[0001] The present invention relates to a column in steel with hollow section, for realizing
steel-concrete mixed structures.
[0002] More specifically, the present invention relates to a connection node for transferring
stresses between steel and concrete and a method for realizing the same, as well as
the hollow column realized with the method according to the invention.
Technical field
[0003] Steel-concrete composite structures are constituted by portions realized in steel
for metal carpentry and by portions realized in ordinary reinforced concrete, made
interacting with each other by means of a suitably dimensioned connection system.
Appreciated features of such structural system are those connected to the use of portions
in metal carpentry which guarantee the advantages of the prefabrication and use of
steel.
[0004] This ensures speed of building yard operations, auto-supporting of some elements
also in absence of finishing casting (step 1), compactness of sections of resistant
elements. To these advantages it is added the simplification generally guaranteed
by the technology of reinforced concrete in comparison to the one of traditional metal
carpentry works. The use of reinforced concrete allows in fact great assembly tolerances,
the use of not so skilled workers, simplicity of realization of structural nodes,
remarkable adaptability to even complex geometries, reduced elastic deformations.
[0005] The European norm "Eurocode 4: Design of composite steel and concrete structures,
part 1-1: general rules and rules for buildings" for hollow columns in steel filled
with concrete recommends the use of shear connections apt to distribute, among the
portions of steel and concrete, the stresses transmitted by the elements connected
to the end of the column and transmitted by the loads applied along the column, when
the project resistance to shear exceeds the contact section between steel and concrete.
[0006] In seismic area the use of shear connections is a mandatory and essential condition
to be able to react properly to the stresses the element is subjected to, and so the
choice of the geometrical and dimensional features and the distribution along the
development of the column but above all the embodiment of the connection system are
very relevant.
[0007] Before the following description, it is to be said that steel-concrete mixed structures
life is divided, as it is well known, in two steps.
[0008] In step 1 (or step of structure realization), the loads relating to the dead weight
of the structure, of the other elements of the floor and of the concrete casting are
provided. During this step, it is not possible to rely on the resistance properties
of concrete, which is not solidified, or however, it has not reached its final resistance
characteristics yet.
[0009] To evaluate the structural safety during this step, only the sections of the portions
in steel, stressed by loads really provided in such step (structural components weight
and working loads of the building yard) are considered as resistant sections.
[0010] The step 2 is instead the step during which the building, after concrete curing,
assumes its final configuration of steel-concrete mixed structure. In this step, the
resistance to be considered is both the one of steel and concrete, while the actions
to be considered for structural tests are all the project actions, including possible
seismic actions.
[0011] At the state of the art, the technical field of the realization of steel-concrete
mixed structures comprises many solutions both relating to vertical structures (i.e.
pillars or columns) and horizontal structures (i.e. beams). In particular, the present
invention relates to a column in steel with hollow section, filled with concrete and
able to resist to deviated tensile, compressive and bending stresses, having a hollow
metal profile of square, rectangular or circular shape as crossing section, and connected
to the filling concrete by means of a specific connection system apt to transfer stresses
between steel section and filling concrete.
[0012] It is to be specified that, even if many realization embodiments of steel-concrete
mixed columns are known at the state of the art - as for example those described in
documents
KR100620860,
CN106638985A,
KR20150046913,
CN106759865,
CN106522419 - all the embodiments known at the state of the art have some limits.
[0013] US2006265992 describes a joint structure for connecting a rectangular steel beam to a rectangular
steel column using a coupling member which eliminates the need to cut columns, improving
efficiency.
[0014] The embodiments known at the state of the art however do not allow to realize connection
elements arranged arbitrarily along the longitudinal development of the column, nor
describe specific embodiments and geometrical characteristics of the connection nodes
which maximize the efficacy in distributing stresses, and so, the structural performance
of the composite column.
Aim of the invention
[0015] Aim of the present invention is to provide a hollow column in steel for the realization
of steel-concrete mixed structures, which overcomes the limits linked to the embodiments
known at the state of the art, with particular reference to the embodiments of the
connection node.
[0016] More specifically, the present invention provides a hollow column in steel for the
realization of steel-concrete mixed structures in which the connection nodes for transferring
stresses between steel and concrete have geometrical features so to maximize the efficacy,
and can be arranged, along the development of the column, in any position, according
to what results from structural calculations.
[0017] The present invention provides a method for the realization of a steel-concrete composite
column constituted by a metal tube filled with concrete cast in place, with two materials
interacting according to the deformation congruence principle and which allow performance
in elastic/plastic field with a response capacity in terms of ductility and resistance
very much above what it is possible with the ordinary reinforced concrete columns
of equal dimensions.
