grip on the elongate
elements 100. In a version, the drive roller 42 can be produced from rubber or other
material with a high friction coefficient in order to increase the grip on the elongate
elements 100 being conveyed.
[0105] The conveying device 40 further comprises at least one guide device 51 in order to
guide the movement of the elongate elements 100 in the advance direction F.
[0106] The guide device 51 is positioned downstream in the advance direction F with respect
to the movement device 45 and is arranged in order to maintain the elongate element
100 in a desired conveying trajectory. This prevents the elongate element 100 from
being able to have undesirable movements during the conveying and, therefore, from
being unable to be correctly removed by the removal device 80.
[0107] The guide device 51 comprises a pair of guide bars 53A, 53B which are positioned
in mutually facing positions, between which the elongate element 100 being conveyed
is intended to pass.
[0108] The guide bars 53A, 53B are positioned parallel with the advance direction F and
allow centring and guiding of the elongate elements.
[0109] The guide device 51 is provided with an adjustment device 54 in order to adjust the
mutual spacing between the guide bars 53A, 53B so as to be able to adapt the conveying
device 40 to convey elongate elements having mutually different widths L1.
[0110] The guide device 51 further comprises a pressure element 52 in order to keep the
elongate element 100 close to the work plane 4 and to prevent the formation of folds,
wrinkles or raised portions of the pressure element 100 from the work plane 4.
[0111] The pressure element comprises, in the form shown, a bar 52 which extends in the
advance direction F and which is intended to press the elongate element 100 on the
work plane 4.
[0112] There are further provided adjustment devices in order to adjust the spacing of the
bar 52 from the work plane 4 in order to convey elongate elements 100 having mutually
different thicknesses "d".
[0113] The bar 52 is positioned in such a manner that the elongate element 100 slides between
the work plane 4 and the bar 52.
[0114] Advantageously, the position of the bar 52 is adjusted in such a manner that there
is contact between the elongate element 100 and the bar 52 itself in order to prevent
the formation of wrinkles and folds.
[0115] The conveying device 40 further comprises a detection device 60 which is intended
to detect the presence of an elongate element 100 in the conveying device 40 in order
to adjust the operation of the conveying device 40 and/or the extraction device 30.
[0116] The detection device 60 comprise a plurality of optical sensors 61 which are capable
of detecting the presence of the elongate element 100.
[0117] Advantageously, the optical sensors 61 are positioned near the drive roller 42 and/or
the idle roller 41.
[0118] Preferably, the optical sensors 61 are positioned downstream of the idle roller 41
in order to detect the presence/absence of an elongate element 100 downstream of the
idle roller 41, as will be better explained below.
[0119] The detection device 60 is associated with the conveying device 40 in order to detect
the position of the elongate element 100 in the conveying device 40 in order to consequently
actuate or stop the extraction device 30 in order to extract an additional elongate
element 100 from the pile.
[0120] When the optical sensors 61 detect the absence of an elongate element 100 in the
detection zone, the extraction device 30 is actuated in order to extract an additional
elongate element 100 from the pile 10.
[0121] Conversely, the actuation of the extraction device 30 is interrupted as long as the
optical sensors 61 detect the presence of an elongate element 100 in the detection
zone.
[0122] During operation, an operator loads a pile 10 of elongate elements 100 in the containment
device 20, urging the elongate elements 100 in abutment against the front wall 25.
[0123] Subsequently, the operator closes the cover 5 and actuates the supply system 1 by
acting on the interface 7.
[0124] There is actuated the extraction device 30 which moves extraction configuration W'
in the direction of extraction F1 towards the conveying device 40.
[0125] In this manner, the engagement tooth 35 is moved towards the lower elongate element
100', engaging it and dragging it with movement in the direction of extraction F1.
[0126] The lower elongate element 100' is received in the seat which is defined by the extraction
elements 31A of the extraction device 30.
[0127] Therefore, the elongate element 100' which is positioned at the bottom in the pile
10 of elongate elements 100 is drawn, by extracting it from the pile 10 by moving
it in the extraction direction F1.
[0128] The extraction direction F1 is perpendicular to the advance direction F. Advantageously,
the elongate elements 100 are positioned in such a manner that the longitudinal axis
Z1 thereof is parallel with the advance direction F. Therefore, they are moved by
means of the extraction device 30 in the individual transverse direction X1.
