TECHNICAL FIELD
[0001] The present disclosure relates to an outdoor unit and a refrigeration cycle apparatus.
BACKGROUND ART
[0002] Japanese Patent Laying-Open No. 2014-01917 (PTL 1) discloses a refrigeration apparatus having an intermediate injection flow
path and a suction injection flow path. In this refrigeration apparatus, a portion
of refrigerant flowing from a condenser toward an evaporator can be merged with the
intermediate pressure refrigerant in a compressor using the intermediate injection
flow path, and can also be merged with the low pressure refrigerant to be suctioned
into the compressor in a suction flow path using the suction injection flow path.
Accordingly, in a case where using the intermediate injection flow path leads to deterioration
of operation efficiency, the suction injection flow path can be used to decrease the
discharge temperature of the compressor.
CITATION LIST
PATENT LITERATURE
SUMMARY OF INVENTION
TECHNICAL PROBLEM
[0004] In the refrigeration apparatus described in
Japanese Patent Laying-Open No. 2014-01917 (PTL 1), when operation of a load device is stopped, for example, and thereby circulation
of the refrigerant is blocked on the indoor unit side and a pump down operation is
started to be performed on the load device side, the pressure in a liquid pipe of
an outdoor unit increases. For example, when refrigerant such as CO
2 utilizing supercriticality is used, the discharge pressure of the compressor is high,
and thus the pressure in a portion of the liquid pipe may exceed a design pressure.
[0005] An object of the present disclosure is to provide an outdoor unit and a refrigeration
cycle apparatus improved to prevent a pressure exceeding a design pressure from being
applied to a pipe.
SOLUTION TO PROBLEM
[0006] The present disclosure relates to an outdoor unit of a refrigeration cycle apparatus,
the outdoor unit being connectable to a load device including a first expansion device
and an evaporator. The outdoor unit includes: a refrigerant outlet port and a refrigerant
inlet port for connecting to the load device; a first flow path, which is a flow path
from the refrigerant inlet port to the refrigerant outlet port, the first flow path
being configured to form, together with the load device, a circulation flow path through
which refrigerant circulates; a compressor, a condenser, and a second expansion device
disposed on the first flow path; a second flow path configured to branch from a portion
of the first flow path between the condenser and the second expansion device, and
to return, to the compressor, the refrigerant that has passed through the condenser;
a third expansion device and a receiver disposed on the second flow path in order
from a branch point where the second flow path is branched from the first flow path;
a third flow path configured to connect a portion of the first flow path between the
second expansion device and the refrigerant outlet port, to a refrigerant inlet of
the receiver; and an on-off valve disposed on the third flow path.
ADVANTAGEOUS EFFECTS OF INVENTION
[0007] According to the outdoor unit and the refrigeration cycle apparatus including the
same of the present disclosure, it is possible to prevent a pressure in a pipe from
exceeding a design pressure even when there is a sudden increase in pressure caused
for example by a flow of the refrigerant being blocked on the load device side.
BRIEF DESCRIPTION OF DRAWINGS
[0008]
Fig. 1 is an overall configuration diagram of a refrigeration cycle apparatus according
to the present embodiment.
Fig. 2 is a flowchart for illustrating control of a third expansion valve 71.
Fig. 3 is a flowchart for illustrating control of a flow rate control valve 72.
Fig. 4 is a flowchart for illustrating control of a second expansion valve 40.
Fig. 5 is a flowchart for illustrating control of an on-off valve 78.
DESCRIPTION OF EMBODIMENTS
[0009] Hereinafter, embodiments of the present disclosure will be described in detail with
reference to the drawings. Although a plurality of embodiments will be described below,
it is originally intended from the time of filing the present application to combine
features described in the embodiments as appropriate. It should be noted that identical
or corresponding parts in the drawings will be designated by the same reference characters,
and the description thereof will not be repeated.
[0010] Fig. 1 is an overall configuration diagram of a refrigeration cycle apparatus according
to the present embodiment. It should be noted that Fig. 1 functionally shows the connection
relation and the arrangement configuration of devices in the refrigeration cycle apparatus,
and does not necessarily show an arrangement in a physical space.
