Technical Field
[0001] The present disclosure relates to a user terminal and a radio communication method
in next-generation mobile communication systems.
Background Art
[0002] In the UMTS (universal mobile telecommunications system) network, the specifications
of Long-Term Evolution (LTE) have been drafted for the purpose of further increasing
high speed data rates, providing lower latency, and so on (see Non-Patent Literature
1). The specifications of LTE-A (LTE-Advanced, LTE Rel.10, Rel. 11, Rel. 12, Rel.
13) also have been drafted for the purpose of further high capacity and advancement
of the LTE (LTE Rel. 8, Rel. 9) or the like.
[0003] Successor systems of LTE (referred to as, for example, FRA (Future Radio Access),
5G (5th generation mobile communication system), 5G+(plus), NR (New Radio), NX (New
radio access), FX (Future generation radio access), LTE Rel.14, LTE Rel.15 or later
versions, and so on) are also under study.
[0004] In the existing LTE system (for example, LTE Rel. 8 to Rel. 14), a user terminal
(UE (User Equipment)) controls reception of a downlink shared channel (for example,
PDSCH (Physical Downlink Shared Channel)) based on downlink control information (DCI
(Downlink Control Information, also referred to as DL assignment, or the like) transmitted
on a downlink control channel (for example, PDCCH (Physical Downlink Control Channel).
The user terminal also controls transmission of an uplink shared channel (for example,
PUSCH (Physical Uplink Shared Channel) based on DCI (also referred to as an UL grant
or the like).
[0005] In existing LTE systems, downlink (DL) and/or uplink (UL) communications are carried
out using 1 ms subframes (referred to as, for example, "transmission time intervals
(TTIs)", and so on). This subframe is the unit of time to transmit one data packet
that is channel-encoded, and is the processing unit in scheduling, link adaptation,
retransmission control (HARQ (Hybrid Automatic Repeat Request), and so on.
[0006] In the existing LTE system, an acknowledgment signal (also referred to as HARQ-ACK,
ACK/NACK, or A/N) for a DL signal (for example, PDSCH) is controlled to be fed back
4 subframes after.
Citation List
Non-Patent Literature
Summary of Invention
Technical Problem
[0008] In future radio communication systems (for example, NR, 5G, 5G+, or Rel.15 or later
versions), it is assumed that a transmission timing of an acknowledgment signal (also
referred to as HARQ-ACK, ACK/NACK, or A/N) for a DL signal (for example, PDSCH) is
specified to the UE by use of the DCI or the like. It is also assumed that the UE
feeds back a HARQ-ACK based on a codebook (in units of codebooks).
[0009] In the NR, it is assumed that transmission of an uplink shared channel (PUSCH) is
specified to the UE by use of the DCI or the like, and the UE transmits a HARQ-ACK
on the uplink shared channel.
[0010] However, how to control the HARQ-ACK transmitted on the uplink shared channel is
problematic. If the HARQ-ACK codebook cannot be appropriately transmitted, communication
quality is possibly deteriorated.
[0011] Then, one of objects of the present disclosure is to provide a user terminal and
radio communication method for appropriately controlling transmission of an acknowledgment
signal on an uplink shared channel.
Solution to Problem
[0012] A user terminal according to an aspect of the present disclosure includes a transmission
section that transmits a plurality of uplink shared channels by repetition transmissions,
and a control section that transmits, based on the number of HARQ-ACKs (Hybrid Automatic
Repeat reQuest-Acknowledgements) for downlink data, the HARQ-ACK on at least one the
plurality of uplink shared channels.
Advantageous Effects of Invention
[0013] According to an aspect of the present disclosure, transmission of an acknowledgment
signal on an uplink shared channel can be appropriately controlled.
Brief Description of Drawings
[0014]
FIG. 1 is a diagram to show an example of HARQ-ACK piggyback in PUSCH repetition transmissions;
FIG. 2 is a diagram to show an example of HARQ-ACK piggyback according to Aspect 1-1-1;
FIG. 3 is a diagram to show an example of HARQ-ACK piggyback according to Aspect 1-1-2;
FIG. 4 is a diagram to show an example of HARQ-ACK piggyback according to Aspect 1-2-1;
FIG. 5 is a diagram to show an example of HARQ-ACK piggyback according to Aspect 1-2-2;
FIG. 6 is a diagram to show an example of HARQ-ACK piggyback according to Aspect 2-1-1;
FIG. 7 is a diagram to show an example of HARQ-ACK piggyback according to Aspect 2-1-2;
FIG. 8 is a diagram to show an example of HARQ-ACK piggyback according to Aspect 2-2-1;
FIG. 9 is a diagram to show an example of HARQ-ACK piggyback according to Aspect 2-2-2;
FIG. 10 is a diagram to show an example of a schematic structure of a radio communication
system according to the present embodiment;
FIG. 11 is a diagram to show an example of an overall structure of a base station
according to the present embodiment;
FIG. 12 is a diagram to show an example of a functional structure of the base station
according to the present embodiment;
FIG. 13 is a diagram to show an example of an overall structure of a user terminal
according to the present embodiment;
FIG. 14 is a diagram to show an example of a functional structure of the user terminal
according to the present embodiment; and
FIG. 15 is a diagram to show an example of a hardware structure of the base station
and the user terminal according to the present embodiment.
Description of Embodiments
(HARQ-ACK Codebook)
[0015] For future radio communication systems (hereinafter, also referred to as NR), a study
is underway to semi-statically or dynamically determine a HARQ-ACK codebook (which
is may be referred to as a HARQ-ACK size) by a UE. The base station may notify the
UE of information indicating a method for determining the HARQ-ACK codebook (for example,
information indicating whether the HARQ-ACK codebook is semi-static or dynamic) through
higher layer signaling. The HARQ-ACK codebook may be referred to as a PDSCH HARQ-ACK
codebook.
[0016] Here, higher layer signaling may be, for example, any of RRC (Radio Resource Control)
signaling, MAC (Medium Access Control) signaling, broadcast information and the like,
or a combination of these.
[0017] For MAC signaling, MAC control element (MAC CE), MAC PDU (Protocol Data Unit), and
the like may be used, for example. The broadcast information may be, for example,
a master information block (MIB), a system information block (SIB), minimum system
information (RMSI (Remaining Minimum System Information)), other system information
(OSI), and the like.
[0018] In a case that the UE is configured to semi-statically determine a HARQ-ACK codebook
(or, a semi-static HARQ-ACK codebook) in a given cell, cell group (CG), PUCCH group,
or the like, the determination of the HARQ-ACK codebook may be referred to as a type
1 HARQ-ACK codebook determination. In a case that the UE is configured to dynamically
determine a HARQ-ACK codebook (or, a dynamic HARQ-ACK codebook), the determination
of the HARQ-ACK codebook may be referred to as a type 2 HARQ-ACK codebook determination.
[0019] The UE may determine the number of bits of the HARQ-ACK based on a structure configured
through higher layer signaling in the type 1 (semi-static) HARQ-ACK codebook determination.
The configured structure may include, for example, the number (for example, maximum
number, minimum number, or the like) of DL transmissions (for example, PDSCH) to be
scheduled across a range associated with the HARQ-ACK feedback timing.
[0020] That range is also referred to as a HARQ-ACK bundling window, a HARQ-ACK feedback
window, a bundling window, a feedback window, and so on. The bundling window may correspond
to at least one of ranges of space, time, and frequency.
[0021] On the other hand, the UE may determine the number of HARQ-ACK bits based on a bit
string of a DL assignment index (DAI (Downlink Assignment Indicator (index)) field
included in downlink control information (for example, DL assignment) in the type
2 (dynamic) HARQ-ACK codebook determination.
[0022] The UE may determine (generate) a HARQ-ACK information bit based on the determined
HARQ-ACK codebook and transmit the generated HARQ-ACK using at least one of an uplink
control channel (PUCCH (Physical Uplink Control Channel)) and an uplink shared channel
(PUSCH (Physical Uplink Shared Channel)).
[0023] The base station may transmit information on the total number of pieces of DL data
to be scheduled to the UE with being included in the downlink control information
used to indicate the PDSCH scheduling. Note that in a case that the bundling window
is configured with a plurality of time units, the base station may notify of the total
number of pieces of DL data until each slot, to the DCI transmitted in each slot.
[0024] The information on the total number of pieces of DL data to be scheduled corresponds
to the total number of bits of the HARQ-ACK (or a codebook size) fed back by the UE.
The information on the total number of pieces of DL data to be scheduled may be referred
to as a total DAI (T-DAI, DL total DAI).
[0025] The DCI used for scheduling each PDSCH may include a counter DAI (C-DAI) in addition
to the total DAI. The counter DAI indicates a cumulative total value of the scheduled
data. For example, the downlink control information of one or a plurality of CCs to
be scheduled in a certain time unit (slot or subframe) may include the counter DAIs
numbered in the order of a CC index. In a case that the HARQ-ACKs for the DL data
to be scheduled across a plurality of time units are collectively fed back (for example,
in a case that the bundling window includes a plurality of slots), the counter DAI
may apply across the plurality of time units.
[0026] The counter DAI may be cumulated in ascending order of the CC indexes from a duration
with a small slot index.
[0027] The total DAI indicates a sum (the total number) of pieces of the scheduled data.
For example, the downlink control information for one or a plurality of CCs to be
scheduled in a certain time unit (slot or subframe) may respectively include the number
of pieces of the data to be scheduled. That is, the total DAIs included in the downlink
control information transmitted in the same slot have the same value. In the case
that the HARQ-ACKs for the DL data to be scheduled across a plurality of time units
are collectively fed back (for example, in the case that the bundling window includes
a plurality of slots), the total DAI may be configured across the plurality of time
units.
[0028] In a case that the UE is configured with a dynamic HARQ-ACK codebook through higher
layer signaling or the like from the base station, the UE may control a HARQ-ACK bit
arrangement (also referred to as a HARQ-ACK bit order, or an A/N assignment order)
to be fed back based on the counter DAI included in the downlink control information.
[0029] In a case that the counter DAI included in the downlink control information received
by the UE is nonconsecutive, the UE feeds back the relevant nonconsecutive object
(DL data) as a NACK to the base station. With this configuration, even in a case that
the UE fails to detect the downlink control information itself for scheduling the
data of a certain CC, the UE can appropriately perform retransmission control by a
feedback as a NACK even if the UE cannot recognize the CC failed to be detected.
[0030] In such a manner, the HARQ-ACK bit order is determined based on the value of the
counter DAI (counter DAI value). The counter DAI value in a given time unit (for example,
PDCCH monitoring occasion) is determined based on the CC (or, cell) index.
[0031] In the NR, a study is underway to define at least a first DCI format and a second
DCI format as the DCI for scheduling the DL transmission (for example, PDSCH). The
first DCI format and the second DCI format are so defined they are different from
each other in content, a payload size and the like. The first DCI format may be referred
to as DCI format 1_0 and the second DCI format may be referred to as DCI format 1_1.
[0032] Similarly, a study is underway to define at least DCI format 0_0 and DCI format 0_1
as the DCI for scheduling the UL transmission (for example, PUSCH).
[0033] For NR, a study is underway in which the counter DAI is included in both the first
DCI format and the second DCI format, whereas the total DAI is configured to be included
in one DCI format. Specifically, the first DCI format may not include the total DAI,
but the second DCI format may include the total DAI.
[0034] Next, the feedback control of the HARQ-ACK by use of the PUSCH will be described.
[0035] In a case that the UE multiplexes a HARQ-ACK feedback on a PUSCH to not be scheduled
in the DCI format (configured-grant PUSCH) or a PUSCH to be scheduled in DCI format
0_0, the same operation as that in multiplexing the HARQ-ACK on the PUCCH can be applied.
That is, a 2-bit counter DAI may be included in at least one of the first DCI format
1_0 and the second DCI format 1_1, whereas a 2-bit total DAI may be included in one
DCI format (for example, the second DCI format 1_1).
[0036] In contrast, in a case that the UE multiplexes the HARQ-ACK feedback on the PUSCH
to be scheduled in DCI format 0_1, the 2-bit counter DAI is included in at least one
of first DCI format 1_0 and the second DCI format 1_1. The UE may use, as the total
DAI, an UL DAI (for example, first two bits) included in the DCI (for example, DCI
format 0_1) for scheduling the PUSCH.
[0037] Note that in a case that only one serving cell is configured, the second DCI format
1_1 may be configured not to include the total DAI.
[0038] In a case of HARQ-ACK transmission using the dynamic HARQ-ACK codebook, the UE may
perform the HARQ-ACK transmission in units of transport blocks (TBs) or in units of
code blocks (CBs). In this case, the HARQ-ACK codebooks may be separately generated
(or, a codebook and a sub-codebook may be generated) for the TB-based HARQ-ACK transmission
and the CB-based HARQ-ACK transmission.
[0039] For example, a 2-bit counter DAI may be included in at least one of first DCI format
1_0 and second DCI format 1_1, and a 2-bit total DAI may be included in one DCI format
(for example, second DCI format 1_1). First two bits of the total DAI in a UL direction
may be included as a first sub-codebook in DCI format 0_1, and next two bits of the
total DAI in the UL direction may be included as a next sub-codebook in DCI format
0_1.
(PDSCH-to-ACK timing)
[0040] In NR, the UE determines a timing from receiving a PDSCH to transmitting a HARQ-ACK
corresponding to the PDSCH (which may be also referred to as a PDSCH-to-ACK timing,
"K1", and so on) based on the DCI (which may be referred to as a DL DCI, a DL assignment,
DCI format 1_0, DCI format 1_1, and the like) for scheduling the PDSCH.
