TECHNICAL FIELD
[0001] The present disclosure relates to the technical field of underwater pipe pile foundations,
and particularly relates to a construction method for an underwater pipe pile foundation
and the underwater pipe pile foundation.
BACKGROUND
[0002] With the development of offshore wind power towards deep and open sea, in order to
more effectively utilize offshore wind power resources to increase the power generation
efficiency, high-megawatt wind generator sets are to be developed and applied gradually,
which will obviously increase the overall load on the upper parts of wind generators
and causes the problem that the wind generators may collapse laterally after being
mounted due to the increment of bearing capacity required on the bottoms of the wind
generators, thereby affecting the smooth operation of the wind generators. The requirement
on the bearing capacity can be met by means of increasing the size of an offshore
wind power pile foundation, which can undoubtedly increase the production and transportation
costs of the pile foundation greatly.
[0003] In order to reduce the device cost, a post-grouting construction method is frequently
adopted as a construction method for a pile foundation in the prior art. During construction,
firstly, a pipe pile foundation is driven into a soil body under a water body by a
pile vibrosinking device, then, cement slurry is injected into the bottom of the pipe
pile foundation from the inner side of a pipe pile by pressurization, and cement slurry
is squeezed into the soil body, so that the strength of the soil body below the pipe
pile foundation is enhanced, and the pipe pile foundation is prevented from sinking.
However, during post-grouting construction, the soil body under the water body is
higher in density, the diffusion volume of the cement slurry in the soil body is smaller,
and the soil body may play a role in filtering the cement slurry in the process of
injecting the cement slurry by pressurization, so that solid and liquid in the concrete
may be separated to greatly reduce the strength of the cement slurry, which weakens
the bearing capacity enhancement for the pipe pile foundation, and may still cause
the problem that the pipe pile is inclined laterally during actual use.
SUMMARY
[0004] Therefore, the technical problem to be solved by the present disclosure is to overcome
the defect in the prior art that the bearing capacity enhancement of a pipe pile foundation
constructed by using a post-grouting construction method for an underwater pipe pile
foundation is weakened, thereby providing a construction method for an underwater
pipe pile foundation and the underwater pipe pile foundation.
[0005] In order to solve the above-mentioned technical problem, the present disclosure provides
a construction method for an underwater pipe pile foundation, including the following
steps:
[0006] disposing construction interlayers on a side wall of a pipe pile body in an axial
direction, disposing a plurality of construction holes in the sides, away from an
inner cavity of the pipe pile body, of the construction interlayers in the axial direction,
and covering the construction holes with plugging plates;
hoisting and sinking the pipe pile body on a position to be constructed, and sinking
the pipe pile body to a predetermined elevation;
respectively disposing explosive impact apparatuses at the plurality of construction
holes along the construction interlayers, and detonating the explosive impact apparatuses
to bomb out the plugging plates and form soil body cavities in soil bodies on positions
corresponding to the construction holes; and
injecting cement slurry into the soil body cavities along the construction interlayers
via the construction holes to complete the construction.
[0007] Optionally, before the step of injecting cement slurry into the soil body cavities,
the construction method further includes: injecting the cement slurry into soil bodies
on the bottom of the pipe pile body via the construction interlayers to complete pile
tip grouting.
[0008] Optionally, the step of pile tip grouting includes: laying down a grouting pipe to
the bottom of the pipe pile body along the construction interlayers, isolating the
construction interlayer at a slurry outlet of the grouting pipe, and injecting the
cement slurry at a predetermined pressure via the grouting pipe.
[0009] Optionally, the step of injecting cement slurry into the soil body cavities includes:
forming the slurry outlet in the side wall of the grouting pipe, laying down the grouting
pipe to the slurry outlet and a certain construction hole along the construction interlayers,
isolating two sides of the slurry outlet in the axial direction of the grouting pipe
in the construction interlayers, enabling the slurry outlet, the construction holes
and the soil body cavities to form an isolated sealed space, and injecting the cement
slurry into the soil body cavities via the grouting pipe.
