Technical Field
[0001] The present invention relates to the technical field of slope drainage engineering,
and in particular, to a grouting structure filled with soluble crystals and a construction
method thereof.
Background
[0002] Rainfall infiltration is one of the important factors to change the mechanical parameters
of the slope and induce landslides. Timely and effective drainage of the slope is
an effective way to solve this problem. The existing drainage measures for slope mainly
include surface drainage ditch, blind ditch, collecting well, horizontal drainage
borehole, underground drainage hole, negative pressure drainage, etc.
[0003] The existing negative pressure drainage technology for slope mainly divides the slope
boreholes into a water-permeable borehole section and a grouting seal borehole section,
with a water-stop ring made of water-expanding rubber in between. As described in
the Chinese Patent, publication No.
CN107246019A, side slope underground water drilling self-starting negative pressure drainage system
and method, wherein a declination borehole grout into the grouting seal borehole section,
and the reserved water-permeable borehole section is isolated from the outside atmosphere.
The water inlet of the drain pipe is arranged in the permeable pipe, and the water
outlet of such pipe extends out of the ground through the water-stop ring made of
water-expanding rubber for drainage. Before the drainage process occurs, the pressure
in the borehole will gradually increase with the infiltration of groundwater, leading
to the natural outflow of the groundwater from the water outlet. When the drainage
process takes place, because the drainage capacity of the drain pipe is greater than
the flow rate of groundwater in the slope infiltrating into the cavity of the water-permeable
borehole section and the air pressure in the permeable pipe is lower than the atmospheric
pressure (a negative pressure is formed), the water in the soil around the permeable
pipe continues to flow towards it, forcing the groundwater in the slope to flow rapidly
towards the borehole to drain to the surface. At the same time, due to the negative
pressure in the permeable pipe, the water in all directions around the permeable pipe
will flow towards it, so the drainage range will increase, and such increased drainage
range is more conducive to discharging the groundwater in the slope.
[0004] However, in the process of on-site construction, the difficulty of negative pressure
drainage technology is that the water-permeable borehole section needs to maintain
its permeability, and the slurry of the grouting seal borehole section cannot enter
the water-permeable borehole section. If the pressure of grouting is high, the slurry
will often break through the baffle structure such as the water-stop ring made of
water-expanding rubber and enter the water-permeable borehole section, resulting in
the failure of the borehole; if the pressure of grouting is small, the borehole section
cannot be closed and the negative pressure cannot be formed. Accordingly, in order
to solve the above problems, a new grouting technology is required.
WO2019/000776 discloses a grouting structure, comprising: a water-permeable section (water-permeable
drilling section 6) and a grouting section (grouting closed drilling section 7), wherein
the water-permeable section (6) is located at the lower part of a declination borehole
(1 and the grouting section (7) is situated at the upper part of the borehole (1 );
a water-stop component (water-expanding rubber water stop ring 3) is arranged between
the water-permeable section (7) and the grouting section (7) ; a permeable pipe (water
pipe 4) is arranged in the water- permeable section (6) ; the top of the permeable
pipe (4) is in contact with the water-stop component (3); a cavity is formed in the
permeable pipe (4); the groundwater penetrates into the cavity through the permeable
pipe (4); the water inlet of the drain pipe (4) is arranged in the water-permeable
section (6), and the water inlet of the a drain pipe (drain pipe 8) is inserted into
the permeable pipe (4) after passing through the water-stop component (3); the water
outlet of the drain pipe (8) is located at the lower part of the slope (1 0); the
elevation of the water inlet of the drain pipe (8) is higher than that of the water
outlet of the drain pipe (8), and the lift of the drain pipe (8) is less than the
height of the water column (11) corresponding to the atmospheric pressure; the space
between the drain pipe (8) and the wall of the borehole of the grouting section (7)
is used for grouting. However it does not disclose that the pipe is filled with solid
soluble crystals.
Summary
[0005] For overcoming the deficiency of existing negative pressure drainage technology in
controlling the pressure of grouting and the consequent failure in negative pressure
drainage, an object of the present invention is to provide a grouting structure filled
with soluble crystals and a construction method thereof.
