TECHNICAL FIELD
[0001] The present disclosure relates to a branch unit and an air conditioning apparatus.
BACKGROUND ART
[0002] Refrigerant leakage may occur when air conditioning equipment has a failure or is
discarded. In order to reduce the influence of refrigerant leakage on global environment,
it is required to reduce the amount of refrigerant to be charged into the air conditioning
equipment. There is known an air conditioning apparatus that uses a chlorofluorocarbon-based
refrigerant for heat transfer between an outdoor unit and a branch unit, and uses
water or an anti-freezing solution (a brine) for heat transfer between the branch
unit and an indoor unit, in order to reduce the amount of refrigerant to be charged.
The method for this air conditioning apparatus is called an indirect air conditioning
method.
[0003] In air conditioning of a large-scale building, there may be a case where a plurality
of indoor units are connected to a common outdoor unit, and a plurality of rooms where
the plurality of indoor units are respectively installed are owned or used by different
owners or users. In such a case, there are some market demands to apportion a power
consumption charge of the outdoor unit according to air conditioning capabilities
exhibited by the respective indoor units installed in the respective rooms or tenants.
In particular, in air conditioning equipment that adopts the indirect air conditioning
method, it is relatively easy to measure flow rates and temperatures, and thus systems
for apportioning and billing power consumption of the air conditioning equipment have
already been widespread in the market.
[0004] For example, there is known a method of providing pressure sensors before and after
a flow control valve, calculating a flow rate of a heat medium from an opening area
of the valve and a differential pressure before and after the valve, and calculating
a heat exchange amount (air conditioning capability) using a difference in temperatures
of the heat medium at an inlet and an outlet of a heat exchanger (see, for example,
Japanese Patent No. 6678837).
CITATION LIST
PATENT LITERATURE
SUMMARY OF INVENTION
TECHNICAL PROBLEM
[0006] However, in the air conditioning apparatus and the method for calculating the flow
rate of the heat medium disclosed in
Japanese Patent No. 6678837 (PTL 1), pressure sensors in a number that is at least equal to or more than the
number of indoor units are required. Generally, a pressure sensor has a problem that
it is more expensive than a temperature sensor or the like.
[0007] The present disclosure relates to a branch unit and an air conditioning apparatus
that calculate flow rates using electric heaters and temperature sensors, which are
generally less expensive than pressure sensors, in order to solve the aforementioned
problem.
SOLUTION TO PROBLEM
[0008] The present disclosure relates to a branch unit arranged between a heat source unit
using a first heat medium and a plurality of indoor units using a second heat medium.
The branch unit includes a first heat exchanger and a second heat exchanger, a first
pump, a second pump, a plurality of first ports, a plurality of second ports, a flow
path switching unit, a plurality of forward path side heaters, and a plurality of
first temperature sensors.
[0009] The first heat exchanger and the second heat exchanger are each configured to exchange
heat between the first heat medium and the second heat medium. The first pump is configured
to send the second heat medium so as to circulate the second heat medium through the
first heat exchanger. The second pump is configured to send the second heat medium
so as to circulate the second heat medium through the second heat exchanger.
[0010] Via each of the plurality of first ports, the second heat medium is sent to one corresponding
indoor unit of the plurality of indoor units. Via each of the plurality of second
ports, the second heat medium returning from one corresponding indoor unit of the
plurality of indoor units is received.
[0011] The flow path switching unit is configured to connect each of the plurality of first
ports and the plurality of second ports to one of the first heat exchanger and the
second heat exchanger.
[0012] The plurality of forward path side heaters are respectively provided for a plurality
of forward path side pipes through which the second heat medium is sent to the plurality
of first ports. The plurality of first temperature sensors are respectively arranged,
at the plurality of forward path side pipes, downstream of the plurality of forward
path side heaters.
ADVANTAGEOUS EFFECTS OF INVENTION
[0013] According to the branch unit and the air conditioning apparatus of the present disclosure,
it is possible to implement an air conditioning apparatus that can calculate flow
rates of a heat medium using electric heaters and temperature sensors which are generally
less expensive, and that achieves cost reduction.
BRIEF DESCRIPTION OF DRAWINGS
[0014]
Fig. 1 is a view showing a configuration of an air conditioning apparatus 100 in a
first embodiment.
Fig. 2 is a flowchart for illustrating calculation of flow rates and air conditioning
capabilities in the first embodiment.
Fig. 3 is a view showing a configuration of an air conditioning apparatus 100A in
a variation of the first embodiment.
Fig. 4 is a view showing a configuration of an air conditioning apparatus 200 in a
second embodiment.
Fig. 5 is a flowchart for illustrating calculation of flow rates and air conditioning
capabilities in the second embodiment.
Fig. 6 is a view showing a configuration of an air conditioning apparatus 200A in
a variation of the second embodiment.
Fig. 7 is a view showing a configuration of an air conditioning apparatus 300 in a
third embodiment.
Fig. 8 is a view showing a configuration of an air conditioning apparatus 300A in
a variation of the third embodiment.
Fig. 9 is a view showing a configuration of an air conditioning apparatus 400 in a
fourth embodiment.
Fig. 10 is a view showing a configuration of an air conditioning apparatus 400A in
a variation of the fourth embodiment.
Fig. 11 is a flowchart for illustrating control of energization of heaters performed
in a fifth embodiment.
DESCRIPTION OF EMBODIMENTS
[0015] Hereinafter, embodiments of the present disclosure will be described in detail with
reference to the drawings. Although a plurality of embodiments will be described below,
it is originally intended from the time of filing the present application to combine
configurations described in the embodiments as appropriate. It should be noted that
identical or corresponding parts in the drawings will be designated by the same reference
characters, and the description thereof will not be repeated.
