[0001] The present invention relates to a vessel for performing subsea wellbore related
activities, e.g. workover activities, well maintenance, installing an object on a
subsea well bore, while the floating vessel is subjected to heave motion due to waves.
[0002] There are also methods that are performed using the vessel according to the claimed
invention.
[0003] In the art, e.g. as marketed by the present applicant, offshore drilling vessels
are known that comprise:
- a floating hull having a deck surface and a moonpool with a firing line extending
there through;
- a hoisting device, e.g. a crane or multipurpose tower, which hoisting device is mounted
on the floating hull and is configured for lowering and lifting an object along the
firing line, said hoisting device comprising:
∘ a hoisting winch and hoist cable connected to said winch, wherein the hoisting device
is configured to support the hoist cable along the firing line;
∘ a travelling block supported by the hoist cable for connecting with the object;
and
∘ a heave compensation system adapted to provide heave compensation for the hoist
cable to provide a heave compensated motion of the travelling block;
- a mobile working deck, the mobile working deck having a working deck surface, which
working deck in a lowered position preferably covers the moonpool, and which working
deck surface in the lowered position of the mobile working deck is level, preferably
flush, with the deck surface.
[0004] Embodiments are known wherein the travelling block is configured to be connected
with the mobile working deck to enable the hoisting device to lift the mobile working
deck out of the lowered position, to move the mobile working deck between the lowered
position and an elevated position, and to provide a heave compensated motion of the
mobile working deck when lifted in the elevated position. Such a vessel is for example
disclosed in
WO 2013/169099.
[0005] It is also known for the mobile deck to be supported by hydraulic cylinders for providing
the mobile working deck with heave compensation. Such a vessel is for example disclosed
in
WO 2016/062812 and in
WO 2011/008835 A2, which discloses the preamble of claim 1.
[0006] It is submitted that these prior art vessels are directed for performing drilling
activities. The heave compensated deck is provided to provide a stationary working
deck on top of a riser extending between the surface and a subsea well. The vessel
is designed to build and remove these risers on top of a subsea well bore.
[0007] Typically, the working deck of such vessels is provided with a riser string suspension
device that allows to suspend a top end of a string of riser sections from the working
deck in the firing line. The hoisting device is configured to be coupled with the
top end of the riser string, and to lift and lower the top end of the riser into and
out of the riser string suspension device.
[0008] Once the riser string is completed, due to the heave compensation capability, the
mobile working deck can be landed on top of the riser string, to provide workers access
to the riser, for well bore related activities, e.g. well completion and well maintenance.
[0009] The riser string is used to lower and land an object, typically a subsea blow out
preventer also referred to as BOP, towards an onto a well bore. Also, any tools for
performing subsea wellbore related activities are subsequently lowered through the
riser.
[0010] However, with well maintenance a riser is not always required. Building and removing
a riser is time consuming. Furthermore, supporting a riser requires a large vessel.
As an alternative, it is known to use a flexible riser, or not use a riser at all.
[0011] The aim of the invention is to provide a vessel that is able to provide a wide range
of wellbore related activities, in particular to provide a vessel that is configured
for installing an object on a subsea well bore without using a riser.
[0012] The invention therefore provides a vessel according to claim 1, which is configured
for performing subsea wellbore related activities, e.g. workover activities, well
maintenance, installing an object on a subsea well bore.
[0013] According to the claimed invention, the vessel comprises all the features of claim
1.
[0014] The hoisting device can be used for lifting and lowering objects along the firing
line below the mobile working deck, and therefore for lowering and lifting an object
via the moonpool towards and from a sea floor respectively. Possibly, the hoisting
device can also be used for lifting and lowering objects in firing line above the
mobile working deck.
[0015] The hoisting device comprises a heave compensation system. It is submitted that heave
compensation systems for hoisting devices are generally known in the prior art and
typically comprise active and passive heave compensation provided by hydraulic cylinders
supporting sheaves guiding the hoist cable. Because these type of heave compensation
systems for hoisting devices are generally known, they will not be discussed in detail
herein.
[0016] The mobile deck compensator is configured to lift the mobile working deck out of
the lowered position, and to move the mobile working deck between the lowered position
and an elevated position. Furthermore, the mobile deck compensator is configured to
provide a heave compensated motion of the mobile working deck when the mobile working
deck is in the elevated position. When providing heave compensation, the mobile working
deck is lowered and raised relative to the elevated position to compensate for vessel
motions due to the heave of the waves. The mobile deck compensator can lift the mobile
working deck relative to the elevated position into a heave compensation maximum height
position, and lower the mobile working deck relative to the elevated position into
a heave compensation minimum height position.
[0017] For example, in an embodiment, in the elevated positon of the mobile working deck,
the distance between the mobile working deck surface of the mobile working deck and
the deck surface of the deck is 5 meters, in the heave compensation maximum height
positon of the mobile working deck, the distance between the mobile working deck surface
of the mobile working deck and the deck surface of the deck is 7,5 meters, and in
the heave compensation minimum height positon of the mobile working deck, the distance
between the mobile working deck surface of the mobile working deck and the deck surface
of the deck is 2,5 meters.
[0018] In an embodiment, the distance between a bottom side of the mobile working deck,
when supported in an elevated position, preferably the heave compensation maximum
height position, and the deck surface of the vessel is at least 3 meter, preferably
at least 4 meter, to enable large, i.e. having a height of more than 2 m, objects
to be moved into the firing line and below the mobile working deck.
[0019] In an embodiment, the mobile deck compensator comprises two or more, preferably four,
hydraulic mobile deck compensator cylinders. Preferably, the cylinders have a work
line parallel to the firing line.
[0020] In an embodiment of a vessel according to the invention, the mobile deck compensator
comprises a crane or multi-purpose tower comprising a heave compensated hoisting device
adapted for supporting the mobile working deck. In such an embodiment, a second hoisting
device has to be provided for lowering and lifting the objects.
[0021] In an embodiment, the mobile deck compensator, more in particular the two or more
hydraulic mobile deck compensator cylinders of the mobile deck compensator, is hydraulically
connected via a hydraulic conduit to the heave compensation system of the hoisting
device, such that the mobile working deck and the travelling block move synchronously
when heave compensated.
[0022] In the invention, the mobile deck compensator comprises in series:
- a lift cylinder, configured to lift the mobile working deck out of the lowered position
and to move the mobile working deck between the lowered position and an elevated position,
and
- a heave compensation cylinder, configured to provide a heave compensated motion of
the mobile working deck when lifted in the elevated position, moving the mobile deck
between a heave compensation maximum height position and a heave compensation minimum
height position.
[0023] In embodiments, the lift cylinder is connected to the floating hull and to the heave
compensation cylinder, and the heave compensation cylinder is connected to the lift
cylinder and to the mobile working deck. It is also conceivable that the lift cylinder
is connected to the mobile working deck and to the heave compensation cylinder, and
the heave compensation cylinder is connected to the lift cylinder and to the floating
hull.
[0024] The connected lift cylinder and heave compensation cylinder allow a large operational
range of the mobile deck compensator, combined with a compact design that can be stored
in the floating hull, in particular in a deck box of a semisubmersible. This arrangement
allows for a relatively reduced length of the heave compensation cylinder, or cylinders,
as this cylinder(s) only has to have a stroke length attuned to the expected heave
motion compensation. The lifting of the mobile working deck to the elevated position
for example avoids any risk of the working deck reaching its stationary resting position
during heave motion operation, and for example allows for passing of lines, pipes,
etc. from underneath the working deck, e.g. from the diverter and/or a rotary control
device (RCD) to locations outside of the moonpool, e.g. onto the upper deck.
[0025] For example a single lift cylinder supports two heave compensation cylinders, e.g.
the single lift cylinder in between the two heave compensation cylinders.
[0026] For example a working lift cylinder is secured with a rod directed downwards, and
each heave compensation cylinder is secured with its cylinder body to the cylinder
body of the lift cylinder, e.g. via a frame, and has its rod directed upward to the
working deck.
[0027] In an embodiment, the mobile deck compensator is configured to support the mobile
working deck in the elevated position, preferably in the heave compensation maximum
height position, while an object is allowed to move into the firing line below mobile
working deck. Preferably, the mobile deck compensator is configured to provide sufficient
clearance between the deck and the bottom side of the mobile working deck for introducing
an object from the deck into the firing line and below the mobile working deck, when
the latter is in the elevated position. Preferably, the mobile working deck is configured
to support the mobile working deck in the maximum heave compensation height position
to provide additional clearance, and allow for introducing an object into the firing
line and below the mobile working deck. Once in this position, the object can be coupled
with the travelling block of the hoisting device and/or the mobile working deck and/or
a coupling device, e.g. a tubular, supported by the mobile deck, and/or guide wires,
to enable the object to move along the firing line below the mobile working deck.
[0028] In embodiments, the object is moved from the deck surface of the vessel in a substantially
horizontal direction into the firing line. It is also conceivable that the object
is stored above or below the deck surface, and that the object is moved in a non-horizontal
movement path.
[0029] Preferably, the vessel is provided with an object loading device for introducing
an object below the mobile working deck and supporting the object above the moonpool
and in the firing line, such that the object can be coupled with the travelling block
of the hoisting device and/or the mobile working deck and/or a coupling device, e.g.
a tubular, supported by the mobile deck, and/or guide wires, to enable the object
to move along the firing line below the mobile working deck.
