TECHNICAL FIELD
[0001] The present disclosure relates to a binary refrigeration apparatus.
BACKGROUND ART
[0002] Conventionally, as a refrigeration apparatus for performing cooling in a low-temperature
range such as minus several ten degrees, there has been employed a binary refrigeration
apparatus having a first refrigeration cycle for circulating a first refrigerant on
the high-temperature side and a second refrigeration cycle for circulating a second
refrigerant on the low-temperature side. The first refrigeration cycle is referred
to as "high-stage refrigeration cycle". The second refrigeration cycle is referred
to as "low-stage refrigeration cycle".
[0003] In the binary refrigeration apparatus, a cascade condenser is provided. The cascade
condenser includes an evaporator in the first refrigeration cycle and a condenser
in the second refrigeration cycle, and is configured to perform heat exchange between
the first refrigerant and the second refrigerant. In the binary refrigeration apparatus,
a multi-stage refrigeration cycle is formed in which the first refrigeration cycle
is coupled to the second refrigeration cycle by the cascade condenser.
[0004] Such a binary refrigeration apparatus is disclosed in PTL 1. In the binary refrigeration
apparatus disclosed in PTL 1, a natural circulation circuit is provided to circulate
a refrigerant between the cascade condenser and a liquid receiver in the low-stage
refrigeration cycle.
[0005] In the binary refrigeration apparatus disclosed in PTL 1, when the low-stage refrigeration
cycle is stopped, the high-stage refrigeration cycle is operated in order to suppress
pressure increase in the low-stage refrigeration cycle. Thus, in the binary refrigeration
apparatus, the refrigerant in the low-stage refrigeration cycle is cooled by the cascade
condenser when the low-stage refrigeration cycle is stopped. Then, in the binary refrigeration
apparatus, the refrigerant cooled by the cascade condenser is supplied to the liquid
receiver in the low-stage refrigeration cycle. In the binary refrigeration apparatus,
a vapor refrigerant included in the refrigerant stored in the liquid receiver is supplied
to the cascade condenser, with the result that the refrigerant circulates in the natural
circulation circuit.
[0006] Thus, PTL 1 discloses that when the low-stage refrigeration cycle is stopped, not
only the high-stage refrigeration cycle is operated but also the refrigerant cooled
by the cascade condenser is naturally circulated, thereby suppressing pressure increase
in the low-stage refrigeration cycle when the low-stage refrigeration cycle is stopped.
CITATION LIST
PATENT LITERATURE
SUMMARY OF INVENTION
TECHNICAL PROBLEM
[0008] However, in the high-stage refrigeration cycle that is the first refrigeration cycle,
each of various types of devices is configured to have a capacity required for a normal
cooling operation in the binary refrigeration apparatus. Therefore, in the conventional
binary refrigeration apparatus as disclosed in PTL 1, a capacity for evaporating the
refrigerant by an evaporator included in the cascade heat exchanger in the high-stage
refrigeration cycle that is the first refrigeration cycle is insufficient during a
pressure suppression operation for suppressing pressure increase in the low-stage
refrigeration cycle when the low-stage refrigeration cycle that is the second refrigeration
cycle is stopped. Thus, in the conventional binary refrigeration apparatus disclosed
in PTL 1, an operation state of the high-stage refrigeration cycle that is the first
refrigeration cycle becomes unstable, disadvantageously.
[0009] A binary refrigeration apparatus of the present disclosure is to solve the above-described
problem and has an object to stabilize an operation state of a first refrigeration
cycle when a second refrigeration cycle is stopped in the binary refrigeration apparatus.
SOLUTION TO PROBLEM
[0010] The present disclosure relates to a binary refrigeration apparatus. The binary refrigeration
apparatus comprises: a first refrigeration cycle in which a first refrigerant circulates,
the first refrigeration cycle comprising a first compressor, a condensation device,
a first expansion valve, and a cascade heat exchanger; and a second refrigeration
cycle in which a second refrigerant circulates, the second refrigeration cycle comprising
a second compressor, the cascade heat exchanger, a second expansion valve, and a second
evaporator. The cascade heat exchanger is used as a first evaporator in the first
refrigeration cycle and as a second condenser in the second refrigeration cycle by
performing heat exchange between the first refrigerant and the second refrigerant.