First Embodiment
[0016] Fig. 1 is a view showing a configuration of an air conditioning apparatus 100 in
a first embodiment. Air conditioning apparatus 100 has a heat source unit 10, a branch
unit 30, and a plurality of indoor units 50a and 50b. Heat source unit 10 is usually
an outdoor unit arranged outside, and operates as a heat source or a cold source.
Although the present embodiment describes an air conditioning apparatus having two
indoor units, three or more indoor units may be connected to the heat source unit
via the branch unit.
[0017] Heat source unit 10 is connected with branch unit 30 by a first pipe 1 and a second
pipe 2. Indoor unit 50a is connected with branch unit 30 by a third pipe 3a and a
fourth pipe 4a. Indoor unit 50b is connected with branch unit 30 by a third pipe 3b
and a fourth pipe 4b.
[0018] Heat source unit 10 includes a compressor 11, a six-way valve 12, and an outdoor
heat exchanger 13. Six-way valve 12 is configured such that three flow paths are formed
therein. Six ports of six-way valve 12 are connected to a pipe 5 on a discharge side
of compressor 11, a pipe 6 on a suction side of compressor 11, first pipe 1, second
pipe 2, and pipes 7 and 8 at inlet and outlet portions of outdoor heat exchanger 13,
respectively.
[0019] Indoor unit 50a includes an indoor heat exchanger 51a and a flow control valve 52a.
Third pipe 3a, indoor heat exchanger 51a, flow control valve 52a, and fourth pipe
4a are connected in order between a port P1A and a port P2A of branch unit 30.
[0020] Indoor unit 50b includes an indoor heat exchanger 51b and a flow control valve 52b.
Third pipe 3b, indoor heat exchanger 51b, flow control valve 52b, and fourth pipe
4b are connected in order between a port P1B and a port P2B of branch unit 30.
[0021] Branch unit 30 includes heat exchangers 61a and 61b, as shown in Fig. 1. Each of
heat exchangers 61a and 61b performs heat exchange between two fluids. Flow paths
through which the two fluids flow within each heat exchanger will be referred to as
a primary side flow path and a secondary side flow path, respectively.
[0022] As a heat medium flowing through the primary side flow path on a heat source side
(hereinafter referred to as a first heat medium), a chlorofluorocarbon-based refrigerant
is used. The chlorofluorocarbon-based refrigerant circulates through first pipe 1
and second pipe 2. As a heat medium flowing through the secondary side flow path on
a load side (hereinafter referred to as a second heat medium), water or an anti-freezing
solution (a brine) is used. The water or the anti-freezing solution circulates through
third pipe 3a, fourth pipe 4a, third pipe 3b, and fourth pipe 4b.
[0023] One end of the primary side flow path of heat exchanger 61a is connected to pipe
1 via an on-off valve 71a and a port P3, and is connected to pipe 2 via an on-off
valve 72a and a port P4. One end of the primary side flow path of heat exchanger 61b
is connected to pipe 1 via an on-off valve 71b and port P3, and is connected to pipe
2 via an on-off valve 72b and port P4.
[0024] The other end of the primary side flow path of heat exchanger 61a and the other end
of the primary side flow path of heat exchanger 61b are connected and joined via flow
control valves 62a and 62b, respectively, and a junction point thereof is connected
to pipe 1 via a first flow control valve 81 and port P3, and to pipe 2 via a second
flow control valve 82 and port P4.
[0025] Branch unit 30 includes pumps 60a and 60b, as shown in Fig. 1. A discharge port of
pump 60a is connected to one end of the secondary side flow path of heat exchanger
61a. The other end of the secondary side flow path of heat exchanger 61a is connected
to pipe 3a via an on-off valve 91, and is connected to pipe 3b via an on-off valve
93. Further, a discharge port of pump 60a is connected to pipe 4a via an on-off valve
95, and is connected to pipe 4b via an on-off valve 97.
[0026] An outflow side of pump 60b goes through a secondary side of heat exchanger 61b,
and thereafter is connected to pipe 3a via an on-off valve 92, and is connected to
pipe 3b via an on-off valve 94. Further, an inflow side of pump 60b is connected to
pipe 4a via an on-off valve 96, and is connected to pipe 4b via an on-off valve 98.
[0027] Meanwhile, flow control valves 52a and 52b may be respectively arranged on pipes
32a and 32b within the branch unit, to which pipes 4a and 4b are connected. Further,
flow control valves 52a and 52b may be respectively arranged on pipes 31a and 31b
within the branch unit, to which pipes 3a and 3b are connected. It should be noted
that, if on-off valves 91 to 98 can each adjust an opening area thereof, it is also
possible to reduce the number of components as well as cost by causing on-off valves
91 to 98 to provide a flow control function without providing flow control valves
52a and 52b.
[0028] In air conditioning apparatus 100 in the first embodiment, via heat exchangers 61a
and 61b within branch unit 30, a primary side as a heat source unit 10 side, and the
secondary side as an indoor unit 50 side as well as the load side, are independently
provided as separate circuits. Thereby, the first heat medium and the second heat
medium, which are separate fluids, can be used as the heat medium on the primary side
and the heat medium on the secondary side.
[0029] Generally, as the first heat medium on the heat source side, a chlorofluorocarbon-based
refrigerant suitable for a vapor compression refrigeration cycle is used. However,
the chlorofluorocarbon-based refrigerant is considered problematic in terms of contribution
to global warming and flammability, and it is required to reduce the amount of refrigerant
to be used and reduce the risk of leakage to a closed space.
