TECHNICAL FIELD
[0001] This disclosure relates to an asphalt finisher.
BACKGROUND ART
[0002] A known asphalt finisher includes a rear screed that can be extended and retracted
in the lateral direction with respect to a front screed (see Patent Document 1). This
asphalt finisher can increase the width of a road to be paved by extending the rear
screed.
[0003] This asphalt finisher travels while holding a pavement material in front of the rear
screed such that the amount of the pavement material to be compacted by the rear screed
does not become insufficient. The amount of the pavement material held in front of
the rear screed is determined by the height of a mold board disposed between a screw
and the rear screed in the traveling direction.
[0004] The amount of the pavement material held in front of the rear screed basically increases
as the height of the mold board increases. This is because the amount of the pavement
material that passes under the mold board increases as the height of the mold board
increases.
[RELATED-ART DOCUMENT]
[Patent Document]
DISCLOSURE OF INVENTION
PROBLEMS TO BE SOLVED BY THE INVENTION
[0006] However, if the height of the mold board is too high, the amount of the pavement
material held in front of the rear screed excessively increases, and the pavement
material may go over the rear screed and overflow onto a paved surface behind the
rear screed.
[0007] On the other hand, if the height of the mold board is too low, the amount of the
pavement material held in front of the rear screed becomes insufficient, the amount
of the pavement material to be compacted by the rear screed becomes insufficient,
and roughness such as a dent may be formed on the paved surface due to the insufficient
amount of the pavement material.
[0008] Thus the above-described asphalt finisher may reduce the quality of a paved surface
in both cases where the mold board is too high and too low. Therefore, it is desired
to provide an asphalt finisher that can suppress the reduction in the quality of a
paved surface.
MEANS FOR SOLVING THE PROBLEMS
[0009] An asphalt finisher according to an embodiment of the present invention includes
a tractor, a hopper that is disposed in front of the tractor and configured to receive
a pavement material, a conveyor configured to convey the pavement material in the
hopper to a rear side of the tractor, a screw configured to spread the pavement material
conveyed by the conveyor at the rear side of the tractor, a screed configured to compact
the pavement material at a rear side of the screw, a mold board attached to a front
part of the screed, an elevating device configured to move the mold board up and down,
an information acquisition device configured to obtain information on the pavement
material held by the screed, and a control device. The screed includes a front screed
and a rear screed that are shifted from each other in a vehicle length direction,
and the control device is configured to adjust the height of the mold board by driving
the elevating device based on the information obtained by the information acquisition
device.
ADVANTAGEOUS EFFECT OF THE INVENTION
[0010] The above configuration makes it possible to provide an asphalt finisher that can
suppress the reduction in the quality of a paved surface.
BRIEF DESCRIPTION OF THE DRAWINGS
[0011]
FIG. 1A is a side view of an asphalt finisher according to an embodiment of the present
invention;
FIG. 1B is a top view of the asphalt finisher according to the embodiment of the present
invention;
FIG. 1C is a rear view of the asphalt finisher according to the embodiment of the
present invention;
FIG. 2 is a block diagram illustrating an example of a configuration of a mold board
elevating system;
FIG. 3A is a drawing illustrating an example of a screen displayed on a display device;
FIG. 3B is a drawing illustrating an example of a screen displayed on the display
device; and
FIG. 4 is a flowchart illustrating a process.
DESCRIPTION OF EMBODIMENTS
[0012] FIGs. 1A to 1C are drawings illustrating an asphalt finisher 100, which is an example
of a road machine according to an embodiment of the present invention. Specifically,
FIG. 1A is a side view of the asphalt finisher 100, FIG. 1B is a top view of the asphalt
finisher 100, and FIG. 1C is a rear view of the asphalt finisher 100.
[0013] The asphalt finisher 100 mainly includes a tractor 1, a hopper 2, and a screed 3.
In the descriptions below, the direction (+X direction) of the hopper 2 seen from
the tractor 1 is referred to as "front", and the direction (-X direction) of the screed
3 seen from the tractor 1 is referred to as "rear".
[0014] The tractor 1 is a mechanism for causing the asphalt finisher 100 to travel. In the
present embodiment, the tractor 1 moves the asphalt finisher 100 by rotating rear
wheels 5 with a rear wheel drive hydraulic motor and rotating front wheels 6 with
a front wheel drive hydraulic motor. The rear wheel drive hydraulic motor and the
front wheel drive hydraulic motor are rotated by a hydraulic oil supplied from a hydraulic
pump. The rear wheels 5 and the front wheels 6 may be replaced by crawlers.
[0015] A controller 50 is a control device that controls the asphalt finisher 100. In the
present embodiment, the controller 50 includes a microcomputer including a CPU, a
volatile storage device, and a non-volatile storage device, and is provided in the
tractor 1. Functional components corresponding to functions of the controller 50 are
implemented by executing programs stored in the non-volatile storage device with the
CPU. However, each functional component of the controller 50 may be implemented by,
for example, hardware or firmware.
