TECHNICAL FIELD
[0001] Embodiments of the present invention relate to a hot water generator.
BACKGROUND
[0002] A known hot-water supply apparatus is a hot water generator that includes: a refrigeration
cycle of heat pump type; an air-conditioning water circuit; and a hot-water heating
circuit.
[0003] The hot water generator includes: a first circulation pump; a heat pump; a heat exchanger
for a hot-water supply tank; a radiator for heating such as floor heating; a switching
valve; and water piping for circulating water through these components. The switching
valve switches the destination of the water discharged from the heat pump to any one
of the radiator and the heat exchanger for a hot-water supply tank. The hot water
generator further includes: a second circulation pump; a utilization side of the heat
exchanger for a hot-water supply tank; a hot-water supply tank; and water piping for
circulating water through these components.
[0004] A controller compares water temperature in the hot-water supply tank with reboil
tank temperature. When the water temperature in the hot-water supply tank falls below
the reboil tank temperature, the controller reboils the water in the hot-water supply
tank to a target tank temperature. In addition, when change in water temperature per
unit time in the hot-water supply tank is smaller than a reference value (for example,
smaller than 10 degrees), the controller determines that the water temperature is
decreasing due to heat loss from the hot-water supply tank, and causes the second
circulation pump to operate at the maximum flow rate in such a manner that the water
in the hot-water supply tank is subjected to forced convection and is uniformly boiled
to the target tank temperature. Further, when the change in water temperature per
unit time in the hot-water supply tank is equal to or larger than the reference value
(for example, equal to or larger than 10 degrees), the controller determines that
the water temperature is decreasing due to the use of the hot water in the hot-water
supply tank, and causes the second circulation pump to operate at the minimum flow
rate so as to maintain the temperature stratification of the water in the hot-water
supply tank.
PRIOR ART DOCUMENT
PATENT DOCUMENT
SUMMARY
PROBLEMS TO BE SOLVED BY INVENTION
[0006] In order to execute an efficient operation or an operation of maintaining user-friendly
comfort conforming to the situation, the conventional hot-water supply apparatus requires
a plurality of circulation pumps including the first circulation pump and the second
circulation pump. The conventional hot-water supply apparatus with such a configuration
hinders cost reduction and reduction in power consumption of the hot-water supply
apparatus.
[0007] An object of the present invention is to provide a hot water generator that can execute
an efficient operation or an operation of maintaining user-friendly comfort by using
a single pump conforming to the situation.
MEANS FOR SOLVING PROBLEM
[0008] A hot water generator according to one aspect of the present invention includes
a refrigeration circuit configured to circulate a refrigerant, and a hydro unit provided
with a water heat exchanger configured to exchange heat between the refrigerant and
first water that is a utilization-side heat medium. The hydro unit includes an air-conditioning
water circuit configured to cause the first water being subjected to heat-exchange
in the water heat exchanger to circulate in an external apparatus, a hot-water heating
circuit configured to heat second water stored in a hot-water supply tank by causing
the first water being subjected to heat-exchange in the water heat exchanger to circulate
in the hot-water supply tank, a switching valve configured to switch a circulation
passage of the first water to either the air-conditioning water circuit or the hot-water
heating circuit, and a controller configured to control the switching valve. The controller
is capable of executing an air-conditioning operation of switching the switching valve
to circulate the first water in the air-conditioning water circuit, a hot-water heating
operation of switching the switching valve to circulate the first water in the hot-water
heating circuit, and a combinatorial operation mode in which the air-conditioning
operation continuing in first duration and the hot-water heating operation continuing
in second duration are alternately repeated, and changes the second duration of the
hot-water heating operation based on a load state of the air-conditioning water circuit
in the combinatorial operation mode.
[0009] Preferably, the controller of the hot water generator according to one aspect of
the present invention extends the second duration when a load on the air-conditioning
water circuit is smaller than minimum capacity of the refrigeration circuit.
[0010] Preferably, the controller of the hot water generator according to one aspect of
the present invention determines that the load on the air-conditioning water circuit
is smaller than the minimum capacity of the refrigeration circuit in a case of occurrence
of thermo-off where a compressor of the refrigeration circuit stops in the air-conditioning
operation.
[0011] Preferably, the controller of the hot water generator according to one aspect of
the present invention changes the second duration in relation to whether the thermo-off
occurs or not.
[0012] Preferably, the controller of the hot water generator according to one aspect of
the present invention extends the second duration by a predetermined extension time
when the thermo-off occurs during a predetermined first determination interval, and
cancels extension of the second duration by the extension time when the thermo-off
does not occur during a predetermined second determination interval.
[0013] Preferably, the controller of the hot water generator according to one aspect of
the present invention extends the second duration when ambient air temperature is
higher than a predetermined temperature.
EFFECTS OF INVENTION
[0014] The present invention provides a hot water generator that can execute an efficient
operation or an operation of maintaining user-friendly comfort by using a single pump
conforming to the situation.
BRIEF DESCRIPTION OF DRAWINGS
[0015]
Fig. 1 is a system configuration diagram of a hot water generator according to one
embodiment of the present invention.
Fig. 2 is a diagram illustrating relationship between load on an air-conditioning
water circuit and capacity of a refrigeration circuit according to the embodiment
of the present invention.
Fig. 3 is a flowchart illustrating algorithm (i.e., calculation method) of thermo-off
execution monitoring control of the hot water generator according to the embodiment
of the present invention.
Fig. 4 is a flowchart illustrating algorithm (i.e., calculation method) of optimization
control of the hot water generator according to the embodiment of the present invention.
Fig. 5 is a timing chart illustrating the optimization control of the hot water generator
according to the embodiment of the present invention.
Fig. 6 illustrates a hydro unit of a second aspect of the hot water generator according
to the embodiment of the present invention.
Fig. 7 illustrates the hydro unit of the second aspect of the hot water generator
according to the embodiment of the present invention.
Fig. 8 illustrates the hydro unit of the second aspect of the hot water generator
according to the embodiment of the present invention.
Fig. 9 illustrates the hydro unit of the second aspect of the hot water generator
according to the embodiment of the present invention.
