TECHNICAL FIELD OF THE INVENTION
[0001] The present invention relates to a high-strength road for water resources regulation
in response to climate change, and more particularly to a high-strength high-occupancy
road, in which a structural space system having a high strength is constructed in
an underground in combination with various types of road pavement or water-permeable
pavement or additionally arranged water-permeable material constructed on a top of
the structural space to also feature bearing of heavy loading of vehicles.
DESCRIPTION OF THE PRIOR ART
[0002] Due to increasing expansion of cities, with all sorts of man-made facility being
massively built, road areas are continuously increased, resulting in catchment basins
losing the functionality of water retention, leading to a great increase of runoff
flows on the ground. Traditional roads are not water permeable and cause massive surface
runoff flows. This is one of the major causes for flooding in the cities, and this,
together with the impact caused by climate change resulting from global warming, forces
all urban areas to encounter an increased strain for flooding prevention. In addition,
the traditional ways of flood control often place emphasis on flood control of points
and lines by building up various facilities of large- and small-sized dams and drainage
ditches. Extreme weather often causes sudden strong precipitation, and the traditional
roads and drainage ditches are incapable of handling in-city flooding resulting from
the strong precipitation and large-area water accumulation or even large-area flooding
may thus result due to poor drainage in the large area. The traditional flood control
standard and the road construction standard and concept are far less than necessity
for handling climate change.
[0003] The traditional roads isolate the natural circulation of water and air between the
ground surface and the underground, making the underground of the road areas becoming
an ecological dessert devoid of water and oxygen. The traditional roads place emphasis
on traveling of heavy vehicles thereon and thus have to have a compacted road base
and an arrangement of drainage ditch, resulting in a disadvantage that the road base
is not allow to contain water and is not allowed to store water therein. Consequently,
the traditional roads, either general roads or water-permeable pavement roads, or
even high-occupancy high-flow public roads must have a compacted road base and have
to have the road base or road bed enclosed to prevent rainwater from invading into
the road bed or road base in order to avoid softening and collapsing of the road base
due to soaking in water, which may result in casualty loss of public security persons.
[0004] As a result, the traditional water-permeable pavement road must prevent rainwater
from penetrating into the road bed or road base, not allowing the rainwater to invade
into the road bed. Thus, drainage facility must be built up to drain rainwater through
the drainage ditches, and it becomes very pity for not keeping the water resources,
which are precious. Thus, a novel road that features water permeability and constructs
a high-strength water storage space building underground is proposed for an effect
of water retention.
[0005] Concerning the water permeability function and the water storage function of the
traditional roads, the traditional roads are incapable of full water permeability
and are also incapable of full water storage, and may cause massive surface runoff
flows, this being one major cause for in-city flooding.
[0006] To fight against the global warming in order to reduce the loading of the environment
and the negative impacts caused thereby, low-impact development techniques have been
made popularized, yet a concern about whether the popularization of the low-impact
techniques over more than two decades is partly imperfect emerges, particularly flooding
or drought, and influences resulting from extreme climate caused by global warming
seemingly getting even worse sometimes. Maintenance costs for popularizing the low-impact
techniques are very high, and in this concern, one that is sustainable, economic and
easy to maintain is the best condition of perfection and attraction, and among others,
a construction concept of a sponge city is a novel planned city construction in which
functions of flood prevention and waterlogging prevention in combination with ecology
and environmental protection is built in the city. For example, building a water-permeable
road to replace a non-water-permeable road in order to absorb water, store water,
and seeps water during raining, and also to set up water banks underground in parks
and squares to store water therein. In drought and hot weather, water moisture can
be released to alleviate the heat island effect and prevents situations of global
warming. With respect to the making and materials of a sponge city, the water permeability
function of water-permeable bricks and the water storage function of the water banks
are generally incapable of carrying heavy loads and cannot be sustainably secured
and reliable to resist damages resulting from by for example shaking caused by earthquakes
or pressurizing caused by heavy vehicle running on the road surface, and are only
usable in building sites, such as sidewalks, parks, and squares, where the heavy vehicles
are not allowed, in order to avoid public security concerns resulting from collapsing
caused by pressurizing and running of heavy vehicles. And, there is still a need to
build up drainage ditches at two sides of the road in order to drain off the rainwater
falling on the ground surface. Thus, the urban drainage ditches may easily result
in environmental pollution and may be easily jammed, and it is not easy to maintain
and keep clean. The draining openings of the drainage ditches, once jammed by garbage,
becomes visually unaesthetic for the outside appearance thereof.
