TECHNICAL FIELD
[0001] The present application relates to the technical field of foundations, in particular
to grouting consolidation method for full casing borehole guide prefabricated pile
and prefabricated pile therefor.
BACKGROUD
[0002] At present, in the field of foundation engineering technology of water projects,
in particular in the field of marine engineering technology, the pile foundations
in rivers, lakes and seas are mostly cast-in-place bored pile or hammered steel pipe
pile. The most common construction scheme and method for cast-in-place bored pile
is called cofferdam-built island construction or the construction work is completed
with the aid of a steel casing. Cofferdam-built island construction is also called
island construction with filling center. In order to solve the difficulty in marine
environment construction, it is necessary to fill the area enclosed by the cofferdam
with soil, sand and gravel, and then carry out a drilling and grouting process. Moreover,
after the cast-in-place bored pile construction is completed, the cofferdam-built
island needs to be demolished, resulting in a huge amount of construction work, which
causes the problems of long engineering period and high engineering cost. Similarly,
as the hammered steel pipe piles are constructed by hammering to sink into the foundation
in the water area, when the hammered steel pipe piles are hammered to reach a hard
base rock, the ends of the hammered steel pipe piles will be curled or even unable
to be driven into the base rock, and as the steel pipe of the hammered steel pipe
pile can't be taken out, it not only results in the problem that the steel pipe is
prone to be corroded, but also the problem of high construction cost and large amount
of construction work for performing the above construction.
SUMMARY
[0003] Therefore, the present application is intended to provide a grouting consolidation
method for full casing borehole guide prefabricated pile and prefabricated pile therefor
so as to solve the problem in prior art that cast-in-place bored pile foundation construction
has a large amount of construction work, long construction period and high construction
cost in foundations construction in water area with various stratum conditions, especially
in the foundation construction in marine engineering. The application provides a grouting
consolidation method for full casing borehole guide prefabricated pile, which can
be used in the foundation construction of water projects, and comprises the following
steps:
S1. driving a drilling rig carrying a casing to perform borehole construction to a
preset hole depth to form a borehole;
S2. housing the casing in the borehole;
S3. implanting a prefabricated pile into the borehole so that the prefabricated pile
reaches a hole bottom of the borehole;
S4. injecting a slurry into the borehole;
S5. pulling out the casing so that the prefabricated pile and an inner cavity of the
borehole are fixed and cemented into an integrated structure.
[0004] The implanting a prefabricated pile into the borehole so that the prefabricated pile
reaches a hole bottom of the borehole in step S3 comprises the following steps: pre-injecting
a slurry into the borehole; before solidification of the slurry, the prefabricated
pile is implanted into the borehole to reach the hole bottom of the bore.
[0005] The prefabricated pile is prefabricated with a grouting channel for injecting the
slurry into the borehole, the pulling out the casing in step S5 comprises continuously
grouting into the borehole through the grouting channel on the prefabricated pile
during the process of pulling out the casing, and/or the injecting the slurry into
the borehole in step S4 comprises grouting into the borehole through the grouting
channel on the prefabricated pile before pulling out the casing.
[0006] The grouting channel comprises a first grouting channel on a bottom surface of the
prefabricated pile; the pulling out the casing in step S5 comprises continuously grouting
into the borehole through the first grouting channel during the process of pulling
out the casing, and/or the injecting the slurry into the borehole in step S4 comprises
grouting into the borehole through the first grouting channel before pulling out the
casing.
[0007] The grouting channel comprises a second grouting channel located at a side of the
prefabricated pile for grouting between the prefabricated pile and the bore hole;
and
the method further comprises a step S6, grouting between the prefabricated pile and
the bore hole through the second grouting channel.
