Technical Field
[0001] The present invention relates to a crane apparatus for a ship.
Background Art
[0002] A ship equipped with a deck crane on board is used as a cargo ship (e.g., a chip
carrier) (see Patent Publication
JP2010-285271A, for example). An electric deck crane used for cargo handling, for example, is configured
to perform necessary operations such as hoisting, luffing, and slewing by means of
a motor.
Citation List
Patent Document
Summary
Technical Problem
[0004] However, from the viewpoint of optimizing the inboard electric power (particularly
the electric power for cargo handling), there is still room for improvement in the
conventional electric deck crane or crane apparatus including said conventional electric
deck crane.
[0005] Therefore, an object of the present invention is to provide a crane apparatus for
a ship, which is configured to optimize the inboard electric power, particularly the
electric power for cargo handling, thereby curbing the impact on the environmental
burden and improving the efficiency.
Solution to Problem
[0006] One aspect of the present invention is a crane apparatus for a ship equipped with
an electric deck crane, the crane apparatus including:
a motor driving the electric deck crane;
a crane-side battery attached to the electric deck crane;
a generator provided on a hull of the ship;
a hull-side battery provided on the hull; and
wiring connecting the motor, the crane-side battery, the generator, and the hull-side
battery.
[0007] In the conventional electric crane apparatus, although regenerative electric power
is used as the inboard electric power, the excess electric power may be consumed as
heat by a resistor provided on the ship, possibly wasting energy. According to the
crane apparatus of the foregoing aspect, on the other hand, the inboard electric power,
particularly the electric power for cargo handling can be optimized by utilizing the
batteries, thereby curbing the impact on the environmental burden and improving the
efficiency.
[0008] The hull-side battery of the crane apparatus according to the foregoing aspect may
be composed of a battery such as a lithium-ion battery that has a higher energy density
than the crane-side battery.
[0009] The crane-side battery of the crane apparatus according to the foregoing aspect may
be composed of a battery capable of charging and discharging more rapidly than the
hull-side battery, such as a lithium-ion battery or a capacitor with a high capacity
rate.
[0010] The motor of the crane apparatus according to the foregoing aspect may be any of
a wire hoisting motor, a luffing motor, and a slewing motor.
[0011] In the crane apparatus according to the foregoing aspect, a hull-side system may
be provided with a hull-side control unit, and a crane-side system may be provided
with a crane-side control unit. In such a case, a switchboard may be provided between
the hull-side control unit and the crane-side control unit.
Advantageous Effects of Invention
[0012] The present invention can provide a crane apparatus for a ship, which is configured
to optimize the inboard electric power, particularly the electric power for cargo
handling, thereby curbing the impact on the environmental burden and improving the
efficiency.
Brief Description of Drawings
[0013]
Fig. 1 is a diagram schematically illustrating a configuration of a crane apparatus
according to an embodiment of the present invention;
Fig. 2 is a block diagram illustrating a configuration example of a hull-side system
and a crane-side system of the crane apparatus;
Fig. 3 is a side view for explaining a hoisting/lowering operation of an electric
deck crane;
Fig. 4 is a side view for explaining a luffing [up]/luffing [down] operation of the
electric deck crane;
Fig. 5 is a plan view for explaining a slewing operation of the electric deck crane;
and
Fig. 6 is a graph for explaining a brief overview of peak shaving/charging performed
in the crane apparatus.
Description of Embodiments
[0014] Preferred embodiments of the present invention are now described hereinafter with
reference to the accompanying drawings.
[0015] A crane apparatus 10 is an apparatus for a ship equipped with an electric deck crane
210. The crane apparatus 10 according to the present embodiment includes a hull-side
system 100 provided on the hull (ship) 1 side and a crane-side system 200 (see Figs.
1 and 2).
[0016] The hull-side system 100 includes a generator 110, a hull-side battery 130, a hull-side
control unit 140, and a switchboard 150. The crane-side system 200 includes an electric
deck crane 210, a motor 220, a crane-side battery 230, and a crane-side control unit
240 (see Figs. 1 and 2).