[0010] Optionally, the slurry outlet is disposed in the side wall of the grouting pipe,
and isolation air sacs are mounted on two sides of the slurry outlet in the axial
direction of the grouting pipe; and the step of isolating two sides of the slurry
outlet in the axial direction of the grouting pipe includes: by inflating the pair
of isolation air sacs disposed on the two sides of the slurry outlet in the grouting
pipe, expanding the isolation air sacs until horizontal spaces on positions where
the isolation air sacs in the construction interlayers are located are fully filled.
[0011] Optionally, each of the explosive impact apparatuses includes a pair of isolation
plates and an explosive box disposed between the pair of isolation plates; and when
the explosive impact apparatuses are disposed at the plurality of construction holes,
the explosive boxes are aligned to the construction holes, and the pair of isolation
plates is respectively disposed on the upper and lower sides of the construction hole.
[0012] Optionally, the step of disposing construction interlayers includes: disposing the
plurality of construction interlayers at intervals in the circumferential direction
of the pipe pile body.
[0013] The present disclosure further provides an underwater pipe pile foundation constructed
by applying the construction method for the underwater pipe pile foundation in the
present disclosure.
[0014] Optionally, the bottom of the underwater pipe pile foundation extends into a soil
body, and the underwater pipe pile foundation includes: a pipe pile body; and
soil body cavities formed in soil bodies surrounding the pipe pile body, the soil
body cavities being filled with cement structural bodies, and the cement structural
bodies being connected to the pipe pile body.
[0015] Optionally, the underwater pipe pile foundation further includes a plurality of pile
side slurry veins dispersively extending from the soil body cavities to a direction
away from the pipe pile body, the pile side slurry veins being connected with the
cement structural bodies into a whole.
[0016] The technical solutions of the present disclosure have the following advantages.
- 1. The construction method for the underwater pipe pile foundation provided by the
present disclosure includes the following steps: disposing the construction interlayers
on the side wall of the pipe pile body in the axial direction, disposing the plurality
of construction holes in the sides, away from the inner cavity of the pipe pile body,
of the construction interlayers in the axial direction, and covering the construction
holes with the plugging plates; hoisting and sinking the pipe pile body on the position
to be constructed, and sinking the pipe pile body to the predetermined elevation;
respectively disposing the explosive impact apparatuses at the plurality of construction
holes along the construction interlayers, and detonating the explosive impact apparatuses
to bomb out the plugging plates and form the soil body cavities in the soil bodies
on the positions corresponding to the construction holes; and injecting the cement
slurry into the soil body cavities along the construction interlayers via the construction
holes to complete the construction.
Firstly, explosive compact is performed on the soil bodies surrounding the pipe pile
body; the plugging plates on the construction interlayers are vibrated to be smashed
by impact waves generated by explosion; the soil bodies on the outer side form the
soil body cavities due to the impact waves, and the soil bodies at the peripheries
of the cavities are squeezed to be more compact; then, the soil body cavities formed
on a pile side at intervals are grouted in a high-pressure grouting manner; and thus,
the horizontal resistance and the vertical bearing capacity of pile side soil bodies
can be effectively enhanced, the ability of the pipe pile body resisting horizontal
displacement under the action of a lateral load and a bending moment is improved,
and the risk that the pile foundation is inclined towards one side under the impact
action of water flow, sea waves and the like can be reduced greatly.
- 2. In the construction method for the underwater pipe pile foundation provided by
the present disclosure, before the step of injecting cement slurry into the soil body
cavities, the construction method further includes: injecting the cement slurry into
the soil bodies on the bottom of the pipe pile body via the construction interlayers
to complete pile tip grouting. By injecting the cement slurry in the soil bodies on
the bottom of the pipe pile body in advance, pile tip grouting stone bodies are formed
on a pile tip of the pipe pile body, so that the soil plugging effect of a pipe pile
is improved, and the bearing capacity of the pipe pile is comprehensively improved.
Meanwhile, the pipe pile is prevented from settling during construction to prevent
the construction holes from being mismatched with the soil body cavities, so that
the construction precision is improved, and the horizontal resistance and vertical
bearing capacity of the pile side soil bodies are effectively enhanced.