[0008] During the foundation construction of water projects with a water area having a base
rock layer at a bottom thereof,
the driving a drilling rig carrying a casing to perform borehole construction to a
preset hole depth in step S1 comprises sinking the casing to the base rock layer;
sinking a drilling bit of the drilling rig to the base rock layer through the inner
cavity of the casing, and drilling the base rock layer to form a base rock borehole
in the base rock layer; and
the removing the drilling bit of the drilling rig from the base rock borehole, and
housing the casing in the base rock borehole in step S2 comprises removing the drilling
bit of the drilling rig from the base rock borehole and the casing sequentially, and
a lower end of the casing entering an opening edge of the inner cavity of the base
rock borehole; and
the borehole comprises the base rock borehole.
during the foundation construction of water projects with a water area having a bottom
comprising a loose layer and a base rock layer sequentially from up to down,
the driving a drilling rig carrying a casing to perform borehole construction to a
preset hole depth in step S1 comprises:
sinking the casing to the loose layer, and the drilling rig drilling the loose layer
to drive the casing through the loose layer to form a loose layer borehole;
removing mud and sand from the casing;
sinking the drilling bit of the drilling rig to the base rock layer through the inner
cavity of the casing, and drilling the base rock layer to form a base rock borehole
in the base rock layer;
the removing the drilling bit of the drilling rig from the borehole, and housing the
casing in the borehole in step S2 comprises removing the drilling bit of the drilling
rig from the base rock borehole and the casing sequentially, and a lower end of the
casing entering an opening edge of the inner cavity of the base rock borehole; and
the borehole comprises the loose layer borehole and the base rock borehole.
[0009] During the foundation construction of water projects with a water area having a loose
layer at a bottom thereof,
the driving a drilling rig carrying a casing to perform borehole construction to a
preset hole depth in step S1 comprises sinking the casing to the loose layer, and
the drilling rig drilling the loose layer to form a loose layer borehole to bring
the casing into the loose layer; removing mud and sand from the casing.
[0010] An upper end of the prefabricated pile is located above a water surface of the water
area, and /or an upper end of the prefabricated pile is located below a water surface
of the water area.
[0011] The slurry comprises cement slurry and/or mortar and/or chemical slurry.
[0012] A prefabricated pile, comprising
a pile body, and
a grouting channel, arranged on the pile body, wherein a liquid inlet end of the grouting
channel extends out of an upper end surface of the pile body, and a liquid outlet
end of the grouting channel extends out of a lower end surface of the pile body and/or
a side surface of the pile body.
[0013] The pile body is a reinforced concrete prefabricated pile, and the grouting channel
is a grouting pipe prefabricated on a steel cage of the pile body.
[0014] The technical scheme of the present application has the following advantages:
- 1. The application provides a grouting consolidation method for full casing borehole
guide prefabricated pile, which can be used in the foundation construction of water
projects, and comprises the following steps:
S 1. driving a drilling rig carrying a casing to perform borehole construction to
a preset hole depth; S2. housing the casing in the borehole; S3. implanting a prefabricated
pile into the borehole so that the prefabricated pile reaches a hole bottom of the
borehole; S4. injecting a slurry into the borehole; S5. pulling out the casing so
that the prefabricated pile and an inner cavity of the borehole are fixed and cemented
into an integrated structure.
In order to adapt to the stratums of various water projects, especially the marine
engineering environment, wherein the construction of the marine engineering is performed
above the surface of rivers and lakes, the present application firstly provide a casing
to cooperate to drill holes, then guides the prefabricated pile into the hole bottom
of the borehole, and finally injects a slurry to solidify to realize the construction
of water area stratums. Since the foundation of water project has high requirements
for construction intensity, casing can be used to assist drilling to adapt to different
stratum structures underwater. Guiding prefabricated piles into the bottom of the
borehole can effectively ensure a stable and reliable foundation construction of water
projects. Through the above methods, the construction of pile foundations in rivers,
lakes and seas and other water areas can be realized. Since the steps of cofferdam-built
island construction and demolition thereof can be omitted, and the above casing can
be reused, the problem of large amount of engineering, long engineering period, and
high engineering cost in the cast-in-place bored pile foundation construction can
be solved, while ensuring the construction intensity.
- 2. In the grouting consolidation method for full casing borehole guide prefabricated
pile provided by the present application, the implanting a prefabricated pile into
the borehole so that the prefabricated pile reaches a hole bottom of the borehole
in step S3 comprises the following steps: pre-injecting a slurry into the borehole;
before solidification of the slurry, the prefabricated pile is implanted into the
borehole to reach the hole bottom of the bore. By pre-injecting the slurry into the
borehole before implanting the prefabricated pile in the borehole, the prefabricated
pile and the slurry in the borehole can be fully cemented. Moreover, a descending
impact force of the prefabricated piles can also effectively cause the slurry to enter
the bottom of the borehole, thereby forming a larger and solid bottom-fixing head
of the borehole 2.
