TECHNICAL FIELD
[0001] The present disclosure relates to an air conditioning apparatus.
BACKGROUND ART
[0002] In recent years, houses have been increasingly airtight and thermally insulated,
aiming at a ZEH (net Zero-Energy House). For highly insulated houses, the rated capacity
sufficient for the floor area is still required during air conditioning in midsummer
and midwinter, while the air conditioning load when the room temperature is stable
is extremely small.
[0003] In order to implement stable air conditioning under an extremely small air conditioning
load, an air conditioning apparatus may be operated with a low frequency of its compressor.
A lower frequency of the compressor, however, results in a smaller difference between
high and low pressures in a refrigerant circuit and a lower temperature and a lower
superheat of discharged refrigerant. The lower superheat of discharged refrigerant
causes a lower temperature and a lower superheat of sucked refrigerant, which is likely
to cause a liquid-gas two-phase state of the refrigerant sucked into the compressor.
Such a state may lead to failure of the compressor. While the state of the sucked
refrigerant may usually be converted from the two-phase state to a single gas phase
by narrowing the opening of an electronic expansion valve, it has been difficult to
precisely control the electronic expansion valve, particularly when the valve has
a small opening degree, due to manufacture variation of the electronic expansion valve.
[0004] WO2013/103061 (PTL 1) discloses an electronic expansion valve with an attached barcode representing
property data reflecting manufacture variation, in order to stabilize air conditioning
control, as well as an air conditioning apparatus including the electronic expansion
valve.
CITATION LIST
PATENT LITERATURE
SUMMARY OF INVENTION
TECHNICAL PROBLEM
[0006] For the electronic expansion valve disclosed in
WO2013/103061 (PTL 1), the valve opening point of each electronic expansion valve is measured in
advance and its data is recorded in the form of a barcode, in order to correct for
the manufacture variation of the valve opening point. During manufacture of an air
conditioning apparatus, it is necessary to read the barcode and reflect the read data
on a control program for the electronic expansion valve. This, however, results in
increase of the manufacturing steps for the air conditioning apparatus.
[0007] The present disclosure is made in order to solve the problem as described above,
and its object is to disclose an air conditioning apparatus that can implement a low-capacity
operation, while avoiding complication of the manufacturing steps.
SOLUTION TO PROBLEM
[0008] The present disclosure relates to an air conditioning apparatus. The air conditioning
apparatus includes a refrigerant circuit and a controller. The refrigerant circuit
is configured to allow refrigerant to circulate through a compressor, a condenser,
an expansion valve, and an evaporator. The expansion valve has an opening degree variable
from a lower limit opening degree to an upper limit opening degree. The controller
is configured to control the expansion valve to alternately repeat a first opening
degree and a second opening degree in a range of less than or equal to a quarter of
the upper limit opening degree, where the second opening degree is smaller than the
first opening degree.
ADVANTAGEOUS EFFECTS OF INVENTION
[0009] The air conditioning apparatus of the present disclosure repeatedly increases and
decreases the opening degree of the expansion valve, in a range of less than or equal
to a quarter of the upper limit opening degree. Thus, the air conditioning apparatus
capable of low-capacity operation while avoiding complication of the manufacturing
steps can be implemented.
BRIEF DESCRIPTION OF DRAWINGS
[0010]
Fig. 1 shows a configuration of an air conditioning apparatus according to Embodiment
1.
Fig. 2 is a block diagram showing configurations of a controller and an LEV.
Fig. 3 is a waveform chart illustrating change of the opening degree of an electronic
expansion valve.
Fig. 4 illustrates a relation between the Cv value of LEV 111 and the number of pulses
representing the opening degree of LEV 111.
Fig. 5 illustrates respective positions of CvA and CvB in Fig. 3 for respective opening
degrees shown in Fig. 4.
Fig. 6 is a flowchart illustrating control for operating mode switching performed
by an air conditioning system according to Embodiment 1.
Fig. 7 is a flowchart showing an example of details of a process in step S3 of Fig.
6.
Fig. 8 is a flowchart illustrating a process performed in Embodiment 2.
Fig. 9 shows an example of a map M1 used in Embodiment 2.