- 3. In the construction method for the underwater pipe pile foundation provided by
the present disclosure, by inflating the pair of isolation air sacs disposed on the
two sides of the slurry outlet in the grouting pipe, the isolation air sacs expand
until the horizontal spaces on the positions where the isolation air sacs in the construction
interlayers are located are fully filled. The horizontal spaces on heights where the
isolation air sacs are located are fully filled by the isolation air sacs, so that
the slurry outlet, the construction holes and the soil body cavities form an isolated
sealed space; then, the cement slurry is injected into the soil body cavities via
the grouting pipe, an injection pressure is increased when the cement slurry is injected,
and due to the injection of the cement slurry by pressurization, the penetration depth
of the cement slurry in the soil bodies and the compaction degree of the cement slurry
inside the soil body cavities can be effectively improved.
- 4. In the construction method for the underwater pipe pile foundation provided by
the present disclosure, each of the explosive impact apparatuses includes the pair
of isolation plates and the explosive box disposed between the pair of isolation plates;
and when the explosive impact apparatuses are disposed at the plurality of construction
holes, the explosive boxes are aligned to the construction holes, and the pair of
isolation plates is respectively disposed on the upper and lower sides of the construction
holes. When the soil body cavities are formed by explosion construction, by mounting
the explosive box between the two isolation plates, explosive impact waves in a vertical
direction are obstructed by the isolation plates when the explosive box is detonated,
so that the impact waves can only move to the plugging plates and form impact in the
soil bodies on corresponding positions after bombing out the plugging plates to form
the soil body cavities. By directionally moving the explosive impact waves, the compaction
degrees of the soil bodies surrounding the soil body cavities formed by explosive
impact are enhanced, and the bearing capacity of the soil bodies surrounding the pile
foundation to the pile foundation is improved.
- 5. The underwater pipe pile foundation provided by the present disclosure extends
into the soil body and includes: the pipe pile body; and the soil body cavities formed
in the soil bodies surrounding the pipe pile body, the soil body cavities being filled
with the cement structural bodies, and the cement structural bodies being connected
to the pipe pile body. By disposing the cement structural bodies connected to the
pipe pile body in the soil bodies surrounding the pipe pile body and enhancing the
bearing capacity surrounding the pipe pile body, the risk that the pipe pile body
is inclined to laterally collapse can be reduced effectively.
- 6. The underwater pipe pile foundation provided by the present disclosure further
includes the plurality of pile side slurry veins dispersively extending from the soil
body cavities to a direction away from the pipe pile body, and the pile side slurry
veins are connected with the cement structural bodies into a whole. By outwards extending
the pile side slurry veins from the cement structural bodies, the overall movement
resistance of the cement structural bodies is increased, the cement structural bodies
are prevented from settling, the cement structural bodies can be stably connected
to the periphery of the pipe pile body, and the long-term stable operation of the
underwater pipe pile foundation is guaranteed.
BRIEF DESCRIPTION OF THE DRAWINGS
[0017] To describe the technical solutions in the specific implementations of the present
disclosure or the prior art more clearly, the accompanying drawings required for describing
the specific implementations or the prior art will be briefly introduced below. Apparently,
the accompanying drawings in the following description show only some implementations
of the present disclosure, and those of ordinary skill in the art may still derive
other accompanying drawings from these accompanying drawings without creative efforts.
Fig. 1 is a top view showing a pipe pile body provided in an implementation of the
present disclosure;
Fig. 2 is a schematic diagram showing that a pipe pile body provided in an implementation
of the present disclosure sinks to a predetermined elevation on the seabed;
Fig. 3 is a schematic diagram showing a step that explosive impact apparatuses are
disposed and detonated in an implementation of the present disclosure;
Fig. 4 is a schematic structural diagram showing an explosive impact apparatus provided
in an implementation of the present disclosure;
Fig. 5 is a schematic diagram showing working states of isolation air sacs provided
in an implementation of the present disclosure; and
Fig. 6 is a schematic diagram showing a step of pile side grouting construction provided
in an implementation of the present disclosure.