[0129] This substantially simplifies the extraction operations.
[0130] This further reduces any phenomena of dragging of the elongate element which is positioned
above the lower elongate element 100'.
[0131] This advantage is maintained independently of the orientation of the elongate elements
100 with respect to the advance direction F, both when they are positioned with the
longitudinal axis Z1 parallel with the advance direction F, as in the case described
above, and also when they are arranged with the individual transverse axis X1 parallel
with the advance direction F.
[0132] By moving the extraction device 30, the lower elongate element 100' is progressively
extracted from the pile 10 and moves into the gap 26 until it is moved outside the
pile 10.
[0133] The extraction device 30 moves the lower elongate element 100' by inserting it in
the sliding cavity 49A.
[0134] The extraction device 30 moves the lower elongate element 100' by inserting it progressively
inside the sliding cavity 49A of the brackets 46 and the through-hole 43 which is
defined between the idle roller 42 and the drive roller 41 so that the lower elongate
element 100' can be subsequently moved with the conveying device 40.
[0135] Furthermore, the provision of the accompanying device and in particular the provision
of the sliding cavities 49A in the region of each bracket 46 allows guidance of the
movement of the lower elongate element 100'. In particular, for example, in the case
of flexible material, such as, for example, materials for producing seals, there is
prevented the formation of wrinkles or undulations in the lower elongate element 100'
in the advance direction F.
[0136] When the elongate element 100' is external with respect to the pile 10, it can be
moved in the advance direction F without interfering with the other elongate elements
100 which are present in the pile 10.
[0137] The extraction device 30 is moved as far as the release configuration W' in which
the elongate element 100' is outside the pile 10 and is positioned in the region of
the conveying device 40 and inserted in the sliding cavity 49A and/or the through-hole
43 between the idle roller 42 and the drive roller 41.
[0138] In this manner, the elongate element 100 can be moved by actuating the movement device
45.
[0139] In a version, in the delivery configuration W' of the extraction device 30, the elongate
element 100 is moved into abutment against the support 71 to which the idle roller
41 is fixed.
[0140] The support 71 acts as an abutment for the elongate element 100.
[0141] In this manner, there is obtained alignment of the elongate element 100' with the
conveying device 40.
[0142] Subsequently, the extraction device 30 is moved until it returns to the extraction
position W'.
[0143] Simultaneously, the drive roller 41 is actuated and the elongate element 100' is
conveyed by the conveying device 40 in the advance direction F.
[0144] The elongate element 100' is caused to pass between the guide bars 53A, 53B. In this
manner, there are obtained alignment and a correct positioning of the elongate element
100' being conveyed.
[0145] The bar 52 further maintains the elongate element 100' in a state correctly positioned
on the work plane 4.
[0146] The elongate element 100' is conveyed by the conveying device 40 towards the removal
device 80.
[0147] When the elongate element 100' reaches the removal device 80, it is dragged thereby
at a speed which depends on the speed at which the elongate element 100' is required
by the operating machine 200.
[0148] When the elongate element 100' reaches the removal device 80, the motor 44 is stopped,
and therefore the drive roller 42, and the elongate element 100 is no longer conveyed
by the conveying device 40 but is instead moved by means of the removal device 80.
[0149] There are provided position sensors which are not shown in the Figures and which
are advantageously of the mechanical type and intended to detect when the elongate
element 100' is supplied to the removal device 80 in order to consequently stop the
motor 44.
[0150] When the optical sensors 61 of the detection device 60 detect the absence of an elongate
element 100' in the detection zone 63, they transmit a signal which allows repeated
actuation of the extraction device 30 in order to extract an additional elongate element
100" from the pile 10.
[0151] The optical sensors 61 are positioned downstream of the movement device 45 so that,
when they detect the absence of an elongate element 100 in the detection zone 63,
the elongate element 100' which is conveyed has already been removed by the removal
device 80 and is moved by means of the removal device 80 towards the operating machine
200.
[0152] The optical sensors 61 are positioned downstream of the movement device 45 so that,
when they detect the absence of an elongate element 100, there is no elongate element
inserted in the through-hole 43 between the idle roller 41 and the drive roller 42,
that is to say, the movement device 45 is free to receive an additional elongate element
100".