[0041] For example, when detecting DCI format 1_0, the UE transmits, based on a field for
indication of timing from PDSCH to HARQ (HARQ feedback timing information, "PDSCH-to-HARQ-timing-indicator
field") included in the DCI, a HARQ-ACK corresponding to the PDSCH in a slot n + k
(for example, k is an integer from 1 to 8) with reference to a slot n including a
last symbol of the PDSCH.
[0042] When detecting DCI format 1_1, the UE transmits, based on a "PDSCH-to-HARQ-timing-indicator
field" included in the DCI, a HARQ-ACK corresponding to the PDSCH in a slot n + k
with reference to a slot n including a last symbol of the PDSCH. A correspondence
relationship between k and the above timing indicator field here may be configured
to the UE for each PUCCH (or PUCCH group, cell group) through higher layer signaling.
[0043] For example, the above correspondence relationship may be configured by a parameter
(which may be referred to as a dl-DataToUL-ACK, a Slot-timing-value-Kl, and so on)
included in a PUCCH configuration information element (PUCCH Config information element)
of RRC signaling. For example, a plurality of candidate values of a PDSCH-to-ACK timing
indicator may be configured by the K1 through higher layer signaling, and one of the
plurality of candidate values may be indicated by the DCI for scheduling the
PDSCH.
[0044] The K1 may be configured for each PUCCH group (or cell group). The K1 may be a time
determined based on numerology (for example, SCS) for a channel transmitting the HARQ-ACK
(for example, PUCCH or PUSCH).
(HARQ-ACK Transmission on PUSCH)
[0045] In a case that a timing of a specific PUSCH based on the UL DCI (for example, a slot)
matches a timing of a HARQ-ACK based on the DL DCI (for example, a slot), the UE may
piggyback the HARQ-ACK onto the specific PUSCH.
[0046] The UE may transmit a HARQ-ACK codebook on one PUSCH in PUSCH repetition transmissions
and a HARQ-ACK codebook on another PUSCH in the PUSCH repetition transmissions.
[0047] A study is underway to indicate HARQ-ACK piggyback onto a PUSCH by an UL DAI in DCI
format 0_1 for scheduling PUSCH repetition transmissions (a DAI in the DCI for scheduling
the PUSCH (UL grant), a first DAI).
[0048] In a case that the UE is configured with a semi-static HARQ-ACK codebook, the UL
DAI is one bit long, which indicates whether or not a HARQ-ACK is piggybacked. In
a case that the UE is configured with a dynamic HARQ-ACK codebook, the UL DAI is two
bits long, which indicates a HARQ-ACK codebook size.
[0049] In an example of FIG. 1, the UE receives DCI #0 in slot #0 to receive PDSCH #0 based
on DCI #0. The DCI 0 schedules PDSCH #0 and indicates slot #6 as a HARQ-ACK feedback
timing for PDSCH #0. After that, the UE receives DCI #1 in slot #1 to receive PDSCH
#1 based on DCI #1. DCI #1 schedules PDSCH #1 and indicates slot #8 as a HARQ-ACK
feedback timing for PDSCH #1.
[0050] After that, the UE receives DCI #3 in slot #4. DCI #3 schedules PUSCH repetition
transmissions including the PUSCHs #0 to #3 in slots #6 to #9. After that, the UE
transmits the PUSCHs #0 to #3 in slots #6 to #9, based on DCI #3.
[0051] In this case, the UE piggybacks a HARQ-ACK codebook for PDSCH #0 onto the PUSCH #0,
and piggybacks a HARQ-ACK codebook for PDSCH #1 onto the PUSCH #2.
[0052] In the case that two HARQ-ACK codebooks are piggybacked onto one PUSCH repetition
transmission in this way, it can be assumed that the UL DAI indicates only the HARQ-ACK
codebook on one PUSCH in the PUSCH repetition transmission. In this case, how the
UE controls the HARQ-ACK transmission based on the UL DAI is not clear. Therefore,
the base station may possibly not receive correctly the HARQ-ACK codebook on the PUSCH
repetition transmission.
[0053] In a case that the UE fails to receive the DCI (DL total DAI) for scheduling the
PDSCH, the number of HARQ-ACKs transmitted by the UE is different from the DL total
DAI, and therefore, the base station cannot appropriately acquire the HARQ-ACK.
[0054] Then, the inventors of the present invention have conceived of a method for appropriately
controlling the transmission of the acknowledgment signal (HARQ-ACK) in the repetition
transmissions of the uplink shared channel.
[0055] Hereinafter, embodiments according to the present invention will be described with
reference to the drawings. Aspects described below may be employed independently or
in combination.
(Aspect 1)
[0056] The UE may not repeat rate matching for the PUSCH in a case of piggybacking the UCI
(HARQ-ACK) in the PUSCH repetition transmissions.
[0057] The UE may perform rate matching of the UL data in one PUSCH in the PUSCH repetition
transmissions (a specific PUSCH), and may not perform the rate matching of the UL
data in a PUSCH other than the specific PUSCH in the PUSCH repetition transmissions
(non-specific PUSCH).
[0058] The UE may not perform the rate matching of the UL data regardless of whether to
perform the rate matching of the UL data in the specific PUSCH in the PUSCH repetition
transmissions, in the non-specific PUSCH in the PUSCH repetition transmissions. In
other words, the UE may not perform the rate matching of the UL data in the non-specific
PUSCH regardless of whether or not the non-specific PUSCH is a HARQ-ACK feedback timing.
<Aspect 1-1>
[0059] A description is given of a case that the UE is configured with a semi-static HARQ-ACK
codebook (type 1 HARQ-ACK codebook determination).
[0060] The UE configured with the semi-static HARQ-ACK codebook may comply with one of next
Aspects 1-1-1 and 1-1-2.
<<Aspect 1-1-1>>
[0061] The DAI (UL DAI) in the DCI (UL DCI, UL grant, DCI format 0_0, 0_1) for scheduling
PUSCH repetition transmissions may indicate whether a HARQ-ACK is piggybacked onto
one PUSCH (specific PUSCH) in the PUSCH repetition transmissions.
[0062] The specific PUSCH may be a PUSCH satisfying a given condition among the PUSCHs carrying
the HARQ-ACK in the PUSCH repetition transmissions. The given condition may be one
of the next three conditions 1 to 3.
- Condition 1
[0063] The specific PUSCH may be a PUSCH being the earliest and having the smallest CC index
among some PUSCHs each carrying the HARQ-ACK in the PUSCH repetition transmissions.
In a case that the PUSCH repetition transmissions are repetitions in a time direction,
the specific PUSCH may be the earliest PUSCH among some PUSCHs each carrying the HARQ-ACK
in the PUSCH repetition transmissions. In a case that the PUSCH repetition transmissions
are repetitions in a frequency direction, the specific PUSCH may be a PUSCH having
the smallest CC index among some PUSCHs each carrying the HARQ-ACK in the PUSCH repetition
transmissions.
- Condition 2
[0064] The specific PUSCH may be a PUSCH onto which piggybacked is a HARQ-ACK for a PDSCH
being the earliest and having the smallest CC index among the PUSCHs in the PUSCH
repetition transmissions.
- Condition 3
[0065] The specific PUSCH may be a PUSCH onto which piggybacked is a HARQ-ACK based on a
PDCCH being the earliest and having the smallest CC index among the PUSCHs in the
PUSCH repetition transmissions.
[0066] The DAI (DL total DAI) in the DCI (DL DCI, DL assignment, DCI format 1_0, 1_1) for
scheduling the PDSCH may indicate the number of PDSCHs (the number of HARQ-ACKs) to
be scheduled.
[0067] The UE may control the HARQ-ACK piggyback onto the specific PUSCH (at least one of
presence or absence of the HARQ-ACK piggyback and the HARQ-ACK codebook size) based
on at least one of the DL total DAI in the DL DCI and the UL DAI in the UL DCI.
[0068] The UE can determine the HARQ-ACK transmission on the specific PUSCH based on the
UL DAI even in a case of failing to receive the DL DAI corresponding to the specific
PUSCH, and therefore, the base station can appropriately receive the HARQ-ACK.
[0069] In the case of piggybacking the HARQ-ACK onto the specific PUSCH, the UE may map
(multiplex) the HARQ-ACK to a resource acquired by the rate matching of the UL data
on the PUSCH.
[0070] A process of the rate matching for the PUSCH is to control the number of bits after
coding (coded bits) in consideration of actually available radio resources. In a case
that the number of coded bits is smaller than the number of bits mappable to the actually
available radio resources, at least some of the coded bits may be repeated. In a case
that the number of coded bits is larger than the number of mappable bits, some of
coded bits may be deleted.
[0071] In a case that the UE transmits the HARQ-ACK of up to N bits on the specific PUSCH,
the UE may map (multiplex) the HARQ-ACK to a resource acquired by puncturing the UL
data on the specific PUSCH. In a case that the UE transmits the HARQ-ACK of more than
N bits on the specific PUSCH, the UE may map (multiplex) the HARQ-ACK to a resource
acquired by the rate matching of the UL data on the specific PUSCH. N may be 2 or
another integer.
[0072] A process of puncturing the PUSCH is to perform coding assuming that the resource
allocated for the PUSCH can be utilized (or without consideration of an amount of
an unavailable resource), but may mean that a coded symbol is not mapped to an actually
unavailable resource (that is, a free resource is made). On a receiving side, performance
deterioration due to the puncturing can be suppressed by not using the coded symbol
of the punctured resource in decoding.
[0073] The HARQ-ACK of up to N bits may be allowed to be piggybacked onto the non-specific
PUSCH in the PUSCH repetition transmissions. In other words, the UE may piggyback
the HARQ-ACK of up to N bits onto the non-specific PUSCH in the PUSCH repetition transmissions.
N may be 2 or another integer. The UE may map (multiplex) the HARQ-ACK to a resource
acquired by puncturing the UL data on the non-specific PUSCH.
[0074] The UE may determine whether to piggyback the HARQ-ACK onto the non-specific PUSCH,
based on the DL DAI (DL total DAI) and a given number N.
[0075] The UE may be configured with a HARQ-ACK association set (HARQ-ACK codebook association
set, DL association set) to associate a PDSCH slot with a PUSCH slot based on the
HARQ-ACK association set. The HARQ-ACK association set (DL association set) indicates
the PDSCH slot associated with the HARQ-ACK transmitted in one slot.
[0076] The UE may transmit a NACK as a HARQ-ACK for a slot with no PDSCH in the HARQ-ACK
association set.
[0077] The base station may not configure the HARQ-ACK of more than N bits on the non-specific
PUSCH. In other words, the UE may assume that the HARQ-ACK of more than N bits is
not configured on the non-specific PUSCH (or, may not assume that the HARQ-ACK of
more than N bits is configured on the non-specific PUSCH). In the case that the HARQ-ACK
of more than N bits is configured on the non-specific PUSCH, the UE may deal with
this case as an error case.
[0078] In a case that the UE punctures the non-specific PUSCH by up to N bits, the base
station can assume that the HARQ-ACK is piggybacked onto the non-specific PUSCH based
on the DL total DAI, and decode the UL data and HARQ-ACK on the non-specific PUSCH.
[0079] The base station can appropriately receive the UL data and the HARQ-ACK by processing
the puncturing of the UL data on the non-specific PUSCH based on the DL DAI and the
given number N.
[0080] Even if the UE fails to detect the DL DCI and transmits the PUSCH without puncturing
of the corresponding non-specific PUSCH, the base station can assume the puncturing
of the resource for the HARQ-ACK codebook to decode the PUSCH without using the resource
for the HARQ-ACK codebook.
[0081] In a case that the HARQ-ACK timing is the non-specific PUSCH and the HARQ-ACK is
of more than N bits, the UE may drop the HARQ-ACK or piggyback the HARQ-ACK onto a
PUSCH after (next to) the non-specific PUSCH.
[0082] The UE may puncture the UL data on the PUSCH in a case of piggybacking the HARQ-ACK
of up to N bits onto the PUSCH, and may perform the rate matching of the UL data on
the PUSCH in a case of piggybacking the HARQ-ACK of equal to or greater than N bits
(exceeding N bits) onto the PUSCH. The base station may assume this operation of the
UE to decode the PUSCH and the HARQ-ACK.
[0083] The UE may not be notified of the HARQ-ACK piggybacked onto the non-specific PUSCH,
and therefore, overhead can be suppressed.
[0084] A restriction (N bits) given to the HARQ-ACK codebook on the non-specific PUSCH allows
reception performance of the PUSCH to be ensured.
[0085] In an example of FIG. 2, N is 2.
[0086] In slot #0, the UE receives DCI #0 and PDSCH #0 scheduled on the basis of DCI #0.
[0087] In slot #1, the UE receives DCI #1 and PDSCH #1 scheduled on the basis of DCI #1.
[0088] In slot #3, the UE receives DCI #2 and PDSCH #2 scheduled on the basis of DCI #2.
[0089] In slot #4, the UE receives DCI #3. DCI #3 schedules repetition transmissions with
the number of repetitions K = 4 in slots #6 to #9.
[0090] The specific PUSCH is the earliest PUSCH (PUSCH #0).
[0091] The UL DAI in DCI #3 indicates whether to piggyback the HARQ-ACK onto the PUSCH #0
(specific PUSCH). In this example, the UL DAI indicates that the HARQ-ACK is piggybacked
onto the specific PUSCH (valid).
[0092] The UE is configured with the HARQ-ACK association set (K1 = {3, 4, 5, 6}).
[0093] A HARQ-ACK association set for slot #6 includes slots #0 to #3. The UE configured
with this HARQ-ACK association set piggybacks a 4-bit HARQ-ACK for slots #0 to #3
onto the PUSCH #0 in slot #6 (specific PUSCH).