[0017] The generator 110 is a device that generates electricity by utilizing power of an
engine 20 in the hull 1 (see Fig. 2). For example, in the crane apparatus 10 of the
present embodiment, three generators 111, 112, and 113, generators No. 1 to No. 3,
are arranged in the hull 1, constituting the crane apparatus 10 (see Fig. 1).
[0018] Of at least two batteries provided in the crane apparatus 10, the hull-side battery
130 is the one provided in the hull 1. The hull-side battery 130 of the present embodiment
is composed of a battery having a higher energy density than the crane-side battery
230. A preferred example of such hull-side battery 130 is a lithium-ion battery. The
hull-side battery 130 of the present embodiment is connected to the hull-side control
unit 140 via a battery control unit 132 (Fig. 2).
[0019] The hull-side control unit 140 is a control unit provided in the hull-side system
100. Such hull-side control unit 140 of the present embodiment configured by an EMS
keeps the amount of electric power of each of the generators 111, 112, and 113 constant
at all times and manages the amount of charge/discharge of the hull-side battery 130.
[0020] The electric deck crane 210 of the crane-side system 200 is a crane apparatus configured
to perform necessary operations such as a hoisting/lowering operation of hook 216
(or sometimes a bucket shown in Fig. 1) (see Fig. 3), an luffing [up]/luffing [down]
operation of a jib (arm) 214 (see Fig. 4), and a slewing operation of a crane body
212 (see Fig. 5). For example, three electric deck cranes 210, electric deck cranes
No. 1 to No. 3, are installed in the hull 1 of the present embodiment (see Fig. 1),
but Figs. 2 to 5 illustrate only one of these electric deck cranes as a representative
example.
[0021] The motor 220 provides driving force for causing the electric deck cranes 210 to
perform necessary operations. In the crane-side system 200 of the present embodiment,
the electric deck cranes 210 are provided with a hoisting motor 220A, a luffing motor
220B, and a slewing motor 220C, respectively (see Fig. 2). These motors 220 (hoisting
motor 220A, luffing motor 220B, and slewing motor 220C) are connected to the crane-side
control unit 240 via respective inverters 222 (a hoisting motor inverter 222A, a luffing
motor inverter 222B, and a slewing motor inverter 222C) (see Fig. 2).
[0022] The the crane-side battery 230 is a battery attached to each electric deck crane
210. The crane-side battery 230 of the present embodiment is composed of a battery
capable of charging and discharging more rapidly than the hull-side battery 130, and
is provided for each electric deck crane. A favorable example of such crane-side battery
230 is a battery composed of a lithium-ion battery or a capacitor with a high capacity
rate. The crane-side battery 230 of the present embodiment is connected to the crane-side
control unit 240 via a battery control unit 232 (see Fig. 2).
[0023] The crane-side control unit 240 is a control unit provided in the crane-side system
200. The crane-side control unit 240 of the present embodiment performs various types
of control on the electric deck crane 210, such as managing the amount of charge/discharge
of the crane-side battery 230.
[0024] As described above, the components constituting the crane apparatus 10, that is,
the motor 220, the crane-side battery 230, the generators 110, the hull-side battery
130 and the like, are connected by wiring 300.
[0025] A switchboard is provided between the hull-side control unit 140 and the crane-side
control unit 240. For example, in the present embodiment, the switchboard 150 is provided
on the wiring 300 on the hull-side system 100 side (see Fig. 2).
[0026] Next, operations for carrying out a cargo handling operation by the crane apparatus
10 of the present embodiment, electric power fluctuations, and the like will be described
step by step (see Fig. 6).
(1) Prior to hoisting
[0027] In the stage prior to the hoisting operation (the stage prior to starting the cargo
handling operation), the hull-side battery 130 is being charged from the generator
110.
(2) Hoist
[0028] The hoisting motor 220A is driven to perform the hoisting operation. At the start
of hoisting, the crane-side battery 230 discharges to supply electric power to the
hoisting motor 220A, and thereafter the hull-side battery 130 discharges to supply
electric power to the hoisting motor 220A.
(3) Luffing [down]
[0029] The both batteries (the hull-side battery 130 and the crane-side battery 230) are
charged with regenerative electric power that is generated in the luffing motor 220B
to perform the luffing [down] operation.