[0018] Before the following detailed description, it is to be said that what described and
claimed by the present inventors has been found out by laboratory test on prototypes
realized in scale 1:1, subjected to pseudo-static cyclic test with increasing drifts
displacement control.
Brief description of the invention
[0019] The present invention reaches the prefixed aims since it is a column (1), according
to claim 1, for the realization of mixed concrete and steel structures, comprising:
a tube (10) with hollow section, configured to be filled with concrete through an
opening (14) at its higher end or through openings (14) arranged on its own side surface,
a plurality of connection systems (11, 12, 13) configured to transfer stresses between
the hollow section in steel and filling concrete, each connection system (11, 12,
13) comprising at least two profiles in steel arranged in a plane orthogonal to the
axis of said metal tube and configured to occupy partially the hollow portion of the
section of the tube, characterized in that said tube column (10) is realized by means
of a unique metal tube, it is subdivided in a plurality of lengths (110, 120, 130,
140) corresponding to sections comprised between two floors slab of the structure
and at each length (110, 120, 130, 140) it is provided a group of foot connection
systems (111, 121, 131, 141) and a group of head connection systems (112, 122, 132,
142) positioned at the head and foot of each length, respectively, in that said steel
profiles are introduced in elongated holes with suitable dimensions for introducing
from outside a respective profile and in the following welded, as fillet welds with
full filling, to the outer tube (100), and in that said elongated holes have height
equal to thickness (Sp) of the relative profile and width equal to width (L) of the
side of the tube (100) reduced by a suitable portion, so to guarantee the integrity
of the tube (100) also during the cutting and welding steps.
Detailed description of the invention
[0020] With reference to the appended drawings, the column (1) according to the present
invention comprises a tube (10) with hollow section, configured to be filled with
concrete through an opening (14) at its own higher end or through openings (141) arranged
on its own side surface. As it will be explained better in the following, preferably
said openings (141) are arranged at the fastening sections of floors slab.
[0021] It is to be specified that with hollow section it is intended an innerly hollow section,
preferably of circular (101), square (102) or rectangular shape (103).
[0022] From a structural point of view, the tube (10) having such a section can be realized,
without departing from the aims of the invention, both by using welded metal tubes
and by using welding free metal tubes.
[0023] The column (1) comprises also a plurality of connection systems (11, 12, 13) configured
to transfer stresses between the hollow section in steel and the filling concrete.
[0024] Each connection system (11, 12, 13) comprises at least a profile in steel, arranged
in an orthogonal plane to the axis of said metal tube and configured to occupy partially
the hollow portion of the section of the tube. In figure 2-a it is shown an embodiment
in which each system comprises a unique steel profile.
[0025] Furthermore, as it is shown in figure 2-b as a whole and in figure 6 in detail, each
connection system (11, 12, 13) comprises a plurality of steel profiles (111, 112),
arranged each on a plane orthogonal to the axis of said metal tube and configured
to occupy partially the hollow portion of the section of the tube.
[0026] The hollow column (1) comprises a plurality of connectors.
[0027] For example, in figure 5, it is shown a column (1), realized with a unique tube (10)
and subdivided in 4 lengths (110, 120, 130, 140). With "length" it is intended the
section of a column comprised between two floors slab, or between foundation and floor
of the first floor.
[0028] At the first length starting from the top (110) it is provided a group of foot connectors
(111) and a group of head connectors (112). Each group of connectors comprises at
least two stresses distribution elements (11) of the type described in the following.
Similarly, respective head and foot connector groups (121, 122, 131, 132, 141, 142)
are associated to each of the following lengths (120, 130, 140).
[0029] The maximum tubes marketable lengths are about 13.5 m. This maximum length is to
be intended as indicative and not limiting the aims of the invention. Anyway, it is
clear that, for lenghts of many meters of the column, all the connector groups (111,
121, 122, 131, 132, 142) distant from the ends of the tube cannot be realized, from
a structural point of view, by working inside the tube.
[0030] For this reason, in the following it is described the realization embodiment of the
connection nodes according to the present invention, and the working method needed
to realize them.
[0031] The realization method according to the invention comprises the steps of:
(1000) realization of a plurality of connection elements (11), by cutting steel plates
with suitable thickness;
(2000) at the perimeter of each section of the tube (10) in which a connection node
is desired, realization of elongated holes with suitable dimensions to introduce from
outside the connection element (11);
(3000) calking of the portion of the outer edge of the connection element (11) which
will have to be welded to the tube (100), so to realize a "v" profile (113);
(4000) introduction of each connection element (11) in a respective elongated hole
obtained along the perimeter of the tube (100);
(5000) welding, as fillet welds with full filling, of the calked outer edge (113)
of the connection element (11) to the outer tube (100) with following restoration
of the tube resistant section.
