(19)
(11) EP 3 724 492 A1

(12)

(43) Date of publication:
21.10.2020 Bulletin 2020/43

(21) Application number: 18814658.3

(22) Date of filing: 12.12.2018
(51) International Patent Classification (IPC): 
F03D 9/25(2016.01)
H01B 7/14(2006.01)
H02G 1/10(2006.01)
(86) International application number:
PCT/EP2018/084643
(87) International publication number:
WO 2019/115653 (20.06.2019 Gazette 2019/25)
(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated Extension States:
BA ME
Designated Validation States:
KH MA MD TN

(30) Priority: 13.12.2017 EP 17380028

(71) Applicant: Fundación Tecnalia Research & Innovation
20009 Donostia - San Sebastián (ES)

(72) Inventors:
  • SELLNER, Jan
    48160 Derio, Bizkaia (ES)
  • RICO RUBIO, Antonio
    48160 Derio, Bizkaia (ES)
  • BERQUE, Joannes
    48160 Derio, Bizkaia (ES)
  • NAVA, Vincenzo
    48009 Bilbao (ES)
  • DEL POZO MARTÍN, Alberto
    48160 Derio, Bizkaia (ES)

(74) Representative: Balder IP Law, S.L. 
Paseo de la Castellana 93 5ª planta
28046 Madrid
28046 Madrid (ES)

   


(54) METHOD FOR INSTALLING A SUBSEA CABLE IN AN OFFSHORE WIND FARM