[0006] Accordingly, in order to accomplish the above objects, the present invention provides
the following technologies:
A grouting structure filled with soluble crystals, comprising a water-permeable section
and a grouting section, wherein the water-permeable section is located at the lower
part of a declination borehole, and the grouting section is situated at the upper
part of the borehole; a water-stop component is arranged between the water-permeable
section and the grouting section; a permeable pipe is arranged in the water-permeable
section; the top of the permeable pipe is in contact with the water-stop component;
a cavity is formed in the permeable pipe; the groundwater penetrates into the cavity
through the permeable pipe; a water inlet of the drain pipe is arranged in the water-permeable
section, and the water inlet of the drain pipe is insterted into the permeable pipe
after passing through the water-stop component; a water outlet of the drain pipe is
located at the lower part of the slope; an elevation of the water inlet of the drain
pipe is higher than that of the water outlet of the drain pipe, and the lift of the
drain pipe is less than the height of the water column corresponding to the atmospheric
pressure; a space between the drain pipe and the wall of the borehole of the grouting
section is grounted; wherein the permeable pipe is filled with solid soluble crystals.
[0007] The permeable pipe is a pipe with permeable holes on its pipe wall.
[0008] The lift of the drain pipe being smaller than the height of the water column corresponding
to atmospheric pressure means the height difference between the water inlet of the
drain pipe and the borehole orifice is smaller than the height of the water column
corresponding to the local atmospheric pressure in order to perform negative pressure
drainage.
[0009] The present invention provides a grouting structure filled with soluble crystals,
wherein the permeable pipe is filled with the solid soluble crystals to support the
water-stop component to a certain extent during grouting, contributing to the prevention
of the slurry from entering the water-permeable section, and the water-stop component
from being squeezed to cause a large displacement; at the same time, grouting pressure
will be increased to reduce the porosity of the grouting section and a better sealing
can be achieved to ensure the negative pressure effect of the water-permeable section.
The soluble crystals can dissolve, thereby changing the osmotic pressure of the surrounding
soil, leading to the water flow from the surrounding soil to the permeable section
and finally forcing the groundwater in the slope to be discharged to the surface;
the cavity in the permeable pipe can facilitate the infiltration of groundwater after
the soluble crystals dissolve. The present structure is beneficial to increase the
pressure of grouting, reduce cracks in the grouting section, and improve the sealing
effect, thus enhancing the negative pressure effect of the water-permeable section,
effectively supporting the water-stop component during grouting, preventing the slurry
from entering the water-permeable section and the consequent interference in the formation
of a negative pressure environment, avoiding blockage of the permeable pipe, and preventing
large displacement of the water-stop component by squeezing. It is conducive to ensuring
continuous drainage of the deep portion of the slope, and is of great significance
in solving the problem of drainage treatment of large-scale landslide.
[0010] Preferably, the soluble crystals comprise at least one of solid salt, solid sugar,
solid alum and solid ice.
[0011] Different soluble crystals have different dissolution rates, and can be selected
and matched according to actual needs. Among them, solid salt and solid alum, after
dissolving, will form a certain residue in the water-permeable section and the drain
pipe, contributing to the inhibition of growth of plants in the drain pipe and the
water-permeable section, the effective avoidance of blockage, and the guarantee of
effectiveness and continuity of the entire drainage system.
[0012] Preferably, the slurry of the grouting section is cement mortar or cement-sodium
silicate slurry.
[0013] Preferably, the water-stop component includes a water-stop strip made of water-expanding
rubber, a water-stop belt or sandbags.
[0014] Preferably, the bottom of the permeable pipe is provided with a pipe boot.
[0015] It is conducive to avoiding blockage at the bottom of the permeable pipe due to accumulation
of sand and gravel and the consequent impact on drainage.
