Technical Field
[0001] The present disclosure relates to an air conditioner, a control method, and a program.
Background Art
[0003] Various types of refrigerants are used in air conditioners. From the viewpoint of
preventing global warming, the use of refrigerants with a low global warming potential
(GWP) is being promoted.
[0004] PTL 1 discloses, as a related technique, a technique relating to a refrigerating
cycle device for storing a refrigerant such that a pipe having a low design pressure
can be used.
Citation List
Patent Literature
[0005] [PTL 1] International Publication No.
2017/175299
Summary of Invention
Technical Problem
[0006] By the way, among the refrigerants having a low GWP, there are refrigerants having
higher combustibility than the refrigerants having a high GWP. When such a refrigerant
leaks to the outside of the air conditioner, it is necessary to ensure that the refrigerant
does not burn.
[0007] Therefore, when a refrigerant leaks in an air conditioner, there is a demand for
a technique capable of reducing the leakage.
[0008] An object of the present disclosure is to provide an air conditioner, a control method
and a program capable of solving the above-described problems.
Solution to Problem
[0009] In order to solve the above problems, an air conditioner according to the present
disclosure includes: a condenser that condenses a refrigerant; an evaporator that
evaporates the condensed refrigerant; a compressor that compresses the evaporated
refrigerant; a receiver capable of recovering the compressed refrigerant; and a switching
valve capable of switching a discharge destination of the compressed refrigerant from
the condenser to the receiver.
[0010] A control method according to the present disclosure performed by an air conditioner
including a condenser that condenses a refrigerant, an evaporator that evaporates
the condensed refrigerant, a compressor that compresses the evaporated refrigerant,
a receiver capable of recovering the compressed refrigerant, and a switching valve
capable of switching a discharge destination of the compressed refrigerant from the
condenser to the receiver, the method including: controlling a flow path in the switching
valve.
[0011] A program according to the present disclosure causes a computer in an air conditioner
to control a flow path in a switching valve, the air conditioner including a condenser
that condenses a refrigerant, an evaporator that evaporates the condensed refrigerant,
a compressor that compresses the evaporated refrigerant, a receiver capable of recovering
the compressed refrigerant, and the switching valve capable of switching a discharge
destination of the compressed refrigerant from the condenser to the receiver.
Advantageous Effects of Invention
[0012] According to the air conditioner, the control method, and the program according to
the embodiment of the present disclosure, when the refrigerant leaks in the air conditioner,
the leakage can be reduced.
Brief Description of Drawings
[0013]
Fig. 1 is a diagram showing an example of a configuration of an air conditioner according
to a first embodiment of the present disclosure.
Fig. 2 is a diagram showing an example of a configuration of a control device according
to the first embodiment of the present disclosure.
Fig. 3 is a first diagram for explaining a determination whether recovery of a refrigerant
has been completed in the first embodiment of the present disclosure.
Fig. 4 is a second diagram for explaining a determination whether the recovery of
the refrigerant has been completed in the first embodiment of the present disclosure.
Fig. 5 is a diagram showing an example of a processing flow of the air conditioner
according to the first embodiment of the present disclosure.
Fig. 6 is a diagram showing an example of a configuration of an air conditioner according
to a second embodiment of the present disclosure.
Fig. 7 is a diagram showing an example of a processing flow of the air conditioner
according to the second embodiment of the present disclosure.
Fig. 8 is a schematic block diagram illustrating a configuration of a computer according
to at least one embodiment.
Description of Embodiments
<First Embodiment>
[0014] Hereinafter, embodiments will be described in detail with reference to the drawings.
(Configuration of air conditioner)
[0015] The configuration of an air conditioner 1 according to a first embodiment of the
present disclosure will be described.
[0016] The air conditioner 1 according to the first embodiment of the present disclosure
is an air conditioner that recovers the refrigerant in the receiver, when the leakage
of the refrigerant from the air conditioner is detected. As shown in Fig. 1, the air
conditioner 1 includes an outdoor unit 10, an indoor unit 20, and a control device
30.
[0017] In the first embodiment, the air conditioner 1 will be described by using the operation
during the cooling operation as an example (that is, by using the case of operating
as a refrigerating cycle device as an example) among the heating and cooling operations
of the air conditioner 1, and the operation during the heating operation will be described
at the end of the first embodiment.
(Configuration of outdoor unit)
[0018] As shown in Fig. 1, the outdoor unit 10 includes a compressor 101, an accumulator
102, a switching valve 103 (an example of a switching valve), a four-way valve 104,
a blower fan 105, a heat exchanger 106 (an example of a condenser, an example of a
compressor), a throttle mechanism 107 (an example of an expansion valve), a check
valve 108, a receiver 109, an on/off valve 110, a discharge temperature sensor 111,
a receiver temperature sensor 112, and a gas sensor 113 (an example of a gas sensor).