[0032] As it is observed, the whole just described realization allows to operate from outside
for the realization of the connection system, and so it does not require that the
connection element is arranged at the ends of the column. It is to be specified that,
according to what found out by the present inventors, the structural resistance better
features are obtained with the following preferred realization embodiment of the mixed
column according to the invention, in which:
- the depth of the "v" calking is equal to the thickness (T) of the tube (100) of the
column reduced by 2 mm, with the calking "v" vertex at the center of the thickness
(Sp) of the connection element (11);
- the dimensions of the calking (113) have to be added to the depth (Bc) the connection
element (11) has to project of inside the tube (100), since the calking is wholly
contained in the thickness of the column (100);
- the outer whole length of the connection elements (11) which is welded to the tube
(100) is equal to the length of the whole perimeter of the tube (100), reduced by
a portion suitable to guarantee the integrity of the tube (100) also during the cutting
and welding steps.
[0033] In particular, as it is shown in figure 6, in case of tubes with square or rectangular
sections, the elongated holes realized for each section of the tube at step (1000)
- are four in number, one for each side of the tube (100),
- are centred with respect to the side of the tube and have height equal to the thickness
(Sp) of the connection element (11) and width equal to width (L) of the side of the
tube (100) reduced by six times the thickness (T) of the same tube (100).
[0034] In case of square or rectangular sections, and as it is shown in particular in figure
6-b, each connection element (11) has a shape in plant composed of:
- a rectangle of width equal to the width of the elongated hole obtained in the tube
and height equal to the difference half between width of hole and width (L) of tube
(100) with
- a isosceles trapezoid with sides at 45°, major base coincident with the width of the
rectangle and height such that the whole depth of the connection element is equal
to the calculation length (Bc) of the connection element increased by the thickness
(T) of the tube.
[0035] In case of tubes (100) with circular section, as it is shown in figure 7, the elongated
holes realized in step (1000) are two in number, are symmetrical with respect to a
diameter of the section and have the ends of each opening spacing to each other four
times the thickness (T) of the tube.
[0036] Also in this case, the height of the openings is equal to the thickness of the connector,
so to allow its introduction.
[0037] The shape of each connection element (11) in this case is a segment of circular crown,
with outer radius equal to the radius of the tube element (100) reduced by 2 mm, inner
radius equal to the inner radius of the column (100) reduced by the calculation width
(Bc) of connector and height of the segment of circular crown equal to the outer radius
of the column (100) reduced by two times the thickness of the tube of the column and
further reduced by 2 mm.
[0038] From a positioning point of view of the connectors along the section, as it is shown
in figure 5 and figure 8-a, in a preferred embodiment the connectors positions along
the longitudinal development of the column are concentrated at the head and foot of
each length.
[0039] More in particular, in order to optimize the structural resistance performance, the
first connector (11) at the foot of each length (110, 120, 130, 140) is positioned
at a distance equal to 2 times the calculation width (Bc) of the connector from the
beginning of the length, which is measured starting from the foundation for the first
bottom length (104), and is measured extrados of the section in concrete of the floor
beam for the other lengths (110, 120, 130).
[0040] The first connector (11) at the head of each length, starting from the top to bottom,
has to be positioned as well at a distance equal to 2 times the calculation width
(Bc) of the connector starting from intrados of the section in concrete of the floor
beam.
[0041] The connectors next to the first one are spaced to each other two times the calculation
width (Bc) of the connector.
[0042] The multi-floor column with composed section provided with connectors according to
what just described can be progressively filled with concrete through the side openings
(141) arranged at heights immediately higher to those of each floor slab, so to support,
at the height of the general deck, the discharge of step 1 of auto-supporting beams
with mixed steel-concrete section which converge on the same, thus contributing to
the whole realization of the prefabrication in workshop with dry assembly on the building
yard of the structural system of the building.
[0043] It is to be précised in fact that, to such aim, as it is shown in figure 9, at the
height of each floor beam, the column (100) comprises a window (141) configured to
allow the introduction of the head of a tube for concrete, thus allowing the filling
of the portion of the underlying column. From the just described disclosure, it is
clear that the device for transferring stresses for the hollow column (1) according
to the invention can be realized simply in workshop in the steel structure prefabrication
step, and does not need any operation to be carried out in building yard, with the
exception of the execution of the concrete positioning and casting.
[0044] As yet said, each column comprises a system for transferring stresses at or near
each end section of each single length of the pillaring, and more specifically at
the head and foot of each single length, i.e. in the two end sections of each single
column of the pillaring. This allows to obtain the result that, when a structure with
frame is realized, which comprises a plurality of pillars realized by means of columns
of the just described type, each pillar is provided with connections which allow the
load transfer between steel and concrete at all the sections in which the load applied
can be subjected to variations, which coincide with the head and the foot of the pillar.
