TECHNICAL FIELD
[0001] The invention relates to the field of demolition work. In particular, the invention
provides a mobile system suitable for demolition work. The invention also relates
to a method for delimiting demolition work, as well as other instances, such as temporary
struts after fires, earthquakes, explosions and natural disasters.
TECHNICAL BACKGROUND OF THE INVENTION
[0002] The terms demolishing, pulling down or razing refer to the demolition of a movable
or immovable property into smaller components which can then be removed. Preferably,
demolition work is carried out using (heavy) vehicles, such as a demolition crane
or wrecking ball which mechanically pull down the building structures to be demolished.
[0003] However, in urbanized and industrial regions, the demolition sector is confronted
with sites where demolition by means of machines is not possible. In a residential
area, there is often insufficient space to place the required machinery and to catch
falling debris in an adequate manner. As a result thereof, it is often decided to
pull down the building structures by hand. This typically takes place by erecting
a scaffold against the building structure to be demolished, which can then be pulled
down manually by workers (row by row).
[0004] However, manual demolition is an inefficient, expensive and risky approach. Often,
manual demolitions are associated with a larger risk of accidents, since everything
has to be carried out on a smaller surface area. The danger relates to a building
collapsing or falling, falling debris and exposure to harmful substances, such as
asbestos and quartz dust.
[0005] In addition, placing a scaffold also means that the scaffold has to be anchored to
the structure to be pulled down. After all, the scaffold is not reliable and susceptible
to the wind. This produces an additional risk. In case the walls are old, it is possible
for relatively large parts to suddenly break loose during demolition work, as a result
of which the scaffold is taken down with them. Any workers which might be on the scaffold
in such a moment, thus run an additional risk. Also, anchoring the scaffold to the
wall at an elevated level is problematic if that very same wall is to be demolished.
[0006] In addition, constructing and taking down a scaffold is very labour-intense. A scaffold
is also prone to accidents: if, for example, a (demolition) crane hits the scaffold,
this may cause a pipe to bend, which may render the entire scaffold unstable.
[0007] As a result, pulling down building structures is dangerous and specialised work.
Traditionally, the scores of the demolition sector with regard to industrial accidents
are worse than the average of the entirety of the building industry. More particularly,
this means that not only the frequency rate is worse, but also the degree of severity.
For example, studies show that there were a total of 22 fatal industrial accidents
in the Belgian building industry in the year 2009 at an employment figure of 154,200
FTEs (1 for every 7,000 FTEs). In the sector of demolition work, the number of fatal
industrial accidents over the same period was 2 per 5,000 FTEs, or 1 for every 2,500
FTEs.
[0008] There is therefore a need for a system which offers a solution to one or more of
the aforementioned problems.
SUMMARY
[0009] The present invention and the preferred embodiments thereof aim to offer a solution
to one or more of the abovementioned drawbacks. To this end, the present invention
relates to a mobile system for demolishing a building structure. The invention also
provides a method for demolishing a building structure.
[0010] In a first aspect, the invention relates to a mobile system suitable for demolition
work, the mobile system comprising the following:
- a container with telescopic support elements;
- an inflatable screen provided in the container; and,
- at least two guides for guiding the inflatable screen.
[0011] In some preferred embodiments, the inflatable screen comprises an inflatable cushion.
[0012] In some preferred embodiments, the screen is made of PVC.
[0013] In some preferred embodiments, the inflatable screen is provided with a friction-reducing
and/or crack-reducing coating.
[0014] In some preferred embodiments, the system comprises a screen-inflating means; preferably
an air pump.
[0015] In some preferred embodiments, the screen comprises a pressure-relief feature.
[0016] In some preferred embodiments, the screen is attached to the guides.
[0017] In some preferred embodiments, the guides have a maximum adjustable height of at
least 1.0 m to at most 50.0 m.
[0018] In some preferred embodiments, the guides comprise a drive means; preferably an electrical
or hydraulic drive.
[0019] In some preferred embodiments, the support elements have a length of at least 1.0
m to at most 3.0 m.
[0020] In some preferred embodiments, the support elements are supporting legs.