[0019] The compressor 101 is a device that compresses a gaseous refrigerant. The refrigerant
compressed by the compressor 101 is normally sent to the heat exchanger 106 via the
switching valve 103 and the four-way valve 104.
[0020] The accumulator 102 is a device that separates a liquid refrigerant and a gaseous
refrigerant. Only the gaseous refrigerant among the refrigerants separated by the
accumulator 102 is sent to the compressor 101.
[0021] The switching valve 103 is a valve that switches the destination of the refrigerant
discharged from the compressor 101.
[0022] For example, the switching valve 103 normally sets the destination of the refrigerant
discharged from the compressor 101 to the heat exchanger 106. Further, when the leakage
of the refrigerant is detected, the switching valve 103 uses the receiver 109 as the
destination of the refrigerant discharged from the compressor 101.
[0023] The four-way valve 104 is a valve that switches between a cooling operation and a
heating operation of the air conditioner 1. The four-way valve 104 uses the heat exchanger
106 as the destination of the refrigerant discharged from the compressor 101, during
the cooling operation of the air conditioner 1. During the heating operation, the
destination of the refrigerant is the heat exchanger 201.
[0024] The blower fan 105 is a fan that sends air to the heat exchanger 106.
[0025] The heat exchanger 106 operates as a condenser during the cooling operation of the
air conditioner 1. That is, the gaseous refrigerant exchanges heat with the air sent
by the blower fan 105 and becomes a liquid refrigerant. The liquid refrigerant in
the heat exchanger 106 is sent to the throttle mechanism 107.
[0026] The throttle mechanism 107 includes a mechanism for reducing the pressure of the
refrigerant and expanding the refrigerant. The throttle mechanism 107 reduces the
temperature of the refrigerant. The throttle mechanism 107 is provided between the
heat exchanger 106 and the heat exchanger 201, which will be described later. The
throttle mechanism 107 is, for example, an electronic expansion valve.
[0027] The check valve 108 is a valve that prevents the backflow of the refrigerant. For
example, when leakage of a refrigerant is detected and the receiver 109 is set as
the destination of the refrigerant discharged from the compressor 101 by the switching
valve 103, the check valve 108 sends the refrigerant only in the direction from the
compressor 101 to the receiver 109.
[0028] The receiver 109 is a container that recovers and stores the refrigerant inside,
when the leakage of the refrigerant is detected.
[0029] The on/off valve 110 is a valve that opens and closes the flow path of the refrigerant.
For example, the on/off valve 110 is an electromagnetic valve.
[0030] The discharge temperature sensor 111 is a sensor that measures the temperature in
the refrigerant discharge unit of the compressor 101. The discharge temperature sensor
111 is provided in the refrigerant discharge unit of the compressor 101.
[0031] The receiver temperature sensor 112 is a sensor that measures the temperature at
the receiver 109. The receiver temperature sensor 112 is provided above the receiver
109.
[0032] The gas sensor 113 is a sensor that detects a gaseous refrigerant. For example, the
gas sensor 113 is provided in the vicinity of the heat exchanger 106.
(Configuration of indoor unit)
[0033] As shown in Fig. 1, the indoor unit 20 includes a heat exchanger 201 (an example
of a compressor and an example of a condenser), a blower fan 202, and a gas sensor
203 (an example of a gas sensor).
[0034] The blower fan 202 is a fan that sends air to the heat exchanger 201. The heat exchanger
201 operates as an evaporator during the cooling operation of the air conditioner
1. That is, the refrigerant of which temperature is reduced by the throttle mechanism
107 exchanges heat with the air sent by the blower fan 202 and becomes a gaseous refrigerant.
That is, the air conditioner 1 operates as a cooling cycle device.
[0035] The gas sensor 203 is a sensor that detects a gaseous refrigerant. For example, the
gas sensor 203 is provided in the vicinity of the heat exchanger 201.
(Configuration of control device)
[0036] As shown in Fig. 2, the control device 30 includes a sensor information acquisition
unit 301, a refrigerant leakage determination unit 302, a valve control unit 303 (an
example of a first control unit and an example of a second control unit), a recovery
completion determination unit 304 (an example of a determination unit), a fan control
unit 305, and a storage unit 308.
[0037] The sensor information acquisition unit 301 acquires the measurement result of the
temperature measured by the discharge temperature sensor 111 or the receiver temperature
sensor 112. Further, the sensor information acquisition unit 301 acquires the detection
result of the refrigerant from the gas sensor 113 and the gas sensor 203.
[0038] The refrigerant leakage determination unit 302 determines whether or not the refrigerant
is leaking in the air conditioner 1, based on the detection result of the gas sensor
113 or the gas sensor 203.