- 3. In the grouting consolidation method for full casing borehole guide prefabricated
pile provided by the present application, the prefabricated pile is prefabricated
with a grouting channel for injecting the slurry into the borehole, and the pulling
out the casing in step S5 comprises continuously grouting into the borehole through
the grouting channel on the prefabricated pile during the process of pulling out the
casing, and during this process, the slurry can flow into the borehole simply and
conveniently through the grouting channel of the prefabricated pile to fill the gap
generated in this process. In addition, through the above method, the prefabricated
pile and the stratums around the borehole can be tightly cemented and fixed to be
adapted to various stratums, but also make the pulling of the casing smoother, and
reduce operation difficulty, thereby solving the problem that the existing cast-in-place
bored pile foundation in water has large amount of engineering work, long engineering
period and high engineering cost.
The injecting the slurry into the borehole in step S4 comprises grouting into the
borehole through the grouting channel on the prefabricated pile before pulling out
the casing.
The operation of grouting into the borehole through the grouting channel on the prefabricated
pile before pulling out the casing or directly injecting the slurry into the borehole
is simple and convenient, which can make the prefabricated pile and the stratum around
the borehole 2 tightly cemented and fixed together to form a prefabricated pile foundation,
thereby improving a connection strength of the prefabricated pile, soil, and sand
in the marine engineering environment.
- 4. In the grouting consolidation method for full casing borehole guide prefabricated
pile provided by the present application, the grouting channel comprises a first grouting
channel on a bottom surface of the prefabricated pile. Through setting a grouting
channel in the bottom surface and side surface of the prefabricated pile respectively,
so that the slurry can be injected into the borehole from the bottom surface of the
prefabricated pile, such that the slurry can more evenly and fully fill a gap between
the prefabricated pile and the borehole, and the prefabricated pile and the stratums
around the borehole 2 can be tightly cemented and fixed together to form a prefabricated
pile foundation.
- 5. In the grouting consolidation method for full casing borehole guide prefabricated
pile provided by the present application, during the foundation construction of water
projects with a water area having a base rock layer at a bottom thereof, the driving
a drilling rig carrying a casing to perform borehole construction to a preset hole
depth in step S1 comprises the following steps: sinking the casing to the base rock
layer, sinking a drilling bit of the drilling rig to the base rock layer through the
inner cavity of the casing, and drilling the base rock layer to form a base rock borehole
in the base rock layer; the removing the drilling bit of the drilling rig from the
base rock borehole, and housing the casing in the base rock borehole in step S2 comprises
removing the drilling bit of the drilling rig from the base rock borehole and the
casing sequentially, and a lower end of the casing entering an opening edge of the
inner cavity of the base rock borehole; and the borehole comprises the base rock borehole.
The drilling bit of the drilling rig passes through the casing to drill the base rock
layer, which can effectively solve the problem that the base rock layer is difficult
to be constructed in the construction process of the water area with the base rock
layer at the bottom thereof. Moreover, by pre-injecting the slurry into the base rock
borehole, and then sinking the prefabricated piles into the base rock borehole, the
descending impact effect of the prefabricated piles can effectively make more slurry
to fully filtrate into and consolidate with the base rock layer, thus the slurry fully
fills the bottom and side part of the base rock layer.
- 6. In the grouting consolidation method for full casing borehole guide prefabricated
pile provided by the present application, during the foundation construction of water
projects with a water area having a bottom comprising a loose layer and a base rock
layer sequentially from up to down,
the driving a drilling rig carrying a casing to perform borehole construction to a
preset hole depth in step S1 comprises: sinking the casing to the loose layer, and
the drilling rig drilling the loose layer to drive the casing through the loose layer
to form a loose layer borehole, removing mud and sand from the casing, sinking the
drilling bit of the drilling rig to the base rock layer through the inner cavity of
the casing, and drilling the base rock layer to form a base rock borehole in the base
rock layer; the removing the drilling bit of the drilling rig from the borehole, and
housing the casing in the borehole in step S2 comprises, removing the drilling bit
of the drilling rig from the base rock borehole and the casing sequentially, and a
lower end of the casing entering an opening edge of the inner cavity of the base rock
borehole; and the borehole comprises the loose layer borehole and the base rock borehole.
