TECHNICAL FIELD
[0001] The present invention relates to a hot water supply system that includes a heat pump
heating unit capable of supplying hot water to a hot water storage tank.
BACKGROUND ART
[0002] A hot water supply system conventionally known is capable of storing, in a hot water
storage tank, hot water generated using a heat pump heating unit, and further heating
the hot water supplied from the hot water storage tank to a hot water supply terminal
using a gas heater. For example, the hot water supply system disclosed in Patent Literature
1 (
JP 2013-113495 A) performs a heating operation using the gas heater as well as boiling of water in
a hot water storage tank using the heat pump heating unit when hot water in the hot
water storage tank runs out. In this manner, supply of the hot water to the hot water
supply terminal is secured even when the hot water in the hot water storage tank runs
out.
SUMMARY OF THE INVENTION
<Technical Problem>
[0003] The heat pump heating unit is generally operated at a heating capability (frequency)
that maximizes heat pump efficiency (COP) in accordance with an outside air temperature
regardless of a required amount of heat. In other words, the heat pump heating unit
is uniformly operated at the heating capability (frequency) that maximizes COP in
both of a case where a sufficient amount of heat can be secured only by the boiling
operation using the heat pump heating unit, and a case where heating by the gas heater
is required due to a shortage of the amount of heat as a result of delivery of a large
amount of hot water, for example.
[0004] Meanwhile, when COP of the heat pump heating unit is converted into primary energy
efficiency and compared with primary energy efficiency of an auxiliary heating unit
such as a gas heater, the efficiency of the heat pump heating unit is often higher
than that of the auxiliary heating unit. Accordingly, when a shortage of the amount
of heat occurs, i.e., hot water in the hot water storage tank runs out, for example,
at the time of boiling by the heat pump heating unit having the heating capability
described above, optimal overall energy efficiency of the system including the heat
pump heating unit and the auxiliary heating unit is difficult to achieve in some cases
by performing operation together with heating by the auxiliary heating unit.
[0005] An object of the present invention is to provide a hot water supply system including
a heat pump heating unit and an auxiliary heating unit and capable of optimizing overall
energy efficiency of the system.
<Solution to Problem>
[0006] A hot water supply system of the present invention includes a hot water storage tank
that stores hot water, a hot water delivery unit that supplies the hot water from
the hot water storage tank to a use side, a heat pump heating unit that boils the
hot water in the hot water storage tank, and an auxiliary heating unit capable of
heating the hot water supplied from the hot water storage tank to the hot water delivery
unit. The hot water supply system is configured to perform a heat pump isolated operation
that boils the hot water in the hot water storage tank using the heat pump heating
unit, and an auxiliary heating combined operation that simultaneously performs boiling
of the hot water in the hot water storage tank and heating of the hot water using
the auxiliary heating unit when an amount of heat is insufficient only by the boiling
of the hot water in the hot water storage tank using the heat pump heating unit. The
heat pump isolated operation includes boiling in a first mode and boiling in a second
mode having different heating capabilities. The heating capability of the boiling
in the first mode is higher than the heating capability of the boiling in the second
mode, and heat pump efficiency of the boiling in the first mode is lower than heat
pump efficiency of the boiling in the second mode. In addition, the boiling in the
first mode is performed in a predetermined condition where a shortage of the amount
of heat is likely to be caused by the boiling in the second mode in a state where
a large amount of delivery of the hot water is estimated or a large amount of the
hot water is actually delivered.
[0007] According to this configuration, total energy efficiency of the entire hot water
supply system can be optimized by reducing the proportion of the heating amount generated
by the auxiliary heating unit in the heating amount of the entire system.
[0008] In the hot water supply system described above, the heating capability of the boiling
in the first mode may be higher than a heating capability at which COP may be maximized
at an outside air temperature at that time. In addition, primary energy efficiency
of the boiling in the first mode may be equal to or higher than primary energy efficiency
during isolated operation of the auxiliary heating unit.
[0009] This configuration reduces a decrease in the primary energy efficiency of the heat
pump heating unit to efficiency lower than the primary energy efficiency of the auxiliary
heating unit, thereby reducing a drop of the overall energy efficiency of the hot
water supply system.
[0010] The hot water supply system described above may further include a hot water storage
amount detection unit that detects a hot water storage amount in the hot water storage
tank. The boiling in the second mode may be started when the hot water storage amount
detected by the hot water storage amount detection unit becomes smaller than a first
hot water storage amount. The boiling in the second mode may be switched to the boiling
in the first mode when the hot water storage amount becomes a second hot water storage
amount smaller than the first hot water storage amount.
[0011] This configuration can reduce operation of the auxiliary heating unit performed in
accordance with a decrease in the amount of hot water in the hot water storage tank,
thereby optimizing the overall energy efficiency of the hot water supply system.
[0012] The above hot water supply system may further include a bathtub 10a to which the
hot water is supplied from the hot water delivery unit. The boiling in the first mode
may be performed when a hot water filling instruction for supplying the hot water
at a target temperature to the bathtub 10a is issued.
[0013] This configuration can reduce operation of the auxiliary heating unit performed in
accordance with a decrease in the amount of hot water in the hot water storage tank
as a result of delivery of a large amount of hot water during filling of hot water,
thereby optimizing the overall energy efficiency of the hot water supply system.
[0014] The hot water supply system described above may further include: a hot water delivery
amount detection unit that detects a hot water delivery amount supplied from the hot
water storage tank to the hot water delivery unit; a history information storage unit
that stores history information indicating a hot water delivery amount detected by
the hot water delivery amount detection unit, and a hot water delivery time; and a
hot water delivery prediction unit that predicts a scheduled hot water delivery amount
and a scheduled hot water delivery time based on the history information stored in
the history information storage unit. In this case, the boiling in the first mode
is performed when delivery of the hot water not predicted by the hot water delivery
prediction unit is executed at a time of operation of the heat pump heating unit for
storing the scheduled hot water delivery amount predicted by the hot water delivery
prediction unit in the hot water storage tank by the scheduled hot water delivery
time.
[0015] This configuration can reduce operation of the auxiliary heating unit performed in
accordance with a decrease in the amount of hot water in the hot water storage tank,
thereby optimizing the overall energy efficiency of the hot water supply system.
[0016] The hot water supply system may further include: a hot water storage amount detection
unit that detects a hot water storage amount in the hot water storage tank; a hot
water delivery amount detection unit that detects a hot water delivery amount supplied
from the hot water storage tank to the hot water delivery unit; a history information
storage unit that stores history information indicating a hot water delivery amount
detected by the hot water delivery amount detection unit, and a hot water delivery
time; and a hot water delivery prediction unit that predicts a scheduled hot water
delivery amount and a scheduled hot water delivery time based on the history information
stored in the history information storage unit. In this case, the boiling in the first
mode is performed when the scheduled hot water delivery amount is larger than a total
value of the hot water storage amount detected by the hot water storage amount detection
unit and a scheduled hot water storage amount at the scheduled hot water delivery
time of an operation by the boiling in the second mode.
[0017] This configuration can reduce operation of the auxiliary heating unit performed in
accordance with a decrease in the amount of hot water in the hot water storage tank,
thereby optimizing the overall energy efficiency of the hot water supply system.
[0018] In the hot water supply system, the heat pump heating unit may include a refrigerant
circuit through which a refrigerant circulates, the refrigerant circuit including
a compressor, a radiator, an expansion mechanism, and an evaporator each connected
to the refrigerant circuit. A frequency of the compressor in the boiling in the first
mode may be higher than a frequency of the compressor in the boiling in the second
mode at a same outside air temperature.