[0039] For example, when the gas sensor 113 detects the refrigerant, the refrigerant leakage
determination unit 302 determines that the refrigerant is leaking in the outdoor unit
10.
[0040] Further, for example, when the gas sensor 203 detects the refrigerant, the refrigerant
leakage determination unit 302 determines that the refrigerant is leaking in the indoor
unit 20.
[0041] The valve control unit 303 controls the switching valve 103, the four-way valve
104, the throttle mechanism 107, and the on/off valve 110.
[0042] For example, during the normal cooling operation of the air conditioner 1, the valve
control unit 303 controls the flow path of the refrigerant in the switching valve
103 to connect the compressor 101 and the four-way valve 104, and connect the check
valve 108 and the on/off valve 110. Further, the valve control unit 303 controls the
flow path of the refrigerant in the four-way valve 104 to connect the switching valve
103 and the heat exchanger 106 and connect the accumulator 102 and the heat exchanger
201. Further, the valve control unit 303 performs control such that the opening degree
of the throttle mechanism 107 becomes an appropriate opening degree. Further, the
valve control unit 303 controls the on/off valve 110 to be shut off.
[0043] Further, for example, when the leakage of a refrigerant is detected in the cooling
operation of the air conditioner 1, the valve control unit 303 controls the flow path
of the refrigerant in the switching valve 103 to connect the compressor 101 and the
check valve 108, and connect the four-way valve 104 and the on/off valve 110. Further,
the valve control unit 303 controls the flow path of the refrigerant in the four-way
valve 104 to connect the switching valve 103 and the heat exchanger 106 and connect
the accumulator 102 and the heat exchanger 201. Further, the valve control unit 303
controls the opening degree of the throttle mechanism 107 to full open. Further, the
valve control unit 303 controls the on/off valve 110 to be shut off.
[0044] The recovery completion determination unit 304 determines whether or not the recovery
of the refrigerant in the receiver 109 has been completed, based on the measurement
result of the discharge temperature sensor 111 or the measurement result of the receiver
temperature sensor 112.
[0045] For example, when the refrigerant is recovered in the receiver 109, as shown in Fig.
3, the temperature measured by the receiver temperature sensor 112 rises, and then
the temperature rise slows down. Therefore, the recovery completion determination
unit 304 determines that the recovery of the refrigerant has been completed, when
the measurement result of the receiver temperature sensor 112 determines that the
rise has slowed down after the rise.
[0046] Further, for example, when the refrigerant is recovered in the receiver 109, the
temperature measured by the discharge temperature sensor 111 decreases as shown in
Fig. 4. The measurement result of the discharge temperature sensor 111 reaches the
lower limit of the temperature when the refrigerant runs out, and then the temperature
rises due to the heat of the motor of the compressor 101. Therefore, when it is determined
that the measurement result of the discharge temperature sensor 111 decreases to the
lower limit of the temperature and then increases, the recovery completion determination
unit 304 determines that the recovery of the refrigerant has been completed.
[0047] The fan control unit 305 controls the rotation of the blower fan 105 and the blower
fan 202.
[0048] The compressor control unit 306 controls the operation of the compressor 101.
[0049] For example, the compressor control unit 306 controls the compressor 101 to be in
an operating state or a stopped state.
[0050] The error notification unit 307 makes a notification of the leakage of the refrigerant.
[0051] For example, the error notification unit 307 displays the leakage of the refrigerant
on a display unit provided in the room or a display unit of the remote controller.
[0052] The storage unit 308 stores various types of information necessary for the process
performed by the control device 30.
[0053] For example, the storage unit 308 stores the temperature threshold value used by
the recovery completion determination unit 304 to determine whether or not the recovery
of the refrigerant in the receiver 109 has been completed.
[0054] With the above-described configuration, during the normal cooling operation of the
air conditioner 1, the refrigerant flows through a flow path that circulates in the
order of the compressor 101, the switching valve 103, the four-way valve 104, the
heat exchanger 106, the throttle mechanism 107, the heat exchanger 201, the four-way
valve 104, the accumulator 102, and the compressor 101.
(Process performed by the air conditioner)
[0055] Next, the process of the air conditioner 1 according to the first embodiment of the
present disclosure will be described.
[0056] Here, the processing flow of the air conditioner 1 when the leakage of the refrigerant
is detected in the heat exchanger 106 that operates as a condenser during the normal
cooling operation of the air conditioner 1 shown in Fig. 5 will be described.
[0057] The air conditioner 1 is in a state of the normal cooling operation. That is, the
valve control unit 303 controls the flow path of the refrigerant in the switching
valve 103 to connect the compressor 101 and the four-way valve 104, and connect the
check valve 108 and the on/off valve 110. Further, the valve control unit 303 controls
the flow path of the refrigerant in the four-way valve 104 to connect the on/off valve
110 and the heat exchanger 106 and connect the accumulator 102 and the heat exchanger
201. Further, the valve control unit 303 performs control such that the opening degree
of the throttle mechanism 107 becomes an appropriate opening degree. Further, the
valve control unit 303 controls the on/off valve 110 to be shut off.