[0030] Accordingly, by using water or an anti-freezing solution as the second heat medium
on the load side, it is possible to reduce the amount of the chlorofluorocarbon-based
refrigerant to be used on the primary side, and reduce the risk of refrigerant leakage
to an indoor environment which is a closed space.
[0031] Further, in air conditioning of a large-scale building, there may be a case where
heating is required in an office room, whereas cooling is required in a room in which
heat is generated, such as a computer room, a kitchen, and the like. In such a case,
there is known an air conditioning apparatus in which each indoor unit can arbitrarily
select cooling or heating regardless of the operation state of cooling or heating
of another indoor unit. Such an air conditioning apparatus has a configuration in
which a plurality of indoor units are connected to a common outdoor unit via a branch
unit. Such an air conditioning method by which one air conditioning apparatus can
simultaneously operate air conditioning for cooling and air conditioning for heating
is referred to as simultaneous cooling and heating method. Air conditioning apparatus
100 adopts such a simultaneous cooling and heating-type air conditioning method.
[0032] Air conditioning apparatus 100 has four operation modes, that is, a "full-cooling
mode", a "full-heating mode", "a first simultaneous cooling and heating operation
mode", and "a second simultaneous cooling and heating operation mode".
[0033] The full-cooling mode is a mode in which both indoor units 50a and 50b perform cooling
operation. The full-heating mode is a mode in which both indoor units 50a and 50b
perform heating operation. The first simultaneous cooling and heating operation mode
is a mode in which indoor unit 50a performs cooling operation and indoor unit 50b
performs heating operation. The second simultaneous cooling and heating operation
mode is a mode in which indoor unit 50a performs heating operation and indoor unit
50b performs cooling operation.
[0034] It should be noted that, when there are three or more indoor units, the first simultaneous
cooling and heating operation mode may be an operation mode in which cooling is dominant,
such as a case where the number of units for cooling operation is more than the number
of units for heating operation. The second simultaneous cooling and heating operation
mode may be an operation mode in which heating is dominant, such as a case where the
number of units for cooling operation is less than the number of units for heating
operation.
[0035] In the full-cooling mode, three flow paths indicated by solid lines in Fig. 1 are
formed within six-way valve 12. In branch unit 30, on-off valves 71a and 71b are opened,
and on-off valves 72a and 72b are closed. Further, flow control valve 81 is closed,
and flow control valve 82 is opened. The degree of opening of each of flow control
valves 62a and 62b is controlled by a controller 70 to correspond to a flow rate of
the first heat medium required. Both heat exchangers 61a and 61b serve as evaporators,
and cool the second heat medium. The cooled second heat medium is distributed to indoor
heat exchangers 51a and 51b by on-off valves 91 to 98, and cool indoor air.
[0036] In the full-heating mode, three flow paths indicated by broken lines in Fig. 1 are
formed within six-way valve 12. In branch unit 30, on-off valves 71a and 71b are closed,
and on-off valves 72a and 72b are opened. Further, flow control valve 82 is closed,
and flow control valve 81 is opened. The degree of opening of each of flow control
valves 62a and 62b is controlled by controller 70 to correspond to a flow rate of
the first heat medium required. Both heat exchangers 61a and 61b serve as condensers,
and heat the second heat medium. The heated second heat medium is distributed to indoor
heat exchangers 51a and 51b by on-off valves 91 to 98, and heat the indoor air.
[0037] In the simultaneous cooling and heating operation modes, on-off valves 71b and 72a
and flow control valves 81 and 82 are closed, and the three flow paths indicated by
the solid lines in Fig. 1 are formed within six-way valve 12.
[0038] The first heat medium flows from compressor 11, via pipe 7, outdoor heat exchanger
13, pipe 2, and on-off valve 72b, to reach heat exchanger 61b serving as a condenser,
and expands at flow control valve 62b and is changed to have a low temperature and
a low pressure.
[0039] Thereafter, the first heat medium passes through flow control valve 62a and heat
exchanger 61a serving as an evaporator, flows via on-off valve 71a, pipe 1, six-way
valve 12, and pipe 6, and returns to compressor 11.
[0040] In this case, heat exchanger 61b serves as a heat source for heating, and heat exchanger
61a serves as a cold source for cooling.
[0041] According to whether each of indoor units 50a and 50b performs heating operation
or cooling operation, on-off valves 91 to 98 switch whether to connect flow paths
corresponding to indoor units 50a and 50b to the heat source or to the cold source.
[0042] In the first simultaneous cooling and heating operation mode, on-off valves 91 to
98 are controlled such that indoor unit 50a performs cooling operation and indoor
unit 50b performs heating operation, and in the second simultaneous cooling and heating
operation mode, on-off valves 91 to 98 are controlled such that indoor unit 50a performs
heating operation and indoor unit 50b performs cooling operation.
[0043] It should be noted that, in simultaneous cooling and heating operation, the flow
paths indicated by the broken lines may be formed within six-way valve 12, flow control
valves 81 and 82 and on-off valves 71a and 72b may be closed, and the first heat medium
may flow in order of on-off valve 72a, heat exchanger 61a, flow control valves 62a
and 62b, heat exchanger 61b, and on-off valve 71b. In this case, heat exchanger 61a
serves as a heat source for heating, and heat exchanger 61b serves as a cold source
for cooling.