[0016] The hopper 2 is a mechanism for receiving a pavement material. In the present embodiment,
the hopper 2 is disposed in front of the tractor 1 and is configured to be opened
and closed in a Y-axis direction (vehicle width direction) by a hopper cylinder. The
asphalt finisher 100 normally receives a pavement material from the back of a dump
truck with the hopper 2 fully opened. The pavement material is, for example, an asphalt
mixture. FIG. 1B illustrates a state where the hopper 2 is fully opened. An operator
of the asphalt finisher 100 normally closes the hopper 2 when the pavement material
in the hopper 2 decreases to gather the pavement material near the inner wall of the
hopper 2 to the central portion of the hopper 2. This is to enable a conveyor CV in
the center of the hopper 2 to convey the pavement material to the rear side of the
tractor 1. The pavement material conveyed to the rear side of the tractor 1 is spread
by a screw SC in the vehicle width direction at a position behind the tractor 1 and
in front of the screed 3. In the present embodiment, the screw SC is in a state where
extension screws are arranged in the lateral direction and connected to each other.
In FIGs. 1A and 1B, a pavement material PV spread by the screw SC is indicated by
coarse (thin) hatching.
[0017] The screed 3 is a mechanism for compacting the pavement material PV. In the present
embodiment, the screed 3 includes a front screed 30 and a rear screed 31. The front
screed 30 includes a left front screed 30L and a right front screed 30R, and the rear
screed 31 includes a left rear screed 31L and a right rear screed 31R.
[0018] The screed 3 is a floating screed towed by the tractor 1 and is connected to the
tractor 1 via a leveling arm 3A. The screed 3 is moved up and down together with the
leveling arm 3A by the expansion and retraction of a screed lift cylinder 25.
[0019] A leveling cylinder 28 is a hydraulic cylinder that moves a front end portion of
the leveling arm 3A up and down to adjust the leveling thickness of the pavement material.
In the present embodiment, the leveling cylinder 28 includes a left leveling cylinder
28L and a right leveling cylinder 28R.
[0020] In the present embodiment, the rear screed 31 is configured to be extended and retracted
in the vehicle width direction by a telescopic cylinder (not shown). Specifically,
the left rear screed 31L is extended and retracted in the vehicle width direction
by a left telescopic cylinder (not shown), and the right rear screed 31R is extended
and retracted in the vehicle width direction by a right telescopic cylinder (not shown).
That is, the left rear screed 31L and the right rear screed 31R can be extended and
retracted independently of each other. Alternatively, the rear screed 31 may be a
detachable fixed (non-extendable) screed that is attached with, for example, a crane
when the rear screed 31 is used.
[0021] A screed elevating device 29 is attached to a joint between the front screed 30 and
the rear screed 31. The screed elevating device 29 is configured to be able to move
the rear screed 31 up and down with respect to the front screed 30. In the present
embodiment, the screed elevating device 29 rotates a screed elevating motor used as
a hydraulic actuator in response to a control command from the controller 50 to drive
a rotation/linear motion conversion mechanism attached to the rear screed 31 and thereby
move the rear screed 31 up and down. The screed elevating device 29 includes a left
screed elevating device 29L that moves the left rear screed 31L up and down and a
right screed elevating device 29R that moves the right rear screed 31R up and down.
The rotation/linear motion conversion mechanism is, for example, a bolt-nut mechanism.
The rotation/linear motion conversion mechanism may be a different type of mechanism
such as a ball screw mechanism or a rack and pinion mechanism. The screed elevating
motor may instead be an electric motor. The screed elevating device 29 may also be
a hydraulic cylinder.
[0022] A side plate 41 is configured to prevent the pavement material PV from spreading
in the vehicle width direction. In the present embodiment, the side plate 41 includes
a left side plate 41L fixed to the left end of the left rear screed 31L and a right
side plate 41R fixed to the right end of the right rear screed 31R. A screed step
42 is a component that constitutes a scaffold used when an operator works at a position
behind the screed 3.
[0023] A mold board 43 is disposed in front of the screed 3. The mold board 43 includes
a left mold board 43L and a right mold board 43R. The left mold board 43L is configured
to adjust the holding amount of the left rear screed 31L, which indicates the amount
of the pavement material PV retained in front of the left rear screed 31L. The right
mold board 43R is configured to adjust the holding amount of the right rear screed
31R, which indicates the amount of the pavement material PV retained in front of the
right rear screed 31R. The pavement material PV passes through a gap between the lower
end of the left mold board 43L and the roadbed RB and reaches a position in front
of the left rear screed 31L. Also, the pavement material PV passes through a gap between
the lower end of the right mold board 43R and the roadbed RB and reaches a position
in front of the right rear screed 31R.
[0024] In the present embodiment, the mold board 43 is configured to be extended and retracted
in the vehicle width direction together with the rear screed 31. Alternatively, similarly
to the rear screed 31, the mold board 43 may be a detachable, fixed (non-extendable)
mold board that is attached when used. Also, the mold board 43 is configured to be
moved up and down by a mold board elevating device 24.
[0025] The mold board elevating device 24 is a mechanism for moving the mold board 43 up
and down. In the present embodiment, the mold board elevating device 24 includes a
left mold board elevating device 24L and a right mold board elevating device 24R.
[0026] The left mold board elevating device 24L is a mechanism for moving the left mold
board 43L up and down, and includes a left outer elevating device 24LD and a left
inner elevating device 24LP. The left outer elevating device 24LD is a mechanism that
moves the left end (distal end) of the left mold board 43L up and down, and the left
inner elevating device 24LP is a mechanism that moves the right end (proximal end)
of the left mold board 43L up and down.