[0058] In this state, the refrigerant leakage determination unit 302 determines whether
or not the refrigerant is leaking in the air conditioner 1, based on the detection
result of the gas sensor 113 or the gas sensor 203.
[0059] Specifically, the refrigerant leakage determination unit 302 determines that the
refrigerant is leaking when the gas sensor 113 or the gas sensor 203 detects the refrigerant.
[0060] Here, the gas sensor 113 detects the refrigerant.
[0061] The sensor information acquisition unit 301 acquires a detection result indicating
that the refrigerant has been detected from the gas sensor 113.
[0062] When acquiring a detection result indicating that the sensor information acquisition
unit 301 has detected the refrigerant from the gas sensor 113, the refrigerant leakage
determination unit 302 determines that the refrigerant is leaking in the outdoor unit
10 (step S1).
[0063] The valve control unit 303 controls the flow path of the refrigerant in the switching
valve 103 to connect the compressor 101 and the check valve 108, and connect the four-way
valve 104 and the on/off valve 110 (step S2).
[0064] The valve control unit 303 controls the opening degree of the throttle mechanism
107 to full open (step S3). The fan control unit 305 stops the rotation of the blower
fan 202 (step S4). In addition, the process of step S3 and step S4 reduces the gasification
of the refrigerant, so that the density of the refrigerant is increased. As a result,
the refrigerant can be efficiently recovered in the receiver 109.
[0065] The recovery completion determination unit 304 determines whether or not the recovery
of the refrigerant in the receiver 109 has been completed, based on the measurement
result of the discharge temperature sensor 111 or the measurement result of the receiver
temperature sensor 112 (step S5).
[0066] When the recovery completion determination unit 304 determines that the recovery
of the refrigerant in the receiver 109 has not been completed (NO in step S5), the
process returns to the process of step S5.
[0067] Further, when the recovery completion determination unit 304 determines that the
recovery of the refrigerant in the receiver 109 has been completed (YES in step S5),
the compressor control unit 306 controls the compressor 101 to stop (from the operating
state) (step S6). Then, the error notification unit 307 notifies the leakage of the
refrigerant (step S7).
[0068] In this way, when the refrigerant leaks in the heat exchanger 106 that operates as
a condenser, the air conditioner 1 can reduce the leakage of the refrigerant from
the heat exchanger 106. In this case, the air conditioner 1 can recover the refrigerant
on the inlet side of the heat exchanger 106. Therefore, the air conditioner 1 can
recover the refrigerant more safely than the case where the refrigerant is recovered
on the outlet side of the heat exchanger 106.
[0069] Further, in the cooling operation of the air conditioner 1, even when the refrigerant
leaks from the heat exchanger 201 operating as an evaporator, and other places, and
the gas sensor 113 or the gas sensor 203 detects the refrigerant, similarly, the receiver
109 may recover the refrigerant.
[0070] Further, in the heating operation of the air conditioner 1, the heat exchanger 106
operates as an evaporator, the heat exchanger 201 operates as a condenser, and the
valve control unit 303 controls the flow path of the refrigerant in the four-way valve
104 to connect the switching valve 103 and the heat exchanger 201 and connect the
accumulator 102 and the heat exchanger 106. The rotation of the blower fan 105 is
stopped in step S4.
[0071] Then, in the heating operation of the air conditioner 1, even when the refrigerant
leaks from the heat exchanger 201 operating as a condenser, the heat exchanger 106
operating as an evaporator, and other places, and the gas sensor 113 or the gas sensor
203 detects the refrigerant, similarly, the receiver 109 may recover the refrigerant.
[0072] When the refrigerant leaks in the heat exchanger 201 during the heating operation
of the air conditioner 1, the air conditioner 1 can recover the refrigerant on the
inlet side of the heat exchanger 201. Therefore, the air conditioner 1 can recover
the refrigerant more safely than the case where the refrigerant is recovered on the
outlet side of the heat exchanger 201.
(Action and effect of air conditioner)
[0073] The air conditioner 1 according to the first embodiment of the present disclosure
has been described above.
[0074] The air conditioner (1) according to the first embodiment of the present disclosure
includes a condenser (106, 201) that condenses a refrigerant, an evaporator (201,
106) that evaporates the condensed refrigerant, a compressor (101) that compresses
the evaporated refrigerant, a receiver (109) capable of recovering the compressed
refrigerant, and a switching valve (103) capable of switching a discharge destination
of the compressed refrigerant from the condenser (106, 201) to the receiver (109).
