| (84) |
Designated Contracting States: |
|
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL
NO PL PT RO RS SE SI SK SM TR |
| (30) |
Priority: |
10.01.2019 US 201962790936 P
|
| (43) |
Date of publication of application: |
|
17.11.2021 Bulletin 2021/46 |
| (73) |
Proprietor: Sharp Kabushiki Kaisha |
|
Sakai-shi, Osaka 590-8522 (JP) |
|
| (72) |
Inventors: |
|
- YING, Kai
Vancouver, WA 98683 (US)
- AIBA, Tatsushi
Sakai City, Osaka 590-8522 (JP)
- YOKOMAKURA, Kazunari
Sakai City, Osaka 590-8522 (JP)
- KOWALSKI, John Michael
Vancouver, WA 98683 (JP)
|
| (74) |
Representative: Müller-Boré & Partner
Patentanwälte PartG mbB |
|
Friedenheimer Brücke 21 80639 München 80639 München (DE) |
| (56) |
References cited: :
EP-A1- 2 608 593
|
WO-A1-2020/030013
|
|
| |
|
|
- INTEL CORPORATION: "Enhancements to configured grant PUSCH", vol. RAN WG1, no. Chengdu,
China; 20181008 - 20181012, 29 September 2018 (2018-09-29), XP051518192, Retrieved
from the Internet <URL:http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F94b/Docs/R1%2D1810787%2Ezip>
[retrieved on 20180929]
- HUAWEI ET AL: "Enhanced UL configured grant transmissions", vol. RAN WG1, no. Spokane,
USA; 20181112 - 20181116, 11 November 2018 (2018-11-11), XP051554098, Retrieved from
the Internet <URL:http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/RAN1/Docs/R1%2D1812226%2Ezip>
[retrieved on 20181111]
- NTT DOCOMO SAMSUNG PANASONIC KDDI OPPO ERICSSON CATT AT&T VIVO NOKIA NSB NTT SHARP:
"WF on PUSCH time-domain resource allocation", vol. RAN WG1, no. Busan, Korea; 20180521
- 20180525, 29 May 2018 (2018-05-29), XP051463538, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F93/Docs>
[retrieved on 20180529]
- HUAWEI, HISILICON: "PUSCH enhancements for URLLC", 3GPP DRAFT; R1-1812223, 3RD GENERATION
PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921
SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Spokane, USA; 20181112 - 20181116,
R1-1812223, 11 November 2018 (2018-11-11), Mobile Competence Centre ; 650, route des
Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051554095
- NTT DOCOMO, INC.: "UL data transmission procedure for June Release URLLC", 3GPP DRAFT;
R1-1807069, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ;
650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no.
Busan, Korea; 20180521 - 20180525, R1-1807069, 20 May 2018 (2018-05-20), Mobile Competence
Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051442267
- NTT DOCOMO, INC.: "Offline summary for UL data transmission procedure", 3GPP DRAFT;
R1-1809767, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ;
650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no.
Gothenburg, Sweden; 20180820 - 20180824, R1-1809767, 22 August 2018 (2018-08-22),
Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex
; France, XP051517128
|
|