[0027] The right mold board elevating device 24R is a mechanism for moving the right mold
board 43R up and down, and includes a right outer elevating device 24RD and a right
inner elevating device 24RP. The right outer elevating device 24RD is a mechanism
that moves the right end (distal end) of the right mold board 43R up and down, and
the right inner elevating device 24RP is a mechanism that moves the left end (proximal
end) of the right mold board 43R up and down.
[0028] Each of the left outer elevating device 24LD, the left inner elevating device 24LP,
the right outer elevating device 24RD, and the right inner elevating device 24RP may
be implemented by a hydraulic cylinder, an electric cylinder, or a combination of
a hydraulic motor or an electric motor and a rotation/linear motion conversion mechanism.
[0029] One of the left outer elevating device 24LD and the left inner elevating device 24LP
may be omitted. For example, when the left outer elevating device 24LD is omitted,
the left end (distal end) of the left mold board 43L is supported by the left side
plate so as to be slidable in the vertical direction (Z-axis direction) and is moved
up and down along with the vertical movement of the right end (proximal end) of the
left mold board 43L moved by the left inner elevating device 24LP. The same applies
to a case where the left inner elevating device 24LP is omitted.
[0030] Similarly, one of the right outer elevating device 24RD and the right inner elevating
device 24RP may be omitted. For example, when the right inner elevating device 24RP
is omitted, the left end (proximal end) of the right mold board 43R is supported by
the right front screed 30R so as to be slidable in the vertical direction (Z-axis
direction) and is moved up and down along with the vertical movement of the right
end (distal end) of the right mold board 43R moved by the right outer elevating device
24RD. The same applies to a case where the right outer elevating device 24RD is omitted.
[0031] A center crown device 26 is provided on the front screed 30. The center crown device
26 is a mechanism configured to extend and contract a turnbuckle attached between
the left front screed 30L and the right front screed 30R and thereby adjust the angle
between the lower surface of the left front screed 30L (a left front screed plate)
and the lower surface of the right front screed 30R (a right front screed plate) seen
from behind. For example, the center crown device 26 rotates the body of the turnbuckle
by rotating a hydraulic motor in response to a control command from the controller
50 and thereby extends and contracts the turnbuckle.
[0032] A slope crown device 27 is provided between the front screed 30 and the rear screed
31. The slope crown device 27 includes a left slope crown device 27L and a right slope
crown device 27R. Specifically, the left slope crown device 27L is disposed between
the left front screed 30L and the left rear screed 31L, and the right slope crown
device 27R is disposed between the right front screed 30R and the right rear screed
31R.
[0033] The left slope crown device 27L is a mechanism that extends and contracts a turnbuckle
attached between the left front screed 30L and the left rear screed 31L and thereby
adjusts the angle between the lower surface of the left front screed 30L (a left front
screed plate) and the lower surface of the left rear screed 31L (a left rear screed
plate) seen from behind. For example, the left slope crown device 27L rotates the
body of the turnbuckle by rotating a hydraulic motor in response to a control command
from the controller 50, and thereby extends and contracts the turnbuckle. The same
applies to the right slope crown device 27R.
[0034] On the top of the tractor 1, a guide rail 1G, which can be used as a handrail by
an operator of the asphalt finisher 100, is provided. Examples of operators of the
asphalt finisher 100 include an operator who operates the tractor 1 and an operator
(for example, an assistant operator) who operates the screed 3. An information acquisition
device 51 is attached to the guide rail 1G. The information acquisition device 51
may instead be attached to a canopy or attached directly to the body of the tractor
1. Also, the information acquisition device 51 may be attached to the front screed
30 or the rear screed 31.
[0035] The information acquisition device 51 is configured to obtain information on the
pavement material PV. In the present embodiment, the information acquisition device
51 is a LIDAR configured to measure the distance to an object existing around the
asphalt finisher 100, and its measurement range includes the space in front of the
rear screed 31. Also, the LIDAR is configured to be able to measure, for example,
the distance between each of one million or more points in the measurement range and
the LIDAR (reference point).
[0036] Specifically, the information acquisition device 51 includes a left information acquisition
device 51L, a right information acquisition device 51R, and a rear information acquisition
device 51C attached to the guide rail 1G. The left information acquisition device
51L is configured to be able to obtain information on the pavement material PV held
by the left rear screed 31L. The right information acquisition device 51R is configured
to obtain information on the pavement material PV held by the right rear screed 31R.
The rear information acquisition device 51C is configured to obtain information on
the surface of the pavement material PV compacted by the screed 3.
[0037] For example, a measurement range ZL of the left information acquisition device 51L
is set such that the amount of the pavement material PV retained in the space surrounded
by the left front screed 30L, the left rear screed 31L, the left side plate 41L, and
the left mold board 43L can be detected as the holding amount of the left rear screed
31L. Similarly, a measurement range ZR of the right information acquisition device
51R is set, for example, such that the amount of the pavement material PV retained
in the space surrounded by the right front screed 30R, the right rear screed 31R,
the right side plate 41R, and the right mold board 43R can be detected as the holding
amount of the right rear screed 31R. The amount of the pavement material PV is measured
using, for example, at least one of the volume of the pavement material PV, the height
of a pile of the pavement material PV, and the distance between a reference point
and the peak of the pile of the pavement material PV as a unit of measurement.