[0044] Air conditioning apparatus 100 further includes controller 70. Controller 70 includes
a CPU (Central Processing Unit) 71, a memory 72 (a ROM (Read Only Memory) and a RAM
(Random Access Memory)), input/output buffers (not shown) for inputting/outputting
various signals, and the like. CPU 71 expands programs stored in the ROM onto the
RAM or the like and executes the programs. The programs stored in the ROM are programs
describing processing procedures of controller 70. According to these programs, controller
70 performs control of devices in air conditioning apparatus 100. This control can
be processed not only by software but also by dedicated hardware (electronic circuitry).
[0045] Controller 70 may be arranged within a case of one of heat source unit 10, branch
unit 30, and indoor units 50a and 50b, or may be arranged on a control panel or the
like different therefrom.
[0046] In the present embodiment, controller 70 receives measurement values of temperature
sensors T1, T3, T11, T12, Tai, Tao, Tbi, and Tbo, to perform calculation of a flow
rate G of the second heat medium and calculation of an air conditioning capability
Q in each of indoor units 50a and 50b. Accordingly, controller 70 is desirably arranged
within the case of branch unit 30 or on the control panel or the like arranged in
the vicinity of branch unit 30.
[0047] Fig. 2 is a flowchart for illustrating calculation of flow rates and air conditioning
capabilities in the first embodiment. Controller 70 energizes heaters in step S1,
calculates flow rates Ga and Gb of the second heat medium flowing through indoor units
50a and 50b in step S2, and calculates air conditioning capabilities Qa and Qb of
indoor units 50a and 50b in step S3.
[0048] A method for calculating flow rates Ga and Gb of the second heat medium flowing through
indoor units 50a and 50b and calculating air conditioning capabilities Qa and Qb of
indoor units 50a and 50b in the first embodiment will be described below. Flow rates
Ga and Gb will be collectively represented as flow rate G, and air conditioning capabilities
Qa and Qb will be collectively represented as air conditioning capability Q.
[0049] For example, it is assumed that indoor unit 50a starts cooling operation, heat exchanger
61a has a low temperature by the action of operation of heat source unit 10, corresponding
pump 60a is driven, on-off valves 91 and 95 are opened, and on-off valves 92 and 96
are closed.
[0050] Temperature sensor Tai measures a temperature of the second heat medium that flows
out of pump 60a. Temperature sensor Tao measures a temperature of the second heat
medium that flows into a secondary side of heat exchanger 61a, is cooled, and flows
out of heat exchanger 61a. Thereafter, the second heat medium flows through a forward
path side thermal bonding portion within pipe 31a that connects between port P1A and
on-off valve 91 for selecting a secondary side outlet of heat exchanger 61a. On that
occasion, the second heat medium is heated by a heater 201 attached to the forward
path side thermal bonding portion. Temperature sensor T1 measures a temperature of
the heated second heat medium. The second heat medium thereafter flows through third
pipe 3a and reaches indoor unit 50a. The temperature of the second heat medium is
increased by cooling the indoor air in indoor unit 50a. Then, the second heat medium
flows through fourth pipe 4a, on-off valve 95, and a return path side intra-unit pipe,
and reaches pump 60a. Temperature sensor T11 measures a temperature of the second
heat medium that flows out of indoor unit 50a.
[0051] Here, when heater 201 is an electric heater, a heating amount H (kW) of the second
heat medium is determined from power consumption of heater 201. A temperature variation
range ΔT (°C) of the second heat medium is determined from a difference between detection
values T1 and Tao of temperature sensor T1 and temperature sensor Tao. Using heating
amount H (kW), temperature variation range ΔT = T1-Tao, and a specific heat Cp (kJ/(kg·°C))
of the heat medium, flow rate G (kg/sec) of the heat medium can be calculated by the
following equation (1):

[0052] A temperature difference Δθ (°C) at an inlet and an outlet of indoor unit 50a is
determined from a difference between detection values T1 and T11 of temperature sensor
T1 and temperature sensor T11. Using flow rate G (kg/sec) of the heat medium flowing
through indoor unit 50a described above, and temperature difference Δθ = T1-T1 1,
air conditioning capability Q (kW) of indoor unit 50a can be calculated by the following
equation (2):

[0053] When indoor unit 50a performs heating operation, even if the heat exchanger having
a low temperature changes from heat exchanger 61a to heat exchanger 61b due to the
operation state of heat source unit 10 and the operation state of another indoor unit
50b, air conditioning capability Q of each indoor unit can be calculated by the same
computing equation.
[0054] Unlike the present embodiment, a method for calculating the flow rate of the heat
medium using pressure sensors will be considered. In the method using the pressure
sensors, it is necessary to arrange the pressure sensors before and after a flow control
valve to measure a differential pressure before and after the flow control valve.
Generally, there are a configuration in which a flow control valve is attached within
an indoor unit, and a configuration in which a flow control valve is attached within
a branch unit. The pressure of the second heat medium decreases gradually as it moves
in a flow direction within a pipe, due to pressure loss caused by friction against
a wall surface within the pipe. Accordingly, in order to calculate the flow rate of
the second heat medium with high accuracy, it is more desirable to attach the pressure
sensors immediately before and immediately after the flow control valve.
[0055] That is, when a flow control valve is attached within an indoor unit, the pressure
sensors are also attached within the same indoor unit, and when a flow control valve
is attached within a branch unit, the pressure sensors are also attached within the
same branch unit.
[0056] When a flow control valve is attached within an indoor unit, there is an advantage
that fine control of the flow rate of the heat medium according to indoor temperature
can be implemented by a microcomputer within the indoor unit. However, it is necessary
to transmit information about air conditioning capabilities of respective indoor units
for apportioning a power charge to the respective indoor units, to microcomputers
of an outdoor unit and a branch unit on each occasion, which may put a pressure on
communication capacity.