[0011] Referring to Fig. 1, a refrigeration cycle apparatus 1 includes an outdoor unit 2,
a load device 3, and pipes 84 and 88. Outdoor unit 2 has a refrigerant outlet port
PO2 and a refrigerant inlet port PI2 for connecting to load device 3. Load device
3 has a refrigerant outlet port PO3 and a refrigerant inlet port PI3 for connecting
to outdoor unit 2. Pipe 84 connects refrigerant outlet port PO2 of outdoor unit 2
to refrigerant inlet port PI3 of load device 3. Pipe 88 connects refrigerant outlet
port PO3 of load device 3 to refrigerant inlet port PI2 of outdoor unit 2.
[0012] Outdoor unit 2 of refrigeration cycle apparatus 1 is connectable to load device 3.
Outdoor unit 2 includes a compressor 10 having a suction port G1, a discharge port
G2, and an intermediate pressure port G3, a condenser 20, a fan 22, a heat exchanger
30, a second expansion valve 40, and pipes 80 to 83 and 89. Heat exchanger 30 has
a first passage H1 and a second passage H2, and is configured to exchange heat between
refrigerant flowing in first passage H1 and the refrigerant flowing in second passage
H2.
[0013] Load device 3 includes a first expansion valve 50, an evaporator 60, pipes 85, 86,
and 87, and an on-off valve 28. Evaporator 60 is configured to perform heat exchange
between air and the refrigerant. In refrigeration cycle apparatus 1, evaporator 60
evaporates the refrigerant by absorbing heat from the air in a space to be cooled.
First expansion valve 50 is, for example, a temperature expansion valve controlled
independently of outdoor unit 2. It should be noted that first expansion valve 50
may be an electronic expansion valve which can decompress the refrigerant. On-off
valve 28 is closed when load device 3 stops operation, to block the refrigerant.
[0014] Compressor 10 compresses the refrigerant suctioned from pipe 89, and discharges the
compressed refrigerant to pipe 80. Compressor 10 can arbitrarily change a drive frequency
by inverter control. Further, compressor 10 is provided with intermediate pressure
port G3, and allows the refrigerant from intermediate pressure port G3 to flow into
an intermediate portion of a compression process. Compressor 10 is configured to adjust
a rotation speed according to a control signal from a controller 100. By adjusting
the rotation speed of compressor 10, a circulation amount of the refrigerant is adjusted,
and the capability of refrigeration cycle apparatus 1 can be adjusted. As compressor
10, various types of compressors can be adopted, and for example, a compressor of
scroll type, rotary type, screw type, or the like can be adopted.
[0015] Condenser 20 is configured such that the high-temperature, high-pressure gas refrigerant
discharged from compressor 10 performs heat exchange with outside air (heat dissipation).
By this heat exchange, the refrigerant is condensed and transforms into a liquid phase.
The refrigerant discharged from compressor 10 to pipe 80 is condensed and liquefied
in condenser 20, and flows into pipe 81. Fan 22 for blowing the outside air is attached
to condenser 20 in order to increase the efficiency of heat exchange. Fan 22 supplies
condenser 20 with the outside air with which the refrigerant performs heat exchange
in condenser 20. By adjusting the number of revolutions of fan 22, a refrigerant pressure
on a discharge side of compressor 10 (a high pressure-side pressure) can be adjusted.
Second expansion valve 40 is an electronic expansion valve which can decompress the
refrigerant that has passed through condenser 20 and first passage H1 of heat exchanger
30.
[0016] Here, it is assumed that the refrigerant used for a refrigerant circuit of refrigeration
cycle apparatus 1 is CO
2. However, when there occurs a state where a subcool is less likely to be ensured,
another refrigerant may be used.
[0017] It should be noted that, in the present specification, for ease of description, a
device which cools the refrigerant such as CO
2 in a supercritical state will also be referred to as condenser 20. Further, in the
present specification, for ease of description, an amount of decrease from a reference
temperature of the refrigerant in the supercritical state will also be referred to
as a subcool.