[0038] A measurement range ZC of the rear information acquisition device 51C is set to include,
for example, the width of the screed 3 (i.e., the entire width of a new pavement NP).
[0039] The information acquisition device 51 may be implemented by a monocular camera, a
stereo camera, a distance sensor, a millimeter wave radar, an ultrasonic sensor, a
laser radar, a laser scanner, a distance image camera, or a laser range finder.
[0040] In the present embodiment, the asphalt finisher 100 is configured to obtain information
on the pavement material PV in the measurement range ZL and the measurement range
ZR with two information acquisition devices 51. However, the asphalt finisher 100
may be configured to obtain information on the pavement material PV in the measurement
range ZL and the measurement range ZR with one information acquisition device 51 or
three or more information acquisition devices 51.
[0041] The display device 52 is configured to display information on the asphalt finisher
100. In the present embodiment, the display device 52 is a liquid crystal display
disposed in front of a driving seat 1S.
[0042] A communication device 53 is configured to control communications between the asphalt
finisher 100 and devices outside of the asphalt finisher 100. In the present embodiment,
the communication device 53 is disposed in front of the driving seat 1S.
[0043] Next, with reference to FIG. 2, a control system LS provided in the asphalt finisher
100 is described. FIG. 2 is a block diagram illustrating an example of a configuration
of the control system LS.
[0044] The control system LS mainly includes the mold board elevating device 24, the center
crown device 26, the slope crown device 27, the leveling cylinder 28, the screed elevating
device 29, the controller 50, the left information acquisition device 51L, the right
information acquisition device 51R, the display device 52, and the communication device
53.
[0045] The controller 50 includes, as functional components, an information acquisition
part 50a, a crown device driving part 50b, a leveling cylinder drive part 50c, a screed
elevating part 50d, and a mold board elevating part 50e. Although the information
acquisition part 50a, the crown device driving part 50b, the leveling cylinder drive
part 50c, the screed elevating part 50d, and the mold board elevating part 50e are
illustrated as separate components for descriptive purposes, they are not necessarily
physically separated and may be entirely or partially implemented by a common software
component or a common hardware component.
[0046] The information acquisition part 50a is configured to obtain information on the surface
of the new pavement NP. In the present embodiment, the information acquisition part
50a measures the finished surface shape of the new pavement NP based on an output
of the LIDAR used as the rear information acquisition device 51C. Specifically, the
information acquisition part 50a measures the finished surface shape of the new pavement
NP using a local coordinate system centered on the LIDAR and a reference coordinate
system. That is, the information acquisition part 50a identifies the coordinates in
the reference coordinate system corresponding to each point on the surface of the
new pavement NP by converting the coordinates in the local coordinate system into
the coordinates in the reference coordinate system. The reference coordinate system
is, for example, a world geodetic coordinate system. The world geodetic coordinate
system is a three-dimensional Cartesian XYZ coordinate system in which the origin
is set at the center of gravity of the earth, the X-axis is set in the direction of
the intersection between the Greenwich meridian and the equator, the Y-axis is set
in the direction of 90 degrees east longitude, and the Z-axis is set in the direction
of the North Pole.
[0047] The information acquisition part 50a is configured to be able to measure the finished
surface shape of the new pavement NP within the measurement range during pavement
work, i.e., while the asphalt finisher 100 is moving forward.
[0048] The information acquisition part 50a may be configured to determine whether a step
exists on the paved surface. In this case, the information acquisition part 50a may
be configured to cause the display device 52 to display the determination result indicating
the presence or the absence of a step. Also, when it is determined that a step exists,
the information acquisition part 50a may display information indicating the position
of the step.
[0049] The information acquisition part 50a may determine whether a step exists by performing
image processing on an image captured by an imaging device used as the rear information
acquisition device 51C. In this case, the imaging device is, for example, a monocular
camera, a stereo camera, an infrared camera, a range image camera, a LIDAR. The image
processing includes, for example, a binarization process, an edge detection process,
and a Hough transform process.
[0050] When the size of an irregularity on the surface of the new pavement NP is greater
than a predetermined value, the information acquisition part 50a may display the corresponding
information on the display device 52. In this case, the information acquisition part
50a may output an alert from an audio output device (not shown).
[0051] The crown device driving part 50b is configured to drive at least one of the center
crown device 26 and the slope crown device 27. In the present embodiment, the crown
device driving part 50b separately drives the center crown device 26 and the slope
crown device 27 by using, for example, a hydraulic pump, a hydraulic motor, and a
control valve. Specifically, the crown device driving part 50b separately drives the
center crown device 26 and the slope crown device 27 in response to commands entered
by an operator of the asphalt finisher 100 via an input device (not shown). The crown
device driving part 50b may separately and autonomously drive the center crown device
26 and the slope crown device 27 in response to control commands from the controller
50 that are different from commands entered by the operator.
[0052] The leveling cylinder drive part 50c is configured to drive the leveling cylinder
28. The leveling cylinder drive part 50c drives the leveling cylinder 28 by using,
for example, a hydraulic pump and a control valve. Specifically, the leveling cylinder
drive part 50c drives the leveling cylinder 28 in response to a command entered by
the operator of the asphalt finisher 100 via an input device. The leveling cylinder
drive part 50c may also autonomously drive the leveling cylinder 28 in response to
a control command from the controller 50, which is different from the command entered
by the operator.