[0019] This configuration can produce a heating capability necessary for the boiling in
the first mode by increasing the frequency of the compressor.
[0020] In the hot water supply system, the heat pump heating unit may include a refrigerant
circuit through which a refrigerant circulates, the refrigerant circuit including
a compressor, a heat source side heat exchanger, an expansion mechanism, and a usage-side
heat exchanger each connected to the refrigerant circuit. The heat pump heating unit
may further include a fan that feeds air to the heat source side heat exchanger to
cause heat exchange. In this case, a number of revolutions of the fan in the boiling
in the first mode may be larger than a number of revolutions of the fan in the boiling
in the second mode at a same outside air temperature.
[0021] This configuration can produce a heating capability necessary for the boiling in
the first mode by increasing the number of revolutions of the fan.
BRIEF DESCRIPTION OF THE DRAWINGS
[0022]
FIG. 1 is a configuration diagram of a hot water supply system according to an embodiment
of the present invention.
FIG. 2 is a configuration diagram of a control unit of the hot water supply system
in FIG. 1.
FIG. 3 is a diagram showing a change in COP in accordance with a change in a heating
capability of a heat pump unit.
FIG. 4 is a diagram showing a change in primary energy efficiency in accordance with
the change in the heating capability of the heat pump unit.
FIG. 5 is a flowchart for describing an operation of the hot water supply system in
FIG. 1.
FIG. 6 is a time chart for describing the operation of the hot water supply system
in FIG. 1.
FIG. 7 is a flowchart for describing an operation of a hot water supply system according
to Modification A.
FIG. 8 is a flowchart for describing an operation of a hot water supply system according
to Modification B.
FIG. 9 is a diagram showing a change in a usage charge per unit capability in accordance
with a change in the heating capability of the heat pump unit.
FIG. 10 is a diagram showing a change in a carbon emission amount per unit capability
in accordance with a change in the heating capability of the heat pump unit.
DESCRIPTION OF EMBODIMENTS
(1) Configuration of hot water supply system 1
[0023] FIG. 1 is a configuration diagram of a hot water supply system 1 according to an
embodiment of the present invention. The hot water supply system 1 includes a heat
pump unit 2 (heat pump heating unit), a hot water circuit unit 3 having a hot water
storage tank 5, and a gas heater 6 (one example of auxiliary heating unit). The heat
pump unit 2 generates hot water to be stored in the hot water storage tank 5. A hot
water supply terminal 10 (one example of hot water delivery unit) delivers hot water
from the hot water storage tank 5. The hot water in the hot water storage tank 5 is
further heated by the gas heater 6 as needed before delivery.
(1-1) Configuration of heat pump unit 2
[0024] The heat pump unit 2 includes a refrigerant circuit 41 where a refrigerant circulates.
The refrigerant circuit 41 is constituted by a compressor 11, an outdoor heat exchanger
(heat source side heat exchanger) 12, an expansion valve (one example of expansion
mechanism) 13, and a hot water supply heat exchanger (usage-side heat exchanger) 16
connected to each other via a refrigerant pipe 40. A fan 15 is disposed in such a
position as to face the outdoor heat exchanger 12. An outside air temperature sensor
21 detects an outside air temperature.
[0025] In a boiling operation for storing hot water in the hot water storage tank 5, the
refrigerant discharged from the compressor 11 sequentially flows to the hot water
supply heat exchanger 16, the expansion valve 13, and the outdoor heat exchanger 12
as indicated by arrows R1 in FIG. 1, and returns to the compressor 11 after passing
through the outdoor heat exchanger 12 to constitute a heating cycle. In this case,
the hot water supply heat exchanger 16 functions as a condenser, while the outdoor
heat exchanger 12 functions as an evaporator. In this boiling operation, the hot water
for hot water supply is heated by heat exchange between the high-temperature refrigerant
having entered from the discharge side of the compressor 11 and the hot water for
hot water supply in the hot water supply heat exchanger 16.
(1-2) Configuration of hot water circuit unit 3
[0026] The hot water circuit unit 3 is connected to the hot water supply heat exchanger
16. The hot water circuit unit 3 is configured to circulate hot water by connecting
the hot water storage tank 5, a pump 17, and the hot water supply heat exchanger 16
via a water pipe 45. The discharge side of the pump 17 of the hot water circuit unit
3 is connected to a hot water inlet of the hot water supply heat exchanger 16, and
the suction side of the pump 17 is connected to one end of the hot water storage tank
5. A hot water outlet of the hot water supply heat exchanger 16 is connected to the
other end of the hot water storage tank 5.
[0027] Hot water that exchanges heat with the refrigerant flowing through the hot water
supply heat exchanger 16 circulates in the hot water circuit unit 3. Specifically,
when the boiling operation is performed, hot water caused to flow from the hot water
storage tank 5 by the pump 17 is supplied to the hot water supply heat exchanger 16.
In addition, hot water heated by the hot water supply heat exchanger 16 is returned
to the hot water storage tank 5.
[0028] A hot water delivery temperature sensor 22 is disposed in the vicinity of the hot
water outlet of the hot water supply heat exchanger 16, and detects a temperature
of the hot water flowing from the hot water supply heat exchanger 16. The hot water
storage tank 5 includes a plurality of hot water storage temperature sensors 5a to
5d (hot water storage amount detection unit), and detects a hot water storage amount
based on water temperatures detected by each of the hot water storage temperature
sensors 5a to 5d. Note that the outside air temperature sensor 21, the hot water delivery
temperature sensor 22, and the hot water storage temperature sensors 5a to 5d described
above may be any sensors as long as the detected temperatures can be output to a control
unit 30.
(1-3) Configuration of hot water supply terminal 10 and gas heater 6
[0029] Hot water in the hot water storage tank 5 of this configuration is delivered via
the hot water supply terminal 10. The gas heater 6 is disposed between the hot water
storage tank 5 and the hot water supply terminal 10, and has a heating unit 6a. The
hot water storage tank 5, the gas heater 6, and the hot water supply terminal 10 are
connected via a water pipe 47. The gas heater 6 is capable of heating the hot water
supplied from the hot water storage tank 5 before the hot water is supplied to the
hot water supply terminal 10. The hot water supply terminal 10 can supply the hot
water in the hot water storage tank 5 for use by a user, and also supply the hot water
to a bathtub 10a.
[0030] A flow rate sensor 23 (flow rate detection unit) is provided in the water pipe 46,
and detects a flow rate of the hot water supplied from the hot water storage tank
5 to the hot water supply terminal 10. Alternatively, the flow rate sensor 23 may
be provided in a water pipe other than the water pipe 46 as long as the amount of
the hot water supplied from the hot water storage tank 5 can be detected.
[0031] As described above, the hot water supply system 1 includes the heat pump unit 2 (heat
pump heating unit) capable of supplying hot water to the hot water storage tank 5,
and the gas heater 6 (auxiliary heating unit) capable of heating hot water supplied
from the hot water storage tank 5 to the hot water supply terminal 10. The hot water
supply system 1 is capable of performing a boiling operation for storing hot water
in the hot water storage tank 5 using the heat pump unit 2, and an additional heating
operation for heating hot water supplied from the hot water storage tank 5 as necessary
using the gas heater 6 at the time of supply of hot water from the hot water storage
tank 5 to the hot water supply terminal 10. The operation performed by the hot water
supply system 1 is classified into a heat pump isolated operation for performing only
the boiling operation, an auxiliary heating isolated operation for performing only
the additional heating operation, and an auxiliary heating combined operation for
simultaneously performing both the boiling operation and the additional heating operation.