[0030] In an embodiment, the object loading device is a dedicated crane or vehicle, configured
to pick up and lift an object located on the deck, move the object towards the moonpool,
and support the object above the moonpool in the firing line. In an embodiment, the
object loading device is a heavy duty robot arm, configured to pick up an object located
on the deck and to, in an extended configuration, support the object above the moonpool
in the firing line.
[0031] The object loading device e.g. comprises a cart track comprising tracks for moving
a cart and/or the object, while suspended from or supported by the cart track, into
the firing line and below the mobile working deck, wherein preferably the cart track
is located on the deck surface, or below the deck surface on a moonpool deck. Preferably
the cart and/ or object is skid or slid in a substantially horizontal direction into
the firing line. Preferably, the cart track comprises tracks on opposite sides of
the firing line, for moving a cart and/or the object, while suspended from or supported
by the cart track into the firing line and below the mobile working deck.
[0032] Possibly, the object are supported on a cart, or are supported directly on the tracks,
i.e. an object with an integrated cart. In a further embodiment, the mobile working
deck is provided with a cart track as well, the tracks of which align with tracks
of the cart track on the deck surface of the vessel when the mobile working deck is
in the lowered position, to enable a cart or object to be moved along said tracks
from the deck surface of the vessel directly onto the mobile working deck, and vice
versa, in a substantially horizontal direction.
[0033] In an embodiment, the object loading device comprises a sliding deck section, preferably
supported on a track comprising tracks on opposite sides of the firing line, wherein
the sliding deck section is located adjacent a moonpool opening in the deck surface,
and which sliding deck section can be slid over the moonpool opening in the deck surface
for moving the object, while supported by the sliding deck section, into the firing
line and below the mobile working deck, preferably when the mobile working deck is
in the elevated position, preferably the heave compensation maximum height position,
to allow for the object to be coupled with the travelling block and/or the mobile
deck and/or a coupling device, e.g. a tubular, supported by the mobile deck and/or
guide wires.
[0034] In an embodiment wherein the mobile deck compensator comprises two or more hydraulic
mobile deck compensator cylinders, located on opposite sides of the moonpool, the
sliding deck section is configured to be positioned above the moonpool between the
hydraulic mobile deck compensation cylinders.
[0035] In embodiments, the cart track is located on the deck surface of the vessel, or alternatively
the cart track is located below the deck surface of the vessel on a lower deck level,
e.g. a so-called moonpool deck.
[0036] The tracks of the cart track, e.g. rails or skid rails, preferably extend on opposite
sides of the firing line, preferably along opposite sides of the moonpool. In an embodiment,
the object loading device comprises a removable track or sliding deck section that
can be placed over the moonpool to support an object in the firing line above the
moonpool and below the mobile working deck. Thus, the firing line passes between the
track. A cart supporting an object, or an object supported directly on the tracks,
is with one end supported on one of the tracks, e.g. on one of the rails, and with
another end on the opposite track, e.g. the other rail. The track can thus support
an object in the firing line.
[0037] In an embodiment, a second floor is provided below the mobile working deck, to support
an object above the moonpool in the firing line. In such an embodiment for example
a skid track, comprising tracks on the deck of the vessel and tracks on the second
floor, which tracks are aligned when the mobile working deck is supported in the elevated
position, preferably is supported in the maximum heave compensation height position,
to enable an object to be skidded from the deck onto the second floor.
[0038] Preferably, the mobile working deck is configured to support a tubular clamping device
in the firing line, to thus enable the mobile working deck to support a tubular, or
a string of tubulars, in the firing line. Furthermore, in such an embodiment, the
mobile deck compensator can be used to lower and lift the supported tubular, and objects
connected thereto, for example other tubulars or a BOP, along the firing line.
[0039] The mobile working deck is preferably configured to removable support a tubular clamping
device, such that it can be moved away from the firing line to enable the travelling
block and hoist cable to pass through the mobile working deck and lift and lower objects
through the working deck and/or below the working deck. In an embodiment, the tubular
clamping device can be lifted into and out of a working position in the mobile working
deck, and can be removed from the mobile working deck when not in use. In another
embodiment, the tubular clamping device can be slid between an active position in
which it is aligned with the firing line and a parking position in which it is out
of line with the firing line. In such an embodiment the tubular support clamp may
for example be supported in a sliding deck section, and by sliding the deck section
the tubular support clamp can be moved into and out of the firing line.
[0040] In an embodiment, the mobile working deck is configured to support tools, for example
a slip device or gimbal device, in the firing line in a similar way as set out above
in reference to the tubular clamping device.
[0041] In an embodiment of the claimed invention, the vessel furthermore comprises at least
one guide wire winch and a guide wire connected to said guide wire winch, which guide
wire is to be connected to the subsea well, e.g. to a subsea stack mounted on that
well or to a well template, such that it extends parallel to and spaced from the firing
line, and wherein the guide wire winch comprises a heave compensation system adapted
to keep the guide wire, when fixed to a subsea well, under substantially constant
tension for guiding an object being lowered towards, or lifted from, the sea floor
along the firing line.
[0042] In an embodiment of the claimed invention, the vessel comprises at least one guide
wire winch, mounted to the mobile working deck, and a guide wire connected to said
guide wire winch, which guide wire is to be connected to the subsea well, e.g. to
a subsea stack mounted on that well or to a well template, such that it extends parallel
to and spaced from the firing line, and wherein the guide wire winch comprises a heave
compensation system adapted to keep the guide wire, when fixed to a subsea well, under
substantially constant tension when the mobile working deck is held in a fixed position
relative to the vessel, to provide a guide, parallel to and offset from the firing
line, for guiding the object being lowered towards, or lifted from, the sea floor
along the firing line.
[0043] In such an embodiment, when the mobile deck compensator provides the mobile working
deck with heave compensation, this heave compensation also provides the guide wire
winch with heave compensation, and can thus be sued to keep the guide wire, when fixed
to a subsea well, under substantially constant tension. This is beneficial since it
is not required to continuously roll the guide wire on and of the guide wire winch,
or over a heave compensated sheave, to provide heave compensation, which will lengthen
the lifetime of the guide wire.
[0044] In embodiments wherein at least one guide wire winch is mounted to the mobile working
deck, it is conceivable that a guide wire winch is provided onto the working deck
surface. In preferred embodiments, the at least one guide wire winch is located below
the mobile working deck surface of the mobile working deck. The guide wire winch not
being mounted onto the deck surface of the mobile working deck enables to provide
the mobile working deck with a clean deck surface, which is in particular beneficial
when the mobile working deck is in the lowered position and the deck surface of the
mobile working deck is level with the deck surface of the deck of the vessel.
[0045] In an embodiment, the guide wire winch is moveably mounted, to enable the position
of the guide wire winch to be adapted relative to guide wire anchor points at the
well, such that the guide wire extends parallel to the firing line. In addition or
as an alternative, guide wire guides, for example moveable sheaves, can be provided
on the mobile working deck to allow for the trajectory of the guide wire to be adjusted,
in particular to make the guide wire extend parallel to the firing line.
[0046] The working deck surface of a vessel according to the invention preferably comprises
a hoist cable opening aligned with the firing line, for passing through hoist cable
of the hoisting device. In embodiments, the hoist cable opening of the mobile working
deck is large enough for passing through the travelling block.
[0047] In an alternative embodiment, the mobile working deck comprises a frame defining
a central passage for passing through the object supported by the hoisting device,
and one or more movable, e.g. pivotable or removable, deck segments.
[0048] In embodiments, the movable deck segments can be provided in a hoist position in
which a hoist cable opening is provided, large enough for passing through the hoist
cable, or hoist cables in case of a multi fall hoisting configuration. In a travelling
block position of the moveable deck segments, the movable deck segments have moved
to allow a travelling block to pass though the central opening in the mobile working
deck, which travelling block position of the movable deck segments creates an opening
which is large enough for passing through the travelling block.
[0049] In embodiments, the movable deck segments are moveable to a cover position in which
the movable deck segments cover said central passage to provide a deck surface over
that opening.
[0050] In embodiments, the movable deck segments are movable to an open position in which
said central opening is open. Preferably, said central opening is large enough to
pass through a large sized object to be lowered towards the sea floor. For example
in such an embodiment, part of a subsea stack to be installed on top of a well head
can be assembled in the firing line and on the mobile working deck, be lifted from
the mobile working deck using the hoisting device, after which the moveable deck segments
are moved to the open position and the object can be lowered through the mobile working
deck and through the moonpool towards the sea floor. Preferably, the open position
of the movable deck segments allows for passing through objects having a foot print
of four by four meters. It is submitted that the size of such an object pass through
opening is significantly larger than the size of a travelling block pass through opening.
The moveable deck segments can be temporarily removed, or can for example be pivoted
or slid out of the way.
[0051] Thus, the mobile working deck can be utilised prior to the object being lowered,
i.e. to assemble the subsea stack, and while and after the object is being lowered.
Thus, an highly efficient use of deck space is possible.
[0052] In an embodiment of a vessel according to the invention, a second floor is suspended
below the mobile deck. The second floor allows for objects to be supported below the
mobile working deck, and to provide access to the space below the mobile working deck.
[0053] Preferably, the second floor is level with the deck surface of the vessel when the
mobile deck is in an elevated position, preferably the heave compensation maximum
height position. Thus, an object can be moved from the deck surface of the vessel,
onto the second floor in a substantially horizontal direction, when the mobile working
deck is in an elevated position, preferably the heave compensation maximum height
position. Once the object is located on the second floor, it can be coupled with the
hoisting device, i.e. the travelling block, or with an object supported by the hoisting
device or the mobile working deck, for example a tubular, and/or with guide wires
extending between the vessel, preferably between the mobile working deck of the vessel,
and the subsea well bore.