Fig. 10 illustrates the hydro unit of the second aspect of the hot water generator
according to the embodiment of the present invention.
Fig. 11 illustrates the hydro unit of the second aspect of the hot water generator
according to the embodiment of the present invention.
DETAILED DESCRIPTION
[0016] Embodiments of a hot water generator according to the present invention will be described
by referring to Fig. 1 to Fig. 11. The same reference signs are given to identical
or equivalent components in each figure.
[0017] Fig. 1 is a system configuration diagram of a hot water generator according to one
embodiment of the present invention.
[0018] As shown in Fig. 1, the hot water generator 1 according to the present embodiment
is a heat pump type. The hot water generator 1 includes: an outdoor unit 2 that is
a heat source unit configured to exchange heat between outdoor air and a refrigerant;
a hydro unit 3 (i.e., water heat exchanger) that exchanges heat between the refrigerant
and water (i.e., first water) as a utilization-side heat medium; a remote controller
4 that is an input device configured to receive an operation by a user; and a controller
6 that controls the outdoor unit 2 and the hydro unit 3 on the basis of the operation
inputted to the remote controller 4.
[0019] Main functions of the hot water generator 1 includes:
- (1) a function of circulating the refrigerant between the outdoor unit 2 and the hydro
unit 3 and thereby exchanging heat between the refrigerant and water as the utilization-side
heat-medium in a water heat exchanger 11 in the hydro unit 3;
- (2) a function of circulating hot water between the hydro unit 3 and an external apparatus
101 for air conditioning and thereby air-conditioning the room in which the external
apparatus 101 is installed; and
- (3) a function of circulating hot water between the hydro unit 3 and an in-tank heat
exchanger 58 housed in a hot-water supply tank 13, thereby heating the water to be
supplied from the external source to the hot-water supply tank 13 into hot water,
and supplying it to the outside of the generator 1.
[0020] Hereinafter, the circulating water flowing through the closed circuit including the
water heat exchanger 11 is referred to as the first water. The water to be stored
in the hot-water supply tank 13 and finally supplied to the outside of the generator
1 is referred to as the second water.
[0021] The hot water generator 1 heats the first water, and supplies the obtained hot water
at a first temperature to the external apparatus 101 for air conditioning, such as
a radiator 102 of a floor heating system, i.e., floor heating panel and/or a radiator
102 of an air conditioning system, such as a fan coil unit. The first temperature
is influenced by the type of the refrigerant and the capacity of the outdoor unit
2. In the case of circulating a R410A refrigerant, the first temperature reaches a
maximum of about 60 degrees Celsius (°C). In the case of using a R32 refrigerant that
can be at higher temperature, the first temperature can be raised to about 65 degrees
Celsius (°C). The hot water at the first temperature (i.e., first water) flows through
the external apparatus 101that lowers its temperature, and then is returned to the
hydro unit 3.
[0022] In addition, the hot water generator 1 can also generate hot water (i.e., first water)
at a second temperature (for example, around 70°C) higher than the first temperature
by using heat exchange between the first water and the refrigerant through the water
heat exchanger 11 as well as heating of the first water by the backup heater 12, and
cause the generated hot water to pass through the inside of the hot-water supply tank
13.
[0023] The first water, which is hot water at the first temperature or the second temperature,
is used for heating the second water in the hot-water supply tank 13. The second water
is supplied to a destination (i.e., hot-water utilization place) such as a washroom,
a kitchen, and a bathroom. City water is connected to the hot-water supply tank 13.
The amount of the second water supplied to the utilization place is complemented by
the city water in such a manner that the hot-water supply tank 13 is always kept full.
Since the water pressure of the city water is applied to the second water in the hot-water
supply tank 13, the second water comes out when a faucet at the utilization place
is turned on.
[0024] In general, the outdoor unit 2 is installed outdoors and the hydro unit 3 is installed
indoors. The outdoor unit 2 and the hydro unit 3 are connected to each other by using
crossover pipes 17 and 18 of refrigerant piping 16 and a communication line (not shown).
The hot water generator 1 does not have water pipes laid outdoors, and thus, can prevent
the water in its water piping from freezing when the outdoor temperature is low in
winter.
[0025] The hot water generator 1 includes a refrigeration circuit 21 of heat pump type.
The heat source of the refrigeration circuit 21 is the outdoor air.
[0026] The refrigeration circuit 21 includes: a compressor 22 configured to compress and
discharge the refrigerant; a four-way valve 26; an air heat exchanger 23 as an evaporator;
an expansion valve 25; a water heat exchanger 11 as a condenser; a suction cup 27
provided on the suction side of the compressor 22; and the refrigerant piping 16 that
connects these refrigeration cycle components in sequence to circulate the refrigerant.
The refrigeration circuit 21 transfers heat from the air heat exchanger 23 to the
water heat exchanger 11 by circulating the refrigerant. The refrigeration circuit
21 heats the first water into hot water by using the heat transferred to the water
heat exchanger 11. Part of the refrigerant piping 16 and the water heat exchanger
11 are housed in the hydro unit 3. Excluding the part of the refrigerant piping 16
and the water heat exchanger 11, the remaining components of the refrigeration circuit
21 are housed in the outdoor unit 2.
[0027] When water is heated by the refrigeration circuit 21, the air heat exchanger 23 functions
as an evaporator (also referred to as a heat absorber), and the water heat exchanger
11 functions as a condenser (also referred to as a radiator).
[0028] The compressor 22 is, for example, a rotary compressor. The compressor 22 compresses
the refrigerant, pressurizes the refrigerant, and then discharges the refrigerant.
The compressor 22 can change its operating frequency by known inverter control. The
amount of heat to be transferred to the high temperature area increases by increasing
the rotation speed of the compressor 22, and decreases by decreasing the rotation
speed of the compressor 22. In this manner, the capacity of the outdoor unit 2, i.e.,
the heating capacity of the first water is controlled. The power consumption of the
compressor 22 increases when the rotation speed of the compressor 22 is increased,
and the power consumption of the compressor 22 decreases when the rotation speed of
the compressor 22 is decreased.
[0029] The expansion valve 25 is, for example, an electronic expansion valve (PMV: Pulse
Motor Valve) that can adjust its valve opening with fine resolution by being driven
by a stepping motor.