[0018] A first flow path F1 from refrigerant inlet port PI2 to refrigerant outlet port PO2
via compressor 10, condenser 20, first passage H1 of heat exchanger 30, and second
expansion valve 40 forms, together with a flow path on which first expansion valve
50 and evaporator 60 of load device 3 are disposed, a circulation flow path through
which the refrigerant circulates. Hereinafter, this circulation flow path will also
be referred to as a "main refrigerant circuit" of a refrigeration cycle.
[0019] Outdoor unit 2 further includes pipes 91, 92, and 94 configured to cause the refrigerant
to flow from a portion of the circulation flow path between an outlet of first passage
H1 and second expansion valve 40 to an inlet of second passage H2, pipes 96 to 98
configured to cause the refrigerant to flow from an outlet of second passage H2 to
suction port G1 or intermediate pressure port G3 of compressor 10, and a flow path
switching unit 74 configured to be capable of selecting one of suction port G1 and
intermediate pressure port G3 as a destination of the refrigerant flowing out from
the outlet of second passage H2. Hereinafter, a second flow path F2 that branches
from the main refrigerant circuit and delivers the refrigerant to compressor 10 via
second passage H2 will also be referred to as an "injection flow path".
[0020] Outdoor unit 2 further includes a receiver 73 disposed on second flow path F2 and
configured to store the refrigerant. A third expansion valve 71 is disposed between
pipes 91 and 92, pipe 91 branching from the portion of the circulation flow path between
the outlet of first passage H1 and second expansion valve 40, and pipe 92 connected
to an inlet of receiver 73. Outdoor unit 2 further includes a degassing pipe 93 that
connects a gas exhaust outlet of receiver 73 to second passage H2 and is configured
to exhaust a refrigerant gas within receiver 73, a throttle device 70 disposed between
degassing pipe 93 and pipe 94 leading to second passage H2, and a flow rate control
valve 72 configured to adjust a flow rate of the refrigerant in pipe 94 connected
to a liquid refrigerant exhaust outlet of receiver 73.
[0021] Pipe 91 is a pipe that branches from the main refrigerant circuit and causes the
refrigerant to flow into receiver 73. Third expansion valve 71 is an electronic expansion
valve which can decrease the pressure of the refrigerant at a high pressure portion
of the main refrigerant circuit to an intermediate pressure. Receiver 73 is a container
in which the refrigerant decompressed and having two phases is separated into a gas
phase and a liquid phase, and which can store the refrigerant and adjust the circulation
amount of the refrigerant in the main refrigerant circuit. Degassing pipe 93 connected
to an upper portion of receiver 73 and pipe 94 connected to a lower portion of receiver
73 are pipes for taking out the refrigerant separated into gas refrigerant and liquid
refrigerant within receiver 73, in a separated state. Flow rate control valve 72 adjusts
a circulation amount of the liquid refrigerant to be exhausted from pipe 94, and thereby
can adjust the amount of the refrigerant in receiver 73.
[0022] By providing receiver 73 on the injection flow path as described above, it becomes
easy to ensure a subcool in pipes 82 and 83 which are liquid pipes. This is because,
since receiver 73 generally includes the gas refrigerant therein and a refrigerant
temperature reaches a saturation temperature, it is not possible to ensure a subcool
if receiver 73 is disposed on pipe 82.
[0023] Further, if receiver 73 is provided at an intermediate pressure portion, it becomes
possible to store the intermediate pressure liquid refrigerant within receiver 73
even when the pressure at the high pressure portion of the main refrigerant circuit
is high and the refrigerant is in the supercritical state. Thus, the design pressure
of the container of receiver 73 can be set to be lower than that of the high pressure
portion, and cost reduction by thinning the container can also be achieved.
[0024] Outdoor unit 2 further includes pressure sensors 110 to 112, temperature sensors
120 to 122, and controller 100 configured to control compressor 10, second expansion
valve 40, third expansion valve 71, flow rate control valve 72, and flow path switching
unit 74.