[0021] In some preferred embodiments, the system comprises a stabiliser.
[0022] In some preferred embodiments, the system comprises an atomising installation.
[0023] In some preferred embodiments, the system comprises a noise-reducing means.
[0024] In some preferred embodiments, the at least two guides are telescopic and/or foldable.
[0025] In a next aspect, the invention relates to a method for delimiting demolition work,
the method comprising the steps:
- (a) placing a mobile system as described herein, preferably near demolition work;
- (b) placing the telescopic support elements in a supporting position;
- (c) folding out a guide, preferably the two guides;
- (d) adjusting the height of an inflatable screen, preferably by means of a beam or
bar; and,
- (e) inflating the inflatable screen.
[0026] In some preferred embodiments, the height of the inflated screen is gradually reduced,
so that the demolition work on one side and the screen on the other side are at approximately
the same height.
[0027] In a next aspect, the invention relates to a method for taking down the mobile system
as described herein, the method comprising the steps:
- (a) deflating an inflatable screen;
- (b) rolling up or folding up the inflatable screen into the container;
- (c) taking down and storing the guides in the container;
- (d) placing the telescopic support elements in or against the container; and,
- (e) optionally, shutting off the container.
[0028] In some preferred embodiments, the mobile system is transported by means of transport.
[0029] In a next aspect, the invention relates to a use of a mobile system as described
herein for delimiting demolition work.
[0030] Such a mobile system partly solves the abovementioned problems of conventional scaffolds.
Such a mobile system also has the advantage that it can be moved, as a result of which
only relatively small surface areas are required. By systematically moving the mobile
system as the demolition work proceeds, its use results in a saving in material and
costs. Such a mobile system also has the advantage that it can readily be transported
and/or moved, requiring fewer vehicles.
[0031] In addition, such a mobile system is efficient: no roads have to be closed off and
no traffic has to be stopped. The mobile system results in less dust and fewer loose
pieces of debris. The mobile system omits the need for a hoisting crane. The mobile
system is more resistant to wind, for example to winds of forces up to 8 Beaufort.
DESCRIPTION OF THE FIGURES
[0032] In order to show the characteristic features of the invention in a more satisfactory
manner, some preferred embodiments of the present invention are described in the attached
figures, without any limiting nature. The reference numerals are discussed in greater
detail in the examples. Throughout the figures, claims and examples, the following
numbering is used: 100 - mobile system; 110 - container; 120 - support elements; 130
- inflatable screen; 140 - guides.
[0033] Fig. 1 shows a diagrammatic illustration of a part of a mobile system according to a preferred
embodiment
[0034] The inventors have discovered that the mobile system as described herein can offer
the following advantages:
- improved safety conditions, such as:
- no need for building and taking down scaffolds; and/or,
- no need for working with a jumping cushion;
- dust control; and/or,
- quicker dismantling options.
[0035] As a result of this container, it is possible to pull down walls which should in
fact be demolished manually by means of a machine, because the container provides
a closed safety screen, as a result of which falling debris cannot end up outside
the work zone. Furthermore, it is no longer necessary to construct a scaffold alongside
the wall to be pulled down and workers no longer have to get up onto the scaffold
in order to demolish the wall row by row.
[0036] As the demolition work continues, the inflated screen (which is divided into compartments
from which the air can be removed individually) may, in some embodiments, be gradually
rolled up so that the wall to be pulled down on one side and the buffer cushion on
the other side are always at the same height.
[0037] In addition, when placing a traditional scaffold, the scaffold still also has to
be anchored in the wall to be pulled down, which creates an addition risk. Due to
the age of the walls, it is possible that relatively large pieces suddenly become
dislodged, as a result of which the scaffold may collapse if this section of wall
comes down. Workers which are busy demolishing a wall on the scaffold thus run an
addition risk which can now be prevented by using the container. The reason for this
is that the container is not anchored in the wall and no one has to stand on top of
it in order to be able to carry out the demolition work.
