[0001] This invention relates to offshore offloading solutions for exporting hydrocarbon
fluids, such as oil produced from subsea wells.
[0002] Offshore exploration for oil and gas is being performed in ever more challenging
waters, with fields now being developed in water depths of 3000m or more. To recover
hydrocarbons from such depths, designers of riser and offloading systems face difficult
technical challenges. Those challenges may be compounded by metocean characteristics
and by low reservoir temperatures.
[0003] The invention also arises from the challenges of developing marginal subsea oil fields,
including small, remote or inaccessible fields. Addressing those challenges requires
the cost of production and of capital investment to be minimised.
[0004] A typical subsea oil production system comprises production wells each with a wellhead,
pipelines running on the seabed, structures to support valves and connectors, manifolds
and risers to bring production fluids to the surface. At the surface, a topside installation
that can be a platform or a vessel receives the production fluids before their onward
transportation.
[0005] Crude oil is a multiphase fluid that generally contains sand, oil, water and gas.
These components of the wellstream interact in various ways that tend to decrease
the flow rate in the production system, from the wellhead to storage. A critical failure
mode in crude oil production is clogging or plugging of pipelines by solids because
remediation of such blockages can be extremely expensive, especially in deep water.
[0006] When the temperature of a wellstream decreases below a certain threshold, at a given
pressure, components of crude oil may react together or individually to coagulate
or precipitate as solid wax, asphaltenes or hydrates that could plug a pipeline. For
example, wax will typically appear in oil at a temperature of around 30°C.
[0007] As crude oil is hot at the outlet of a wellhead, typically around 200°C, one approach
in subsea oil production is to maintain the oil temperature above the critical threshold
until the oil has been delivered to a topside installation. There, the oil can be
treated to allow the treated oil to be transported at ambient temperature in tankers
or in pipelines.
[0008] Two main approaches are known in the art to reduce the cost of producing oil from
subsea fields, especially marginal subsea fields. A first approach is to simplify
subsea equipment as much as possible, for example by using a long, insulated and optionally
also heated pipeline extending from a wellhead and minimal additional equipment subsea.
Where fields are isolated or remote, a challenge of that approach is that the cost
of installing and optionally heating the long pipeline becomes a large element of
the cost of development and operation.
[0009] Marginal fields requires low-cost solutions. In many cases, particularly for isolated
fields, it is important to remove the pipeline cost. One alternative is to use a subsea
storage unit to store produced crude oil before offloading. For example, crude oil
may be stored in an inflatable bag on the seabed.
[0010] Thus, the present invention arises from a second approach, namely to transfer at
least some conventionally-topside production and storage functions to a subsea location
for intermittent export of oil by shuttle tanker vessels. This involves subsea separation,
processing and storage of produced oil. By displacing at least some oil processing
steps from the topside to the seabed, the need for thermal insulation or heating can
be reduced and ideally, in principle, removed.
[0011] It follows that there is a need periodically to offload oil that has been processed
and stored subsea whenever transfer to a tanker vessel is required.
[0012] Many solutions are known for offshore offloading of hydrocarbon fluids. Most involve
exporting such fluids from a surface or topside storage facility to a tanker that
is fluidly connected to the topside storage facility. Usually, hose storage systems
are located on the topside facility. For example, in
WO 99/42358 the topside storage facility is a floating storage and offloading (FSO) vessel and
in
WO 2015/22477, the topside storage facility is a buoyant SPAR platform.
WO 99/00579 and
WO 98/14363 also disclose SPAR platforms, which in these examples are connected to a subsea storage
facility.
[0013] Topside storage facilities such as FSOs and SPARs are complex and bulky structures
that are very costly. Additionally, connecting them to a tanker can be challenging.
[0014] A tanker may connect to an offloading buoy, also located at the surface. The offloading
buoy is fluidly connected to a line at or near to the surface known as an offloading
line (OLL) that is picked up by the tanker and hauled aboard for connection. This
does not remove the need for surface systems.
[0015] Sometimes, partial storage is provided by a surface buoy as disclosed in
WO 2009/117901.
US 6688348 and
US 5275510 disclose another export system in which a near-surface termination buoy supports
an export hose.
[0016] Permanent risers are known, for example as disclosed in
WO 2013/037002,
US 6453838,
US 5657823 and in
US 2008/0056826, connected by flexible jumper pipes to a floating production storage and offloading
(FPSO) vessel or other surface facility. A drawback of this arrangement is its permanence:
an FPSO must be on station continuously to process hydrocarbons flowing from the riser;
similarly, the jumper pipes between the riser and the FPSO are a permanent system
that will typically remain in place until the riser is decommissioned. An additional
export system from the FPSO to a shuttle tanker remains necessary, either directly
or via a buoy as described above. Additional systems comprising permanent risers connected
via flexible jumper pipes to an FPSO are also described in
US 2005/0042952 and
US 4436048, although emergency disconnection of the jumpers from the buoy is possible in these
systems.
US 2002/0115365 and
US 2003/0180097 both describe permanent risers that extend from the seabed to a floating surface
platform.
US 2005/0241832 describes the provision of buoyancy elements coupled in series with section of a
riser to provide support to the riser between the surface platform and the seabed.
[0017] WO 2006/090102 discloses a tank system anchored to the seabed.
WO 2012/051148 describes a marine subsea assembly, having an upper and a lower riser assembly, the
lower riser assembly connecting a subsea riser to a seabed mooring and to a subsea
hydrocarbon fluid source and the upper riser assembly connecting the riser to a near-surface
subsea buoyancy device and to a surface structure.
[0018] In
WO 85/03494 a visiting tanker connects directly to a subsea storage tank. In
US 3654951, an export hose is folded onto a subsea storage tank. This is not realistic for deep-water
systems because the hose would be impractically long and would be likely to be crushed
by hydrostatic pressure.
[0019] WO 02/076816 discloses a subsea storage tank and export riser tensioned by a subsea buoy. The
subsea buoy retains a hose and a mooring line that are accessible near the surface
from any tanker. This places permanent lines and other equipment within the splash
zone, just below the surface, where sea dynamics are influential. This generates fatigue
in hoses, lines and other equipment. There is also a risk of clashing with vessels
at the surface.
US 2006/0000615 and
GB 2133446 also describe systems comprising export risers that are tensioned by sub-surface
buoys, in which export hoses are retained by the buoys and are accessible from a tanker
for the export operation.
[0020] Thus, a drawback of prior art solutions is the requirement for expensive development
that makes exploitation of small, remote fields uneconomical. Another drawback is
the presence of permanent equipment at or just below the sea surface, generating a
risk of clashing with vessels and fatigue caused by sea motion. Also, prior art solutions
rely on surface units, which makes them unsuitable for use in deep water.
[0021] Against this background, the invention resides in a subsea hydrocarbon export system
that comprises: a riser tower having a column, particularly a riser column or pipe,
extending from a seabed location to a sub-surface buoy that supports the column in
an upright orientation; and a subsea connector that is operable underwater to couple
the column temporarily to a hose suspended from a surface shuttle tanker vessel for
an export operation and to release the hose after the export operation. The column
extends through the buoy, along a central longitudinal axis passing through the buoy,
and communicates with a subsea tank for storing hydrocarbon fluids and a subsea processing
system for processing hydrocarbon fluids. The subsea connector comprises an upwardly-facing
socket at an upper extremity of the column and aligned with the central longitudinal
axis of the column for receiving a plug connector element of the hose.