The condensation device comprises a first heat exchanger unit configured to condense
the first refrigerant, and a second heat exchanger unit configured to condense or
evaporate the first refrigerant. The binary refrigeration apparatus further comprises
a switching device configured to switch a state of the second heat exchanger unit
between a first state in which the first refrigerant is condensed and a second state
in which the first refrigerant is evaporated. In a first operation for performing
cooling by the second evaporator in the second refrigeration cycle, the switching
device is configured to bring the second heat exchanger unit into the first state,
and in a second operation for suppressing a pressure in the second refrigeration cycle,
the switching device is configured to bring the second heat exchanger unit into the
second state.
ADVANTAGEOUS EFFECTS OF INVENTION
[0011] According to the binary refrigeration apparatus of the present disclosure, in the
second operation for suppressing the pressure of the second refrigeration cycle, the
second heat exchanger unit of the condensation device is switched by the switching
device to the second state in which the first refrigerant is evaporated, so that a
capacity for evaporating the first refrigerant in the first refrigeration cycle is
increased in the second operation for suppressing the pressure of the second refrigeration
cycle, thereby stabilizing an operation state of the first refrigeration cycle when
the second refrigeration cycle is stopped.
BRIEF DESCRIPTION OF DRAWINGS
[0012]
Fig. 1 is an overall configuration diagram of a binary refrigeration apparatus 10
according to a first embodiment.
Fig. 2 is an overall configuration diagram of binary refrigeration apparatus 10 according
to the first embodiment.
Fig. 3 is a block diagram showing an exemplary control configuration according to
binary refrigeration apparatus 10 of the first embodiment.
Fig. 4 is a flowchart of function switching control for a second heat exchanger unit
122 in a pressure increase suppression operation.
Fig. 5 is an overall configuration diagram of a binary refrigeration apparatus 10A
according to a second embodiment.
Fig. 6 is an overall configuration diagram of binary refrigeration apparatus 10A according
to the second embodiment.
Fig. 7 is an overall configuration diagram of a binary refrigeration apparatus 10B
according to a third embodiment.
Fig. 8 is an overall configuration diagram of binary refrigeration apparatus 10B according
to the third embodiment.
Fig. 9 is a diagram showing a configuration of a heat exchanger 70 according to a
fourth embodiment.
Fig. 10 is a diagram showing a configuration of a header according to a fifth embodiment.
Fig. 11 is a diagram showing a configuration of a header according to a sixth embodiment.
Fig. 12 is a diagram showing arrangements of a first heat exchanger unit 121 and a
second heat exchanger unit 122 according to a seventh embodiment.
Fig. 13 is a diagram showing arrangements of a first heat exchanger unit 121 and a
second heat exchanger unit 122 according to an eighth embodiment.
Fig. 14 is a diagram showing arrangements of a first heat exchanger unit 121A and
a second heat exchanger unit 122A according to a ninth embodiment.
Fig. 15 is a cross sectional view showing an exemplary flat tube 50 provided in a
flat tube heat exchanger.
Fig. 16 is a flowchart of pressure control for a second refrigeration cycle 2 in the
pressure increase suppression operation.
Fig. 17 is a Mollier diagram showing a state of a first refrigerant during the pressure
increase suppression operation.
Fig. 18 is a flowchart of stop control for a first refrigeration cycle 1 during the
pressure increase suppression operation.
Fig. 19 is a diagram showing an overall configuration of a binary refrigeration apparatus
10C comprising a switching device 800 according to a thirteenth embodiment.
Fig. 20 is a diagram showing the overall configuration of binary refrigeration apparatus
10C comprising switching device 800 according to the thirteenth embodiment.