[0016] A construction method for a grouting structure filled with soluble crystals, using
any of the above-mentioned grouting structures filled with soluble crystals, comprising
the following steps:
- a. drilling a declination borehole according to the geological survey, and making
the water-permeable section of the borehole below the groundwater level line of the
slope;
- b. arranging a permeable pipe in the water-permeable section, and then inserting a
drain pipe into the permeable pipe;
- c. filling the permeable pipe with solid soluble crystals, and then installing a water-stop
component to block the water-permeable section;
- d. injecting slurry into the borehole to form a grouting section, and the completing
the construction of the grouting structure.
[0017] Adopting a construction method of a grouting structure filled with soluble crystals
recites in the present invention, wherein the permeable pipe is filled with solid
soluble crystals to support the water-stop component, does not increase additional
difficulty and cost, effectively improving the pressure of grouting in the grouting
process, contributing to the improvement of grouting efficiency and avoidance of the
damage to the water-stop component, and effectively ensuring the grouting effect,
thereby guaranteeing the effective formation of a negative pressure environment for
efficient operation of the drainage system and continuous drainage.
[0018] Preferably, after step d, the following steps are also included:
e. injecting water into the permeable pipe from the water outlet of the drain pipe;
f. drawing the solution out from the water outlet of the drain pipe and testing it
after the soluble crystals are dissolved;
g. stopping suction and completing the construction of the grouting structure when
the concentration ρ of the soluble crystals in the solution meets the requirements.
[0019] It is beneficial to dissolve the soluble crystals at a rapid pace so as to perform
drainage as soon as possible.
[0020] Preferably, in the step g., stop suction when the concentration ρ of the soluble
crystals is less than or equal to 1/2 ρ
0, wherein ρ
0 stands for the initial concentration of the soluble crystals.
[0021] Preferably, in the step e, inject water above 40° C.
[0022] To sum up, compared with the existing art, the beneficial effects of the present
invention are:
- 1. The present structure is beneficial to increase the pressure of grouting, reduce
cracks in the grouting section, and improve the sealing effect, thus enhancing the
negative pressure effect of the water-permeable section, effectively supporting the
water-stop component during grouting, preventing the slurry from entering the water-permeable
section and the consequent interference in the formation of a negative pressure environment,
avoiding blockage of the permeable pipe, and preventing large displacement of the
water-stop component by squeezing. It is conducive to ensuring continuous drainage
of the deep portion of the slope, and is of great significance in solving the problem
of drainage treatment of large-scale landslide.
- 2. Adopting a construction method of a grouting structure filled with soluble crystals
recites in the present invention, wherein the permeable pipe is filled with solid
soluble crystals to support the water-stop component, does not increase additional
difficulty and cost, effectively improving the pressure of grouting in the grouting
process, contributing to the improvement of grouting efficiency and avoidance of the
damage to the water-stop component, and effectively ensuring the grouting effect,
thereby guaranteeing the effective formation of a negative pressure environment for
efficient operation of the drainage system and continuous drainage.
Brief Description of Drawings
[0023]
FIG. 1 is a structure view of a grouting structure filled with soluble crystals of
the present invention;
FIG. 2 is a view of drainage of a grouting structure filled with soluble crystals
of the present invention.
[0024] Element Reference: 1-permeable pipe, 21-water-permeable section, 22-grouting section,
23-water-stop component, 24-slurry, 3-soluble crystals, 4-drain pipe, 5-groundwater
level line.
Description of Embodiments
[0025] The present invention will be further described in detail below with reference to
the accompanying drawings and specific embodiments. However, it shall not be construed
that the scope of the above-mentioned subject matter of the present invention is limited
to the following embodiments, as all technologies realized based on the content of
the present invention belong to the scope of the present invention.