(1-4) Configuration of control unit 30 of hot water supply system 1
[0032] The control unit 30 of the hot water supply system 1 includes a CPU, a ROM, a RAM
(none of them shown), and others. As shown in FIG. 2, the control unit 30 of the hot
water supply system 1 includes a hot water runout determination unit 31, a COP curve
storage unit 32, a COP curve calculation unit 33, an efficiency calculation unit 34a,
a capability derivation unit 35, a boiling control unit 36, a hot water delivery control
unit 37, a history information storage unit 38, and a hot water delivery prediction
unit 39. The input side of the control unit 30 is connected to the hot water storage
temperature sensors 5a to 5d attached to a side surface of the hot water storage tank
5, a remote controller 20, the outside air temperature sensor 21, the hot water delivery
temperature sensor 22, and the flow rate sensor 23. The output side of the control
unit 30 is connected to the compressor 11, the fan 15, the heating unit 6a, and an
actuator such as the pump 17. An input received from the remote controller 20 is transmitted
to each of the heat pump unit 2 and the hot water circuit unit 3.
[0033] The hot water runout determination unit 31 determines whether or not a hot water
storage amount in the hot water storage tank 5 has decreased (the proportion of hot
water in the hot water storage tank 5 has decreased) and the hot water has run out
(whether the boiling operation needs to be performed). According to the present embodiment,
the hot water runout determination unit 31 determines the need for the boiling operation
to cope with runout of the hot water (a state that the hot water storage amount has
become a predetermined value or smaller) caused by a decrease in the proportion of
the hot water in the hot water storage tank 5 when the temperature detected by the
hot water storage temperature sensor 5b attached to the side surface of the hot water
storage tank 5 is lower than a hot water storage target temperature by a predetermined
temperature or more. A hot water delivery target temperature is input from the user
by operation of the remote controller 20.
[0034] The COP curve storage unit 32 stores a plurality of COP curves. The plurality of
COP curves corresponds to various outside air temperatures and hot water delivery
target temperatures. As shown in FIG. 3, each of the COP curves indicates a heating
capability (compressor frequency) represented on the horizontal axis, and COP on the
vertical axis to show the heating capability of the heat pump unit 2 and the COP at
the corresponding heating capability. As shown in FIG. 3, the COP of the heat pump
unit 2 has a maximum value b at a heating capability a1.
[0035] When the need for the boiling operation is determined, the COP curve calculation
unit 33 calculates a COP curve based on the outside air temperature and the hot water
delivery target temperature at that time. According to the present embodiment, the
COP curve storage unit 32 stores a plurality of COP curves. Accordingly, the COP curve
calculation unit 33 obtains a COP curve corresponding to the outside air temperature
and the hot water delivery target temperature at that time from among the COP curves
stored in the COP curve storage unit 32. The outside air temperature is a temperature
detected by the outside air temperature sensor 21. The hot water delivery target temperature
is a temperature input by the remote controller 20.
[0036] The efficiency calculation unit 34a calculates primary energy efficiency of the heat
pump unit 2 based on the COP curve obtained by the COP curve calculation unit 33.
According to the present embodiment, the efficiency calculation unit 34a uses a primary
energy conversion coefficient of 0.369 for each COP curve to calculate the primary
energy efficiency. Accordingly, as shown in FIG. 4, the primary energy efficiency
curve calculated based on the COP curve indicates the heating capability of the heat
pump unit 2, and the primary energy efficiency at the corresponding heating capability,
on the horizontal axis representing the heating capability and the vertical axis representing
the primary energy efficiency. As shown in FIG. 4, the curve of the primary energy
efficiency calculated based on the COP curve has a maximum value c at the heating
capability a1. In FIG. 4, the primary energy efficiency of the gas heater 6 is indicated
as d.
[0037] The capability derivation unit 35 derives the heating capability of the heat pump
unit 2 based on the COP curve in FIG. 3. The capability derivation unit 35 sets the
heating capability of the boiling operation in accordance with an amount of water
allowed to be boiled by a predetermined time described below and a predicted hot water
delivery amount, or other operating conditions. The heating capability of the gas
heater 6 during execution of the auxiliary heating combined operation is derived from
a difference between the temperature of the hot water supplied from the hot water
storage tank 5 and the temperature of the hot water obtained at the time of delivery
of the hot water from the hot water supply terminal 10, and then based on an insufficient
heating capability of the heat pump unit 2.
[0038] The boiling control unit 36 controls a frequency of the compressor 11, a number of
revolutions of the pump 17, and a number of revolutions of the fan 15. Specifically,
the boiling control unit 36 controls the frequency of the compressor 11 and the number
of revolutions of the fan 15 during the boiling operation based on the heating capability
of the heat pump unit 2 derived by the capability derivation unit 35. The boiling
control unit 36 maintains a constant frequency of the compressor 11, and controls
the number of revolutions of the pump 17 to obtain a hot water delivery target temperature.
[0039] The hot water delivery control unit 37 controls the heating unit 6a of the gas heater
6 during the additional heating operation performed at the time of delivery of hot
water based on the heating capability of the gas heater 6 derived by the capability
derivation unit 35.
[0040] The history information storage unit 38 stores a hot water delivery amount per unit
time detected by the flow rate sensor 23 as history information in association with
a measurement time. The history information storage unit 38 stores, as history information,
a fluctuation tendency of the hot water delivery amount for each time zone in one
day (or each day of the week), and a total hot water delivery amount, for example.
[0041] The hot water delivery prediction unit 39 analyzes, as a pattern, the time zone and
the hot water delivery amount when a large amount of hot water is delivered for the
user based on the history information stored in the history information storage unit
38 described above. The hot water delivery amount and the hot water delivery time
are predicted based on this pattern of delivered hot water. The control unit 30 compares,
at predetermined time intervals (e.g., at intervals of ten minutes), a hot water storage
amount detected by the hot water storage temperature sensors 5a to 5d of the hot water
storage tank 5 with a hot water delivery amount predicted by the hot water delivery
prediction unit 38 within a predetermined time (e.g., two hours) from a current time.
When the predicted hot water delivery amount is larger than the hot water storage
amount herein, the control unit 30 instructs a start of the boiling operation.
(2) Description of heating operation by hot water supply system 1
[0042] As described above, the hot water supply system 1 is configured to perform the heat
pump isolated operation for performing the boiling operation for the hot water storage
tank 5 using only the heat pump unit 2, the auxiliary heating isolated operation for
heating hot water supplied from the hot water storage tank 5 to the hot water supply
terminal 10 using only the gas heater 6, and the auxiliary heating combined operation
for simultaneously executing the boiling operation using the heat pump unit 2 and
the additional heating operation using the gas heater 6.
[0043] The boiling operation is performed in a case where the hot water storage amount in
the hot water storage tank 5 decreases, or where a large delivery amount of hot water
is predicted by the hot water delivery prediction unit 39. The heat pump isolated
operation of the boiling operation includes an operation in a normal boiling mode
described below (one example of boiling in second mode), and an operation in a rapid
boiling mode (one example of boiling in first mode). The auxiliary heating combined
operation is performed in a case where the amount of heat is insufficient for supplying
hot water at a desired temperature to the user even after the boiling operation, such
as a case where a large amount of hot water exceeding the hot water storage amount
in the hot water storage tank 5 is delivered. In this case, the additional heating
operation is performed for further heating hot water supplied from the hot water storage
tank 5 using the heating unit 6a in parallel with the boiling operation. In this manner,
hot water at a desired temperature is supplied to the user even when the hot water
storage amount in the hot water storage tank 5 decreases.