[0054] In an embodiment of the vessel according to the invention, the second floor comprises
a floor frame defining a central passage, and one or more movable floor segments,
which are movable , e.g. pivotable or removable, between a cover position wherein
the floor segments cover said central passage to provide a deck surface over that
passage, and an open position in which said central opening is open, e.g. for passing
through the object supported by the hoisting device.
[0055] In addition or as an alternative, the second floor can be disconnected and removed
in its entirety, once the object is supported by the hoisting device and is ready
to be lowered towards the subsea well bore.
[0056] In an embodiment of a vessel according to the claimed invention, the vessel comprises
a heave compensation control system, which heave compensation control system controls
the heave compensation system of the hoisting device, the mobile deck compensator
and if present, a heave compensation system of a guide wire winch. Possibly, synchronous
heave compensation is provided. A heave compensation control system of the same applicant
has been described in
WO2016/062812.
[0057] Preferably, at least one of a drill string slip device, a riser spider device, and/or
a diverter is supported by the mobile working deck, wherein said drill string slip
device is configured to support a suspended drill string within a riser, wherein the
riser spider device is configured to support a suspended riser, e.g. during assembly
and disassembly of a riser, and wherein the diverter is configured to divert a hydrocarbon
and/or drilling mud stream from a subsea wellbore to the vessel.
[0058] In an embodiment of a vessel according to the claimed invention, a riser tensioning
system is provided for supporting a riser at an upper end thereof, located in the
moonpool; the riser extending along the firing line between the subsea wellbore and
the vessel. Possibly, riser tensioning cylinders are provided in the hull of the vessel,
in the deckbox structure of a semisubmersible, which are connected to a telescopic
joint which is provided at the upper end of the riser.
[0059] A riser tensioning system provides a near constant upward force on the riser independent
of the movement of the floating vessel. When the riser is connected to a wellhead
on the sea bed the riser tensioning system manages the differential movements between
the riser and the vessel. If there were no riser tensioning system and the vessel
moves downward because of heave, the riser would buckle; and if the vessel rises then
high forces would be transmitted to the riser and it would stretch and be damaged.
[0060] The weight of the riser is suspended form the riser tensioning system. Possibly,
the riser can be provided with buoyancy means, e.g. floating cans, to support at least
part of the weight of the riser.
[0061] In embodiments, a rotating control device and/ or a diverter is suspended from the
mobile working deck, to which a top end of the riser, in particular of the telescopic
joint is attached, preferably via a flex joint.
[0062] In embodiments wherein the position of the mobile working deck is fixed with respect
to the vessel, in particular in the lowered position thereof, the differential movements
between riser and vessel can be absorbed by the telescopic joint.
[0063] In embodiments wherein the mobile deck compensator provides a heave compensated motion
of the mobile working deck, and the telescopic joint is connected to the mobile working
deck, then generally there is no need for the telescopic joint to absorb differential
movements. In such an embodiment, the telescopic joint can be locked, fixing the position
of the mobile working deck relative to the riser, and the mobile deck compensator
is used to support the mobile working deck and optionally part of the weight of the
riser. Thus, the mobile deck compensator can be used to absorb the differential movements
between riser and vessel and thus act as a riser tensioning system.
[0064] It is also conceivable that the telescopic joint is not locked and that the telescopic
joint still absorbs some relative movements.
[0065] It is conceivable that during assembly, the mobile working deck can be used to support
the riser.
[0066] In an embodiment, the vessel is a semi-submersible drilling vessel and the floating
hull is embodied as a deckbox structure, the semi-submersible drilling vessel comprising
one or more pontoons, e.g. two parallel pontoons or a ring pontoon, and multiple support
columns extending upward from the one or more pontoons and supporting thereon the
deckbox structure. The deckbox structure is the construction supporting the deck surface
of the semisubmersible.
[0067] In embodiments, the semi-submersible vessel comprises a moonpool deck located below
the deck surface in the deck box structure. Advantageously, a cart track is located
below the deck surface of the vessel, preferably located on the moonpool deck, wherein
the cart track comprises tracks, e.g. rails or skid rails, for moving a cart and/or
the object, while suspended from or supported by the cart track into the firing line
and below the mobile working deck to allow for the object to be coupled with the travelling
block and/or the mobile deck and/or a coupling device, e.g. a tubular, supported by
the mobile deck and/or guide wires. Preferably, the tracks extend on opposite sides
of the firing line.
[0068] In such an embodiment, the moonpool deck and the cart track for moving an object
into the firing line are located below the deck surface, and thus below the mobile
working deck when in the lowered position. Possibly, the mobile working deck does
not need to be lifted to enable the object to be moved into or out of the firing line
below the mobile working deck.
[0069] In an embodiment, the vessel furthermore comprises a cart track provided on the deck
surface of the vessel, the cart track comprising tracks for moving a cart and/or the
object, while supported by the cart track, in a substantially horizontal direction
from the deck surface into the firing line and below the mobile working deck in the
elevated position, preferably the heave compensation maximum height position, to allow
for the object to be coupled with the travelling block and/or the mobile deck and/or
a coupling device, e.g. a tubular, supported by the mobile deck and/or guide wires.
[0070] In such an embodiment, the mobile deck compensator is configured to provide sufficient
clearance between the deck surface and the mobile working deck, more in particular
a bottom side, i.e. the side facing the sea, of the mobile working deck, for the object
to be moved into the firing line to pass under the mobile working deck.
[0071] There are methods that are performed using the vessel according to the claimed invention.
[0072] An exemplary method for installing an object on to the seafloor using a vessel according
to the invention comprises the steps:
- positioning an object in the below the mobile working deck and in the firing line;
- connecting the object to the travelling block of the hoisting device and/or the mobile
working deck and/or a coupling device, e.g. a tubular, supported by the mobile deck,
and/or guide wires; and
- lowering the object towards the seafloor using the hoisting device.
[0073] Possibly, the method further comprises the step of lifting the mobile working deck
out of the lowered position into the elevated position, preferably the heave compensation
maximum height position.
[0074] A further method comprises the steps:
- connecting at least one guide wire from a guide wire winch located on the mobile working
deck to a subsea well, e.g. a well template;
- using a heave compensation system of the guide wire winch to keep the guide wire under
a substantially constant tension, while the mobile deck is supported in an elevated
position, preferably the heave compensation maximum height position, and;
- slidably connecting the object with the at least one guide wire.
[0075] Preferably, the method further comprises the step of using the mobile deck compensator
to provide a heave compensated motion of the mobile working deck and, instead of the
heave compensation system of the guide wire winch, to keep the guide wire under a
substantially constant tension.
[0076] It is also possible to provide a method for installing an object on to the seafloor
using a vessel according to the claimed invention, the method comprises the steps:
- positioning an object in the firing line, preferably while the mobile working deck
is supported in an elevated position, preferably is while the mobile working deck
is supported in the heave compensation maximum height position;
- connecting the object to the travelling block of the hoisting device;
- use the mobile deck compensator to lift the mobile working deck into the elevated
position, and to provide heave compensated motion of the mobile working deck;
- using the heave compensation system of the hoisting device to provide a compensated
motion of the travelling block and therefore of the object supported by the travelling
block;
- preferably connecting the object with guide wires; and
- lowering the object towards the seafloor using the hoisting device.
[0077] It is also provided a method for using a wellbore-related activity tool, the wellbore-related
activity tool comprising a tool winch a tool wire and a tool, in a subsea well using
a vessel comprising at least one guide wire winch according to claim 6, the method
comprising the steps:
- connecting the at least one guide wire to the subsea well and use the heave compensation
system of the guide wire winch to keep the guide wire under a substantially constant
tension;
- positioning the wellbore-related activity tool on the deck surface of the mobile working
deck;
- positioning the tool below the mobile working deck, the tool wire passing through
an opening in the working deck;
- connecting the tool with the at least one guide wire;
- using the mobile deck compensator to lift the mobile working deck into the elevated
position and to provide the mobile working deck with heave compensated motion;
- using the mobile deck compensator, instead of the heave compensation system of the
guide wire winch, to keep the guide wire under a substantially constant tension; and
- use the tool winch to lower the tool towards the subsea well bore.
[0078] The invention is further elucidated in relation to the drawings, in which:
Fig. 1 shows a schematic side view in cross section of an exemplary embodiment of
a vessel according to the invention in a first working position;
Fig. 2 shows a schematic side view in cross section of an exemplary embodiment of
a vessel according to the invention in a second working position;
Fig. 3 shows a schematic side view in cross section of the vessel of Figure 1 in a
third working position;
Fig. 4 shows a schematic side view in cross section of the vessel of Figure 1 in a
fourth working position;
Fig. 5 shows a schematic side view in cross section of the vessel of Figure 1 in an
alternative working position;
Fig. 6 shows a further alternative configuration of the vessel according to the invention;
and
Fig. 7 shows a further alternative configuration of the vessel according to the invention;
Fig. 8 shows a further alternative configuration of the vessel according to the invention;
Fig. 9 shows a detail of the configuration of fig. 8,
Fig. 10 shows the vessel of fig. 8 in another configuration;
Fig. 11 shows the vessel of fig. 8 in another configuration;
Figs. 12a-12c show the vessel of fig. 10 in distinct positions.