[0030] The refrigerant piping 16 connects the compressor 22, the suction cup 27, the four-way
valve 26, the air heat exchanger 23, the expansion valve 25, and the water heat exchanger
11. The refrigerant piping 16 includes: a first refrigerant pipe 16a that connects
the discharge side of the compressor 22 and the four-way valve 26; a second refrigerant
pipe 16b that connects the suction side of the compressor 22 and the four-way valve
26; a third refrigerant pipe 16c that connects the four-way valve 26 and the water
heat exchanger 11; a fourth refrigerant pipe 16d that connects the air heat exchanger
23 and the water heat exchanger 11; and a fifth refrigerant pipe 16e that connects
the air heat exchanger 23 and the four-way valve 26.
[0031] The suction cup 27 is provided in the second refrigerant pipe 16b. The expansion
valve 25 is provided in the fourth refrigerant pipe 16d.
[0032] The crossover pipes 17 and 18 of the refrigerant piping 16 cause the refrigerant
to flow back and forth between the outdoor unit 2 and the hydro unit 3. The crossover
pipe 17 is part of the third refrigerant pipe 16c and is laid outside the outdoor
unit 2 and outside the hydro unit 3. The crossover pipe 18 is part of the fourth refrigerant
pipe 16d and is laid outside the outdoor unit 2 and outside the hydro unit 3. Out
of the third refrigerant pipe 16c, the portion provided inside the hydro unit 3 is
referred to as an intra-hydro-unit first refrigerant pipe 31. Out of the fourth refrigerant
pipe 16d, the portion provided inside the hydro unit 3 is referred to as an intra-hydro-unit
second refrigerant pipe 32.
[0033] The four-way valve 26 switches the flow of the refrigerant in the refrigerant piping
16. When the first water is heated in the refrigeration circuit 21, the four-way valve
26 circulates the refrigerant from the first refrigerant pipe 16a to the third refrigerant
pipe 16c and circulates the refrigerant from the fifth refrigerant pipe 16e to the
second refrigerant pipe 16b (i.e., refrigerant flow indicated by the solid line in
Fig. 1).
[0034] The refrigeration circuit 21 discharges the compressed high-temperature and high-pressure
refrigerant from the compressor 22 and sends this refrigerant to the water heat exchanger
11 via the four-way valve 26. The water heat exchanger 11 exchanges heat between the
first water passing through the inside of the water heat exchanger 11 and the refrigerant
passing through the inside of the water heat exchanger 11. Consequently, the first
water is heated up and the refrigerant is cooled down to turn into a high-pressure
liquid state. In other words, the water heat exchanger 11 functions as a radiator
when heating water into hot water. The refrigerant having passed through the water
heat exchanger 11 passes through the expansion valve 25, then is decompressed to become
a low-pressure gas-liquid two-phase refrigerant, and then reaches the air heat exchanger
23. The air heat exchanger 23 exchanges heat between the outdoor air and the refrigerant
passing through the inside of the air heat exchanger 23 so as to cool the outdoor
air. At this time, the air heat exchanger 23 functions as a heat absorber that evaporates
the refrigerant into a gaseous state. The refrigerant having passed through the air
heat exchanger 23 is sucked into the compressor 22.
[0035] In winter, the refrigeration circuit 21 can switch the direction of the refrigerant
flow in the refrigerant piping 16 by the four-way valve 26 so as to execute a defrosting
operation. When executing the defrosting operation, the hot water generator 1 inverts
the four-way valve 26 to generate a refrigerant flow in the refrigeration circuit
21 that is opposite to the direction of the refrigerant flow at the time of heating
the water into hot water. In the case of the defrosting operation, the four-way valve
26 circulates the refrigerant from the first refrigerant pipe 16a to the fifth refrigerant
pipe 16e, and circulates the refrigerant from the third refrigerant pipe 16c to the
second refrigerant pipe 16b (i.e., refrigerant flow indicated by the dashed line in
Fig. 1). In the case of the defrosting operation, the air heat exchanger 23 functions
as a condenser and the water heat exchanger 11 functions as an evaporator. As a result,
the temperature of the air heat exchanger 23 rises and the frost having adhered to
its surface is melted.
[0036] In addition, the refrigeration circuit 21 for warm-temperature areas may be dedicated
to heating of water without including the four-way valve 26. In this case, the discharge
side of the compressor 22 is connected to the water heat exchanger 11 through the
refrigerant piping 16 and the suction side of the compressor 22 is connected to the
air heat exchanger 23 through the refrigerant piping 16.
[0037] In addition to the water heat exchanger 11, the hydro unit 3 further includes: an
air-conditioning water circuit 41 configured to circulate the first water, which has
been subjected to heat-exchange in the water heat exchanger 11, in the external apparatus
101; the hot-water supply tank 13 configured to store hot water; and a water circuit
for hot-water supplying and heating, hereinafter referred to as a hot-water heating
circuit, 42 configured to heat the second water in the hot-water supply tank 13 by
circulating the first water, which has been subjected to heat-exchange in the water
heat exchanger 11, in the hot-water supply tank 13.
[0038] The air-conditioning water circuit 41 and the hot-water heating circuit 42 share
the utilization side of the water heat exchanger 11, the backup heater 12, a pump
43, and a switching valve 45. These components and water piping 46 that connects these
components are referred to as a water-circuit shared-portion 48. In the water-circuit
shared-portion 48, hot water circulates in one direction. The switching valve 45 is
connected to the discharge side of the pump 43. The downstream side of the switching
valve 45 branches into the air-conditioning water circuit 41 and the hot-water heating
circuit 42. The switching valve 45 switches the circulation passage of the water,
which has been subjected to heat-exchange in the water heat exchanger 11, to one of
the air-conditioning water circuit 41 and the hot-water heating circuit 42. The air-conditioning
water circuit 41 and the hot-water heating circuit 42 join together at the upstream
side of the water heat exchanger 11. In other words, the water heat exchanger 11 is
connected to the downstream side of the air-conditioning water circuit 41 and the
downstream side of the hot-water heating circuit 42. The backup heater 12 is connected
to the downstream side of the water heat exchanger 11, and the suction side of the
pump 43 is connected to the downstream side of the backup heater 12. Note that the
pump 43 may be connected the upstream side of the backup heater 12.