[0018] Descriptions for reference numerals in the accompanying drawings: 1, channel steel;
2, high-strength plastic plate; 3, pipe pile body; 4, pile tip grouting hole; 5, explosive
impact apparatus; 6, steel wire rope; 7, soil body cavity; 8, explosive box; 9, explosion
starter; 10, isolation plate; 11, grouting pump; 12, slurry agitation and storage
device; 13, pile side slurry vein; 14, cement slurry; 15, grouting pipe; 16; slurry
outlet; 17, construction hole; 18, isolation air sac; 19, pile tip grouting stone
body; and 20, construction interlayer.
DETAILED DESCRIPTION
[0019] The technical solutions of the present disclosure will be described clearly and completely
below with reference to the accompanying drawings. Apparently, the described embodiments
are only a part, but not all, of the embodiments of the present disclosure. Based
on the embodiments in the present disclosure, all other embodiments obtained by those
of ordinary skill in the art without creative effects shall fall within the protection
scope of the present disclosure.
[0020] In the description of the present disclosure, it should be noted that directional
or positional relationships indicated by terms such as "center", "upper", "lower",
"left", "right", "vertical", "horizontal", "inner" and "outer" are directional or
positional relationships based on the accompanying drawings, are merely intended to
facilitate the description of the present disclosure and the simplification of the
description, rather than to indicate or imply that the appointed apparatus or element
has to be located in a specific direction or structured and operated in the specific
direction so as not to be understood as restrictions on the present disclosure. In
addition, terms "first", "second" and "third" are only for the purpose of description,
but cannot be understood as indicating or implying the relative importance.
[0021] In the description of the present disclosure, it should be noted that the terms "mount",
"link", and "connection" should be understood in a broad sense unless otherwise specified
and defined, for example, "connection" may be fixed connection or detachable connection
or integral connection, may be mechanical connection or electrical connection, may
be direct connection or indirect connection through an intermediate medium, and may
be internal connection of two elements. For those of ordinary skill in the art, the
specific meanings of the above-mentioned terms in the present disclosure may be understood
according to specific situations.
[0022] In addition, the technical features involved in the different implementations of
the present disclosure described below may be combined with one another without any
conflict.
Embodiment 1
[0023] As shown in Fig. 1 to Fig. 6, the present embodiment provides a construction method
for an underwater pipe pile foundation, which is applicable to construction of a pipe
pile foundation in a water body such as a river, a lake, and the sea, and includes
the following steps.
[0024] Construction interlayers 20 are disposed on a side wall of a pipe pile body 3 in
an axial direction, and four construction interlayers 20 are disposed at intervals
in the circumferential direction of the pipe pile body 3. A plurality of construction
holes 17 are disposed in the sides, away from an inner cavity of the pipe pile body
3, of the construction interlayers 20 in the axial direction, and the construction
holes 17 are covered with high-strength plastic plates 2 serving as plugging plates.
In the present embodiment, firstly, holes serving as the construction holes 17 are
formed at intervals in a web plate of channel steel 1 in a length direction, and the
high-strength plastic plates 2 are fixed to inner sides of rectangular holes in a
manner of epoxy resin glue or bolt connection. After the connection between the channel
steel 1 and the high-strength plastic plates 2 is completed, the channel steel 1 is
welded on an outer wall of a steel pipe pile. By welding two wing plates of the channel
steel 1 on the outer side wall of the steep pipe pile, the construction interlayers
20 are formed between the channel steel 1 and the steel pipe pile.
[0025] The pipe pile body 3 on which the construction interlayers 20 are mounted is shipped
to a construction machine station by a transport ship; the pipe pile body 3 is hoisted,
firstly, the pile sinks by means of the dead weight of the pipe pile body 3, and then,
a pile hammer is mounted to hit and sink the pile to a predetermined elevation.
[0026] A plurality of explosive impact apparatuses 5 are hoisted into the construction interlayers
20 by means of steel wire ropes 6. Each of the explosive impact apparatuses 5 includes
a pair of steel isolation plates 10 and an explosive box 8 disposed between the pair
of isolation plates 10; and when the explosive impact apparatuses 5 are disposed at
the plurality of construction holes 17, the explosive boxes 8 and the construction
holes 17 are correspondingly consistent in height, and the pair of isolation plates
10 is respectively disposed on upper and lower sides of the construction holes 17.