[0075] By the air conditioner (1), when the leakage of the refrigerant is detected, the
refrigerant can be recovered on the inlet side of the condenser (106, 201). As a result,
the air conditioner (1) can reduce the leakage, when the refrigerant leaks in the
air conditioner.
<Second Embodiment>
(Configuration of air conditioner)
[0076] The configuration of the air conditioner 1 according to the second embodiment of
the present disclosure will be described.
[0077] The air conditioner 1 according to the second embodiment of the present disclosure
is an air conditioner that uses a receiver as a substitute for an accumulator as well
as for the recovery of a refrigerant. As shown in Fig. 6, the air conditioner 1 includes
the outdoor unit 10, the indoor unit 20, and the control device 30. Hereinafter, the
air conditioner 1 will be described with a focus on the differences from the first
embodiment.
[0078] In the second embodiment, the air conditioner 1 will be described by using the operation
during the cooling operation as an example (that is, by using the case of operating
as a refrigerating cycle device as an example) among the heating and cooling operations
of the air conditioner 1, and the operation during the heating operation will be described
at the end of the second embodiment.
(Configuration of outdoor unit)
[0079] As shown in Fig. 6, the outdoor unit 10 includes the compressor 101, the switching
valve 103, the four-way valve 104, the blower fan 105, the heat exchanger 106, the
throttle mechanism 107, the check valve 108, the receiver 109, a first on/off valve
110, a discharge temperature sensor 111, a receiver temperature sensor 112, a gas
sensor 113, a second on/off valve 114, a first three-way valve 115 (an example of
a switching valve), and a second three-way valve 116 (an example of a switching valve).
[0080] The first three-way valve 115 and the second three-way valve 116 are valves added
to operate the receiver 109 as an accumulator in addition to recovering the refrigerant.
[0081] The valve control unit 303 controls the switching valve 103, the four-way valve 104,
the throttle mechanism 107, the first on/off valve 110, the second on/off valve 114,
the first three-way valve 115, and the second three-way valve 116.
[0082] For example, during the normal cooling operation of the air conditioner 1, the valve
control unit 303 controls the flow path of the refrigerant in the switching valve
103 to connect the compressor 101 and the four-way valve 104, and connect the check
valve 108 and the second on/off valve 114. Further, the valve control unit 303 controls
the flow path of the refrigerant in the four-way valve 104 to connect the switching
valve 103 and the heat exchanger 106 and connect the first three-way valve 115 and
the heat exchanger 201. Further, the valve control unit 303 controls the opening degree
of the throttle mechanism 107 to an appropriate opening degree. Further, the valve
control unit 303 controls the first on/off valve 110 to open. Further, the valve control
unit 303 controls the second on/off valve 114 to be shut off. Further, the valve control
unit 303 controls the first three-way valve 115 to connect the four-way valve 104
and the first on/off valve 110. Further, the valve control unit 303 controls the second
three-way valve 116 to connect the compressor 101 and the receiver 109.
[0083] Further, for example, when the leakage of a refrigerant is detected in the cooling
operation of the air conditioner 1, the valve control unit 303 controls the flow path
of the refrigerant in the switching valve 103 to connect the compressor 101 and the
check valve 108, and connect the four-way valve 104 and the second on/off valve 114.
Further, the valve control unit 303 controls the flow path of the refrigerant in the
four-way valve 104 to connect the switching valve 103 and the heat exchanger 106 and
connect the first three-way valve 115 and the heat exchanger 201. Further, the valve
control unit 303 controls the opening degree of the throttle mechanism 107 to full
open. Further, the valve control unit 303 controls the first on/off valve 110 to be
shut off. Further, the valve control unit 303 controls the second on/off valve 114
to be shut off. Further, the valve control unit 303 controls the first three-way valve
115 to connect the compressor 101 and the four-way valve 104. Further, the valve control
unit 303 controls the second three-way valve 116 to connect the check valve 108 and
the receiver 109.
[0084] With the above-described configuration, during the normal cooling operation of the
air conditioner 1, the refrigerant flows through a flow path that circulates in the
order of the compressor 101, the switching valve 103, the four-way valve 104, the
heat exchanger 106, the throttle mechanism 107, the heat exchanger 201, the four-way
valve 104, the first three-way valve 115, the first on/off valve 110, the receiver
109, the second three-way valve 116, and the compressor 101.
[0085] In Fig. 6, the arrow indicated by the solid line indicates the flow of the refrigerant
during the normal cooling operation of the air conditioner 1. Further, the arrow shown
by the broken line indicates the flow of the refrigerant when the leakage of the refrigerant
is detected in the cooling operation of the air conditioner 1.
(Process performed by the air conditioner)
[0086] Next, the process of the air conditioner 1 according to the second embodiment of
the present disclosure will be described.
[0087] Here, the processing flow of the air conditioner 1 when the leakage of the refrigerant
is detected in the heat exchanger 106 that operates as a condenser during the normal
cooling operation of the air conditioner 1 shown in Fig. 7 will be described.