(4) Luffing [down] and slewing
[0030] The both batteries (the hull-side battery 130 and the crane-side battery 230) are
charged with the regenerative electric power that is generated in the luffing motor
220B to perform the luffing [down] operation.
(5) Lower
[0031] The both batteries (the hull-side battery 130 and the crane-side battery 230) are
charged with regenerative electric power that is generated in the hoisting motor 220A
to perform the lowering operation.
(6) Grab a cargo
[0032] A grabbing operation for grabbing a cargo by the bucket (or an operation for hooking
a cargo by the hook 216) is performed.
(7) Hoist
[0033] The hoisting motor 220A is driven to perform the hoisting operation. In so doing,
the crane-side battery 230 discharges to supply electric power to the hoisting motor
220A.
(8) Luffing [up]
[0034] The luffing motor 220B is driven to perform the luffing [up] operation. At the start
of luffing [up], the crane-side battery 230 discharges to supply electric power to
the luffing motor 220B, and thereafter the hull-side battery 130 discharges to supply
electric power to the luffing motor 220B.
(9) Slewing
[0035] The slewing operation is performed during or after the luffing operation. In this
slewing operation, the hull-side battery 130 discharges to supply electric power to
the luffing motor 220B and/or the slewing motor 220C.
(10) Luffing [down]
[0036] The both batteries (the hull-side battery 130 and the crane-side battery 230) are
charged with the regenerative electric power that is generated in the luffing motor
220B to perform the luffing [down] operation.
(11) Lower
[0037] The both batteries (the hull-side battery 130 and the crane-side battery 230) are
charged with the regenerative electric power that is generated in the hoisting motor
220A to perform the lowering operation.
[0038] In the cargo handling operation that has been described step by step from (1) to
(11) above, the crane apparatus 10 of the present embodiment is operated in accordance
with the fluctuating electric power demand of the electric deck crane 210. Specifically,
the electric power is supplied (discharged) from the hull-side battery 130 to the
electric deck crane 210 when the electric power demand thereof exceeds the amount
of electric power supply, and the electric power is stored (charged) in the hull-side
battery 130 when the electric power demand of the electric deck crane 210 is below
the amount of electric power supply. During a single cargo handling cycle (typically
for approximately 200 seconds), discharge and charge are switched once or twice. When
the hoisting/luffing motors 220A and 220B start to move, each of the motors instantaneously
(for 1 to 2 seconds) requires several to ten times as much electric power as the electric
power required during steady rotation. This instantaneous electric power demand occurs
once or twice during a single cargo handling cycle. This instantaneous electric power
demand is supplied (discharged) from the crane-side battery 230. In addition, the
regenerative electric power that is generated by the reverse rotation (lowering, etc.)
of the hoisting/luffing motors 220A and 220B during a cargo handling cycle is charged
to the crane-side battery 230.
[0039] In the crane apparatus 10 of the present embodiment, the crane-side system 200 is
characterized in responding to an instantaneous electric power demand, and the hull-side
system 100 is characterized in balancing the electric power demand relatively gently.
Therefore, it is preferred that a rapid charge/discharge compatible battery be used
for the crane-side battery 230, that a capacity storage battery be used for the hull-side
battery 130, and that the charge/discharge timing be employed in accordance with the
characteristics of said batteries.
[0040] Moreover, in the crane apparatus 10 of the present embodiment, balancing of all the
electric power supply/demand is controlled by the hull-side control unit 140 and the
crane-side control unit 240, and the crane apparatus 10 can be operated at a constant
generator output, improving the fuel efficiency. Thus, a highly efficient system can
be realized. As a result, the generators 110 make no load fluctuations, thereby achieving
fuel saving. Another advantage is that, even when performing cargo handling with the
electric power received from the outside, the amount of the electric power received
can be reduced.
[0041] Also, according to the crane apparatus 10 of the present embodiment, cost reduction,
energy saving, reduction of the environmental burden and the like can be accomplished
by utilizing the batteries. Specifically, the following are achieved:
- 1) Optimization of the capacities of the generators (the sizes of the generators can
be reduced by utilizing the batteries).