Fig. 21 is a block diagram showing an exemplary control configuration of binary refrigeration
apparatus 10C.
Fig. 22 is a diagram showing an overall configuration of a binary refrigeration apparatus
10D comprising a switching device 801 according to a fourteenth embodiment.
Fig. 23 is a diagram showing the overall configuration of binary refrigeration apparatus
10D comprising switching device 801 according to the fourteenth embodiment.
Fig. 24 is a diagram showing an overall configuration of a binary refrigeration apparatus
10E comprising a switching device 802 according to a fifteenth embodiment.
Fig. 25 is a diagram showing the overall configuration of binary refrigeration apparatus
10E comprising switching device 802 according to the fifteenth embodiment.
Fig. 26 is a diagram showing an overall configuration of a binary refrigeration apparatus
10F according to a sixteenth embodiment.
DESCRIPTION OF EMBODIMENTS
[0013] Hereinafter, embodiments of the present disclosure will be described in detail with
reference to figures. Hereinafter, the plurality of embodiments will be described;
however, it is initially expected at the time of filing of the application to appropriately
combine configurations described in the embodiments. It should be noted that in the
figures, the same or corresponding portions are denoted by the same reference characters
and will not be described repeatedly.
First Embodiment.
(Overall Configuration of Binary Refrigeration Apparatus 10)
[0014] Each of Figs. 1 and 2 is an overall configuration diagram of a binary refrigeration
apparatus 10 according to a first embodiment. Each of Figs. 1 and 2 functionally shows
connection relation and arrangement configuration among devices in binary refrigeration
apparatus 10, and does not necessarily show an arrangement in a physical space.
[0015] Referring to Figs. 1 and 2, binary refrigeration apparatus 10 comprises a first refrigeration
cycle 1 and a second refrigeration cycle 2. First refrigeration cycle 1 is a high-stage
refrigeration cycle. Second refrigeration cycle 2 is a low-stage refrigeration cycle.
In binary refrigeration apparatus 10, first refrigeration cycle 1 and second refrigeration
cycle 2 are coupled together by a cascade heat exchanger 3 so as to form a refrigeration
cycle having a multi-stage configuration.
[0016] In first refrigeration cycle 1, a first refrigerant circulates. In second refrigeration
cycle 2, a second refrigerant circulates. The first refrigerant is, for example, a
propane refrigerant. The second refrigerant is, for example, a carbon dioxide refrigerant.
It should be noted that as the first refrigerant and the second refrigerant, the same
type of refrigerant may be used or different types of refrigerants may be used.
[0017] It should be noted that as each of the first refrigerant and the second refrigerant,
it is preferable to select a refrigerant having high performance, low GWP (Global
Warming Potential), low combustibility, and low toxicity. In particular, since second
refrigeration cycle 2 is a path having an indoor unit provided in a room in and out
of which a person is considered to come frequently, a refrigerant having no influence
on the human body, such as low combustibility and low toxicity, is used as the second
refrigerant. Since it is considered that first refrigeration cycle 1 is installed
in a space such as an outdoor space in and out of which a person is less likely to
come, a high-performance refrigerant is used as the first refrigerant. As an example,
a CO2 refrigerant is used for second refrigeration cycle 2, and an R290 refrigerant,
R1234yf refrigerant, or R32 refrigerant is used for first refrigeration cycle 1.
[0018] When a high-pressure refrigerant is used as the second refrigerant in second refrigeration
cycle 2, a design using a device and a tube each having a high pressure resistance
is required. When the high-pressure refrigerant is used as the second refrigerant,
a device or a tube each having a low pressure resistance may be used in second refrigeration
cycle 2 by performing an operation for suppressing pressure increase in second refrigeration
cycle 2 using first refrigeration cycle 1.