[0038] A jumping cushion or jumping mat is no longer required either. The existing unstable
and cumbersome principle consists in creating a rubber jumping mat (± 120m
2 with a weight of 4 tons). When hauling up the jumping mat, which is only attached
at the top, it may catch a lot of wind and this may cause adverse situations. The
entire process therefore takes a lot of energy and effort to ensure everything run
smoothly. As the curtain "hangs" loosely, as it were, and does not adjoin the building
closely, there is a risk that large pieces of debris may push the jumping mat in the
wrong direction in an uncontrollable way. The container solves this problem by the
fact that, contrary to the jumping mat, it can be placed very close to the wall to
be pulled down. In fact, the cushion is inflated until it bears against the wall and
thus provides a slight counterpressure. Thus, the pieces of debris will always fall
towards the inside of the work zone and the problem of pieces of debris falling on,
for example, public roads is significantly reduced. An additional problem when using
a jumping mat is the fact that it has to be placed at height on a building site, as
a result of which a scaffold has to be used again when taking it down.
[0039] Since the environmental law also requires dust control measures to be taken during
demolition work, an atomizer is usually chosen to make the dust settle more quickly
and the ground is also made moist. Here, the container also offers a solution in the
sense that the inflatable cushion ensures that the area behind the wall to be pulled
down is completely closed. This thus provides the same effect as a scaffold from which
a screen has been hung. But with the container, the work of having to hang these screens
from the constructed scaffolds can also be omitted. By carrying out a demolition using
the container, workers are no longer exposed to dust either. After all, when performing
demolition work on a scaffold, workers are constantly exposed to dust, in particular
if the scaffold has also been closed off with sheeting to prevent the dust from spreading
outside the work zone.
[0040] Due to the fact that it is no longer necessary to construct a scaffold, fewer dust
control activities have to be carried out and fewer workers have to be provided, the
user may assume that a demolition can be carried out more quickly and less expensively
and that, in addition, significantly fewer logistic processes have to be organised.
In essence, the cushion container replaces the scaffold and screens and requires significantly
less preparation time before the actual demolition work can be started.
DETAILED DESCRIPTION
[0041] Before the present system and method according to the invention are described, it
should be understood that the present invention is not limited to specific described
systems and methods or combinations, since such systems and methods and combinations
may obviously vary. It should also be clear that the terminology used herein is not
intended to be limiting, since the scope of the present invention is only limited
by the attached claims.
[0042] All the documents cited in the present specification are incorporated herein in their
entirety by way of reference.
[0043] As used below in this text, the singular forms "a", "an", "the" include both the
singular and the plural, unless the context clearly indicates otherwise.
[0044] The terms "comprise", "comprises" as used below are synonymous with "including",
"include" or "contain", "contains" and are inclusive or open and do not exclude additional
unmentioned parts, elements or method steps. The terms "comprise", "comprises" are
inclusive of the term "contain".
[0045] The enumeration of numeric values by means of ranges of figures comprises all values
and fractions in these ranges, as well as the cited end points.
[0046] The term "approximately" as used when referring to a measurable value, such as a
parameter, an amount, a time period, and the like, is intended to include variations
of +/- 10% or less, preferably +/-5% or less, more preferably +/-1% or less, and still
more preferably +/-0.1% or less, of and from the specified value, in so far as the
variations are applicable to function in the invention disclosed herein. It should
be understood that the value to which the term "approximately" refers per se has also
been disclosed.
[0047] In the following passages, different aspects of the invention are defined in more
detail. Each aspect so defined may be combined with any other aspect or aspects unless
clearly indicated to the contrary. In particular, a feature indicated as being "preferred"
or "advantageous" may be combined with other features or properties indicated as being
"preferred" and/or "advantageous". Reference throughout this specification to "one
embodiment" or "an embodiment" means that a particular feature, structure or characteristic
described in connection with the embodiment is included in at least one embodiment
of the present invention. Appearances of the phrases "in one embodiment" or "an embodiment"
in various places throughout this specification do not necessarily refer to the same
embodiment, but may. Furthermore, the described features, structures or characteristics
may be combined in any suitable manner, as would be apparent to a person skilled in
the art on the basis of this description. The embodiments described and claimed in
the claims may be used in any combination. In the present description of the invention,
reference is made to the accompanying drawings that form a part thereof, and in which
specific embodiments of the invention are shown by way of illustration. Parenthesized
or emboldened reference numerals affixed to specific elements illustrate the respective
elements by way of example, without limiting said elements as a consequence. It is
to be understood that other embodiments may be utilised and structural or logical
changes may be made without departing from the scope of the present invention. The
following detailed description, therefore, is not to be taken in a limiting sense,
and the scope of the present invention is defined by the appended claims.