[0057] On the other hand, when a flow control valve is attached within a branch unit, the
amount of communication between the branch unit and an indoor unit about control of
the flow control valve is reduced, and information about air conditioning capabilities
of respective indoor units can be collectively managed for computation at high frequency
in the microcomputer within the branch unit. However, it is impossible to obtain information
about the indoor units and the indoor temperatures at high frequency from the microcomputers
within the indoor units, because it puts a pressure on communication capacity. Thus,
fine control of the flow rate of the heat medium according to indoor temperature cannot
be implemented.
[0058] In the first embodiment, pressure sensors are not used to calculate the flow rate.
Accordingly, the method for calculating the flow rate of the heat medium disclosed
in the first embodiment is independent of the positions of the flow control valves.
In the first embodiment, information required to compute the air conditioning capabilities
of the respective indoor units is completed within branch unit 30. Thus, collective
management for computation at high frequency in controller 70 provided within branch
unit 30 or in the vicinity of branch unit 30 can be implemented, and an air conditioning
apparatus system independent of the presence or absence of flow control valves 52a
and 52b of indoor units 50a and 50b can be configured.
[0059] Fig. 3 is a view showing a configuration of an air conditioning apparatus 100A in
a variation of the first embodiment. Air conditioning apparatus 100A includes a branch
unit 30A instead of branch unit 30 in the configuration of air conditioning apparatus
100 in Fig. 1. Branch unit 30A includes heaters 201A and 202A instead of heaters 201
and 202 in the configuration of branch unit 30 shown in Fig. 1.
[0060] In the configuration in Fig. 1, heaters 201 and 202 are arranged on a side close
to ports P1A and P1B with respect to a flow path switching unit 90. In contrast, in
the configuration in Fig. 3, heaters 201A and 202A are arranged on a side close to
first heat exchanger 61a and second heat exchanger 61b with respect to flow path switching
unit 90, and are each configured to heat both of two branched pipes.
[0061] By adopting such an arrangement, it may also be possible to arrange the heaters by
utilizing vacant spaces within the branch unit.
Second Embodiment
[0062] Fig. 4 is a view showing a configuration of an air conditioning apparatus 200 in
a second embodiment. Air conditioning apparatus 200 includes a branch unit 230 instead
of branch unit 30, and includes a controller 270 instead of controller 70, in the
configuration of air conditioning apparatus 100 in Fig. 1. Branch unit 230 further
includes heaters 203 and 204 and temperature sensors T56 and T78 in the configuration
of branch unit 30 shown in Fig. 1.
[0063] That is, branch unit 230 includes heater 203 configured to heat the second heat medium
within pipe 32a connected to fourth pipe 4a, and heater 204 configured to heat the
second heat medium within pipe 32b connected to fourth pipe 4b. Temperature sensors
T56 and T78 are arranged downstream of heaters 203 and 204, respectively.
[0064] In the first embodiment, when indoor unit 50a or 50b performs cooling operation,
the second heat medium at a low temperature before reaching indoor unit 50a or 50b
is heated for the purpose of calculating the flow rate, and thereby cooling capability
is reduced. In the second embodiment, when an indoor unit performs cooling operation,
the second heat medium returning from the indoor unit is heated by a heater attached
downstream of the indoor unit, and thereby influence on indoor cooling capability
can be eliminated.
[0065] Fig. 5 is a flowchart for illustrating calculation of flow rates and air conditioning
capabilities in the second embodiment.
[0066] Controller 270 determines, in step S11, whether or not indoor unit 50a performs heating
operation. When indoor unit 50a performs heating operation (YES in S11), controller
270 energizes heater 201 in step S12. When indoor unit 50a performs cooling operation
(NO in S11), controller 270 energizes heater 203 in step S13.
[0067] Further, controller 270 determines, in step S14, whether or not indoor unit 50b performs
heating operation. When indoor unit 50b performs heating operation (YES in S14), controller
270 energizes heater 202 in step S15. When indoor unit 50b performs cooling operation
(NO in S14), controller 270 energizes heater 204 in step S16.
[0068] Thereafter, controller 270 calculates flow rates Ga and Gb of the second heat medium
flowing through indoor units 50a and 50b, respectively, in step S17, and calculates
air conditioning capabilities Qa and Qb of indoor units 50a and 50b, respectively,
in step S18. Since the methods for calculating flow rate G and air conditioning capability
Q are the same as those in the first embodiment, the descriptions thereof will not
be repeated here.
[0069] Fig. 6 is a view showing a configuration of an air conditioning apparatus 200A in
a variation of the second embodiment. Air conditioning apparatus 200A includes a branch
unit 230A instead of branch unit 230 in the configuration of air conditioning apparatus
200 in Fig. 4.
[0070] In the configuration in Fig. 4, heaters 201 and 202 are respectively arranged on
the side close to ports P1A and P1B with respect to flow path switching unit 90, and
heaters 203 and 204 are respectively arranged on a side close to ports P2A and P2B
with respect to flow path switching unit 90. In contrast, in the configuration in
Fig. 6, heaters 201 and 202 are arranged on the side close to first heat exchanger
61a and second heat exchanger 61b with respect to flow path switching unit 90, and
are each configured to heat both of two branched pipes. Similarly, in the configuration
in Fig. 6, heaters 203 and 204 are arranged on a side close to pumps 60a and 60b with
respect to flow path switching unit 90, and are each configured to heat both of two
branched pipes. Temperature sensors T5 and T6 are arranged downstream of heater 203,
and temperature sensors T7 and T8 are arranged downstream of heater 204.
[0071] By adopting such an arrangement, it may also be possible to arrange the heaters by
utilizing vacant spaces within the branch unit.