[0015] Corresponding to the construction process of water project with water area having
the loose layer and base rock layer from top to bottom thereof, the loose layer is
firstly drilled by the drilling bit of the drilling rig, and then the mud and sand
is discharged; then, the base rock layer is drilled by a drilling bit passing through
the casing, which effectively solves the problem of the construction difficulty of
the above water area caused by the loose layer and the base rock layer.
[0016] Moreover, the base rock layer and loose layer are filled and fixed respectively through
the following steps: pre-injecting the slurry into a base rock borehole, and then
filling the base rock borehole by sinking the prefabricated pile into the base rock
borehole; then during the process of lifting the casing, the slurry is continuously
injected into the loose layer through the grouting channel on the prefabricated pile.
[0017] Drilling in the base rock is performed in a manner of pre-injecting slurry and then
implanting the prefabricated pile, which can effectively make the slurry cemented
and fixed with the base rock borehole with sufficient time and the slurry can infiltrate
into the base rock more fully under the effect of the impact force of the prefabricated
pile. The loose layer is injected with the slurry during the casing is lifted, which
can be used to effectively fill the gap between the prefabricated pile and the casing
to complete the above grouting work, so that the prefabricated pile and the stratums
around the borehole in the loose layer can be cemented and fixed together with the
slurry.
BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly describe the technical solutions in the specific embodiments
of the present application or in the prior art, hereinafter the accompanying drawings
required to be used in the description of the specific embodiments or the prior art
will be briefly introduced. Apparently, the accompanying drawings described below
are only directed to some embodiments of the present application, and for those skilled
in the art, without expenditure of creative labor, other drawings can be derived on
the basis of these accompanying drawings.
Figure 1 is a schematic view showing the installation step of a full casing in a water
area with loose layer and base rock layer provided by the present application;
Figure 2 is a schematic view showing the step of pre-injecting the slurry to the base
rock layer in the water area with loose layer and base rock layer provided by the
present application;
Figure 3 is a schematic view showing the step of sinking the prefabricated pile to
a bottom of the pre-injected borehole in a water area with loose layer and base rock
layer provided by the present application;
Figure 4 is a schematic view showing the step of taking out a full casing in a water
area with loose layer and base rock layer provided by the present application;
Figure 5 is a schematic structural view showing a connection structure between the
prefabricated pile and a bottom of the water area with a loose layer and a base rock
layer provided by the present application after grouting consolidation process for
full casing borehole guide prefabricated pile is completed;
Figure 6 is a schematic structural view showing a prefabricated pile that sinks to
the bottom of the borehole provided by the present application;
Figure 7 is a schematic view showing a connection structure between the prefabricated
pile and the foundation of the environment when the full casing is taken out after
grouting consolidation process for full casing borehole provided by the present application.
Reference numerals:
[0019] 1- casing; 2- borehole; 3- slurry; 4- prefabricated pile; 5- grouting channel; 6-first
grouting channel; 7- second grouting channel; 8- loose layer; 9- base rock layer 10-
water surface; 11-liquid inlet end; 12- liquid outlet end; 13- base rock borehole;
14- loose layer borehole.
DETAILED DESCRIPTION
[0020] A clear and complete description of the technical solutions in the present application
will be given below, in conjunction with the accompanying drawings in the embodiments
of the present application. Apparently, the embodiments described below are a part,
but not all, of the embodiments of the present application. All of other embodiments,
obtained by those of ordinary skill in the art based on the embodiments of the present
application without any creative effort, fall into the protection scope of the present
application.
[0021] In the description of the present application, it needs to be noted that, the terms
such as "center", "on/above", "below", "left", "right", "vertical", "horizontal",
"inside", "outside" refer to the orientation or position relation based on the illustration
of the drawings, and merely for facilitating and simplifying the description of the
present application, but not indicating or implying that the apparatus or components
must have a specific orientation, or a specific configuration and operation. Thus,
it should be understood as a limitation to the present application. In addition, the
terms such as "first", "second", "third" are merely for the purpose of description,
but should not be understood as an indication or implication of relative importance.