[0094] A HARQ-ACK association set for slot #7 is slots #1 to #4. This HARQ-ACK association
set configures a HARQ-ACK of more than two bits onto the non-specific PUSCH, and therefore,
this is an error case. The UE may not transmit a HARQ-ACK in slot #7.
[0095] A HARQ-ACK association set for slot #8 is slots #2 to #5. This HARQ-ACK association
set configures a HARQ-ACK of more than two bits onto the non-specific PUSCH, and therefore,
this is an error case. The UE may not transmit a HARQ-ACK in slot #8.
[0096] A HARQ-ACK association set for slot #9 is slots #3 to #5. This HARQ-ACK association
set configures a HARQ-ACK of more than two bits onto the non-specific PUSCH, and therefore,
this is an error case. The UE may not transmit a HARQ-ACK in slot #9.
<<Aspect 1-1-2>>
[0097] The DAI (UL DAI) in the DCI (UL DCI, UL grant, DCI format 0_0, 0_1) for scheduling
PUSCH repetition transmissions may indicate whether a HARQ-ACK is piggybacked onto
all PUSCHs in the PUSCH repetition transmissions.
[0098] Here, the all PUSCHs in the PUSCH repetition transmissions may be interpreted as
all PUSCHs each specified as a HARQ-ACK feedback timing by the DCI (DL DCI) for scheduling
the PDSCH or all PUSCHs each capable of transmitting a HARQ-ACK, in the PUSCH repetition
transmissions.
[0099] In a case that the UL DAI is 1, the UE may piggyback the HARQ-ACK onto the all PUSCHs
in the PUSCH repetition transmissions.
[0100] In a case that the UL DAI is 0, the UE may not piggyback the HARQ-ACK onto the all
PUSCHs in the PUSCH repetition transmissions.
[0101] The UE may determine the HARQ-ACK codebook size based on a semi-static HARQ-ACK
codebook generation procedure (type 1 HARQ-ACK codebook determination).
[0102] The UE may be configured with a HARQ-ACK association set to associate a PDSCH slot
with a PUSCH slot based on the HARQ-ACK association set.
[0103] The UE may transmit a NACK as a HARQ-ACK for a slot with no PDSCH in the HARQ-ACK
association set.
[0104] The UE may not be notified of the HARQ-ACK piggybacked onto the non-specific PUSCH,
and therefore, overhead can be suppressed.
[0105] In an example of FIG. 3, the UE receives DCIs #0 to #3 and PDSCHs #0 to #2 similar
to FIG. 2.
[0106] The UL DAI in DCI #3 indicates whether to piggyback the HARQ-ACK onto the PUSCHs
#0 to #3 (non-specific PUSCHs). In this example, the UL DAI indicates that the HARQ-ACK
is piggybacked onto the non-specific PUSCH (valid).
[0107] The UE is configured with the HARQ-ACK association set (K1 = {3, 4, 5, 6}).
[0108] A HARQ-ACK association set (DL association set) for slot #6 includes slots #0 to
#3. The UE piggybacks a 4-bit HARQ-ACK for slots #0 to #3 onto the PUSCH #0.
[0109] A HARQ-ACK association set for slot #7 includes slots #1 to #4. The UE piggybacks
a 4-bit HARQ-ACK for slots #1 to #4 onto the PUSCH #1.
[0110] A HARQ-ACK association set for slot #8 includes slots #2 to #5. The UE piggybacks
a 4-bit HARQ-ACK for slots #2 to #5 onto the PUSCH #2.
[0111] Slot #6 is an UL slot, and therefore, a HARQ-ACK association set for slot #9 includes
slots #3 to #5. The UE piggybacks a 3-bit HARQ-ACK for slots #3 to #5 onto the PUSCH
#3.
[0112] The UE may use a NACK as a HARQ-ACK for a slot with no HARQ-ACK (slot with no PDSCH).
<Aspect 1-2>
[0113] A description is given of a case that the UE is configured with a dynamic HARQ-ACK
codebook (type 2 HARQ-ACK codebook determination).
[0114] The DAI (UL DAI) in the DCI (UL DCI, UL grant, DCI format 0_0, 0_1) for scheduling
PUSCH repetition transmissions may indicate a HARQ-ACK codebook size on one PUSCH
(specific PUSCH) in the PUSCH repetition transmissions.
[0115] The specific PUSCH may be a PUSCH satisfying a given condition among the PUSCHs carrying
the HARQ-ACK in the PUSCH repetition transmissions. The given condition may be one
of three conditions 1 to 3 described above.
[0116] The DAI (DL total DAI) in the DCI (DL DCI, DL assignment, DCI format 1_0, 1_1) for
scheduling the PDSCH may indicate the number of PDSCHs (the number of HARQ-ACKs) to
be scheduled.
[0117] The UE may determine the HARQ-ACK codebook size on the specific PUSCH based on at
least one of the DL total DAI in the DL DCI and the UL DAI in the UL DCI.
[0118] The UE can determine the HARQ-ACK transmission on the specific PUSCH based on the
UL DAI even in a case of failing to receive the DL DAI corresponding to the specific
PUSCH, and therefore, the base station can appropriately receive the HARQ-ACK.
[0119] In the case of piggybacking the HARQ-ACK onto the specific PUSCH, the UE may map
(multiplex) the HARQ-ACK to a resource acquired by the rate matching of the UL data
on the PUSCH.
[0120] Note that, in a case that the UE transmits the HARQ-ACK of up to N bits on the specific
PUSCH, the UE may map (multiplex) the HARQ-ACK to a resource acquired by puncturing
the UL data on the specific PUSCH. In a case that the UE transmits the HARQ-ACK of
more than N bits on the specific PUSCH, the UE may map (multiplex) the HARQ-ACK to
a resource acquired by the rate matching of the UL data on the specific PUSCH. N may
be 2 or another integer.
[0121] The UE configured with the dynamic HARQ-ACK codebook may comply with one of next
Aspects 1-2-1 and 1-2-2 with respect to the non-specific PUSCH.
<<Aspect 1-2-1>>
[0122] The HARQ-ACK of up to N bits may be allowed to be piggybacked onto the non-specific
PUSCH in the PUSCH repetition transmissions. In other words, the UE may piggyback
the HARQ-ACK of up to N bits onto the non-specific PUSCH in the PUSCH repetition transmissions.
N may be 2 or another integer. The UE may multiplex the HARQ-ACK of up to N bits to
the non-specific PUSCH by puncturing the UL data on the non-specific PUSCH.
[0123] The UE may determine the HARQ-ACK codebook size on the non-specific PUSCH, based
on the DL DAI (DL total DAI) and a given number N.
[0124] The base station may not schedule the HARQ-ACK of more than N bits on the non-specific
PUSCH. In other words, the UE may assume that the HARQ-ACK of more than N bits is
not scheduled on the non-specific PUSCH (or, may not assume that the HARQ-ACK of more
than N bits is scheduled on the non-specific PUSCH). In the case that the HARQ-ACK
of more than N bits is scheduled on the non-specific PUSCH, the UE may deal with this
case as an error case.
[0125] In a case that the UE punctures the non-specific PUSCH by up to N bits, the base
station can assume that the HARQ-ACK is piggybacked onto the non-specific PUSCH based
on the DL total DAI, and decode the UL data and HARQ-ACK on the non-specific PUSCH.
[0126] The base station can appropriately receive the UL data and the HARQ-ACK by processing
the puncturing of the UL data on the non-specific PUSCH based on the DL DAI and the
given number N.
[0127] Even if the UE fails to detect the DL DCI and transmits the PUSCH without puncturing
of the corresponding non-specific PUSCH, the base station can assume the puncturing
of the resource for the HARQ-ACK codebook to decode the PUSCH without using the resource
for the HARQ-ACK codebook.
[0128] In a case that the HARQ-ACK timing is the non-specific PUSCH and the HARQ-ACK is
of more than N bits, the UE may drop the HARQ-ACK or piggyback the HARQ-ACK onto a
PUSCH after (next to) the non-specific PUSCH.
[0129] The UE may puncture the UL data on the PUSCH in a case of piggybacking the HARQ-ACK
of up to N bits onto the PUSCH, and may perform the rate matching of the UL data on
the PUSCH in a case of piggybacking the HARQ-ACK of equal to or greater than N bits
(exceeding N bits) onto the PUSCH. The base station may assume this operation of the
UE to decode the PUSCH and the HARQ-ACK.
[0130] The UE may not be notified of the HARQ-ACK piggybacked onto the non-specific PUSCH
through other than the DL DCI, and therefore, overhead can be suppressed.
[0131] A restriction (N bits) given to the HARQ-ACK codebook on the non-specific PUSCH allows
reception performance of the PUSCH to be ensured.
[0132] In an example of FIG. 4, N is 2.
[0133] In slot #0, the UE receives DCI #0 and PDSCH #0 scheduled on the basis of DCI #0.
DCI #0 indicates slot #6 as a HARQ-ACK feedback timing for PDSCH #0.
[0134] In slot #1, the UE receives DCI #1 and PDSCH #1 scheduled on the basis of DCI #1.
DCI #1 indicates slot #6 as a HARQ-ACK feedback timing for PDSCH #1.
[0135] In slot #3, the UE receives DCI #2 and PDSCH #2 scheduled on the basis of DCI #2.
DCI #2 indicates slot #8 as a HARQ-ACK feedback timing for PDSCH #2.
[0136] In slot #4, the UE receives DCI #3. DCI #3 schedules repetition transmissions with
the number of repetitions K = 4 in slots #6 to #9.
[0137] UE-specific PDSCH parameters (for example, PDSCH-Config) configured for the UE through
higher layer signaling may include the maximum number of codewords scheduled on the
basis of one DCI (for example, codeword maximum number, maxNrofCodeWordsScheduledByDCI).
The codeword maximum number indicates the number of MCSs (Modulation and Coding Schemes),
RVs (Redundancy Versions), NDIs (New Data Indicators) in the DCI. The codeword maximum
number may be 1 or 2, or another integer.
[0138] In this example, the UE is configured with codeword maximum number = 2. Accordingly,
the number of HARQ-ACK bits for each PDSCH is 2. The specific PUSCH is the earliest
PUSCH (PUSCH #0).
[0139] The base station does not schedule a HARQ-ACK of more than two bits in slots #7,
#8, and #9.
[0140] Assume that the counter DAI (C_DAI) in DCI #0 is 1, the counter DAI in DCI #1 is
2, the counter DAI in DCI #2 is 1, and the UL DAI in DCI #3 is 2.
[0141] The UE piggybacks a HARQ-ACK of UL DAI * codeword maximum number = 4 onto the specific
PUSCH. Specifically, the UE piggybacks a 4-bit HARQ-ACK corresponding to PDSCHs #0
and #1 onto the PUSCH #0.
[0142] Since the UE can piggyback a HARQ-ACK of up to two bits onto the non-specific PUSCH,
the UE piggybacks a 2-bit HARQ-ACK corresponding to PDSCH #2 onto the PUSCH #2.
<<Aspect 1-2-2>>
[0143] The UE may determine the HARQ-ACK codebook size on the non-specific PUSCH based on
the DL DAI (DL total DAI) in the DL DCI.
[0144] The UE may map (multiplex) the HARQ-ACK to a resource acquired by the rate matching
of the UL data on the non-specific PUSCH. The UE may map (multiplex) the HARQ-ACK
to a resource acquired by puncturing the UL data on the non-specific PUSCH.
[0145] In a case that the UE transmits the HARQ-ACK of up to N bits on the non-specific
PUSCH, the UE may map (multiplex) the HARQ-ACK to a resource acquired by puncturing
the UL data on the non-specific PUSCH. In a case that the UE transmits the HARQ-ACK
of more than N bits on the non-specific PUSCH, the UE may map (multiplex) the HARQ-ACK
to a resource acquired by the rate matching of the UL data on the non-specific PUSCH.
N may be 2 or another integer.
[0146] The base station can appropriately receive the UL data and the HARQ-ACK by processing
the rate matching or puncturing of the UL data on the non-specific PUSCH based on
the DL total DAI.
[0147] In an example of FIG. 5, the UE receives DCIs #0 to #3 and PDSCHs #0 to #2 similar
to FIG. 4. The UE is configured with codeword maximum number = 2. Accordingly, the
number of HARQ-ACK bits for each PDSCH is 2. The specific PUSCH is the earliest PUSCH
(PUSCH #0).
[0148] In DCI #0, the counter DAI (C_DAI) is 1, and the total DAI (T_DAI) is 1. In DCI #1,
the counter DAI is 2, and the total DAI is 2. In DCI #2, the counter DAI is 1, and
the total DAI is 1.
[0149] In DCI #3, the UL DAI is 2.
[0150] The UE piggybacks a 4-bit HARQ-ACK corresponding to PDSCHs #0 and #1 onto the PUSCH
#0 (specific PUSCH) based on the UL DAI in DCI #3. The UE piggybacks a 2-bit HARQ-ACK
corresponding to PDSCH #2 onto the PUSCH #2 (non-specific PUSCH) based on the total
DAI in DCI #2.
(Aspect 2)
[0151] The UE may repeat the rate matching for the PUSCH in the case of piggybacking the
UCI in the PUSCH repetition transmissions.
[0152] The UE may perform the rate matching of the UL data on the non-specific PUSCH in
accordance with the rate matching of the UL data on the specific PUSCH. For example,
in a case of rate matching for a specific PUSCH, the UE may perform the same rate
matching as on the specific PUSCH on the non-specific PUSCH. The UE may perform rate
matching (the same in a pattern and size as the rate matching in the specific PUSCH)
in a resource in the non-specific PUSCH corresponding to a resource for the rate matching
in the specific PUSCH.