[0022] The subsea tank may serve as a foundation for the riser tower. Indeed, the subsea
processing system may also serve as a foundation for the riser tower. A subsea pump
is suitably provided for pumping hydrocarbon fluids up the column to the subsea connector.
[0023] The buoy suitably surrounds an upper end portion of the column and may comprise shell
elements that are assembled together around the upper end portion of the column.
[0024] The column may comprise a connection between a major lower section and a minor upper
section, the buoy being attached to the upper section of the column.
[0025] There may be at least one laterally-projecting male formation on the column, which
formation may be engaged with a female interlocking formation of the buoy. Such a
male formation suitably surrounds the column and could be formed integrally with the
column.
[0026] The buoy may comprise a sleeve fixed to and surrounding the column. In that case,
an upper cross-member may extend laterally from the sleeve, which cross-member suitably
supports one or more lifting points. The upper cross-member may also support one or
more attachment points for the attachment of at least one clump weight. Conveniently,
one or more buoyant elements of the buoy may bear against an underside of the upper
cross-member to apply buoyant upthrust via the upper cross-member in use.
[0027] A lower cross-member may also extend laterally from the sleeve and suitably supports
one or more attachment points for the attachment of at least one clump weight. One
or more buoyant elements of the buoy may rest upon the lower cross-member.
[0028] A bend restrictor may be attached to the buoy to extend along and around the column
under the buoy. For example, the bend restrictor may be attached to a lower cross-member
of the buoy.
[0029] At least one clump weight may be releasably attached to the buoy. Such a clump weight
may comprise a chain or could be a rigid structure attachable to the buoy. In either
case, the buoy may comprise one or more external tubes or sockets that open upwardly
to receive at least one clump weight.
[0030] In specific embodiments, the or each clump weight may be at least part of a ring
that extends circumferentially around the buoy. It is also possible for the or each
clump weight to comprise at least one downwardly-extending pin for engagement with
one or more respective sockets of the buoy. In that case, the or each clump weight
may comprise a pair of those pins, one pin of the pair being longer than the other
pin of the pair.
[0031] Advantageously, the buoy may comprise non-floodable buoyancy such as rigid buoyant
foam or macrospheres.
[0032] The hose is suitably a bonded polymer composite hose. Whilst the hose is preferably
longitudinally flexible, there may be a rigid guide structure at a distal end of the
hose.
[0033] Preferably, the column is of pipe that can be wound onto a reel or carousel onboard
an installation vessel, without substantial plastic deformation of the pipe. For example,
the column is suitably of bonded polymer composite pipe. More generally, the column
is advantageously of a material that is substantially neutrally buoyant in sea water.
[0034] The inventive concept embraces a related method of exporting hydrocarbon fluids from
a seabed location. That method comprises: sailing a shuttle tanker vessel to a surface
export location above a column, such as a riser column or pipe, that extends from
the seabed location and communicates with a subsea tank for storing hydrocarbon fluids
to a sub-surface buoy, which buoy supports the column in an upright orientation extending
along a central longitudinal axis passing through the buoy, and wherein the column
extends through the buoy; suspending a hose from the vessel to reach the column; operating
a subsea connector underwater to couple the hose temporarily to the column for an
export operation by inserting a plug connector of the hose into an upwardly-facing
socket at an upper extremity of the column, wherein when coupled, the socket and plug
connector are mutually aligned along the central longitudinal axis of the column;
during the export operation, causing hydrocarbon fluids to flow from the seabed location
up the column and along the coupled hose to the vessel; and on completion of the export
operation, releasing the hose from the column by removing the plug connector of the
hose from the upwardly-facing socket, lifting the hose to the vessel and sailing the
vessel away from the surface export location.
[0035] The hydrocarbon fluids may be stored at the seabed location before the export operation
or may be processed at the seabed location before or during the export operation.
The hydrocarbon fluids are suitably pumped at the seabed location during the export
operation to flow up the column.
[0036] There is also described a related method of installing a subsea hydrocarbon export
system. That method comprises: lowering a major lower section of a column, such as
a riser column or pipe, into water beneath an installation vessel; suspending the
lower section from the installation vessel; positioning a buoy and a minor upper section
of the column over the suspended lower section; joining the upper section to the lower
section to complete the column; and lowering the buoy and the completed column into
the water beneath the installation vessel to anchor a lower end of the column at a
seabed location to a subsea facility comprising a subsea tank for storing hydrocarbon
fluids, the buoy then being at a sub-surface location.
[0037] The lower section of the column may be unwound from shipboard storage while launching
that lower section into the water. Preferably the buoy and the upper section are raised
from a stowed position on the installation vessel into an upright orientation when
positioning them over the suspended lower section.
[0038] Ballast may be added to the buoy before lowering the buoy and the completed column
into the water beneath the installation vessel. The added ballast may then be removed
from the buoy after anchoring the lower end of the column at the seabed location.
To achieve this, one or more clump weights may be attached to the buoy to add the
ballast, for example by inserting at least part of a clump weight into an upwardly-opening
external tube or socket on the buoy. The or each clump weight may then be removed
from the buoy to remove the added ballast. In that case, the or each clump weight
may be attached to the buoy at a level beneath a mid-point of the buoy, preferably
to a lower end region of the buoy. Alternatively, the or each clump weight may be
attached to an upper end region of the buoy.
[0039] In summary, the invention provides for offloading from a subsea storage unit to a
transport tanker at the surface. Hydrocarbon fluids such as oil flow from a feed pump
at the seabed and up a riser to a sub-surface buoy that supports the riser. A low
differential pressure riser system comprises a composite pipe that is nearly neutrally
buoyant in sea water.
[0040] At its lower end, the upright composite pipe of the riser is connected by a remotely-operated
connector to piping running from the feed pump, which pumps crude oil from the subsea
storage unit to the offloading system.
[0041] Before offloading, a shuttle tanker positions itself above the known coordinates
of the buoy. The buoy will be within a circular area of movement dependent on current
and wave interactions. The shuttle tanker lowers a hose with a connector at the lower
end that is capable of locating the buoy and the associated connection geometry. The
shuttle tanker moves the connector into alignment with the buoy and connects to a
hub on top of the buoy. For example, the shuttle tanker can employ a dynamic positioning
system to move the connector laterally to the appropriate position. Offloading of
oil can then start. After offloading, the shuttle tanker will disconnect from the
buoy and depart.
[0042] To achieve offloading from subsea storage, embodiments of the invention provide for
composite pipe material to be used in the riser section, supported in an upright orientation
by standardised, industrial buoyancy elements. Floodable buoyancy is not necessary
- only compact buoyancy and associated clump weights for installation. This results
in very low weights. Also, the hose is lowered from a tanker vessel to the buoy instead
of the traditional approach of pulling a flexible hose up to the deck of a tanker.
[0043] Thus, the present invention uses the development of subsea processing to simplify
the offloading equipment and process. A tanker vessel connects directly to a subsea
buoy by a hose, preferably a bonded polymer composite hose. The hose should be sufficiently
flexible to be stored onboard the tanker, yet sufficiently stiff to be easily guided
to the subsea connector. The hose should also be strong enough to withstand the pressures
to which it will be exposed in use - both internal fluid pressure and external hydrostatic
pressure at the depth of the buoy.
[0044] Embodiments of the invention provide an underwater hydrocarbon export system comprising:
a tower comprising a sub-surface buoy and a riser column between the seabed and the
buoy; and a temporary hose hoisted from surface vessel; wherein the sub-surface buoy
comprises a subsea connector for subsea connection and disconnection of the temporary
hose for hydrocarbon export.