[0022] In the description of the present application, it needs to be noted that, unless
specifically defined or restricted otherwise, terms "installation", "connection",
"connect" should be broadly construed, for example, they may be fixed connection or
detachable connection or integral connection; mechanical connection or electrical
connection; direct connection, or indirect connection via an intermediate medium,
or internal communication between two units; wireless connection or wired connection.
For those skilled in the art, the specific meaning of the aforementioned terms in
the present application can be understood according to specific situations thereof.
[0023] Furthermore, the technical features which the embodiments of the present application
provided below refer to can be combined with each other as long as no conflict is
constituted.
Example 1
[0024] In Example 1, it provides a grouting consolidation method for full casing borehole
guide prefabricated pile. The engineering environment for construction is shown in
Figures 1 to 7. During a construction process in the water area having loose layer
8 and base rock layer 9 from top to bottom sequentially at the bottom thereof, the
grouting consolidation method for full casing borehole guide prefabricated pile comprises
the following steps:
S1, sinking the casing 1 to the loose layer 8, and the drilling rig drilling the loose
layer 8 to drive the casing 1 through the loose layer 8 to form a loose layer borehole
14;
removing water, mud and sand from the casing 1;
sinking the drilling bit of the drilling rig to the base rock layer through the inner
cavity of the casing 1, and drilling the base rock layer to form a base rock borehole
13 in the base rock layer;
S2, removing the drilling bit of the drilling rig from the base rock borehole 13 and
the casing 1 sequentially, and a lower end of the casing 1 entering an opening edge
of the inner cavity of the base rock borehole 13 such that an end of the casing 1
is sleeved with the opening edge of the base rock borehole 13;
S3, pre-injecting a slurry into the borehole 2; before solidification of the slurry,
implanting the prefabricated pile 4 into the borehole 2 to reach the hole bottom of
the bore 2; and locating an upper end of the prefabricated pile 4 above the water
surface of the water area, so as to facilitate the grouting through a grouting channel
5 on the prefabricated pile 4 by a construction personnel;
S4, lifting the casing 1, and during the lifting of the casing 1, continuously injecting
the slurry into the base rock borehole 13 and the loose layer borehole 14 through
the grouting channel 5 on the prefabricated pile 4; the grouting channel 5 comprising
a first grouting channel 6 on a bottom surface of the prefabricated pile 4, during
the process of pulling out the casing 1, continuously injecting the slurry into the
loose layer borehole 14 through the first grouting channel 6, so that the prefabricated
piles 4 is respectively fixed and cemented with a hole wall and bottom of the base
rock borehole 13 and a hole wall of the loose layer borehole 14 into an integrated
structure;
S5, injecting the slurry between the prefabricated pile 4 and the stratums through
the second grouting channel 7 to achieve an effect of repeatedly strengthening the
prefabricated pile 4; corresponding to the construction process of water project with
a water area having the loose layer 8 and base rock layer 9 from top to bottom thereof,
drilling the loose layer 8 firstly by the drilling bit of the drilling rig, and then
discharging the mud and sand; drilling the base rock layer 9 by the drilling bit passing
through the casing 1, which effectively solves the problem of the construction difficulty
of the above water area caused by the loose layer 8 and the base rock layer 9. Moreover,
the base rock layer 9 and loose layer 8 is filled and fixed respectively through the
following steps: pre-injecting the slurry into a base rock borehole 13, and then filling
the base rock borehole 13 by sinking the prefabricated pile 4 into the base rock borehole
13; then during the process of lifting the casing 1, continuously injecting the slurry
into the loose layer 8 through the grouting channel 5 of the prefabricated pile. The
base rock borehole 13 in the base rock is performed in a manner of pre-injecting slurry
and then implanting the prefabricated pile 4, which can effectively make the slurry
cemented and fixed with the base rock borehole 13 with sufficient time and the slurry
can fully infiltrate into the base rock 9 under the effect of the impact force of
the prefabricated pile 4. The loose layer 8 is injected with the slurry during the
casing 1 is lifted, which can be used to effectively fill the gap between the prefabricated
pile 4 and the casing 1 to complete the above grouting work, so that the prefabricated
pile 4 and the stratums around the loose layer borehole 14 can be cemented and fixed
together with the slurry.