<Aspect 2-1>
[0153] A description is given of a case that the UE is configured with a semi-static HARQ-ACK
codebook (type 1 HARQ-ACK codebook determination).
[0154] The UE configured with the semi-static HARQ-ACK codebook may comply with one of next
Aspects 2-1-1 and 2-1-2.
<<Aspect 2-1-1>>
[0155] The DAI (UL DAI) in the DCI (UL DCI, UL grant, DCI format 0_0, 0_1) for scheduling
PUSCH repetition transmissions may indicate whether a HARQ-ACK is piggybacked onto
one PUSCH (specific PUSCH) in the PUSCH repetition transmissions.
[0156] The specific PUSCH may be a PUSCH satisfying a given condition among the PUSCHs carrying
the HARQ-ACK in the PUSCH repetition transmissions. The given condition may be one
of three conditions 1 to 3 described above.
[0157] The HARQ-ACK piggybacked onto the specific PUSCH of up to the number of HARQ-ACK
bits may be allowed to be piggybacked onto the non-specific PUSCH. In other words,
the UE may piggyback the HARQ-ACK piggybacked onto the specific PUSCH of up to the
number of HARQ-ACK bits onto the non-specific PUSCH.
[0158] The number of HARQ-ACK bits piggybacked onto the non-specific PUSCH may be the number
of HARQ-ACK bits piggybacked onto the specific PUSCH.
[0159] In a case that the number of HARQ-ACK bits on one non-specific PUSCH in the PUSCH
repetition transmissions is smaller than the number of HARQ-ACK bits on the specific
PUSCH, the UE may add a NACK to the HARQ-ACK on the PUSCH. With this configuration,
the UE may equalize the number of HARQ-ACK bits on the non-specific PUSCH with the
number of HARQ-ACK bits on the specific
PUSCH.
[0160] The UE may be configured with a HARQ-ACK association set to associate a PDSCH slot
with a PUSCH slot based on the HARQ-ACK association set.
[0161] The UE may determine the HARQ-ACK codebook size based on the HARQ-ACK association
set.
[0162] The UE may transmit a NACK as a HARQ-ACK for a slot with no PDSCH in the HARQ-ACK
association set.
[0163] The base station may not configure a HARQ-ACK association set corresponding to the
non-specific PUSCH having a HARQ-ACK codebook size larger than a HARQ-ACK codebook
size corresponding to the specific PUSCH.
[0164] The UE may assume that the UE is not configured with (or, may not assume that the
UE is configured with) a HARQ-ACK codebook size association set corresponding to the
non-specific PUSCH having a HARQ-ACK codebook size larger than a HARQ-ACK codebook
size corresponding to the specific PUSCH. In the case that the UE is configured with
a HARQ-ACK codebook size association set corresponding to the non-specific PUSCH having
a HARQ-ACK codebook size larger than a HARQ-ACK codebook size corresponding to the
specific PUSCH, the UE may deal with this case as an error case.
[0165] In an example of FIG. 6, the UE receives DCIs #0 to #3 and PDSCHs #0 to #2 similar
to FIG. 2.
[0166] The specific PUSCH is the earliest PUSCH (PUSCH #0).
[0167] The UE is configured with the HARQ-ACK association set (K1 = {3, 4, 5, 6}).
[0168] The UL DAI in DCI #3 indicates whether to piggyback the HARQ-ACK onto the PUSCH #0
(specific PUSCH). In this example, the UL DAI indicates that the HARQ-ACK is piggybacked
onto the non-specific PUSCH (valid).
[0169] A HARQ-ACK association set (DL association set) for slot #6 includes slots #0 to
#3. The UE piggybacks a 4-bit HARQ-ACK for slots #0 to #3 onto the PUSCH in slot #6
(specific PUSCH).
[0170] A HARQ-ACK association set for slot #7 includes slots #1 to #4. The UE piggybacks
a 4-bit HARQ-ACK for slots #1 to #4 onto the PUSCH in slot #7 (non-specific PUSCH).
[0171] A HARQ-ACK association set for slot #8 includes slots #2 to #5. The UE piggybacks
a 4-bit HARQ-ACK for slots #2 to #5 onto the PUSCH in slot #8 (non-specific PUSCH).
[0172] A HARQ-ACK association set for slot #9 includes slots #3 to #5. The UE piggybacks
a 4-bit HARQ-ACK obtained by adding a 1-bit NACK to a 3-bit HARQ-ACK for slots #3
to #5 onto the PUSCH in slot #9 (non-specific PUSCH).
<<Aspect 2-1-2>>
[0173] The DAI (UL DAI) in the DCI (UL DCI, UL grant, DCI format 0_0, 0_1) for scheduling
PUSCH repetition transmissions may indicate whether a HARQ-ACK is piggybacked onto
all PUSCHs in the PUSCH repetition transmissions.
[0174] Here, the all PUSCHs in the PUSCH repetition transmissions may be interpreted as
all PUSCHs each specified as a HARQ-ACK feedback timing by the DCI (DL DCI) for scheduling
the PDSCH or interpreted as all PUSCHs each capable of transmitting a HARQ-ACK, in
the PUSCH repetition transmissions.
[0175] In a case that the UL DAI is 1, the UE may piggyback the HARQ-ACK onto the all PUSCHs
in the PUSCH repetition transmissions.
[0176] In a case that the UL DAI is 0, the UE may not piggyback the HARQ-ACK onto the all
PUSCHs in the PUSCH repetition transmissions.
[0177] The UE may be configured with a HARQ-ACK association set to associate a PDSCH slot
with a PUSCH slot based on the HARQ-ACK association set.
[0178] The UE may determine the HARQ-ACK codebook size based on the HARQ-ACK association
set.
[0179] The UE may transmit a NACK as a HARQ-ACK for a slot with no PDSCH in the HARQ-ACK
association set.
[0180] The maximum number of bits of the HARQ-ACK (HARQ-ACK maximum number) on the PUSCH
in the PUSCH repetition transmissions may be allowed to be piggybacked onto the PUSCH
in the PUSCH repetition transmissions.
[0181] The HARQ-ACK maximum number may be defined by a specification, or configured to the
UE through higher layer signaling. The HARQ-ACK maximum number may be based on the
HARQ-ACK association set.
[0182] In a case that the HARQ-ACK codebook size (the number of HARQ-ACK bits) on one non-specific
PUSCH in the PUSCH repetition transmissions is smaller than the HARQ-ACK codebook
size on the specific PUSCH, the UE may add a NACK to the HARQ-ACK on the non-specific
PUSCH. With this configuration, the UE may equalize the HARQ-ACK codebook size on
the non-specific PUSCH with the HARQ-ACK codebook size on the specific PUSCH.
[0183] The number of HARQ-ACK bits on each PUSCH in the PUSCH repetition transmissions may
be equal to the HARQ-ACK maximum number. The UE may piggyback the HARQ-ACK of the
HARQ-ACK maximum number onto the PUSCH of the HARQ-ACK feedback timing in the PUSCH
repetition transmissions.
[0184] In a case that the number of HARQ-ACK bits on one PUSCH in the PUSCH repetition transmissions
is smaller than the HARQ-ACK maximum number, the UE may add a NACK to the HARQ-ACK
on the PUSCH. With this configuration, the UE may equalize the number of HARQ-ACK
bits on the specific PUSCH with the HARQ-ACK maximum number.
[0185] In an example of FIG. 7, the UE receives DCIs #0 to #3 and PDSCHs #0 to #2 similar
to FIG. 2.
[0186] The UL DAI in DCI #3 indicates whether to piggyback the HARQ-ACK onto the PUSCHs
#0 to #3. In this example, the UL DAI indicates that the HARQ-ACK is piggybacked onto
the non-specific PUSCH (valid).
[0187] The HARQ-ACK maximum number is 5. The UE is configured with the HARQ-ACK association
set (K1 = {3, 4, 5, 6, 7}).
[0188] The UL DAI in DCI #3 indicates whether the HARQ-ACK can be piggybacked onto the PUSCHs
#0 to #3 (all PUSCHs). In this example, the UL DAI indicates that the HARQ-ACK can
be piggybacked onto the all PUSCHs (valid).
[0189] A HARQ-ACK association set for slot #6 includes slots #-1 to #3. The UE piggybacks
a 5-bit HARQ-ACK for slots #-1 to #3 onto the PUSCH in slot #6.
[0190] A HARQ-ACK association set for slot #7 includes slots #0 to #4. The UE piggybacks
a 5-bit HARQ-ACK for slots #0 to #4 onto the PUSCH in slot #7.
[0191] A HARQ-ACK association set for slot #8 includes slots #1 to #5. The UE piggybacks
a 5-bit HARQ-ACK for slots #1 to #5 onto the PUSCH in slot #8.
[0192] A HARQ-ACK association set for slot #9 includes slots #2 to #5. The UE piggybacks
a 5-bit HARQ-ACK obtained by adding a 1-bit NACK to a 4-bit HARQ-ACK for slots #2
to #5 onto the PUSCH in slot #9.
<Aspect 2-2>
[0193] A description is given of a case that the UE is configured with a dynamic HARQ-ACK
codebook (type 2 HARQ-ACK codebook determination).
[0194] The UE configured with the dynamic HARQ-ACK codebook may comply with one of next
Aspects 2-2-1 and 2-2-2 with respect to the non-specific PUSCH.
<<Aspect 2-2-1>>
[0195] The DAI (UL DAI) in the DCI (UL DCI, UL grant, DCI format 0_0, 0_1) for scheduling
PUSCH repetition transmissions may indicate a HARQ-ACK codebook size on one PUSCH
(specific PUSCH) in the PUSCH repetition transmissions.
[0196] The specific PUSCH may be a PUSCH satisfying a given condition among the PUSCHs carrying
the HARQ-ACK in the PUSCH repetition transmissions. The given condition may be one
of three conditions 1 to 3 described above.
[0197] The DAI (DL total DAI) in the DCI (DL DCI, DL assignment, DCI format 1_0, 1_1) for
scheduling the PDSCH may indicate the number of PDSCHs (the number of HARQ-ACKs) to
be scheduled.
[0198] The UE may determine the HARQ-ACK codebook size on the specific PUSCH, based on at
least one of the DL total DAI in the DL DCI and the UL DAI in the UL DCI.
[0199] In a case that the HARQ-ACK codebook size (the number of HARQ-ACK bits) on one non-specific
PUSCH in the PUSCH repetition transmissions is smaller than the HARQ-ACK codebook
size on the specific PUSCH, the UE may add a NACK to the HARQ-ACK on the non-specific
PUSCH. With this configuration, the UE may equalize the HARQ-ACK codebook size on
the non-specific PUSCH with the HARQ-ACK codebook size on the specific PUSCH.
[0200] The UE can determine the HARQ-ACK transmission on the specific PUSCH, based on the
UL DAI even in a case of failing to receive the DL DAI corresponding to the specific
PUSCH, and therefore, the base station can appropriately receive the HARQ-ACK.
[0201] In the case of piggybacking the HARQ-ACK onto the specific PUSCH, the UE may map
(multiplex) the HARQ-ACK to a resource acquired by the rate matching of the UL data
on the PUSCH.
[0202] The HARQ-ACK piggybacked onto the specific PUSCH of up to the number of HARQ-ACK
bits may be allowed to be piggybacked onto the non-specific PUSCH. In other words,
the UE may piggyback the HARQ-ACK piggybacked onto the non-specific PUSCH of up to
the number of HARQ-ACK bits piggybacked onto the non-specific PUSCH.
[0203] The base station may not schedule the HARQ-ACK of more than the number of HARQ-ACK
bits piggybacked onto the specific PUSCH on the non-specific PUSCH. The UE may assume
that the HARQ-ACK of more than the number of HARQ-ACK bits piggybacked onto the specific
PUSCH is not scheduled on the non-specific PUSCH (or, may not assume that the HARQ-ACK
of more than the number of HARQ-ACK bits piggybacked onto the specific PUSCH is scheduled
on the non-specific PUSCH). In the case that the HARQ-ACK of more than the number
of HARQ-ACK bits piggybacked onto the specific PUSCH is scheduled on the non-specific
PUSCH, the UE may deal with this case as an error case.
[0204] The base station can appropriately receive the UL data and HARQ-ACK on the non-specific
PUSCH by processing the rate matching for the non-specific PUSCH similarly to the
process of the rate matching for the specific PUSCH.
[0205] In an example of FIG. 8, the UE receives DCIs #0 to #3 and PDSCHs #0 to #2 similar
to FIG. 4.
[0206] In this example, the UE is configured with codeword maximum number = 2. Accordingly,
the number of HARQ-ACK bits for each PDSCH is 2. The specific PUSCH is the earliest
PUSCH (PUSCH #0).
[0207] The base station does not schedule a HARQ-ACK of more than two bits in slots #7,
#8, and #9.
[0208] In DCI #0, the counter DAI (C_DAI) is 1, and the total DAI (T_DAI) is 1. In DCI #1,
the counter DAI is 2, and the total DAI is 2. In DCI #2, the counter DAI is 1, and
the total DAI is 1.
[0209] In DCI #3, the UL DAI is 2.
[0210] The UE piggybacks a HARQ-ACK of UL DAI * codeword maximum number = 4 onto the specific
PUSCH. Specifically, the UE piggybacks a 4-bit HARQ-ACK corresponding to PDSCHs #0
and #1 onto the PUSCH #0.
[0211] The UE piggybacks the HARQ-ACK of the number of HARQ-ACK bits on the specific PUSCH
onto the non-specific PUSCH. Specifically, the UE piggybacks a 4-bit HARQ-ACK onto
PDSCHs #1 and #3.