[0079] First, the invention will be further elucidated on the basis of the exemplary embodiment
of an apparatus according to the invention as shown in Figs. 1-5. In the figures,
the same reference signs have been used for elements that correspond in the various
figures. The reference sign shave been linked to the various aspects in the list of
reference signs as well. Once such an element has been described with respect to one
figure, the description of that element is incorporated by reference into the descriptions
of corresponding elements of other figures unless the text or context indicates otherwise.
[0080] Fig. 1 shows a schematic side view in cross section of an exemplary embodiment of
a vessel 1 according to the invention in a first working position of lowering an object
towards the sea floor. Figures 2, 3 and 4 show the same vessel in a subsequent second
working position and third working position.
[0081] The vessel 1 according to claim 1 is configured for performing subsea wellbore related
activities, e.g. workover activities, well maintenance, installing an object 8 on
a subsea well bore 2. According to the claimed invention, the vessel 1 comprises a
floating hull 3, a hoisting device 7, a mobile working deck 15 and a mobile deck compensator
18.
[0082] The floating hull 3 has a deck surface 6, which is here the main deck. The floating
hull 3 furthermore has a moonpool 4, providing access to the sea for letting down
objects into the sea and lifting objects out of the sea. Above the moonpool, the deck
6 has a moonpool opening 27. A firing line 9 extends through the moonpool.
[0083] The vessel 1 furthermore comprises a mobile working deck 15. The mobile working deck
15 has a working deck surface 16. Figure 1 shows the mobile working deck in a lowered
position. In the shown lowered position, the mobile working deck 15 covers the moonpool
4. In the lowered positon, the mobile working deck surface 16 is level with the deck
surface 6 of the vessel 1, i.e. the mobile working deck surface 16 and the deck surface
6 form one large deck surface that can be integrally used. In the preferred embodiment
shown, the working deck surface 16 of the mobile working deck 15 is even flush with
the deck surface 6. Thus, a person or an object can pass from the deck onto the mobile
working deck in a horizontal direction. No step or lowering has to be negotiated.
[0084] A mobile deck compensator 18 is connected with the floating hull 3 of the vessel
1 and the mobile working deck 15.
[0085] In the exemplary embodiment shown, the mobile deck compensator 18 comprises four
hydraulic mobile deck compensator cylinders 31. These hydraulic mobile deck compensator
cylinders 31 are each located at a corner of the mobile working deck, and are with
one end connected with the floating hull 3 of the vessel 1 and with the other end
to the mobile working deck 15. One pair of hydraulic mobile working deck cylinders
31 is located on one side of the moonpool 4. These cylinders are visible in the figures.
One pair of hydraulic mobile working deck cylinders is located on an opposite side
of the moonpool 4. These cylinders are not visible in the figure because they are
located behind the two hydraulic mobile working deck cylinders 31 that are visible.
[0086] The mobile deck compensator 18 is configured to lift the mobile working deck 15 out
of the lowered position, shown in figure 1, and into an elevated positon, shown in
figures 2-4. Thus, the mobile deck compensator 18 according to the claimed invention
can move the mobile working deck 15 between the lowered position and an elevated position.
Furthermore, according to the claimed invention, the mobile deck compensator 18 is
configured to provide a heave compensated motion of the mobile working deck when lifted
in the elevated position, moving the mobile working deck relative to the elevated
position between a heave compensation maximum height position and the heave compensation
minimum height position. Thus, the mobile deck compensator can keep the mobile working
deck, when lifted in the elevated position, substantially stationary relative to the
sea floor.
[0087] Possibly, the distance between a bottom side 44 of the mobile working deck 15, when
supported in the heave compensation maximum height position, and the deck surface
6 of the vessel 1 is at least 3 meter, preferably at least 4 meter, to enable large,
i.e. having a height of more than 2 meter, objects to be moved into the firing line
9 and below the mobile working deck 15.
[0088] A hoisting device 7 is provided which is configured for lowering and lifting an object
8 along the firing line 9 and via the moonpool towards and from a sea floor 10 respectively.
In the embodiment shown, the hoisting device 7 is a multipurpose tower. The multipurpose
tower comprises a mast that is mounted on the floating hull 3, and that supports a
hoisting winch 11 and a hoist cable 12 connected to the hoisting winch 11. A travelling
block 13, for connecting with the object to be lowered to, or lifted from, the sea
floor, is supported by the hoist cable 12.
[0089] The hoisting device is configured to support the hoist cable 12 along a firing line
9, i.e. a virtual line indicating the vertical trajectory along which an object can
be lowered through the moonpool. In the figures, the firing line coincides with the
section of hoist cable extending between the multipurpose tower, more in particular
a crown block of the multipurpose tower, and the travelling block.
[0090] The hoisting device 7 furthermore comprises a heave motion compensation system 14,
adapted to provide heave compensation for the hoist cable to provide a heave compensated
motion of the travelling block. It is submitted that heave compensation systems for
hoisting devices are generally known in the prior art and typically comprise active
and passive heave compensation provided by hydraulic cylinders supporting sheaves
guiding the hoist cable. Because these type of heave compensation systems for hoisting
devices are generally known, it will not be discussed in detail herein.
[0091] Here, the mobile working deck 15 is provided with a hoist cable opening 17, aligned
with the firing line 9 for passing through the travelling block 13 and the hoist cable
12 of the hoisting device 7.
[0092] In the embodiment shown, an object loading device is provided for introducing an
object below the mobile working deck 15 and in the firing line 9, here embodied as
a sliding deck section 24. The sliding deck section 25 is supported on a track 24
comprising tracks 26 on opposite sides of the firing line 9, here between the two
pairs of hydraulic mobile working deck cylinders 31. The sliding deck section is located
adjacent a moonpool opening 27 (shown in fig. 2) in the deck surface 6, which position
is shown in figures 1 and 2.
[0093] The sliding deck section 25 can be slid over the moonpool opening 27 in the deck
surface 6 for moving an object 8, while supported by the sliding deck section, into
the firing line 9 and below the mobile working deck 15, when the mobile working deck
is in the elevated position, which is shown in figures 2-5. It is submitted that the
mobile deck compensator is configured to support the mobile working deck in the heave
compensation maximum height position, to provide additional clearance between the
deck surface and the bottom side of the mobile working deck, for introducing large
sized objects into the firing line and below the mobile working deck.
[0094] Once positioned below the mobile working deck, the object is coupled with the travelling
block, to enable the hoisting device to move the object along the firing line below
the mobile working deck, more in particular, to lower the object 8 towards the sea
floor, more in particular towards the subsea well bore 2.
[0095] In the embodiment shown, the vessel 1 furthermore comprises two guide wire winches
28, mounted to the mobile working deck 15, and a guide wire 29 connected to said guide
wire winch.
[0096] The guide wires 29 are connected to the subsea well bore 2, in the embodiment shown
to a well template 46, such that the guide wires extends parallel to and spaced from
the firing line 9. The guide wire winches 28 each comprise a heave compensation system
30 adapted to keep the guide wire 29, when fixed to a subsea well, under substantially
constant tension for guiding an object being lowered towards, or lifted from, the
sea floor along the firing line.
[0097] When the mobile deck compensator provides the mobile working deck with heave compensation,
this heave compensation also provides the guide wire winch with heave compensation,
and can thus be used to keep the guide wire, when fixed to a subsea well, under substantially
constant tension when the mobile working deck is held in a fixed position relative
to the vessel. This is beneficial since it is not required to continuously roll the
guide wire on and of the guide wire winch, or over a heave compensated sheeve, to
provide heave compensation, which will lengthen the lifetime of the guide wire.
[0098] In the preferred embodiment shown, the guide wire winches 28 are located below the
deck surface 16 of the mobile working deck 15, which provide the mobile working deck
with a clean deck surface, which is in particular beneficial when the mobile working
deck is in the lowered position and the deck surface of the mobile working deck is
level with the deck surface of the deck of the vessel, see figure 1.
[0099] It is submitted that in the situation shown in figure 1, i.e. with the guide wires
29 connected to the subsea well and the mobile working deck in the lower, thus fixed,
position, the heave compensation system of the guide wire winches is used to keep
the guide wires under a substantially constant tension. Also, while the mobile working
deck is in the elevated position and an object is being moved into the firing line,
the mobile working deck will be in a fixed positon, and the heave compensation system
of the guide wire winches is used to keep the guide wires under a substantially constant
tension. Once the mobile working deck is heave compensated, the guide wire winches
no longer need to provide heave compensation.
[0100] The vessel 1 allows for installing the object 8 on to the seafloor, more in particular
on the subsea well bore.
[0101] Once the travelling block 13 has been positioned below the mobile working deck 15,
the hoist cable passing through the hoist cable opening 17 in the mobile working deck,
the travelling block 13 can be connected to an object located below the mobile working
deck, see figure 2.
[0102] The object loading device, in the embodiment shown the sliding deck section, can
be used for positioning an object in the below the mobile working deck, when raised
in the elevated position, and in the firing line 9, see figures 2 and 3. In the embodiment
of the vessel shown, the object can be moved in a substantially horizontal direction
from the deck surface 6 into the firing line 9 and below the mobile working deck 15
[0103] After the object 8 has been connected with the travelling block 13, and with the
guide wires 29, the object is lifted from the sliding deck section 24, which is subsequently
retracted, such that the object can be lowered towards the subsea well bore 2 using
the hoisting device 7. While it is lowered the object is guide by the guide wires,
and is thus positioned correctly relative to the subsea well bore, see figure 4.
[0104] Figure 5 shows a schematic side view in cross section of the vessel of figure 1 in
an alternative working position.