[0025] Furthermore, through setting a grouting channel in the bottom surface and side surface
of the prefabricated pile 4 respectively, so that the slurry can be injected into
the base rock borehole 13 and loose layer borehole 14 from the bottom surface and
side surface of the prefabricated pile 4 respectively, such that the slurry can more
evenly and fully fill in a gap between the prefabricated pile 4 and the base rock
borehole 13, and a gap between the prefabricated pile 4 and the loose layer borehole
14; and the prefabricated pile 4 and the stratums around the borehole 2 can be tightly
cemented and fixed together to form a prefabricated pile 4 foundation. In addition,
the present application firstly provide a casing 1 for cooperation wth drilling holes,
then guides the prefabricated pile 4 into the stratums of the borehole 2, and finally
injects a slurry 3 for consolidation to realize the construction of water area stratums.
Through the above methods, the construction of pile foundations in rivers, lakes and
seas and other water areas can be realized. Since the steps of cofferdam-built island
construction and demolition thereof can be omitted, and the above casing 1 can be
reused, the problem of large amount of engineering, long engineering period, and high
engineering cost in the cast-in-place bored pile foundation construction can be solved,
while ensuring the construction intensity. In addition, in this application, a certain
volume of slurry 3 is injected into the steel casing 1 before the steel casing 1 is
pulled out, and the slurry 3 can permeate a soil layer or sand layer at the bottom
of the steel casing 1 to make the stratum at bottom of the borehole 2 and the bottom
of the prefabricated pile 4 closely cemented together. Thus, a solid fixed structure
after solidification can be formed at the bottom of the borehole 2.
[0026] Moreover, when lifting the steel casing 1, the slurry 3 can be tightly cemented and
fixed with the stratums around the borehole 2, such that the prefabricated pile 4
and the stratums around the sidewall of the borehole 2 will be tightly cemented and
fixed together to form a prefabricated pile foundation, which in turn, improves the
connection strength of the prefabricated pile 4 with the soil and sand in the foundation
environment or the marine engineering environment.
[0027] In Example 1, a prefabricated pile comprises:
a pile body being a reinforced concrete prefabricated pile, and
a grouting channel 5, arranged on the pile body, wherein a liquid inlet end 11 of
the grouting channel 5 extends out of an upper end surface of the pile body, and a
liquid outlet end 12 of the grouting channel 5 extends out of a lower end surface
of the pile body and/or a side surface of the pile body.
[0028] In Example 1, the casing 1 is made of metal, and the bottom end of the casing 1 has
a tooth-like structure for cutting the soil.
[0029] Certainly, the position of the upper end of the prefabricated pile 4 is not specifically
limited in the application. In other Examples, the upper end of the prefabricated
pile 4 is located below the water surface of the water area.
[0030] Certainly, the material and composition of the slurry 3 is not specifically limited
in the application. In other Examples, the slurry 3 can also be mortar or chemical
slurry, as well as two or three of cement slurry, mortar slurry and chemical slurry.
mixture.
[0031] Certainly, the present application does not specifically limit the connection manner
of the grouting channel 5 and the steel cage. In other Examples, the grouting channel
5 is preset on the steel cage.
[0032] Certainly, the present application does not specifically limit the arrangement manner
and number of grouting channels on the prefabricated pile 4. In other Examples, the
prefabricated pile 4 only comprises a plurality of first grouting channels 6 located
on the bottom surface of the prefabricated pile 4, or the prefabricated pile 4 only
comprises a plurality of second grouting channels 7 on the side surface of the prefabricated
pile 4.
[0033] Certainly, the application of the present application does not specifically limit
the function of the second grouting channel 7. In other Examples, in the process of
pulling out the casing 1, the slurry can be continuously injected into the borehole
14 in the loose layer through the first grouting channel 6 and the second grouting
channel 7.
Example 2
[0034] Example 2 differs from Example 1 in that the grouting consolidation method for full
casing borehole guide prefabricated pile in the engineering construction environment
of the water area having base rock 9 at the bottom thereof, comprise the following
steps:
S1, sinking the casing 1 to the base rock layer; sinking a drilling bit of the drilling
rig to the base rock layer through the inner cavity of the casing 1, and drilling
the base rock layer to form a base rock borehole 13 in the base rock layer;
S2: the lower end of the casing 1 entering an opening edge of the inner cavity of
the base rock borehole 13, so that an end of the casing 1 is sleeved with the opening
edge of the base rock borehole 13, and the drilling bit of the drilling rig is sequentially
removed from the base rock bore 13 and the casing 1;
S3, pre-injecting a slurry 3 into the borehole 2; before solidification of the slurry
3, the prefabricated pile 4 is implanted into the base rock borehole 13 to reach the
hole bottom thereof;
S4. pulling out the casing 1 so that the inner cavity of the prefabricated pile 4
and the borehole 2 are fixed and cemented into an integrated structure.