[0045] WO 2014/060717 shows a typical connector that may be used to allow connection between the buoy and
the hose despite substantial misalignment.
[0046] The export system may also comprise a subsea storage tank on the seabed. In that
case, the bottom of the riser column may be fluidly and/or mechanically connected
to the subsea storage tank. The riser column is suitably of bonded polymer composite
pipe.
[0047] The buoy is suitably connected to the hose between 30m and 200m, more preferably
between 75m and 150m, below the water surface. The buoy may comprise at least two
split half-shells.
[0048] The new system proposed by the invention employs a composite, substantially neutral
riser that is exposed to the current at the relevant depth. This system is lightweight
due to its materials and is therefore nearly independent of depth, easy to install
from a reel and requires less resources. A lighter system requires lower buoyant forces
to keep the riser upright, and can be anchored either directly by a subsea processing
unit or by a simple foundation.
[0049] The invention allows a standardised, more reliable system in which moving parts are
located at the upper end of the system, while the lower part of the system is largely
static. Appropriate modifications may be made to a shuttle tanker loading hose system,
and offloading from a storage tank may require an associated subsea feed pump.
[0050] In order that the invention may be more readily understood, reference will now be
made, by way of example, to the accompanying drawings, in which:
Figure 1 is a schematic side view of an offloading system in accordance with the invention,
showing a tanker connected to the system to offload production fluids from subsea
storage;
Figure 2 is a perspective view of an embodiment of an offloading system in accordance
with Figure 1;
Figure 3 is an enlarged perspective view of a buoy being part of the offloading system
of Figure 2, now coupled to a hose suspended from the tanker;
Figure 4 is a side view of the buoy of Figure 3;
Figure 5 is a sectional side view on line A-A of Figure 4;
Figure 6 is an exploded perspective view of the buoy of Figure 3 and a riser column
to which the buoy is attached;
Figure 7 corresponds to Figure 6 but shows the buoy partially assembled around the
riser column;
Figure 8 is a detail perspective view of a lower cross-member of the buoy;
Figure 9 corresponds to Figure 8 but shows a bend restrictor attached to the lower
cross-member;
Figure 10 is a perspective view that corresponds to Figure 1 but shows a variant of
an offloading system of the invention;
Figure 11 is a side view that corresponds to Figure 4 but shows the buoy in the variant
of Figure 10;
Figure 12 is a sectional side view on line A-A of Figure 11;
Figure 13 is an exploded perspective view of the buoy of Figure 11 and a riser column
to which the buoy is attached;
Figure 14 is a perspective view of the buoy of Figure 11 from beneath, showing how
clump weight chains may be attached to the buoy;
Figure 15 is a perspective view corresponding to Figure 14 but from above;
Figure 16 is a perspective view of the buoy of Figure 11, showing an alternative hose
arrangement that may also be used in the embodiment of Figures 1 to 9;
Figure 17 is an illustrative example not forming any part of the protected scope showing
an installation vessel that is configured to install the riser column and to attach
the buoy to the riser column to form a riser tower;
Figure 18 corresponds to Figure 17 but shows the installation vessel from the other
side;
Figures 19a to 19e are a series of schematic side views of the installation vessel
of Figures 17 and 18 when assembling and installing a riser tower;
Figure 20 is a perspective view of a variant of the buoy of Figure 13 showing an alternative
clump weight support;
Figures 21 and 22 are perspective views that correspond to Figure 20 but show clump
weight arrangements held by the clump weight support;
Figures 23 and 24 are perspective views of a variant of the buoy of Figure 13 showing
alternative clump weight arrangements;
Figure 25 is a perspective view of another variant of the buoy of Figure 13 showing
a further alternative clump weight support; and
Figures 26 to 28 are perspective views showing how various clump weights can be engaged
with and disengaged from the clump weight support of Figure 25.
[0051] Referring firstly to Figure 1 of the drawings, an offloading system 10 of the invention
comprises a subsea processing and/or storage facility 12 that lies on the seabed 14.
The facility 12 optionally processes and temporarily stores crude oil before periodically
offloading the oil to a visiting shuttle tanker 16 that floats on the surface 18 above
the facility 12.
[0052] For this purpose, a riser tower 20 extends upwardly from the subsea facility 12 to
an upper end beneath the surface 18. The riser tower 20 comprises a composite riser
pipe 22 that is kept upright and under tension by a buoy 24 at or near to its upper
end.
[0053] Conveniently, in this example, the riser tower 20 is anchored by the weight of the
subsea facility 12. However, other well-known foundation arrangements such as weights
or piles could be used to anchor the riser tower 20 to the seabed 14 instead.
[0054] The upper end of the riser pipe 22 includes interface features for mating with, and
fluid connection to, a flexible hose 26 that hangs under the surface 18 from the tanker
16. When the hose 26 is engaged with the riser pipe 22 in this way, fluid communication
is effected between the subsea facility 12 and the tanker 16 via the riser pipe 22
and the hose 26.
[0055] The interface features shown here at the upper end of the riser pipe 22 comprise
an upwardly-facing socket 28 that receives a plug connector 30 on the free end of
the hose 26. However, it would be possible to have alternative interface features,
such as a plug connector on the upper end of the riser pipe 22 that mates with a socket
at the end of the hose 26.
[0056] In this example, the buoy 24 surrounds a short upper section 22U of the riser pipe
22 that implements the interface features at the upper end of the riser pipe 22. A
flange connection 32 joins the upper section 22U end-to-end to a much longer lower
section 22L of the riser pipe 22. The lower section 22L may extend from the connection
32 all the way down through the water column to the subsea facility 12.
[0057] Within the buoy 24, the upper section 22U of the riser pipe 22 is surrounded by a
fixed tubular sleeve 34 in concentric, telescopic relation. The buoy 24 further comprises
a tubular buoyant body 36 that surrounds the sleeve 34. The buoyant body 36 may comprise
one or more hollow chambers, may be formed of rigid buoyant material such as syntactic
foam or may comprise a mass of rigid buoyant macrospheres, depending upon the hydrostatic
pressure expected at the operational depth
[0058] The buoyant body 36 bears against an upper cross-member 38 that is fixed to the sleeve
34 above the buoy 24. Consequently, buoyant upthrust of the buoyant body 36 exerted
via the upper cross-member 38 and the sleeve 34 imparts tension in the riser pipe
22. The sleeve 34 and the upper cross-member 38 are suitably of steel and so are apt
to be welded together.
[0059] In this example, the buoyant body 36 comprises shells 40 of part-circular cross-section
that are brought together and fixed together as an annulus, for example by clamping
under tension applied to external straps, closely to encircle the sleeve 34 and the
upper section 22U of the riser pipe 22 within the sleeve 34. In this example, there
are two sets of shells 40 stacked one above the other. There could be only one such
set of shells 40 or more than two such sets of shells 40.
[0060] In addition to the upper cross-member 36, the shells 40 are located against axial
movement along the riser pipe 22 by engagement of locating formations on an inner
side of each shell 40 with complementary locating formations on an outer side of the
sleeve 34. The locating formations are exemplified here by male formations on the
sleeve 34 that engage with female formations of the shells 40. Specifically, axially-spaced
collars 42 encircle the sleeve 34 to engage with grooves on an inner side of each
shell 40.
[0061] The collars 42 may be attached to the sleeve 34 by welding, clamping and/or by bonding.
Alternatively the sleeve 34 could be omitted. In that case, the collars 42 may be
clamped or bonded directly to the riser pipe 22 or could be formed integrally with
the riser pipe 22 by locally thickening the wall of the riser pipe 22 to increase
its external diameter.