(2-1) Description of normal boiling mode (example of boiling in second mode)
[0044] According to the present embodiment, the operation in the normal boiling mode is
performed when the hot water storage amount in the hot water storage tank 5 becomes
a predetermined value (e.g., 40 L for a tank capacity of 100 L of the hot water storage
tank 5) or smaller, or in a night time zone in which an inexpensive electricity charge
is set without estimation of delivery of hot water for a long time. The operation
in the normal boiling mode is also performed when the current hot water storage amount
falls below the hot water delivery amount predicted by the hot water delivery prediction
unit 38 within two hours from the current time.
[0045] When the operation in the normal boiling mode is performed, the capability derivation
unit 35 derives a1 as the heating capability of the heat pump unit 2 to produce a
heating capability maximizing COP in the COP curve in FIG. 3. Thereafter, the boiling
control unit 36 controls the frequency of the compressor 11 and the number of revolutions
of the pump 17 until the hot water delivery temperature detected by the hot water
delivery temperature sensor 22 reaches a hot water delivery target temperature based
on the heating capability a1. During the operation in the normal boiling mode, the
heat pump unit operates at the capability maximizing the heat pump efficiency.
(2-2) Description of rapid boiling mode (example of boiling in first mode)
[0046] On the other hand, the operation in the rapid boiling mode is performed when the
hot water storage amount needs to be rapidly increased. According to the present embodiment,
the operation in the rapid boiling mode is executed when a sufficient hot water storage
amount is difficult to generate by the operation in the normal boiling mode. For example,
the operation in the rapid boiling mode is executed when the boiling is not completed
by a predetermined time by the operation in the normal boiling mode due to delivery
of hot water not predicted by the hot water delivery prediction unit 39 after a start
of the operation in the normal boiling mode performed in response to a state where
the current hot water storage amount falls below a scheduled hot water delivery amount
within two hours from the current time.
[0047] When the operation in the rapid boiling mode is performed, the capability derivation
unit 35 derives a heating capability of the heat pump unit 2 at which the primary
energy efficiency of the heat pump unit 2 is equalized with the primary energy efficiency
of the gas heater 6. Accordingly, as shown in FIG. 4, the capability derivation unit
35 derives a2 as the heating capability of the heat pump unit 2 at which the primary
energy efficiency of the heat pump unit 2 is equalized with the primary energy efficiency
d of the gas heater 6 based on a curve of the primary energy efficiency calculated
based on the COP curve. Thereafter, the boiling control unit 36 controls the frequency
of the compressor 11 and the number of revolutions of the pump 17 such that the hot
water delivery temperature detected by the hot water delivery temperature sensor 22
becomes a hot water delivery target temperature based on the heating capability a2.
[0048] After the hot water delivery temperature detected by the hot water delivery temperature
sensor 22 reaches the hot water delivery target temperature, the compressor 11 is
so controlled as to operate at a frequency (frequency corresponding to the heating
capability a2) higher than a frequency (frequency corresponding to the heating capability
a1) during operation in the normal boiling mode. In addition, the pump 17 is so controlled
as to operate at a number of revolutions larger than the number of revolutions of
the pump 17 during operation in the normal boiling mode. In this manner, the pump
17 is driven at a larger number of revolutions during the operation in the rapid boiling
mode. Accordingly, the flow rate of hot water circulating through the hot water circuit
unit 3 increases, whereby the amount of hot water stored in the hot water storage
tank 5 per unit time can increase in comparison with that amount during operation
in the normal boiling mode while maintaining a constant hot water delivery temperature.
(2-3) Description of auxiliary heating combined operation
[0049] According to the present embodiment, the auxiliary heating combined operation is
performed when the temperature of hot water supplied from the hot water storage tank
5 to the hot water supply terminal 10 becomes lower than the temperature desired by
the user with a shortage of the hot water storage amount in the hot water storage
tank 5.
[0050] When the auxiliary heating combined operation is performed, the capability derivation
unit 35 initially derives a1 as the heating capability of the heat pump unit 2 to
produce a heating capability maximizing COP in the COP curve in FIG. 3. Thereafter,
the boiling control unit 36 controls the frequency of the compressor 11 and the number
of revolutions of the pump 17 such that the hot water delivery temperature detected
by the hot water delivery temperature sensor 22 becomes a hot water delivery target
temperature based on the heating capability a1. The heating capability of the gas
heater 6 is derived based on the insufficient heating capability of the heat pump
unit 2 after the heating capability of the heat pump unit 2 is derived. Thereafter,
the gas heater 6 is operated by the hot water delivery control unit 37. In the auxiliary
heating combined operation, the heat pump unit 2 is also operated at a capability
maximizing heat pump efficiency, similarly to the operation in the normal boiling
mode.
(3) Description of heat pump isolated operation with reference to flowchart
[0051] An operation of the hot water supply system 1 according to the present embodiment
will be described with reference to FIG. 5. The flowchart in FIG. 5 describes a flow
of a process of the heat pump isolated operation performed by the control unit 30.
In the description, S represents a step, and a number following S represents a step
number.
[0052] In step S1, it is determined whether a hot water storage amount in the hot water
storage tank 5 is appropriate for the additional boiling operation based on a temperature
detected by the hot water storage temperature sensor 5d provided on a bottom of the
side surface of the hot water storage tank 5. When the temperature of the hot water
storage temperature sensor 5d is lower than x degrees (e.g., 60 degrees), it is determined
that additional boiling is allowed to be performed.
[0053] In subsequent step S2, the current hot water storage amount detected by the hot water
storage temperature sensors 5a to 5d of the hot water storage tank 5 is compared with
a scheduled hot water delivery amount predicted by the hot water delivery prediction
unit 39 within two hours from the current time. The scheduled hot water delivery amount
is calculated from a water supply temperature at the current time, and a hot water
supply set temperature or hot water filling set temperature set by the user using
the remote controller 20. When the current hot water storage amount is smaller than
the scheduled hot water delivery amount within two hours herein, the control unit
30 stores a time T as a time two hours after the current time, and the scheduled hot
water delivery amount (step S3), and starts the operation in the normal boiling mode
using the heat pump unit 2 (step S4). The capability derivation unit 35 derives a1
as the heating capability of the heat pump unit 2 to produce a heating capability
maximizing COP in the COP curve. Thereafter, the boiling control unit 36 performs
the boiling operation while controlling the frequency of the compressor 11 and the
number of revolutions of the pump 17 in such a manner as to produce the heating capability
a1. On the other hand, when the current hot water storage amount is larger than the
scheduled hot water delivery amount within two hours in step S2, the scheduled hot
water delivery amount within two hours from the current time is considered to be sufficiently
covered by the current hot water storage amount. Accordingly, the process returns
to step S1 and continues determination as to whether additional boiling operation
is allowed to be performed.
[0054] When the operation in the normal boiling mode is started in step S4, the flow rate
sensor 23 checks whether or not hot water is delivered from the hot water supply terminal
10 in step S5. When no hot water is delivered, the operation in the normal boiling
mode is continued (step S6), and it is determined whether the additional boiling operation
is allowed for the hot water storage amount in the hot water storage tank 5 (step
S7). When the temperature detected by the hot water storage temperature sensor 5d
is 60 degrees or higher with determination that the additional boiling is not allowed,
the boiling operation is terminated. When the temperature detected by the hot water
storage temperature sensor 5d is lower than 60 degrees with determination that the
additional boiling is allowed, the process proceeds to step S8. In this step, the
scheduled hot water delivery amount within two hours is compared with the current
hot water storage amount. When the current hot water storage amount is larger than
the scheduled hot water delivery amount within two hours in step S8, the boiling operation
is terminated. When the current hot water storage amount is smaller than the scheduled
hot water delivery amount within two hours, the process returns to step S5 to check
whether or not hot water is delivered.
[0055] When hot water is delivered in step S5, the process further proceeds to step S9.