[0212] The UE piggybacks a 4-bit NACK onto the PUSCH #1 since HARQ-ACK corresponding to
PUSCH #1 does not exist.
[0213] The UE piggybacks a 4-bit HARQ-ACK obtained by adding a 2-bit NACK to a 2-bit HARQ-ACK
corresponding to PDSCH #2 onto the PUSCH #2.
[0214] The UE piggybacks a 4-bit NACK onto the PUSCH #3 since HARQ-ACK corresponding to
PUSCH #3 does not exist.
<<Aspect 2-2-2>>
[0215] The DAI (UL DAI) in the DCI (UL DCI, UL grant, DCI format 0_0, 0_1) for scheduling
PUSCH repetition transmissions may indicate the maximum number of bits of the HARQ-ACK
(HARQ-ACK maximum number) on one PUSCH in the PUSCH repetition transmissions.
[0216] The number of HARQ-ACK bits on each PUSCH in the PUSCH repetition transmissions may
be equal to the HARQ-ACK maximum number. The UE may piggyback the HARQ-ACK of the
HARQ-ACK maximum number onto the PUSCH of the HARQ-ACK feedback timing in the PUSCH
repetition transmissions.
[0217] In a case that the number of HARQ-ACKs on one PUSCH in the PUSCH repetition transmissions
is smaller than the HARQ-ACK maximum number, the UE may add a NACK to the HARQ-ACK
on the PUSCH. With this configuration, the UE may equalize the number of HARQ-ACK
bits on the PUSCH with the HARQ-ACK maximum number.
[0218] The base station can appropriately receive the UL data and HARQ-ACK in the PUSCH
repetition transmissions by processing the indicated HARQ-ACK of the HARQ-ACK maximum
number.
[0219] In an example of FIG. 9, the UE receives DCIs #0, #2, and #3 and PDSCHs #0 to #2
similar to FIG. 4.
[0220] DCI #1 indicates slot #8 as a HARQ-ACK feedback timing for PDSCH #1.
[0221] The UE is configured with codeword maximum number = 2.
[0222] In DCI #0, the counter DAI (C_DAI) is 1, and the total DAI (T_DAI) is 1. In DCI #1,
the counter DAI is 1, and the total DAI is 1. In DCI #2, the counter DAI is 2, and
the total DAI is 2.
[0223] In DCI #3, the UL DAI is 2.
[0224] The UE piggybacks a HARQ-ACK of the HARQ-ACK maximum number = UL DAI * codeword maximum
number = 4 onto each PUSCH. Specifically, the UE piggybacks a 4-bit HARQ-ACK onto
each of the PUSCHs #0 to #1.
[0225] The UE piggybacks a 4-bit HARQ-ACK obtained by adding a 2-bit NACK to a 2-bit HARQ-ACK
corresponding to PDSCH #0 onto the PUSCH #0.
[0226] The UE piggybacks a 4-bit NACK onto the PUSCH #1 since HARQ-ACK corresponding to
the PUSCH #1 does not exist.
[0227] The UE piggybacks a 4-bit HARQ-ACK corresponding to PDSCHs #1 and #2 onto the PUSCH
#2.
[0228] The UE piggybacks a 4-bit NACK onto the PUSCH #3 since HARQ-ACK corresponding to
the PUSCH #3 does not exist.
(Other Aspects)
[0229] In a case that PUSCH repetition transmissions are scheduled in DCI format 0_1, the
UE may apply Aspect 1.
[0230] In a case that PUSCH repetition transmissions are scheduled in DCI format 0_0, or
PUSCH repetition transmissions are a configured-grant PUSCH, the UE may piggyback
any HARQ-ACK onto any PUSCH in the PUSCH repetition transmissions.
[0231] The configured-grant PUSCH (configured-grant based transmission) may be a PUSCH (type
1) configured through higher layer signaling, and at least one of activation, deactivation,
and retransmission of a PUSCH transmission with a given cycle may be controlled on
the basis of the DCI CRC (Cyclic Redundancy Check)-scrambled with a CS (Configured
Scheduling)-RNTI. In a dynamic grant based transmission (initial transmission or retransmission),
scheduling may be controlled on the basis of the DCI CRC-scrambled with the C-RNTI.
[0232] According to this aspect, the UE can appropriately transmit a HARQ-ACK depending
on the DCI format and whether or not the configured-grant PUSCH is applied.
(Radio Communication System)
[0233] Hereinafter, a structure of a radio communication system according to the present
embodiment will be described. In this radio communication system, at least one combination
of the above plurality of aspects is used to perform communication.
[0234] FIG. 10 is a diagram to show an example of a schematic structure of the radio communication
system according to the present embodiment. A radio communication system 1 can adopt
carrier aggregation (CA) and/or dual connectivity (DC) to group a plurality of fundamental
frequency blocks (component carriers) into one, where the system bandwidth in an LTE
system (for example, 20 MHz) constitutes one unit.
[0235] Note that the radio communication system 1 may be referred to as "LTE (Long Term
Evolution)," "LTE-A (LTE-Advanced)," "LTE-B (LTE-Beyond)," "SUPER 3G," "IMT-Advanced,"
"4G (4th generation mobile communication system)," "5G (5th generation mobile communication
system)," "NR (New Radio)," "FRA (Future Radio Access)," "New-RAT (Radio Access Technology),"
and so on, or may be referred to as a system implementing these.
[0236] The radio communication system 1 includes a base station 11 that forms a macro cell
C1 of a relatively wide coverage, and base stations 12 (12a to 12c) that form small
cells C2, which are placed within the macro cell C1 and which are narrower than the
macro cell C1. Also, user terminals 20 are placed in the macro cell C1 and in each
small cell C2. The arrangement, the number, and the like of each cell and user terminal
20 are by no means limited to the aspect shown in the diagram.
[0237] The user terminals 20 can connect with both the base station 11 and the base stations
12. It is assumed that the user terminals 20 use the macro cell C1 and the small cells
C2 at the same time by means of CA or DC. The user terminals 20 can execute CA or
DC by using a plurality of cells (CCs) (for example, five or less CCs, six or more
CCs).
[0238] Between the user terminals 20 and the base station 11, communication can be carried
out by using a carrier of a relatively low frequency band (for example, 2 GHz) and
a narrow bandwidth (referred to as, for example, an "existing carrier," a "legacy
carrier" and so on). Meanwhile, between the user terminals 20 and the base stations
12, a carrier of a relatively high frequency band (for example, 3.5 GHz, 5 GHz, and
so on) and a wide bandwidth may be used, or the same carrier as that used between
the user terminals 20 and the base station 11 may be used. Note that the structure
of the frequency band for use in each base station is by no means limited to these.
[0239] The user terminals 20 can perform communication by using time division duplex (TDD)
and/or frequency division duplex (FDD) in each cell. Furthermore, in each cell (carrier),
a single numerology may be employed, or a plurality of different numerologies may
be employed.
[0240] The term "numerology" may refer to communication parameters applied to transmission
and/or reception of a certain signal and/or channel, and may indicate, for example,
at least one of a subcarrier spacing, a bandwidth, a symbol length, a cyclic prefix
length, a subframe length, a TTI length, the number of symbols per TTI, a radio frame
structure, a filtering processing, a windowing processing, and so on.
[0241] A wired connection (for example, means in compliance with the CPRI (Common Public
Radio Interface) such as an optical fiber, an X2 interface and so on) or a wireless
connection may be established between the base station 11 and the base stations 12
(or between two base stations 12).
[0242] The base station 11 and the base stations 12 are each connected with a higher station
apparatus 30, and are connected with a core network 40 via the higher station apparatus
30. Note that the higher station apparatus 30 may be, for example, access gateway
apparatus, a radio network controller (RNC), a mobility management entity (MME) and
so on, but is by no means limited to these. Also, each base station 12 may be connected
with the higher station apparatus 30 via the base station 11.
[0243] Note that the base station 11 is a base station having a relatively wide coverage,
and may be referred to as a "macro base station," a "central node," an "eNB (eNodeB),"
a "transmitting/receiving point" and so on. The base stations 12 are base stations
having local coverages, and may be referred to as "small base stations," "micro base
stations," "pico base stations," "femto base stations," "HeNBs (Home eNodeBs)," "RRHs
(Remote Radio Heads)," "transmitting/receiving points" and so on. Hereinafter, the
base stations 11 and 12 will be collectively referred to as "base stations 10," unless
specified otherwise.
[0244] Each of the user terminals 20 is a terminal that supports various communication schemes
such as LTE and LTE-A, and may include not only mobile communication terminals (mobile
stations) but stationary communication terminals (fixed stations).
[0245] In the radio communication system 1, as radio access schemes, orthogonal frequency
division multiple access (OFDMA) is applied to the downlink, and single carrier frequency
division multiple access (SC-FDMA) and/or OFDMA is applied to the uplink.
[0246] OFDMA is a multi-carrier communication scheme to perform communication by dividing
a frequency band into a plurality of narrow frequency bands (subcarriers) and mapping
data to each subcarrier. SC-FDMA is a single carrier communication scheme to mitigate
interference between terminals by dividing the system bandwidth into bands formed
with one or continuous resource blocks per terminal, and allowing a plurality of terminals
to use mutually different bands. Note that the uplink and downlink radio access schemes
are by no means limited to the combinations of these, and other radio access schemes
may be used.
[0247] In the radio communication system 1, a downlink shared channel (PDSCH (Physical Downlink
Shared Channel), which is used by each user terminal 20 on a shared basis, a broadcast
channel (PBCH (Physical Broadcast Channel)), downlink L1/L2 control channels and so
on, are used as downlink channels. User data, higher layer control information, SIBs
(System Information Blocks) and so on are communicated on the PDSCH. The MIBs (Master
Information Blocks) are communicated on the PBCH.
[0248] The downlink L1/L2 control channels include at least one of downlink control channels
(a PDCCH (Physical Downlink Control Channel) and/or an EPDCCH (Enhanced Physical Downlink
Control Channel), a PCFICH (Physical Control Format Indicator Channel), and a PHICH
(Physical Hybrid-ARQ Indicator Channel). Downlink control information (DCI), including
PDSCH and/or PUSCH scheduling information, and so on are communicated on the PDCCH.
[0249] Note that the scheduling information may be reported by the DCI. For example, the
DCI scheduling DL data reception may be referred to as "DL assignment," and the DCI
scheduling UL data transmission may be referred to as "UL grant."
[0250] The number of OFDM symbols to use for the PDCCH is communicated on the PCFICH. Transmission
confirmation information (for example, also referred to as "retransmission control
information," "HARQ-ACK," "ACK/NACK," and so on) of HARQ (Hybrid Automatic Repeat
reQuest) to a PUSCH is transmitted on the PHICH. The EPDCCH is frequency-division
multiplexed with the PDSCH (downlink shared data channel) and used to communicate
DCI and so on, like the PDCCH.
[0251] In the radio communication system 1, an uplink shared channel (PUSCH (Physical Uplink
Shared Channel)), which is used by each user terminal 20 on a shared basis, an uplink
control channel (PUCCH (Physical Uplink Control Channel)), a random access channel
(PRACH (Physical Random Access Channel)) and so on are used as uplink channels. User
data, higher layer control information and so on are communicated on the PUSCH. In
addition, radio link quality information (CQI (Channel Quality Indicator)) of the
downlink, transmission confirmation information, SR (Scheduling Request), and so on
are transmitted on the PUCCH. By means of the PRACH, random access preambles for establishing
connections with cells are communicated.
[0252] In the radio communication system 1, a cell-specific reference signal (CRS), a channel
state information-reference signal (CSI-RS), a demodulation reference signal (DMRS),
a positioning reference signal (PRS), and so on are transmitted as downlink reference
signals. In the radio communication system 1, a measurement reference signal (SRS
(Sounding Reference Signal)), a demodulation reference signal (DMRS), and so on are
transmitted as uplink reference signals. Note that DMRS may be referred to as a "user
terminal specific reference signal (UE-specific Reference Signal)." Transmitted reference
signals are by no means limited to these.
<Base Station>
[0253] FIG. 11 is a diagram to show an example of an overall structure of the base station
according to the present embodiment. A base station 10 includes a plurality of transmitting/receiving
antennas 101, amplifying sections 102, transmitting/receiving sections 103, a baseband
signal processing section 104, a call processing section 105 and a communication path
interface 106. Note that the base station 10 may be configured to include one or more
transmitting/receiving antennas 101, one or more amplifying sections 102 and one or
more transmitting/receiving sections 103.
[0254] User data to be transmitted from the base station 10 to the user terminal 20 by the
downlink is input from the higher station apparatus 30 to the baseband signal processing
section 104, via the communication path interface 106.
[0255] In the baseband signal processing section 104, the user data is subjected to transmission
processes, such as a PDCP (Packet Data Convergence Protocol) layer process, division
and coupling of the user data, RLC (Radio Link Control) layer transmission processes
such as RLC retransmission control, MAC (Medium Access Control) retransmission control
(for example, an HARQ transmission process), scheduling, transport format selection,
channel coding, an inverse fast Fourier transform (IFFT) process, and a precoding
process, and the result is forwarded to each transmitting/receiving section 103. Furthermore,
downlink control signals are also subjected to transmission processes such as channel
coding and inverse fast Fourier transform, and the result is forwarded to each transmitting/receiving
section 103.