[0007] In view of the above, in response to and collaborating with the construction of various
water-permeable pavement on the ground surface, to effectively achieve effective storage
and reuse of rainwater directed down into the underground, the present invention aims
to provide a high-occupancy road that features interconnection between ground surface
and underground and supportability of repeated running and pressurizing of heavy vehicles
of tens of tons or hundred tons to achieve a system formwork space of a ground surface
and underground co-constructed structural space to generate a water storage and water
drainage system.
SUMMARY OF THE INVENTION
[0008] The primary objective of the present invention is to provide a high-strength road
for a water resource regulation system in response to climate change, which comprises
a hollow unit body subjected to grouting with concrete grout and combining through
solidification thereof to form an underground structural space, with a permeable pavement
or regular concrete or asphalt laid on a top of the space, wherein the underground
structural space is buried underground for water storage and water drainage to serve
an underground dam of a road base of man-made road and also featuring functions of
rivers and drainage ditches, so that with water so stored, the water resources can
be effectively supplied on site for easy retrieval and reuse to respond to the possibility
of occurrence of vehicle traveling on the ground surface to induce heavy loading and
the occurrence of rainwater washing out and prevention of flooding and droughts. The
high-occupancy high-strength underground structural space mainly comprises a strengthened
concrete supporting pillar formed in the system formwork to improve the strength for
high-occupancy loading and pressurizing bearing capacity of the road to prevent breaking
of the road by heavy vehicles traveling thereon.
[0009] Another objective of the present invention is to provide a high-strength road for
a water resource regulation system in response to climate change, which is a system
formwork space water storage and water drainage system that is applicable to building
of roads, airports, parks, squares, and parking lots, and is a high-occupancy pavement
resisting heavy loading and supporting repeated pressurizing and running by heavy
vehicles of tens of tons of hundred tons, and is also capable of co-construction of
structural space of ground surface and underground.
[0010] To achieve the above objectives a high-strength road for a water resource regulation
system in response to climate change designed according to the present invention comprises
an underground structural space formed by combining a structural formwork of a hollow
unit body by means of grouting and solidifying concrete grout, and a pavement laid
on a top of the underground structural space, characterized in that the hollow unit
body comprises at least one structural formwork and a plurality of side slabs combined
with each other; a plate is disposed on an upper surface of the structural formwork,
the plate being provided with a through hole and at least one through pipe, wherein
the structural formwork and the side slabs are combined together and laid, and then
concrete grout is grouted into and solidifies in the through pipe of the structural
formwork to form an underground structural space with a high support strength, a water
resources regulation road having a water storage and drainage system.
[0011] In an embodiment, the hollow unit body is constructed by combining two, upper and
lower, structural formworks and four side slabs, the upper and lower structural formworks
being provided with a plate on an upper surface, the plate being provided with through
holes and at least one through pipe, tenons and mortises, which correspond to each
other, being formed in a periphery of the plate of the upper and lower structural
formworks to allow the upper and lower structural formworks of two adjacent unit bodies
to joint to each other by means of tenon and mortise joints., in the side slabs, the
slabs are formed with the through holes and are provided, in locations of a side edge,
with snap fastening structures for the side slabs to fast attach, through snap engagement,
to outsides of the upper and lower structural formworks to thereby form a hollow body;
concrete grout is grouted on outside of the hollow unit body, and when the upper and
lower structural formworks are combined, the upper-side and lower-side through pipes
are connected to form a hollow formwork grouting channel, and concrete grout is grouted
into the hollow grouting channel to form an underground structural space system of
high support strength.