[0153] In other words, the conveying device 40 is free to receive an additional elongate
element 100" from the extraction device 30.
[0154] The additional elongate element 100" is extracted in the same manners seen above
and inserted in the through-hole 43 between the idle roller 42 and the drive roller
41 in order to be moved by means of the conveying device 40. The additional elongate
element 100" is conveyed in the advance direction F.
[0155] Since the elongate element 100' and the additional elongate element 100" are moved
by the removal device 80 and the conveying device 40, respectively, they are moved
at mutually different speeds and the mutual spacing may vary.
[0156] The conveying device 40 moves the additional elongate element 100" until it is moved
into abutment with the elongate element 100', that is to say, so as to move the respective
facing transverse walls B, B' of the additional elongate element 100" and the elongate
element 100' into contact with each other.
[0157] If there are stoppages or slow-downs of the removal device 80 and the additional
elongate element 100" urges against the elongate element 100, the movement device
45 is stopped and the conveying of the additional elongate element 100" is stopped.
[0158] The movement device 45 encounters a conveying resistance greater than the urging
force generated by the movement device 45 and this device generates a lifting of the
idle roller with respect to the additional elongate element 100". Therefore, it is
no longer gripped between the idle roller 41 and the drive roller 42 and is not conveyed
in the advance direction F.
[0159] The possibility of varying the conveying speed of the conveying device 40 prevents
the occurrence of jams between two consecutive elongate elements 100, 100".
[0160] In the system of the invention, the elongate elements are supplied with a head/tail
supply.
[0161] The supply system 1 further comprises a sensor which is associated with the containment
device 20 which, when it detects that there is a limited number of elongate elements
100 in the containment device 20, sends a corresponding signal.
[0162] There is generated a warning signal and an operator provides for charging a new pile
of elongate elements in the containment device.
[0163] The charging operation can be carried out without stopping the supply system and
before the elongate elements in the containment device are finished because these
operations are carried out without interfering with the operation of the supply system
which is carried out in the lower portion of the pile, while the new pile is superimposed
on the preceding one.
[0164] Therefore, undesirable pauses of the supply system are prevented.
[0165] When it is desirable to insert additional elongate elements in the system of the
invention, the operator provides for opening the second cover 5B in order to uncover
a portion of the work plane 4 which is positioned upstream in the advance direction
F and to charge in the containment device 20 a pile 10 of elongate elements 100, as
can be seen in Figure 6.
[0166] The pile 10 is supported on the elongate elements 100 which are already present in
the containment device 20.
[0167] The pile 10 is positioned by urging the elongate elements 100 into abutment against
the front wall 24.
[0168] Subsequently, the operator closes the second cover 5B.
[0169] As mentioned, this operation is carried out without any need to stop the operation
of the system of the invention.
[0170] Therefore, the system achieves the predetermined objectives by allows the production
of a number of advantages with respect to the known supply systems.
1. Supply system (1) for elongate elements (100, 100', 100") for supplying elongate elements
(100, 100', 100") in an advance direction (F) comprising:
- a containment device (20) for containing a plurality of elongate elements (100,
100', 100") which are stacked one on the other so as to form a pile (10) of elongate
elements (100, 100', 100"),
- said elongate elements (100, 100', 100") being planar elements with a prevalent
longitudinal extent along a longitudinal axis (Z1) of said elongate elements (100,
100', 100"),
- a conveying device (40) for conveying said elongate elements (100, 100', 100") to
an operating machine (200), said conveying device (40) being provided with a movement
device (45) which is capable of moving said elongate elements (100, 100', 100") along
said advance direction (F),
- an extraction device (30) for extracting said elongate elements (100, 100', 100")
from said containment device (20) and for moving said elongate elements (100, 100',
100") towards said conveying device (40),
- said extraction device (30) comprising at least one extraction element (31, 31A)
which is formed to engage with the lower elongate element (100') which is positioned
in a lower position in said pile (10) and to extract it from said pile (10) by moving
it in an extraction direction (F1) which is located substantially perpendicularly
to said advance direction (F) towards the conveying device (40), said at least one
extraction element (31A) comprising an engagement tooth (35) which is provided on
the face of the extraction element (31A) which is directed towards the lower elongate
element (100') and which projects from said face in order to engage with said lower
elongate element (100') in order to extract it from said pile (10), characterised in that said at least one extraction element (31A) comprises a pair of engagement teeth (35)
which are arranged in the region of opposite edges of said extraction element (31A)
so as to define a C-shaped extraction element (31A).