[0025] Pressure sensor 110 detects a pressure PL at the suction port portion of compressor
10, and outputs a detection value thereof to controller 100. Pressure sensor 111 detects
a discharge pressure PH of compressor 10, and outputs a detection value thereof to
controller 100. Pressure sensor 112 detects a pressure PI in pipe 83 at an outlet
of second expansion valve 40, and outputs a detection value thereof to controller
100.
[0026] By providing second expansion valve 40 to the liquid pipe, outdoor unit 2 can decompress
the refrigerant pressure to be lower than or equal to the design pressure of load
device 3 (for example, 4 MPa), and then deliver the refrigerant to load device 3.
Thereby, even if refrigerant utilizing supercriticality such as CO
2 is used, a general-purpose product having the same design pressure as that of a conventional
load device can be used as load device 3.
[0027] Temperature sensor 120 detects a discharge temperature TH of compressor 10, and outputs
a detection value thereof to controller 100. Temperature sensor 121 detects a refrigerant
temperature T1 in pipe 81 at an outlet of condenser 20, and outputs a detection value
thereof to controller 100. Temperature sensor 122 detects a refrigerant temperature
T2 at the outlet of first passage H1 on a cooled side of heat exchanger 30, and outputs
a detection value thereof to controller 100.
[0028] Flow path switching unit 74 includes pipes 97 and 98 branching from pipe 96, a decompression
device 77 disposed between pipes 97 and 98, and on-off valves 75 and 76 disposed on
pipes 97 and 98, respectively.
[0029] Pipe 97 is connected between pipe 96 and intermediate pressure port G3, and on-off
valve 75 is provided on pipe 97. Decompression device 77 and on-off valve 76 are disposed
in series between the outlet of second passage H2 and suction port G1.
[0030] By on-off valves 75 and 76, the destination of the refrigerant in second flow path
F2 can be switched between intermediate pressure port G3 and suction port G1 of compressor
10.
[0031] In the present embodiment, second flow path F2 controls discharge temperature TH
of compressor 10 by causing the refrigerant decompressed and having two phases to
flow into compressor 10. In addition, the amount of the refrigerant in the main refrigerant
circuit can be adjusted by receiver 73 placed on second flow path F2. Further, second
flow path F2 also ensures supercooling of the refrigerant in the main refrigerant
circuit by heat exchange by heat exchanger 30. Controller 100 performs switching of
the destination of the refrigerant by on-off valves 75 and 76 such that each purpose
can be performed under each operation condition.
[0032] Outdoor unit 2 further includes a third flow path F3 connecting pipe 83 to pipe 92,
and an on-off valve 78 provided on third flow path F3. On-off valve 78 is provided
to avoid a sudden increase in pressure PI in pipe 83 at the start of a pump down operation
described later.
[0033] Controller 100 includes a CPU (Central Processing Unit) 102, a memory 104 (a ROM
(Read Only Memory) and a RAM (Random Access Memory)), input/output buffers (not shown)
for inputting/outputting various signals, and the like. CPU 102 expands programs stored
in the ROM onto the RAM or the like and executes the programs. The programs stored
in the ROM are programs describing processing procedures of controller 100. According
to these programs, controller 100 performs control of the devices in outdoor unit
2. This control can be processed not only by software but also by dedicated hardware
(electronic circuitry).
[0034] (Control during Normal Operation of Refrigeration Cycle Apparatus) Controller 100
feedback-controls third expansion valve 71 such that discharge temperature TH of compressor
10 matches a target temperature.
[0035] Fig. 2 is a flowchart for illustrating control of third expansion valve 71. When
discharge temperature TH of compressor 10 is higher than the target temperature (YES
in S21), controller 100 increases a degree of opening of third expansion valve 71
(S22). Thereby, the refrigerant flowing into intermediate pressure port G3 or suction
port G1 via receiver 73 increases, and thus discharge temperature TH decreases.