[0053] The screed elevating part 50d is configured to drive the screed elevating device
29. The screed elevating device 29 is a mechanism that moves the rear screed 31 up
and down to eliminate a step formed between a paved surface compacted by the front
screed 30 and a paved surface compacted by the rear screed 31. Eliminating the step
indicates preventing the step detected by the controller 50 from being continuously
formed thereafter. A step that has already been formed is removed by using, for example,
a rake for leveling work, a road roller, or a plate compactor.
[0054] The screed elevating part 50d operates the screed elevating device 29 by using, for
example, a hydraulic pump, a hydraulic motor, and a control valve. Specifically, the
screed elevating part 50d drives the screed elevating device 29 in response to a command
entered by the operator of the asphalt finisher 100 via an input device. The screed
elevating part 50d may also autonomously drive the screed elevating device 29 in response
to a control command from the controller 50, which is different from the command entered
by the operator.
[0055] When detecting a step formed between a paved surface formed by the front screed 30
and a paved surface formed by the rear screed 31, the controller 50 may output a control
command to, for example, the screed elevating part 50d. In this case, the screed elevating
part 50d drives the screed elevating device 29 in response to a control command from
the controller 50 to eliminate the step. For example, the screed elevating part 50d
drives the left screed elevating device 29L and thereby moves the left rear screed
31L up and down to eliminate a step formed between a paved surface compacted by the
left front screed 30L and a paved surface compacted by the left rear screed 31L. More
specifically, the screed elevating part 50d rotates a screed elevating motor used
as a hydraulic actuator constituting the left screed elevating device 29L in response
to a control command from the controller 50 and thereby drives a rotation/linear motion
conversion mechanism attached to the left rear screed 31L to move the left rear screed
31L up and down. The right screed elevating device 29R is driven in a similar manner.
[0056] The mold board elevating part 50e is configured to drive the mold board elevating
device 24. The mold board elevating device 24 is a mechanism for moving the mold board
43 up and down to adjust the holding amount of the rear screed 31.
[0057] The mold board elevating part 50e drives the mold board elevating device 24 by using,
for example, a hydraulic pump, a hydraulic motor, and a control valve. Specifically,
the mold board elevating part 50e drives the mold board elevating device 24 in response
to a command entered by the operator of the asphalt finisher 100 via an input device.
The mold board elevating part 50e may also autonomously drive the mold board elevating
device 24 in response to a control command from the controller 50, which is different
from the command entered by the operator.
[0058] For example, when determining that the holding amount of the left rear screed 31L
is too large or too small based on an output of the left information acquisition device
51L, the controller 50 may output a control command to the mold board elevating part
50e. In this case, the mold board elevating part 50e causes the mold board elevating
device 24 to adjust the height of the mold board 43 in response to the control command
from the controller 50. Specifically, the mold board elevating part 50e causes the
left outer elevating device 24LD and the left inner elevating device 24LP to move
the left mold board 43L up and down to adjust the amount of the pavement material
PV that passes under the left mold board 43L and thereby adjust the holding amount
of the left rear screed 31L. The holding amount of the right rear screed 31R is also
adjusted in a similar manner.
[0059] As described above, the controller 50 may autonomously control at least one of the
mold board elevating device 24, the center crown device 26, the slope crown device
27, the leveling cylinder 28, and the screed elevating device 29. Alternatively, the
operator may manually control at least one of the mold board elevating device 24,
the center crown device 26, the slope crown device 27, the leveling cylinder 28, and
the screed elevating device 29.
[0060] Next, with reference to FIGs. 3A and 3B, a screen GX is described. The screen GX
is displayed on the display device 52 by the controller 50 when the controller 50
detects that the holding amount of the rear screed 31 is too large or too small. FIG.
3A and 3B illustrate two examples of the screen GX. Specifically, FIG. 3A illustrates
a screen GX that is displayed when it is detected that the holding amount of the left
rear screed 31L is less than a predetermined lower limit. FIG. 3B illustrates a screen
GX that is displayed when it is detected that the holding amount of the right rear
screed 31R is greater than a predetermined upper limit.
[0061] The screens GX illustrated in FIGs. 3A and 3B include a machine figure GM, a pavement
material graphic GP, and a road surface graphic GR as common graphics.
[0062] The machine graphic GM represents a top view of the asphalt finisher 100. In the
present embodiment, the machine graphic GM represents a top view of the entire asphalt
finisher 100.
[0063] The pavement material graphic GP represents a top view of the pavement material PV
before being compacted by the screed 3. In the present embodiment, the pavement material
graphic GP includes a left pavement material graphic GPL representing the pavement
material PV held by the left rear screed 31L and a right pavement material graphic
GPR representing the pavement material PV held by the right rear screed 31R. The pavement
material graphic GP is displayed such that the operator can distinguish between a
portion where the amount of the pavement material PV is large and a portion where
the amount of the pavement material PV is small. Specifically, in the pavement material
graphic GP, the portion where the amount of the pavement material PV is large is represented
by fine (dark) hatching, and the portion where the amount of the pavement material
PV is small is represented by coarse (light) hatching. However, the pavement material
graphic GP may be displayed using at least one of a difference in color, a difference
in pattern, and a difference in brightness such that the operator can distinguish
between a portion where the amount of the pavement material PV is large and a portion
where the amount of the pavement material PV is small.