[0062] An optional bend restrictor 44 surrounds the upper section 22U of the riser pipe
22 immediately beneath the buoy 24. Conveniently, the bend restrictor 44 is attached
to the underside of the buoy 24 and tapers downwardly as shown here. However, as will
be explained, other bend restrictor arrangements are possible.
[0063] With reference to Figure 1, exemplary dimensions are set out below for ease of understanding.
These dimensions are provided only to put the invention into context and are not intended
to be limiting.
h1 - the depth of the top of the riser tower 20 beneath the surface 18 - 75m;
h2 - the height of the buoy 24 - 7.5m;
h3 - the height of the riser tower 20 from the seabed 18 to the bottom of the buoy 24
- 50m to >2000m
h4 - the length of the bend restrictor 44 - 5m; and
hs - the protruding length of the upper section 22U between the bottom of the buoy
24 and the connection 32 - 10m.
[0064] Reference is now made to Figures 2 to 9 to describe a specific embodiment of the
offloading system 10 in more detail.
[0065] Figure 2 shows that the subsea facility 12 includes a feed pump 46, which during
offloading pumps crude oil from the facility 12 up the riser pipe 22 and the hose
26 to the tanker 16.
[0066] The upwardly-facing socket 28 at the upper end of the riser pipe 22 is shown in Figure
2 ready for engagement with a plug connector 30 of a hose 26 suspended from a tanker
16. Figure 3 shows the plug connector 30 of the hose 26 now engaged with the socket
28.
[0067] The enlarged view of Figure 3 shows further details of the top of the riser tower
20, namely upwardly-protruding lifting padeyes 48 for attachment of lifting lines
during installation, and straps 50 that tightly encircle the shells 40 of the buoyant
body 36. The straps 48 are received in respective circumferential grooves 52 that
are best appreciated in the similarly-enlarged side view of Figure 4.
[0068] The further enlarged sectional view of Figure 5 shows details of the interface between
the riser pipe 22 and the hose 26, effected via the socket 28 and the complementary
plug connector 30.
[0069] The socket 28 is defined by a tubular steel funnel 54 fixed to the top of the sleeve
34. The funnel 54 is stiffened by radial webs 56 and is surrounded by a tubular upper
housing 58. The funnel 54 and the plug connector 30 have complementary frusto-conical
mating surfaces that guide those parts into mutual alignment as the plug connector
30 moves downwardly.
[0070] The upper section 22U of the riser pipe 22 is shown here extending concentrically
within the sleeve 34 and protruding from the sleeve 34 into the funnel 54. The protruding
end of the riser pipe 22 is surrounded by a steel collar 60. When the plug connector
30 engages within the funnel 54, the collar 60 is received in a complementary recess
62 in a distal end face of the plug connector 30.
[0071] Figures 6 and 7 are exploded views that between them show: the upper section 22U
of the riser pipe 22; the flange connection 32; the sleeve 34; the upper cross-member
38 fixed to the sleeve 34; the shells 40 of the buoyant body 36; the collars 42 that
encircle the sleeve 34; the bend restrictor 44; and the lifting padeyes 48.
[0072] Figures 6 and 7 also show other details. For example, it will be apparent that the
lifting padeyes 48 are fixed to the upper cross-member 38 and protrude through respective
slots 64 in the upper housing 58 that surrounds the funnel 54. It will also be apparent
that there is a lower cross-member 66 fixed to a lower end of the sleeve 34, which
provides further axial location for the shells 40 of the buoyant body 36. Also, the
upper and lower cross-members 38, 66 are apt to support sacrificial anodes 68 that
protect the steel parts from corrosion.
[0073] The lower cross-member 66 provides a connection point for the attachment of clump
weights as will be explained later with reference to Figures 16 to 18. To this end,
the underside of the lower cross-member 66 supports hanging padeyes 70 that protrude
through respective slots 72 in a lower housing 74 surrounding the lower cross-member
66.
[0074] The lower cross-member 66 may also have another function, namely to provide an attachment
point for the bend restrictor 44. In this respect, Figures 8 and 9 show that the lower
cross-member 66 has a circular flange 76 that lies in a plane orthogonal to the common
central longitudinal axis of the riser pipe 22 and the sleeve 34. The flange 76 is
penetrated by an array of circumferentially-spaced holes 78 that have counterpart
holes 80 in a parallel upper face of the bend restrictor 44. This allows the bend
restrictor 44 to be bolted securely to the flange 76 of the lower cross-member 66
as shown in Figure 9.
[0075] Turning next to Figures 10 to 16, these show a second embodiment of the invention.
Many features are in common with the first embodiment shown in Figures 1 to 9 and
so will not be repeated here; also, like numerals are used for like features. Figures
11 and 12 best show the main differences between the first and second embodiments.
[0076] Figure 11 shows that the second embodiment has a longer and narrower bend restrictor
44. In this case, the bend restrictor 44 is parallel-sided along most of its length
and tapers only near its lower end down to the diameter of the riser pipe 22 disposed
concentrically within.
[0077] Figure 12 shows an alternative arrangement for the interface between the riser pipe
22 and the hose 26. In this case, the socket 28 is recessed into the top face of an
upper housing 58. Again, the upper housing 58 surrounds an upper cross-member 38 atop
the uppermost shells 40 of the buoyant body 36. Also, the plug connector 30 has a
straight-sided cylindrical body 82 in this example and the socket 28 has a complementary
straight-sided recess 84. However, the recess 84 is surmounted by a frusto-conical
guide surface 86 to guide the body 82 into alignment and engagement with the recess
84.
[0078] Figures 14 and 15 show clump weights in the form of chains 88 hung from hanging padeyes
70 supported by the lower cross-member 66. The weight of the chains 88 is necessary
to overcome the buoyant upthrust of the buoy 24 so as to sink the riser tower 20 to
the required depth upon installation. Locating the clump weights at the bottom of
the buoy improves stability by lowering the centre of gravity or centre of buoyancy
and by decreasing rotational moments.
[0079] Once the riser tower 20 has been anchored to the subsea facility 12 or to another
foundation on the seabed 14, the chains 88 are removed so that the buoyant upthrust
of the buoy 24 can apply the necessary tension to the riser pipe 22. Depending upon
the water depth, divers or an ROV may be used to attach the chains 88 to suitable
lifting lines and to release the chains 88 at the appropriate time for recovery to
the surface. The lower end of the chain 88 is lifted and then the upper end of the
chain 88 is disconnected from the hanging padeyes 70 below the buoy 24.
[0080] Figure 16 shows an alternative hose arrangement. This is shown in relation to the
second embodiment but it may also be used in the first embodiment shown in Figures
1 to 9. Here, the lower end of the hose 26 is defined by a rigid tubular dog-leg structure
90 that offsets the plug connector 30 laterally from the generally downward axis of
the hose 26. The structure 90 is surmounted by a fixing point 92 to which a control
wire 94 may be attached to control the position of the plug connector 30 for alignment
with the socket 28.
[0081] Moving on now to Figures 17 and 18, these drawings show illustrative examples not
forming any part of the protected scope exemplifying how an installation vessel 96
may be adapted to install a riser tower 20 of the invention. Whilst Figures 17 and
18 depict elements of the second embodiment shown in Figures 10 to 16, it will be
evident that the same principles can be applied to installation of the first embodiment
shown in Figures 1 to 9.