[0036] On the other hand, when discharge temperature TH of compressor 10 is lower than the
target temperature (NO in S21 and YES in S23), controller 100 decreases the degree
of opening of third expansion valve 71 (S24). Thereby, the refrigerant flowing into
intermediate pressure port G3 or suction port G1 via receiver 73 decreases, and thus
discharge temperature TH increases.
[0037] When discharge temperature TH is equal to the target temperature (NO in S21 and NO
in S23), controller 100 maintains the degree of opening of third expansion valve 71
in the present state.
[0038] Thus, controller 100 controls the degree of opening of third expansion valve 71 such
that discharge temperature TH of compressor 10 approaches the target temperature.
[0039] Further, controller 100 feedback-controls flow rate control valve 72 such that refrigerant
temperature T1 at the outlet of condenser 20 matches a target temperature, in order
to ensure a subcool SC of the refrigerant at the outlet of condenser 20.
[0040] Fig. 3 is a flowchart for illustrating control of flow rate control valve 72. When
subcool SC determined by refrigerant temperature T1 at the outlet of condenser 20
and a pressure in condenser 20 (approximated by PH) is larger than a target value
(YES in S31), controller 100 decreases a degree of opening of flow rate control valve
72 (S32). Thereby, the amount of the liquid refrigerant to be exhausted from receiver
73 decreases and the amount of the liquid refrigerant within receiver 73 increases,
and thus the amount of the refrigerant circulating through the main refrigerant circuit
decreases. Accordingly, refrigerant temperature T1 increases, and thus subcool SC
decreases.
[0041] On the other hand, when subcool SC determined by refrigerant temperature T1 at the
outlet of condenser 20 and the pressure in condenser 20 (approximated by PH) is smaller
than the target value (NO in S31 and YES in S33), controller 100 increases the degree
of opening of flow rate control valve 72 (S34). Thereby, the amount of the liquid
refrigerant to be exhausted from receiver 73 increases and the amount of the liquid
refrigerant stored in receiver 73 decreases, and thus the amount of the refrigerant
circulating through the main refrigerant circuit increases. Accordingly, refrigerant
temperature T1 decreases, and thus subcool SC increases.
[0042] When subcool SC is equal to the target value (NO in S31 and NO in S33), controller
100 maintains the degree of opening of flow rate control valve 72 in the present state.
[0043] Thus, controller 100 controls the degree of opening of flow rate control valve 72
such that refrigerant temperature T1 at the outlet of condenser 20 approaches the
target temperature.
[0044] Further, when CO
2 is used as the refrigerant, controller 100 performs control of compressor 10 and
second expansion valve 40 to use a supercritical region of the refrigerant. For example,
when an outside air temperature is higher than a supercritical temperature of the
refrigerant as in summer, controller 100 increases the rotation speed of compressor
10 to be higher than that for spring or autumn, to increase the pressure at the high
pressure portion of the main refrigerant circuit. By performing decompression in second
expansion valve 40, load device 3 can be used in common with a device used with an
ordinary refrigerant. On this occasion, second expansion valve 40 is controlled as
described below.
[0045] Controller 100 feedback-controls second expansion valve 40 such that pressure P1
matches a target pressure. This target pressure is set to be substantially the same
as a pressure in a case where an ordinary refrigerant such as R410 is used.
[0046] Fig. 4 is a flowchart for illustrating control of second expansion valve 40. When
pressure PI is higher than the target pressure (YES in S41), controller 100 decreases
a degree of opening of second expansion valve 40 (S42). Thereby, the amount of decompression
by second expansion valve 40 increases, and thus pressure PI decreases.
[0047] On the other hand, when pressure P1 is lower than the target pressure (NO in S41
and NO in S43), controller 100 increases the degree of opening of second expansion
valve 40 (S44). Thereby, the amount of decompression by second expansion valve 40
decreases, and thus pressure P1 increases.
[0048] When pressure PI is equal to the target pressure (NO in S41 and NO in S43), controller
100 maintains the degree of opening of second expansion valve 40 in the present state.