In step S9, it is checked whether or not the predicted hot water delivery amount until
the time T stored in step S3 can be generated by normal boiling. In other words, a
current insufficient hot water amount is calculated and compared with a water amount
allowed to be boiled by the operation in the normal boiling mode. The insufficient
hot water amount (predicted hot water delivery amount until the time T) is calculated
based on the water supply temperature, and the hot water supply set temperature or
the hot water filling set temperature set by the user using the remote controller
20. When the current insufficient hot water amount is smaller than the water amount
allowed to be boiled by the operation in the normal boiling mode, the process proceeds
to step S6. In this case, the boiling operation by the operation in the normal boiling
mode is continued, and determinations in foregoing steps S7 to S8 are made. On the
other hand, when the current insufficient hot water amount is larger than the water
amount allowed to be boiled in the normal boiling mode, it is predicted that the hot
water storage amount becomes insufficient at the time T. In this case, the operation
is switched to the boiling operation by the operation in the rapid boiling mode (step
S10). In this case, the capability derivation unit 35 designates a2 as the heating
capability of the heat pump unit 2. The boiling control unit 36 performs the boiling
operation while controlling the frequency of the compressor 11 and the number of revolutions
of the pump 17 in such a manner as to produce the heating capability a2.
[0056] After the operation in the rapid boiling mode is started, whether the additional
boiling operation is allowed is checked based on the temperature detected by the hot
water storage temperature sensor 5d (step S11). When the temperature detected by the
hot water storage temperature sensor 5d is 60 degrees or higher, the boiling operation
is terminated. When the temperature detected by the hot water storage temperature
sensor 5d is lower than 60 degrees, the process proceeds to step S12. In this step,
the scheduled hot water delivery amount within two hours is compared with the current
hot water storage amount. When the scheduled hot water delivery amount within two
hours is smaller than the current hot water storage amount, it is considered that
a sufficient hot water storage amount has been generated. Accordingly, the boiling
operation is terminated. When the scheduled hot water delivery amount within two hours
is larger than the current hot water storage amount, the process returns to step S5.
In this case, the current insufficient hot water amount is again compared with the
water amount allowed to be boiled by the operation in the normal boiling mode.
(4) Description of heat pump isolated operation with reference to time chart
[0057] Described next will be the operation of the hot water supply system 1 described with
reference to the flowchart of FIG. 5 and performed in a hot water delivery state in
FIG. 6. FIG. 6 is a diagram showing an example of a hot water delivery situation and
a boiling situation in a time zone from the evening to the night, as a period in which
the boiling operation is generally more frequently performed due to a large amount
of hot water delivery in one day. The vertical axis represents the hot water storage
amount in the hot water storage tank 5 (left axis) and the hot water delivery amount
(right axis), while the horizontal axis represents time. A solid line indicates a
change in the actual hot water storage amount, while a broken line indicates a change
in the hot water storage amount predicted at a time t0.
[0058] The hot water storage tank 5 can store 100 L of hot water in total. The heat pump
unit 2 can boil 30 L/H of water by the operation in the normal boiling mode, and 45
L/H of water in the operation in the rapid boiling mode. The hot water delivery amount
and the hot water storage amount are checked every ten minutes. At the time t0 (18:00),
the hot water storage amount in the hot water storage tank 5 is 50 L. The hot water
delivery prediction unit 39 predicts 10 L of hot water delivery from a time t4 to
a time t5 (19: 10 to 19: 30), and 97.5L of hot water delivery (not shown) from a time
t7 (20:00). It is assumed that hot water delivery is not predicted at a later time.
[0059] At the time t0, whether the additional boiling operation is allowed for the hot water
storage tank 5 is determined as shown in step S1 shown in the flowchart in FIG. 5.
At the time t0, the temperature of the hot water storage temperature sensor 5d is
lower than 60 degrees, and it is determined that additional boiling is allowed to
be performed. Accordingly, the process proceeds to step S2, and the current hot water
storage amount (50 L) is compared with the scheduled hot water delivery amount predicted
by the hot water delivery prediction unit 39 within two hours from the current time
(step S2). As described above, it is predicted herein that hot delivery is executed
twice, i.e., 10 L of hot water delivery and 97.5 L of hot water delivery within two
hours, i.e., by 20:00 (time t7), whereby 107.5 L of hot water delivery in total is
predicted. In this case, the current hot water storage amount is smaller than the
scheduled hot water delivery amount until time t7. Accordingly, the time t7 and 107.5
L as the scheduled hot water delivery amount are stored (step S3), and the operation
in the normal boiling mode is started (step S4).
[0060] After the start of the operation in the normal boiling mode, the flow rate sensor
23 checks whether or not hot water is delivered from the hot water supply terminal
10 (step S5). No hot water is delivered until the time t1, whereby the boiling operation
by the operation in the normal boiling mode is continued (step S6). In the period
from the time t0 to the time t1, the operation in the normal boiling mode is continued,
and determinations from S5 to S8 are repeated.
[0061] Subsequently, delivery of hot water is confirmed at the time t1 (18:40) (step S5).
In this case, the process proceeds to step S9, where it is checked whether or not
the predicted hot water delivery amount (107.5 L) can be generated by the time t7
(20:00) by the boiling operation as the operation in the normal boiling mode. The
hot water storage amount at the time t1 is 62.5 L, whereby an insufficient hot water
amount is 45 L. The water amount allowed to be boiled by the operation in the normal
boiling mode until the time t7 is 40 L (30 L/H × one hour and 20 minutes). In other
words, the current insufficient hot water amount is larger than the water amount allowed
to be boiled by the operation in the normal boiling mode, whereby the operation is
switched to the operation in the rapid boiling mode (step S10).
[0062] After the operation in the rapid boiling mode is started, determinations in steps
S11 and S12 in the flowchart in FIG. 5 are made. However, the scheduled hot water
delivery amount within two hours (107.5 L) is larger than the current hot water storage
amount (62.5 L), whereby the operation in the rapid boiling mode is continued. At
the times t2 to t5, steps S9 to S12 are similarly repeated, and the operation in the
rapid boiling mode is continued.
[0063] At the time t6 (19:50), the insufficient hot water amount becomes 5 L in step S9,
and the water amount allowed to be boiled by the operation in the normal boiling mode
until the time t7 also becomes 5 L (30 L/H × ten minutes). In other words, the current
insufficient hot water amount becomes equal to or smaller than the water amount allowed
to be boiled by the operation in the normal boiling mode. In this case, it is predicted
that a sufficient hot water storage amount can be generated by the operation in the
normal boiling mode. Accordingly, the process proceeds to step S6, and the operation
in the rapid boiling mode is switched to the operation in the normal boiling mode.
Subsequently, the process proceeds to step S7 and step S8, but the operation in the
normal boiling mode is continued.
[0064] At the time t7 (20:00), no delivery of hot water is confirmed in step S5, and the
operation in the normal boiling mode continues (step S6). Subsequently, it is determined
that additional boiling is allowed to be performed in step S7. However, the hot water
storage amount becomes 97.5 L for the scheduled hot water delivery amount of 97.5
L within two hours (until 22:00) (hot water is delivered only once at 20:00) in step
S8. In this case, the hot water storage amount is equal to or larger than the scheduled
hot water delivery amount, whereby the boiling operation (operation in the normal
boiling mode) is terminated.