2. Supply system according to the preceding claim, wherein each extraction element (31A)
defines an extraction seat for the lower elongate element (100').
3. Supply system according to the preceding claim, wherein an engagement tooth (35) of
each extraction element (31A) is provided in the region of an edge (31B) of said extraction
element (31A) which is distal with respect to said lower elongate element (100').
4. Supply system according to any one of the preceding claims, wherein said elongate
elements (100, 100', 100") are positioned in said containment device in such a manner
that said longitudinal axis (Z1) is parallel with said advance direction (F), said
elongate elements (100, 100', 100") being moved in the transverse direction thereof
by said extraction device (30).
5. Supply system according to any one of the preceding claims, wherein said extraction
device (30) comprises a plurality of extraction elements (31, 31A) which are spaced
apart in the advance direction (F) and which are intended to engage with said elongate
elements (100, 100', 100") in engagement positions which are spaced apart in the longitudinal
direction (Z1) of said elongate elements (100, 100', 100").
6. Supply system according to the preceding claim, wherein the engagement teeth (35)
of each extraction element (31A) are provided in mutually corresponding positions
in the transverse direction (X) so as to move the elongate element (100, 100', 100")
in a correctly aligned state.
7. Supply system according to claim 5 or 6, wherein said extraction device (30) comprises
a drive motor (33) which is intended to move said plurality of extraction elements
(31) in both the directions of the extraction direction (F1) and a connection element
(32) for mutually connecting the extraction elements (31A) of the plurality of extraction
elements (31) in order to fixedly join them to each other in terms of movement.
8. Supply system according to any one of claims 1 to 7, wherein said conveying device
(40) comprises at least one guide element (51, 53A, 53B) in order to guide the movement
of said elongate elements (100, 100', 100") in said advance direction (F).
9. Supply system according to claim 8, wherein said conveying device (40) comprises a
pressure element (52) which is positioned downstream in said advance direction (F)
with respect to the movement device (45) and which is provided in order to keep said
elongate element (100', 100") close to a work plane (4).
10. Supply system according to any one of the preceding claims and comprising a detection
device (60) which is associated with said conveying device (40) and which is intended
to detect the position of said elongate element (100', 100") in said conveying device
(40) in order to consequently actuate said extraction device (30) in order to extract
an additional elongate element (100") from said pile (10).
11. Supply system according to any one of claims 7 to 10, and comprising an adjustment
device for controlling the conveying speed of the conveying device (40) on the basis
of the speed at which the elongate element (100') is drawn back by the operating machine
(200).
12. Supply system according to any one of claims 7 to 11, wherein said movement device
(45) comprises a drive roller (42) which is rotatable about the rotation axis thereof
and an idle roller (41) which is positioned in a position facing said drive roller
(42) so that there is defined therebetween a through-hole (43) for said elongate element
(100) and which is intended to cooperate with said drive roller (42) in order to convey
said elongate element (100), said idle roller (41) preferably being movable with respect
to said drive roller (42) in order to vary the extent of said through-hole (43).
13. Supply system according to any one of the preceding claims and further comprising
an accompanying device (46, 48, 49) which is intended to receive said elongate elements
(100) from said extraction device (30) and to cooperate with said conveying device
(40) in order to convey said elongate elements (100).
14. Supply system according to the preceding claim when dependent on any of the claims
from 9 to 12, wherein said accompanying device (46, 48, 49) comprises at least one
support bracket (46) having a body which is L-shaped with a base (48) which is fixed
to said work plane (4) and which projects from said work plane (4) in a vertical direction
(Y) and an arm (49) which extends from said base (48) substantially parallel with
said work plane (4) in a transverse direction (X) and which defines with said work
plane (4) a sliding cavity (49A) for said elongate elements (100).