[0012] In another embodiment, outside of the hollow unit body is covered with nonwoven fabric
to carry out back-filling of soil or grouting of concrete grout.
[0013] Effective advantages of the present invention are that heavy rain, when falling on
a road surface, can be collected by means of various types of permeable pavement or
water passage pipe to direct rainwater into underground, and is stored in the high-strength
structural formwork structural space buried underground, so as to not only effectively
prevent chance of flooding occurring on the surface, but also serving for re-supplementing
the underground water resources to allow the rainwater to be stored and recovered
for subsequent reuse.
[0014] Other features of the present invention and embodiments will be described in detail
with reference to the attached drawings for better understanding.
BRIEF DESCRIPTION OF THE DRAWINGS
[0015]
FIG. 1 is a cross-sectional view showing a high-strength road according to the present
invention.
FIG. 2 is an enlarged schematic view showing a partial structure of the present invention.
FIG. 3 is an exploded view showing a structure of a hollow unit body according to
the present invention.
FIG. 4 is a perspective view of FIG. 3 in an assembled formed.
FIG. 4a is an enlarged schematic view showing a partial structure of FIG. 4 according
to the present invention.
FIG. 5 is a schematic view showing structural formworks mutually jointed and expanded
according to the present invention.
FIG. 5a is an enlarged schematic view showing a partial structure of FIG. 5 according
to the present invention.
FIG. 6 is a schematic view showing laying nonwoven fabric on top of a through pipe
according to the present invention before a grouting operation is carried out.
FIG. 7 is a schematic view showing arrangement of hollow tubular pillars beside the
through pipe of the formwork according to the present invention.
FIG. 8 is a schematic view showing the present invention combined with water-permeable
asphalt road surface.
FIG. 9 is a schematic view showing a high-strength road after completion of filling
concrete grout in the through pipe according to the present invention.
FIG. 10 is a schematic view showing water drainage of an underground space according
to the present invention.
FIG. 11 is a schematic view showing preparation of a grouting operation of concrete
grout after through pipes are connected in cascade in an arrangement of hollow unit
bodies stacked in an upper-lower fashion according to the present invention.
FIG. 12 is a schematic exploded view showing a structure of an upper hollow unit body
according to the present invention.
FIG. 13 is a schematic view a side slab arranged and backing under the hollow unit
body structural formwork according to the present invention.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
[0016] Referring to FIGS. 1 and 2, the present invention provides an underground structural
space 30 formed by grouting concrete grout on a hollow unit body 30a to solidify and
combine therewith, and a permeable pavement 10 laid on the structural space. One technical
solution of the permeable pavement 10 includes a permeable pavement structure proposed
early by the present inventor, including a water passage pipe 10a or a water passage
hole formed through drilling for quickly directing surface rainwater to accumulate
in the underground structural space water storage and drainage system of high support
strength according to the present invention.
[0017] Gravel grading 20 is laid under the permeable pavement 10 to quickly receive the
rainwater penetrates down from the road surface through the permeable pavement 10
to get into the system facility of the underground space 30 to prevent occurrence
of flooding.
[0018] Referring to FIGS. 3, 4, and 4a, the hollow unit body 30a of the present invention
comprises a structural formwork 31 and a plurality of side slabs 32 combined together.
A plate 312 is arranged on an upper surface of the structural formwork 31, and the
plate 312 is provided with through holes 311 and at least one through pipe 33. The
plate 312 is formed with recessed portions 313. The structural formwork 31 and the
side slabs 32 are combined together to form a hollow unit body, which is laid on a
road base, followed by grouting concrete grout into the through pipe 33 to form, after
solidified, an underground structural space system having a high support strength.
[0019] Referring to FIGS. 5, 5a, and 6, a plurality of corresponding tenons 317 and mortises
318 are formed on a periphery of the plate 312 of the structural formwork 31, so that
the structural formworks 31 of two adjacent hollow unit body can be joined together
by means of tenon and mortise joints.