[0048] Unless otherwise defined, all terms used in disclosing the invention, including technical
and scientific terms, have the meaning as commonly understood by someone skilled in
the art. By means of further guidance, definitions are included to further explain
the terms which are used in the description of the invention.
[0049] As used herein, the term demolition work refers to a structure such as a movable
or immovable property which has to be demolished or pulled down. The mobile system
described herein is not limited to a certain demolition method or demolition tool.
However, it should be understood that the present demolition method is highly suitable
for demolition work by means of (heavy) vehicles, such as a demolition crane or wrecking
ball which create large amounts of falling debris and/or dust.
[0050] The demolition work will typically take place on a building site. As used herein,
the term building site refers to a plot where building construction is taking place
or which is suitable for building. A building site therefore also refers to a construction
site, construction lot or building location.
[0051] In a first aspect, the invention relates to a mobile system for demolition work,
the mobile system comprising:
- a container with telescopic support elements;
- an inflatable screen provided in the container; and,
- at least two guides for guiding the inflatable screen.
[0052] The mobile system has two forms. In a first transportable form, the screen, the support
elements and the at least two guides are provided in or against the container. As
a result thereof, the extent of the mobile system in the first form is limited to
the container which can easily be transported and moved by means of a means of transport
such as a lorry. The size of the container is that of a typical freight container;
for example a 20-foot container or a 40-foot container. A 20-foot container typically
has an internal length of 5.9 metres and a volume of 33.2 m
3. A 40-foot container typically has an interne length of 12.03 metres and a volume
of 67.7 m
3. Preferably, the container has an external length of at least 5 metres up to at most
25 metres, for example of at least 6 metres up to at most 15 metres. Preferably, the
container has an external height of at least 2 metres up to at most 25 metres, for
example of at least 2.5 metres up to at most 5 metres.
[0053] When the mobile system is placed near demolition work, such as on a building site,
it can be transformed to its second static form. Preferably, the telescopic support
elements are taken out of the container first. These support elements ensure that
the system remains stable and cannot move. These support elements also ensure that
the container can be placed level, for example on uneven terrain. Then, the height
of the guides may optionally be set to the desired height; the desired height will
typically correspond to the height of the demolition work, such as a wall to be pulled
down. In this case, the screen will (partly) be at the same height as the guides.
The screen may be pulled up together with the guides or may be pulled up after the
guides have been set. The guides are preferably telescopic and/or foldable, more preferably
foldable. Lastly, the screen may be inflated in order to form a safety screen suitable
for catching falling rubble, such as a part of a building, falling debris and/or fine
dust. Preferably the guides are unfolded first, after which the screen is pulled up
and then inflated.
[0054] As the demolition progresses, the height of the inflated screen can gradually be
reduced, so that the structure to be pulled down on one side and the screen on the
other side are always at the same height. The support elements are preferably hydraulically
actuated. In some embodiments, the cushion has adjustable pressure levels, for example
2 or 3 adjustable pressure levels. This makes it possible for the cushion to sink,
for example over a distance of 1 metre. Thereafter, the pressure may be increased
again. The screen preferably comprises valves and/or pressure relief valves in order
to control the height of the unit and/or to roll up the unit. In some embodiments,
the screen has various sections. By allowing air to escape from one or more sections,
the screen can be lowered. In the second form, the mobile system essentially forms
a closed space, as a result of which falling debris and/or dust cannot end up outside
the demolition zone. This makes it possible to pull down walls which should in fact
be pulled down manually by means of a machine. As a result thereof, it is no longer
necessary to construct a scaffold alongside the structures to be pulled down. Neither
is there therefore any need for workers to get up onto the scaffold in order to demolish
the structure manually (row by row). In addition, it is not necessary to anchor the
mobile system to the structure, as a result of which there is no risk of collapsing
walls or scaffolds.