Fig. 10 shows another map M1A used in Embodiment 2.
Fig. 11 shows a relation between the operating frequency of a compressor and a desired
Cv value.
Fig. 12 illustrates control of a time ratio performed in Embodiment 3.
Fig. 13 is a flowchart illustrating control for operating mode switching performed
by an air conditioning system according to Embodiment 4.
Fig. 14 is a flowchart illustrating a process in step S3B of Fig. 13.
Fig. 15 shows an example of a map M2 used in Embodiment 4.
DESCRIPTION OF EMBODIMENTS
[0011] Embodiments of the present disclosure are hereinafter described in detail with reference
to the drawings. In the following, a plurality of embodiments are described, and it
is originally intended that characteristics described in connection with the embodiments
each are combined as appropriate. In the drawings, the same or corresponding parts
are denoted by the same reference characters, and a description thereof is not herein
repeated. In the following drawings, the relation between components in terms of the
size may be different from the actual one.
Embodiment 1
[0012] Fig. 1 shows a configuration of an air conditioning apparatus according to Embodiment
1. Air conditioning apparatus 1 includes a refrigerant circuit 150, and refrigerant
circuit 150 includes a compressor 10, an indoor heat exchanger 20, an electronic expansion
valve (LEV: Linear Expansion Valve) 111, an outdoor heat exchanger 40, pipes 90, 92,
94, 96, 97, 99, and a four-way valve 100. Four-way valve 100 has ports E to H.
[0013] Pipe 90 is connected between port H of four-way valve 100 and a port P1 of indoor
heat exchanger 20. Pipe 92 is connected between a port P4 of indoor heat exchanger
20 and LEV 111. Pipe 94 is connected between LEV 111 and a port P3 of outdoor heat
exchanger 40.
[0014] Pipe 96 is connected between a port P2 of outdoor heat exchanger 40, and port F of
four-way valve 100. Pipe 97 is connected between a suction port of compressor 10 and
port E of four-way valve 100. Pipe 99 is connected between a discharge port of compressor
10 and port G of four-way valve 100.
[0015] Compressor 10, LEV 111, outdoor heat exchanger 40, pipes 94, 96, 97, 99, and four-way
valve 100 are contained in outdoor unit 2. Indoor heat exchanger 20 is contained in
indoor unit 3. Outdoor unit 2 and indoor unit 3 are connected to each other through
pipes 90, 92.
[0016] Air conditioning apparatus 1 further includes temperature sensors 101 to 103, 106,
107, and a controller 200. Temperature sensor 101 is placed on pipe 99 to measure
a discharge temperature TH. Temperature sensor 102 is placed near indoor heat exchanger
20 to measure an indoor temperature Tr. Temperature sensor 103 is placed near outdoor
heat exchanger 40 to measure an outdoor temperature Te. Temperature sensor 106 is
placed on a refrigerant pipe of indoor heat exchanger 20 to measure a temperature
T1 of refrigerant in the two-phase region. Temperature sensor 107 is placed on a refrigerant
pipe of outdoor heat exchanger 40 to measure a temperature T2 of refrigerant in the
two-phase region. In accordance with an operation command signal provided from a user
and outputs of various sensors, controller 200 controls compressor 10, four-way valve
100, and LEV 111.
[0017] Compressor 10 is configured to change its operating frequency, in accordance with
a control signal received from controller 200. Specifically, compressor 10 includes
therein a drive motor variable in rotational speed under inverter control and, when
the operating frequency is changed, the rotational speed of the drive motor is changed.
The operating frequency of compressor 10 is changed so as to adjust the output of
compressor 10. Compressor 10 of any of various types such as rotary type, reciprocating
type, scroll type, and screw type, for example, may be employed.
[0018] Four-way valve 100 is controlled into one of a cooling operation state and a heating
operation state, by a control signal received from controller 200. The cooling operation
state refers to a state in which port E and port H communicate with each other and
port F and port G communicate with each other. The heating operation state refers
to a state in which port E and port F communicate with each other and port H and port
G communicate with each other. In the cooling operation state, compressor 10 is operated
to cause refrigerant to circulate in the refrigerant circuit in the direction indicated
by the solid-line arrows. In the heating operation state, compressor 10 is operated
to cause refrigerant to circulate in the refrigerant circuit in the direction indicated
by the broken-line arrows.