[0049] Since pressure PI is controlled as described above, the pressure within load device
3 can be set to be lower than or equal to the design pressure of the device used with
an ordinary refrigerant, and load device 3 can be used in common with a load device
for a conventional machine which uses refrigerant such as R410A.
(Control of Switching of Injection Flow Path)
[0050] When temperature sensor 120 detects an excessive increase in discharge temperature
TH of compressor 10, controller 100 opens on-off valve 75 and closes on-off valve
76 to increase the amount of injection to compressor 10 and prevent a further increase
in the discharge temperature.
[0051] On this occasion, if an intermediate pressure PM increases with an increase in evaporation
temperature or the like with on-off valve 75 being opened, the saturation temperature
of the refrigerant increases, and thus the temperature of the refrigerant passing
through second passage H2 of heat exchanger 30 also increases, resulting in an insufficient
cooling in heat exchanger 30. Thus, there may be a case where it is impossible to
ensure the subcool of the refrigerant in second expansion valve 40.
[0052] Accordingly, controller 100 monitors refrigerant temperature T2 at temperature sensor
122 with on-off valve 75 being opened, and when it is detected that the subcool of
the refrigerant cannot be ensured, controller 100 closes on-off valve 75 and opens
on-off valve 76. Thereby, the refrigerant in second flow path F2 is merged with the
refrigerant on a low pressure side to decrease intermediate pressure PM, and a temperature
difference in heat exchanger 30 can be ensured.
[0053] Since decompression is performed on the main refrigerant circuit by third expansion
valve 71, the devices such as receiver 73 disposed on second flow path F2 can have
a low design pressure, and thus manufacturing cost can be reduced. Even in a case
where the devices have a low design pressure, when a pressure sensor 113 detects an
increase in intermediate pressure PM during operation due to overcharging of the refrigerant,
an increase in outside air temperature, or the like, it is possible to take a safety
measure that releases pressure to the low pressure side by opening on-off valve 76.
(Control during Pump Down Operation)
[0054] Next, control during a pump down operation will be described. The pump down operation
is an operation to transfer the refrigerant from load device 3 to outdoor unit 2 and
store the refrigerant therein, by placing on-off valve 28 or the like on pipe 85 through
which the liquid refrigerant flows in the main refrigerant circuit, and operating
compressor 10 with pipe 85 being blocked. The pump down operation is performed, for
example, by closing second expansion valve 40 or on-off valve 28 before stopping operation,
and thereafter operating compressor 10.
[0055] Generally, a signal for instructing to start the pump down operation is not transmitted
particularly from load device 3 to outdoor unit 2, and the pump down operation is
performed in outdoor unit 2 by continuing a normal operation.
[0056] In the pump down operation, when on-off valve 28 is closed and pressure PL at the
low pressure portion detected by pressure sensor 110 decreases to a set value, controller
100 is configured to stop compressor 10 and stop a pump down. Since compressor 10
is configured such that the refrigerant may not pass therethrough when it is stopped,
the refrigerant does not flow back to load device 3.
[0057] However, when first expansion valve 50 is closed or on-off valve 28 is closed during
the normal operation, pressure P1 in pipes 83, 84, and 85 increases suddenly. When
pressure P1 exceeds the design pressure of pipes 83, 84, and 85 and load device 3,
problems such as leak of the refrigerant may occur. Thus, it is necessary to control
pressure P1 within a range in which it does not exceed the design pressure.
[0058] Accordingly, controller 100 temporarily opens on-off valve 78 to prevent a sudden
increase in pressure P1.
[0059] In the following, control of on-off valve 78 performed during a pump down will be
described. Fig. 5 is a flowchart for illustrating control of on-off valve 78.
[0060] In step S51, controller 100 determines whether or not pressure PI exceeds the design
pressure. The design pressure herein is a pressure that can be tolerated for a short
time, and may be set to be somewhat lower than an actual design pressure.
[0061] When pressure PI does not exceed the design pressure in step S51 (NO in S51), there
is no need to decrease pressure P1, and thus controller 100 closes on-off valve 78
in step S56, and advances the processing to step S57.