15. Supply system according to the preceding claim, wherein said accompanying device (46,
48, 49) comprises a plurality of support brackets (46) which are spaced apart from
each other along said longitudinal axis (Z), said brackets preferably being adjustable
in a vertical direction (Y) in order to vary the dimension of said sliding cavity
(49A).
1. Zuführsystem (1) für längliche Elemente (100, 100', 100") zum Zuführen von länglichen
Elementen (100, 100', 100") in eine Vorschubrichtung (F), umfassend:
- eine Aufnahmevorrichtung (20) zur Aufnahme einer Mehrzahl von länglichen Elementen
(100, 100', 100"), die übereinander gestapelt werden, um einen Stapel (10) von länglichen
Elementen (100, 100', 100") zu bilden,
- wobei die länglichen Elemente (100, 100', 100") ebene Elemente mit einer überwiegenden
Längsausdehnung entlang einer Längsachse (21) der länglichen Elemente (100, 100',
100") sind,
- eine Fördervorrichtung (40) zum Fördern der länglichen Elemente (100, 100', 100")
zu einer Arbeitsmaschine (200), wobei die Fördervorrichtung (40) mit einer Bewegungsvorrichtung
(45) versehen ist, die in der Lage ist, die länglichen Elemente (100, 100', 100")
entlang der Vorschubrichtung (F) zu bewegen,
- eine Entnahmevorrichtung (30) zum Entnehmen der länglichen Elemente (100, 100',
100") aus der Aufnahmevorrichtung (20) und zum Bewegen der länglichen Elemente (100,
100', 100") in Richtung der Fördervorrichtung (40),
- wobei die Entnahmevorrichtung (30) zumindest ein Entnahmeelement (31, 31A) aufweist,
das ausgebildet ist, um mit dem unteren länglichen Element (100'), das in einer unteren
Position im Stapel (10) positioniert ist, in Eingriff zu kommen und es aus dem Stapel
(10) herauszuziehen, indem es in eine Entnahmerichtung (F1) bewegt wird, die im Wesentlichen
senkrecht zur Vorschubrichtung (F) in Richtung der Fördervorrichtung (40) angeordnet
ist,
- wobei das zumindest eine Entnahmeelement (31A) einen Eingriffszahn (35) aufweist,
der an der Fläche des Entnahmeelements (31A) vorgesehen ist, der auf das untere längliche
Element (100') ausgerichtet ist und der von der Fläche hervorsteht, um mit dem unteren
länglichen Element (100') in Eingriff zu kommen, um es aus dem Stapel (10) herauszuziehen,
dadurch gekennzeichnet, dass das zumindest eine Entnahmeelement (31A) ein Paar von Eingriffszähnen (35) aufweist,
die im Bereich von gegenüberliegenden Kanten des Entnahmeelements (31A) angeordnet
sind, um ein C-förmiges Entnahmeelement (31A) zu bilden.
2. Zuführsystem nach dem vorhergehenden Anspruch, wobei jedes Entnahmeelement (31A) einen
Entnahmesitz für das untere längliche Element (100') bildet.
3. Zuführsystem nach dem vorhergehenden Anspruch, wobei ein Eingriffszahn (35) jedes
Entnahmeelements (31A) im Bereich einer Kante (318) des Entnahmeelements (31A) vorgesehen
ist, die in Bezug auf das untere längliche Element (100') distal ist.
4. Zuführsystem nach einem der vorhergehenden Ansprüche, wobei die länglichen Elemente
(100, 100', 100") in der Aufnahmevorrichtung derart angeordnet sind, dass die Längsachse
(Z1) parallel zur Vorschubrichtung (F) verläuft, wobei die länglichen Elemente (100,
100', 100") in ihre Querrichtung durch die Entnahmevorrichtung (30) bewegt werden.
5. Zuführsystem nach einem der vorhergehenden Ansprüche, wobei die Entnahmevorrichtung
(30) eine Mehrzahl von Entnahmeelementen (31, 31A) aufweist, die in Vorschubrichtung
(F) beabstandet sind, und die dazu bestimmt sind, um mit den länglichen Elementen
(100, 100', 100") in Eingriffspositionen einzugreifen, die in der Längsrichtung (Z1)
der länglichen Elemente (100, 100', 100") voneinander beabstandet sind.