[0082] The installation vessel 96 has a working deck 98 that supports a carousel 100 on
which the major lower section 22L of the riser pipe 22 can be wound or spooled. In
this respect, it will be noted that the composite riser pipe 22 has some flexibility
to be bent elastically along its length if a sufficiently large minimum bend radius
is observed. In principle, a reel with a horizontal axis could be used instead of
a carousel to carry the lower section 22L of the riser pipe 22.
[0083] The lower section 22L of the riser pipe 22 is unspooled from the carousel 100 through
a spooler 102 on the working deck 98 beside the carousel 100 and then is overboarded
into the sea along a chute 104. At this stage, a tensioner 106 upstream of the chute
104 carries the weight load of the launched portion of the lower section 22L.
[0084] Once the lower section 22L of the riser pipe 22 has been fully unspooled from the
carousel 100 and lowered into the sea, its weight load is transferred to a crane 108
on the working deck 98. As best shown in Figure 18, a top flange part 110 of the lower
section 22L is then engaged with a hang-off structure 112 outboard of the working
deck 98. This leaves the remainder of the lower section 22L hanging in the water column
beneath the installation vessel 96.
[0085] The working deck 98 supports a frame 114 that in turn supports the upper section
22U of the riser pipe 22 surrounded by the buoy 24. The frame 114 is shown here in
a horizontal stowed position but can be pivoted about a horizontal axis into a vertical
installation position. This pivoting movement upends the upper section 22U and the
buoy 24 and brings them into alignment with the vertical axis of the lower section
22L hung off from the hang-off structure 112 below. It also brings a bottom flange
part 116 of the upper section 22U into alignment with the top flange part 110 of the
lower section 22L. The top and bottom flange parts 110, 116 can then be bolted together.
[0086] When united in this way, the top flange part 110 of the lower section 22L and the
bottom flange part 116 of the upper section 22U together form the aforementioned flange
connection 32 between the upper and lower sections 22U, 22L. This completes the full
length of the riser pipe 22.
[0087] The crane 108 can now take the load of the riser tower 20 comprising the riser pipe
22 and the buoy 24 by attaching lifting lines to the lifting padeyes 48 shown in preceding
figures. Clump weights are attached to the buoy 24 using the hanging padeyes 70 also
shown in the preceding figures. This added ballast overcomes the buoyancy of the buoy
24 and allows the crane 108 to lower the riser tower 20 to the required depth. When
the bottom end of the riser pipe 22 has been anchored to the subsea facility 12 or
other subsea foundation, the clump weights can be removed from the buoy 24 and recovered
to the surface by the crane 108.
[0088] Reference is now made to Figures 19a to 19e, which show the installation vessel 96
performing the abovementioned installation process in simplified, schematic form.
[0089] Figure 19a shows the lower section 22L of the riser pipe 22 being lowered by the
crane 108 for engagement with the hang-off structure 112. At this stage, the frame
114 that supports the buoy 24 and the upper section 22U of the riser pipe 22 is in
the horizontal stowed position.
[0090] In Figure 19b, the crane 108 has transferred the load of the lower section 22L to
the hang-off structure 112. With the crane 108 now disengaged from the lower section
22L, the frame 114 has been pivoted into the vertical installation position. The buoy
24 and the upper section 22U have thereby been upended and brought into vertical alignment
with the lower section 22L suspended from the hang-off structure 112.
[0091] Figure 19c shows the flange connection 32 now made between the upper and lower sections
22U, 22L to complete the full length of the riser pipe 22. The crane 108 has now taken
the load of the riser tower 20 comprising the riser pipe 22 and the buoy 24. Also,
clump weights exemplified here by chains 88 have been attached to the lower end of
the buoy 24.
[0092] The added ballast of the chains 88 overcomes the buoyancy of the buoy 24 and allows
the crane 108 to lower the riser tower 20 to the required depth in the water as shown
in Figure 19d. At that depth, the bottom end of the riser pipe 22 can be anchored
to the subsea facility 12 as shown. Finally, as shown in Figure 19e, the chains 88
can be removed from the buoy 24 and recovered to the surface by the crane 108. An
ROV 118 is shown in attendance in Figures 19d and 19e to assist with the necessary
connection, disconnection and recovery operations.
[0093] Figures 20 to 28 show various alternative arrangements for supporting clump weights.
[0094] In Figure 20, a buoy 24 supports an array of parallel upright tubes 120 that are
equi-angularly spaced around the central vertical axis of the buoy 24. In this example,
there are three tubes 120; there could instead be two such tubes or four or more such
tubes.
[0095] Figure 21 shows how the tubes 120 may be used to support removable solid clump weights
122, such as beams, rods or bars, inserted into the open upper ends of the tubes 120.
For removal, the clump weights 122 are lifted by a crane to pull them out of the tubes
120.
[0096] Whilst the solid clump weights 122 allow for the addition of ample ballast, Figure
22 shows how the clump weights 122 could be supplemented by stud link chains 88 that
may hang inside and/or outside the tubes 120. Figure 22 also shows an offshore worker
124 beside a chain 88 to illustrate scale.
[0097] The chains 88 shown in Figure 22 may be attached to or separate from the solid clump
weights 122. Where the chains 88 are attached to the clump weights 122, the chains
88 make it easier to handle and grab the weights under water, for example by attaching
a hook or a shackle to an upper link of a chain 88. Alternatively, chains 88 may be
used alone, instead of the solid clump weights 122.
[0098] Figures 23 and 24 show solutions that enable clump weight chains 88 to be attached
to the top of a buoy 24. In each case, an upper cross-member 38 supports hooks 126
on its outboard ends that enable chains 88 to be hooked in place. The chains 88 then
hang beside and outside the buoy 24. This positioning has the advantage that the chains
88 are easily accessible for removal and retrieval.
[0099] Finally, Figures 25 to 28 show a further clump weight arrangement, in which solid
clump weights 128 are supported on the exterior of a buoy 24.
[0100] A frame 130 at the bottom of the buoy 24 supports an array of upwardly-opening buckets
or sockets 132 that are equi-angularly spaced around the central vertical axis of
the buoy 24.
[0101] Part-circular solid clump weights 128 are assembled together as a lifting ring or
flange that encircles the buoy 24. In this case, there are two semi-circular clump
weights 128.
[0102] Each clump weight 128 has attachment points 134 on its upper side to allow lifting
lines 136 to be attached. Each clump weight128 also has angularly-spaced pins 138
on its underside that are spaced to align with and engage into the sockets 132. In
this example, there are four sockets 132 and therefore each of the two clump weights
128 has two pins 138.
[0103] On each clump weight 128, one pin 138 is preferably longer than the other pin 138
as shown. This allows the longer pin 138 to be engaged with its socket 132 first and
then to serve as a pivot that helps to guide the shorter pin 138 into an adjacent
socket 132.
[0104] The clump weights 128 can be installed onto the frame 130 of the buoy 24 or removed
from the frame 130 together as shown in Figures 26 and 27 or separately as shown in
Figure 28. In principle it would be possible for a single clump weight 128 to encircle
the buoy 24 rather than being divided into parts.
[0105] As in some preceding embodiments, locating the clump weights 128 near the bottom
end of the buoy 24 improves stability by lowering the centre of gravity or centre
of buoyancy and by decreasing rotational moments.