[0062] On the other hand, when it is detected that pressure PI exceeds the design pressure
in step S51 (YES in S51), controller 100 performs the processing in steps S52 to S55
to prevent a sudden increase in pressure P1.
[0063] In step S52, controller 100 determines whether or not pressure PI in pipe 83 is higher
than a pressure P2 in pipe 92 of the injection flow path.
[0064] When PI is not higher than P2 (NO in S52), pressure PI in pipe 83 does not decrease
even through on-off valve 78 is opened. Thus, in step S53, controller 100 opens on-off
valve 76 and closes on-off valve 75 to decrease a pressure in second flow path F2.
Then, the processing proceeds to step S54.
[0065] When PI is higher than P2 (YES in S52), pressure PI in pipe 83 can be decreased by
opening on-off valve 78. Thus, the processing proceeds to step S54, without performing
the processing in step S53.
[0066] It should be noted that pipe 96 and intermediate pressure port G3 may be directly
connected, without providing flow path switching unit 74. In this case, the processing
in steps S52 and S53 is not performed, and when it is determined as YES in step S51,
the processing promptly proceeds to step S54.
[0067] In step S54, controller 100 opens on-off valve 78 and closes flow rate control valve
72, to introduce the intermediate pressure in second flow path F2 into pipe 83 and
decrease pressure P1. This can prevent pressure PI from exceeding the design pressure
of pipes 83 and 84 and load device 3.
[0068] Preferably, further in step S55, controller 100 decreases the rotation speed of compressor
10 to suppress a further increase in pressure PI in pipe 83, although controller 100
does not necessarily have to perform this step. It should be noted that, when pressure
PI temporarily increases suddenly, the processing in step S55 is performed, and thereafter
pressure P1 decreases, the processing in step S56 may be followed by the processing
for returning the rotation speed of compressor 10 to the original rotation speed,
in order to reduce time for the pump down operation.
[0069] Then, in step S57, the processing is temporarily returned to a main routine, and
thereafter the processing in the flowchart of Fig. 5 is performed repeatedly.
[0070] Finally, the present embodiment will be summarized with reference to the drawings
again. As shown in Fig. 1, the present disclosure relates to outdoor unit 2 of refrigeration
cycle apparatus 1, outdoor unit 2 being connectable to load device 3 including first
expansion valve 50 corresponding to the "first expansion device" and evaporator 60.
Outdoor unit 2 includes refrigerant outlet port PO2 and refrigerant inlet port PI2
for connecting to load device 3, first flow path F1, compressor 10, condenser 20,
second expansion valve 40 corresponding to the "second expansion device", second flow
path F2, third expansion valve 71 corresponding to the "third expansion device", receiver
73, third flow path F3, and on-off valve 78. First flow path F1, which is a flow path
from refrigerant inlet port PI2 to refrigerant outlet port PO2, is configured to form,
together with load device 3, a circulation flow path through which refrigerant circulates.
Compressor 10, condenser 20, and second expansion valve 40 are disposed on first flow
path F1. Second flow path F2 is configured to branch from a portion of first flow
path F1 between condenser 20 and second expansion valve 40, and to return, to compressor
10, the refrigerant that has passed through condenser 20. Third expansion valve 71
and receiver 73 are disposed on second flow path F2 in order from a branch point where
second flow path F2 is branched from first flow path F1. Third flow path F3 is configured
to connect a portion of first flow path F1 between second expansion valve 40 and refrigerant
outlet port PO2, to a refrigerant inlet of receiver 73. On-off valve 78 is disposed
on third flow path F3.
[0071] As shown in Fig. 5, on-off valve 78 is configured to be opened when pressure P1 at
the portion of first flow path F1 between second expansion valve 40 and refrigerant
outlet port PO2 exceeds a threshold value corresponding to the design pressure (YES
in S51).