[0019] In binary refrigeration apparatus 10, various devices of first refrigeration cycle
1 and second refrigeration cycle 2 are accommodated in an outdoor unit 4 or a cooling
unit 5. Outdoor unit 4 may be referred to as an outdoor unit. Cooling unit 5 may be
referred to as an indoor unit. Extension tubes 6 and 7 are provided between cooling
unit 5 or cooling unit 5, outdoor unit 4 and cooling unit 5.
[0020] First refrigeration cycle 1 comprises a first compressor 11, a condensation device
12, a first expansion valve 13, and cascade heat exchanger 3. First refrigeration
cycle 1 further comprises a switching device 80 constituted of a first on-off valve
81, a second on-off valve 82, a third on-off valve 83, a fourth on-off valve 84, and
a fifth on-off valve 85.
[0021] Condensation device 12 comprises a first heat exchanger unit 121, a second heat exchanger
unit 122, a first fan 123, and a second fan 124. First heat exchanger unit 121 is
used as a condenser configured to condense the first refrigerant. Second heat exchanger
unit 122 is in a state selected from a first state in which second heat exchanger
unit 122 is used as a condenser configured to condense the first refrigerant and a
second state in which second heat exchanger unit 122 is used as an evaporator configured
to evaporate the first refrigerant. Switching device 80 is controlled by a controller
100 shown in Fig. 3, and switches the state of second heat exchanger unit 122 between
the first state and the second state. First fan 123 sends air to first heat exchanger
unit 121. Second fan 124 sends air to second heat exchanger unit 122.
[0022] First expansion valve 13 is constituted of an electronic expansion valve. Cascade
heat exchanger 3 comprises an evaporator unit 31 and a condenser unit 32, and is configured
to perform heat exchange between the first refrigerant and the second refrigerant.
Evaporator unit 31 of cascade heat exchanger 3 is used as an evaporator in first refrigeration
cycle 1.
[0023] Second refrigeration cycle 2 comprises a second compressor 21, cascade heat exchanger
3, a second expansion valve 23, and an evaporator 24. Second refrigeration cycle 2
further comprises a third fan 25 and extension tubes 6, 7. Condenser unit 32 of cascade
heat exchanger 3 is used as a condenser in second refrigeration cycle 2. Second expansion
valve 23 is constituted of an electronic expansion valve. Third fan 25 sends air to
evaporator 24.
[0024] In binary refrigeration apparatus 10, the first refrigerant on the high-temperature
side is circulated by first refrigeration cycle 1, and the second refrigerant on the
low-temperature side is circulated by second refrigeration cycle 2. In binary refrigeration
apparatus 10, heat exchange is performed in cascade heat exchanger 3 between the first
refrigerant flowing through first heat exchanger unit 121 and the second refrigerant
flowing through second heat exchanger unit 122, thereby forming a refrigeration cycle
having a multi-stage configuration. In binary refrigeration apparatus 10, cooling
is performed in a low-temperature range of, for example, minus several ten degrees
by such a refrigeration cycle having a multi-stage configuration.
[0025] Next, main sensors provided in binary refrigeration apparatus 10 will be described.
In first refrigeration cycle 1, the following sensors are provided. A first suction
pressure sensor 41 configured to detect a suction pressure of first compressor 11
and a first suction temperature sensor 42 configured to detect a suction temperature
of first compressor 11 are provided between the suction side of first compressor 11
and cascade heat exchanger 3. A first discharging pressure sensor 43 configured to
detect a discharging pressure of first compressor 11 is provided between the discharge
side of first compressor 11 and condensation device 12. First compressor 11 is provided
with a first frequency sensor 47 configured to detect an operation frequency of first
compressor 11.
[0026] In second refrigeration cycle 2, the following sensors are provided. A second suction
pressure sensor 44 configured to detect a suction pressure of second compressor 21
and a second suction temperature sensor 45 configured to detect a suction temperature
of second compressor 21 are provided between the suction side of second compressor
21 and cascade heat exchanger 3. A second discharging pressure sensor 46 configured
to detect a discharging pressure of second compressor 21 is provided between the discharge
side of second compressor 21 and cascade heat exchanger 3. Second compressor 21 is
provided with a second frequency sensor 48 configured to detect an operation frequency
of second compressor 21.