Third Embodiment
[0072] Fig. 7 is a view showing a configuration of an air conditioning apparatus 300 in
a third embodiment. Air conditioning apparatus 300 includes a branch unit 330 instead
of branch unit 30 in the configuration of air conditioning apparatus 100 in Fig. 1.
It should be noted that Fig. 7 does not show a controller corresponding to controller
70.
[0073] Branch unit 330 is configured such that forward path side intra-unit pipes 31a and
31b each have a branched portion and a junction portion, and a plurality of flow paths
extending in parallel between the branched portion and the junction portion. The flow
paths extending in parallel have pipe diameters different from each other, and the
flow path having a smaller pipe cross sectional area is configured to be heated by
a heater.
[0074] Specifically, pipe 31a has a branched portion and a junction portion, and a first
pipe 31a1 and a second pipe 31a2 connected in parallel between the branched portion
and the junction portion. First pipe 31a1 and second pipe 31a2 have pipe diameters
different from each other. Second pipe 31a2 has a cross sectional area smaller than
that of first pipe 31a1. Heater 201 is arranged such that second pipe 31a2 having
a smaller cross sectional area is heated by heater 201. Temperature sensor T1 is arranged
downstream of a portion of second pipe 31a2 heated by heater 201.
[0075] Similarly, pipe 31b has a branched portion and a junction portion, and a first pipe
31b1 and a second pipe 31b2 connected in parallel between the branched portion and
the junction portion. First pipe 31b1 and second pipe 31b2 have pipe diameters different
from each other. Second pipe 31b2 has a cross sectional area smaller than that of
first pipe 31b1. Heater 202 is arranged such that second pipe 31b2 having a smaller
cross sectional area is heated by heater 202. Temperature sensor T3 is arranged downstream
of a portion of second pipe 31b2 heated by heater 202.
[0076] In the first and second embodiments, it is necessary to heat the entire water flow
amount flowing through an indoor unit by a heater to increase temperature. In contrast,
in the third embodiment, it is only necessary to heat a flow amount of the second
heat medium flowing through bypass pipe 31a2 having a smaller cross sectional area
by heater 201 to increase temperature, and it is only necessary to heat a flow amount
of the second heat medium flowing through bypass pipe 31b2 by heater 202 to increase
temperature. Considering that it is only necessary to heat the second heat medium
by the heaters by the same temperature increase range under the condition that the
temperature sensors have the same precision and resolution, power consumption of the
heaters can be reduced by ratios of bypass flow rates in second pipes 31a2 and 31b2
to flow rates in first pipes 31a1 and 31b1.
[0077] It should be noted that ratios between intra-pipe cross sectional areas of second
pipes 31a2 and 31b2 (bypass flow paths) and intra-pipe cross sectional areas of first
pipes 31a1 and 31b1 (main flow paths) are known. Since the ratio between the flow
rate of the second heat medium within a bypass flow path and the flow rate thereof
within a main flow path is equal to the ratio between the intra-pipe cross sectional
areas thereof, the flow rate within the main flow path can be determined from the
flow rate within the bypass flow path. Therefore, in the third embodiment, when flow
rates and air conditioning capabilities of indoor units are computed, power consumption
of the heaters can be reduced, in addition to the effect in the first embodiment.
[0078] Fig. 8 is a view showing a configuration of an air conditioning apparatus 300A in
a variation of the third embodiment. Air conditioning apparatus 300A includes a branch
unit 330A instead of branch unit 330 in the configuration of air conditioning apparatus
300 in Fig. 7.
[0079] In the configuration in Fig. 7, heaters 201 and 202 are respectively arranged on
the side close to ports P1A and P1B with respect to flow path switching unit 90. In
contrast, in the configuration in Fig. 8, heaters 201 and 202 are arranged on the
side close to first heat exchanger 61a and second heat exchanger 61b with respect
to flow path switching unit 90, and are each configured to heat both bypass flow paths
of two branched pipes.
[0080] By adopting such an arrangement, it may also be possible to arrange the heaters by
utilizing vacant spaces within the branch unit.
Fourth Embodiment
[0081] Fig. 9 is a view showing a configuration of an air conditioning apparatus 400 in
a fourth embodiment. The fourth embodiment is a combination of the first to third
embodiments. Air conditioning apparatus 400 includes a branch unit 430 instead of
branch unit 330 in the configuration of air conditioning apparatus 300 in Fig. 7.
It should be noted that Fig. 9 does not show a controller.
[0082] When compared with the configuration of branch unit 330, branch unit 430 is configured
such that return path side intra-unit pipes 32a and 32b each have a branched portion
and a junction portion, and a plurality of flow paths extending in parallel between
the branched portion and the junction portion. The flow paths extending in parallel
have pipe diameters different from each other, and the flow path having a smaller
pipe cross sectional area is configured to be heated by a heater.
[0083] Specifically, pipe 32a has a branched portion and a junction portion, and a first
pipe 32a1 and a second pipe 32a2 connected in parallel between the branched portion
and the junction portion. First pipe 32a1 and second pipe 32a2 have pipe diameters
different from each other. Second pipe 32a2 has a cross sectional area smaller than
that of first pipe 32a1. Heater 203 is arranged such that second pipe 32a2 having
a smaller cross sectional area is heated by heater 203. Temperature sensor T56 is
arranged downstream of a portion of second pipe 32a2 heated by heater 203.