[0019] LEV 111 has its opening degree controlled to adjust the SH (superheat) of refrigerant
at an outlet of an evaporator, by a control signal received from controller 200.
[0020] Fig. 2 is a block diagram showing configurations of the controller and the LEV. As
shown in Fig. 2, controller 200 has a configuration including a CPU (Central Processing
Unit) 201, a memory 202 (ROM (Read Only Memory) and a RAM (Random Access Memory)),
and an input/output buffer (not shown), for example. CPU 201 deploys and executes,
on the RAM for example, programs stored in the ROM. The programs stored in the ROM
are programs in which a process procedure for controller 200 is specified. In accordance
with these programs, controller 200 performs control of each device in air conditioning
apparatus 1. This control is not limited to processing by software, but may be performed
by dedicated hardware (electronic circuit).
[0021] Controller 200 is configured to control a motor drive circuit 203 based on outdoor
temperature Te, indoor temperature Tr, discharge temperature TH, and temperatures
T 1, T2 of refrigerant in the two-phase region.
[0022] LEV 111 includes a stepping motor 112 and a valve body 113 having its opening degree
varied in response to change of the needle position caused by rotation of stepping
motor 112. Stepping motor 112 is driven by motor drive circuit 203. Controller 200
outputs, to motor drive circuit 203, the number of pulses as a command value representing
the opening degree of valve body 113.
[0023] Referring again to Fig. 1, flow of refrigerant indicated by the broken-line arrows
during heating operation is described. Gas refrigerant discharged from compressor
10 flows through pipe 90 into indoor heat exchanger 20. The gas refrigerant entering
indoor heat exchanger 20 exchanges heat with air flowing on the fin side of indoor
heat exchanger 20 to be converted into liquid refrigerant. The liquefied refrigerant
flows through pipe 92 into LEV 111 and undergoes adiabatic expansion.
[0024] The gas-liquid two-phase refrigerant having undergone adiabatic expansion in LEV
111 flows through pipe 94 into outdoor heat exchanger 40. The gas-liquid two-phase
refrigerant entering outdoor heat exchanger 40 exchanges heat with air flowing on
the fin side of outdoor heat exchanger 40 to be converted into gas refrigerant. The
gasified refrigerant flows through pipe 96, four-way valve 100, and pipe 97 and returns
to compressor 10.
[0025] A case where the air conditioning load decreases and the operating frequency of compressor
10 decreases, for example, is described.
[0026] When the air conditioning load is small, controller 200 lowers the operating frequency
of compressor 10 until the air conditioning capacity matches the air conditioning
load. When the operating frequency of compressor 10 decreases, the amount of refrigerant
circulating in refrigerant circuit 150 decreases. As the amount of circulating refrigerant
decreases, the air conditioning capacity (= amount of circulating refrigerant × indoor-unit
enthalpy difference) decreases.
[0027] As the operating frequency of compressor 10 decreases, the pressure difference generated
in compressor 10 decreases, resulting in a smaller temperature difference between
the refrigerant temperature and the air temperature in indoor heat exchanger 20 and
outdoor heat exchanger 40. The decrease of the temperature difference causes less
heat exchange and hence less increase of the discharge temperature, resulting in decrease
of the superheat of discharged refrigerant.
[0028] In view of the above, controller 200 performs control to narrow the opening of LEV
111 and thereby ensure an adequate pressure difference, in order to ensure an adequate
temperature difference.
[0029] When compressor 10 is operated at a reduced frequency in order to precisely implement
a low output of 1 kW or less of the air conditioning capacity, however, it is required
to precisely control the opening degree of LEV 111 into a smaller opening degree.
In this case, it is required to reduce the number of pulses representing the opening
degree to be transmitted as a command from controller 200 to motor drive circuit 203.
The valve opening point at which the electronic expansion valve transitions from the
closed state to the opened state is different for each electronic expansion valve.