[0020] Referring to FIG. 3, the side slab 32 is formed with through holes 321 to allow for
water entry from side surfaces of the hollow unit body 30a and is also provided, at
locations corresponding to an edge of the structural formwork 31 in which snap notches
319 are formed, with snap fastening structures. In the drawing, the snap fastening
structure is provided as a hooking barb 322 to allow the side slab 32 to fast connect,
through snap engagement, to an outside of the structural formwork 31 of each unit
body 30a to form a hollow body structure.
[0021] Referring to FIG. 7, the structural formwork 31 is constructed such that in addition
to a through pipe 33 arranged at the center, four hollow tubular pillars 314 are arranged
around a circumference of the through pipe 33, the through pipe 33 or the hollow tubular
pillars 314 being preferably arranged to include an inner wall having tapering, and
also, an end portion of each of the hollow tubular pillars 314 of the structural formwork
31 being backed with a side slab 32, so that in case of an uneven underside or an
easily-recessing underside, the backing is necessary, as shown in FIG. 13, and after
being combined and positioned, the side slabs 32 are disposed on the side surfaces
thereof for jointing thereto.
[0022] Referring to FIGS. 6, 8, and 9, when the present invention is assembled to form the
hollow unit body 30a, a hollow formwork grouting channel is formed with the structural
formwork 31 on which the through pipe 33 is provided, and under the through pipe 33
or the hollow tubular pillars 314, a sand layer 21 is selectively laid, and if necessary,
a concrete layer 22 is bottomed below the sand layer 21. If necessary, a reinforcement
bar 34 may be selectively disposed in the through pipe 33 of the hollow grouting channel,
as shown in FIG. 8. During grouting concrete grout into the through pipe 33, an entire
structural body of combination of a plurality of hollow unit bodies 30a is entirely
covered, on an outside thereof, with nonwoven fabric 30b and concrete grout 302 is
subsequently grouted into the through holes 301, so that after the concrete gets solidified,
a supporting pillar formed of the solidified concrete in the hollow grouting channel
is solidified into a high-strength building body, forming a column structure similar
to a house structure to shape up and form building body facility as sturdy as an underground
dam, constructing buried underground and more durable to shaking and impacting of
earthquake and pressurizing of large-sized heavy vehicles without causing collapse
and damage to the road surface, and being easy to keep the road surface flat.
[0023] It is noted that a conduit 35 may be built in advance in the interior of the hollow
water storage unit body 30a to ease arrangement for line penetration and arrangement
of lines for water supply, water drainage, electrical wires, telephone lines, and
optical fiber lines of cable television.
[0024] Referring to FIG. 9, the present invention provides the underground space 30 formed
of the hollow unit body 30a by means of solidifying and combining with concrete grout
poured thereto, and the permeable pavement 10 or a regular concrete or asphalt paved
on the top of the water storage space. The pavement 10 is the permeable pavement road
surface formed by laying water-permeable asphalt, so that rainwater in addition to
seeping downward through the permeable pavement for draining accumulated water, so
as to achieve collection of the rainwater to be reused through being pumped out by
using a water pumping device 37, as shown in FIG. 1.
[0025] Referring to FIG. 10, the water drainage function of the structural space under the
road surface according to the present invention is arranged, according to drainage
requirement or being close to a river side, to set up an overflow hole 36 communicating
between the underground space 30 of the present invention and the river, for directly
discharging when a level of rainwater penetrating down through the road surface reaches
the overflow hole 36 to fulfill a function similar to a drainage ditch under the road
surface.
[0026] Referring to FIGS. 11 and 12, in another embodiment of the present invention, to
increase the high-strength structural space for water storage and water drainage under
the road surface, the structural formwork of the hollow unit body according to the
present invention is arranged to stack in an upper-lower fashion so that the through
pipes 33 in the structural formworks 31 of the hollow unit body 30a are connected
in cascade to form a formwork channel for grouting of concrete grout, so that the
concrete, after grouting, is allowed to solidify to form a concrete supporting pillar,
while the system formwork is kept on the outside to protect the concrete supporting
pillar from being invaded by water and also to protect the concrete against aging
caused by oxidation, forming a deeper and bigger under-road space high-strength underground
water resources regulation structural space.