Thanks to this structural measure, it can be considered valid the hypothesis of deformation
congruence for the crossing section of the column, constituted both by the steel hollow
section and by the filling concrete. This hypothesis consists in considering the deformation
of the hollow section equal to the average deformation of the surrounding concrete.
[0045] The just described connection system has to be dimensioned, as a function of the
loads, to guarantee at the same time the project resistance both of the steel the
metal connectors are made up of and of the concrete filling the hollow section. In
other terms, the collapse of both the materials has to be prevented in order that
the load can be transferred effectively. Resistances of all the fastening systems
(by means of welding or screw coupling) between the metal connectors and steel hollow
section of the composite column have to be tested as well.
1. Column (1) for the realization of mixed concrete and steel structures, comprising:
- a tube (10) with hollow section, configured to be filled with concrete through an
opening (14) at its higher end or through openings (14) arranged on its own side surface,
- a plurality of connection systems (11, 12, 13) configured to transfer stresses between
the hollow section in steel and filling concrete, each connection system (11, 12,
13) comprising at least two profiles in steel arranged in a plane orthogonal to the
axis of said metal tube and configured to occupy partially the hollow portion of the
section of the tube,
wherein said tube column (10) is realized by means of a unique metal tube, it is subdivided
in a plurality of lengths (110, 120, 130, 140) corresponding to sections comprised
between two floors slab of the structure and at each length (110, 120, 130, 140) it
is provided a group of foot connection systems (111, 121, 131, 141) and a group of
head connection systems (112, 122, 132, 142) positioned at the head and foot of each
length, respectively,
and wherein
said steel profiles are introduced in elongated holes with suitable dimensions for
introducing from outside a respective profile and in the following welded to the outer
tube (100),
and wherein
said elongated holes have height equal to thickness (Sp) of the relative profile and
width equal to width (L) of the side of the tube (100) reduced by a suitable portion,
so to guarantee the integrity of the tube (100) also during the cutting and welding
steps
characterized in that
said column (1) has rectangular section or circular section,
where said column (1) has rectangular section, said elongated holes are in number
of one for each side of said tube (100), are centred with respect to the side of the
tube (100), and each of said steel profiles has a shape in plant made up of:
- a rectangle of width equal to the width of the hole provided in the tube and height
equal to the difference half between width of hole and width (L) of tube (100) and
a isosceles trapezoid with sides at 45°, major base coincident with the width of the
rectangle
Where said column (1) has circular section, said elongated holes are in number of
two, are symmetrical with respect to a diameter of the section and have the ends of
each opening spacing to each other four times the thickness (T) of the tube, each
of said profiles being a segment of circular crown, with outer radius equal to the
radius of the tube element (100) reduced by 2 mm, inner radius equal to the inner
radius of the column (100) reduced by the width (Bc) of connector (11) and height
of the segment of circular crown equal to the outer radius of the column (100) reduced
by two times the thickness of the tube of the column and further reduced by 2 mm.
2. Column (1) for the realization of concrete and steel mixed structures according to
claim 1, characterized in that said width suitable to guarantee the integrity of the tube (100) also during the
cutting and welding steps is generally equal, for all the holes, to six times the
thickness (T) of the same tube (100).
3. Column (1) for the realization of concrete and steel mixed structures according to
any one of the preceding claims, characterized in that the first connector (11) at the foot of each length (110, 120, 130, 140) is positioned
at a distance from the beginning of each length (110, 120, 130, 140) equal to 2 times
the width (Bc) of the connector.
4. Column (1) for the realization of concrete and steel mixed structures according to
any one of the preceding claims, characterized in that the first connector (11) at the head of each length is positioned at a distance equal
to 2 times the calculation width (Bc) of the connector starting from the intrados
of the section in concrete of the floor beam, and the connectors next to the first
one are spaced to each other 2 times the calculation width (Bc) of the connector.
5. Method for the realization of a hollow column, according to any one of the preceding
claims, comprising the steps of:
(1000) realization of a plurality of connection elements (11), by cutting steel plates;
(2000) at the perimeter of each section of the tube (10) in which a connection node
is desired, realization of elongated holes with suitable dimensions to introduce from
outside a respective connection element (11) obtained in step (1000);
(3000) calking of the portion of the outer edge of the connection element (11) in
the portion which will have to be welded to the tube (100);
(4000) introduction of each connection element (11) in a respective elongated hole
obtained along the perimeter of the tube (100);
(5000) welding, as fillet welds with full filling, of the calked outer edge (113)
of the connection element (11) to the outer tube (100).