[0055] The entire mounted structure may occupy a surface area of at least 10 m
2 and at most 675 m
2, preferably at least 15 m
2 and at most 500 m
2, for example at least 20 m
2 and at most 200 m
2, for example at least 30 m
2 and at most 100 m
2, for example at least 40 m
2 and at most 60 m
2.
[0056] The container as such is already easy to maintain. Preferably, the mechanical parts
of the container are accessible, for example in order to be able to remove dust and
bricks. In some embodiments, the container comprises one or more doors, for example
on the sides of the container.
[0057] Preferably, the mobile system comprises 4 support elements, preferably on each corner
of the container. Preferably, the support elements result in a wider surface area,
resulting in a stable container.
[0058] The support elements serve to support the mobile system on the ground. The support
elements may optionally be anchored. Anchoring will typically be effected using anchoring
elements (e.g. screws, anchor points and the like). The support elements may be pulled
out and attached manually or may be pulled out by machine, for example by means of
an electrical or hydraulic system. The support elements are preferably supporting
legs. The support elements are preferably made of a metal such as steel.
[0059] The support elements have a height of preferably at least 0.2 m to at most 2.0 m,
for example of 0.4 m to 1.6 m, for example of 0.8 m to 1.2 m. The support elements
preferably have a width which is smaller than or equal to the width of the container.
In some embodiments, the support elements are slanted which ensures that they can
be retracted in a compact manner.
[0060] In some embodiments, a support element has a length of at least 1.0 m to at most
3.0 m. The length of the support element is defined as the distance of one end of
the support element to the second end of the support element. The length of a support
element may optionally be adjustable; in which case the maximum length is defined
when the support element has been completely pulled out.
[0061] The guide guides the inflatable screen to the desired height and subsequently serves
as a support for the screen on the container. The guide is preferably anchored or
attached to the container. The guide comprises a body which preferably consists of
a single coherent whole. Alternatively, the guide may be of modular construction,
comprising a series of bodies which are connected to each other. The guide is preferably
made of a metal; such as steel. In some embodiments, the at least two guides are telescopic
and/or foldable, more preferably foldable.
[0062] In some embodiments, the guide may be adjusted in height manually, for example by
means of a telescopic system. Preferably, the height of the guide is adjusted by machine,
for example by means of an electrical or hydraulic system. Preferably, the mobile
system comprises at least two height-adjustable guides for guiding the inflatable
screen. The use of two guides makes it possible to reinforce the edges of the screen
in a more secure way. The more guides are provided, the stronger the reinforcement
of the screen becomes, but also the more expensive the system becomes. The use of
two guides is an optimum balance between strength and cost price.
[0063] In some embodiments, the guide has a maximum adjustable height of at least 1.0 m
to at most 50.0 m. The maximum height of the guide is defined as the distance from
one end of the guide to the second end of the guide when the guide has been completely
pulled out or unfolded, preferably unfolded. In some embodiments, the system also
comprises cables and/or bars which provide additional strength. This provides good
tension between the two foldable guides.
[0064] The deflated screen fits into the container. The screen will preferably be folded
in or rolled up. This makes it possible to move the system to another building site
quickly and easily. The screen is preferably wear-resistant, tear-resistant and/or
replaceable. In some embodiments, the system comprises a beam or bar which is configured
to pull the top side of the screen up. This beam or bar can also be raised via the
guides, for example by means of wheels in a profiled section.
[0065] The inflated screen preferably forms a safety screen or safety cushion for catching
debris and/or dust. It should be understood that the screen is then thus suitable
for catching debris without causing (significant) damage; it is preferably made of
a material which does not break or tear upon contact with falling debris. The screen
is preferably made of a polymer, preferably PVC, preferably UV-resistant PVC. The
thickness of the inflated screen is preferably at least 40 cm and at most 120 cm,
preferably at least 60 cm and at most 100 cm, for example approximately 80 cm. These
materials are suitable for preventing tears when catching debris comprising bricks
or metal. The screen may be provided with a friction-reducing and/or tear-reducing
coating. The screen may comprise an inflatable cushion. By providing a separate inflation
space within the screen, the risk of tears is further reduced.