6. Zuführsystem nach dem vorhergehenden Anspruch, wobei die Eingriffszähne (35) jedes
Entnahmeelements (31A) in einander entsprechenden Positionen in die Querrichtung (X)
vorgesehen sind, um das längliche Element (100, 100', 100") in einem korrekt ausgerichteten
Zustand zu bewegen.
7. Zuführsystem nach Anspruch 5 oder 6, wobei die Entnahmevorrichtung (30) einen Antriebsmotor
(33) aufweist, der dazu bestimmt ist, um die Mehrzahl von Entnahmeelementen (31) in
beiden Richtungen der Entnahmerichtung (F1) und ein Verbindungselement (32) zum gegenseitigen
Verbinden der Entnahmeelemente (31A) der Mehrzahl von Entnahmeelementen (31) zu bewegen,
um sie in Bezug auf die Bewegung fest miteinander zu verbinden.
8. Zuführsystem nach einem der Ansprüche 1 bis 7, wobei die Fördervorrichtung (40) zumindest
ein Führungselement (51, 53A, 538) aufweist, um die Bewegung der länglichen Elemente
(100, 100', 100") in Vorschubrichtung (F) zu führen.
9. Zuführsystem nach Anspruch 8, wobei die Fördervorrichtung (40) ein Druckelement (52)
aufweist, das in Vorschubrichtung (F) stromabwärts in Bezug auf die Bewegungsvorrichtung
(45) positioniert ist, und das vorgesehen ist, um das längliche Element (100', 100")
nahe zu einer Arbeitsebene (4) zu halten.
10. Zuführsystem nach einem der vorhergehenden Ansprüche, das eine Erfassungsvorrichtung
(60) aufweist, die mit der Fördervorrichtung (40) verbunden ist, und die dazu bestimmt
ist, um die Position des länglichen Elements (100', 100") in der Fördervorrichtung
(40) zu erfassen, um folglich die Entnahmevorrichtung (30) zu betätigen, um ein zusätzliches
längliches Element (100") aus dem Stapel (10) herauszuziehen.
11. Zuführsystem nach einem der Ansprüche 7 bis 10, das eine Einstellvorrichtung zur Steuerung
der Fördergeschwindigkeit der Fördervorrichtung (40) auf der Basis der Geschwindigkeit,
mit der das längliche Element (100') von der Arbeitsmaschine (200) zurückgezogen wird,
aufweist.
12. Zuführsystem nach einem der Ansprüche 7 bis 11, wobei die Bewegungsvorrichtung (45)
eine Antriebsrolle (42), die um ihre Drehachse drehbar ist, und eine Leerlaufrolle
(41) aufweist, die in einer der Antriebsrolle (42) zugewandten Position angeordnet
ist, so dass dazwischen ein Durchgangsloch (43) für das längliche Element (100) ausgebildet
ist, und die dazu bestimmt ist, um mit der Antriebsrolle (42) zusammenzuwirken, um
das längliche Element (100) zu fördern, wobei die Leerlaufrolle (41) vorzugsweise
in Bezug auf die Antriebsrolle (42) beweglich ist, um die Ausdehnung des Durchgangslochs
(43) zu variieren.
13. Zuführsystem nach einem der vorhergehenden Ansprüche, das ferner eine Begleitvorrichtung
(46, 48, 49) aufweist, die dazu bestimmt ist, um die länglichen Elemente (100) von
der Entnahmevorrichtung (30) aufzunehmen und mit der Fördervorrichtung (40) zusammenzuwirken,
um die länglichen Elemente (100) zu fördern.
14. Zuführsystem nach dem vorhergehenden Anspruch in Abhängigkeit von einem der Ansprüche
9 bis 12, wobei die Begleitvorrichtung (46, 48, 49) zumindest einen Stützbügel (46)
mit einen L-förmigen Körper mit einer Basis (48) aufweist, die an der Arbeitsebene
(4) befestigt ist und die von der Arbeitsebene (4) in eine vertikale Richtung (Y)
hervorsteht, und einen Arm (49) aufweist, der sich von der Basis (48) im Wesentlichen
parallel zur Arbeitsebene (4) in eine Querrichtung (X) erstreckt, und der mit der
Arbeitsebene (4) einen Gleitraum (49A) für die länglichen Elemente (100) bildet.