Such a difference in valve opening point is caused by a difference in the manner of
attaching the stepping motor, the size of the valve body, and the size of the valve
seat. Use in a region where the number of pulses is small is therefore not recommended,
because an unintended valve opening state may be generated due to manufacture variation
of the valve opening point.
[0030] WO2013/103061 therefore discloses that the properties of the expansion valve are measured individually
in advance and data of the valve opening point is provided in the form of a barcode.
Individual measurement in advance of the properties of the expansion valve and/or
registration of the properties of the expansion valve in the controller of the air
conditioning apparatus, however, increases the manufacturing steps.
[0031] According to the present embodiment, when the opening degree of LEV 111 has been
decreased to a certain opening degree close to the lower limit at which stable use
is possible, and the superheat of discharged refrigerant is insufficient, LEV 111
is fully closed or set to a second opening degree close to the fully closed state
and thereafter the opening degree is increased to a first opening, and this is repeated.
[0032] Fig. 3 is a waveform chart illustrating change of the opening degree of the electronic
expansion valve. In Fig. 3, the horizontal axis represents time, and the vertical
axis represents the Cv value corresponding to the opening degree of the electronic
expansion valve. The Cv value represents the valve capacity coefficient.
[0033] When a time duration during which the opening degree of LEV 111 is set to a first
opening degree (Cv value = CvA), and a time duration during which the opening degree
of LEV 111 is set to a second opening degree (Cv value = CvB), at a certain time ratio
in a period tC are repeated, any average opening degree (Cv value = CvC) between the
first opening degree and the second opening degree can be achieved, depending on the
time ratio.
[0034] In order to achieve a desired superheat of discharged refrigerant while the air conditioning
load is small, controller 200 adjusts time durations tA, tB in Fig. 3 such that the
Cv value of LEV 111 reaches a desired Cv value. More specifically, the Cv value varies
depending on the time ratio (tA/tC or tB/tC), and therefore, controller 200 changes
the time ratio to obtain a desired Cv value.
[0035] Fig. 4 illustrates a relation between the Cv value of LEV 111 and the number of pulses
representing the opening degree of LEV 111. Controller 200 outputs, to motor drive
circuit 203, the number of pulses corresponding to the opening degree of the valve,
as a command value. The number of pulses can be changed from 0 to n. The number of
n varies depending on the specification, for example, of the electronic expansion
valve, and this number in the example of Fig. 4, for example, is n = 500, and 1/4
× n = 125. It is supposed that the Cv value of the opening degree specified by a command
value of 0 is Cvmin, and the Cv value of the opening degree specified by a command
value of 500, which is the maximum number of pulses, is Cvmax. Then, Cvmin may be
zero, or may also be a value larger than zero and close to zero. As long as Cvmin
< Cvmax is satisfied, Cvmin and Cvmax can be defined appropriately.
[0036] Fig. 5 illustrates respective positions of CvA and CvB in Fig. 3 for respective opening
degrees shown in Fig. 4. In Fig. 5, it is illustrated that both a command value A
corresponding to CvA and a command value B corresponding to CvB are the number of
pulses of less than or equal to a quarter (125 for example) of the number of pulses
n (500 for example) corresponding to the controllable maximum opening degree.
[0037] As shown in Fig. 3, the opening degree of the expansion valve corresponding to the
Cv value = CvC achieved by controlling the pulses is used when the air conditioning
load is extremely small, and is used when there is a possibility that open-valve state
occurs unintentionally due to variation of the valve opening point of the expansion
valve. Therefore, when the number of pulses A, B is larger than 1/4 of n, such Cv
value cannot be achieved.
[0038] For example, although the number of pulses B may be set to zero and the number of
pulses A may be set to 500 to make tA in Fig. 3 extremely shorter than tB, it is difficult
to precisely achieve a desired Cv value, because the response speed of the expansion
valve is low and the response speed at which the Cv value is changed in response to
change of the opening degree of the expansion valve is low.
[0039] In view of the above, the present embodiment defines command values A, B as having
the relation: 0 ≤ B < A ≤ n × 1/4. Moreover, an excessively long period tC in Fig.
3 makes it impossible to achieve the average value CvC, and therefore, it is desired
to set period tC to one minute or less.