[0072] Since third flow path F3 and on-off valve 78 are provided as described above, even
if pressure P1 increases suddenly at the start of a pump down operation, pressure
PI can be quickly decreased. Thereby, the pipes and load device 3 having a low design
pressure can be used even when refrigerant such as CO
2 which uses the supercritical region is used at the high pressure portion.
[0073] Further, by disposing receiver 73 on second flow path F2, even the refrigerant such
as CO
2 which uses the supercritical region can be stored in receiver 73, in the state of
liquid refrigerant. Furthermore, supercooling at the pipe portion through which the
liquid refrigerant flows can also be ensured, improving the performance of the refrigeration
cycle apparatus.
[0074] Outdoor unit 2 further includes flow rate control valve 72 disposed on second flow
path F2 and configured to adjust an exhaust flow rate of the liquid refrigerant from
receiver 73.
[0075] Outdoor unit 2 further includes heat exchanger 30 having first passage H1 and second
passage H2 and configured to exchange heat between the refrigerant flowing in first
passage H1 and the refrigerant flowing in second passage H2. First passage H1 of heat
exchanger 30 is disposed between condenser 20 and the branch point at which pipe 91
branches from pipe 82 on first flow path F1, and second passage H2 of heat exchanger
30 is disposed between flow rate control valve 72 and compressor 10 on second flow
path F2.
[0076] Compressor 10 has discharge port G2, suction port G1, and intermediate pressure port
G3. Outdoor unit 2 further includes flow path switching unit 74 configured to switch,
to one of intermediate pressure port G3 and suction port G1, a destination of the
refrigerant that has passed through second flow path F2. As shown in Fig. 5, when
pressure PI at a portion of first flow path F1 downstream of second expansion valve
40 becomes lower than pressure P2 in receiver 73 (NO in S52), flow path switching
unit 74 is configured to select suction port G1 as the destination.
[0077] With such a configuration, when the pressure in receiver 73 increases, the pressure
in receiver 73 can be decreased. Thereby, an operation situation where the pressure
in receiver 73 increases can be permitted, and the operation range can be expanded.
[0078] Outdoor unit 2 further includes pressure sensor 112 configured to detect pressure
P1 at the portion of first flow path F1 downstream of second expansion valve 40, and
controller 100 configured to control compressor 10 and on-off valve 78. As shown in
Fig. 5, when pressure P1 detected by pressure sensor 112 changes from a state where
pressure PI is lower than a threshold value to a state where pressure PI is higher
than the threshold value (YES in S51), controller 100 is configured to open on-off
valve 78 (S54) and decrease the rotation speed of compressor 10 (S55).
[0079] Since on-off valve 78 cooperates with compressor 10 as described above, even if pressure
PI increases suddenly, pressure PI can be quickly decreased.
[0080] Although the present embodiment has been described by illustrating a refrigerating
machine including refrigeration cycle apparatus 1, refrigeration cycle apparatus 1
may be utilized in an air conditioner or the like.
[0081] It should be understood that the embodiment disclosed herein is illustrative and
non-restrictive in every respect. The scope of the present disclosure is defined by
the scope of the claims, rather than the description of the embodiment described above,
and is intended to include any modifications within the scope and meaning equivalent
to the scope of the claims.
REFERENCE SIGNS LIST
[0082] 1: refrigeration cycle apparatus; 2: outdoor unit; 3: load device; 10: compressor;
20: condenser; 22: fan; 28, 75, 76, 78: on-off valve; 30: heat exchanger; 40: second
expansion valve; 50: first expansion valve; 60: evaporator; 70: throttle device; 71:
third expansion valve; 72: flow rate control valve; 73: receiver; 74: flow path switching
unit; 77: decompression device; 80 to 85, 88, 89, 91, 92, 94, 96 to 98: pipe; 93:
degassing pipe; 100: controller; 104: memory; 110 to 113: pressure sensor; 120 to
122: temperature sensor; F1: first flow path; F2: second flow path; F3: third flow
path; G1: suction port; G2: discharge port; G3: intermediate pressure port; HI: first
passage; H2: second passage; PI2, PI3: refrigerant inlet port; PO2, PO3: refrigerant
outlet port.