[0105] Here, the vessel 1 is used for performing well bore related activities using a wellbore-related
activity tool 47. In the shown embodiment, the wellbore-related activity tool comprises
a tool winch 48 a tool wire 49 and a tool 50, in a subsea well bore 2.
[0106] A well bore related activity tool can for example be a coiled tubing tool or a wire
line tool, which are generally known tools. With such a tool, the tool winch can be
used for lowering and lifting the tool wire and tool winch. In addition, it is possible
that a separate tool transportation device 51 is used, for example opposite tracks
configured for engaging the tool wire between them and moving the tool wire to lift
and lower the tool.
[0107] The guide wires 29 have been connected to the subsea well bore 2, more in particular
to the well template 46 of the subsea well bore, and can thus be used for guiding
the tool 50.
[0108] It is submitted that since the heave compensated mobile working deck can be used
for supporting the wellbore-related activity tool, there is no need for providing
the wellbore-related activity tool with a dedicated heave compensation device.
[0109] Once the wellbore-related activity tool 47 has positioned the tool 50 below the mobile
working deck 15, the tool wire passing through an opening, e.g. the hoist cable opening,
in the working deck it can be connected to the guide wires 29.
[0110] Subsequently, the mobile deck compensator can be used to lift the mobile working
deck into the elevated position, and to provided the mobile working deck with heave
compensated motion. When the mobile working deck is heave compensated, both the guide
wires and the well bore activity tool are in a substantially fixed position relative
to the well bore. Thus, no additional heave compensation, for example by the heave
compensation device of the guide wire winches, is required.
[0111] In the embodiment shown in figure 5, the tool winch 48 is used in combination with
a tool transportation device 51, comprising opposed tracks, to lower the tool towards
the subsea well bore. The guide wires guide the tool, and make sure it lands in a
correct position on the well bore, in the embodiment shown on the object 7 mounted
on the well bore.
[0112] It is submitted that even when guide wires are used, a remotely operated vehicle
(ROV), may be deployed to accurately position and/or install objects and or tools
on the subsea well bore.
[0113] Figure 6 shows yet a further alternative configuration according to the invention,
wherein the vessel is a semi-submersible drilling vessel and wherein the floating
hull 3 is embodied as a deckbox structure, the semi-submersible drilling vessel comprising
one or more pontoons, e.g. two parallel pontoons or a ring pontoon, and multiple support
columns extending upward from the one or more pontoons and supporting thereon the
deckbox structure. The deckbox structure has a deck surface 6, and another lower deck
surface labelled a moonpool deck 19.
[0114] An object loading device is provided for introducing the object 8 in the firing line
and below the mobile working deck 15, such that the object 8 can be coupled with the
travelling block 13 of the hoisting device 7 and/or the mobile working deck 15 and/or
a coupling device, e.g. a tubular, supported by the mobile deck, and/or guide wires,
to enable the object to move along the firing line 9 below the mobile working deck
15. Here, the object loading device comprises a cart track 20 comprising tracks 21
for moving a cart 22 with the object 8, and/or the object, while suspended from or
supported by the cart track, into the firing line and below the mobile working deck
15. Here, the cart track 20 is located below the deck surface 6 on the moonpool deck
19.
[0115] Figure 7 show yet further alternative configuration of the vessel according to the
invention. A second floor 36 is suspended below the mobile working deck 15, which
is here level with the deck surface 6 of the vessel 1 when the mobile working deck
15 is in an elevated position, preferably the heave compensation maximum height position.
The object 8 is allowed to move over the deck surface 6 onto the second floor 36,
where it can be coupled with the travelling block 13 of the hoisting device 7 and/or
the mobile working deck 15 and/or a coupling device, e.g. a tubular, supported by
the mobile deck, and/or guide wires, to enable the object to move along the firing
line 9 below the mobile working deck 15.
[0116] In figs. 8-12c yet a further alternative vessel according to the invention is shown
in cross-sectional view. In fig. 8 a detail of a semi-submersible vessel 1 is shown
, comprising a deckbox structure 3. Not shown is that the semi-submersible drilling
vessel comprises one or more pontoons, e.g. two parallel pontoons or a ring pontoon,
and multiple support columns extending upward from the one or more pontoons and supporting
thereon the deckbox structure.
[0117] The deckbox structure 3 has a moonpool 4 through which a firing line 9 extends. The
deckbox structure 3 has a deck surface 6. A hoisting device is not shown.
[0118] A mobile working deck 15 is provided, having a working deck surface 16, which in
a lowered position of the mobile working deck 15, as shown in fig. 8, is level, here
flush, with the deck surface 6.
[0119] A mobile deck compensator 18 is provided, here according to the invention, which
is shown in further detail in fig. 9. The mobile deck compensator comprises a lift
cylinder 101, configured to lift the mobile working deck 15 out of the lowered position
and to move the mobile working deck between the lowered position and an elevated position.
The mobile deck compensator further comprises a heave compensation cylinder 102, configured
to provide a heave compensated motion of the mobile working deck 15 when lifted in
the elevated position, moving the mobile deck between a heave compensation maximum
height position as is visible in fig. 12c, and a heave compensation minimum height
position, as is visible in fig. 12b. The mobile working deck 15 is supported by two
sets of a lift cylinder and two heave compensation cylinders.
[0120] In the shown configuration, the lift cylinder 101 is connected to the floating hull
3 and to two heave compensation cylinders 102, and the heave compensation cylinders
102 are connected to the lift cylinder 101 and to the mobile working deck 15.
[0121] It is also conceivable that the lift cylinder 101 is connected to the mobile working
deck 15 and to the heave compensation cylinder 102, and the heave compensation cylinder
102 is connected to the lift cylinder 101 and to the floating hull 3.
[0122] The connected lift cylinder and heave compensation cylinders allow a large operational
range of the mobile deck compensator, combined with a compact design that can be stored
in the floating hull, in particular in a deckbox of a semisubmersible. In fig. 9 it
this operation range is visible: on the right-hand side of fig. 9 the piston 101'
of the lift cylinder 101 is shown in an extended position, as well as piston 102'
of the heave compensation cylinders 102. On the left-hand side of fig. 9 both pistons
are retracted and hence not visible.
[0123] In fig. 8 it is visible that in the shown embodiment of the vessel 1 a riser tensioning
system is provided for supporting a riser (shown in figs. 10, 12a-12c) at an upper
end thereof, located in the moonpool 4; the riser extending along the firing line
between the subsea wellbore and the vessel. Riser tensioning cylinders 110 are provided
in the deckbox structure 3 of a semisubmersible. In fig 10 it is visible that these
are connected to a telescopic joint 115 which is provided at the upper end of the
riser. Here, the outer part of the telescopic joint is labelled 115a and the inner
part 115c. Therebetween a ring 115b is provided which is supported by the riser tensioning
cylinders 110. As such, the weight of the riser is suspended form the riser tensioning
system. Possibly, the riser can be provided with buoyancy means, e.g. floating cans,
to support at least part of the weight of the riser.
[0124] In fig. 8 is visible that a rotating control device 112 and a diverter 113 is suspended
from the mobile working deck 15, to which a top end of the riser, in particular of
the telescopic joint 115c is attached, preferably via a flex joint 116, visible in
fig. 10. Also visible is a work floor 114, which is here suspended from the mobile
working deck 15.
[0125] In embodiments wherein the position of the mobile working deck is fixed with respect
to the vessel, in particular in the lowered position thereof, as shown in fig. 10,
the differential movements between riser and vessel can be absorbed by the telescopic
joint.
[0126] In figs. 12a-12c is shown that the mobile deck compensator 18 with lift cylinder
101 and heave compensation cylinders 102 provides a heave compensated motion of the
mobile working deck 15, and the telescopic joint is connected to the mobile working
deck. In this situation there is generally no need for the telescopic joint to absorb
differential movements. In such an embodiment, the telescopic joint can be locked,
fixing the position of the mobile working deck relative to the riser. Thus, the mobile
deck compensator can be used to absorb the differential movements between riser and
vessel and thus act as a riser tensioning system.
[0127] In fig. 12a, the mobile working deck has moved out of the lowered position by the
lift cylinder 101, of which now the piston 101' is visible, to an elevated position.
Heave compensated motion of the mobile working deck 15 is provided by the heave compensation
cylinders 102. In fig. 12c, the mobile deck 15 has moved to a heave compensation maximum
height position, in which the pistons 102' of the heave compensation cylinders are
fully extended, similar to the situation in the right-hand part of fig. 9. In fig.
12b, the mobile deck is in a heave compensation minimum height position, with the
pistons 102' of the heave compensation cylinders 102 fully retracted.
[0128] In fig. 11, it is shown that a BOP 140 has skidded from a parking position (in which
the BOP 140 protrudes above deck surface 6), via a cart 122 on track 121 into the
firing line 9 and below the mobile working deck 15, which is here in the heave compensation
maximum height position with fully extended pistons 102' of the heave compensation
cylinders 102 and fully extended pistons 101' of the lift cylinders 101.
[0129] In an embodiment multiple vertically mounted mobile deck compensator cylinders are
arranged between the deckbox structure and the mobile working deck, e.g. two sets
of multiple compensator cylinders, e.g. two pairs, supporting the mobile working deck.