6. Method according to claim 5,
characterized in that
- the depth of said calking is equal to the thickness (T) of the tube (100) of the
column reduced by 2 mm, and said calking is symmetrical to the thickness (sp) of the
connection element (11);
- after the introduction of step (4000) the calking is wholly contained in the thickness
of the column (100);
- the outer whole length of the connection elements (11) which is welded to the tube
(100) is equal to the length of the whole perimeter of the section of the tube (100),
reduced by a portion suitable to guarantee the integrity of the tube (100) also during
the cutting and welding steps.
7. Method according to claim 6,
characterized in that said section is a square or rectangular section, and said elongated holes realized
at step (1000);
- are four in number for each section, one for each side of the tube (100),
- are centred with respect to the side of the tube;
- have a height equal to the thickness (Sp) of the connection element (11) and width
equal to width (L) of the side of the tube (100) reduced by six times the thickness
(T) of the same tube (100).
8. Method according to claim 6 or 7,
characterized in that said section is a rectangular section, and each connection element (11) has a shape
in plant composed of:
- a rectangle of width equal to the width of the hole provided in the tube and height
equal to the difference half between width of hole and width (L) of tube (100);
- a isosceles trapezoid with sides at 45°, major base coincident with the width of
the rectangle.
9. Method according to claim 6, characterized in that said section is a circular section, said elongated holes realized in step (1000)
are two in number, are symmetrical with respect to a diameter of the section and have
the ends of each opening spacing to each other four times the thickness (T) of the
tube.
10. Method according to claim 9, characterized in that the shape of each connection element (11) is a segment of circular crown, with outer
radius equal to the radius of the tube element (100) reduced by 2 mm, inner radius
equal to the inner radius of the column (100) reduced by the width (Bc) of connector
and height of the segment of circular crown equal to the outer radius of the column
(100) reduced by two times the thickness of the tube of the column and further reduced
by 2 mm.
1. Säule (1) zur Errichtung von Verbundkonstruktionen aus Beton und Stahl, umfassend:
- ein Hohlprofilrohr (10), das konfiguriert ist, um durch eine Öffnung (14) an seinem
oberen Ende oder durch Öffnungen (14) an seiner Seitenfläche mit Beton ausgefüllt
zu werden,
- mehrere Verbindungssysteme (11, 12, 13), die konfiguriert sind, um Spannungen zwischen
dem Stahlhohlprofil und dem Füllbeton zu übertragen, wobei jedes Verbindungssystem
(11, 12, 13) mindestens zwei Stahlprofile umfasst, die in einer Ebene senkrecht zur
Achse des Metallrohrs angeordnet sind und derart konfiguriert sind, um den Hohlraum
des Rohrs teilweise auszufüllen,
wobei die Rohrsäule (10) aus einem einzigen Metallrohr besteht, das in mehrere Längen
(110, 120, 130, 140) unterteilt ist, die den Querschnitten zwischen zwei Geschossdecken
der Konstruktion entsprechen, und wobei für jede Länge (110, 120, 130, 140) eine Gruppe
von Fußverbindungssystemen (111, 121, 131, 141) vorhanden ist und eine Gruppe von
Kopfverbindungssystemen (112, 122, 132, 142) jeweils am Kopf- und Fußende jeder Länge
angeordnet sind,
und wobei die Stahlprofile werden in längliche Bohrungen mit geeigneten Abmessungen
eingeführt zur Einführung des jeweiligen Profils von außen und anschließend mit dem
Außenrohr (100) verschweißt werden,
und wobei
die länglichen Bohrungen eine Höhe aufweisen, die der Dicke (Sp) des jeweiligen Profils
entspricht, und eine Breite, die der Breite (L) der Rohrseite (100) abzüglich eines
geeigneten Anteils entspricht, um die Integrität des Rohrs (100) auch während der
Schneid- und Schweißvorgänge zu gewährleisten,
dadurch gekennzeichnet, dass
die Säule (1) einen rechteckigen oder kreisförmigen Querschnitt aufweist,
wobei die Säule (1) einen rechteckigen Querschnitt aufweist, die länglichen Bohrungen
sind eins an der Zahl jeder Seite des Rohrs (100) mittig zur Rohrseite (100) und jedes
der Stahlprofile eine Grundform aufweist, die sich zusammensetzt von:
- einem Rechteck mit einer Breite, die der Breite der in dem Rohr vorgesehenen Bohrung
entspricht, und mit einer Höhe, die der Hälfte der Differenz zwischen der Breite der
Bohrung und der Breite (L) des Rohrs (100) entspricht ; und einem gleichschenkliges
Trapez mit Seitenwinkeln von 45°, dessen Hauptbasis mit der Breite des Rechtecks übereinstimmt,
wobei die Säule (1) einen kreisförmigen Querschnitt aufweist, die länglichen Bohrungen
sind zwei an der Zahl symmetrisch zum Durchmesser des Querschnitts angeordnet und
deren Enden jeder Öffnung jeweils um das Vierfache der Dicke (T) des Rohrs voneinander
beabstandet sind,
wobei jedes der Profile ein kreisförmiges Kronensegment ist, dessen Außenradius dem
Radius des Rohrelements (100) abzüglich 2 mm entspricht, dessen Innenradius dem Innenradius
der Säule (100) abzüglich der Breite (Bc) des Verbindungsstücks (11) entspricht und
dessen Höhe dem Außenradius der Säule (100) abzüglich der doppelten Rohrdicke der
Säule und zusätzlich 2 mm entspricht.