[0040] Fig. 6 is a flowchart illustrating control for operating mode switching performed
by an air conditioning system according to Embodiment 1.
[0041] In step S1, controller 200 determines whether or not the magnitude of the difference
between indoor temperature Tr and set temperature Tset is smaller than a reference
value Tth1. Thus, the magnitude of the air conditioning load is determined.
[0042] When |t-Tset| < Tth1 is satisfied (YES in S1), controller 200 determines, in step
S2, whether or not the superheat of discharged refrigerant (hereinafter referred to
as discharge SH) is smaller than a reference value Tth2. Thus, the state of refrigerant
circuit 150 is determined.
[0043] When discharge SH < Tth2 is satisfied (YES in S2), controller 200 repeatedly outputs,
in step S3, command values A and B as described above with reference to Figs. 3 to
5, to thereby control LEV 111, such that the opening degree of LEV 111 regularly repeats
H (first opening degree, CV value = CvA) and L (second opening degree, Cv value =
CvB). Thus, the opening degree of the average Cv value = CvC is achieved.
[0044] In contrast, when |t-Tset| ≥ Tth1 is satisfied (NO in S1) or discharge SH ≥ Tth2
is satisfied (NO in S2), normal control for specifying the opening degree of LEV 111
by one command value is performed in step S4.
[0045] While the time ratio tA/tC in Fig. 3 may be a fixed value (50% for example), the
time ratio can be changed to change the average opening degree of LEV 111 with finer
precision.
[0046] Fig. 7 is a flowchart showing an example of the details of the process in step S3
of Fig. 6. Initially, in step S11, controller 200 determines whether or not discharge
SH is smaller than reference value Tth2.
[0047] When discharge SH < Tth2 is satisfied (YES in S11), controller 200 reduces, in step
S12, the duration of time tA in which the opening degree of the LEV is high first
opening degree CvA to thereby reduce time ratio tA/tC. The operation in step S11 is
then performed again.
[0048] The initial value of the time ratio in step S12 may be set to 100%, so that the time
ratio is adjusted to set discharge SH to a desired value and, after the time ratio
is adjusted (YES in S11), the LEV opening degree H/L repetitive operation is performed
for a certain time at the time ratio fixed to the adjusted time ratio (S13).
[0049] As described above, Embodiment 1 enables control of LEV 111 which is set to the narrowed
state corresponding to the low-opening-degree region (the region of 1/4 or less of
the upper limit opening degree) in which the proper relation between a pulse command
value and the opening degree of LEV 111 or the Cv value is difficult to achieve. Thus,
the low capacity operation where the operating frequency of the compressor is set
low is facilitated.
Embodiment 2
[0050] According to Embodiment 1 as shown in Fig. 7, the time ratio is changed while detecting
the value of discharge SH, to determine a proper time ratio.
[0051] In connection with Embodiment 2, a refrigeration cycle apparatus is described that
is characterized by: storing, in memory 202 of controller 200, the Cv value of the
expansion valve for making discharge SH more than or equal to a specified value based
on the indoor and outdoor temperatures, measuring the indoor and outdoor temperatures,
and adjusting the time ratio of the opening degree of LEV 111 within a certain time
based on the measured temperatures, to thereby obtain a desired Cv value (CvC).
[0052] The flow and the state of refrigerant in the refrigeration cycle apparatus are similar
to those of Embodiment 1, and therefore, the description thereof is not herein repeated.
[0053] Fig. 8 is a flowchart illustrating a process performed in Embodiment 2. Fig. 8 shows
the process of step S3A performed in Embodiment 2 instead of step S3 shown in Fig.
7.
[0054] Initially, in step S21, controller 200 obtains outdoor temperature Te from temperature
sensor 103 and obtains indoor temperature Tr from temperature sensor 102. In step
S22, controller 200 determines the Cv value from a map M1 stored in advance in memory
202, and calculates the time ratio corresponding to the Cv value determined in step
S23.