- 2) Optimization of the efficiency of the generation engine with the assistance of
the batteries.
- 3) Power peak shaving in cargo handling by means of the batteries (see Fig. 6).
- 4) At the time of cargo handling, charging the batteries with the regenerative electric
power generated when lowering the crane.
[0042] Now, the above 3) will be explained supplementarily. Let it be assumed that the curve
of the electric power used in cargo handling using a crane apparatus for a typical
ship is as shown in Fig. 6. By utilizing the batteries of the crane apparatus 10 of
the present embodiment, the amount of electric power that exceeds a predetermined
output value X [kW] obtained when a constant output operation is performed by the
generator 110 can be reduced (power peak shaving), and the electric power that is
generated by the generator 110 when the required electric power is less than 0 [kW]
can be stored in the batteries (see Fig. 6).
[0043] Although the foregoing embodiment is an example of a preferred embodiment of the
present invention, the present invention is not limited thereto; the present invention
can be modified and implemented in various ways without departing from the gist of
the present invention.
Industrial Applicability
[0044] The present invention can favorably be applied to a crane apparatus for a ship equipped
with an electric deck crane.
Reference Signs List
[0045]
- 1
- Hull (ship)
- 10
- Crane apparatus
- 20
- Engine
- 100
- Hull-side system
- 110
- Generator
- 130
- Hull-side battery
- 132
- Battery control unit
- 140
- Hull-side control unit
- 150
- Switchboard
- 200
- Crane-side system
- 210
- Electric deck crane
- 212
- Crane body
- 214
- Jib
- 216
- Hook
- 220
- (Hoisting/luffing/slewing) motor
- 222
- Inverter
- 230
- Crane-side battery
- 232
- Battery control unit
- 240
- Crane-side control unit
- 300
- Wiring
1. A crane apparatus for a ship equipped with an electric deck crane, the crane apparatus
comprising:
a motor driving the electric deck crane;
a crane-side battery attached to the electric deck crane;
a generator provided on a hull of the ship;
a hull-side battery provided on the hull; and
wiring connecting the motor, the crane-side battery, the generator, and the hull-side
battery.
2. The crane apparatus for a ship according to claim 1, wherein the hull-side battery
is composed of a battery having a higher energy density than the crane-side battery.
3. The crane apparatus for a ship according to claim 1 or 2, wherein the crane-side battery
is composed of a battery capable of charging and discharging more rapidly than the
hull-side battery.
4. The crane apparatus for a ship according to any one of claims 1 to 3, wherein the
motor is any of a wire hoisting motor, a luffing motor, and a slewing motor.
5. The crane apparatus for a ship according to any one of claims 1 to 4, wherein the
hull-side system is provided with a hull-side control unit, and the crane-side system
is provided with a crane-side control unit.
6. The crane apparatus for a ship according to claim 5, wherein a switchboard is provided
between the hull-side control unit and the crane-side control unit.
Amended claims under Art. 19.1 PCT
1. (Amended) A crane apparatus for a ship equipped with an electric deck crane, the crane
apparatus comprising:
a motor driving the electric deck crane;
a crane-side battery attached to the electric deck crane;
a generator provided on a hull of the ship;
a hull-side battery that is composed of a battery having a higher energy density than the crane-side battery and is provided on the hull; and
wiring connecting the motor, the crane-side battery, the generator, and the hull-side
battery.
2. (Deleted)
3. (Amended) The crane apparatus for a ship according to claim 1, wherein the crane-side battery is composed of a battery capable of charging and
discharging more rapidly than the hull-side battery.
4. (Amended) The crane apparatus for a ship according to any one of claim 1 or 3, wherein
the motor is any of a wire hoisting motor, a luffing motor, and a slewing motor.
5. (Amended) The crane apparatus for a ship according to any one of claims 1, 3, and 4, wherein the hull-side system is provided with a hull-side control unit, and
the crane-side system is provided with a crane-side control unit.
6. The crane apparatus for a ship according to claim 5, wherein a switchboard is provided
between the hull-side control unit and the crane-side control unit.