[0256] The transmitting/receiving sections 103 convert baseband signals that are pre-coded
and output from the baseband signal processing section 104 on a per antenna basis,
to have radio frequency bands and transmit the result. The radio frequency signals
having been subjected to frequency conversion in the transmitting/receiving sections
103 are amplified in the amplifying sections 102, and transmitted from the transmitting/receiving
antennas 101. The transmitting/receiving sections 103 can be constituted with transmitters/receivers,
transmitting/receiving circuits or transmitting/receiving apparatus that can be described
based on general understanding of the technical field to which the present disclosure
pertains. Note that each transmitting/receiving section 103 may be structured as a
transmitting/receiving section in one entity, or may be constituted with a transmitting
section and a receiving section.
[0257] Meanwhile, as for uplink signals, radio frequency signals that are received in the
transmitting/receiving antennas 101 are amplified in the amplifying sections 102.
The transmitting/receiving sections 103 receive the uplink signals amplified in the
amplifying sections 102. The transmitting/receiving sections 103 convert the received
signals into the baseband signal through frequency conversion and outputs to the baseband
signal processing section 104.
[0258] In the baseband signal processing section 104, user data that is included in the
uplink signals that are input is subjected to a fast Fourier transform (FFT) process,
an inverse discrete Fourier transform (IDFT) process, error correction decoding, a
MAC retransmission control receiving process, and RLC layer and PDCP layer receiving
processes, and forwarded to the higher station apparatus 30 via the communication
path interface 106. The call processing section 105 performs call processing (setting
up, releasing and so on) for communication channels, manages the state of the base
station 10, manages the radio resources and so on.
[0259] The communication path interface 106 transmits and/or receives signals to and/or
from the higher station apparatus 30 via a given interface. The communication path
interface 106 may transmit and/or receive signals (backhaul signaling) with other
base stations 10 via an inter-base station interface (for example, an optical fiber
in compliance with the CPRI (Common Public Radio Interface) and an X2 interface).
[0260] Note that each transmitting/receiving section 103 may further include an analog beamforming
section performing analog beamforming. The analog beamforming section can be constituted
with an analog beamforming circuit (for example, a phase shifter, a phase shift circuit),
or an analog beamforming apparatus (for example, a phase shift device) described based
on general understanding of the technical field to which the present invention pertains.
The transmitting/receiving antennas 101 can be formed of an antenna array, for example.
Each transmitting/receiving section 103 is configured to adopt a single BF and a multi
BF.
[0261] The transmitting/receiving sections 103 transmit the downlink (DL) signals (including
at least one of DL data signals (downlink shared channels), DL control signals (downlink
control channels), and DL reference signals) to the user terminals 20, and receive
the uplink (UL) signals (including at least one of UL data signals, UL control signals,
and UL reference signals) from the user terminals 20.
[0262] The transmitting/receiving sections 103 may transmit the downlink control information
used for scheduling the downlink shared channels, and receive the acknowledgment signals
for the downlink shared channels.
[0263] FIG. 12 is a diagram to show an example of a functional structure of the base station
according to the present embodiment. Note that, the present example primarily shows
functional blocks that pertain to characteristic parts of the present embodiment,
and it is assumed that the base station 10 may include other functional blocks that
are necessary for radio communication as well.
[0264] The baseband signal processing section 104 at least includes a control section (scheduler)
301, a transmission signal generation section 302, a mapping section 303, a received
signal processing section 304, and a measurement section 305. Note that these structures
may be included in the base station 10, and some or all of the structures do not need
to be included in the baseband signal processing section 104.
[0265] The control section (scheduler) 301 controls the whole of the base station 10. The
control section 301 can be constituted with a controller, a control circuit or control
apparatus that can be described based on general understanding of the technical field
to which the present disclosure pertains.
[0266] The control section 301, for example, controls the generation of signals in the transmission
signal generation section 302, the mapping of signals by the mapping section 303,
and so on. The control section 301 controls the signal receiving processes in the
received signal processing section 304, the measurements of signals in the measurement
section 305, and so on.
[0267] The control section 301 controls the scheduling (for example, resource assignment)
of system information, a downlink data signal (for example, a signal transmitted on
the PDSCH), a downlink control signal (for example, a signal transmitted on the PDCCH
and/or the EPDCCH. Transmission confirmation information, and so on). Based on the
results of determining necessity or not of retransmission control to the uplink data
signal, or the like, the control section 301 controls generation of a downlink control
signal, a downlink data signal, and so on.
[0268] The transmission signal generation section 302 generates downlink signals (downlink
control signals, downlink data signals, downlink reference signals and so on) based
on commands from the control section 301 and outputs the downlink signals to the mapping
section 303. The transmission signal generation section 302 can be constituted with
a signal generator, a signal generation circuit or signal generation apparatus that
can be described based on general understanding of the technical field to which the
present disclosure pertains.
[0269] For example, the transmission signal generation section 302 generates DL assignment
to report assignment information of downlink data and/or UL grant to report assignment
information of uplink data, based on commands from the control section 301. The DL
assignment and the UL grant are both DCI, and follow the DCI format. For a downlink
data signal, encoding processing, modulation processing, and the like are performed
in accordance with a coding rate, modulation scheme, or the like determined based
on channel state information (CSI) from each user terminal 20.
[0270] The mapping section 303 maps the downlink signals generated in the transmission signal
generation section 302 to given radio resources, based on commands from the control
section 301, and outputs these to the transmitting/receiving sections 103. The mapping
section 303 can be constituted with a mapper, a mapping circuit or mapping apparatus
that can be described based on general understanding of the technical field to which
the present disclosure pertains.
[0271] The received signal processing section 304 performs receiving processes (for example,
demapping, demodulation, decoding and so on) of received signals that are input from
the transmitting/receiving sections 103. Here, the received signals are, for example,
uplink signals that are transmitted from the user terminals 20 (uplink control signals,
uplink data signals, uplink reference signals and so on). The received signal processing
section 304 can be constituted with a signal processor, a signal processing circuit
or signal processing apparatus that can be described based on general understanding
of the technical field to which the present disclosure pertains.
[0272] The received signal processing section 304 outputs the decoded information acquired
through the receiving processes to the control section 301. For example, if the received
signal processing section 304 receives the PUCCH including HARQ-ACK, the received
signal processing section 304 outputs the HARQ-ACK to the control section 301. The
received signal processing section 304 outputs the received signals and/or the signals
after the receiving processes to the measurement section 305.
[0273] The measurement section 305 conducts measurements with respect to the received signals.
The measurement section 305 can be constituted with a measurer, a measurement circuit
or measurement apparatus that can be described based on general understanding of the
technical field to which the present disclosure pertains.
[0274] For example, the measurement section 305 may perform RRM (Radio Resource Management)
measurement, CSI (Channel State Information) measurement, and so on, based on the
received signal. The measurement section 305 may measure a received power (for example,
RSRP (Reference Signal Received Power)), a received quality (for example, RSRQ (Reference
Signal Received Quality), an SINR (Signal to Interference plus Noise Ratio), an SNR
(Signal to Noise Ratio)), a signal strength (for example, RSSI (Received Signal Strength
Indicator)), channel information (for example, CSI), and so on. The measurement results
may be output to the control section 301.
<User Terminal>
[0275] FIG. 13 is a diagram to show an example of an overall structure of a user terminal
according to the present embodiment. A user terminal 20 includes a plurality of transmitting/receiving
antennas 201, amplifying sections 202, transmitting/receiving sections 203, a baseband
signal processing section 204 and an application section 205. Note that the user terminal
20 may be configured to include one or more transmitting/receiving antennas 201, one
or more amplifying sections 202 and one or more transmitting/receiving sections 203.
[0276] Radio frequency signals that are received in the transmitting/receiving antennas
201 are amplified in the amplifying sections 202. The transmitting/receiving sections
203 receive the downlink signals amplified in the amplifying sections 202. The transmitting/receiving
sections 203 convert the received signals into baseband signals through frequency
conversion, and output the baseband signals to the baseband signal processing section
204. The transmitting/receiving sections 203 can be constituted with transmitters/receivers,
transmitting/receiving circuits or transmitting/receiving apparatus that can be described
based on general understanding of the technical field to which the present disclosure
pertains. Note that each transmitting/receiving section 203 may be structured as a
transmitting/receiving section in one entity, or may be constituted with a transmitting
section and a receiving section.
[0277] The baseband signal processing section 204 performs, on each input baseband signal,
an FFT process, error correction decoding, a retransmission control receiving process,
and so on. The downlink user data is forwarded to the application section 205. The
application section 205 performs processes related to higher layers above the physical
layer and the MAC layer, and so on. In the downlink data, broadcast information may
be also forwarded to the application section 205.
[0278] Meanwhile, the uplink user data is input from the application section 205 to the
baseband signal processing section 204. The baseband signal processing section 204
performs a retransmission control transmission process (for example, an HARQ transmission
process), channel coding, precoding, a discrete Fourier transform (DFT) process, an
IFFT process and so on, and the result is forwarded to the transmitting/receiving
section 203.
[0279] The transmitting/receiving sections 203 convert the baseband signals output from
the baseband signal processing section 204 to have radio frequency band and transmit
the result. The radio frequency signals having been subjected to frequency conversion
in the transmitting/receiving sections 203 are amplified in the amplifying sections
202, and transmitted from the transmitting/receiving antennas 201.
[0280] Note that each transmitting/receiving section 203 may further include an analog beamforming
section performing analog beamforming. The analog beamforming section can be constituted
with an analog beamforming circuit (for example, a phase shifter, a phase shift circuit),
or an analog beamforming apparatus (for example, a phase shift device) described based
on general understanding of the technical field to which the present invention pertains.
The transmitting/receiving antennas 201 can be formed of an antenna array, for example.
Each transmitting/receiving section 203 is configured to adopt a single BF and a multi
BF.
[0281] The transmitting/receiving sections 203 receive the downlink (DL) signals (including
at least one of DL data signals (downlink shared channels), DL control signals (downlink
control channels), and DL reference signals) from the base station 10, and transmit
the uplink (UL) signals (including at least one of UL data signals, UL control signals,
and UL reference signals) to the base station 10.
[0282] The transmitting/receiving sections 203 may receive the downlink shared channels
to be scheduled in the downlink control information, and transmit the acknowledgment
signals for the downlink shared channels. The transmitting/receiving sections 203
may transmit the uplink shared channels to be scheduled in the downlink control information.
[0283] FIG. 14 is a diagram to show an example of a functional structure of the user terminal
according to the present embodiment. Note that, the present example primarily shows
functional blocks that pertain to characteristic parts of the present embodiment,
and it is assumed that the user terminal 20 may include other functional blocks that
are necessary for radio communication as well.
[0284] The baseband signal processing section 204 provided in the user terminal 20 at least
includes a control section 401, a transmission signal generation section 402, a mapping
section 403, a received signal processing section 404 and a measurement section 405.
Note that these structures may be included in the user terminal 20, and some or all
of the structures do not need to be included in the baseband signal processing section
204.
[0285] The control section 401 controls the whole of the user terminal 20. The control section
401 can be constituted with a controller, a control circuit or control apparatus that
can be described based on general understanding of the technical field to which the
present disclosure pertains.
[0286] The control section 401, for example, controls the generation of signals in the transmission
signal generation section 402, the mapping of signals by the mapping section 403,
and so on. The control section 401 controls the signal receiving processes in the
received signal processing section 404, the measurements of signals in the measurement
section 405, and so on.
[0287] The control section 401 acquires a downlink control signal and a downlink data signal
transmitted from the base station 10, from the received signal processing section
404. The control section 401 controls generation of an uplink control signal and/or
an uplink data signal, based on the results of determining necessity or not of retransmission
control to a downlink control signal and/or a downlink data signal.
[0288] The transmission signal generation section 402 generates uplink signals (uplink control
signals, uplink data signals, uplink reference signals and so on) based on commands
from the control section 401, and outputs the uplink signals to the mapping section
403. The transmission signal generation section 402 can be constituted with a signal
generator, a signal generation circuit or signal generation apparatus that can be
described based on general understanding of the technical field to which the present
disclosure pertains.
[0289] For example, the transmission signal generation section 402 generates an uplink control
signal about transmission confirmation information, the channel state information
(CSI), and so on, based on commands from the control section 401. The transmission
signal generation section 402 generates uplink data signals based on commands from
the control section 401. For example, when a UL grant is included in a downlink control
signal that is reported from the base station 10, the control section 401 commands
the transmission signal generation section 402 to generate the uplink data signal.
[0290] The mapping section 403 maps the uplink signals generated in the transmission signal
generation section 402 to radio resources, based on commands from the control section
401, and outputs the result to the transmitting/receiving sections 203. The mapping
section 403 can be constituted with a mapper, a mapping circuit or mapping apparatus
that can be described based on general understanding of the technical field to which
the present disclosure pertains.
[0291] The received signal processing section 404 performs receiving processes (for example,
demapping, demodulation, decoding and so on) of received signals that are input from
the transmitting/receiving sections 203. Here, the received signals are, for example,
downlink signals transmitted from the base station 10 (downlink control signals, downlink
data signals, downlink reference signals and so on). The received signal processing
section 404 can be constituted with a signal processor, a signal processing circuit
or signal processing apparatus that can be described based on general understanding
of the technical field to which the present disclosure pertains. The received signal
processing section 404 can constitute the receiving section according to the present
disclosure.
[0292] The received signal processing section 404 outputs the decoded information acquired
through the receiving processes to the control section 401. The received signal processing
section 404 outputs, for example, broadcast information, system information, RRC signaling,
DCI and so on, to the control section 401. The received signal processing section
404 outputs the received signals and/or the signals after the receiving processes
to the measurement section 405.
[0293] The measurement section 405 conducts measurements with respect to the received signals.
The measurement section 405 can be constituted with a measurer, a measurement circuit
or measurement apparatus that can be described based on general understanding of the
technical field to which the present disclosure pertains.