1. A subsea hydrocarbon export system, comprising:
a riser tower (20) having a column (22) extending from a seabed location (14) to a
sub-surface buoy (24) that supports the column under tension in an upright orientation,
wherein the column extends along a central longitudinal axis passing through the buoy,
and communicates with a subsea tank for storing hydrocarbon fluids and with a subsea
processing system (12) for processing hydrocarbon fluids, and wherein the column (24)
extends through the buoy (24); and
a subsea connector that is operable underwater to couple the column (22) temporarily
to a hose (26) suspended from a surface shuttle tanker vessel (16) for an export operation
and to release the hose after the export operation;
wherein the subsea connector comprises an upwardly-facing socket (28), at an upper
extremity of the column (22) and aligned with the central longitudinal axis of the
column, for receiving a plug connector (30) of the hose (26).
2. The system of Claim 1, wherein the subsea tank serves as a foundation for the riser
tower (20).
3. The system of any preceding claim, further comprising a subsea pump (46) for pumping
hydrocarbon fluids up the column (22) to the subsea connector.
4. The system of any preceding claim, wherein the buoy (24) surrounds an upper end portion
of the column (22).
5. The system of Claim 4, wherein the buoy (24) comprises shell elements (40) assembled
together around the upper end portion of the column.
6. The system of any preceding claim, wherein the column (22) comprises a connection
between a major lower section (22L) and a minor upper section (22U), the buoy (24)
being attached to the upper section of the column.
7. The system of any preceding claim, comprising at least one laterally-projecting male
formation on the column (22), which formation is engaged with a female interlocking
formation of the buoy (24).
8. The system of Claim 7, wherein the male formation surrounds the column (22).
9. The system of Claim 7 or Claim 8, wherein the male formation is formed integrally
with the column (22).
10. The system of any preceding claim, wherein the buoy (24) comprises a sleeve (34) fixed
to and surrounding the column (22).
11. The system of Claim 10, further comprising an upper cross-member (38) extending laterally
from the sleeve (34), which cross-member supports one or more lifting points.
12. The system of Claim 11, wherein the upper cross-member (38) also supports one or more
attachment points for the attachment of at least one clump weight.
13. The system of Claim 11 or Claim 12, wherein one or more buoyant elements of the buoy
(24) bear against an underside of the upper cross-member (38) to apply buoyant upthrust
to the upper cross-member in use.
14. The system of any of Claims 10 to 13, further comprising a lower cross-member (66)
extending laterally from the sleeve (34).
15. The system of Claim 14, wherein the lower cross-member (66) supports one or more attachment
points for the attachment of at least one clump weight.
16. The system of Claim 14 or Claim 15, wherein one or more buoyant elements of the buoy
(24) rest upon the lower cross-member (66).
17. The system of any preceding claim, wherein a bend restrictor (44) is attached to the
buoy (24) and extends along and around the column (22) under the buoy.
18. The system of any preceding claim, further comprising at least one clump weight releasably
attached to the buoy.
19. The system of Claim 18, wherein the or each clump weight comprises a chain (88).
20. The system of Claim 18, wherein the or each clump weight is a rigid structure (122)
attachable to the buoy.
21. The system of any preceding claim, wherein the buoy (24) comprises one or more external
tubes (120) or sockets (132) that open upwardly to receive at least one clump weight.
22. The system of any preceding claim, wherein the buoy (24) comprises non-floodable buoyancy.
23. The system of Claim 22, wherein the buoy (24) comprises rigid buoyant foam or macrospheres.
24. The system of any preceding claim, wherein the hose (26) is a bonded polymer composite
hose.
25. The system of any preceding claim, wherein the hose (26) is longitudinally flexible
and comprises a rigid guide structure at a distal end of the hose.
26. The system of any preceding claim, wherein the column (22) is of pipe that can be
wound onto a reel or carousel onboard an installation vessel, without substantial
plastic deformation of the pipe.
27. The system of any preceding claim, wherein the column (22) is of bonded polymer composite
pipe.
28. The system of any preceding claim, wherein the column (22) is of material that is
substantially neutrally buoyant in sea water.
29. The system of any preceding claim, wherein the hose (26) is connected to the column
(22) at a depth of between 30m and 200m underwater.
30. A method of exporting hydrocarbon fluids from a seabed location, the method comprising:
sailing a shuttle tanker vessel (16) to a surface export location above a column (22)
that extends from the seabed location (14) and communicates with a subsea tank (12)
for storing the hydrocarbon fluids to a sub-surface buoy (24), which buoy supports
the column (22) under tension in an upright orientation extending along a central
longitudinal axis passing through the buoy (24), and wherein the column (22) extends
through the buoy (24);
suspending a hose (26) from the vessel (16) to reach the column (22);
operating a subsea connector underwater to couple the hose (26) temporarily to the
column (22) for an export operation by inserting a plug connector (30) of the hose
into an upwardly-facing socket (28) at an upper extremity of the column (22), wherein
when coupled, the socket (28) and plug connector (30) are mutually aligned along the
central longitudinal axis of the column (22);
during the export operation, causing hydrocarbon fluids to flow from the seabed location
up the column (22) and along the coupled hose (26) to the vessel (16); and
on completion of the export operation, releasing the hose (26) from the column (22)
by removing the plug connector (30 of the hose from the upwardly-facing socket (28),
lifting the hose (26) to the vessel (16) and sailing the vessel away from the surface
export location.
31. The method of Claim 30, comprising storing the hydrocarbon fluids at the seabed location
(14) before the export operation.
32. The method of Claim 30 or Claim 31, comprising processing the hydrocarbon fluids at
the seabed location before or during the export operation.
33. The method of any of Claims 30 to 32, comprising pumping the hydrocarbon fluids at
the seabed location during the export operation to flow up the column (22).
1. Unterwasserkohlenwasserstoff-Exportsystem, das Folgendes umfasst:
einen Riser-Turm (20), der eine Säule (22) aufweist, die sich von einem Meeresbodenort
(14) zu einer Unterwasserboje (24) erstreckt, die die Säule unter Spannung in einer
aufrechten Ausrichtung trägt, wobei sich die Säule entlang einer zentralen Längsachse
erstreckt, die durch die Boje verläuft und mit einem Unterwassertank zum Speichern
von Kohlenwasserstofffluiden und mit einem Unterwasserverarbeitungssystem (12) zum
Verarbeiten von Kohlenwasserstofffluiden kommuniziert, und wobei sich die Säule (24)
durch die Boje (24) erstreckt; und
einen Unterwasserverbinder, der unter Wasser betriebsfähig ist, um die Säule (22)
vorübergehend mit einem Schlauch (26) zu koppeln, deran einem Oberflächen-Shuttle-Tanker
(16) für einen Exportbetrieb aufgehängt ist, und um den Schlauch nach dem Exportbetrieb
zu lösen;
wobei der Unterwasserverbinder eine nach oben gerichtete Fassung (28), an einem oberen
Endpunkt derSäule (22) und mit der zentralen Längsachse der Säule ausgerichtet, zum
Aufnehmen eines Steckverbinders (30) des Schlauchs (26) umfasst.
2. System nach Anspruch 1, wobei der Unterwassertank als ein Fundament für den Riser-Turm
(20) dient.
3. System nach einem der vorhergehenden Ansprüche, das ferner eine Unterwasserpumpe (46)
zum Pumpen von Kohlenwasserstofffluiden die Säule (22) hinauf zu dem Unterwasserverbinder
umfasst.
4. System nach einem der vorhergehenden Ansprüche, wobei die Boje (24) einen oberen Endabschnitt
der Säule (22) umgibt.
5. System nach Anspruch 4, wobei die Boje (24) Hüllenelemente (40) umfasst, die zusammen
um den oberen Endabschnitt der Säule herum zusammengesetzt sind.