[0039] In the water-circuit shared-portion 48, the first water having been subjected to
heat-exchange in the water heat exchanger 11 is supplied to either the air-conditioning
water circuit 41 or the hot-water heating circuit 42 via the switching valve 45 by
the operation of the pump 43. The first water, which has been used at the supply destination
and lowered in temperature, is returned to the water heat exchanger 11 and heated
again by the refrigerant that circulates through the refrigeration circuit 21. The
first water having been subjected to heat-exchange in the water heat exchanger 11
is sucked into the pump 43 directly (i.e., without further heating) or after being
further heated by the backup heater 12. When the backup heater 12 is driven (ON),
the first water is heated to 70 degrees Celsius (°C) or higher. The backup heater
12 operates only in a hot-water heating operation when the first water is insufficiently
heated in the water heat exchanger 11 by the heat pump, i.e., only when the water
temperature of the first water is low.
[0040] In addition to the water-circuit shared-portion 48, the air-conditioning water circuit
41 further includes: a hot-water supply pipe 51 configured to send the first water,
which has been subjected to heat-exchange in the water heat exchanger 11, to the external
apparatus 101; and a hot-water return pipe 52 configured to return the first water,
which has been used in the external apparatus 101 and lowered in temperature, from
the external apparatus 101 to the water heat exchanger 11. The hot-water supply pipe
51 and the hot-water return pipe 52 are connected to the external apparatus 101 through
external water piping 103. The air-conditioning water circuit 41, the water piping
103, and the external apparatus 101 circulate the first water that has been subjected
to heat-exchange in the water heat exchanger 11.
[0041] The hot-water supply tank 13 stores the second water heated by the hot-water heating
circuit 42, and discharges the second water by request from a user. The hot-water
supply tank 13 is provided with a temperature sensor 55 that measures the water temperature
inside the hot-water supply tank 13. The output of the temperature sensor 55 is inputted
to the controller 6.
[0042] In addition to the water-circuit shared-portion 48, the hot-water heating circuit
42 further includes: a hot-water supply pipe 57 configured to send the first water,
which has been subjected to heat-exchange in the water heat exchanger 11, to the hot-water
supply tank 13; an in-tank heat exchanger 58 configured to exchange heat between the
second water in the hot-water supply tank 13 and the water being subjected to heat-exchange
in the water heat exchanger 11; and a hot-water return pipe 59 configured to return
the first water, which has been used in the hot-water supply tank 13 and lowered in
temperature, to the water heat exchanger 11.
[0043] To the hot-water supply tank 13, a water supply pipe 61 and a hot-water supply pipe
62 are connected. The water supply pipe 61 leads water, such as city water before
heating, as the second water to the hot-water supply tank 13 from the external source.
The hot-water supply pipe 62 sends the second water boiled in the hot-water supply
tank 13 to the outside of the generator 1. The hot-water supply pipe 62 supplies hot
water to a sink, a kitchen, and/or a bath. In the hot-water supply tank 13, the second
water having flowed out through the hot-water supply pipe 62 is complemented by the
city water through the water supply pipe 61. Thus, when a large amount of hot water
is supplied through the hot-water supply pipe 62, the proportion of low-temperature
city water increases in the hot-water supply tank 13, and the temperature of the second
water decreases. Although the hot-water supply tank 13 is kept warm by a heat insulating
material or the like, the temperature of the second water in the hot-water supply
tank 13 decreases due to natural heat dissipation after a long period of time. Hence,
the second water in the hot-water supply tank 13 is appropriately heated by the hot-water
heating circuit 42.
[0044] The hot water generator 1 executes a plurality of operation modes including: an air-conditioning
operation in which water being subjected to heat-exchange in the water heat exchanger
11 is circulated in the air-conditioning water circuit 41; a hot-water supplying and
heating operation, hereinafter referred to as a hot-water heating operation, in which
the water being subjected to heat-exchange in the water heat exchanger 11 is circulated
in the hot-water heating circuit 42; and a combinational operation (hereinafter also
referred to as the combinational operation mode) in which the air-conditioning operation
and the hot-water heating operation are switched as appropriate. Switching of these
operation modes is executed by selectively connecting the switching valve 45 on the
downstream side to either the hot-water supply pipe 51 of the air-conditioning water
circuit 41 or the hot-water supply pipe 57 of the hot-water heating circuit 42.
[0045] In the combinational operation mode, the air-conditioning operation continuing in
first duration and the hot-water heating operation continuing in second duration are
alternately repeated. The first duration of the air-conditioning operation is, for
example, 20 minutes, and the initial value of the second duration of the hot-water
heating operation is, for example, 30 minutes. Switching between the air-conditioning
operation mode and the hot-water heating operation mode maintains the setting temperature
required by the external apparatus 101, and at the same time, heats (boils) the water
in the hot-water supply tank 13 up to the setting temperature and/or maintains the
water in the hot-water supply tank 13 at the required setting temperature.
[0046] It is preferred that the remote controller 4 is composed of another remote controller
installed on the wall surface of the room in addition to the remote controller installed
in the hydro unit 3.
[0047] The remote controller 4 allows the user to command the air-conditioning operation
or the hot-water heating operation. When both the air-conditioning operation and the
hot-water heating operation are simultaneously commanded (simultaneous ON), the combinatorial
operation mode is executed. In addition, the setting temperature of the room in which
the external apparatus 101 is installed, and the setting temperature of the second
water to be stored in the hot-water supply tank 13 can be inputted via the remote
controller 4.
[0048] In the air-conditioning operation, the first water is supplied to the external apparatus
101 in such a manner that the temperature of the room in which the external apparatus
101 is installed reaches the setting temperature. Although illustration is omitted,
the room in which the external apparatus 101 is installed is provided with a room
temperature sensor for detecting the room temperature. In the hot-water heating operation,
the first water is supplied to the in-tank heat exchanger 58 in such a manner that
the temperature of the second water in the hot-water supply tank 13 maintains the
setting temperature. In the combinational operation mode, the air-conditioning operation
and the hot-water heating operation are executed simultaneously or in a time-sharing
manner.