[0064] The road surface graphic GR represents a top view of the new pavement NP. In the
present embodiment, the road surface graphic GR displays the new pavement NP with
a diagonal line pattern.
[0065] FIG. 3A includes graphics G11 and G21. The graphic G11 is displayed when the holding
amount of the left rear screed 31L is not proper. In the present embodiment, the graphic
G11 is an alert including character information such as "SHORT OF PAVEMENT MATERIAL!"
regarding an abnormal state currently occurring.
[0066] The graphic G21 is displayed when the holding amount of the left rear screed 31L
is improper. In the present embodiment, the graphic G21 is a balloon that includes
information about an action to be taken to resolve the abnormal state currently occurring
and points to the position of the measurement range ZL (see FIG. 1B). The graphic
G21 displays, for example, text information such as "MOVE LEFT MOLD BOARD UPWARD"
to communicate to the operator of the asphalt finisher 100 that the entire left mold
board 43L is autonomously moved upward by the controller 50.
[0067] FIG. 3B includes graphics G12 and G22. The graphic G12 is displayed when the holding
amount of the right rear screed 31R is improper. In the present embodiment, the graphic
G12 is an alert including character information such as "TOO MUCH PAVEMENT MATERIAL!"
regarding an abnormal state currently occurring.
[0068] The graphic G22 is displayed when the holding amount of the right rear screed 31R
is improper. In the present embodiment, the graphic G22 is a balloon that includes
information about an action to be taken to resolve the abnormal state currently occurring
and points to the position of the left edge of the measurement range ZR (see FIG.
1B). For example, the graphic G22 displays text information such as "MOVE LEFT END
OF RIGHT MOLD BOARD DOWNWARD" to communicate to the operator of the asphalt finisher
100 that the left end (proximal end) of the right mold board 43R is autonomously moved
downward by the controller 50.
[0069] Next, with reference to FIG. 4, a process (hereafter referred to as a "height adjustment
process"), which is performed by the controller 50 to adjust the height of the mold
board 43 and thereby adjust the holding amount of the rear screed 31, is described.
FIG. 4 is a flowchart illustrating the height adjustment process. For example, the
controller 50 repeatedly performs the height adjustment process at a predetermined
control cycle while the asphalt finisher 100 is moving forward.
[0070] First, the controller 50 determines whether the holding amount is insufficient on
the left side (step ST1). In the present embodiment, the information acquisition part
50a of the controller 50 determines whether the holding amount of the left rear screed
31L is less than a predetermined lower limit based on an output of a LIDAR used as
the left information acquisition device 51L.
[0071] When it is determined that the holding amount is insufficient on the left side (YES
at step ST1), the controller 50 moves the left mold board 43L upward (step ST2). This
is to solve the shortage of the holding amount of the left rear screed 31L by increasing
the amount of the pavement material PV that passes under the left mold board 43L.
In the present embodiment, the information acquisition part 50a outputs a control
command to cause the mold board elevating part 50e to move the left mold board 43L
upward. The mold board elevating part 50e drives the left mold board elevating device
24L in response to the control command from the information acquisition part 50a to
move the left mold board 43L upward.
[0072] When it is determined that the holding amount is not insufficient on the left side
(NO at step ST1), the controller 50 determines whether the holding amount is excessive
on the left side (step ST3). In the present embodiment, the information acquisition
part 50a determines whether the holding amount of the left rear screed 31L is greater
than a predetermined upper limit based on an output of a LIDAR used as the left information
acquisition device 51L.
[0073] When it is determined that the holding amount is excessive on the left side (YES
at step ST3), the controller 50 moves the left mold board 43L downward (step ST4).
This is to reduce the amount of the pavement material PV that passes under the left
mold board 43L and thereby solve the excess of the holding amount of the left rear
screed 31L. In the present embodiment, the information acquisition part 50a outputs
a control command to cause the mold board elevating part 50e to move the left mold
board 43L downward. The mold board elevating part 50e drives the left mold board elevating
device 24L in response to the control command from the information acquisition part
50a to lower the left mold board 43L.
[0074] When it is determined that the holding amount is not excessive on the left side (NO
at step ST3), the controller 50 performs step ST5 without performing step ST4.
[0075] The controller 50 may be configured to determine whether the holding amount is insufficient
on the left side after determining whether the holding amount is excessive on the
left side. Also, the controller 50 may be configured to simultaneously determine whether
the holding amount is excessive on the left side and whether the holding amount is
insufficient on the left side.
[0076] Next, the controller 50 determines whether the holding amount is insufficient on
the right side (step ST5). In the present embodiment, the information acquisition
part 50a determines whether the holding amount of the right rear screed 31R is less
than a predetermined lower limit based on an output of a LIDAR used as the right information
acquisition device 51R.
[0077] When it is determined that the holding amount is insufficient on the right side (YES
at step ST5), the controller 50 moves the right mold board 43R upward (step ST6).