2. Säule (1) zum Errichtung von Verbundkonstruktionen aus Beton und Stahl nach Anspruch
1, dadurch gekennzeichnet, dass die Breite, die die Integrität des Rohrs (100) auch während der Schneid- und Schweißvorgänge
gewährleistet, im Allgemeinen für alle Bohrungen dem Sechsfachen der Wandstärke (T)
desselben Rohrs (100) entspricht.
3. Säule (1) zur Errichtung von Verbundkonstruktionen aus Beton und Stahl nach einem
der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der erste Verbinder (11) am Fuß jeder Länge (110, 120, 130, 140) in einem Abstand
vom Anfang jeder Länge (110, 120, 130, 140) angeordnet ist, der dem Doppelten der
Breite (Bc) des Verbinders entspricht.
4. Säule (1) zur Errichtung von Verbundkonstruktionen aus Beton und Stahl nach einem
der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der erste Verbinder (11) am Kopf jeder Länge in einem Abstand von dem Intrados des
Betonquerschnitts des Bodenbalkens angeordnet ist, der dem Doppelten der Auslegungsbreite
(Bc) des Verbinders entspricht, und die benachbarten Verbinder jeweils im Abstand
des Doppelten der Auslegungsbreite (Bc) des Verbinders angeordnet sind.
5. Verfahren zum Herstellen einer Hohlsäule nach einem der vorhergehenden Ansprüche,
umfassend die folgenden Schritte:
(1000) Herstellen mehrerer Verbindungselemente (11) durch Zuschneiden von Stahlplatten;
(2000) Herstellen von länglichen Bohrungen mit geeigneten Abmessungen am Umfang jedes
Abschnitts des Rohrs (10), in dem ein Verbindungsknoten gewünscht ist, zum Einsetzen
eines entsprechenden in Schritt (1000) hergestellten Verbindungselemente (11) von
außen;
(3000) Abdichten des Teil des Außenrandes des Verbindungselements (11) im Bereich,
der mit dem Rohr (100) verschweißt werden soll;
(4000) Einsetzen jedes Verbindungselements (11) in eine entsprechende, entlang des
Umfangs des Rohrs (100) angebrachte längliche Bohrung;
(5000) Schweißen des abgedichteten Außenrandes (113) des Verbindungselements (11)
mit dem Außenrohr (100) mittels einer Kehlnaht.
6. Verfahren nach Anspruch 5,
dadurch gekennzeichnet, dass:
- die Tiefe der Abdichtung der Wandstärke (T) des Rohrs (100) der Säule abzüglich
2 mm entspricht und die Abdichtung symmetrisch zur Stärke (sp) des Verbindungselements
(11) ist;
- die Abdichtung nach Einführung des Schritts (4000) vollständig innerhalb der Stärke
der Säule (100) liegt;
- die Gesamtlänge der an das Rohr (100) geschweißten Verbindungselemente (11) der
Gesamtlänge des Rohrquerschnitts (100) abzüglich eines Anteils entspricht, der die
Integrität des Rohrs (100) auch während der Schneid- und Schweißvorgänge gewährleistet.
7. Verfahren nach Anspruch 6,
dadurch gekennzeichnet, dass der Querschnitt ein quadratischer oder rechteckiger Querschnitt ist und die länglichen
Bohrungen in Schritt (1000) realisiert sind ;
- vier pro Querschnitt sind, je eines auf jeder Seite des Rohrs (100),
- mittig zur Rohrseite angeordnet sind;
- eine Höhe aufweisen, die der Stärke (Sp) des Verbindungselements (11) entspricht,
und eine Breite, die der Breite (L) der Seite des Rohrs (100) entspricht und um das
Sechsfache der Stärke (T) desselben Rohrs (100) reduziert ist.