[0049] When both the air-conditioning operation and the hot-water heating operation (i.e.,
simultaneous ON) are set via the remote controller 4 and the temperature of the second
water in the hot-water supply tank 13 falls below the setting temperature, the combinational
operation mode is executed. When the temperature of the second water in the hot-water
supply tank 13 is above the setting temperature, regardless of whether the simultaneous
ON of the air-conditioning operation and the hot-water heating operation is set, execution
of the hot-water heating operation is unnecessary and only the air-conditioning operation
is executed. In the case where the air-conditioning operation is set to OFF, the hot-water
heating operation is executed when the temperature of the second water in the hot-water
supply tank 13 falls below the setting temperature. The operation of the compressor
remains stopped as long as the temperature of the second water in the hot-water supply
tank 13 is above the setting temperature.
[0050] The controller 6 includes a microprocessor (not shown) and a storage device (not
shown) that stores various control programs to be executed by the microprocessor,
parameters, and the like. The controller 6 executes the various control programs.
[0051] In addition, on the basis of a control signal received from the remote controller
4 and/or a sensor through a wired or wireless communication line, the controller 6
executes: operation control of each of the refrigeration circuit 21, the air-conditioning
water circuit 41, and the hot-water heating circuit 42; and operation control of the
hot water generator 1 including switching of the operation circuits between the air-conditioning
water circuit 41 and the hot-water heating circuit 42.
[0052] Further, the controller 6 executes: control of the air-conditioning operation in
which the air-conditioning operation is executed by switching the switching valve
45 to cause the water being subjected to heat-exchange in the water heat exchanger
11 to circulate in the air-conditioning water circuit 41; control of the hot-water
heating operation in which the switching valve 45 is switched to cause the water being
subjected to heat-exchange in the water heat exchanger 11 to circulate in the hot-water
heating circuit 42 and thereby heat the water in the hot-water supply tank 13; and
control of the combinatorial operation mode in which the air-conditioning operation
continuing in the first duration and the hot-water heating operation continuing in
the second duration are alternately repeated.
[0053] Hereinbelow, a description will be given of the relationship between the load on
the air-conditioning water circuit 41 (hereinafter also referred to as "the air-conditioning
load") and the capacity of the refrigeration circuit 21.
[0054] Fig. 2 is a diagram illustrating the relationship between the load on the air-conditioning
water circuit 41 and the capacity of the refrigeration circuit 21 according to the
embodiment of the present invention. The load on the air-conditioning water circuit
41 means the air-conditioning load for heating the room (i.e., raising the temperature
of the room) by the external apparatus 101. In the case of the present embodiment,
the load on the air-conditioning water circuit 41 is the air-conditioning load of
the room in which the radiator 102 of the floor heating system and the radiator 102
of the air conditioning system are installed.
[0055] In Fig. 2, the broken line A indicates the relationship between the load on the air-conditioning
water circuit 41 and the ambient air temperature, and the solid line B indicates the
relationship between the capacity of the refrigeration circuit 21 and the ambient
air temperature.
[0056] As shown by the broken line A in Fig. 2, the load on the air-conditioning water circuit
41 correlates with the ambient air temperature. The higher the ambient air temperature
becomes, the smaller the heating capacity required for the room becomes, so the load
on the air-conditioning water circuit 41 is reduced.
[0057] As shown by the solid line B in Fig. 2, the capacity of the refrigeration circuit
21 is balanced with the air-conditioning load when the ambient air temperature is
in the range between a first ambient air temperature t1 and a second ambient air temperature
t2 (line segment B2). Note that the first ambient air temperature t1 is lower than
the second ambient air temperature t2. Within this range, the hot water generator
1 varies the capacity of the refrigeration circuit 21 by performing inverter control
on the operating frequency of the compressor 22 so as to balance the air-conditioning
load and the capacity of the refrigeration circuit 21. The operating frequency of
the compressor 22 reaches its maximum value when the ambient air temperature is the
first ambient air temperature t1, and this point is defined as the maximum capacity
balance point Cmax. The operating frequency of compressor 22 reaches its minimum value
when the ambient air temperature is the second ambient air temperature t2, and this
point is defined as the minimum capacity balance point Cmin.
[0058] When the ambient air temperature is equal to or lower than the first ambient air
temperature t1, i.e., on the lower temperature side (segment B1) than the maximum
capacity balance point Cmax in Fig. 2, the capacity of the refrigeration circuit 21
is insufficient for the air-conditioning load and thus cannot reach the setting temperature
required by the external apparatus 101. Thus, the compressor 22 runs continuously
without stopping. However, normally, the capacity of the refrigeration circuit 21
is set to be larger than the air-conditioning load at the lowest ambient air temperature
in the usage range. Hence, it is not operated on the side of the line segment Bl.
[0059] When the ambient air temperature is equal to or higher than the second ambient air
temperature t2, i.e., on the higher temperature side (line segment B3) than the minimum
capacity balance point Cmin in Fig. 2, the capacity of the refrigeration circuit 21
exceeds the air-conditioning load and thus may exceed the setting temperature required
by the external apparatus 101. For this reason, when the temperature in the room where
the external apparatus 101 is installed exceeds the setting temperature as a result
of the air-conditioning operation, the compressor 22 is temporarily stopped such that
the excess of the setting temperature required by the external apparatus 101 is prevented.
Such a temporary suspension of the compressor 22 is referred to as thermo-off.
[0060] When the ambient air temperature is in the range from the first ambient air temperature
t1 to the second ambient air temperature t2 and the combinatorial operation mode is
executed, the controller 6 alternately repeats the air-conditioning operation and
the hot-water heating operation while maintaining the respective setting values of
the first duration and the second duration without changing, and thereby sends the
required amount of heat to the external apparatus 101 so as to boil the water in the
hot-water supply tank 13.