This is to increase the amount of the pavement material PV passing under the right
mold board 43R and thereby solve the shortage of the holding amount of the right rear
screed 31R. In the present embodiment, the information acquisition part 50a outputs
a control command to cause the mold board elevating part 50e to move the right mold
board 43R upward. The mold board elevating part 50e drives the right mold board elevating
device 24R in response to the control command from the information acquisition part
50a to move the right mold board 43R upward.
[0078] When it is determined that the holding amount is not insufficient on the right side
(NO at step ST5), the controller 50 determines whether the holding amount is excessive
on the right side (step ST7). In the present embodiment, the information acquisition
part 50a determines whether the holding amount of the right rear screed 31R is greater
than a predetermined upper limit based on an output of a LIDAR used as the right information
acquisition device 51R.
[0079] When it is determined that the holding amount is excessive on the right side (YES
at step ST7), the controller 50 moves the right mold board 43R downward (step ST8).
This is to reduce the amount of the pavement material PV passing under the right mold
board 43R and thereby solve the excess of the holding amount of the right rear screed
31R. In the present embodiment, the information acquisition part 50a outputs a control
command to cause the mold board elevating part 50e to move the right mold board 43R
downward. The mold board elevating part 50e drives the right mold board elevating
device 24R in response to the control command from the information acquisition part
50a to move the right mold board 43R downward.
[0080] When it is determined that the holding amount is not excessive on the right side
(NO at step ST7), the controller 50 ends the current height adjustment process without
performing step ST8.
[0081] The controller 50 may be configured to determine whether the holding amount is insufficient
on the right side after determining whether the holding amount is excessive on the
right side. Also, the controller 50 may be configured to simultaneously determine
whether the holding amount is excessive on the right side and whether the holding
amount is insufficient on the right side.
[0082] The controller 50 may be configured to determine how to move each of the left mold
board 43L and the right mold board 43R up and down after the determination of whether
the holding amount is insufficient on the right side, whether the holding amount is
excessive on the right side, whether the holding amount is insufficient on the left
side, and whether the holding amount is excessive on the left side is fully completed.
[0083] With the above-described configuration, the controller 50 can suppress the reduction
in the quality of a paved surface by autonomously adjusting the excess and the shortage
of the holding amount of the rear screed 31. This is because the controller 50 can
improve at least one of the flatness of a paved surface and the homogeneity of a pavement.
[0084] The asphalt finisher 100 can automatically detect the excess and the shortage of
the holding amount of the rear screed 31 and then autonomously move the mold board
43 up or down to solve the excess and the shortage. Accordingly, the asphalt finisher
100 can, for example, prevent the pavement material PV from going over the rear screed
31 and overflowing into the rear side of the rear screed 31. Also, for example, the
asphalt finisher 100 can prevent roughness such as a dent from being formed in a paved
surface due to shortage of the pavement material PV.
[0085] Also, the asphalt finisher 100 can form a flat and homogeneous new pavement NP regardless
of the level of skill of an operator in manual operations of the mold board elevating
device 24. Therefore, the asphalt finisher 100 can maintain the quality of a formed
pavement at or above a certain level.
[0086] Also, the asphalt finisher 100 may be configured to anticipate the occurrence of
an excess or a shortage of the holding amount of the rear screed 31 and to autonomously
move the mold board 43 up or down to prevent the excess or the shortage before it
occurs. In this case, the controller 50 may be configured to anticipate the occurrence
of an excess or a shortage of the holding amount of the rear screed 31 based on outputs
of the information acquisition device 51 that are continuously stored over a predetermined
period of time.
[0087] As described above, the asphalt finisher 100 according to the embodiment of the present
invention includes the tractor 1, the hopper 2 that is disposed in front of the tractor
1 and receives a pavement material, the conveyor CV that conveys the pavement material
in the hopper 2 to the rear side of the tractor 1, the screw SC that spreads the pavement
material conveyed by the conveyor CV at the rear side of the tractor 1, the screed
3 that compacts the pavement material PV at the rear side of the screw SC, the mold
board 43 attached to a front part of the screed 3, the mold board elevating device
24 used as an elevating device for moving the mold board 43 up and down, the information
acquisition device 51 that obtains information on the pavement material PV being held
by the screed 3, and the controller 50 used as a control device. The screed 3 includes
the front screed 30 and the rear screed 31 that are shifted from each other in the
vehicle length direction. The controller 50 is configured to drive the mold board
elevating device 24 based on information obtained by the information acquisition device
51 and thereby adjust the height of the mold board 43.
[0088] With this configuration, the asphalt finisher 100 can adjust the holding amount of
the pavement material PV held by the rear screed 31 such that the holding amount falls
within a predetermined range. Accordingly, the asphalt finisher 100 can prevent the
reduction in the quality of a paved surface by preventing the pavement material PV
from overflowing onto the new pavement NP due to an excessive holding amount and by
preventing roughness such as a dent from being formed on a paved surface due to the
shortage of the holding amount. Accordingly, the asphalt finisher 100 can reduce the
amount of work related to repair of a paved surface and can improve the efficiency
of the entire pavement work.
[0089] The controller 50 is typically configured to move the mold board 43 upward when determining
that the holding amount of the rear screed 31 is less than a predetermined lower limit
based on information obtained by the information acquisition device 51. This is to
increase the holding amount of the rear screed 31.