[0055] Fig. 9 shows an example of map M1 used in Embodiment 2. As shown in Fig. 9, the Cv
value corresponding to the expansion valve opening degree associated with a respective
combination of the indoor temperature and the outdoor temperature is stored, in the
form of a table, in memory 202 incorporated in controller 200. Controller 200 measures
the indoor and outdoor air temperatures Tr and Te with temperature sensors 102 and
103 such as thermistor, and calculates the time ratio implementing the Cv value appropriate
for the air temperature, to control LEV 111.
[0056] While the map in Fig. 9 stores the Cv value, the time ratio associated with the air
temperatures may be stored directly instead of the Cv value. Fig. 10 shows another
map M1A used in Embodiment 2. In Fig. 9, the higher the outdoor temperature and the
lower the indoor temperature (the direction toward the upper left in Fig. 9), the
Cv value decreases and, the lower the outdoor temperature and the higher the indoor
temperature (the direction toward the lower right in Fig. 9), the Cv value increases.
Thus, the Cv value can be reduced by increasing time tB in Fig. 3 and increasing the
time ratio (tB/tC in Fig. 3). Therefore, in map M1A of Fig. 10, the higher the outdoor
temperature and the lower the indoor temperature (the direction toward the upper left
in Fig. 10), time ratio RB (= tB/tC) increases and, the lower the outdoor temperature
and the higher the indoor temperature (the direction toward the lower right in Fig.
10), time ratio RB decreases.
[0057] According to Embodiment 2, the time ratio can be used to control LEV 111, similarly
to Embodiment 1, so that the Cv value of a small opening degree which is difficult
to control can be implemented by the average time and thereby ensure adequate discharge
SH. Further, a desired Cv value which varies depending on the indoor and outdoor air
temperatures is stored in the form of a table in memory 202 in advance, and therefore,
for the actual products, the time ratio can be determined immediately by merely measuring
the indoor and outdoor temperatures by temperature sensors 102 and 103, and accordingly,
more speedy control can be implemented.
Embodiment 3
[0058] Embodiment 3 is characterized by adjusting the time ratio (tB/tC in Fig. 3) of the
opening degree of LEV 111 within a certain time, based on the operating frequency
of compressor 10, to thereby obtain a desired Cv value (CvC).
[0059] The flow and the state of refrigerant in the refrigeration cycle apparatus under
general control are similar to those of Embodiment 1, and therefore, the description
thereof is not herein repeated.
[0060] Fig. 11 shows a relation between the operating frequency of the compressor and the
desired Cv value. Generally, as the operating frequency is increased, the desired
Cv value is also increased, as shown in Fig. 11. As described above in connection
with Embodiment 1, the opening degree of the expansion valve having a small Cv value
is difficult to control. Therefore, in Embodiment 3, at a frequency where a small
Cv value is required, the time ratio shown in Fig. 3 is changed to obtain the desired
Cv value.
[0061] Fig. 12 illustrates control of the time ratio performed in Embodiment 3. According
to Embodiment 3, the time ratio (tB/tC) of the expansion valve opening degree associated
with each operating frequency of compressor 10 is stored, in the form of a table,
in memory 202 incorporated in controller 200. Controller 200 calls, from memory 202,
the time ratio associated with the operating frequency to perform control.
[0062] According to Embodiment 1, the time ratio is tA/tC, and therefore, a time ratio of
100% is a state in which the large opening degree continues. In contrast, in Fig.
12, the time ratio is tB/tC and therefore, a time ratio of 0% is the state in which
the large opening degree continues.
[0063] Therefore, in Fig. 12, while the operating frequency falls in the range from fth
to fmax, LEV 111 is continuously operated at a single opening degree command value,
like the normal control and, when the operating frequency becomes less than or equal
to fth, the first opening degree (corresponding to CvA) and the second opening degree
(corresponding to CvB) are repeated. As the operating frequency decreases from fth
to fmin, the time ratio tB/tC increases and the Cv value decreases.
[0064] According to Embodiment 3, the opening degree command value is controlled such that
the opening degree of LEV 111 is repeated between the first opening degree and the
second opening degree at a certain time ratio, similarly to Embodiment 1. Thus, the
Cv value in the region smaller than the minimum Cv value that can be controlled stably
can be implemented by the time average, so that adequate discharge SH can be ensured.