6. System nach einem der vorhergehenden Ansprüche, wobei die Säule (22) eine Verbindung
zwischen einem Hauptunterbereich (22L) und einem Nebenoberbereich (22U) umfasst, wobei
die Boje (24) an dem Oberbereich der Säule befestigt ist.
7. System nach einem der vorhergehenden Ansprüche, das wenigstens eine seitlich vorstehende
äußere Formation auf der Säule (22) umfasst, wobei diese Formation mit einer inneren
ineinandergreifenden Formation der Boje (24) in Eingriff steht.
8. System nach Anspruch 7, wobei die äußere Formation die Säule (22) umgibt.
9. System nach Anspruch 7 oder 8, wobei die äußere Formation ganzheitlich mit der Säule
(22) ausgebildet ist.
10. System nach einem der vorhergehenden Ansprüche, wobei die Boje (24) eine Muffe (34)
umfasst, die an der Säule (22) befestigt ist und diese umgibt.
11. System nach Anspruch 10, das ferner ein oberes Querelement umfasst (38), das sich
seitlich von der Muffe (34) erstreckt, wobei das Querelement einen oder mehrere Hebepunkte
trägt.
12. System nach Anspruch 11, wobei das obere Querelement (38) ebenso einen oder mehrere
Befestigungspunkte für die Befestigung wenigstens eines Beschwerungsgewichts trägt.
13. System nach Anspruch 11 oder 12, wobei ein oder mehrere schwimmfähige Elemente der
Boje (24) gegen eine Unterseite des oberen Querelements (38) drücken, um dem oberen
Querelement, das in Verwendung ist, einen schwimmfähigen Auftrieb zu verleihen.
14. System nach einem der Ansprüche 10 bis 13, das fernerein unteres Querelement (66)
umfasst, das sich seitlich von der Muffe (34) erstreckt.
15. System nach Anspruch 14, wobei das untere Querelement (66) einen oder mehrere Befestigungspunkte
für die Befestigung wenigstens eines Beschwerungsgewichts trägt.
16. System nach Anspruch 14 oder 15, wobei ein oder mehrere schwimmfähige Elemente der
Boje (24) auf dem unteren Querelement (66) aufliegen.
17. System nach einem der vorhergehenden Ansprüche, wobei ein Krümmungsbegrenzer (44)
an der Boje (24) befestigt ist und sich entlang und um die Säule (22) herum unter
der Boje erstreckt.
18. System nach einem der vorhergehenden Ansprüche, das ferner wenigstens ein Beschwerungsgewicht
umfasst, das an der Boje lösbar befestigt ist.
19. System nach Anspruch 18, wobei das oder jedes Beschwerungsgewicht eine Kette (88)
umfasst.
20. System nach Anspruch 18, wobei das oder jedes Beschwerungsgewicht eine starre Struktur
(122) ist, die an der Boje befestigt werden kann.
21. System nach einem der vorhergehenden Ansprüche, wobei die Boje (24) ein oder mehrere
Außenrohre (120) oder Fassungen (132) umfasst, die sich nach oben öffnen, um wenigstens
ein Beschwerungsgewicht aufzunehmen.
22. System nach einem der vorhergehenden Ansprüche, wobei die Boje (24) eine nicht überflutbare
Schwimmkraft umfasst.
23. System nach Anspruch 22, wobei die Boje (24) einen schwimmfähigen Hartschaum oder
Macrospheres umfasst.
24. System nach einem der vorhergehenden Ansprüche, wobei der Schlauch (26) ein Schlauch
aus gebundenem Polymercomposite ist.
25. System nach einem der vorhergehenden Ansprüche, wobei der Schlauch (26) in einer Längsrichtung
flexibel ist und eine starre Führungsstruktur an einem distalen Ende des Schlauchs
umfasst.
26. System nach einem der vorhergehenden Ansprüche, wobei die Säule (22) aus einem Rohr
besteht, das auf eine Rolle oder ein Karussell an Bord eines Installationsschiffsgewickelt
werden kann, ohne dass das Rohr wesentlich plastisch verformt wird.
27. System nach einem der vorhergehenden Ansprüche, wobei die Säule (22) aus einem Rohr
aus gebundenem Polymercomposite besteht.
28. System nach einem der vorhergehenden Ansprüche, wobei die Säule (22) aus einem Material
besteht, das in Meerwasser im Wesentlichen neutral schwimmfähig ist.
29. System nach einem der vorhergehenden Ansprüche, wobei der Schlauch (26) in einer Tiefe
zwischen 30 m und 200 m unter Wasser mit der Säule (22) verbunden ist.
30. Verfahren zum Exportieren von Kohlenwasserstofffluiden von einem Meeresbodenstandort,
wobei das Verfahren Folgendes umfasst:
Segeln eines Shuttle-Tankers (16) zu einem Oberflächenexportort über einer Säule (22),
die sich von dem Meeresbodenort (14) aus zu einer Unterwasserboje (24) erstreckt und
mit einem Unterwassertank (12) zum Speichern der Kohlenwasserstofffluide kommuniziert,
wobei die Boje die Säule (22) unter Spannung in einer aufrechten Ausrichtung trägt,
die sich entlang einer zentralen Längsachse erstreckt, die durch die Boje (24) verläuft,
und wobei sich die Säule (22) durch die Boje (24) erstreckt;
Aufhängen eines Schlauches (26) von dem Schiff (16), um die Säule (22) zu erreichen;
Betreiben eines Unterwasserverbinders unter Wasser, um den Schlauch (26) vorübergehend
mit der Säule (22) füreinen Exportbetrieb zu koppeln, durch ein Einführen eines Steckverbinders
(30) des Schlauchs in eine nach oben gerichtete Fassung (28) an einem oberen Endpunkt
derSäule (22), wobei bei der Kopplung die Fassung (28) und der Steckverbinder (30)
entlang der zentralen Längsachse der Säule (22) zueinander ausgerichtet sind;
während des Exportbetriebs, Auslösen, dass Kohlenwasserstofffluide von dem Meeresbodenort
die Säule (22) hinauf und entlang des gekoppelten Schlauchs (26) zu dem Schiff (16)
fließen; und
nach Abschluss des Exportbetriebs, Lösen des Schlauchs (26) von der Säule (22) durch
Entfernen des Steckverbinders (30) des Schlauchs von der nach oben gerichteten Fassung
(28), Anheben des Schlauchs (26) zu dem Schiff (16) und Wegsegeln des Schiffs von
dem Oberflächenexportort.
31. Verfahren nach Anspruch 30, das das Lagern der Kohlenwasserstofffluide an dem Meeresbodenort
(14) vor dem Exportbetrieb umfasst.
32. Verfahren nach Anspruch 30 oder31, das das Verarbeiten der Kohlenwasserstofffluide
an dem Meeresbodenort vor oder während des Exportbetriebs umfasst.
33. Verfahren nach einem der Ansprüche 30 bis 32, das das Pumpen der Kohlenwasserstofffluide
an dem Meeresbodenort während des Exportbetriebs umfasst, um die Säule (22) hinaufzufließen.