[0066] The inflatable screen preferably comprises an inflatable cushion, preferably a cushion
which can be inflated and rolled up, along one side of which (preferably the outer
side) sheeting is attached. This sheeting is preferably tear-resistant and/or replaceable.
This sheeting may, for example, be attached to the cushion by means of a hook and
loop fastener (Velcro).
[0067] The system is preferably provided with a means for inflating the screen; a screen-inflating
means. This may be, for example, an air pump or compressor. The pump preferably has
a low (preferably adjustable) pressure and a high flow rate, such as the pump for
a bouncy castle. Once inflated, the screen is preferably kept at a constant air pressure.
This is possible by providing it with a continuous supply of air; for example by means
of ventilating fans. Alternatively, this may be possible by completely sealing the
screen in an airtight manner, so that no air can escape; for example by means of valves.
The screen is preferably provided with a pressure-relief feature; preferably a bending
system. If the screen were to hit something, such as the demolition crane, this could
snap.
[0068] The screen is attached to the guide. Preferably, the screen is connected to the guide
by means of a guiding system. In some embodiments, the guiding system comprises wheels
in a profiled section. The screen may be connected to the wheels, preferably in a
removable manner. This ensures that the screen can easily be replaced. The attachment
may be temporary or permanent. The advantage of a permanent attachment is that the
screen can immediately be taken to the desired height. The advantage of a temporary
connection is that the screen can be uncoupled, so that the guide can be adjusted
first before the screen is then pulled up. A temporary connection also makes it possible
to house the guide and the screen in the container in a more compact way.
[0069] In the present description, the inflated screen is sometimes also referred to as
"safety cushion" or "buffer cushion". In some embodiments, the safety cushion is divided
into compartments which can be deflated separately. As a result, it can be rolled
up gradually, so that the wall to be pulled down on one side and the safety cushion
on the other side are always at the same height. In some embodiments, the screen is
provided with a multi-channel system which leads directly to the various compartments.
These channels may be incorporated structurally on the inner side of the safety cushion
and be made from the same material. Each compartment can then be deflated individually
by means of an air valve. In some embodiments, the screen automatically slides along
downwards during the demolition. In some embodiments, the cushion is provided with
a multi-channel system which leads directly to the various compartments. These channels
may be incorporated structurally on the inner side of the buffer cushion and be made
from the same material. Each compartment can then be deflated individually, for example,
by means of an air valve.
[0070] In some embodiments, the inflated screen is convex. This ensures that there is no
gap when two containers are side by side.
[0071] The system may be provided with a means for noise reduction, for example sheeting.
This makes the system highly suitable for demolition in urban environments with stringent
noise regulations.
[0072] The system may be provided with a stabiliser. This would make it possible to stabilize
the screen in case of strong wind and/or heavy rain.
[0073] The system may be provided with an atomizing system. By spraying atomized water (mist),
the amount of fine dust in the air can be limited or even prevented. Preferably, this
atomizing system is installed in a top beam or bar which pulls the screen along. In
or on this beam or bar, spray heads may be installed. Optionally, an atomizing system
may also be provided on the sides. This may be installed on the guides. Preferably,
the connection for the water is provided at the bottom, for example in or on the container.
Optionally, the container comprises a water tank.
[0074] In a further aspect, the invention relates to a method for delimiting demolition
work. To this end, the mobile container as described above comprises a mechanism which
makes it possible to unroll a safety cushion against a wall to be pulled down. The
container is preferably placed alongside the wall to be pulled down, following which
the as yet uninflated safety cushion can be unrolled upwards by means of a simple
control system. This operation can be performed with great accuracy, so that the system
can be used in an optimum manner. Once the safety cushion has been unrolled, it can
be inflated against the wall in order to provide a certain degree of counterpressure.
[0075] Preferably, the container is placed on site by means of a lorry, for example at approximately
80 cm from the wall to be pulled down. The support elements, preferably extendable
legs, are brought into position; once the container has been placed, it can still
be moved in the direction of the wall to be pulled down (for example up to at most
1 metre).