[0090] Also, the controller 50 is typically configured to move the mold board 43 downward
when determining that the holding amount of the rear screed 31 is larger than a predetermined
upper limit based on information obtained by the information acquisition device 51.
This is to decrease the holding amount of the rear screed 31.
[0091] The holding amount may be represented by, for example, the height of a pile of the
pavement material PV with respect to the roadbed RB or the perpendicular distance
between the reference point of the LIDAR used as the information acquisition device
51 and the peak of a pile of the pavement material PV.
[0092] Alternatively, the holding amount may be represented by the volume of the pavement
material PV. Specifically, the holding amount of the right rear screed 31R may be
represented by, for example, the volume of the pavement material PV retained in a
space surrounded by the right front screed 30R, the right rear screed 31R, the right
side plate 41R, and the right mold board 43R.
[0093] The screed 3 includes, for example, the front screed 30, the left rear screed 31L,
and the right rear screed 31R. In this case, the mold board 43 includes the left mold
board 43L corresponding to the left rear screed 31L and the right mold board 43R corresponding
to the right rear screed 31R. The controller 50 is configured to be able to independently
adjust the heights of the left mold board 43L and the right mold board 43R.
[0094] With this configuration, the asphalt finisher 100 can separately adjust the holding
amount of the pavement material PV held by the left rear screed 31L and the holding
amount of the pavement material PV held by the right rear screed 31R. Therefore, the
asphalt finisher 100 can flexibly deal with a case where the excess and shortage states
of the holding amounts on the right side and the left side are different from each
other. For example, the asphalt finisher 100 can flexibly deal with a case where the
degree of extension of the left rear screed 31L and the degree of extension of the
right rear screed 31R are different from each other.
[0095] The elevating device may include a first elevating device that moves one end of the
mold board 43 up and down and a second elevating device that moves the other end of
the mold board up and down. Specifically, as described in the above embodiment, the
mold board elevating device 24 used as the elevating device may include the left outer
elevating device 24LD that moves the left end (distal end) of the left mold board
43L up and down and the left inner elevating device 24LP that moves the right end
(proximal end) of the left mold board 43L up and down. Similarly, the mold board elevating
device 24 used as the elevating device may include the right outer elevating device
24RD that moves the right end (distal end) of the right mold board 43R up and down
and the right inner elevating device 24RP that moves the left end (proximal end) of
the right mold board 43R up and down.
[0096] With this configuration, the asphalt finisher 100 can, for example, make the heights
of the left end (proximal end) and the right end (distal end) of the right mold board
43R different from each other. That is, the asphalt finisher 100 can properly deal
with even a case where the holding amount on the front right side of the right rear
screed 31R is proper but the holding amount on the front left side of the right rear
screed 31R is too large as exemplified in FIG. 3B. In this case, the asphalt finisher
100 can reduce the holding amount on the front left side of the right rear screed
31R while maintaining the proper holding amount on the front right side of the right
rear screed 31R by moving the left end (proximal end) of the right mold board 43R
downward while maintaining the height of the right end (distal end) of the right mold
board 43R.
[0097] In the above-described embodiment, the information acquisition device 51 is a LIDAR.
However, the information acquisition device 51 may also be a monocular camera or a
combination of a monocular camera and a LIDAR. Also, the information acquisition device
51 may be a stereo camera, a distance sensor, a millimeter wave radar, an ultrasonic
sensor, a laser radar, a laser scanner, a distance image camera, a laser range finder,
or any combination of them. With this configuration, the asphalt finisher 100 can
suppress the reduction in the quality of a paved surface with a relatively simple
configuration.
[0098] A preferred embodiment of the present invention is described above. However, the
present invention is not limited to the above-described embodiment, and various modifications
or substitutions may be applied to the above-described embodiment without departing
from the scope of the present invention. Also, the features described in the above
embodiment may be combined as needed as long as they do not technically contradict
with each other.
[0099] For example, in the above-described embodiment, the controller 50 is configured to
automatically detect an excess and a shortage of the holding amount and then move
the mold board 43 up and down to autonomously solve the excess and the shortage. However,
the controller 50 may be configured to inform the operator that an excess or a shortage
of the holding amount is detected and then prompt the operator to move the mold board
43 up or down. In this case, the controller 50 may support the manual operation of
the mold board elevating device 24 by the operator by using at least one of sound,
light, and vibration.
EXPLANATION OF REFERENCE NUMERALS
[0101] 1 ... tractor 1G ... guide rail 1S ... driving seat 2 ... hopper 3 ... screed 3A
... leveling arm 5 ... rear wheel 6 ... front wheel 24 ... mold board elevating device
25 ... screed lift cylinder 26 ... center crown device 27 ... slope crown device 28
... leveling cylinder 29 ... screed elevating device 30 ... front screed 31 ... rear
screed 41 ... side plate 42 ... screed step 43 ... mold board 50 ... controller 50a
... information acquisition part 50b ... crown device driving part 50c ... leveling
cylinder drive part 50d ... screed elevating part 50e ... mold board elevating part
51 ... information acquisition device 52 ... display device 53 ... communication device
100 ... asphalt finisher AP ... feature CV ... conveyor NP ... new pavement PV ...
pavement material RB ... roadbed SC ... screw