15. Zuführsystem nach dem vorhergehenden Anspruch, wobei die Begleitvorrichtung (46, 48,
49) eine Mehrzahl von Stützbügeln (46) aufweist, die entlang der Längsachse (Z) voneinander
beabstandet sind, wobei die Bügel vorzugsweise in eine vertikale Richtung (Y) einstellbar
sind, um die Abmessung des Gleitraums (49A) zu variieren.
1. Système d'approvisionnement (1) d'éléments allongés (100, 100', 100") pour l'approvisionnement
d'éléments allongés (100, 100', 100") dans une direction d'avance (F), le système
comprenant :
- un dispositif de maintien (20) pour maintenir une pluralité d'éléments allongés
(100, 100', 100") qui sont empilés les uns sur les autres de manière à former un empilement
(10) d'éléments allongés (100, 100', 100"),
- lesdits éléments allongés (100, 100', 100") étant des éléments plans avec une étendue
longitudinale prédominante le long d'un axe longitudinal (Z1) desdits éléments allongés
(100, 100', 100"),
- un dispositif d'acheminement (40) pour acheminer lesdits éléments allongés (100,
100', 100") vers une machine de travail (200), ledit dispositif d'acheminement (40)
étant doté d'un dispositif de déplacement (45) qui est capable de déplacer lesdits
éléments allongés (100, 100', 100") le long de ladite direction d'avance (F),
- un dispositif d'extraction (30) pour extraire lesdits éléments allongés (100, 100',
100") dudit dispositif de maintien (20) et pour déplacer lesdits éléments allongés
(100, 100', 100") vers ledit dispositif d'acheminement (40),
- ledit dispositif d'extraction (30) comprenant au moins un élément d'extraction (31,
31A) qui est formé pour venir en prise avec l'élément allongé inférieur (100') qui
est positionné dans une position inférieure dans ledit empilement (10) et pour l'extraire
dudit empilement (10) en le déplaçant dans une direction d'extraction (F1) qui est
située sensiblement perpendiculairement à ladite direction d'avance (F) vers le dispositif
d'acheminement (40), ledit au moins un élément d'extraction (31A) comprenant une dent
de mise en prise (35) qui est prévue sur la face de l'élément d'extraction (31A) qui
est dirigée vers l'élément allongé inférieur (100') et qui fait saillie de ladite
face pour venir en prise avec ledit élément allongé inférieur (100') afin de l'extraire
dudit empilement (10), caractérisé en ce que ledit au moins un élément d'extraction (31A) comprend une paire de dents de mise
en prise (35) qui sont disposées dans la région de bords opposés dudit élément d'extraction
(31A) de manière à définir un élément d'extraction en forme de C (31A).
2. Système d'approvisionnement selon la revendication précédente, dans lequel chaque
élément d'extraction (31A) définit un siège d'extraction pour l'élément allongé inférieur
(100').
3. Système d'approvisionnement selon la revendication précédente, dans lequel une dent
de mise en prise (35) de chaque élément d'extraction (31A) est prévue dans la région
d'un bord (31B) dudit élément d'extraction (31A) qui est distal par rapport audit
élément allongé inférieur (100').
4. Système d'approvisionnement selon l'une quelconque des revendications précédentes,
dans lequel lesdits éléments allongés (100, 100', 100") sont positionnés dans ledit
dispositif de confinement de manière à ce que ledit axe longitudinal (Z1) soit parallèle
à ladite direction d'avance (F), lesdits éléments allongés (100, 100', 100") étant
déplacés dans la direction transversale de ceux-ci par ledit dispositif d'extraction
(30).
5. Système d'approvisionnement selon l'une quelconque des revendications précédentes,
dans lequel ledit dispositif d'extraction (30) comprend une pluralité d'éléments d'extraction
(31, 31A) qui sont espacés les uns des autres dans la direction d'avance (F) et qui
sont destinés à venir en prise avec lesdits éléments allongés (100, 100', 100") dans
des positions de mise en prise qui sont espacées les unes des autres dans la direction
longitudinale (Z1) desdits éléments allongés (100, 100', 100").