[0035] In this Example, the drilling bit of the drilling rig passes through the casing 1
to drill the base rock layer 9, which can effectively solve the problem that the base
rock layer 9 is difficult to be constructed during the construction of the water area
with the base rock layer 9 at the bottom thereof. Moreover, by pre-injecting the slurry
3 into the base rock borehole 13, and then sinking the prefabricated pile 4 into the
base rock borehole 13, more slurry 3 can effectively infiltrate into and consolidate
the rock layer 9 through a descending impact of the prefabricated pile 4 such that
the slurry 3 can fully fill in the bottom and side part of the base rock layer 9.
Example 3
[0036] Example 3 differs from Example 1 in that the grouting consolidation method for full
casing borehole guide prefabricated pile in the engineering construction environment
of the water area having a loose layer 8 at the bottom thereof, comprise the following
steps:
S1, sinking a casing 1 to the loose layer 8, and drilling the loose layer 8 to form
a loose layer borehole 14 by a drilling rig which drives the casing 1 into the loose
layer 8; removing the mud and sand from the casing 1;
S2, housing the casing 1 in the loose layer borehole 14;
S3, implanting the prefabricated pile 4 into the loose layer borehole 14 so that the
prefabricated pile 4 reaches a bottom of the loose layer borehole 14;
S4, lifting the casing 1; and during the lifting of the casing 1, continuously injecting
the slurry into the loose layer borehole 14 through the grouting channel 5 on the
prefabricated pile 4; the grouting channel 5 comprising a first grouting channel 6
on a bottom surface of the prefabricated pile 4, during the process of pulling out
the casing 1, continuously injecting the slurry into the loose layer borehole 14 through
the first grouting channel 6, so that the prefabricated piles 4 is fixed and cemented
with a hole wall and bottom of the loose layer borehole 14 to form an integrated structure.
[0037] Obviously, the above-described examples are only examples for clear illustration,
but not intended to limit the examples. Other variations or modifications in the various
forms can be made by those skilled in the art based on the above description. There
is no need and no way to exhaust all of the examples. The obvious changes or variations
derived therefrom are still within the scope of protection claimed by the present
disclosure.
1. A method for grouting and consolidating a full casing borehole guide prefabricated
pile,
characterized in that,
the method is used for foundation construction of water projects and comprises the
following steps:
S1. driving a drilling rig carrying a casing (1) to perform borehole construction
to a preset hole depth to form a borehole (2);
S2. housing the casing (1) in the borehole (2);
S3. implanting a prefabricated pile (4) into the borehole (2) so that the prefabricated
pile (4) reaches a hole bottom of the borehole (2);
S4. injecting a slurry (3) into the borehole (2);
S5. pulling out the casing (1) so that the prefabricated pile (4) and an inner cavity
of the borehole (2) are fixed and cemented into an integrated structure.
2. The method according to claim 1,
characterized in that,
the implanting a prefabricated pile (4) into the borehole (2) so that the prefabricated
pile (4) reaches a hole bottom of the borehole (2) in step S3 comprises the following
steps:
pre-injecting a slurry (3) into the borehole (2);
before solidification of the slurry (3), the prefabricated pile (4) is implanted into
the borehole (2) to reach the hole bottom of the bore (2).
3. The method according to claim 1 or 2,
characterized in that,
the prefabricated pile (4) is prefabricated with a grouting channel (5) for injecting
the slurry (3) into the borehole (2),
the pulling out the casing (1) in step S5 comprises continuously grouting into the
borehole (2) through the grouting channel (5) on the prefabricated pile (4) during
the process of pulling out the casing (1), and/or
the injecting the slurry (3) into the borehole (2) in step S4 comprises grouting into
the borehole (2) through the grouting channel (5) on the prefabricated pile (4) before
pulling out the casing (1).