[0027] As shown in FIG. 12, the hollow unit body 30a of the different embodiment of the
present invention is changed to be formed of a combination of two structural formworks,
including an upper structural formwork 31a and a lower structural formwork 31b and
four side slabs 32. When assembled, the upper structural formwork 31a and the lower
structural formwork 31b, the two being of the same structure, are arranged to stack
in an upper-lower and symmetric fashion, and the four side slabs 32 are snap fit to
the circumferential edges of the upper structural formwork 31a and the lower structural
formwork 31b to joint together to form a hollow body having a space.
[0028] The present invention provides a system having a high-occupancy high-strength pressurizing-resistant
space under a road surface and also providing water storage and water drainage, for
achieving an effect of water storage and water drainage for a large area in a short
period of time, featuring prevention of probability of occurrence of regional flooding
and drought and also allowing rainwater to slowly penetrate into the underground soil
layer to re-supplement the underground water resources, and as such, a function of
effective and fast draining of water on surface in a short period of time and recovery
of rainwater and re-supplementing of underground water is achieved.
[0029] From the above, the present invention provides the following practical advantages:
- (1) A hollow and high-occupancy, high-strength structural underground space is provided
in a road to serve as a water storage, water drainage, and catastrophe prevention
system, similar to a man-made underground dam and waterway facility, which may automatically
store water and prevent catastrophe during rainwater flooding season for supplying
to the ground surface with a simple water pumping device for fulfilling an environmental
protection efficacy through subsequent repeated reuse and repeated recirculation of
rainwater so as to achieve an effect of full storage of water and recovery and reuse
of rainwater resources.
- (2) A jointed underground structural space formed of a structural formwork is provided,
which not only has high porosity and high supporting, but also features light weight
and small size and high reusability, allowing construction to be carried out more
easily and faster, shortening the construction time, lowering cost, and also providing
an effect of environmental protection.
- (3) Improvement is achieved for inconsistency of traditional roads and water conservancy
constructions and catastrophe prevention and water resources regulation, and is even
good for alleviating the probability of occurrence of flooding and droughts and the
occurrence of public security events of the traditional roads being easy to collapse.
- (4) Surface runoff flow can be improved, and probability of occurrence of flooding
and droughts can be reduced, and underground water resources can be re-supplemented,
so as to not only achieve water retention for base, but also build up a reliable and
effect sponge city ecological environment.
- (5) The disadvantage of a traditional road base being necessarily compacted and isolating
water and air from naturally circulating can be alleviated to thereby provide facility
that places more emphasis on catastrophe prevention and environmental ecology.
- (6) Disadvantages of traditional way of using water and water management only being
made in spots (such as water dams) with water supply being not easy and maintenance
being difficulty and cost being high, and disadvantages of lines (such as ditches)
being necessarily cleaned and maintained, and having malodors, mosquitos and insects,
cockroaches, mice that cause contamination to the environment can be alleviated.
[0030] In summary, the present invention provides a high-strength road for water resources
regulation in response to climate change, which constructs an underground water storage
and water drainage structural space of efficacy of underground water resources regulation
and use and featuring both underground space and high supporting, showing a value
of use in the industry, and as such, a patent application is proposed. However, the
above provides only the preferred embodiments of the present invention and should
not be construed as limiting to the scope of implementation of the present invention.
All simple equivalent variations and modifications that are based on the claims and
the contents of the specification of the present invention are considered falling
in the scope of the present invention defined by the claims.