[0088] The air conditioner 1 is in a state of the normal cooling operation. That is, the
valve control unit 303 controls the flow path of the refrigerant in the switching
valve 103 to connect the compressor 101 and the four-way valve 104, and connect the
check valve 108 and the second on/off valve 114. Further, the valve control unit 303
controls the flow path of the refrigerant in the four-way valve 104 to connect the
switching valve 103 and the heat exchanger 106 and connect the first three-way valve
115 and the heat exchanger 201. Further, the valve control unit 303 performs control
such that the opening degree of the throttle mechanism 107 becomes an appropriate
opening degree. Further, the valve control unit 303 controls the first on/off valve
110 to open. Further, the valve control unit 303 controls the second on/off valve
114 to be shut off. Further, the valve control unit 303 controls the first three-way
valve 115 to connect the four-way valve 104 and the first on/off valve 110. Further,
the valve control unit 303 controls the second three-way valve 116 to connect the
compressor 101 and the receiver 109.
[0089] In this state, the refrigerant leakage determination unit 302 determines whether
or not the refrigerant is leaking in the air conditioner 1, based on the detection
result of the gas sensor 113 or the gas sensor 203.
[0090] Specifically, the refrigerant leakage determination unit 302 determines that the
refrigerant is leaking when the gas sensor 113 or the gas sensor 203 detects the refrigerant.
[0091] Here, the gas sensor 113 detects the gaseous refrigerant.
[0092] The sensor information acquisition unit 301 acquires a detection result indicating
that the refrigerant has been detected from the gas sensor 113.
[0093] When acquiring a detection result indicating that the sensor information acquisition
unit 301 has detected the refrigerant from the gas sensor 113, the refrigerant leakage
determination unit 302 determines that the refrigerant is leaking in the outdoor unit
10 (step S1).
[0094] The valve control unit 303 controls the flow path of the refrigerant in the switching
valve 103 to connect the compressor 101 and the check valve 108, and connect the four-way
valve 104 and the second on/off valve 114, controls the first on/off valve 110 to
be shut off, controls the first three-way valve 115 to connect the compressor 101
and the four-way valve 104, and controls the second three-way valve 116 to connect
the check valve 108 and the receiver 109 (step S11).
[0095] The valve control unit 303 controls the opening degree of the throttle mechanism
107 to full open (step S3). The fan control unit 305 stops the rotation of the blower
fan 202 (step S4).
[0096] The recovery completion determination unit 304 determines whether or not the recovery
of the refrigerant in the receiver 109 has been completed, based on the measurement
result of the discharge temperature sensor 111 or the measurement result of the receiver
temperature sensor 112 (step S5).
[0097] When the recovery completion determination unit 304 determines that the recovery
of the refrigerant in the receiver 109 has not been completed (NO in step S5), the
process returns to the process of step S5.
[0098] Further, when the recovery completion determination unit 304 determines that the
recovery of the refrigerant in the receiver 109 has been completed (YES in step S5),
the compressor control unit 306 controls the compressor 101 to stop (from the operating
state) (step S6). Then, the error notification unit 307 notifies the leakage of the
refrigerant (step S7).
[0099] In this way, when the refrigerant leaks in the heat exchanger 106 that operates as
a condenser, the air conditioner 1 can reduce the leakage of the refrigerant from
the heat exchanger 106. In this case, the air conditioner 1 can recover the refrigerant
on the inlet side of the heat exchanger 106. Therefore, the air conditioner 1 can
recover the refrigerant more safely than the case where the refrigerant is recovered
on the outlet side of the heat exchanger 106.
[0100] Further, in the cooling operation of the air conditioner 1, even when the refrigerant
leaks from the heat exchanger 201 operating as an evaporator, and other places, and
the gas sensor 113 or the gas sensor 203 detects the refrigerant, similarly, the receiver
109 may recover the refrigerant.
[0101] Further, in the heating operation of the air conditioner 1, the heat exchanger 106
operates as an evaporator, the heat exchanger 201 operates as a condenser, and the
valve control unit 303 controls the flow path of the refrigerant in the four-way valve
104 to connect the switching valve 103 and the heat exchanger 201 and connect the
accumulator 102 and the heat exchanger 106. The rotation of the blower fan 105 is
stopped in step S4.
[0102] Then, in the heating operation of the air conditioner 1, even when the refrigerant
leaks from the heat exchanger 201 operating as a condenser, the heat exchanger 106
operating as an evaporator, and other places, and the gas sensor 113 or the gas sensor
203 detects the refrigerant, similarly, the receiver 109 may recover the refrigerant.