Embodiment 1
[0026] Referring to FIG. 1, a grouting structure filled with soluble crystals of the present
invention, comprising a water-permeable section 21 and a grouting section 22, wherein
the water-permeable section 21 is located at the lower part of a declination borehole,
and the grouting section 22 is situated at the upper part of the borehole; a water-stop
component 23 is arranged between the water-permeable section 21 and the grouting section
22; a permeable pipe 1 is arranged in the water-permeable section 21; the top of the
permeable pipe 1 contacts the water-stop component 23; a cavity is formed in the permeable
pipe 1; the permeable pipe 1 is filled with solid soluble crystals 3; the groundwater
penetrates into the cavity through the permeable pipe 1; the water inlet of the drain
pipe 4 is arranged in the water-permeable section 21, and the water inlet of the drain
pipe 4 inserts into the permeable pipe 1 after passing through the water-stop component
23; the water outlet of the drain pipe 4 is located at the lower part of the slope;
the elevation of the water inlet of the drain pipe 4 is higher than that of the water
outlet of the drain pipe 4, the lift of the drain pipe 4 is less than the height of
the water column corresponding to the atmospheric pressure; the space between the
drain pipe 4 and the wall of the borehole of the grouting section 22 is used for grouting.
[0027] Specifically, the diameter of the borehole should be larger than 90mm, and the permeable
pipe 1 can be a corrugated pipe, externally covered with filter cloth and internally
supported by HDPE, preventing large particles such as coarse sand and gravel from
entering; a pipe boot is set at the bottom of the permeable pipe 1; the pipe boot
can be a HDPE pipe with a sealed bottom and an open top, and is sleeved on the bottom
of the permeable pipe 1 (not shown in the FIG) ; the drain pipe 4 can be a PA pipe
with a diameter of 4-8mm; the drain pipe 4 has good air tightness; the drainage capacity
of the drain pipe 4 is greater than the flow rate of groundwater in slope infiltrating
into the water-permeable section 21, facilitating natural drainage when the water
head height of the cavity in the permeable pipe 1 is greater than the orifice elevation
of the borehole as a result of elevated groundwater level, discharging groundwater
of the slope in real time, and keeping the groundwater below the safe water level;
the slurry 24 of the grouting section 22 is cement mortar or cement-sodium silicate
slurry, cutting off the water-gas connection between the ground surface and the cavity
of the water-permeable borehole section; the water-stop component 23 includes a water-stop
ring made of water-expanding rubber, a water-stop belt or sandbags; after the water-stop
component 23 is closed, the gap between the drain pipe 4 and the wall of the borehole
of the grouting section 22 is closed by grouting.
[0028] The soluble crystals 3 comprise at least one of solid salt, solid sugar, solid alum
and solid ice. The space between the permeable pipe 1 and the drain pipe 4 is filled
with the soluble crystals 3, providing effective support for the water-stop component
23 during grouting. After that, groundwater will flow into or additional water will
be added into the permeable pipe 1 over time, dissolving the soluble crystals 3 and
then freeing the cavity in the permeable pipe 1 for drainage. Different soluble crystals
3 have different dissolution rates and can be selected according to actual needs.
The present structure is beneficial to increase the pressure of grouting, reduce cracks
in the grouting section, and improve the sealing effect, thus enhancing the negative
pressure effect of the water-permeable section, effectively supporting the water-stop
component during grouting, preventing the slurry from entering the water-permeable
section and the consequent interference in the formation of a negative pressure environment,
avoiding blockage of the permeable pipe, and preventing large displacement of the
water-stop component by squeezing; besides, solid salt and solid alum, after dissolving,
will form a certain residue in the water-permeable section 21 and the drain pipe 4,
contributing to the inhibition of growth of plants in the drain pipe 4 and the water-permeable
section 21, the effective avoidance of blockage, and the guarantee of availability
and continuity of the entire drainage system. solid salt and solid alum, after dissolving,
will form a certain residue in the water-permeable section 21 and the drain pipe 4,
contributing to the inhibition of growth of plants in the drain pipe 4 and the water-permeable
section 21, the effective avoidance of blockage, and the guarantee of effectiveness
and continuity of the entire drainage system.