[0294] For example, the measurement section 405 may perform RRM measurement, CSI measurement,
and so on, based on the received signal. The measurement section 405 may measure a
received power (for example, RSRP), a received quality (for example, RSRQ, SINR, SNR),
a signal strength (for example, RSSI), channel information (for example, CSI), and
so on. The measurement results may be output to the control section 401.
[0295] The transmitting/receiving section 203 may transmit a plurality of uplink shared
channels in repetition transmissions. The control section 401 may transmit, based
on the number of HARQ-ACKs (Hybrid Automatic Repeat reQuest-Acknowledgements) for
the downlink data (PDSCH) (the number of HARQ-ACKs in which a HARQ-ACK codebook size,
an UL DAI, a DL total DAI, and a HARQ-ACK feedback timing are in the same slot), the
HARQ-ACK on at least one of the plurality of uplink shared channels (PUSCH, specific
PUSCH, non-specific PUSCH).
[0296] A presence or absence of, or the number of HARQ-ACKs, the HARQ-ACK being transmitted
on one specific uplink shared channel (specific PUSCH) satisfying a given condition
among the plurality of uplink shared channels, may be based on a downlink assignment
index (DAI, UL DAI, DL total DAI) included in downlink control information for scheduling
the repetition transmissions.
[0297] A presence or absence of, or the number of HARQ-ACKs, the HARQ-ACK being transmitted
on each of the plurality of uplink shared channels, may be based on a downlink assignment
index (DAI, UL DAI, DL total DAI) included in downlink control information for scheduling
the repetition transmissions.
[0298] The control section 401 may perform rate matching in the specific uplink shared channel
(specific PUSCH) satisfying a given condition among the plurality of uplink shared
channels, and may not perform rate matching in an uplink shared channel (non-specific
PUSCH) other than the specific uplink shared channel among the plurality of uplink
shared channels.
[0299] The control section 401 may perform rate matching in the specific uplink shared channel
(specific PUSCH) satisfying a given condition among the plurality of uplink shared
channels, and may perform rate matching in an uplink shared channel (non-specific
PUSCH) other than the specific uplink shared channel among the plurality of uplink
shared channels.
<Hardware Structure>
[0300] Note that the block diagrams that have been used to describe the above embodiments
show blocks in functional units. These functional blocks (components) may be implemented
in arbitrary combinations of at least one of hardware and software. Also, the method
for implementing each functional block is not particularly limited. That is, each
functional block may be realized by one piece of apparatus that is physically or logically
coupled, or may be realized by directly or indirectly connecting two or more physically
or logically separate pieces of apparatus (for example, via wire, wireless, or the
like) and using these plurality of pieces of apparatus. The functional blocks may
be implemented by combining softwares into the apparatus described above or the plurality
of apparatuses described above.
[0301] Here, functions include judgment, determination, decision, calculation, computation,
processing, derivation, investigation, search, confirmation, reception, transmission,
output, access, resolution, selection, designation, establishment, comparison, assumption,
expectation, considering, broadcasting, notifying, communicating, forwarding, configuring,
reconfiguring, allocating (mapping), assigning, and the like, but function are by
no means limited to these. For example, functional block (components) to implement
a function of transmission may be referred to as a "transmitting section (transmitting
unit)," a "transmitter," and the like. The method for implementing each component
is not particularly limited as described above.
[0302] For example, a base station, a user terminal, and so on according to one embodiment
of the present disclosure may function as a computer that executes the processes of
the radio communication method of the present disclosure. FIG. 15 is a diagram to
show an example of a hardware structure of the base station and the user terminal
according to one embodiment. Physically, the above-described base station 10 and user
terminal 20 may each be formed as computer an apparatus that includes a processor
1001, a memory 1002, a storage 1003, a communication apparatus 1004, an input apparatus
1005, an output apparatus 1006, a bus 1007, and so on.
[0303] Note that in the present disclosure, the words such as an apparatus, a circuit, a
device, a section, and a unit can be interchangeably interpreted. The hardware structure
of the base station 10 and the user terminal 20 may be configured to include one or
more of apparatuses shown in the drawings, or may be configured not to include part
of apparatuses.
[0304] For example, although only one processor 1001 is shown, a plurality of processors
may be provided. Furthermore, processes may be implemented with one processor or may
be implemented at the same time, in sequence, or in different manners with two or
more processors. Note that the processor 1001 may be implemented with one or more
chips.
[0305] Each function of the base station 10 and the user terminals 20 is implemented, for
example, by allowing given software (programs) to be read on hardware such as the
processor 1001 and the memory 1002, and by allowing the processor 1001 to perform
calculations to control communication via the communication apparatus 1004 and control
at least one of reading and writing of data in the memory 1002 and the storage 1003.
[0306] The processor 1001 controls the whole computer by, for example, running an operating
system. The processor 1001 may be configured with a central processing unit (CPU),
which includes interfaces with peripheral apparatus, control apparatus, computing
apparatus, a register, and so on. For example, the above-described baseband signal
processing section 104 (204), call processing section 105, and so on may be implemented
by the processor 1001.
[0307] Furthermore, the processor 1001 reads programs (program codes), software modules,
data, and so on from at least one of the storage 1003 and the communication apparatus
1004, into the memory 1002, and executes various processes according to these. As
for the programs, programs to allow computers to execute at least part of the operations
of the above-described embodiments are used. For example, the control section 401
of each user terminal 20 may be implemented by control programs that are stored in
the memory 1002 and that operate on the processor 1001, and other functional blocks
may be implemented likewise.
[0308] The memory 1002 is a computer-readable recording medium, and may be constituted with,
for example, at least one of a ROM (Read Only Memory), an EPROM (Erasable Programmable
ROM), an EEPROM (Electrically EPROM), a RAM (Random Access Memory), and other appropriate
storage media. The memory 1002 may be referred to as a "register," a "cache," a "main
memory (primary storage apparatus)," and so on. The memory 1002 can store executable
programs (program codes), software modules, and the like for implementing the radio
communication method according to one embodiment of the present disclosure.
[0309] The storage 1003 is a computer-readable recording medium, and may be constituted
with, for example, at least one of a flexible disk, a floppy (registered trademark)
disk, a magneto-optical disk (for example, a compact disc (CD-ROM (Compact Disc ROM)
and so on), a digital versatile disc, a Blu-ray (registered trademark) disk), a removable
disk, a hard disk drive, a smart card, a flash memory device (for example, a card,
a stick, and a key drive), a magnetic stripe, a database, a server, and other appropriate
storage media. The storage 1003 may be referred to as "secondary storage apparatus."
[0310] The communication apparatus 1004 is hardware (transmitting/receiving device) for
allowing inter-computer communication via at least one of a wired network and a wireless
network, and may be referred to as, for example, a "network device," a "network controller,"
a "network card," a "communication module," and so on. The communication apparatus
1004 may be configured to include a high frequency switch, a duplexer, a filter, a
frequency synthesizer, and so on in order to realize, for example, at least one of
frequency division duplex (FDD) and time division duplex (TDD). For example, the above-described
transmitting/receiving antennas 101 (201), amplifying sections 102 (202), transmitting/receiving
sections 103 (203), communication path interface 106, and so on may be implemented
by the communication apparatus 1004. In the transmitting/receiving section 103 (203),
the transmitting section 103a (203a) and the receiving section 103b (203b) can be
implemented while being separated physically or logically.
[0311] The input apparatus 1005 is an input device that receives input from the outside
(for example, a keyboard, a mouse, a microphone, a switch, a button, a sensor, and
so on). The output apparatus 1006 is an output device that allows sending output to
the outside (for example, a display, a speaker, an LED (Light Emitting Diode) lamp,
and so on). Note that the input apparatus 1005 and the output apparatus 1006 may be
provided in an integrated structure (for example, a touch panel).
[0312] Furthermore, these types of apparatus, including the processor 1001, the memory 1002,
and others, are connected by a bus 1007 for communicating information. The bus 1007
may be formed with a single bus, or may be formed with buses that vary between pieces
of apparatus.
[0313] Also, the base station 10 and the user terminals 20 may be structured to include
hardware such as a microprocessor, a digital signal processor (DSP), an ASIC (Application-Specific
Integrated Circuit), a PLD (Programmable Logic Device), an FPGA (Field Programmable
Gate Array), and so on, and part or all of the functional blocks may be implemented
by the hardware. For example, the processor 1001 may be implemented with at least
one of these pieces of hardware.
(Variations)
[0314] Note that the terminology described in the present disclosure and the terminology
that is needed to understand the present disclosure may be replaced by other terms
that convey the same or similar meanings. For example, a "channel," a "symbol," and
a "signal" (or signaling) may be interchangeably interpreted. Also, "signals" may
be "messages." A reference signal may be abbreviated as an "RS," and may be referred
to as a "pilot," a "pilot signal," and so on, depending on which standard applies.
Furthermore, a "component carrier (CC)" may be referred to as a "cell," a "frequency
carrier," a "carrier frequency" and so on.
[0315] A radio frame may be constituted of one or a plurality of periods (frames) in the
time domain. Each of one or a plurality of periods (frames) constituting a radio frame
may be referred to as a "subframe." Furthermore, a subframe may be constituted of
one or a plurality of slots in the time domain. A subframe may be a fixed time length
(for example, 1 ms) independent of numerology.
[0316] Here, numerology may be a communication parameter applied to at least one of transmission
and reception of a certain signal or channel. For example, numerology may indicate
at least one of a subcarrier spacing (SCS), a bandwidth, a symbol length, a cyclic
prefix length, a transmission time interval (TTI), the number of symbols per TTI,
a radio frame structure, a particular filter processing performed by a transceiver
in the frequency domain, a particular windowing processing performed by a transceiver
in the time domain, and so on.
[0317] A slot may be constituted of one or a plurality of symbols in the time domain (OFDM
(Orthogonal Frequency Division Multiplexing) symbols, SC-FDMA (Single Carrier Frequency
Division Multiple Access) symbols, and so on). Furthermore, a slot may be a time unit
based on numerology.
[0318] A slot may include a plurality of mini-slots. Each mini-slot may be constituted of
one or a plurality of symbols in the time domain. A mini-slot may be referred to as
a "sub-slot." A mini-slot may be constituted of symbols less than the number of slots.
A PDSCH (or PUSCH) transmitted in a time unit larger than a mini-slot may be referred
to as "PDSCH (PUSCH) mapping type A." A PDSCH (or PUSCH) transmitted using a mini-slot
may be referred to as "PDSCH (PUSCH) mapping type B."
[0319] A radio frame, a subframe, a slot, a mini-slot, and a symbol all express time units
in signal communication. A radio frame, a subframe, a slot, a mini-slot, and a symbol
may each be called by other applicable terms. Note that time units such as a frame,
a subframe, a slot, mini-slot, and a symbol in the present disclosure may be interchangeably
interpreted.
[0320] For example, one subframe may be referred to as a "transmission time interval (TTI),"
a plurality of consecutive subframes may be referred to as a "TTI," or one slot or
one mini-slot may be referred to as a "TTI." That is, at least one of a subframe and
a TTI may be a subframe (1 ms) in existing LTE, may be a shorter period than 1 ms
(for example, 1 to 13 symbols), or may be a longer period than 1 ms. Note that a unit
expressing TTI may be referred to as a "slot," a "mini-slot," and so on instead of
a "subframe."
[0321] Here, a TTI refers to the minimum time unit of scheduling in radio communication,
for example. For example, in LTE systems, a base station schedules the allocation
of radio resources (such as a frequency bandwidth and transmit power that are available
for each user terminal) for the user terminal in TTI units. Note that the definition
of TTIs is not limited to this.
[0322] TTIs may be transmission time units for channel-encoded data packets (transport blocks),
code blocks, or codewords, or may be the unit of processing in scheduling, link adaptation,
and so on. Note that, when TTIs are given, the time interval (for example, the number
of symbols) to which transport blocks, code blocks, codewords, or the like are actually
mapped may be shorter than the TTIs.
[0323] Note that, in the case where one slot or one mini-slot is referred to as a TTI,
one or more TTIs (that is, one or more slots or one or more mini-slots) may be the
minimum time unit of scheduling. Furthermore, the number of slots (the number of mini-slots)
constituting the minimum time unit of the scheduling may be controlled.
[0324] A TTI having a time length of 1 ms may be referred to as a "normal TTI" (TTI in LTE
Rel. 8 to Rel. 12), a "long TTI," a "normal subframe," a "long subframe," a "slot"
and so on. A TTI that is shorter than a normal TTI may be referred to as a "shortened
TTI," a "short TTI," a "partial or fractional TTI," a "shortened subframe," a "short
subframe," a "mini-slot," a "sub-slot," a "slot" and so on.
[0325] Note that a long TTI (for example, a normal TTI, a subframe, and so on) may be interpreted
as a TTI having a time length exceeding 1 ms, and a short TTI (for example, a shortened
TTI and so on) may be interpreted as a TTI having a TTI length shorter than the TTI
length of a long TTI and equal to or longer than 1 ms.
[0326] A resource block (RB) is the unit of resource allocation in the time domain and the
frequency domain, and may include one or a plurality of consecutive subcarriers in
the frequency domain. The number of subcarriers included in an RB may be the same
regardless of numerology, and, for example, may be 12. The number of subcarriers included
in an RB may be determined based on numerology.
[0327] Also, an RB may include one or a plurality of symbols in the time domain, and may
be one slot, one mini-slot, one subframe, or one TTI in length. One TTI, one subframe,
and so on each may be constituted of one or a plurality of resource blocks.
[0328] Note that one or a plurality of RBs may be referred to as a "physical resource block
(PRB (Physical RB))," a "sub-carrier group (SCG)," a "resource element group (REG),"
a "PRB pair," an "RB pair," and so on.