[0103] When the refrigerant leaks in the heat exchanger 201 during the heating operation
of the air conditioner 1, the air conditioner 1 can recover the refrigerant on the
inlet side of the heat exchanger 201. Therefore, the air conditioner 1 can recover
the refrigerant more safely than the case where the refrigerant is recovered on the
outlet side of the heat exchanger 201.
(Action and effect of air conditioner)
[0104] The air conditioner 1 according to the second embodiment of the present disclosure
has been described above.
[0105] The air conditioner (1) according to the second embodiment of the present disclosure
includes a receiver (109) that operates as an accumulator that separates a liquid
refrigerant and a gaseous refrigerant.
[0106] This air conditioner (1) eliminates the need for an accumulator, and the air conditioner
1 can be manufactured easily and inexpensively.
[0107] In another embodiment of the present disclosure, the control device 30 may be provided
in the outdoor unit 10 or the indoor unit 20.
[0108] In the process according to the embodiment of the present disclosure, the order of
processing may be changed as long as appropriate processing is performed.
[0109] Each of the storage unit 308 and the storage device (including a register and a latch)
in the embodiment of the present disclosure may be provided anywhere within a range
in which appropriate information is transmitted and received. Further, a plurality
of the storage units 308 and the storage devices may be present in places within a
range in which appropriate information is transmitted and received, and may distribute
and store data.
[0110] Although the embodiment of the present disclosure has been described, the above-described
control device 30 and other control devices may have a computer system inside. Then,
the procedures of the processes described above are stored in a computer-readable
recording medium in the form of a program, and the above processes are performed by
the program being read and executed by the computer. A specific example of a computer
is shown below.
[0111] Fig. 8 is a schematic block diagram illustrating a configuration of a computer according
to at least one embodiment.
[0112] As shown in Fig. 8, a computer 5 includes a CPU 6, a main memory 7, a storage 8,
and an interface 9.
[0113] For example, each of the above-described control device 30 and other control devices
is mounted on the computer 5. The operation of each processing unit described above
is stored in the storage 8 in the form of a program. The CPU 6 reads a program from
the storage 8, expands the read program into the main memory 7, and executes the above
process according to the program. Further, CPU 6 secures a storage area corresponding
to each of the above-described storage units in the main memory 7, according to the
program.
[0114] Examples of the storage 8 include a Hard Disk Drive (HDD), a Solid State Drive (SSD),
a magnetic disk, an optical magnetic disk, a Compact Disc Read Only Memory (CD-ROM),
a Digital Versatile Disc Read Only Memory (DVD-ROM), a semiconductor memory, and the
like. The storage 8 may be an internal medium directly connected to the bus of the
computer 5, or may be an external medium connected to the computer 5 through the interface
9 or a communication line. Further, when this program is delivered to the computer
5 through a communication line, the computer 5 receiving the delivered program may
develop the program in the main memory 7 and execute the above process. In at least
one embodiment, the storage 8 is a non-transitory tangible storage medium.
[0115] Further, the above program may implement a part of the above-described functions.
Further, the program may be a so-called difference file (difference program), which
can implement the above-described functions in combination with a program already
recorded in the computer system.
[0116] Although some embodiments of the present disclosure have been described, these embodiments
are examples and do not limit the scope of the disclosure. These embodiments may be
subject to various additions, various omissions, various replacements, and various
changes without departing from the gist of the disclosure.
<Additional Notes>
[0117] The air conditioner (1), the control method, and the program described in each embodiment
of the present disclosure are understood as follows, for example.
[0118]
- (1) An air conditioner (1) according to a first aspect includes a condenser (106,
201) that condenses a refrigerant, an evaporator (201, 106) that evaporates the condensed
refrigerant, a compressor (101) that compresses the evaporated refrigerant, a receiver
(109) capable of recovering the compressed refrigerant, and a switching valve (103,
115, 116) capable of switching a discharge destination of the compressed refrigerant
from the condenser (106, 201) to the receiver (109).
[0119] By the air conditioner (1), when the leakage of the refrigerant is detected, the
refrigerant can be recovered on the inlet side of the condenser (106, 201). As a result,
the air conditioner (1) can reduce the leakage, when the refrigerant leaks in the
air conditioner.
[0120] (2) The air conditioner (1) according to a second aspect is the air conditioner (1)
according to (1) and may further include a gas sensors (113, 203) that detects leakage
of the refrigerant, in which the switching valve (103, 115, 116) may switch the discharge
destination from the condenser (106, 201) to the receiver (109), when the gas sensor
(113, 203) detects the leakage.
[0121] The air conditioner (1) makes it possible to detect the leakage of the refrigerant
and appropriately switch the discharge destination.
[0122] (3) The air conditioner (1) according to a third aspect is the air conditioner (1)
according to (1) or (2), in which the receiver (109) may operate as an accumulator
that separates a liquid refrigerant and a gaseous refrigerant.