6. Système d'approvisionnement selon la revendication précédente, dans lequel les dents
de mise en prise (35) de chaque élément d'extraction (31A) sont prévues dans des positions
mutuellement correspondantes dans la direction transversale (X) de manière à déplacer
l'élément allongé (100, 100', 100") dans un état correctement aligné.
7. Système d'approvisionnement selon la revendication 5 ou 6, dans lequel ledit dispositif
d'extraction (30) comprend un moteur d'entraînement (33) qui est destiné à déplacer
ladite pluralité d'éléments d'extraction (31) dans les deux directions de la direction
d'extraction (F1) et un élément de raccordement (32) pour raccorder mutuellement les
éléments d'extraction (31A) de la pluralité d'éléments d'extraction (31) afin de les
joindre solidement les uns aux autres en termes de déplacement.
8. Système d'approvisionnement selon l'une quelconque des revendications 1 à 7, dans
lequel ledit dispositif d'acheminement (40) comprend au moins un élément de guidage
(51, 53A, 53B) afin de guider le déplacement desdits éléments allongés (100, 100',
100") dans ladite direction d'avance (F).
9. Système d'approvisionnement selon la revendication 8, dans lequel ledit dispositif
d'acheminement (40) comprend un élément de pression (52) qui est positionné en aval
dans ladite direction d'avance (F) par rapport au dispositif de déplacement (45) et
qui est prévu pour maintenir ledit élément allongé (100', 100") à proximité d'un plan
de travail (4).
10. Système d'approvisionnement selon l'une quelconque des revendications précédentes
et comprenant un dispositif de détection (60) qui est associé audit dispositif d'acheminement
(40) et qui est destiné à détecter la position dudit élément allongé (100', 100")
dans ledit dispositif d'acheminement (40) afin d'actionner en conséquence ledit dispositif
d'extraction (30) en vue d'extraire un élément allongé supplémentaire (100") dudit
empilement (10).
11. Système d'approvisionnement selon l'une quelconque des revendications 7 à 10, et comprenant
un dispositif de réglage pour commander la vitesse d'acheminement du dispositif d'acheminement
(40) en fonction de la vitesse à laquelle l'élément allongé (100') est retiré par
la machine de travail (200).
12. Système d'approvisionnement selon l'une quelconque des revendications 7 à 11, dans
lequel ledit dispositif de déplacement (45) comprend un galet d' entraînement (42)
qui peut tourner autour de son axe de rotation et un galet libre (41) qui est positionné
dans une position faisant face audit galet d'entraînement (42) de sorte qu'il soit
défini entre eux un trou traversant (43) pour ledit élément allongé (100) et qui est
destiné à coopérer avec ledit galet d'entraînement (42) afin d'acheminer ledit élément
allongé (100), ledit galet libre (41) étant de préférence mobile par rapport audit
galet d'entraînement (42) afin de faire varier l'étendue dudit trou traversant (43).
13. Système d'approvisionnement selon l'une quelconque des revendications précédentes
et comprenant en outre un dispositif connexe (46, 48, 49) qui est destiné à recevoir
lesdits éléments allongés (100) à partir dudit dispositif d'extraction (30) et à coopérer
avec ledit dispositif d' acheminement (40) afin d'acheminer lesdits éléments allongés
(100).
14. Système d'approvisionnement selon la revendication précédente lorsqu'elle dépend de
l'une quelconque des revendications 9 à 12, dans lequel ledit dispositif connexe (46,
48, 49) comprend au moins une armature de support (46) ayant un corps qui est en forme
de L avec une base (48) qui est fixée audit plan de travail (4) et qui fait saillie
dudit plan de travail (4) dans une direction verticale (Y) et un bras (49) qui s'étend
de ladite base (48) sensiblement parallèlement audit plan de travail (4) dans une
direction transversale (X) et qui définit avec ledit plan de travail (4) une cavité
de coulissement (49A) pour lesdits éléments allongés (100).
15. Système d'approvisionnement selon la revendication précédente, dans lequel ledit dispositif
connexe (46, 48, 49) comprend une pluralité d'armatures de support (46) qui sont espacées
les unes des autres selon ledit axe longitudinal (Z), lesdites armatures étant de
préférence réglables dans une direction verticale (Y) afin de faire varier la dimension
de ladite cavité de coulissement (49A).