[0065] As described above, according to the hot water supply system 1 of the present embodiment,
the rapid boiling operation is performed on condition that a sufficient hot water
storage amount is not generated by the boiling operation in the normal boiling operation
in a state that the current hot water storage amount is smaller than the hot water
delivery amount predicted by the hot water delivery prediction unit 39 within a predetermined
time from the current time, as an example of a condition where a shortage of the amount
of heat is likely to be produced by the operation in the normal boiling mode with
an estimation of delivery of a large amount of hot water or actual delivery of a large
amount of hot water. In this case, the heating ratio of the auxiliary heating combined
operation can be reduced by performing rapid boiling by the operation in the rapid
boiling mode. Accordingly, the total energy efficiency of the overall hot water supply
system 1 improves.
(5) Modifications
[0066] Various modifications will be hereinafter described. Configurations of the following
modifications are similar to the corresponding configurations of the embodiment described
above except for the configurations particularly noted. Accordingly, description of
the similar configurations will be omitted, and only parts different from the corresponding
parts of the embodiment described above will be described below.
(5-1) Modification A
[0067] In Modification A, the operation in the rapid boiling mode is performed in a case
where the hot water storage amount further decreases even after a start of boiling
by the operation in the normal boiling mode based on determination of runout, i.e.,
determination that the hot water storage amount in the hot water storage tank 5 is
smaller than a predetermined value, as an example of a condition where a shortage
of the amount of heat is likely to be produced by the operation in the normal boiling
mode with an estimation of delivery of a large amount of hot water or actual delivery
of a large amount of hot water. The hot water storage amount is checked based on the
temperatures detected by the hot water storage temperature sensors 5a to 5d attached
to the side surface of the hot water storage tank 5. According to this example, the
operation in the rapid boiling mode is performed in the following case. The operation
in the normal boiling mode is started when the hot water storage amount becomes equal
to or smaller than a first hot water storage amount (e.g., 40 L for 100 L which is
the tank capacity of the hot water storage tank 5) with a decrease in the temperature
detected by the hot water storage temperature sensor 5b to a temperature lower than
the hot water target storage temperature by a predetermined temperature or more. Thereafter,
the operation in the rapid boiling mode is performed when the hot water storage amount
becomes a second hot water storage amount (e.g., 20 L) smaller than the first hot
water storage amount with a decrease in the temperature of the hot water storage temperature
sensor 5a provided above the hot water storage temperature sensor 5b on the hot water
storage tank 5 to a temperature lower than the hot water storage target temperature
by a predetermined temperature or more.
[0068] FIG. 7 is a flowchart of the present modification. In step S101, it is determined
whether the temperature detected by the hot water storage temperature sensor 5b is
lower than y degrees (e.g., 60 degrees). When the temperature detected by the hot
water storage temperature sensor 5b is lower than y degrees, it is determined that
the hot water storage amount is a predetermined value (first predetermined value,
such as 40 L) or smaller, in a state of runout of hot water. In this case, the operation
in the normal boiling mode is started (step S102). After the start of the operation
in the normal boiling mode, whether hot water is delivered from the hot water supply
terminal 10 is checked (step S103). When no hot water is delivered, the operation
in the normal boiling mode is performed while repeating determinations in step S103
and step S105 until the temperature detected by the hot water storage temperature
sensor 5b becomes y degrees or higher. When the temperature detected by the hot water
storage temperature sensor 5b becomes equal to or higher than y degrees, it is determined
that the hot water storage amount in the hot water storage tank 5 is sufficient. In
this case, the boiling operation is terminated.
[0069] On the other hand, when delivery of the hot water is confirmed in step S103, the
process proceeds to step S104. In this step, it is determined whether the temperature
detected by the hot water storage temperature sensor 5a disposed above the hot water
storage temperature sensor 5b on the hot water storage tank 5 is lower than z degrees
(e.g., 60 degrees). It is determined herein whether the hot water storage amount reaches
a second predetermined value (e.g., 20 L) which is smaller than the first predetermined
value based on which runout of hot water has been determined. When the detected temperature
is z degrees or higher, the process proceeds to step 105. In this step, the operation
in the normal boiling mode is performed while repeating determinations in step S103
and step S105 until the temperature detected by the hot water storage temperature
sensor 5b becomes y degrees or higher.
[0070] When the detected temperature is lower than z degrees, the hot water storage amount
is the second predetermined value or smaller. In this case, it is determined that
the increase in the hot water storage amount produced by the operation in the normal
boiling mode is insufficient. Accordingly, the operation in the rapid boiling mode
is started (step S106). After the start of the operation in the rapid boiling mode,
the temperature detected by the hot water storage temperature sensor 5a is measured
(step S107). The operation in the rapid boiling mode is continued until the detected
temperature becomes z degrees or higher. When the detected temperature becomes equal
to or higher than z degrees, the operation is switched to the operation in the normal
boiling mode (step S108). Thereafter, the boiling operation is continued. Subsequently,
it is checked whether or not the runout of hot water is continuing based on the temperature
detected by the hot water storage temperature sensor 5b. When the runout state of
hot water is cancelled with the detected temperature of y degrees or higher, the boiling
operation is terminated.
[0071] According to this configuration, the frequency of execution of the auxiliary heating
combined operation can be reduced even when the hot water delivery pattern cannot
be analyzed using the hot water delivery prediction unit 39 in the absence of the
history information accumulated in the history information storage unit 38, such as
a case immediately after the power source is turned on. Accordingly, energy efficiency
of the overall hot water supply system 1 improves. In addition, the auxiliary heating
combined operation is predicted based on the hot water storage amount obtained by
the hot water storage temperature sensors 5a to 5d provided on the hot water storage
tank 5. Accordingly, energy efficiency of the overall hot water supply system 1 improves
by simple control.
(5-2) Modification B
[0072] In modification B, the operation in the rapid boiling mode is performed in a case
where a hot water filling instruction for supplying hot water at a target temperature
to the bathtub 10a has been issued from the user using the remote controller 20, as
an example of a condition where a shortage of the amount of heat is likely to be produced
by boiling in the normal boiling operation with an estimation of delivery of a large
amount of hot water or actual delivery of a large amount of hot water.
[0073] FIG. 8 is a flowchart of the present modification. In step S201, whether or not a
hot water filling instruction has been issued is checked. When the issue of the hot
water filling instruction is confirmed, the process proceeds to step S202 to start
measurement of the timer T1 of the control unit 30. In this case, checking of the
timer T1 continues until the timer T1 reaches α minutes (e.g., five minutes) in step
S203. When the timer T1 reaches α minutes, the timer T1 is reset (step S204). Thereafter,
whether filling of hot water is continuing is checked (step S205). When the hot water
filling instruction is not continuing at this time, the process returns to step S201
and waits until a next hot water filling instruction is issued. When the hot water
filling instruction is continuing, the boiling operation in the rapid boiling mode
is started (step S206). It is estimated that water has been supplied to a lower part
of the hot water storage tank 5 with an elapse of a predetermined time counted by
the timer T1 from reception of the hot water filling instruction to the start of the
boiling operation.
[0074] When the operation in the rapid boiling mode is started, it is checked whether filling
of hot water is completed (step S207). Completion of filling of hot water is determined
based on determination that the amount of hot water supplied to the bathtub 10a has
reached a hot water set amount for filling, or on a termination instruction from the
remote controller 20. When it is determined in step S207 that filling of hot water
has been completed, measurement with the timer T2 starts (step S208). The operation
in the rapid boiling mode continues while repeating determinations in steps S209 and
S210 until the temperature detected by the hot water storage temperature sensor 5d
provided on the bottom of the side surface of the hot water storage tank 5 becomes
x degrees (e.g., 60 degrees) or higher (step S209), or until the measurement time
of the timer T2 reaches β minutes (e.g., 20 minutes) (step S210). When the temperature
detected by the hot water storage temperature sensor 5d becomes equal to or higher
than x degrees, or in a case of an elapse of β minutes, the timer T2 is reset (step
S211) with termination of the boiling operation.