Further, the desired Cv value that varies depending on the operating frequency can
be stored in the form of a table in advance, and therefore, for the actual products,
better control can be implemented by merely reading the time ratio associated with
the frequency.
Embodiment 4
[0065] Embodiment 4 is characterized by combining Embodiments 1 to 3 to control LEV 111
based on the time ratio associated with the indoor air temperature, the outdoor air
temperature, and the operating frequency.
[0066] The general flow and state of refrigerant in the refrigeration cycle apparatus are
similar to those of Embodiment 1, and therefore, the description thereof is not herein
repeated.
[0067] Fig. 13 is a flowchart illustrating control for operating mode switching performed
by an air conditioning system according to Embodiment 4. The flowchart of Fig. 13
corresponds to the flowchart of Fig. 6 except that step S2A is added after step S2
and step S3B is performed instead of step S3.
[0068] Initially, in step S1, controller 200 determines whether or not the magnitude of
the difference between indoor temperature Tr and set temperature Tset is smaller than
reference value Tth1. Thus, the magnitude of the air conditioning load is determined.
[0069] When |t-Tset| < Tth1 is satisfied (YES in S1), controller 200 determines in step
S2 whether or not discharge SH is smaller than reference value Tth2. Thus, the state
of refrigerant circuit 150 is determined.
[0070] When discharge SH < Tth2 is satisfied (YES in S2), controller 200 determines, in
step S2A, whether or not operating frequency f of compressor 10 is lower than a reference
value fth. Thus, it is determined whether or not a frequency range of fmin to fth
is obtained for which the time ration control as shown in Fig. 12 is introduced.
[0071] When f <fth is satisfied (YES in S2A), controller 200 outputs, in step S3B, command
values A and B repeatedly to control LEV 111, so that the opening degree of LEV 111
regularly repeats between H (first opening degree, Cv value = CvA) and L (second opening
degree, Cv value = CvB). In this way, the opening degree of Cv value = CvC is implemented
as an average value.
[0072] In contrast, when |t-Tset| ≥ Tth1 is satisfied (NO in S1), or when discharge SH ≥
Tth2 is satisfied (NO in S2) or f ≥ fth is satisfied (NO in S2A), normal control of
specifying the opening degree of LEV 111 by a single command value is performed in
step S4.
[0073] Fig. 14 is a flowchart illustrating the process in step S3B in Fig. 13. Initially,
in step S31, controller 200 obtains outdoor temperature Te from temperature sensor
103 and obtains indoor temperature Tr from temperature sensor 102, and further obtains
operating frequency f from a control process routine of compressor 10. Then, in step
S32, controller 200 determines the Cv value from a map M2 stored in advance in memory
202 and, in step S33, calculates the time ratio corresponding to the determined Cv
value.
[0074] Fig. 15 shows an example of map M2 used in Embodiment 4. As shown in Fig. 15, the
Cv value corresponding to the expansion valve opening degree associated with the combination
of the indoor and outdoor temperatures and the operating frequency is stored in the
form of a table in memory 202 incorporated in controller 200. Controller 200 calculates
the time ratio that implements the Cv value associated with air temperatures Tr, Te
and operating frequency f to control LEV 111.
[0075] While the Cv value is stored in the map of Fig. 15, the time ratio associated with
the air temperatures may directly be stored, instead of the Cv value.
[0076] As described above, in Embodiment 4, the Cv value of the expansion valve opening
degree or the time ratio associated with air temperatures Tr, Te and operating frequency
f is stored in the form of a table in memory 202. Controller 200 calls, from memory
202, the Cv value or the time ratio associated with air temperatures Tr, Te and operating
frequency f during operation, to control LEV 111.
[0077] According to Embodiment 4, the opening degree command value is controlled such that
the opening degree of LEV 111 is repeated between the first opening degree and the
second opening degree at a certain time ratio, similarly to Embodiment 1. Thus, the
Cv value in the region smaller than the minimum Cv value that can be controlled stably
can be implemented by the time average, so that adequate discharge SH can be ensured.
Further, Embodiment 2 and Embodiment 3 can be combined to implement still better control.