[0061] When the ambient air temperature is equal to or higher than the second ambient air
temperature t2, the capacity of the refrigeration circuit 21 becomes redundant. Thus,
when the ambient air temperature is equal to or higher than the second ambient air
temperature t2 and the combinatorial operation mode is executed, the thermo-off occurs
in the first duration of the air-conditioning operation, and the compressor 22 operates
intermittently. In other words, under the condition where the ambient air temperature
is equal to or higher than the second ambient air temperature t2, when the air-conditioning
operation and the hot-water heating operation are alternately repeated without changing
the first duration and the second duration, the time required for the hot water in
the hot-water supply tank 13 to reach the setting temperature is unnecessarily delayed.
[0062] For this reason, the controller 6 of the hot water generator 1 according to the present
embodiment changes the second duration of the hot-water heating operation on the basis
of the state of the air-conditioning load in the combinational operation mode. This
control is referred to as (hot-water supply capacity) optimization control.
[0063] In order to execute the optimization control, the controller 6 monitors whether the
thermo-off occurs in the air-conditioning operation or not. This control is referred
to as thermo-off execution monitoring control.
[0064] As shown in Fig. 3, in the thermo-off execution monitoring control of the hot water
generator 1 according to the present embodiment, occurrence/non-occurrence of the
thermo-off is monitored at a predetermined first determination interval (for example,
every 20 minutes) during the air-conditioning operation. When the thermo-off occurs
during the first determination interval, 1 is added (as so-called increment) to a
value of count F for counting the number of thermo-off occurrence. Also in the thermo-off
execution monitoring control, when the thermo-off does not occur during a predetermined
second determination interval (for example, 30 minutes), 1 is subtracted (as so-called
decrement) from the value of the count F. The thermo-off execution monitoring control
is executed in the air-conditioning operation and in the combinational operation mode.
[0065] Specifically, the controller 6 monitors whether the remote controller 4 receives
a command to start the air-conditioning operation or not (No in the step S1). Each
step is executed by the controller 6. If the remote controller 4 receives the command
to start the air-conditioning operation mode (Yes in the step S1), in the step S2,
the controller 6 starts both: clocking of the first determination interval by the
first timer; and clocking of the second determination interval by the second timer.
[0066] In the next step S3, the controller 6 monitors occurrence/non-occurrence of the thermo-off
due to increase in room temperature up to or above the setting temperature attributable
to the air-conditioning operation by the external apparatus 101. If the first determination
interval elapsed based on the first timer (Yes in the step S4), in the next step S5,
the controller 6 initializes the first timer to zero and restarts the clocking by
the first time.
[0067] In the next step S6, the controller 6 checks whether the thermo-off has occurred
during the previous (i.e., immediately preceding) clocking by the first timer or not.
[0068] If the thermo-off has occurred during the previous clocking by the first timer (Yes
in the step S6), in the step S7, the controller 6 adds 1 to the value of the count
F. It is preferred that an upper limit value is set for this count F. For example,
the upper limit value of the count F is set to 8 in the steps S8 and S9. If a command
to stop the air-conditioning operation mode is not received in the thermo-off execution
monitoring control (Yes in the step S10), it returns to the step S3 and the processing
is repeated.
[0069] If the thermo-off has not occurred during the previous clocking by the first timer,
the controller 6 maintains the value of the count F (No in the step S6). If the controller
6 has not received the command to stop the air-conditioning operation (Yes in the
step S10), it returns to the step S3 and the processing is repeated.
[0070] If the second timer reaches the second determination interval (No in the step S4,
Yes in the step S11), in the step S12, the controller 6 initializes the second timer
to zero and restarts the clocking by the second timer.
[0071] In the next step S13, the controller 6 checks whether the thermo-off has occurred
during the previous clocking by the second timer or not.
[0072] If the thermo-off has occurred during the previous clocking by the first timer, the
value of the count F is maintained (Yes in the step S13). If the command to stop the
air-conditioning operation has not been received (Yes in the step S10), it returns
to the step S3 and the processing is repeated.
[0073] If the thermo-off has not occurred during the previous clocking by the second timer
(No in the step S13), in the next step S14, 1 is subtracted from the value of the
count F. It is preferred that a lower limit value is set for the count F. For example,
the lower limit value of the count F is set to 0 in the steps S15 and S16. If the
command to stop the air-conditioning operation is not received in the thermo-off execution
monitoring control (Yes in the step S10), it returns to the step S3 and the processing
is repeated.
[0074] As shown in Fig. 4, the controller 6 of the hot water generator 1 according to the
present embodiment extends the second duration when the air-conditioning load is smaller
than the minimum capacity of the refrigeration circuit 21. In the case of occurrence
of the thermo-off in which the compressor 22 of the refrigeration circuit 21 stops
during the air-conditioning operation, the controller 6 determines the air-conditioning
load to be smaller than the minimum capacity of the refrigeration circuit 21.
[0075] The controller 6 changes the second duration in correlation with occurrence/non-occurrence
of the thermo-off. In other words, if the thermo-off occurs during the predetermined
first determination interval, the controller 6 extends the second duration by a predetermined
extension time. If the thermo-off does not occur during the predetermined second determination
interval, the controller 6 cancels the extension of the second duration by the extension
time.
[0076] Specifically, the controller 6 monitors whether the remote controller 4 has received
a command to start the hot-water heating operation or not (No in the step S31). If
the remote controller 4 has received the command to start the hot-water heating operation
(Yes in the step S31), the controller 6 monitors whether the measured value of the
temperature sensor 55 of the hot-water supply tank 13 is equal to or lower than the
setting temperature or not (No in the step S32).
[0077] If the measured value of the temperature sensor 55 of the hot-water supply tank 13
is equal to or lower than the setting temperature (Yes in the step S32), in the next
step S33, the controller 6 starts the hot-water heating operation. At this time, clocking
of the execution time of the hot-water heating operation is started.
[0078] In the next step S34, the controller 6 determines whether the air-conditioning operation
is being executed simultaneously with the hot-water heating operation or not.
[0079] If the air-conditioning operation is not being executed (No in the step S34), in
the next step S35, the controller 6 monitors whether the measured value of the temperature
sensor 55 has reached the setting temperature or not. If the measured value of the
temperature sensor 55 reaches the setting temperature (Yes in the step S35), in the
next step S36, the hot-water heating operation is completed, and the processing returns
to the step S32.