Embodiment 2
[0029] The construction method of a grouting structure filled with soluble crystals according
to the present invention adopts a grouting structure filled with soluble crystals
as described in Embodiment 1, and includes the following steps:
- a. drilling a declination borehole according to the geological survey, and making
the water-permeable section 21 of the borehole below the groundwater level line 5
of the slope, that is, the position of the water-permeable section 21 is set according
to the water level of the groundwater level line 5; the height difference between
the bottom of the borehole and the orifice of the borehole is less than the height
of the water column corresponding to the local atmospheric pressure, ensuring that
the lift of the drain pipe 4 meets the requirements;
- b. arranging a permeable pipe 1 in the water-permeable section 21, and then inserting
a drain pipe 4 into the permeable pipe 1 with the port of the drain pipe 4 extending
into the bottom of the permeable pipe 1;
- c. filling the permeable pipe 1 with solid soluble crystals 3 until it is full, and
then installing a water-stop component 23 to block the water-permeable section 21;
- d. injecting slurry 24 into the borehole to form the grouting section 22 by the backward
method can increase the pressure of grouting during grouting; the slurry 24 flowing
into the surrounding soil to further ensure the sealing of the grouting section 22.
- e. injecting water, such as water above 40° C, into the permeable pipe 1 from the
water outlet of the drain pipe 4;
- f. drawing the solution out from the water outlet of the drain pipe 4 and testing
it after the soluble crystals 3 are dissolved; stopping suction and completing the
construction of the grouting structure when the concentration ρ of the soluble crystals
3 in the solution meets the requirements.
[0030] In step 1, the solubility of the soluble crystals 3 can be roughly obtained according
to the amount of water injected and the amount of the soluble crystals 3. The prediction
of reaching the predetermined solubility according to time is acceptable, and complete
dissolution is not a must. The cavity in the permeable pipe 1 can be vacated more
quickly with water injection, as such, the groundwater in the surrounding soil can
penetrate into the permeable pipe 1.
[0031] In step 1, the pumping is stopped when it is detected that the concentration ρ of
the soluble crystals 3 is less than or equal to 1/2 ρ
0, wherein ρ
0 is the initial concentration of the soluble crystals 3 and can be can be roughly
obtained according to the volume of the water-permeable section, the amount of water
injected and the mass of the soluble crystals 3, or by referring to the concentration
of the liquid extracted for the first time after a certain period of time. The aforementioned
concentration requirements are mainly used to roughly grasp the dissolution of the
soluble crystals 3.
[0032] Water injection is optional, that is, not to perform steps e and 1, but to utilize
the penetration of groundwater into the permeable section 21 to dissolve the soluble
crystals 3. During the dissolution process, the osmotic pressure increases, the attraction
to groundwater elevates, and then the infiltration of groundwater into the permeable
pipe 1 is accelerated; at the same time, the solution will diffuse freely and the
groundwater can still effectively dissolve the soluble crystals 3 when the groundwater
needs to be drained.
[0033] When the soluble crystal 3 is solid ice it can be effectively melt since the soil
has a temperature and there is no need to inject water; after the ice melts, the cavity
in the permeable pipe 1 is vacated and there is no need to test the concentration.
[0034] As shown in FIG. 2, after the construction is completed, since the groundwater level
line 5 in the slope is higher than the highest point of the drain pipe 4 (that is
where the orifice of the borehole is located), the water head height of the water
inlet of the drain pipe 4 is higher than that of the orifice of the borehole, discharging
groundwater in the water-permeable section 21 by the drain pipe 4 under a water head
difference, and triggering a drainage process. When the groundwater level drops below
the highest point of the drain pipe 4, a siphon drainage process is started and negative
pressure is generated in the water-permeable section 21. As such, the groundwater
in the slope accelerates into the cavity, and after the groundwater in the cavity
and the soil above the water-permeable section 21 in the slope is drained, an entire
drainage process ends; wherein with cycles of rainfall infiltration, the drainage
process circulates, effectively realizing continuous drainage of a deep portion of
the slope, solving a problem of drainage treatment of large landslide, and ensuring
the stability of the slope with low maintenance cost.