[0075] According to this configuration, the frequency of execution of the auxiliary heating
combined operation can be reduced even when the hot water delivery pattern cannot
be analyzed using the hot water delivery prediction unit 39 in the absence of the
history information accumulated in the history information storage unit 38, such as
a case immediately after the power source is turned on. Accordingly, energy efficiency
of the overall hot water supply system 1 improves. In particular, when the capacity
of the hot water storage tank 5 is relatively small, it is highly probable that hot
water in the hot water storage tank 5 runs out by filling of hot water, and that the
gas heater (auxiliary heating unit) 6 needs to be operated. In this case, the rapid
boiling can be started in an earliest possible stage by starting the operation in
the rapid boiling mode at the time of an issue of the hot water filling instruction.
Accordingly, the frequency of execution of the auxiliary heating combined operation
is reduced, and energy efficiency of the overall hot water supply system 1 improves.
After completion of filling of hot water, bathing is predicted. Accordingly, delivery
of a large amount of hot water using a shower is predicted. By continuously performing
the operation in the rapid boiling mode, the frequency of execution of the auxiliary
heating combined operation can be reduced even in a case where delivery of a large
amount of hot water is predicted after completion of filling of hot water. Accordingly,
energy efficiency of the overall hot water supply system 1 improves.
[0076] In the present modification, the operation in the rapid boiling mode is started α
minutes after reception of the hot water filling instruction. Alternatively, the operation
in the rapid boiling mode may be started immediately after reception of the instruction.
When the operation in the rapid boiling mode is started immediately after reception
of the instruction, a larger amount of water can be boiled. As a result, the frequency
of execution of the auxiliary heating combined operation can be reduced.
(5-3) Modification C
[0077] According to the present embodiment, whether the predicted hot water delivery amount
until the time T is allowed to be generated by the operation in the normal boiling
mode is checked when hot water is delivered during the operation in the normal boiling
mode. Alternatively, whether the water can be boiled by the operation in the normal
boiling mode may be checked when the outside air temperature detected by the outside
air temperature sensor 21 becomes a predetermined temperature or lower, or falls by
a predetermined temperature or more, rather than at the time of actual delivery of
hot water. In this manner, the frequency of execution of the auxiliary heating combined
operation can be reduced even when the amount of water allowed to be boiled by the
operation in the normal boiling mode decreases as a result of a drop of the outside
air temperature during the operation in the normal boiling mode. Accordingly, energy
efficiency of the overall hot water supply system 1 improves.
[0078] In addition, for example, whether boiling can be performed by the operation in the
normal boiling mode may be checked when the temperature of water to be mixed (water
supply temperature) at the time of supply of hot water from the hot water storage
tank 5 to the hot water supply terminal 10 becomes a predetermined temperature or
lower, or drops by a predetermined temperature or more, rather than actual delivery
of hot water. Alternatively, whether the water can be boiled by the operation in the
normal boiling mode may be checked when the hot water supply set temperature or the
hot water filling set temperature set by the user becomes a predetermined temperature
or higher, or increases by a predetermined temperature or more. In this manner, the
frequency of execution of the auxiliary heating combined operation can be reduced
even when the predicted hot water delivery amount required by a predetermined time
T increases during the operation in the normal boiling mode. Accordingly, energy efficiency
of the overall hot water supply system 1 improves.
(5-4) Modification D
[0079] According to the embodiment described above, the efficiency calculation unit 34a
derives the primary energy efficiency of the heat pump unit 2 based on the COP curve
obtained by the COP curve calculation unit 33, and calculates the heating capability
of the operation in the rapid boiling mode based on a comparison between the primary
energy efficiency of the heat pump unit 2 and the primary energy efficiency of the
gas heater 6. Alternatively, a usage charge of the heat pump unit 2 may be calculated
based on the COP curve obtained by the COP curve calculation unit 33, and compared
with a usage charge of the gas heater 6 to derive the heating capability of the operation
in the rapid boiling mode.
[0080] FIG. 9 shows a relationship between the heating capability (horizontal axis) and
the usage charge per unit heating capability (vertical axis) for the heat pump unit
2 and the gas heater 6. In Modification E, the control unit 30 includes a usage charge
calculation unit 34b. The usage charge calculation unit 34b calculates a usage charge
per unit heating capability based on the COP curve obtained by the COP curve calculation
unit 33. Each usage charge is calculated by multiplying a consumption per unit time
by a unit price of the usage charge. The power consumption of the heat pump unit 2
is calculated by dividing the heating capability by COP. Accordingly, as shown in
FIG. 9, the usage charge per unit capability varies in accordance with the heating
capability, and becomes a minimum value e at the heating capability a1. On the other
hand, the usage charge per unit capability of the gas heater 6 is a constant usage
charge f regardless of the heating capability.
[0081] When the operation in the normal boiling mode is performed, the capability derivation
unit 35 derives a1 as the heating capability of the heat pump unit 2 to produce a
heating capability maximizing COP in the COP curve in FIG. 3. Thereafter, the boiling
control unit 36 controls the frequency of the compressor 11 and the number of revolutions
of the pump 17 until the hot water delivery temperature detected by the hot water
delivery temperature sensor 22 reaches a hot water delivery target temperature based
on the heating capability a1. In other words, during the operation in the normal boiling
mode, the heat pump unit 2 operates at the capability maximizing heat pump efficiency.
[0082] On the other hand, when the operation in the rapid boiling mode is performed, the
capability derivation unit 35 derives a heating capability of the heat pump unit 2
at which the usage charge of the heat pump unit 2 is equalized with the usage charge
of the gas heater 6. Accordingly, as shown in FIG. 9, the capability derivation unit
35 derives, based on a usage charge curve calculated based on the COP curve, a heating
capability a3 of the heat pump unit 2 at which the usage charge of the heat pump unit
2 is equalized with the usage charge f of the gas heater 6. Thereafter, the boiling
control unit 36 controls the frequency of the compressor 11 and the number of revolutions
of the pump 17 based on the heating capability a3 until the hot water delivery temperature
detected by the hot water delivery temperature sensor 22 reaches a hot water delivery
target temperature.
[0083] This configuration can reduce a rise of the usage charge of the heat pump unit 2
from the usage charge of the gas heater 6, thereby reducing a rise of the usage charge
of the overall hot water supply system 1.
(5-5) Modification E
[0084] In addition, for example, a carbon emission amount of the heat pump unit 2 may be
calculated based on the COP curve obtained by the COP curve calculation unit 33, and
compared with a carbon emission amount of the gas heater 6 to derive the heating capability
of the operation in the rapid boiling mode.
[0085] FIG. 10 shows a relationship between the heating capability (horizontal axis) and
the carbon emission amount per unit heating capability (vertical axis) for the heat
pump unit 2 and the gas heater 6. According to Modification F, the control unit 30
includes a carbon emission amount calculation unit 34c. The carbon emission amount
calculation unit 34c calculates a carbon emission amount per unit heating capability
based on the COP curve obtained by the COP curve calculation unit 33. Each carbon
emission amount is obtained by dividing a carbon dioxide emission coefficient per
unit capability by device efficiency. The heat pump unit 2 is driven by electric power.
Accordingly, a carbon emission amount per unit capability of the heat pump unit 2
is calculated by dividing a carbon dioxide emission amount per unit capability during
power generation by COP. As shown in FIG. 10, the carbon emission amount per unit
capability varies in accordance with the heating capability, and becomes a minimum
value g at the heating capability a1. On the other hand, the carbon emission amount
per unit capability of the gas heater 6 is a constant carbon emission amount h regardless
of the heating capability.