Preferably the mobile deck compensator cylinders are configured to provide a heave
compensated motion of the working deck relative to the deckbox structure. In an embodiment
a first set of working deck compensator cylinders is arranged outward of a first BOP
handling cart rails, relative to the moonpool, and a second set of working deck compensator
cylinders is arranged outward of a second BOP handling cart rails, relative to the
moonpool, so as to allow for passing a subsea BOP on a BOP handling cart in between
the first and second set of working deck compensator cylinders. For example the working
deck compensator cylinders are extendable to raise the working deck from its lowered
stationary resting position into an elevated position so as to allow for passage of
the subsea BOP from the BOP storage room into the firing line underneath the elevated
working deck. As preferred mobile deck compensator cylinder not only allow for raising
and lowering of the working deck but also for heave compensation motion of the working
deck, e.g. with a riser connected via a locked telescopic joint to the working deck.
1. Vessel (1) for performing subsea wellbore related activities, wherein the vessel comprises:
- a floating hull (3) having a main deck (5) with a deck surface (6) and a moonpool
(4) with a firing line (9) extending there through,
- a hoisting device (7), e.g. a crane or multipurpose tower, which hoisting device
(7) is mounted on the floating hull (3) and is configured for lowering and lifting
an object (8) along the firing line (9) and via the moonpool towards and from a sea
floor (10) respectively, said hoisting device comprising:
∘ a hoisting winch (11) and hoist cable (12) connected to said hoisting winch, wherein
the hoisting device is configured to support the hoist cable (12) along the firing
line (9);
∘ a travelling block (13) supported by the hoist cable (12) for connecting with the
object (8); and
∘ a heave compensation system (14) adapted to provide heave compensation for the hoist
cable (12) to provide a heave compensated motion of the travelling block (13);
- a vertically mobile working deck (15), the mobile working deck having a working
deck surface (16), which mobile working deck in a lowered position thereof covers
the moonpool (4), and which working deck surface (16) of the mobile working deck (15)
is level, preferably flush, with the deck surface (6) of the main deck (5) of the
hull (3);
- a mobile deck compensator (18), which mobile deck compensator is connected between
the floating hull (3) of the vessel (1) and the mobile working deck (15), wherein
the mobile deck compensator (18) is configured to lift the mobile working deck (15)
out of the lowered position, to move the mobile working deck between the lowered position
and an elevated position, and to provide a heave compensated motion of the mobile
working deck (15) when lifted in the elevated position, moving the mobile deck between
a heave compensation maximum height position and a heave compensation minimum height
position,
characterized in that the mobile deck compensator (18) comprises in series:
- a lift cylinder (101), configured to lift the mobile working deck (15) out of the
lowered position and to move the mobile working deck between the lowered position
and an elevated position, and
- a heave compensation cylinder (102), configured to provide a heave compensated motion
of the mobile working deck (15) when lifted in the elevated position, moving the mobile
deck between a heave compensation maximum height position and a heave compensation
minimum height position.
2. Vessel according to claim 1, wherein the mobile deck compensator comprises two or
more, preferably four, hydraulic mobile deck compensator cylinders, wherein preferably
the cylinders have a work line parallel to the firing line.
3. Vessel according to claim 2, wherein the hydraulic mobile deck compensator cylinders
of the mobile deck compensator, are hydraulically connected via a hydraulic conduit
to the heave compensation system of the hoisting device, such that the mobile working
deck and the travelling block move synchronously when heave compensated.
4. Vessel according to one or more of the preceding claims, wherein the lift cylinder
(101) is connected to the floating hull (3) and to the heave compensation cylinder
(102), and wherein the heave compensation cylinder (102) is connected to the lift
cylinder (101) and to the mobile working deck (15).
5. Vessel according to claim 1, wherein the lift cylinder (101) is connected to the mobile
working deck (15) and to the heave compensation cylinder (102), and wherein the heave
compensation cylinder (102) is connected to the lift cylinder (101) and to the floating
hull (3).
6. Vessel according to one or more of the preceding claims, wherein a single lift cylinder
supports two heave compensation cylinders, e.g. the single lift cylinder in between
the two heave compensation cylinders.
7. Vessel according to one or more of the preceding claims, wherein the mobile deck compensator
comprises a crane or multi-purpose tower comprising a heave compensated hoisting device
adapted for supporting the mobile working deck.
8. Vessel according to one or more of the preceding claims, wherein the mobile working
deck is configured to support a tubular clamping device in the firing line, and wherein
the mobile deck compensator is operable to lower and lift the supported tubular, and
objects connected thereto, for example other tubulars or a BOP, along the firing line.
9. Vessel according one or more of the preceding claims, wherein the vessel is a semi-submersible
drilling vessel and wherein the floating hull (3) is embodied as a deckbox structure,
the semi-submersible drilling vessel comprising one or more pontoons, e.g. two parallel
pontoons or a ring pontoon, and multiple support columns extending upward from the
one or more pontoons and supporting thereon the deckbox structure.
10. Vessel according to one or more of the preceding claims, wherein the distance between
a bottom side (44) of the mobile working deck (15), when supported in the heave compensation
maximum height position, and the deck surface (6) of the vessel (1) is at least 3
meter, preferably at least 4 meter, to enable large, i.e. having a height of more
than 2 meter, objects (8) to be moved into the firing line (9) and below the mobile
working deck (15).
11. Use of a vessel for performing subsea wellbore related activities, wherein the vessel
comprises:
- a floating hull (3) having a main deck (5) with a deck surface (6) and a moonpool
(4) with a firing line (9) extending there through,
- a hoisting device (7), e.g. a crane or multipurpose tower, which hoisting device
(7) is mounted on the floating hull (3) and is configured for lowering and lifting
an object (8) along the firing line (9) and via the moonpool towards and from a sea
floor (10) respectively, said hoisting device comprising:
∘ a hoisting winch (11) and hoist cable (12) connected to said hoisting winch, wherein
the hoisting device is configured to support the hoist cable (12) along the firing
line (9);
∘ a travelling block (13) supported by the hoist cable (12) for connecting with the
object (8); and
∘ a heave compensation system (14) adapted to provide heave compensation for the hoist
cable (12) to provide a heave compensated motion of the travelling block (13);
- a vertically mobile working deck (15), the mobile working deck having a working
deck surface (16), which mobile working deck in a lowered position thereof covers
the moonpool (4), and which working deck surface (16) of the mobile working deck (15)
is level, preferably flush, with the deck surface (6) of the main deck (5) of the
hull (3);
- a mobile deck compensator (18), which mobile deck compensator is connected between
the floating hull (3) of the vessel (1) and the mobile working deck (15), wherein
the mobile deck compensator (18) is configured to lift the mobile working deck (15)
out of the lowered position, to move the mobile working deck between the lowered position
and an elevated position, and to provide a heave compensated motion of the mobile
working deck (15) when lifted in the elevated position, moving the mobile deck between
a heave compensation maximum height position and a heave compensation minimum height
position,
wherein the mobile deck compensator (18) comprises in series:
- a lift cylinder (101), configured to lift the mobile working deck (15) out of the
lowered position and to move the mobile working deck between the lowered position
and an elevated position, and
- a heave compensation cylinder (102), configured to provide a heave compensated motion
of the mobile working deck (15) when lifted in the elevated position, moving the mobile
deck between a heave compensation maximum height position and a heave compensation
minimum height position, wherein the use comprises the following steps:
- lifting the mobile working deck (15) out of the lowered position by the mobile deck
compensator (18);
- moving the mobile working deck between the lowered position and the elevated position
by the mobile deck compensator (18); and
- providing the heave compensated motion of the mobile working deck (15) by the mobile
deck compensator when the mobile working deck is lifted in the elevated position,
wherein the mobile deck is moved between the heave compensation maximum height position
and the heave compensated minimum height position.
1. Wasserfahrzeug (1) zum Durchführen von Aktivitäten im Zusammenhang mit einem Unterwasserbohrloch,
wobei das Wasserfahrzeug umfasst
- einen schwimmenden Rumpf (3), der ein Hauptdeck (5) mit einer Deckfläche (6) und
ein Moonpool (4) mit einer Firing Line (9) aufweist, die sich dort hindurch erstreckt,
- eine Hebevorrichtung (7), z.B. ein Kran oder ein Mehrzweckturm, wobei die Hebevorrichtung
(7) an dem schwimmenden Rumpf (3) angebracht ist und zum Absenken und Anheben eines
Objekts (8) entlang der Firing Line (9) und über den Moonpool zu bzw. von einem Meeresboden
(10) ausgestaltet ist, wobei die Hebevorrichtung umfasst:
o eine Hebewinde (11) und ein Hebeseil (12), das mit der Hebewinde verbunden ist,
wobei die Hebevorrichtung ausgestaltet ist, um das Hebeseil (12) entlang der Firing
Line (9) zu halten;
o einen beweglichen Block (13), der von dem Hebeseil (12) mit zum Verbinden mit dem
Objekt (8) gehalten wird; und
o ein Seegangskompensationssystem (14), das ausgestaltet ist, um eine Seegangskompensation
für das Hebeseil (12) bereitzustellen, um eine seegangskompensierte Bewegung des beweglichen
Blocks (13) bereitzustellen;
- ein vertikal bewegliches Arbeitsdeck (15), wobei das bewegliche Arbeitsdeck eine
Arbeitsdeckfläche (16) aufweist, wobei das bewegliche Arbeitsdeck in einer abgesenkten
Position davon den Moonpool (4) abdeckt, und wobei die Arbeitsdeckfläche (16) des
beweglichen Arbeitsdecks (15) auf gleicher Höhe, vorzugsweise bündig, mit der Deckfläche
(6) des Hauptdecks (5) des Rumpfes (3) ist;
- einen Mobildeckkompensator (18), wobei der Mobildeckkompensator zwischen dem schwimmenden
Rumpf (3) des Wasserfahrzeugs (1) und dem beweglichen Arbeitsdeck (15) angebracht
ist, wobei der Mobildeckkompensator (18) ausgestaltet ist, um das bewegliche Arbeitsdeck
(15) aus der abgesenkten Position anzuheben, um das bewegliche Arbeitsdeck zwischen
der abgesenkten Position und einer angehobenen Position zu bewegen, und um eine seegangskompensierte
Bewegung des beweglichen Arbeitsdecks (15) bereitzustellen, wenn es in der angehobenen
Position angehoben ist, wobei das bewegliche Deck zwischen einer Seegangskompensations-Maximalhöhenposition
und einer Seegangskompensations-Minimalhöhenposition bewegt wird,
dadurch gekennzeichnet, dass der Mobildeckkompensator (18) in Reihe umfasst:
- einen Hebezylinder (101), der ausgestaltet ist, um das bewegliche Arbeitsdeck (15)
aus der abgesenkten Position anzuheben und das bewegliche Arbeitsdeck zwischen der
abgesenkten Position und einer angehobenen Position zu bewegen, und
- einen Seegangskompensationszylinder (102), der ausgestaltet ist, um eine seegangskompensierte
Bewegung des bewegliche Arbeitsdecks (15) bereitzustellen, wenn es in die angehobene
Position angehoben wird, wobei das bewegliche Deck zwischen einer Seegangskompensations-Maximalhöhenposition
und einer Seegangskompensations-Minimalhöhenposition bewegt wird.