[0080] If the air-conditioning operation is being executed (No in the step S34), in the
next step S37, the controller 6 determines whether the count F as incremented/decremented
in the thermo-off execution monitoring control is larger than 0 or not.
[0081] If the count F is 0 (No in the step S37), in the next step S38, the controller 6
sets the second duration to an initial value, for example, 30 minutes.
[0082] If the count F is larger than 0 (Yes in the step S37), the controller 6 extends the
second duration for continuing the hot-water heating operation. In the step S39, the
product of a predetermined extension time (for example, 5 minutes) and the value of
the count F is added to the second duration. If the count F is 0, the extension of
the second duration is canceled and the second duration returns to its initial value.
[0083] Next, in the step S40, the controller 6 monitors whether the measured value of the
temperature sensor 55 has reached the setting temperature in the second duration set
in the step S38 or extended in the step S39 (No in the step S41) .
[0084] If the second duration set in the step S38 or the second duration extended in the
step S39 elapses (Yes in the step S41) or if the measured value of the temperature
sensor 55 reaches the setting temperature (Yes in the step S40), the controller 6
completes the hot-water heating operation in the step S36, and the processing returns
to the step S32.
[0085] In Fig. 5, in the combinatorial operation mode, the first duration for continuing
the air-conditioning operation is 20 minutes, the initial value of the second duration
for continuing the hot-water heating operation is 30 minutes, and the extension time
is 5 minutes (C in Fig. 5).
[0086] In the interval A shown in Fig. 5, the air-conditioning load is small, the count
F (x in Fig. 5) is 0, and the controller 6 alternately repeats the air-conditioning
operation for 20 minutes (α in Fig. 5) and the hot-water heating operation for 30
minutes (β in Fig. 5).
[0087] In the interval B shown in Fig. 5, it is assumed that one or more thermo-off does
not occur during the air-conditioning operation. Under this assumption, the count
F is incremented by 1 every first determination interval, for example, every 20 minutes.
The controller 6 extends the second duration each time the air-conditioning operation
for 20 minutes is switched to the hot-water heating operation, and alternately repeats
the air-conditioning operation and the hot-water heating operation.
[0088] In the interval C shown in Fig. 5, it is assumed that the thermo-off does not occur
during the air-conditioning operation. Under this assumption, the count F is decremented
by 1 every second determination interval, for example, every 30 minutes. The controller
6 shortens the second duration each time the air-conditioning operation for 20 minutes
is switched to the hot-water heating operation, and alternately repeats the air-conditioning
operation and the hot-water heating operation.
[0089] Since the thermo-off execution monitoring control and the optimization control are
executed asynchronously, the second duration does not necessarily change by one unit
of the extension time (5 minutes) and may change by a plurality of units, for example,
2 units of the extension time (i.e., total of 10 minutes).
[0090] Regardless of the count F, when the ambient air temperature is higher than a predetermined
temperature at which the air-conditioning load is presumed to be smaller than the
minimum capacity of the refrigeration circuit 21, the controller 6 may extend the
second duration. In this case, it is preferred that the hot water generator 1 includes
a temperature sensor configured to measure the ambient air temperature. The optimization
control based on the ambient air temperature is suitable in the case of the hot water
generator 1 provided with the compressor 22 that cannot change its operating frequency,
for example.
[0091] As described above, the hot water generator 1 according to the present embodiment
changes the second duration on the basis of the state of the air-conditioning load
in the control of the combinational operation mode. Thus, the hot water generator
1 can allocate the surplus capacity of the refrigeration circuit 21 in the air-conditioning
operation to the hot-water heating operation. For example, when the air-conditioning
load is small, the hot water generator 1 can devote more time to the hot-water heating
operation. Such operation control of the hot water generator 1 allows the hot water
generator 1 to execute an efficient operation or an operation maintaining user-friendly
comfort conforming to the situation, as compared with the operation control of the
conventional hot-water supply apparatus provided with a plurality of pumps.
[0092] In addition, the hot water generator 1 according to the present embodiment extends
the second duration when the air-conditioning load is smaller than the minimum capacity
of the refrigeration circuit 21 in the combinational operation mode. Thus, the hot
water generator 1 can reliably allocate the surplus capacity of the refrigeration
circuit 21 in the air-conditioning operation to the hot-water heating operation. Consequently,
the hot water generator 1 can bring the temperature of the second water in the hot-water
supply tank 13 up to the setting temperature quickly.
[0093] Further, when the thermo-off occurs during the air-conditioning operation, the hot
water generator 1 according to the present embodiment determines the air-conditioning
load to be smaller than the minimum capacity of the refrigeration circuit 21. Hence,
the hot water generator 1 can accurately determine whether the refrigeration circuit
21 has the surplus capacity in the air-conditioning operation or not.
[0094] Moreover, the hot water generator 1 according to the present embodiment changes the
second duration in correlation with occurrence/non-occurrence of the thermo-off. Thus,
the hot water generator 1 can reliably allocate the surplus capacity of the refrigeration
circuit 21 in the air-conditioning operation to the hot-water heating operation.
[0095] Furthermore, the hot water generator 1 according to the present embodiment extends
the second duration by the predetermined extension time when the thermo-off occurs
during the predetermined first determination interval, and cancels the extension of
the second duration by the predetermined extension time when the thermo-off does not
occur during the predetermined second determination interval. Hence, the hot water
generator 1 can timely reflect the surplus capacity of the refrigeration circuit 21
in the air-conditioning operation.
[0096] In addition, the hot water generator 1 according to the present embodiment may extend
the second duration when the ambient air temperature is higher than a predetermined
temperature. Such a hot water generator 1 executes an efficient operation or an operation
maintaining user-friendly comfort conforming to the situation even in the case of
being provided with a compressor 22 that cannot change its operating frequency.
[0097] Next, other aspects of the hot water generator 1 according to the present embodiment
will be described. In a hot water generator 1A and a hot water generator 1B described
in the respective aspects, the same components as those of the hot water generator
1 are denoted by the same reference signs, and duplicate description is omitted.
[0098] As shown in Fig. 6 to Fig. 8, the hot water generator 1A of the second aspect according
to the present embodiment includes a hydro unit 3A.