(Control Configuration of Binary Refrigeration Apparatus 10)
[0027] Next, an exemplary control configuration of binary refrigeration apparatus 10 will
be described. Fig. 3 is a block diagram showing the exemplary control configuration
of binary refrigeration apparatus 10 according to the first embodiment.
[0028] Controller 100 comprises a CPU (Central Processing Unit) 101, a memory 102 (ROM (Read
Only Memory) and RAM (Random Access Memory)), an input/output buffer (not shown) configured
to input/output various types of signals, and the like.
[0029] CPU 101 loads a program stored in the ROM into the RAM or the like and executes the
program. The program stored in the ROM is a program in which a processing procedure
of control in controller 100 is written. The program for controller 100 comprises:
a main routine program functioning as a core of the program; and a subroutine program
invoked from the main program so as to be executed. Controller 100 performs control
for each device in binary refrigeration apparatus 10 in accordance with these programs.
This control is not limited to processing by software, and the processing can be performed
by dedicated hardware (electronic circuit).
[0030] Controller 100 receives detection signals output from various sensors such as first
suction pressure sensor 41, first suction temperature sensor 42, first discharging
pressure sensor 43, first frequency sensor 47, second suction pressure sensor 44,
second suction temperature sensor 45, second discharging pressure sensor 46, and second
frequency sensor 48.
[0031] Controller 100 outputs control signals to various devices such as first compressor
11, first fan 123, second fan 124, first on-off valve 81, second on-off valve 82,
third on-off valve 83, fourth on-off valve 84, fifth on-off valve 85, first expansion
valve 13, second compressor 21, second expansion valve 23, and third fan 25 so as
to control the various control devices.
[0032] It should be noted that Fig. 3 also shows exemplary connection among a fourth fan
33, a fifth fan 128, a first pump 141, a second pump 142, and an outdoor air temperature
sensor 49, which are not provided in the first embodiment but are provided in other
embodiments described later.
[0033] Controller 100 controls first compressor 11, first compressor 11, first fan 123,
second fan 124, first on-off valve 81, second on-off valve 82, third on-off valve
83, fourth on-off valve 84, fifth on-off valve 85, first expansion valve 13, second
compressor 21, second expansion valve 23, and third fan 25 in accordance with detection
results of various sensors such as first suction pressure sensor 41, first suction
temperature sensor 42, first discharging pressure sensor 43, first frequency sensor
47, second suction pressure sensor 44, second suction temperature sensor 45, second
discharging pressure sensor 46, and second frequency sensor 48.
[0034] Controller 100 controls a frequency of first compressor 11 in order to adjust an
evaporation temperature of the first refrigerant in first refrigeration cycle 1. Controller
100 controls a frequency of second compressor 12 in order to adjust an evaporation
temperature of the second refrigerant in second refrigeration cycle 2. In order to
adjust the condensing temperatures or the evaporation temperatures in the heat exchangers
corresponding to first fan 123, second fan 124, and third fan 25, controller 100 controls
a rotation speed of each fan to control a flow rate of a heat medium. Controller 100
controls a degree of opening of first expansion valve 13 in order to adjust a degree
of superheat on the suction side of first compressor 11. Controller 100 controls a
degree of opening of second expansion valve 23 in order to adjust a degree of superheat
on the suction side of second compressor 12.
(Operation of Binary Refrigeration Apparatus 10 during Cooling Operation)
[0035] Next, an operation of binary refrigeration apparatus 10 in a cooling operation will
be described with reference to Fig. 1. In Fig. 1, flow of the first refrigerant and
flow of the second refrigerant in the cooling operation are indicated by straight
arrows.