1. A grouting structure filled with soluble crystals, comprising: a drain pipe (4), a
water-permeable section (21) and a grouting section (22), wherein the water-permeable
section (21) is located at the lower part of a declination borehole, and the grouting
section (22) is situated at the upper part of the borehole; a water-stop component
(23) is arranged between the water-permeable section (21) and the grouting section
(22); a permeable pipe (1) is arranged in the water-permeable section (21); the top
of the permeable pipe (1) is in contact with the water-stop component (23); a cavity
is formed in the permeable pipe (1) ; the groundwater penetrates into the cavity through
the permeable pipe (1); a water inlet of the drain pipe (4) is arranged in the water-permeable
section (21), and the water inlet of the drain pipe (4) is inserted into the permeable
pipe (1) after passing through the water-stop component (23); a water outlet of the
drain pipe (4) is located at the lower part of the slope; an elevation of the water
inlet of the drain pipe (4) is higher than that of the water outlet of the drain pipe
(4), and the lift of the drain pipe (4) is less than the height of the water column
corresponding to the atmospheric pressure; a space between the drain pipe (4) and
the wall of the borehole of the grouting section (22) is grounted;
wherein the permeable pipe (1) is filled with solid soluble crystals (3);
2. The grouting structure, as recited in claim 1, wherein the soluble crystals (3) comprise
at least one of solid salt, solid sugar, solid alum and solid ice.
3. The grouting structure, as recited in claim 1, wherein a slurry (24) of the grouting
section (22) is cement mortar or cement-sodium silicate slurry.
4. The grouting structure, as recited in any one of claims 1-3, wherein the water-stop
component (23) includes a water-stop strip made of water-expanding rubber, a water-stop
belt or sandbags.
5. The grouting structure, as recited in any one of claims 1-3, wherein the bottom of
the permeable pipe (1) is provided with a pipe boot.
6. A construction method for a grouting structure filled with soluble crystals, wherein
any grouting structure filled with soluble crystals is applied in accordance with
claims 1-5, comprises the following steps:
a. drilling a declination borehole according to the geological survey, and making
the water-permeable section (21) of the borehole below the groundwater level line
(5) of the slope;
b. arranging a permeable pipe (1) in the water-permeable section (21), and then inserting
a drain pipe (4) into the permeable pipe (1);
c. filling the permeable pipe (1) with solid soluble crystals (3), and then installing
a water-stop component (23) to block the water-permeable section (21) ;
d. injecting slurry (24) into the borehole to form a grouting section (22), and then
completing the construction of the grouting structure.
7. The construction method, as recited in claim 6, wherein the following steps are included
after step d:
e. injecting water into the permeable pipe (1) from the water outlet of the drain
pipe (4);
f. drawing the solution out from the water outlet of the drain pipe (4) and testing
it after the soluble crystals (3) are dissolved;
g. stopping suction and completing the construction of the grouting structure when
the concentration ρ of the soluble crystals (3) in the solution meets the requirements.
8. The construction method, as recited in claim 7, wherein suction is stopped when the
concentration ρ of the soluble crystals (3) is less than or equal to 1/2 ρ0 in the step 1, wherein ρ0 stands for the initial concentration of the soluble crystals.
9. The construction method, as recited in claim 7, wherein water above 40°C is injected
in the step e.
1. Eine mit löslichen Kristallen gefüllte Verpressstruktur, umfassend: ein Abflussrohr
(4),
einen wasserdurchlässigen Abschnitt (21) und einen Verpressabschnitt (22), wobei der
wasserdurchlässige Abschnitt (21) am unteren Teil eines Deklinationsbohrlochs angeordnet
ist und der Verpressabschnitt (22) am oberen Teil des Bohrlochs angeordnet ist; wobei
ein Wasserstoppbauteil (23) zwischen dem wasserdurchlässigen Abschnitt (21) und dem
Verpressabschnitt (22) angeordnet ist; wobei ein durchlässiges Rohr (1) in dem wasserdurchlässigen
Abschnitt (21) angeordnet ist; wobei der obere Teil des durchlässigen Rohrs (1) mit
dem Wasserstoppbauteil (23) in Kontakt ist; wobei im durchlässigen Rohr (1) ein Hohlraum
gebildet wird; wobei durch das durchlässige Rohr (1) das Grundwasser in den Hohlraum
eindringt; wobei in dem wasserdurchlässigen Abschnitt (21) ein Wasserzulauf des Abflussrohrs
(4) angeordnet ist und der Wasserzulauf des Abflussrohrs (4) nach dem Passieren des
Wasserstoppbauteils (23) in das durchlässige Rohr (1) eingeführt wird; wobei sich
der Wasserablauf des Abflussrohrs (4) am unteren Teil der Böschung befindet; wobei
eine Höhe des Wassereinlasses des Abflussrohrs (4) höher ist als die des Wasserauslasses
des Abflussrohrs (4) und die Höhe des Abflussrohrs (4) geringer ist als die Höhe der
Wassersäule, welche dem atmosphärischen Druck entspricht; wobei ein Freiraum zwischen
dem Abflussrohr (4) und der Bohrlochwand des Verpressabschnitts (22) eingegossen wird;
wobei das durchlässige Rohr (1) mit festen löslichen Kristallen (3) gefüllt ist;
2. Die Vergussstruktur nach Anspruch 1, wobei die löslichen Kristalle (3) mindestens
eines der folgenden Bestandteile umfassen: Feststoffsalz, Feststoffzucker, Feststoffalaun
und Feststoffeis.