2. Wasserfahrzeug nach Anspruch 1, wobei der Mobildeckkompensator zwei oder mehr, vorzugsweise
vier, hydraulische Mobildeckkompensator-Zylinder umfasst, wobei die Zylinder vorzugsweise
eine Arbeitslinie parallel zu der Firing Line aufweisen.
3. Wasserfahrzeug nach Anspruch 2, wobei die hydraulischen Mobildeckkompensator-Zylinder
des Mobildeckkompensators über eine Hydraulikleitung mit dem Seegangskompensationssystem
der Hebevorrichtung hydraulisch verbunden sind, so dass sich das bewegliche Arbeitsdeck
und der bewegliche Block synchron bewegen, wenn sie seegangskompensiert sind.
4. Wasserfahrzeug nach einem oder mehreren der vorhergehenden Ansprüche, wobei der Hebezylinder
(101) mit dem schwimmenden Rumpf (3) und mit dem Seegangskompensationszylinder (102)
verbunden ist, und wobei der Seegangskompensationszylinder (102) mit dem Hebezylinder
(101) und mit dem beweglichen Arbeitsdeck (15) verbunden ist.
5. Wasserfahrzeug nach Anspruch 1, wobei der Hebezylinder (101) mit dem beweglichen Arbeitsdeck
(15) und mit dem Seegangskompensationszylinder (102) verbunden ist und wobei der Seegangskompensationszylinder
(102) mit dem Hebezylinder (101) und mit dem schwimmenden Rumpf (3) verbunden ist.
6. Wasserfahrzeug nach einem oder mehreren der vorhergehenden Ansprüche, wobei ein einzelner
Hebezylinder zwei Seegangskompensationszylinder hält, z. B. der einzelne Hebezylinder
zwischen den beiden Seegangskompensationszylindern.
7. Wasserfahrzeug nach einem oder mehreren der vorhergehenden Ansprüche, wobei der Mobildeckkompensator
einen Kran oder einen Mehrzweckturm umfasst, der eine seegangskompensierte Hebevorrichtung
umfasst, die zum Halten des beweglichen Arbeitsdecks ausgestaltet ist.
8. Wasserfahrzeug nach einem oder mehreren der vorhergehenden Ansprüche, wobei das bewegliche
Arbeitsdeck ausgestaltet ist, um eine Rohrklemmvorrichtung in der Firing Line zu halten,
und wobei der Mobildeckkompensator ausgestaltet ist, um das gehaltene Rohr und damit
verbundene Objekte, z. B. andere Rohre oder einen BOP, entlang der Firing Line abzusenken
und anzuheben.
9. Wasserfahrzeug nach einem oder mehreren der vorhergehenden Ansprüche, wobei das Wasserfahrzeug
ein halbtauchfähiges Bohrfahrzeug ist und wobei der schwimmende Rumpf (3) als eine
Deckkastenstruktur ausgeführt ist, wobei das halbtauchfähige Bohrfahrzeug einen oder
mehrere Pontons, z.B. zwei parallele Pontons oder einen Ringponton, und mehrere Stützsäulen
umfasst, die sich von dem einen oder den mehreren Pontons nach oben erstrecken und
darauf die Deckkastenstruktur halten.
10. Wasserfahrzeug nach einem oder mehreren der vorhergehenden Ansprüche, wobei der Abstand
zwischen einer Unterseite (44) des beweglichen Arbeitsdecks (15), wenn es in der Seegangskompensations-Maximalhöhenposition
gehalten wird, und der Deckfläche (6) des Wasserfahrzeugs (1) mindestens 3 Meter,
vorzugsweise mindestens 4 Meter, beträgt, um zu ermöglichen, dass große Objekte (8),
d.h. die eine Höhe von mehr als 2 Metern haben, in die Firing Line (9) und unter das
bewegliche Arbeitsdeck (15) bewegt werden können.
11. Verwendung eines Wasserfahrzeugs zur Durchführung von Aktivitäten im Zusammenhang
mit einem Unterwasserbohrloch, wobei das Wasserfahrzeug umfasst:
- einen schwimmenden Rumpf (3), der ein Hauptdeck (5) mit einer Deckfläche (6) und
einen Moonpool (4) mit einer durch diesen verlaufenden Firing Line (9) aufweist
- eine Hebevorrichtung (7), z.B. ein Kran oder ein Mehrzweckturm, wobei die Hebevorrichtung
(7) an dem schwimmenden Rumpf (3) angebracht ist und zum Absenken und Anheben eines
Objekts (8) entlang der Firing Line (9) und über den Moonpool zu bzw. von einem Meeresboden
(10) ausgestaltet ist, wobei die Hebevorrichtung umfasst:
∘ eine Hebewinde (11) und ein Hebeseil (12), das mit der Hebewinde verbunden ist,
wobei die Hebevorrichtung ausgestaltet ist, um das Hebeseil (12) entlang der Firing
Line (9) zu halten;
∘ einen beweglichen Block (13), der von dem Hebeseil (12) zum Verbinden mit dem Objekt
(8) gehalten wird; und
∘ ein Seegangskompensationssystem (14), das ausgestaltet ist, um eine Seegangskompensation
für das Hebeseil (12) bereitzustellen, um eine seegangskompensierte Bewegung des beweglichen
Blocks (13) bereitzustellen;
- ein vertikal bewegliches Arbeitsdeck (15), wobei das bewegliche Arbeitsdeck eine
Arbeitsdeckfläche (16) aufweist, wobei das bewegliche Arbeitsdeck in einer abgesenkten
Position davon den Moonpool (4) abdeckt, und wobei die Arbeitsdeckfläche (16) des
beweglichen Arbeitsdecks (15) auf gleicher Höhe, vorzugsweise bündig, mit der Deckfläche
(6) des Hauptdecks (5) des Rumpfes (3) ist;
- einen Mobildeckkompensator (18), wobei der Mobildeckkompensator zwischen dem schwimmenden
Rumpf (3) des Wasserfahrzeugs (1) und dem beweglichen Arbeitsdeck (15) angebracht
ist, wobei der Mobildeckkompensator (18) ausgestaltet ist, um das bewegliche Arbeitsdeck
(15) aus der abgesenkten Position heraus anzuheben, um das bewegliche Arbeitsdeck
zwischen der abgesenkten Position und einer angehobenen Position zu bewegen, und um
eine seegangskompensierte Bewegung des beweglichen Arbeitsdecks (15) bereitzustellen,
wenn es in der angehobenen Position angehoben ist, wobei das bewegliche Deck zwischen
einer Seegangskompensations-Maximalhöhenposition und einer Seegangskompensations-Minimalhöhenposition
bewegt wird,
wobei der Mobildeckkompensator (18) in Reihe umfasst:
- einen Hebezylinder (101), der ausgestaltet ist, um das bewegliche Arbeitsdeck (15)
aus der abgesenkten Position anzuheben und um das bewegliche Arbeitsdeck zwischen
der abgesenkten Position und einer angehobenen Position zu bewegen, und
- einen Seegangskompensationszylinder (102), der ausgestaltet ist, um eine seegangskompensierte
Bewegung des mobilen Arbeitsdecks (15) bereitzustellen, wenn es in die angehobene
Position angehoben wird, wobei das bewegliche Deck zwischen einer Seegangskompensations-Maximalhöhenposition
und einer Seegangskompensations-Minimalhöhenposition bewegt wird, wobei die Verwendung
die folgenden Schritte umfasst:
- Anheben des beweglichen Arbeitsdecks (15) aus der abgesenkten Position durch den
Mobildeckkompensator (18);
- Bewegen des beweglichen Arbeitsdecks zwischen der abgesenkten Position und der angehobenen
Position durch den Mobildeckkompensator (18); und
- Bereitstellen der seegangskompensierten Bewegung des beweglichen Arbeitsdecks (15)
durch den Mobildeckkompensator, wenn das bewegliche Arbeitsdeck in die angehobene
Position angehoben wird, wobei das bewegliche Deck zwischen der Seegangskompensations-Maximalhöhenposition
und der Seegangskompensations-Minimalhöhenposition bewegt wird.