After the preparatory work is ready, explosion starters 9 are started to complete
energy release of all explosive boxes 8 inside a single piece of channel steel 1,
so that the plugging plates are bombed out, and soil body cavities 7 are formed in
soil bodies on positions corresponding to the construction holes 17. Then, residues
obtained after the explosive impact apparatuses 5 in the pile side soil bodies are
taken out and stored. The explosive impact apparatuses 5 are hoisted by the steel
wire ropes 6, leading wires are disposed inside the steel wire ropes 6, one end of
each leading wire is sequentially connected to each of the plurality of explosive
boxes 8, and the other end of each leading wire is connected to each of the explosion
starters 9. When the explosion starters 9 are started, the explosive boxes 8 are detonated
to generate explosive impact waves by which the high-strength plastic plates 2 are
bombed out, and thus, the soil body cavities 7 are formed outside. The pair of isolation
plates 10 is used to provide a reliable limited space so that explosive impact energy
is mainly propagated to the high-strength plastic plates 2.
[0027] Before cement slurry 14 is injected into the soil body cavities 7, the cement slurry
14 is injected into soil bodies on the bottom of the pipe pile body 3 via the construction
interlayers 20 to complete pile tip grouting. A grouting pipe 15 is laid down to the
bottom of the pipe pile body 3 along the construction interlayers 20, the construction
interlayer 20 at a slurry outlet 16 of the grouting pipe 15 is isolated, and the cement
slurry 14 is injected at a predetermined pressure via the grouting pipe 15. Specifically,
pile tip grouting holes 4 for communicating the construction interlayers 20 to the
inner cavity of the pipe pile body 3 are formed in the side wall on the end, close
to the bottom, of the pipe pile body 3. The slurry outlet 16 is disposed in the side
wall of the grouting pipe 15, and isolation air sacs 18 are mounted on two sides of
the slurry outlet 16 in the axial direction of the grouting pipe 15. An outer surface
of the grouting pipe 15 is provided with height marks. Firstly, the grouting pipe
15 is laid down to a pile tip, and the slurry outlet 16 in the grouting pipe 15 is
enabled to align to the pile tip grouting holes 4 and face the pile tip grouting holes
4. An inflation apparatus is started to inflate the isolation air sacs 18 to expand
the isolation air sacs 18 on the upper and lower sides of the slurry outlet 16, and
after the two isolation air sacs 18 on the upper and lower sides are closed, a sealed
space is formed for the slurry outlet 16 of the grouting pipe 15. Then, a grouting
pump 11 is started, a pressure gauge is adjusted to a set grouting strength, and the
cement slurry 14 is injected into a soil core inside the pile tip via the grouting
pipe 15 to form pile tip grouting stone bodies 19, thereby completing pile tip grouting.
The slurry is injected into the soil core inside the pile tip of the pipe pile body
3 from the slurry outlet 16 of the grouting pipe 15 via the pile tip grouting holes
4 to form the pile tip grouting stone bodies 19, so that the strength of the soil
core is enhanced, and the bearing capacity of the pile tip is increased.
[0028] Air in the isolation air sacs 18 is released, and the grouting pipe 15 is uplifted
to the slurry outlet 16 of the channel steel 1 on the bottommost end of a pile side;
the inflation apparatus is restarted, and after the inflation for the two isolation
air sacs 18 on the upper and lower sides is completed, the isolation air sacs 18 expand
until horizontal spaces on positions where the isolation air sacs 18 in the construction
interlayers 20 are located are fully filled, and the slurry outlet 16, the construction
holes 17 and the soil body cavities 7 are enabled to form an isolated sealed space;
high-pressure grouting starts, and the slurry rushes into the soil body cavities 7
and spread to the surrounding soil bodies; and grouting is stopped when the grouting
rate is reduced sharply. The above-mentioned step that the grouting pipe 15 is uplifted
is repeated, and the slurry outlet 16 is enabled to sequentially correspond to the
soil body cavities 7 on different heights until all pile side grouting constructions
are completed. The grouting construction processes in the plurality of construction
interlayers 20 may be performed at the same time or alone, and the specific construction
manner may be determined according to situations on construction sites. During grouting,
the cement slurry 14 in a slurry agitation and storage device 12 is injected into
the slurry outlet 16 of the grouting pipe 15 via a slurry suction pipe and a grouting
and delivering pipe under a pressure generated by the grouting pump 11. The annular
isolation air sacs 18 are disposed on the upper and lower sides of the slurry outlet
16 of the grouting pipe 15, and the isolation air sacs 18 expand by inflation before
grouting to form a sealed space, which ensures that the cement slurry 14 smoothly
enters the soil body cavities 7 formed by explosive impact under the action of high
pressure and also enters the soil bodies at the peripheries of the soil body cavities
7 in a manner of permeation, compaction or cleavage to form irregular pile side slurry
veins 13 extending vertically and horizontally.