8. Verfahren nach Anspruch 6 oder 7,
dadurch gekennzeichnet, dass der Querschnitt ein rechteckiger Querschnitt ist und jedes Verbindungselement (11)
eine Grundform aufweist, die aus Folgendem besteht:
- einem Rechteck mit einer Breite, die der Breite der im Rohr vorgesehenen Bohrung
entspricht, und mit einer Höhe, die der Hälfte der Differenz zwischen der Breite der
Bohrung und der Breite (L) des Rohrs (100) entspricht;
- einem gleichschenkliges Trapez, dessen Seiten einen Winkel von 45° bilden, wobei
die längere Basis mit der Breite des Rechtecks übereinstimmt.
9. Verfahren nach Anspruch 6, dadurch gekennzeichnet, dass der Querschnitt ein kreisförmiger Querschnitt ist, die in Schritt (1000) hergestellten
länglichen Bohrungen zwei an der Zahl sind, symmetrisch zum Durchmesser des Querschnitts
angeordnet sind und die Enden jeder Öffnung einen Abstand von dem Vierfachen der Stärke
(T) des Rohrs aufweisen.
10. Verfahren nach Anspruch 9, dadurch gekennzeichnet, dass jedes Verbindungselement (11) ein kreisförmiges Kronensegment aufweist, dessen Außenradius
dem Radius des Rohrelements (100) abzüglich 2 mm entspricht, dessen Innenradius dem
Innenradius der Säule (100) abzüglich der Breite (Bc) des Verbindungselements entspricht
und dessen Höhe dem Außenradius der Säule (100) abzüglich der doppelten Stärke des
Säulenrohrs und zusätzlich 2 mm entspricht.
1. Colonne (1) pour la réalisation de structures mixtes en béton et en acier, comprenant
:
- un tube (10) à section creuse, configuré pour être rempli de béton par une ouverture
(14) à son extrémité supérieure ou par des ouvertures passantes (14) disposées sur
sa propre surface latérale,
- une pluralité de systèmes de connexion (11, 12, 13) configurés pour transférer des
contraintes entre la section creuse en acier et le béton de remplissage, chaque système
de connexion (11, 12, 13) comprenant au moins deux profiles en acier disposés dans
un plan orthogonal à l'axe dudit tube métallique et configurés pour occuper partiellement
la partie creuse de la section du tube,
dans laquelle la dite colonne tubulaire (10) est réalisée au moyen d'un tube métallique
unique, subdivisé en une pluralité de longueurs (110, 120, 130, 140) correspondant
à des sections comprises entre deux dalles de plancher de la structure et à chaque
longueur (110, 120, 130, 140), étant prévu un groupe de systèmes de connexion de pied
(111, 121, 131, 141) et un groupe de systèmes de connexion de tête (112, 122, 132,
142) positionnés respectivement à la tête et au pied de chaque longueur,
et dans laquelle
lesdits profiles en acier sont introduits dans des trous allongés de dimensions appropriées
pour l'introduction depuis l'extérieur d'un profil respectif et ensuite soudés au
tube extérieur (100),
et dans laquelle
lesdits trous allongés ont une hauteur égale à l'épaisseur (Sp) du profil relatif
et une largeur égale à la largeur (L) du côté du tube (100) réduite d'une portion
appropriée, afin de garantir l'intégrité du tube (100) également pendant les étapes
de découpe et de soudage,
caractérisée en ce que
ladite colonne (1) a une section rectangulaire ou une section circulaire, dans laquelle
ladite colonne (1) a une section rectangulaire, lesdits trous allongés étant au nombre
d'un de chaque côté dudit tube (100) et centrés par rapport au côté du tube (100),
et chacun desdits profils en acier a une forme en plan composée de :
- un rectangle de largeur égale à la largeur du trou prévu dans le tube et de hauteur
égale à la moitié de la différence entre la largeur du trou et la largeur (L) du tube
(100) ; et un trapèze isocèle avec des côtés de 45°, la base majeure coïncidant avec
la largeur du rectangle,
dans laquelle ladite colonne (1) a une section circulaire, lesdits trous allongés
sont au nombre de deux, sont symétriques par rapport à un diamètre de la section et
ont les extrémités de chaque ouverture espacées l'une de l'autre de quatre fois l'épaisseur
(T) du tube, chacun desdits profils étant un segment de couronne circulaire, avec
un rayon extérieur égal au rayon de l'élément tubulaire (100) réduit de 2 mm, un rayon
intérieur égal au rayon intérieur de la colonne (100) réduit de la largeur (Bc) du
connecteur (11) et une hauteur du segment de couronne circulaire égale au rayon extérieur
de la colonne (100) réduit de deux fois l'épaisseur du tube de la colonne et encore
réduit de 2 mm.