Summary
[0078] Air conditioning apparatus 1 of the present embodiment includes refrigerant circuit
150 and controller 200. Refrigerant circuit 150 is configured to allow refrigerant
to circulate through compressor 10, condenser 40, 20, LEV 111, and evaporator 20,
40. LEV 111 has an opening degree variable from a lower limit opening degree to an
upper limit opening degree. Controller 200 is configured to control LEV 111 to alternately
repeat a first opening degree CvA and a second opening degree CvB in a range of less
than or equal to a quarter of the upper limit opening degree, second opening degree
CvB being smaller than first opening degree CvA.
[0079] Preferably, controller 200 specifies a plurality of opening degrees from the lower
limit opening degree Cvmin to the upper limit opening degree Cvmax, by respective
command values from 0 to n, where n is a natural number. Controller 200 outputs the
command values to alternately repeat a first command value A and a second command
value B in a range of less than or equal to a quarter of n, the second command value
being smaller than the first command value.
[0080] Preferably, air conditioning apparatus 1 further includes: outdoor unit 2 containing
one of condenser 40, 20 and evaporator 20, 40 and containing the compressor; and indoor
unit 3 containing the other one of condenser 40, 20 and evaporator 20, 40. Controller
200 controls LEV 111 to alternately repeat first opening degree CvB and second opening
degree CvA, when a low-capacity operating condition including a first condition is
satisfied, the first condition being a condition that a magnitude of a difference
between set temperature Tset and temperature Tr of air sucked into indoor unit 3 is
smaller than threshold value Tth1 (Fig. 6, YES in S1).
[0081] More preferably, the low-capacity operating condition is satisfied, when the first
condition is satisfied and a second condition is satisfied, the second condition being
a condition that a value of superheat of the refrigerant discharged from compressor
10 is less than or equal to a specified value Tth2 (Fig. 6, YES in S2).
[0082] Still more preferably, as shown in Fig. 7, controller 200 adjusts a time ratio between
the first opening degree and the second opening degree in a period that are alternately
repeated, to cause the value of superheat to approach specified value Tth2.
[0083] Preferably, controller 200 includes processor 201 and memory 202. Memory 202 stores
a map as shown in Fig. 9, input data to the map is an indoor temperature and an outdoor
air temperature, and output data from the map is a time ratio between the first opening
degree and the second opening degree in a period that are alternately repeated, or
the output data is a capacity coefficient (Cv value) of LEV 111 corresponding to the
time ratio. Processor 201 controls LEV 111 using the map.
[0084] Preferably, controller 200 includes processor 201 and memory 202. Memory 202 stores
a map, input data to the map is an operating frequency of compressor 10, and output
data from the map is a time ratio between the first opening degree and the second
opening degree in a period that are alternately repeated, or the output data is a
capacity coefficient (Cv value) of the expansion valve corresponding to the time ratio.
Processor 201 controls LEV 111 using the map.
[0085] Preferably, controller 200 includes processor 201 and memory 202. Memory 202 stores
a map, as shown in Fig. 15, input data to the map is an indoor temperature, an outdoor
air temperature, and an operating frequency of the compressor, and output data from
the map is a time ratio between the first opening degree and the second opening degree
in a period that are alternately repeated, or the output data is a capacity coefficient
of the expansion valve corresponding to the time ratio. Processor 201 controls LEV
111 using the map.
[0086] It should be construed that the embodiments disclosed herein are given by way of
illustration in all respects, not by way of limitation. It is intended that the scope
of the present invention is defined by claims, not by the above description of the
embodiments, and encompasses all modifications and variations equivalent in meaning
and scope to the claims.
REFERENCE SIGNS LIST
[0087] 1 air conditioning apparatus; 2 outdoor unit; 3 indoor unit; 10 compressor; 20, 40
heat exchanger; 90, 92, 94, 96, 97, 99 pipe; 100 four-way valve; 101, 102, 103, 106,
107 temperature sensor; 111 LEV; 112 stepping motor; 113 valve body; 150 refrigerant
circuit; 200 controller; 201 processor; 202 memory; 203 motor drive circuit; E, F,
G, H, P1, P3, P4 port