[0029] The present disclosure provides a post-grouting bearing capacity improving technology
applicable to explosive impact on an offshore wind power steel pipe pile. By adding
the explosive impact apparatuses 5, the plastic plugging plates on the channel steel
1 are vibrated to be smashed by impact waves generated by explosion; the soil bodies
on the outer side form the soil body cavities 7 due to the impact waves; and the soil
bodies at the peripheries of the cavities are squeezed to be more compact, so that
the void ratio of the soil bodies is reduced. The soil body cavities 7 formed on the
pile side at intervals are grouted in a high-pressure grouting manner, and thus, the
horizontal resistance and the vertical bearing capacity of pile side soil bodies can
be enhanced as a whole. In addition, the soil core inside the pipe pile body 3 can
be reinforced by the grouting holes formed near the pile tip, so that the soil plugging
effect of the steel pipe pile is further improved, and the bearing capacity of the
pipe pile body 3 is comprehensively improved.
[0030] As an alternative implementation, when the wall thickness of the pipe pile body 3
meets design strength, the construction interlayers may be directly formed in the
side wall of the pipe pile body 3 when the pipe pile body 3 is formed.
[0031] As an alternative implementation, when the internal diameter of the pipe pile body
3 meets a construction requirement, the construction interlayers may be formed by
welding the channel steel 1 on the inner side wall of the pipe pile body 3, and the
construction holes 17 are reserved in the side wall when the pipe pile body 3 is formed
or the construction holes 17 are formed by cutting on corresponding positions after
the construction of the construction interlayers is completed.
Embodiment 2
[0032] The present embodiment provides an underwater pipe pile foundation constructed by
applying the construction method for the underwater pipe pile foundation in embodiment
1.
[0033] The bottom of the underwater pipe pile foundation extends into a soil body. The underwater
pipe pile foundation includes a pipe pile body and soil body cavities. The soil body
cavities are formed in soil bodies surrounding the pipe pile body, and are filled
with cement structural bodies, and the cement structural bodies are connected to the
pipe pile body. The underwater pipe pile foundation further includes a plurality of
pile side slurry veins dispersively extending from the soil body cavities to a direction
away from the pipe pile body, and the pile side slurry veins are connected with the
cement structural bodies into a whole. By outwards extending the pile side slurry
veins from the cement structural bodies, the overall movement resistance of the cement
structural bodies is increased to prevent the cement structural bodies from settling,
so that the cement structural bodies can be stably connected to the periphery of the
pipe pile body, thereby guaranteeing the long-term stable operation of the underwater
pipe pile foundation. An inner cavity at the bottom of the pipe pile body is further
provided with pile tip grouting stone bodies, so that the soil plugging effect is
improved. By disposing the soil body cavities, the cement structural bodies, the pile
side slurry veins, and the pile tip grouting stone bodies, the horizontal and vertical
bearing capacity of the pipe pile body are comprehensively enhanced, and the risk
that the pipe pile body is inclined to laterally collapse during use can be reduced
greatly.
[0034] Apparently, the above-mentioned embodiments are merely intended to clearly describe
examples, rather than to limit the implementations. Those of ordinary skill in the
art can further make other variations or alterations in different forms on the basis
of the above-mentioned description. It is unnecessary and impossible to exhaustively
list all the implementations herein. Apparent variations or alterations derived therefrom
still fall within the protection scope of the present disclosure.