[0076] Then, preferably two guides slide out of the container via a hydraulic system. The
screen which can be rolled up is pulled upwards via these two guides until it reaches
the required height (for example the height of the wall to be pulled down). Finally,
the cushion which is attached to the screen is inflated (for example in several compartments)
until it makes contact with the wall and thus exerts a slight counterpressure. During
demolition, the screen gradually moves back down.
[0077] In some embodiments, the method comprises the steps:
- (a) placing a mobile system according to one or more embodiments as described herein,
preferably near demolition work;
- (b) placing the telescopic support elements in a supporting position;
- (c) folding out a guide, preferably the two guides;
- (d) adjusting the height of an inflatable screen, preferably by means of a beam or
bar; and,
- (e) inflating the inflatable screen.
[0078] Preferably, the inflatable screen is unrolled against a wall to be pulled down. The
container is placed alongside the wall to be pulled down, following which the as yet
uninflated inflatable screen can be unrolled upwards by means of a simple control
system. This operation can be performed with great accuracy, so that the system can
be used in an optimum manner. Once the inflatable screen has been unrolled, it can
be inflated against the wall in order to provide a certain degree of counterpressure.
[0079] Preferably, the container is placed on site at a distance from the wall to be pulled
down. This distance is preferably at least 10 cm and at most 150 cm, for example at
least 20 cm and at most 140 cm, for example at least 40 cm and at most 120 cm, for
example at least 60 cm and at most 100 cm, for example approximately 80 cm The extendable
legs are brought into position as support elements. Subsequently, preferably two guides
slide out of the container via a hydraulic system. The screen which can be rolled
up is pulled upwards via these two guides until it has reached the required height
(= height of the wall to be pulled down). Finally, the cushion which is attached to
the screen is preferably inflated until it makes contact with the wall and thus provides
a slight counterpressure. Thus, the pieces of debris will always fall towards the
inside of the work zone and the problem of pieces of debris falling onto, for example,
public roads is significantly reduced.
[0080] The maximum time period required for installation is preferably 1 hour, for example
45 min, for example 30 min, for example 15 min. This is significantly quicker than
the construction of conventional scaffolds.
[0081] In some embodiments, the screen automatically moves along downwards during demolition.
As the demolition progresses, the safety cushion may gradually be rolled up (for example
divided into compartments which can be deflated individually), so that the wall to
be pulled down on one side and the safety cushion on the other side are always at
the same height.
[0082] In a further aspect, the invention relates to a method for taking down the mobile
system, the method comprising the steps:
- (a) deflating an inflatable screen;
- (b) rolling up or folding up the inflatable screen into the container;
- (c) taking down and storing the guides in the container;
- (d) placing the telescopic support elements in or against the container; and,
- (e) optionally, shutting off the container.
[0083] Once taken down, the mobile system can be transported or moved by a means of transport,
such as a lorry, by means of a crane.
[0084] In a further aspect, the invention relates to a use of a mobile system according
to one or more embodiments as described herein for delimiting demolition work.
[0085] In addition to its use for specific situations in the demolition work, the mobile
system may be useful when, for example, unloading vessels in which case large amounts
of dust are released (unloading soil or wood) and/or delimiting events causing noise
pollution. The mobile system can thus also be used during loading and/or unloading
vessels. Alternatively, the mobile system may be used to prevent noise pollution,
for example during events. Preferably, the mobile system is used to prevent nuisance
from dust.
[0086] Preferably, the maximum time period for installation and positioning of the container
is a period of 30 minutes. With conventional scaffolds, a surface area of 140 m
2 takes approximately eight hours. Preferably, the maximum time period for pulling
in the cushion is a period of 15 minutes compared to 4 hours for a traditional scaffold.
[0087] Preferably, the container is able to resist gusts of wind up to 8 Beaufort (wind
load is measured on the top side of the container by means of an anemometer and/or
electronic sensors). When the limit is exceeded, the buffer cushion may be lowered
to an acceptable level.