3. Verpressstruktur nach Anspruch 1, wobei die Aufschlämmung (24) des Verpressabschnitts
(22) Zementmörtel oder Zement-Natriumsilikat-Aufschlämmung ist.
4. Die Verpressstruktur nach einem der Ansprüche 1 bis 3, wobei die Wasserstoppbauteile
(23) einen Wasserstopstreifen aus wasserausdehnendem Gummi, ein Wasserstopband oder
Sandsäcke umfasst.
5. Die Verpressstruktur nach einem der Ansprüche 1 bis 3, wobei der Boden des durchlässigen
Rohres (1) mit einer Rohrmanschette versehen ist.
6. Ein Konstruktionsverfahren für eine mit löslichen Kristallen gefüllte Verpressstruktur,
wobei jede mit löslichen Kristallen gefüllte Verpressstruktur gemäß den Ansprüchen
1 bis 5 angewendet wird, umfasst die folgenden Schritte:
a. Bohrung eines Deklinationsbohrlochs entsprechend der geologischen Vermessung und
Herstellung des wasserdurchlässigen Abschnitts (21) des Bohrlochs unterhalb der Grundwasserstandslinie
(5) des Hanges;
b. Anordnung eines durchlässigen Rohrs (1) in dem wasserdurchlässigen Abschnitt (21)
und anschließendes Einsetzen eines Ablaufrohrs (4) in das durchlässige Rohr (1);
c. Füllung des durchlässigen Rohrs (1) mit festen, löslichen Kristallen (3) und anschließende
Installation eines Wasserstoppbauteils (23) zur Blockierung des wasserdurchlässigen
Abschnitts (21);
d. Injizierung von Aufschlämmung (24) in das Bohrloch, um einen Verpressabschnitt
(22) zu bilden, und anschließende Fertigstellung der Verpressstruktur.
7. Das Konstruktionsverfahren nach Anspruch 6, wobei die folgenden Schritte nach dem
Schritt d enthalten sind:
e. Injizierung von Wasser in das durchlässige Rohr (1) aus dem Wasserauslass des Abflussrohrs
(4);
f. Entnahme der Lösung aus dem Wasserausgang des Abflussrohrs (4) und Prüfung nach
Auflösung der löslichen Kristalle (3);
g. Beendigung der Absaugung und Fertigstellung der Injektionsstruktur, wenn die Konzentration
ρ der löslichen Kristalle (3) in der Lösung den Anforderungen entspricht.
8. Das Konstruktionsverfahren nach Anspruch 7, wobei die Absaugung gestoppt wird, wenn
die Konzentration ρ der löslichen Kristalle (3) im Schritt f kleiner als oder gleich
1/2 ρ0 ist, wobei ρ0 für die Anfangskonzentration der löslichen Kristalle steht.
9. Das Konstruktionsverfahren nach Anspruch 7, wobei im Schritt e Wasser mit einer Temperatur
von über 40°C injiziert wird.