1. Navire (1) pour effectuer des activités associées à un puits de forage sous-marin,
dans lequel le navire comprend :
- une coque flottante (3) ayant un pont principal (5) avec une surface de pont (6)
et un puits central (4) avec une ligne de tir (9) s'étendant à travers ce dernier,
- un dispositif de levage (7), par exemple une grue ou une tour multifonction, lequel
dispositif de levage (7) est monté sur la coque flottante (3) et est configuré pour
abaisser et lever un objet (8) le long de la ligne de tir (9) et via le puits central
vers et depuis un plancher marin (10) respectivement, ledit dispositif de levage comprenant
:
∘ un treuil de levage (11) et un câble de levage (12) raccordé audit treuil de levage,
dans lequel le dispositif de levage est configuré pour supporter le câble de levage
(12) le long de la ligne de tir (9) ;
∘ un bloc mobile (13) supporté par le câble de levage (12) pour se raccorder avec
l'objet (8) ; et
∘ un système de compensation de pilonnement (14) adapté pour fournir la compensation
de pilonnement pour que le câble de levage (12) fournisse un mouvement compensé de
pilonnement du bloc mobile (13) ;
- un pont de travail verticalement mobile (15), le pont de travail mobile ayant une
surface de pont de travail (16), lequel pont de travail mobile, dans sa position abaissée,
recouvre le puits central (4) et laquelle surface de pont de travail (16) du pont
de travail mobile (15) est de niveau, de préférence à fleur avec la surface de pont
(6) du pont principal (5) de la coque (3) ;
- un compensateur de pont mobile (18), lequel compensateur de pont mobile est raccordé
entre la coque flottante (3) du navire (1) et le pont de travail mobile (15), dans
lequel le compensateur de pont mobile (18) est configuré pour lever le pont de travail
mobile (15) hors de la position abaissée, afin de déplacer le pont de travail mobile
entre la position abaissée et une position levée, et pour fournir un mouvement compensé
de pilonnement du pont de travail mobile (15) lorsqu'il est levé dans la position
élevée, déplaçant le pont mobile entre une position de hauteur maximum de compensation
de pilonnement et une position de hauteur minimum de compensation de pilonnement,
caractérisé en ce que le compensateur de pont mobile (18) comprend en série :
un cylindre de levage (101) configuré pour lever le pont de travail mobile (15) hors
de la position abaissée et pour déplacer le pont de travail mobile entre la position
abaissée et une position élevée, et
un cylindre de compensation de pilonnement (102) configuré pour fournir un mouvement
compensé de pilonnement du pont de travail mobile (15) lorsqu'il est levé dans la
position élevée, déplaçant le pont mobile entre une position de hauteur maximum de
compensation de pilonnement et une position de hauteur minimum de compensation de
pilonnement.
2. Navire selon la revendication 1, dans lequel le compensateur de pont mobile comprend
deux ou plus, de préférence quatre cylindres hydrauliques de compensateur de pont
mobile, dans lequel de préférence les cylindres ont une ligne de travail parallèle
à la ligne de tir.
3. Navire selon la revendication 2, dans lequel les cylindres hydrauliques de compensateur
de pont mobile du compensateur de pont mobile, sont raccordés, par voie hydraulique,
via un conduit hydraulique, au système de compensation de pilonnement du dispositif
de levage, de sorte que le pont de travail mobile et le bloc mobile se déplacent de
manière synchrone lorsque le pilonnement est compensé.
4. Navire selon une ou plusieurs des revendications précédentes, dans lequel le cylindre
de levage (101) est raccordé à la coque flottante (3) et au cylindre de compensation
de pilonnement (102), et dans lequel le cylindre de compensation de pilonnement (102)
est raccordé au cylindre de levage (101) et au pont de travail mobile (15).
5. Navire selon la revendication 1, dans lequel le cylindre de levage (101) est raccordé
au pont de travail mobile (15) et au cylindre de compensation de pilonnement (102),
et dans lequel le cylindre de compensation de pilonnement (102) est raccordé au cylindre
de levage (101) et à la coque flottante (3).
6. Navire selon une ou plusieurs des revendications précédentes, dans lequel un seul
cylindre de levage supporte deux cylindres de compensation de pilonnement, par exemple
le cylindre de levage unique entre les deux cylindres de compensation de pilonnement.
7. Navire selon une ou plusieurs des revendications précédentes, dans lequel le compensateur
de pont mobile comprend une grue ou une tour multifonction comprenant un dispositif
de levage compensé de pilonnement adapté pour supporter le pont de travail mobile.
8. Navire selon une ou plusieurs des revendications précédentes, dans lequel le pont
de travail mobile est configuré pour supporter un dispositif de serrage de tubulaire
dans la ligne de tir, et dans lequel le compensateur de pont mobile est opérationnel
pour abaisser et lever le tubulaire supporté, et les objets raccordés à ce dernier,
par exemple d'autres tubulaires ou un BOP, le long de la ligne de tir.
9. Navire selon une ou plusieurs des revendications précédentes, dans lequel le navire
est un navire de forage semi-submersible et dans lequel la coque flottante (3) est
mise en oeuvre sous la forme d'une structure de pont à poutre caisson, le navire de
forage semi-submersible comprenant un ou plusieurs pontons, par exemple deux pontons
parallèles ou un ponton annulaire et plusieurs colonnes de support s'étendant vers
le haut à partir des un ou plusieurs pontons et supportant sur ces dernières, la structure
de pont à poutre caisson.
10. Navire selon une ou plusieurs des revendications précédentes, dans lequel la distance
entre un côté inférieur (44) du pont de travail mobile (15), lorsqu'il est supporté
dans la position de hauteur maximum de compensation de pilonnement, et la surface
de pont (6) du navire (1) est d'au moins 3 mètres, de préférence d'au moins 4 mètres,
pour permettre de déplacer de gros objets (8), c'est-à-dire ayant une hauteur supérieure
à 2 mètres, dans la ligne de tir (9) et au-dessous du pont de travail mobile (15).
11. Utilisation d'un navire pour effectuer des activités associées à un puits de forage
sous-marin, dans laquelle le navire comprend :
une coque flottante (3) ayant un pont principal (5) avec une surface de pont (6) et
un puits central (4) avec une ligne de tir (9) s'étendant à travers ce dernier,
un dispositif de levage (7), par exemple une grue ou une tour multifonction, lequel
dispositif de levage (7) est monté sur la coque flottante (3) et est configuré pour
abaisser et lever un objet (8) le long de la ligne de tir (9) et via le puits central
vers et depuis un plancher marin (10) respectivement, ledit dispositif de levage comprenant
:
un treuil de levage (11) et un câble de levage (12) raccordé audit treuil de levage,
dans lequel le dispositif de levage est configuré pour supporter le câble de levage
(12) le long de la ligne de tir (9) ;
un bloc mobile (13) supporté par le câble de levage (12) pour se raccorder avec l'objet
(8) ; et
un système de compensation de pilonnement (14) adapté pour fournir la compensation
de pilonnement pour que le câble de levage (12) fournisse un mouvement compensé de
pilonnement du bloc mobile (13) ;
un pont de travail verticalement mobile (15), le pont de travail mobile ayant une
surface de pont de travail (16), lequel pont de travail mobile dans sa position abaissée
recouvre le puits central (4) et laquelle surface de pont de travail (16) du pont
de travail mobile (15) est de niveau, de préférence à fleur avec la surface de pont
(6) du pont principal (5) de la coque (3) ;
un compensateur de pont mobile (18), lequel compensateur de pont mobile est raccordé
entre la coque flottante (3) du navire (1) et le pont de travail mobile (15), dans
lequel le compensateur de pont mobile (18) est configuré pour lever le pont de travail
mobile (15) hors de la position abaissée, afin de déplacer le pont de travail mobile
entre la position abaissée et une position levée, et pour fournir un mouvement compensé
de pilonnement du pont de travail mobile (15) lorsqu'il est levé dans la position
élevée, déplaçant le pont mobile entre une position de hauteur maximum de compensation
de pilonnement et une position de hauteur minimum de compensation de pilonnement,
dans laquelle le compensateur de pont mobile (18) comprend en série :
un cylindre de levage (101) configuré pour lever le pont de travail mobile (15) hors
de la position abaissée et pour déplacer le pont de travail mobile entre la position
abaissée et une position élevée, et
un cylindre de compensation de pilonnement (102) configuré pour fournir un mouvement
compensé de pilonnement du pont de travail mobile (15) lorsqu'il est levé dans la
position élevée, déplaçant le pont mobile entre une position de hauteur maximum de
compensation de pilonnement et une position de hauteur minimum de compensation de
pilonnement,
dans laquelle l'utilisation comprend les étapes suivantes consistant à :
lever le pont de travail mobile (15) hors de la position abaissée par le compensateur
de pont mobile (18) ;
déplacer le pont de travail mobile entre la position abaissée et la position élevée
par le compensateur de pont mobile (18) ; et
fournir le mouvement compensé de pilonnement du pont de travail mobile (15) par le
compensateur de pont mobile lorsque le pont de travail mobile est levé dans la position
élevée, dans laquelle le pont mobile est déplacé entre la position de hauteur maximum
de compensation de pilonnement et la position de hauteur minimum compensée de pilonnement.