4. The method according to claim 3,
characterized in that,
the grouting channel (5) comprises a first grouting channel (6) on a bottom surface
of the prefabricated pile (4);
the pulling out the casing (1) in step S5 comprises continuously grouting into the
borehole (2) through the first grouting channel (6) during the process of pulling
out the casing (1), and/or
the injecting the slurry (3) into the borehole (2) in step S4 comprises grouting into
the borehole (2) through the first grouting channel (6) before pulling out the casing
(1).
5. The method according to claim 3 or 4,
characterized in that,
the grouting channel (5) comprises a second grouting channel (7) located at a side
of the prefabricated pile (4) for grouting between the prefabricated pile (4) and
the bore hole (2); and
the method further comprises a step S6, grouting between the prefabricated pile (4)
and the bore hole (2) through the second grouting channel (7).
6. The method according to any one of claims 1 to 5,
characterized in that,
during the foundation construction of water projects with a water area having a base
rock layer (9) at a bottom thereof,
the driving a drilling rig carrying a casing (1) to perform borehole construction
to a preset hole depth in step S1 comprises the following steps:
sinking the casing (1) to the base rock layer;
sinking a drilling bit of the drilling rig to the base rock layer through the inner
cavity of the casing (1), and
drilling the base rock layer to form a base rock borehole (13) in the base rock layer;
and
the removing the drilling bit of the drilling rig from the base rock borehole (13),
and housing the casing (1) in the base rock borehole (13) in step S2 comprises,
removing the drilling bit of the drilling rig from the base rock borehole (13) and
the casing (1) sequentially, and a lower end of the casing (1) entering an opening
edge of the inner cavity of the base rock borehole (13); and
the borehole (2) comprises the base rock borehole (13).
7. The method according to any one of claims 1 to 5,
characterized in that
during the foundation construction of water projects with a water area having a bottom
comprising a loose layer (8) and a base rock layer (9) sequentially from up to down,
the driving a drilling rig carrying a casing (1) to perform borehole construction
to a preset hole depth in step S1 comprises:
sinking the casing (1) to the loose layer (8), and the drilling rig drilling the loose
layer (8) to drive the casing (1) through the loose layer (8) to form a loose layer
borehole (14);
removing mud and sand from the casing (1);
sinking the drilling bit of the drilling rig to the base rock layer through the inner
cavity of the casing (1), and drilling the base rock layer to form a base rock borehole
(13) in the base rock layer;
the removing the drilling bit of the drilling rig from the borehole (2), and housing
the casing (1) in the borehole (2) in step S2 comprises,
removing the drilling bit of the drilling rig from the base rock borehole (13) and
the casing (1) sequentially, and a lower end of the casing (1) entering an opening
edge of the inner cavity of the base rock borehole (13); and
the borehole (2) comprises the loose layer borehole (14) and the base rock borehole
(13).
8. The method according to any one of claims 1 to 5,
characterized in that,
during the foundation construction of water projects with a water area having a loose
layer (8) at a bottom thereof,
the driving a drilling rig carrying a casing (1) to perform borehole construction
to a preset hole depth in step S1 comprises:
sinking the casing (1) to the loose layer (8), and the drilling rig drilling the loose
layer (8) to form a loose layer borehole (14) to bring the casing (1) into the loose
layer (8);
removing mud and sand from the casing (1).
9. The method according to any one of claims 6 to 8,
characterized in that
an upper end of the prefabricated pile (4) is located above a water surface of the
water area, and /or
an upper end of the prefabricated pile (4) is located below a water surface of the
water area.
10. The method according to any one of claims 1 to 9, characterized in that
the slurry (3) comprises cement slurry and/or mortar and/or chemical slurry.
11. A prefabricated pile, comprising
a pile body, and
a grouting channel (5), arranged on the pile body, wherein a liquid inlet end (11)
of the grouting channel (5) extends out of an upper end surface of the pile body,
and a liquid outlet end (12) of the grouting channel (5) extends out of a lower end
surface of the pile body and/or a side surface of the pile body.
12. The prefabricated pile according to claim 11, characterized in that,
the pile body is a reinforced concrete prefabricated pile, and the grouting channel
(5) is a grouting pipe prefabricated on a steel cage of the pile body.