[0329] Furthermore, a resource block may be constituted of one or a plurality of resource
elements (REs). For example, one RE may correspond to a radio resource field of one
subcarrier and one symbol.
[0330] A bandwidth part (BWP) (which may be also referred to as partial bandwdth and so
on) may represent a subset of continuous common RBs (common resource blocks) for a
certain numerology in a certain carrier. Here, the common RBs may be specified by
an RB index using, as a reference, a common reference point of that carrier. The PRB
may be defined in a certain BWP and numbered in the BWP.
[0331] A BWP may include a BWP for UL (UL BWP) and a BWP for DL (DL BWP). One or a plurality
of BWPs may be configured in one carrier for the UE.
[0332] At least one of the configured BWPs may be active, and the UE may not assume transmitting
and/or receiving a given signal/channel out of the active BWP. Note that a "cell",
a "carrier" and so on in the present disclosure may be interpreted as a "BWP".
[0333] Note that the above-described structures of radio frames, subframes, slots, mini-slots,
symbols, and so on are merely examples. For example, structures such as the number
of subframes included in a radio frame, the number of slots per subframe or radio
frame, the number of mini-slots included in a slot, the numbers of symbols and RBs
included in a slot or a mini-slot, the number of subcarriers included in an RB, the
number of symbols in a TTI, the symbol length, the cyclic prefix (CP) length, and
so on can be variously changed.
[0334] Also, the information, parameters, and so on described in the present disclosure
may be represented in absolute values or in relative values with respect to given
values, or may be represented in another corresponding information. For example, radio
resources may be specified by given indices.
[0335] The names used for parameters and so on in the present disclosure are in no respect
limiting. Furthermore, mathematical expressions that use these parameters, and so
on may be different from those expressly disclosed in the present disclosure. For
example, since various channels (PUCCH (Physical Uplink Control Channel), PDCCH (Physical
Downlink Control Channel), and so on) and information elements can be identified by
any suitable names, the various names allocated to these various channels and information
elements are in no respect limiting.
[0336] The information, signals, and so on described in the present disclosure may be represented
by using any of a variety of different technologies. For example, data, instructions,
commands, information, signals, bits, symbols, chips, and so on, all of which may
be referenced throughout the herein-contained description, may be represented by voltages,
currents, electromagnetic waves, magnetic fields or particles, optical fields or photons,
or any combination of these.
[0337] Also, information, signals, and so on can be output in at least one of from higher
layers to lower layers and from lower layers to higher layers. Information, signals,
and so on may be input and/or output via a plurality of network nodes.
[0338] The information, signals, and so on that are input and/or output may be stored in
a specific location (for example, a memory) or may be managed by using a management
table. The information, signals, and so on to be input and/or output can be overwritten,
updated, or appended. The information, signals, and so on that are output may be deleted.
The information, signals, and so on that are input may be transmitted to another apparatus.
[0339] Reporting of information is by no means limited to the aspects/embodiments described
in the present disclosure, and other methods may be used as well. For example, reporting
of information may be implemented by using physical layer signaling (for example,
downlink control information (DCI), uplink control information (UCI), higher layer
signaling (for example, RRC (Radio Resource Control) signaling, broadcast information
(master information block (MIB), system information blocks (SIBs), and so on), MAC
(Medium Access Control) signaling and so on), and other signals and/or combinations
of these.
[0340] Note that physical layer signaling may be referred to as "L1/L2 (Layer 1/Layer 2)
control information (L1/L2 control signals)," "L1 control information (L1 control
signal)," and so on. Also, RRC signaling may be referred to as an "RRC message," and
can be, for example, an RRC connection setup message, an RRC connection reconfiguration
message, and so on. Also, MAC signaling may be reported using, for example, MAC control
elements (MAC CEs).
[0341] Also, reporting of given information (for example, reporting of "X holds") does not
necessarily have to be reported explicitly, and can be reported implicitly (by, for
example, not reporting this given information or reporting another piece of information).
[0342] Determinations may be made in values represented by one bit (0 or 1), may be made
in Boolean values that represent true or false, or may be made by comparing numerical
values (for example, comparison against a given value).
[0343] Software, whether referred to as "software," "firmware," "middleware," "microcode,"
or "hardware description language," or called by other names, should be interpreted
broadly to mean instructions, instruction sets, code, code segments, program codes,
programs, subprograms, software modules, applications, software applications, software
packages, routines, subroutines, objects, executable files, execution threads, procedures,
functions, and so on.
[0344] Also, software, commands, information, and so on may be transmitted and received
via communication media. For example, when software is transmitted from a website,
a server, or other remote sources by using at least one of wired technologies (coaxial
cables, optical fiber cables, twisted-pair cables, digital subscriber lines (DSL),
and so on) and wireless technologies (infrared radiation, microwaves, and so on),
at least one of these wired technologies and wireless technologies are also included
in the definition of communication media.
[0345] The terms "system" and "network" used in the present disclosure may be used interchangeably.
[0346] In the present disclosure, the terms such as "precoding," a "precoder," a "weight
(precoding wait)," "quasi-co-location (QCL)," a "TCI state (Transmission Configuration
Indication state)," a "spatial relation," a "spatial domain filter," a "transmit power,"
"phase rotation," an "antenna port," an "antenna port group," a "layer," "the number
of layers," a "rank," a "resource," a "resource set," a "resource group," a "beam,"
a "beam width," a "beam angular degree," an "antenna," an "antenna element," a "panel,"
and so on can be used interchangeably.
[0347] In the present disclosure, the terms such as a "base station (BS)," a "radio base
station," a "fixed station," a "NodeB," an "eNodeB (eNB)," a "gNodeB (gNB)," an "access
point," a "transmission point (TP)," a "reception point (RP)," a "transmission/reception
point (TRP)," a "panel," a "cell," a "sector," a "cell group," a "carrier," a "component
carrier," and so on can be used interchangeably. The base station may be referred
to as the terms such as a "macro cell," a small cell," a "femto cell," a "pico cell,"
and so on.
[0348] A base station can accommodate one or a plurality of (for example, three) cells.
When a base station accommodates a plurality of cells, the entire coverage area of
the base station can be partitioned into multiple smaller areas, and each smaller
area can provide communication services through base station subsystems (for example,
indoor small base stations (RRHs (Remote Radio Heads))). The term "cell" or "sector"
refers to part of or the entire coverage area of at least one of a base station and
a base station subsystem that provides communication services within this coverage.
[0349] In the present disclosure, the terms "mobile station (MS)," "user terminal," "user
equipment (UE)," "terminal," and the like may be used interchangeably.
[0350] A mobile station may be referred to as a "subscriber station," "mobile unit," "subscriber
unit," "wireless unit," "remote unit," "mobile device," "wireless device," "wireless
communication device," "remote device," "mobile subscriber station," "access terminal,"
"mobile terminal," "wireless terminal," "remote terminal," "handset," "user agent,"
"mobile client," "client," or some other appropriate terms in some cases.
[0351] At least one of a base station and a mobile station may be referred to as a "transmitting
apparatus," a "receiving apparatus," a "communication apparatus," and so on. Note
that at least one of a base station and a mobile station may be device mounted on
a mobile body or a mobile body itself, and so on. The mobile body may be a vehicle
(for example, a car, an airplane, and the like), may be a mobile body which moves
unmanned (for example, a drone, an automatic operation car, and the like), or may
be a robot (a manned type or unmanned type). Note that at least one of a base station
and a mobile station also includes an apparatus which does not necessarily move during
communication operation. For example, at least one of a base station and a mobile
station may be an IoT (Internet of Things) device such as a sensor, and the like.
[0352] Furthermore, the base station in the present disclosure may be interpreted as a user
terminal. For example, each aspect/embodiment of the present disclosure may be applied
to the structure that replaces a communication between a base station and a user terminal
with a communication between a plurality of user terminals (for example, which may
be referred to as "D2D (Device-to-Device)," "V2X (Vehicle-to-Everything)," and the
like). In this case, user terminals 20 may have the functions of the base stations
10 described above. The words "uplink" and "downlink" may be interpreted as the words
corresponding to the terminal-to-terminal communication (for example, "side"). For
example, an uplink channel, a downlink channel and so on may be interpreted as a side
channel.
[0353] Likewise, the user terminal in the present disclosure may be interpreted as base
station. In this case, the base station 10 may have the functions of the user terminal
20 described above.
[0354] Actions which have been described in the present disclosure to be performed by a
base station may, in some cases, be performed by upper nodes. In a network including
one or a plurality of network nodes with base stations, it is clear that various operations
that are performed to communicate with terminals can be performed by base stations,
one or more network nodes (for example, MMEs (Mobility Management Entities), S-GW
(Serving-Gateways), and so on may be possible, but these are not limiting) other than
base stations, or combinations of these.
[0355] The aspects/embodiments illustrated in the present disclosure may be used individually
or in combinations, which may be switched depending on the mode of implementation.
The order of processes, sequences, flowcharts, and so on that have been used to describe
the aspects/embodiments in the present disclosure may be reordered as long as inconsistencies
do not arise. For example, although various methods have been illustrated in the present
disclosure with various components of steps in exemplary orders, the specific orders
that are illustrated herein are by no means limiting.
[0356] The aspects/embodiments illustrated in the present disclosure may be applied to LTE
(Long Term Evolution), LTE-A (LTE-Advanced), LTE-B (LTE-Beyond), SUPER 3G, IMT-Advanced,
4G (4th generation mobile communication system), 5G (5th generation mobile communication
system), FRA (Future Radio Access), New-RAT (Radio Access Technology), NR(New Radio),
NX (New radio access), FX (Future generation radio access), GSM (registered trademark)
(Global System for Mobile communications), CDMA 2000, UMB (Ultra Mobile Broadband),
IEEE 802.11 (Wi-Fi (registered trademark)), IEEE 802.16 (WiMAX (registered trademark)),
IEEE 802.20, UWB (Ultra-WideBand), Bluetooth (registered trademark), systems that
use other adequate radio communication methods and next-generation systems that are
enhanced based on these. A plurality of systems may be combined (for example, a combination
of LTE or LTE-A and 5G, and the like) and applied.
[0357] The phrase "based on" (or "on the basis of") as used in the present disclosure does
not mean "based only on" (or "only on the basis of"), unless otherwise specified.
In other words, the phrase "based on" (or "on the basis of") means both "based only
on" and "based at least on" ("only on the basis of" and "at least on the basis of").
[0358] Reference to elements with designations such as "first," "second," and so on as used
in the present disclosure does not generally limit the quantity or order of these
elements. These designations may be used in the present disclosure only for convenience,
as a method for distinguishing between two or more elements. Thus, reference to the
first and second elements does not imply that only two elements may be employed, or
that the first element must precede the second element in some way.
[0359] The term "judging (determining)" as in the present disclosure herein may encompass
a wide variety of actions. For example, "judging (determining)" may be interpreted
to mean making "judgments (determinations)" about judging, calculating, computing,
processing, deriving, investigating, looking up, search and inquiry (for example,
searching a table, a database, or some other data structures), ascertaining, and so
on.
[0360] Furthermore, "judging (determining)" may be interpreted to mean making "judgments
(determinations)" about receiving (for example, receiving information), transmitting
(for example, transmitting information), input, output, accessing (for example, accessing
data in a memory), and so on.
[0361] In addition, "judging (determining)" as used herein may be interpreted to mean making
"judgments (determinations)" about resolving, selecting, choosing, establishing, comparing,
and so on. In other words, "judging (determining)" may be interpreted to mean making
"judgments (determinations)" about some action.
[0362] In addition, "judging (determining)" may be interpreted as "assuming," "expecting,"
"considering," and the like.
[0363] "The maximum transmit power" according to the present disclosure may mean a maximum
value of the transmit power, may mean the nominal maximum transmit power (the nominal
UE maximum transmit power), or may mean the rated maximum transmit power (the rated
UE maximum transmit power).
[0364] The terms "connected" and "coupled," or any variation of these terms as used in the
present disclosure mean all direct or indirect connections or coupling between two
or more elements, and may include the presence of one or more intermediate elements
between two elements that are "connected" or "coupled" to each other. The coupling
or connection between the elements may be physical, logical, or a combination thereof.
For example, "connection" may be interpreted as "access."
[0365] In the present disclosure, when two elements are connected, the two elements may
be considered "connected" or "coupled" to each other by using one or more electrical
wires, cables, printed electrical connections, and the like, as some non-limiting
and non-inclusive examples, by using electromagnetic energy having wavelengths in
radio frequency regions, microwave regions, (both visible and invisible) optical regions,
or the like.
[0366] In the present disclosure, the phrase "A and B are different" may mean that "A and
B are different from each other." Note that the phrase may mean that "A and B is each
different from C." The terms "separate," "be coupled," and so on may be interpreted
similarly to "different."
[0367] When terms such as "include," "including," and variations of these are used in the
present disclosure, these terms are intended to be inclusive, in a manner similar
to the way the term "comprising" is used. Furthermore, the term "or" as used in the
present disclosure is intended to be not an exclusive disjunction.
[0368] For example, in the present disclosure, when an article such as "a," "an," and "the"
in the English language is added by translation, the present disclosure may include
that a noun after these articles is in a plural form.
[0369] Now, although the invention according to the present disclosure has been described
in detail above, it should be obvious to a person skilled in the art that the invention
according to the present disclosure is by no means limited to the embodiments described
in the present disclosure. The invention according to the present disclosure can be
implemented with various corrections and in various modifications, without departing
from the spirit and scope of the invention defined by the recitations of claims. Consequently,
the description of the present disclosure is provided only for the purpose of explaining
examples, and should by no means be construed to limit the invention according to
the present disclosure in any way.