[0084] Similarly, pipe 32b has a branched portion and a junction portion, and a first pipe
32b1 and a second pipe 32b2 connected in parallel between the branched portion and
the junction portion. First pipe 32b1 and second pipe 32b2 have pipe diameters different
from each other. Second pipe 32b2 has a cross sectional area smaller than that of
first pipe 32b1. Heater 204 is arranged such that second pipe 32b2 having a smaller
cross sectional area is heated by heater 204. Temperature sensor T78 is arranged downstream
of a portion of second pipe 32b2 heated by heater 204.
[0085] With such a configuration, adverse influence of heating by the heaters on the indoor
units during cooling can be reduced, and power consumption of the heaters can be reduced.
[0086] Fig. 10 is a view showing a configuration of an air conditioning apparatus 400A in
a variation of the fourth embodiment. Air conditioning apparatus 400A includes a branch
unit 430A instead of branch unit 430 in the configuration of air conditioning apparatus
400 in Fig. 9.
[0087] In the configuration in Fig. 9, heaters 201 and 202 are respectively arranged on
the side close to ports P1A and P1B with respect to flow path switching unit 90, and
heaters 203 and 204 are respectively arranged on the side close to ports P2A and P2B
with respect to flow path switching unit 90. In contrast, in the configuration in
Fig. 10, heaters 201 and 202 are arranged on the side close to first heat exchanger
61a and second heat exchanger 61b with respect to flow path switching unit 90, heaters
203 and 204 are arranged on the side close to pumps 60a and 60b with respect to flow
path switching unit 90, each heater is configured to heat both bypass flow paths of
two branched pipes, and temperature sensors T5, T6, T7, and T8 are arranged downstream
of the heaters for the bypass flow paths.
[0088] By adopting such an arrangement, it may also be possible to arrange the heaters by
utilizing vacant spaces within the branch unit.
Fifth Embodiment
[0089] In a fifth embodiment, the controller controls timing at which power is supplied
to the heaters in the configurations of the first to fourth embodiments. When all
the indoor units do not perform operation, the pumps in the branch unit are also stopped,
and it is not necessary to measure the flow rates by the heaters. However, when at
least any one of the indoor units performs operation, it is necessary to calculate
air conditioning capability of the indoor unit for billing purposes and the like.
[0090] In the fifth embodiment, energization of the heaters is controlled even in such a
case to reduce power consumption.
[0091] Fig. 11 is a flowchart for illustrating control of energization of the heaters performed
in the fifth embodiment. In the following, a description will be given of a case where
the control is applied to the configuration of the first embodiment in Fig. 1. It
should be noted that the same control can also be applied to the other embodiments.
[0092] In step S51, controller 70 determines whether or not air conditioning apparatus 100
is in operation. When air conditioning apparatus 100 is not in operation (NO in S51),
the processing of this flowchart is exited. When air conditioning apparatus 100 is
in operation (YES in S51), the processing proceeds to step S52.
[0093] In step S52, controller 70 determines whether a time for measuring flow rates G has
come (or whether flow rates G are being measured) or not.
[0094] When the time for measurement has come (YES in S52), the controller energizes heaters
201 and 202 in step S53. Then, in step S53, the controller calculates flow rates G
and air conditioning capabilities Q using the equations (1) and (2) in the first embodiment.
[0095] On the other hand, when the time for measurement has not come (NO in S52), the controller
turns off heaters 201 and 202 in step S54.
[0096] The time for measurement in step S52 is a time from a measurement start time to a
measurement finish time, and is one minute, for example. Further, measurement is started
every 10 minutes, for example, and when the one-minute time for measurement finishes,
the heaters are de-energized for the remaining nine minutes. In this case, power consumption
of the heaters can be reduced to one tenth even when the indoor units perform operation.
[0097] As has been described above, the configuration in the fifth embodiment has a measurement
off mode. In the measurement off mode, power supply to all the forward path side heaters
(and all the return path side heaters) is stopped while at least one indoor unit is
in operation. Since the air conditioning capabilities of the indoor units rarely change
significantly and frequently, it is practically unnecessary to constantly compute
the air conditioning capabilities by constantly energizing the heaters. In the fifth
embodiment, the measurement off mode is provided for a constant time at constant intervals,
and energy saving can be achieved by reducing power consumption of the heaters.
(Conclusion)
[0098] The embodiments described above will be described again with reference to the drawings.
[0099] The present disclosure relates to branch unit 30 arranged between heat source unit
10 using the first heat medium and the plurality of indoor units 50a and 50b using
the second heat medium. Branch unit 30 shown in Fig. 1 includes first heat exchanger
61a and second heat exchanger 61b, first pump 60a, second pump 60b, a plurality of
first ports P1A and P1B, a plurality of second ports P2A and P2B, flow path switching
unit 90, a plurality of forward path side heaters 201 and 202, and a plurality of
first temperature sensors T1 and T3.
[0100] First heat exchanger 61a and second heat exchanger 61b are each configured to exchange
heat between the first heat medium and the second heat medium. First pump 60a is configured
to send the second heat medium so as to circulate the second heat medium through first
heat exchanger 61a. Second pump 60b is configured to send the second heat medium so
as to circulate the second heat medium through second heat exchanger 61b.
[0101] Via each of the plurality of first ports P1A and P1B, the second heat medium is able
to be sent to one corresponding indoor unit of the plurality of indoor units 50a and
50b. Via each of the plurality of second ports P2A and P2B, the second heat medium
returning from one corresponding indoor unit of the plurality of indoor units 50a
and 50b is able to be received.
[0102] Flow path switching unit 90 is configured to connect each of the plurality of first
ports P1A and P1B and the plurality of second ports P2A and P2B to one of first heat
exchanger 61a and second heat exchanger 61b.