[0088] Preferably, the container is stable on an unmetalled and/or sloping (for example
with a slope angle of 5 degrees) surface, in which case the container is fully operational.
The support elements compensate for variations and inclines in the surface.
[0089] Preferably, the container is able to autonomously perform a lateral displacement,
for example over a maximum distance of 1 metre. The support elements make such a lateral
displacement possible.
[0090] Preferably, the container is able to reduce the dust generation inside the zone of
the container. This may be effected by means of an atomizing installation.
[0091] Preferably, the buffer cushion is completely protected against falling objects from
the building to be demolished (pieces of debris, glass, steel,...). This may be achieved
by using replaceable protective sheeting.
[0092] Preferably, the container creates a physically delimited zone between the public
space and the work zone, in contrast with the use of traditional scaffolds with sheeting.
[0093] Preferably, the construction and operation of the container is carried out by only
a limited number of people, for example by 1 person who has been specifically trained
for this purpose, and preferably from ground level.
EXAMPLES
[0094] Reference is made to the figures by way of example. The embodiments illustrated in
the figures are preferred embodiments of the present invention and should by no means
be interpreted as a limitation.
Example 1
[0095] Fig. 1 shows a diagrammatic illustration of a system according to an embodiment of the invention.
1. Mobile system (100) suitable for demolition work, the mobile system (100) comprising
the following:
- a container (110) with telescopic support elements (120);
- an inflatable screen (130) provided in the container (110); and,
- at least two guides (140) for guiding the inflatable screen (130).
2. Mobile system (100) according to Claim 1, wherein the inflatable screen (130) comprises
an inflatable cushion.
3. Mobile system (100) according to one of Claims 1 or 2, wherein the screen (130) is
made of PVC.
4. Mobile system (100) according to one of Claims 1 to 3, wherein the inflatable screen
(130) is provided with a friction-reducing and/or crack-reducing coating.
5. Mobile system (100) according to one of Claims 1 to 4, wherein the system (100) comprises
a screen-inflating means; preferably an air pump.
6. Mobile system (100) according to one of Claims 1 to 5, wherein the screen (130) comprises
a pressure-relief feature.
7. Mobile system (100) according to one of Claims 1 to 6, wherein the screen (130) is
attached to the guides (140), and/or wherein the guides (140) have a maximum adjustable
height of at least 1.0 m to at most 50.0 m.
8. Mobile system (100) according to one of Claims 1 to 7, wherein the guides (140) comprise
a drive means; preferably an electrical or hydraulic drive.
9. Mobile system (100) according to one of Claims 1 to 8, wherein the support elements
(120) have a length of at least 1.0 m to at most 3.0 m, and/or wherein the support
elements (120) are supporting legs.
10. Mobile system (100) according to one of Claims 1 to 9, wherein the system (100) comprises
a stabiliser, and/or wherein the system (100) comprises an atomising installation,
and/or wherein the system (100) comprises a noise-reducing means.
11. Mobile system (100) according to one of Claims 1 to 10, wherein the at least two guides
(140) are telescopic and/or foldable.
12. Method for delimiting demolition work, the method comprising the steps:
(a) placing a mobile system (100) according to one of Claims 1 to 11, preferably near
demolition work;
(b) placing the telescopic support elements (120) in a supporting position;
(c) folding out a guide, preferably the two guides (140);
(d) adjusting the height of an inflatable screen (130), preferably by means of a beam
or bar; and,
(e) inflating the inflatable screen (130).
13. Method according to Claim 12, wherein the height of the inflated screen (130) is gradually
reduced, so that the demolition work on one side and the screen (130) on the other
side are at approximately the same height.
14. Method for taking down the mobile system (100) according to one of Claims 1 to 11,
the method comprising the steps:
(a) deflating an inflatable screen (130);
(b) rolling up or folding up the inflatable screen (130) into the container (110);
(c) taking down and storing the guides (140) in the container (110);
(d) placing the telescopic support elements (120) in or against the container (110);
and,
(e) optionally, shutting off the container (110);
preferably wherein the mobile system (100) is transported by a means of transport.
15. Use of a mobile system (100) according to one of Claims 1 to 11 for delimiting demolition