1. A high-strength road for a water resource regulation system in response to climate
change, comprising an underground structural space (30) formed by combining a structural
formwork (31) of a hollow unit body (30a) by means of grouting and solidifying concrete
grout (302), and a pavement (10) laid on a top of the underground structural space
(30), characterized in that the hollow unit body (30a) comprises at least one structural formwork (31) and a
plurality of side slabs (32) combined with each other; a plate (312) is disposed on
an upper surface of the structural formwork (31), the plate (312) being provided with
a through hole (311) and at least one through pipe (33), wherein the structural formwork
(31) and the side slabs (32) are combined together and laid, and then concrete grout
(302) is grouted into and solidifies in the through pipe (33) of the structural formwork
(31) to form an underground structural space (30) with a high support strength, a
water resources regulation road having a water storage and drainage system.
2. The high-strength road for a water resource regulation system in response to climate
change according to claim 1, characterized in that in the structural formwork (31) of the hollow unit body (30a), tenons (317) and mortises
(318), which correspond to each other, are formed in a periphery of the plate (312)
to allow the structural formworks (31) of two adjacent unit bodies (30a) to joint
to each other by means of tenon and mortise joints; and in the side slabs (32), the
slabs (32) are formed with the through holes (321) and are provided, in locations
of a side edge, with snap fastening structures.
3. The high-strength road for a water resource regulation system in response to climate
change according to claim 1, characterized in that the hollow unit body (30a) is constructed by combining two, upper and lower, structural
formworks (31) and four side slabs (32).
4. The high-strength road for a water resource regulation system in response to climate
change according to claim 1, characterized in that the plate (312) of the structural formwork (31) is provided with hollow tubular pillars
(314) arranged in a circumference of the through pipe (33).
5. The high-strength road for a water resource regulation system in response to climate
change according to claim 2, characterized in that the plate (312) of the structural formwork (31) is provided, on four sides of a top,
with snap notches (319), and snap fastening structures provided in locations of side
edges of the side slabs (32) are hooking barbs (322).
Amended claims under Art. 19.1 PCT
1. A high-strength road for a water resource regulation system in response to climate
change, comprising a structure formed by combining a structural formwork (31) of a hollow
unit body (30a) and solidified concrete grout (302), the structure forming an underground
structural space (30), a pavement (10) being laid on a top of the underground structural
space (30), characterized in that the hollow unit body (30a) comprises at least one structural formwork (31) and a
plurality of side slabs (32) combined with each other; a plate (312) is disposed on
an upper surface of the structural formwork (31), the plate (312) being provided with
a through hole (311) and at least one through pipe (33), wherein the structural formwork
(31) and the side slabs (32) are combined together and laid, and concrete grout (302)
is grouted into the through pipe (33) of the structural formwork (31), and the concrete grout (302) solidifies and is capable of forming an underground structural space (30) with a high support strength, the underground structural space (30) forming a water resources regulation road having a water storage and drainage function.
2. The high-strength road for a water resource regulation system in response to climate
change, characterized in that in the structural formwork (31) of the hollow unit body (30a), tenons (317) and mortises
(318), which correspond to each other, are formed in a periphery of the plate (312)
to allow the structural formwork (31)s of two adjacent unit bodies (30a) to joint
to each other by means of tenon and mortise joints; and in the side slabs (32), the
slabs (32) are formed with the through holes (321) and are provided, in locations
of a side edge, with snap fastening structures for the side slabs (32) to fast attach, through snap engagement, to outsides of the
structural formwork (31) to thereby form a hollow unit body (30a).
3. The high-strength road for a water resource regulation system in response to climate
change according to claim 1, characterized in that the hollow unit body (30a) is constructed by combining two, upper and lower, structural
formworks (31) and four side slabs (32).
4. The high-strength road for a water resource regulation system in response to climate
change according to claim 1, characterized in that the plate (312) of the structural formwork (31) is provided with hollow tubular pillars
(314) arranged in a circumference of the through pipe (33).
5. The high-strength road for a water resource regulation system in response to climate
change according to claim 2, characterized in that the plate (312) of the structural formwork (31) is provided, on four sides of a top,
with snap notches (319), and snap fastening structures provided in locations of side
edges of the side slabs (32) are hooking barbs (322).