[0103] The plurality of forward path side heaters 201 and 202 are respectively provided
for a plurality of forward path side pipes 31a and 31b through which the second heat
medium is able to be sent to the plurality of first ports P1A and P1B. The plurality
of first temperature sensors T1 and T3 are respectively arranged, at the plurality
of forward path side pipes 31a and 31b, downstream of the plurality of forward path
side heaters 201 and 202.
[0104] Since flow rates are detected by the temperature sensors and the heaters as described
above, the sensors can be arranged with a higher degree of freedom when compared with
a case where pressure sensors are used. In particular, since the temperature sensors
are collectively arranged in branch unit 30, load of communication between the indoor
units and the branch unit is reduced, which is advantageous in terms of performing
fine control.
[0105] Preferably, as shown in Fig. 7, in branch unit 330, each of the plurality of forward
path side pipes 31a and 31b includes first pipe 31a1, 31b1 and second pipe 31a2, 31b2.
Second pipes 31a2 and 31b2 have flow path cross sectional areas smaller than those
of first pipes 31a1 and 31b1, respectively, and are configured to be branched from
first pipes 31a1 and 31b1, respectively, and thereafter join first pipes 31a1 and
31b1 again, respectively. Each of the plurality of first temperature sensors T1 and
T3 and each of the plurality of forward path side heaters 201 and 202 are arranged
at second pipe 31a2, 31b2 corresponding thereto.
[0106] With such a configuration, power consumption of forward path side heaters 201 and
202 when detecting the flow rates can be reduced.
[0107] Preferably, as shown in Fig. 4, branch unit 230 further includes a plurality of return
path side heaters 203 and 204, and a plurality of second temperature sensors T56 and
T78. The plurality of return path side heaters 203 and 204 are respectively provided
for a plurality of return path side pipes 32a and 32b through which the second heat
medium flowing into the plurality of second ports P2A and P2B passes. The plurality
of second temperature sensors T56 and T78 are respectively arranged, at the plurality
of return path side pipes 32a and 32b, downstream of the plurality of return path
side heaters 203 and 204.
[0108] With such a configuration, when cooling is performed in the indoor units, it is possible
to measure the flow rates of the second refrigerant after it flows through the indoor
units. Therefore, it is possible to avoid a situation that is disadvantageous for
cooling, such as heating the second refrigerant flowing into the indoor units by the
heaters during cooling.
[0109] Preferably, as shown in Fig. 9, in branch unit 430, the plurality of return path
side pipes 32a and 32b include third pipes 32a1 and 32b1 and fourth pipes 32a2 and
32b2, respectively. Fourth pipes 32a2 and 32b2 have flow path cross sectional areas
smaller than those of third pipes 32a1 and 32b1, respectively, and are configured
to be branched from third pipes 32a1 and 32b1, respectively, and thereafter join third
pipes 32a1 and 32b1 again, respectively. Each of the plurality of second temperature
sensors T11 and T12 and each of the plurality of return path side heaters 203 and
204 are arranged at fourth pipe 32a2, 32b2 corresponding thereto.
[0110] With such a configuration, power consumption of return path side heaters 203 and
204 when detecting the flow rates can be reduced.
[0111] Branch unit 30 further includes controller 70 configured to control first pump 60a,
second pump 60b, flow path switching unit 90, and the plurality of forward path side
heaters 201 and 202. As illustrated in Fig. 11, controller 70 is configured to repeat
a measurement mode and a measurement off mode when at least one of the plurality of
indoor units 50a and 50b is in operation, the measurement mode being a mode in which
at least one of the plurality of forward path side heaters 201 and 202 is turned on
to measure flow rate Ga, Gb, the measurement off mode being a mode in which all of
the plurality of forward path side heaters 201 and 202 are turned off.
[0112] By intermittently detecting the flow rates as described above, power consumption
of forward path side heaters 201 and 202 when detecting the flow rates can be reduced.
[0113] Preferably, the second heat medium is water or an anti-freezing solution.
[0114] In another aspect, the present disclosure relates to an air conditioning apparatus
100, 200, 300, 400 including: any one of branch units 30, 130, 230, 330, and 430;
heat source unit 10; and the plurality of indoor units 50a and 50b.
[0115] It should be understood that the embodiments disclosed herein are illustrative and
non-restrictive in every respect. The scope of the present disclosure is defined by
the scope of the claims, rather than the description of the embodiments described
above, and is intended to include any modifications within the scope and meaning equivalent
to the scope of the claims.
REFERENCE SIGNS LIST
[0116] 1, 2, 3a, 3b, 4a, 4b, 5, 6, 7, 8, 31a, 31b, 32a, 32b, 31a1, 31b1, 32a1, 32b1, 31a2,
31b2, 32a2, 32b2: pipe; 10: heat source unit; 11: compressor; 12: six-way valve; 13,
51a, 51b, 61a, 61b: heat exchanger; 30, 30A, 230, 230A, 330, 330A, 430, 430A: branch
unit; 50, 50a, 50b: indoor unit; 52a, 52b, 62a, 62b, 81, 82: flow control valve; 60a,
60b: pump; 70, 270: controller; 71a, 71b, 72a, 72b, 91, 92, 93, 94, 95, 96, 97, 98:
on-off valve; 71: CPU; 72: memory; 90: flow path switching unit; 100, 100A, 200, 200A,
300, 300A, 400, 400A: air conditioning apparatus; 201, 201A, 202, 202A, 203, 204:
heater; G11, T1, T3, T5 to T8, T11, T12, T56, T78, Ta, Tai, Tao, Tbi, Tbo: temperature
sensor; P1A, P1B, P2A, P2B, P3, P4: port.