2. Colonne (1) pour la réalisation de structures mixtes en béton et en acier selon la
revendication 1, caractérisée en ce que ladite largeur, adaptée pour garantir l'intégrité du tube (100) même pendant les
étapes de découpe et de soudage, est généralement égale, pour tous les trous, à six
fois l'épaisseur (T) du même tube (100).
3. Colonne (1) pour la réalisation de structures mixtes en béton et en acier selon l'une
quelconque des revendications précédentes, caractérisée en ce que le premier connecteur (11) au pied de chaque longueur (110, 120, 130, 140) est positionné
à une distance du début de chaque longueur (110, 120, 130, 140) égale à 2 fois la
largeur (Bc) du connecteur.
4. Colonne (1) pour la réalisation de structures mixtes en béton et en acier selon l'une
quelconque des revendications précédentes, caractérisée en ce que le premier connecteur (11) à la tête de chaque longueur est positionné à une distance
égale à 2 fois la largeur de calcul (Bc) du connecteur à partir de l'intrados de la
section en béton de la poutre de plancher, et les connecteurs à côté du premier sont
espacés l'un de l'autre de 2 fois la largeur de calcul (Bc) du connecteur.
5. Procédé de réalisation d'une colonne creuse, selon l'une quelconque des revendications
précédentes, comprenant les étapes suivantes :
(1000) réalisation d'une pluralité d'éléments de connexion (11), par découpe de plaques
d'acier ;
(2000) au périmètre de chaque section du tube (10) dans laquelle un nœud de connexion
est souhaité, réalisation de trous allongés de dimensions appropriées pour introduire
de l'extérieur un élément de connexion respectif (11) obtenu à l'étape (1000) ;
(3000) calfeutrage de la partie du bord extérieur de l'élément de connexion (11) dans
la partie qui devra être soudée au tube (100) ;
(4000) introduction de chaque élément de connexion (11) dans un trou allongé respectif
obtenu le long du périmètre du tube (100) ;
(5000) soudage, sous forme de soudures d'angle avec remplissage complet, du bord extérieur
calfeutré (113) de l'élément de connexion (11) au tube extérieur (100).
6. Procédé selon la revendication 5,
caractérisé en ce que
- la profondeur dudit calfeutrage est égale à l'épaisseur (T) du tube (100) de la
colonne réduite de 2 mm, et ledit calfeutrage est symétrique à l'épaisseur (sp) de
l'élément de connexion (11) ;
- après l'introduction de l'étape (4000), le calfeutrage est entièrement contenu dans
l'épaisseur de la colonne (100) ;
- la longueur totale extérieure des éléments de connexion (11) soudés au tube (100)
est égale à la longueur du périmètre total de la section du tube (100), réduite d'une
portion appropriée pour garantir l'intégrité du tube (100) également pendant les étapes
de découpe et de soudage.
7. Procédé selon la revendication 6,
caractérisé en ce que ladite section est une section carrée ou rectangulaire, et lesdits trous allongés
réalisés à l'étape (1000) ;
- sont au nombre de quatre pour chaque section, une pour chaque côté du tube (100),
- sont centrés par rapport au côté du tube ;
- ont une hauteur égale à l'épaisseur (Sp) de l'élément de connexion (11) et une largeur
égale à la largeur (L) du côté du tube (100) réduite de six fois l'épaisseur (T) du
même tube (100).
8. Procédé selon la revendication 6 ou 7,
caractérisé en ce que ladite section est une section rectangulaire et que chaque élément de connexion (11)
a une forme en plan composée de :
- un rectangle de largeur égale à la largeur du trou prévu dans le tube et de hauteur
égale à la moitié de la différence entre la largeur du trou et la largeur (L) du tube
(100) ;
- un trapèze isocèle dont les côtés forment un angle de 45°, la base majeure coïncidant
avec la largeur du rectangle.
9. Procédé selon la revendication 6, caractérisé en ce que ladite section est une section circulaire, lesdits trous allongés réalisés à l'étape
(1000) sont au nombre de deux, sont symétriques par rapport à un diamètre de la section
et ont les extrémités de chaque ouverture espacées l'une de l'autre de quatre fois
l'épaisseur (T) du tube.
10. Procédé selon la revendication 9, caractérisé en ce que la forme de chaque élément de connexion (11) est un segment de couronne circulaire,
avec un rayon extérieur égal au rayon de l'élément tubulaire (100) réduit de 2 mm,
un rayon intérieur égal au rayon intérieur de la colonne (100) réduit de la largeur
(Bc) du connecteur et une hauteur du segment de couronne circulaire égale au rayon
extérieur de la colonne (100) réduit de deux fois l'épaisseur du tube de la colonne
et encore réduite de 2 mm.