[0099] The hydro unit 3A includes a second switching valve 65A that bypasses the air-conditioning
water circuit 41 and the hot-water heating circuit 42.
[0100] The second switching valve 65A selectively connects the hot-water return pipe 52
of the air-conditioning water circuit 41 to either the water heat exchanger 11 or
the hot-water supply pipe 57 of the hot-water heating circuit 42. The side of the
water heat exchanger 11 in the second switching valve 65A merges with the hot-water
return pipe 59 of the hot-water heating circuit 42.
[0101] As to the switching valve 45 and the second switching valve 65A, the routes allowing
water flow are indicated in white, and the routes blocking water flow are indicated
in black.
[0102] As shown in Fig. 6, when: the discharge side of the pump 43 is switched to the air-conditioning
water circuit 41 by the switching valve 45; and the second switching valve 65A is
connected on the downstream side to the hot-water supply pipe 57 of the hot-water
heating circuit 42, the first water used in the air-conditioning water circuit 41
is reused for heating the second water in the hot-water supply tank 13 or keeping
this second water warm. In other words, the hot water generator 1A can simultaneously
execute both the air-conditioning operation and the hot-water heating operation while
prioritizing the air-conditioning operation. The hot water generator 1A can prevent
temperature drop of the external apparatus 101, which may occur in the hot-water heating
operation.
[0103] In addition, as shown in Fig. 7, when: the discharge side of the pump 43 is switched
to the air-conditioning water circuit 41 by the switching valve 45; and the second
switching valve 65A is connected on the downstream side to the water heat exchanger
11, the air-conditioning water circuit 41 can circulate the first water independently.
In other words, the hot water generator 1A can execute the air-conditioning operation
mode alone.
[0104] Further, as shown in Fig. 8, when: the discharge side of the pump 43 is switched
to the hot-water heating circuit 42 by the switching valve 45; and the second switching
valve 65A is connected on the downstream side to the water heat exchanger 11, the
hot-water heating circuit 42 can circulate the first water independently. In other
words, the hot water generator 1A can execute the hot-water heating operation mode
alone. Although the second switching valve 65A connects the hot-water return pipe
52 and the water heat exchanger 11, the side of the air-conditioning water circuit
41 of the switching valve 45 is closed, and thus, circulation of the first water in
the air-conditioning water circuit 41 is prevented.
[0105] As shown in Fig. 9 to Fig. 11, the hot water generator 1B of the third aspect according
to the present embodiment includes a hydro unit 3B.
[0106] The hydro unit 3B includes a second switching valve 65B that bypasses the air-conditioning
water circuit 41 and the hot-water heating circuit 42.
[0107] The second switching valve 65B selectively connects the hot-water return pipe 59
of the hot-water heating circuit 42 to either the water heat exchanger 11 or the hot-water
supply pipe 51 of the air-conditioning water circuit 41. The side of the water heat
exchanger 11 of the second switching valve 65B merges with the hot-water return pipe
52 of the air-conditioning water circuit 41.
[0108] As to the switching valve 45 and the second switching valve 65B, the routes allowing
water flow are indicated in white, and the routes blocking water flow are indicated
in black.
[0109] As shown in Fig. 9, when: the discharge side of the pump 43 is switched to the hot-water
heating circuit 42 by the switching valve 45; and the second switching valve 65B is
connected on the downstream side to the hot-water supply pipe 51 of the air-conditioning
water circuit 41, the water used in the hot-water heating circuit 42 is reused in
the external apparatus 101. In other words, the hot water generator 1B can simultaneously
execute the air-conditioning operation and the hot-water heating operation while prioritizing
the hot-water heating operation. The hot water generator 1B can circulate water from
the hot-water heating circuit 42 with a higher setting temperature in general to the
air-conditioning water circuit 41 with a lower setting temperature, and can simultaneously
execute the air-conditioning operation and the hot-water heating operation even when
the setting temperature of the external apparatus 101 is lower than boiling setting
temperature.
[0110] In addition, as shown in Fig. 10, when: the discharge side of the pump 43 is switched
to the hot-water heating circuit 42 by the switching valve 45; and the second switching
valve 65B is connected on the downstream side to the water heat exchanger 11, the
hot-water heating circuit 42 can circulate the water independently. In other words,
the hot water generator 1B can execute the hot-water heating operation alone.
[0111] Further, as shown in Fig. 11, when: the discharge side of the pump 43 is switched
to the air-conditioning water circuit 41 by the switching valve 45; and the second
switching valve 65B is connected on the downstream side to the hot-water supply pipe
51 of the air-conditioning water circuit 41, the air-conditioning water circuit 41
can circulate the water independently. In other words, the hot water generator 1B
can execute the air-conditioning operation alone. Although the second switching valve
65B connects the hot-water return pipe 59 and the hot-water supply pipe 51, the side
of the hot-water heating circuit 42 of the switching valve 45 is closed, and thus,
water circulation in the hot-water heating circuit 42 is prevented.
[0112] As described above, according to the hot water generator 1 of the present embodiment,
an efficient operation or an operation of maintaining user-friendly comfort can be
executed conforming to the situation without using a plurality of pumps.
[0113] While certain embodiments have been described, these embodiments have been presented
by way of example only, and are not intended to limit the scope of the inventions.
Indeed, the novel embodiments described herein may be embodied in a variety of other
forms; furthermore, various omissions, substitutions and changes in the form of the
embodiments described herein may be made without departing from the spirit of the
inventions. The accompanying claims and their equivalents are intended to cover such
forms or modifications as would fall within the scope and spirit of the inventions.
REFERENCE SIGNS LIST
[0114]
- 1, 1A, 1B
- hot water generator
- 2
- outdoor unit
- 3, 3A, 3B
- hydro unit
- 4
- remote controller
- 6
- controller
- 11
- water heat exchanger
- 12
- backup heater
- 13
- hot-water supply tank
- 21
- refrigeration circuit
- 22
- compressor
- 23
- air heat exchanger
- 41
- air-conditioning water circuit
- 42
- hot-water heating circuit
- 43
- pump
- 45
- switching valve
- 48
- water-circuit shared-portion
- 58
- in-tank heat exchanger
- 65A, 65B
- second switching valve
- 101
- external apparatus