1. Structure d'injection remplie de cristaux solubles, comprenant : un drain (4), une
section perméable (21) et une section d'injection (22), caractérisée en ce que la section perméable (21) étant située dans la partie inférieure d'un trou de forage
oblique ; et la section d'injection (22) étant située dans la partie supérieure du
trou de forage ; un composant d'arrêt d'eau (23) étant disposé entre la section perméable
(21) et la section d'injection (22) ; un tuyau perméable (1) étant disposé dans la
section perméable (21) ; la partie supérieure du tuyau perméable (1) étant mise en
contact avec le composant d'arrêt d'eau (23) ; une cavité étant formée dans le tuyau
perméable (1) ; l'eau souterraine pénétrant dans la cavité à travers le tuyau perméable
(1) ; une entrée d'eau du drain (4) étant disposée dans la section perméable (21)
; et l'entrée d'eau du drain (4) étant insérée dans le tuyau perméable (1) après le
franchissement du composant d'arrêt d'eau (23) ; une sortie d'eau du drain (4) étant
située dans la partie inférieure de la pente ; la hauteur de l'entrée d'eau du drain
(4) étant supérieure à celle de la sortie d'eau du drain (4) ; et la hauteur du drain
(4) étant inférieure à la hauteur de la colonne d'eau correspondant à la pression
atmosphérique ; un espace entre le drain (4) et la paroi du trou de forage de la section
d'injection (22) étant injecté ;
caractérisée en ce que le tuyau perméable (1) étant rempli de cristaux solides solubles (3).
2. Structure d'injection selon la revendication 1, caractérisée en ce que les cristaux solubles (3) comprennent au moins l'un des éléments suivants : sel solide,
sucre solide, alun solide et glace solide.
3. Structure d'injection selon la revendication 1, caractérisée en ce que la solution de mortier (24) de la section d'injection (22) est un mortier de ciment
ou une solution de ciment-silicate de sodium.
4. Structure d'injection selon l'une des revendications 1 à 3, caractérisée en ce que le composant d'arrêt d'eau (23) comprend une bande d'arrêt d'eau en caoutchouc d'expansion,
une ceinture d'arrêt d'eau ou des sacs de sable.
5. Structure d'injection selon l'une des revendications 1 à 3, caractérisée en ce que le fond du tuyau perméable (1) est pourvu d'un sabot de tuyau.
6. Procédé de construction d'une structure d'injection remplie de cristaux solubles,
caractérisé en ce que toute structure d'injection remplie de cristaux solubles étant appliquée selon l'une
des revendications 1 à 5, comprenant les étapes suivantes :
a. forer un trou de forage oblique selon l'étude géologique, et réaliser la section
perméable (21) du trou de forage sous la ligne de niveau de la nappe phréatique (5)
de la pente ;
b. disposer un tuyau perméable (1) dans la section perméable (21), et puis insérer
un drain (4) dans le tuyau perméable (1) ;
c. remplir le tuyau perméable (1) de cristaux solides solubles (3), et puis monter
un composant d'arrêt d'eau (23) pour obturer la section perméable (21) ;
d. injecter la solution (24) dans le trou de forage pour former une section d'injection
(22), et puis achever la construction de la structure d'injection.
7. Procédé de construction selon la revendication 6,
caractérisé en ce que les étapes suivantes sont incluses après la réalisation de l'étape d :
e. injection d'eau dans le tuyau perméable (1) à partir de la sortie d'eau du drain
(4) ;
f. aspirer la solution à partir de la sortie d'eau du drain (4) et la tester après
dissolution des cristaux solubles (3) ;
g. arrêter l'aspiration et achever la construction de la structure d'injection lorsque
la concentration ρ des cristaux solubles (3) dans la solution répond aux exigences.
8. Procédé de construction selon la revendication 7, caractérisé en ce que l'aspiration est arrêtée lorsque la concentration ρ des cristaux solubles (3) est
inférieure ou égale à 1/2 ρ0 dans l'étape f, où ρ0 représente la concentration initiale des cristaux solubles.
9. Procédé de construction selon la revendication 7, caractérisé en ce que l'eau avec température plus de 40°C est injectée dans l'étape e.