1. Système d'exportation d'hydrocarbure sous-marin, comprenant :
une tour de colonne montante (20) ayant une colonne (22) s'étendant d'un emplacement
de fond marin (14) à une bouée immergée (24) qui supporte la colonne sous tension
dans une orientation verticale, la colonne s'étendant le long d'un axe longitudinal
central passant à travers la bouée, et communiquant avec un réservoir sous-marin pour
stocker des fluides hydrocarbures et avec un système de traitement sous-marin (12)
pour traiter des fluides hydrocarbures, et la colonne (24) s'étendant à travers la
bouée (24) ; et
un raccord sous-marin qui peut fonctionnersous l'eau permettant d'accoupler temporairement
la colonne (22) à une conduite (26) suspendue à un bâtiment navire-citerne navette
de surface (16) pour une opération d'exportation et permettant de libérer la conduite
après l'opération d'exportation ;
le raccord sous-marin comprenant un emboîtement (28) orienté vers le haut, à une extrémité
supérieure de la colonne (22) et aligné sur l'axe longitudinal central de la colonne,
de manière à recevoir un raccord tampon (30) de la conduite (26).
2. Système selon la revendication 1, le réservoir sous-marin servant de fondation pour
la tour de colonne montante (20).
3. Système selon l'une quelconque des revendications précédentes, comprenant en outre
une pompe sous-marine (46) permettant de pomper des fluides hydrocarbures vers le
haut de la colonne (22) au raccord sous-marin.
4. Système selon l'une quelconque des revendications précédentes, la bouée (24) entourant
une partie d'extrémité supérieure de la colonne (22).
5. Système selon la revendication 4, la bouée (24) comprenant des éléments de coque (40)
assemblés ensemble autour de la partie d'extrémité supérieure de la colonne.
6. Système selon l'une quelconque des revendications précédentes, la colonne (22) comprenant
un raccordement entre une section inférieure principale (22L) et une section supérieure
mineure (22U), la bouée (24) étant attachée à la section supérieure de la colonne.
7. Système selon l'une quelconque des revendications précédentes, comprenant au moins
une formation mâle faisant saillie latéralement sur la colonne (22), laquelle formation
est engagée avec une formation de verrouillage femelle de la bouée (24).
8. Système selon la revendication 7, la formation mâle entourant la colonne (22).
9. Système selon la revendication 7 ou la revendication 8, la formation mâle étant formée
d'un seul tenant avec la colonne (22).
10. Système selon l'une quelconque des revendications précédentes, la bouée (24) comprenant
un manchon (34) fixé à et entourant la colonne (22).
11. Système selon la revendication 10, comprenant en outre une traverse supérieure (38)
s'étendant latéralement depuis le manchon (34), laquelle traverse supporte un ou plusieurs
points de levage.
12. Système selon la revendication 11, la traverse supérieure (38) supportant également
un ou plusieurs points de fixation pour lafixation d'au moins un lest de câble-guide.
13. Système selon la revendication 11 ou la revendication 12, un ou plusieurs éléments
flottants de la bouée (24) s'appuyant contre une face inférieure de la traverse supérieure
(38) de manière à appliquer une poussée de flottabilité à la traverse supérieure en
cours d'utilisation.
14. Système selon l'une quelconque des revendications 10 à 13, comprenant en outre une
traverse inférieure (66) s'étendant latéralement à partir du manchon (34).
15. Système selon la revendication 14, la traverse inférieure (66) supportant un ou plusieurs
points de fixation pour lafixation d'au moins un lest de câble-guide.
16. Système selon la revendication 14 ou la revendication 15, un ou plusieurs éléments
flottants de la bouée (24) reposant sur la traverse inférieure (66).
17. Système selon l'une quelconque des revendications précédentes, un restricteurde courbure
(44) étant attaché à la bouée (24) et s'étendant le long et autour de la colonne (22)
sous la bouée.
18. Système selon l'une quelconque des revendications précédentes, comprenant en outre
au moins un lest de câble-guide attaché de manière libérale à la bouée.
19. Système selon la revendication 18, le ou chaque lest de câble-guide comprenant une
chaîne (88).
20. Système selon la revendication 18, le ou chaque lest de câble-guide étant une structure
rigide (122) pouvant être attachée à la bouée.
21. Système selon l'une quelconque des revendications précédentes, la bouée (24) comprenant
un ou plusieurs tubes externes (120) ou emboîtements (132) qui s'ouvrent vers le haut
de manière à recevoir au moins un lest de câble-guide.
22. Système selon l'une quelconque des revendications précédentes, la bouée (24) comprenant
une flottabilité non inondable.
23. Système selon la revendication 22, la bouée (24) comprenant de la mousse flottante
rigide ou des macrosphères.
24. Système selon l'une quelconque des revendications précédentes, la conduite (26) étant
une conduite composite polymère lié.
25. Système selon l'une quelconque des revendications précédentes, la conduite (26) étant
flexible longitudinalement et comprenant une structure de guidage rigide à une extrémité
distale de la conduite.
26. Système selon l'une quelconque des revendications précédentes, la colonne (22) étant
un tuyau qui peut être enroulé sur un enrouleur ou un carrousel à bord d'un bâtiment
d'installation, sans déformation plastique substantielle du tuyau.
27. Système selon l'une quelconque des revendications précédentes, la colonne (22) étant
un tuyau composite polymère lié.
28. Système selon l'une quelconque des revendications précédentes, la colonne (22) étant
en un matériau qui a une flottabilité sensiblement neutre dans l'eau de mer.
29. Système selon l'une quelconque des revendications précédentes, la conduite (26) étant
reliée à la colonne (22) à une profondeur comprise entre 30 m et 200 m sous l'eau.
30. Procédé d'exportation de fluides hydrocarbures à partir d'un emplacement de fond marin,
le procédé comprenant :
la navigation d'un bâtiment navire-citerne navette (16) vers un emplacement d'exportation
en surface au-dessus d'une colonne (22) qui s'étend de l'emplacement de fond marin
(14) et communique avec un réservoir sous-marin (12) pour stocker les fluides hydrocarbures
vers une bouée immergée (24), laquelle bouée supporte la colonne (22) sous tension
dans une orientation verticale s'étendant le long d'un axe longitudinal central passant
à travers la bouée (24), et la colonne (22) s'étendant à travers la bouée (24) ;
la suspension d'une conduite (26) depuis le bâtiment (16) pour atteindre la colonne
(22) ;
l'actionnement d'un raccord sous-marin sous l'eau pour accoupler temporairement la
conduite (26) à la colonne (22) permettant une opération d'exportation en insérant
un raccord tampon (30) de la conduite dans un emboîtement (28) orienté vers le haut
à une extrémité supérieure de la colonne (22), lorsqu'ils sont accouplés, l'emboîtement
(28) et le raccord tampon (30) étant mutuellement alignés le long de l'axe longitudinal
central de la colonne (22) ;
pendant l'opération d'exportation, le fait d'amener les fluides hydrocarbures à s'écouler
depuis l'emplacement de fond marin vers le haut de la colonne (22) et le long de la
conduite accouplée (26) jusqu'au bâtiment (16) ; et
à la fin de l'opération d'exportation, la libération de la conduite (26) de la colonne
(22) en retirant le raccord tampon (30 de la conduite de l'emboîtement (28) orienté
vers le haut, soulevant la conduite (26) vers le bâtiment (16) et l'éloignement du
bâtiment de l'emplacement d'exportation en surface.
31. Procédé selon la revendication 30, comprenant le stockage des fluides hydrocarbures
à l'emplacement de fond marin (14) avant l'opération d'exportation.
32. Procédé selon la revendication 30 ou la revendication 31, comprenant le traitement
des fluides hydrocarbures à l'emplacement de fond marin avant ou pendant l'opération
d'exportation.
33. Procédé selon l'une quelconque des revendications 30 à 32, comprenant le pompage des
fluides hydrocarbures à l'emplacement de fond marin pendant l'opération d'exportation
pour l'écoulement vers le haut de la colonne (22).