[0123] This air conditioner (1) eliminates the need for an accumulator, and the air conditioner
1 can be manufactured easily and inexpensively.
[0124] (4) The air conditioner (1) according to a fourth aspect is the air conditioner (1)
according to any one of (1) to (3) and may further include a first control unit (303)
that controls a flow path in the switching valve (103, 115, 116).
[0125] The air conditioner (1) makes it possible to appropriately control the flow path
in the switching valve (103, 115, 116).
[0126] (5) The air conditioner (1) according to a fifth aspect is the air conditioner (1)
according to any one of (1) to (4) and may further include an expansion valve (107)
provided between the evaporator (201, 106) and the condenser (106, 201) and capable
of controlling a valve opening degree to full open, when the discharge destination
is switched from the condenser (106, 201) to the receiver.
[0127] With this air conditioner (1), the temperature of the refrigerant is reduced and
the density of the refrigerant is increased. As a result, the refrigerant can be safely
recovered to the receiver (109).
[0128] (6) The air conditioner (1) according to a sixth aspect is the air conditioner (1)
according to (5) and may further include a second control unit (303) that controls
the valve opening degree.
[0129] The air conditioner (1) makes it possible to appropriately control the valve opening
degree.
[0130] (7) The air conditioner (1) according to a seventh aspect is the air conditioner
(1) according to any one of (1) to (6), and may further include a determination unit
(304) that determines whether or not recovery of the refrigerant by the receiver (109)
has been completed.
[0131] The air conditioner (1) makes it possible to determine the completion of the recovery
of the refrigerant. As a result, it is not necessary to perform unnecessary control
after the recovery of the refrigerant has been completed.
[0132] (8) The air conditioner (1) according to an eighth aspect is the air conditioner
(1) according to (7), in which the determination unit (304) may determine whether
or not the recovery has been completed, based on a temperature at a discharge unit
of the compressor (101) or a temperature at the receiver (109).
[0133] The air conditioner (1) makes it possible to determine the completion of the recovery
of the refrigerant by using an easy method. As a result, it is not necessary to perform
unnecessary control after the recovery of the refrigerant has been completed.
[0134] (9) A control method according to a ninth aspect performed by an air conditioner
(1) including a condenser (106, 201) that condenses a refrigerant, an evaporator (201,
106) that evaporates the condensed refrigerant, a compressor (101) that compresses
the evaporated refrigerant, a receiver (109) capable of recovering the compressed
refrigerant, and a switching valve (103, 115, 116) capable of switching a discharge
destination of the compressed refrigerant from the condenser (106, 201) to the receiver
(109), the method including: controlling a flow path in the switching valve (103,
115, 116).
[0135] According to this control method, it is possible to recover the refrigerant on the
inlet side of the condenser (106, 201), when the leakage of the refrigerant is detected.
As a result, the control method can reduce the leakage, when the refrigerant leaks
in the air conditioner.
[0136] (10) A program according to a tenth aspect causes a computer (5) in an air conditioner
to control a flow path in a switching valve (103, 115, 116), the air conditioner (1)
including a condenser (106, 201) that condenses a refrigerant, an evaporator (201,
106) that evaporates the condensed refrigerant, a compressor (101) that compresses
the evaporated refrigerant, a receiver (109) capable of recovering the compressed
refrigerant, and the switching valve (103, 115, 116) capable of switching a discharge
destination of the compressed refrigerant from the condenser (106, 201) to the receiver
(109).
[0137] According to this program, it is possible to recover the refrigerant on the inlet
side of the condenser (106, 201), when the leakage of the refrigerant is detected.
As a result, the program can reduce the leakage, when the refrigerant leaks in the
air conditioner.
Industrial Applicability
[0138] According to the air conditioner, the control method, and the program according to
the embodiment of the present disclosure, when the refrigerant leaks in the air conditioner,
the leakage can be reduced.
Reference Signs List
[0139]
- 1
- Air conditioner
- 5
- Computer
- 6
- CPU
- 7
- Main memory
- 8
- Storage
- 9
- Interface
- 10
- Outdoor unit
- 20
- Indoor unit
- 30
- Control device
- 101
- Compressor
- 102
- Accumulator
- 103
- Switching valve
- 104
- Four-way valve
- 105, 202
- Blower fan
- 106, 201
- Heat exchanger
- 107
- Throttle mechanism
- 108
- Check valve
- 109
- Receiver
- 110, 114
- On/off valve
- 111
- Discharge temperature sensor
- 112
- Receiver temperature sensor
- 113, 203
- Gas sensor
- 301
- Sensor information acquisition unit
- 302
- Refrigerant leakage determination unit
- 303
- Valve control unit
- 304
- Recovery completion determination unit
- 305
- Fan control unit
- 306
- Compressor control unit
- 307
- Error notification unit
- 308
- Storage unit