1. A construction method for an underwater pipe pile foundation, comprising the following
steps:
disposing construction interlayers (20) on a side wall of a pipe pile body (3) in
an axial direction, disposing a plurality of construction holes (17) in the sides,
away from an inner cavity of the pipe pile body (3), of the construction interlayers
(20) in the axial direction, the plurality of construction interlayers (20) being
disposed at intervals in the circumferential direction of the pipe pile body (3),
and covering the construction holes (17) with plugging plates, the pipe pile body
(3) being a hollow steel pipe pile;
hoisting and sinking the pipe pile body (3) on a position to be constructed, and sinking
the pipe pile body (3) to a predetermined elevation;
respectively disposing explosive impact apparatuses (5) at the plurality of construction
holes (17) along the construction interlayers (20), each of the explosive impact apparatuses
(5) comprising a pair of isolation plates (10) and an explosive box (8) disposed between
the pair of isolation plates (10); aligning the explosive boxes (8) to the construction
holes (17), respectively disposing the pair of isolation plates (10) on the upper
and lower sides of the construction holes (17), detonating the explosive impact apparatuses
(5) to bomb out the plugging plates and form soil body cavities (7) in soil bodies
on positions corresponding to the construction holes (17);
laying down a grouting pipe (15) to the bottom of the pipe pile body (3) along the
construction interlayers (20), isolating the construction interlayer (20) at a slurry
outlet (16) of the grouting pipe (15), forming pile tip grouting holes (4) for communicating
the construction interlayers (20) to the inner cavity of the pipe pile body (3) in
the side wall on the end, close to the bottom, of the pipe pile body (3), and injecting
slurry into a soil core inside a pile tip of the pipe pile body (3) from the slurry
outlet (16) of the grouting pipe (15) via the pile tip grouting holes (4) to complete
pile tip grouting; and
injecting cement slurry (14) into the soil body cavities (7) along the construction
interlayers (20) via the construction holes (17) to complete the construction.
2. The construction method for the underwater pipe pile foundation of claim 1, wherein
the step of injecting cement slurry (14) into the soil body cavities (7) comprises:
forming the slurry outlet (16) in the side wall of the grouting pipe (15), laying
down the grouting pipe (15) to the slurry outlet (16) and a certain construction hole
(17) along the construction interlayers (20), isolating two sides of the slurry outlet
(16) in the axial direction of the grouting pipe (15) in the construction interlayers
(20), enabling the slurry outlet (16), the construction holes (17) and the soil body
cavities (7) to form an isolated sealed space, and injecting the cement slurry (14)
into the soil body cavities (7) via the grouting pipe (15).
3. The construction method for the underwater pipe pile foundation of claim 2, wherein
isolation air sacs (18) are mounted on two sides of the slurry outlet (16) in the
axial direction of the grouting pipe (15); and the step of isolating two sides of
the slurry outlet (16) in the axial direction of the grouting pipe (15) comprises:
by inflating the pair of isolation air sacs (18) disposed on the two sides of the
slurry outlet (16) in the grouting pipe (15), expanding the isolation air sacs (18)
until horizontal spaces on positions where the isolation air sacs (18) in the construction
interlayers (20) are located are fully filled.
4. An underwater pipe pile foundation, constructed by applying the construction method
for the underwater pipe pile foundation of any one of claims 1 to 3.
5. The underwater pipe pile foundation of claim 4, wherein the bottom of the underwater
pipe pile foundation extends into a soil body, and the underwater pipe pile foundation
comprises:
a pipe pile body (3); and
soil body cavities (7) formed in soil bodies surrounding the pipe pile body (3), the
soil body cavities (7) being filled with cement structural bodies, and the cement
structural bodies being connected to the pipe pile body (3).
6. The underwater pipe pile foundation of claim 5, further comprising a plurality of
pile side slurry veins (13) dispersively extending from the soil body cavities (7)
to a direction away from the pipe pile body (3), the pile side slurry veins (13) being
connected with the cement structural bodies into a whole.