|
(11) | EP 3 827 133 A1 |
(12) |
|
|
|
|
||||||||||||||||||||||||
(54) | RETAINING ENGINEERING STRUCTURE AND DESIGN METHOD FOR STABILIZING DEEP EXCAVATIONS OR EARTH SLOPE INSTABILITY NEAR EXISTING CIVIL OBJECTS |