[0086] When the operation in the normal boiling mode is performed, the capability derivation
unit 35 derives a1 as the heating capability of the heat pump unit 2 to produce a
heating capability maximizing COP in the COP curve in FIG. 3. Thereafter, the boiling
control unit 36 controls the frequency of the compressor 11 and the number of revolutions
of the pump 17 until the hot water delivery temperature detected by the hot water
delivery temperature sensor 22 reaches a hot water delivery target temperature based
on the heating capability a1. In other words, during the operation in the normal boiling
mode, the heat pump unit 2 operates at the capability maximizing heat pump efficiency.
[0087] On the other hand, when the operation in the rapid boiling mode is performed, the
capability derivation unit 35 derives a heating capability of the heat pump unit 2
at which the carbon emission amount of the heat pump unit 2 is equalized with the
carbon emission amount of the gas heater 6. Accordingly, as shown in FIG. 10, the
capability derivation unit 35 derives, based on a carbon emission amount curve calculated
based on the COP curve, a heating capability a4 of the heat pump unit 2 at which the
carbon emission amount of the heat pump unit 2 is equalized with the carbon emission
amount h of the gas heater 6. Thereafter, the boiling control unit 36 controls the
frequency of the compressor 11 and the number of revolutions of the pump 17 based
on the heating capability a4 until the hot water delivery temperature detected by
the hot water delivery temperature sensor 22 reaches a hot water delivery target temperature.
[0088] This configuration can reduce a rise of the carbon emission amount of the heat pump
unit 2 from the carbon emission amount of the gas heater 6, thereby reducing a rise
of the carbon emission amount of the overall hot water supply system 1.
(5-6) Modification F
[0089] According to the embodiment described above, the heating capability of the heat pump
unit 2 is derived such that the primary energy efficiency at the heating capability
(a2) in the operation in the rapid boiling mode is equalized with the primary energy
efficiency d of the gas heater 6. However, the setting of the heating capability is
not limited to this manner of setting. Various settings may be adopted as long as
such conditions that the heating capability of the heat pump unit 2 during the operation
in the rapid boiling mode is higher than the heating capability (a1) during the operation
in the normal boiling mode, and that the heat pump efficiency of the heat pump unit
2 during the operation in the rapid boiling mode is lower than the heat pump efficiency
of the heat pump unit 2 during the operation in the normal boiling mode are met in
a state that the outside air temperature is equalized.
[0090] Similarly, according to Modification D and Modification F described above, the heating
capability of the heat pump unit 2 is derived such that the usage charge per unit
capability or the carbon emission amount per unit capability at the heating capability
(a3 or a4) of the heat pump unit 2 during the operation in the rapid boiling mode
is equalized with those of the gas heater 6. However, the setting of the heating capability
is not limited to this manner of setting. Various settings may be adopted as long
as such conditions that the heating capability of the heat pump unit 2 during the
operation in the rapid boiling mode is higher than the heating capability (a1) during
the operation in the normal boiling mode, and that the heat pump efficiency of the
heat pump unit 2 during the operation in the rapid boiling mode is higher than the
heat pump efficiency of the heat pump unit 2 during the operation in the normal boiling
mode are met in a state that the outside air temperature is equalized.
[0091] Concerning Modification D, it is sufficient if the heating capability in the rapid
boiling mode is higher than the heating capability at which COP is maximized at the
outside air temperature at that time, and if the usage charge per unit capability
in the rapid boiling mode is equal to or lower than the usage charge per unit capability
of the gas heater 6. In addition, concerning Modification E, it is sufficient if the
heating capability in the rapid boiling mode is higher than the heating capability
at which COP is maximized at the outside air temperature at that time, and if the
carbon emission amount per unit capability in the rapid boiling mode is equal to or
lower than the carbon emission amount per unit capability of the gas heater 6.
[0092] In addition, concerning the heating capability during the operation in the normal
boiling mode, a1 is derived as the heating capability of the heat pump unit 2 to produce
the heating capability maximizing COP in the COP curve. However, various settings
may be established within a range where the heating capability during the operation
in the normal boiling mode produces relatively high COP.
(5-7) Modification G
[0093] According to the embodiment described above, the boiling control unit 36 controls
the frequency of the compressor 11 based on the heating capability a2 until the hot
water delivery temperature detected by the hot water delivery temperature sensor 22
reaches the hot water delivery target temperature in the operation in the rapid boiling
mode. However, for setting the heating capability, instead of or in addition to this
method, the boiling control unit 36 may control the number of revolutions of the fan
15 disposed at a position facing the outdoor heat exchanger 12 such that the hot water
delivery temperature detected by the hot water delivery temperature sensor 22 becomes
the hot water delivery target temperature based on the heating capability a2.
[0094] In this case, after the hot water delivery temperature detected by the hot water
delivery temperature sensor 22 reaches the hot water delivery target temperature,
the fan 15 is controlled at the number of revolutions (number of revolutions based
on the heating capability a2) larger than the number of revolutions (number of revolutions
based on the heating capability a1) during the operation in the normal boiling mode.
In addition, the pump 17 is controlled at the number of revolutions larger than the
number of revolutions of the pump 17 during the operation in the normal boiling mode.
In this manner, the pump 17 is driven at a larger number of revolutions during the
operation in the rapid boiling mode. Accordingly, the flow rate of hot water circulating
through the hot water circuit unit 3 increases, whereby the amount of hot water stored
in the hot water storage tank 5 per unit time can increase in comparison with that
amount during operation in the normal boiling mode while maintaining a constant hot
water delivery temperature.
[0095] The embodiment of the present invention has been described above with reference to
the drawings. However, it should be understood that specific configurations are not
limited to those described in the embodiment. The scope of the present invention is
defined not by the embodiment described above, but by the scope of the claims, and
further includes meanings equivalent to the claims and all modifications within the
scope of the claims.
[0096] For example, in the embodiment and modifications described above, the hot water supply
system 1 includes the gas heater 6 as the auxiliary heating unit. However, the auxiliary
heating unit is not limited to the gas heater 6. Accordingly, as the auxiliary heating
unit, the hot water supply system 1 may have another heating unit such as an electric
heater. The present invention is applicable as long as the auxiliary heating unit
constituted by a heating means other than the heat pump unit 2 has primary energy
efficiency lower than that of the heat pump unit 2. More specifically, the primary
energy efficiency of the auxiliary heating unit is lower than the primary energy efficiency
of the heat pump unit 2 when compared at the heating capability maximizing COP of
the heat pump unit 2. Examples of these heating means include an electric heater and
gas or other combustion-type heating means.
INDUSTRIAL APPLICABILITY
[0097] When the present invention is applied, improvement of total energy efficiency of
an overall hot water supply system is achievable by reducing a proportion of a heating
amount generated by an auxiliary heating unit in a heating amount of the entire system.
REFERENCE SIGNS LIST
[0098]
- 2
- Heat pump unit (heat pump heating unit)
- 5
- Hot water storage tank
- 5a to 5d
- Hot water storage temperature sensor (hot water storage amount detection unit)
- 6
- Gas heater (auxiliary heating unit)
- 10
- Hot water supply terminal (hot water delivery unit)
- 10a
- Bathtub
- 11
- Compressor
- 12
- Outdoor heat exchanger (heat source side heat exchanger)
- 13
- Expansion valve (expansion mechanism)
- 15
- Fan
- 16
- Hot water supply heat exchanger (usage-side heat exchanger)
- 23
- Flow rate sensor (hot water delivery amount detection unit)
- 30
- Control unit
- 38
- History information storage unit
- 39
- Hot water delivery prediction unit
- 41
- Refrigerant circuit
CITATION LIST
PATENT LITERATURE