[0036] The cooling operation is a normal operation in which first compressor 11 of first
refrigeration cycle 1 and second compressor 21 of second refrigeration cycle 2 are
driven to perform cooling in the low-temperature range such as minus several ten degrees
by the refrigeration cycle having a multi-stage configuration.
[0037] In the cooling operation, as shown in Fig. 1, in condensation device 12 of first
refrigeration cycle 1, both first heat exchanger unit 121 and second heat exchanger
unit 122 are each used as a condenser. The operation of binary refrigeration apparatus
10 during the cooling operation will be described below with reference to Fig. 1.
[0038] In the cooling operation, first refrigeration cycle 1 performs the following operation.
First compressor 11 compresses the suctioned first refrigerant and discharges the
compressed first refrigerant as a high-temperature and high-pressure gas refrigerant.
[0039] In the cooling operation, both first heat exchanger unit 121 and second heat exchanger
unit 122 are each used as a condenser in condensation device 12. In the cooling operation,
controller 100 brings first on-off valve 81, second on-off valve 82, and fifth on-off
valve 85 into an opened state and brings third on-off valve 83 and fourth on-off valve
84 into a closed state in switching device 80.
[0040] With such states of first to fourth on-off valves 81 to 84, in the cooling operation,
a first path in which the first refrigerant flows through first heat exchanger unit
121, and a second path in which the first refrigerant flows through first on-off valve
81, second heat exchanger unit 122 and second on-off valve 82 are formed between first
compressor 11 and first expansion valve 13. Thus, in the cooling operation, in condensation
device 12, the high-temperature and high-pressure first refrigerant discharged from
first compressor 11 is branched into first heat exchanger unit 121 and second heat
exchanger unit 122 and flows as indicated by arrows in the figure. In this way, in
the cooling operation, both first heat exchanger unit 121 and second heat exchanger
unit 122 are each used as a condenser.
[0041] In the cooling operation, condensation device 12 condenses the first refrigerant
by exchanging heat between the high-temperature high-pressure first refrigerant having
flowed thereinto and the outdoor air in each of first heat exchanger unit 121 and
second heat exchanger unit 122. By sending air to first heat exchanger unit 121 by
first fan 123, condensation of the first refrigerant in first heat exchanger unit
121 is promoted. By sending air to second heat exchanger unit 122 by second fan 124,
condensation of the first refrigerant in second heat exchanger unit 122 is promoted.
[0042] Controller 100 controls an amount of air to be sent to first heat exchanger unit
121 by first fan 123, thereby controlling an amount of heat exchange between the first
refrigerant and the outdoor air in first heat exchanger unit 121. Controller 100 controls
an amount of air to be sent to second heat exchanger unit 122 by second fan 124, thereby
controlling an amount of heat exchange between the first refrigerant and the outdoor
air in second heat exchanger unit 122.
[0043] The first refrigerant condensed in condensation device 12 is changed into a liquid
phase refrigerant and is supplied to first expansion valve 13. In first expansion
valve 13, the first refrigerant condensed in condensation device 12 is expanded and
reduced in pressure, with the result that the first refrigerant becomes a low-pressure
two-phase refrigerant. The first refrigerant expanded by first expansion valve 13
is supplied to cascade heat exchanger 3 through fifth on-off valve 85 that is in the
opened state.
[0044] In cascade heat exchanger 3, the first refrigerant flows into evaporator unit 31.
In first refrigeration cycle 1, the first refrigerant having flowed into evaporator
unit 31 exchanges heat with the second refrigerant having flowed into condenser unit
32 of cascade heat exchanger 3 in second refrigeration cycle 2 and the two-phase refrigerant
is accordingly evaporated to become a gas refrigerant and is supplied to the suction
side of first compressor 11.
[0045] In the cooling operation, second refrigeration cycle 2 performs the following operation.
Second compressor 21 compresses the suctioned second refrigerant and discharges the
compressed second refrigerant as a high-temperature and high-pressure gas refrigerant.
[0046] The second refrigerant discharged from second compressor 21 is supplied to cascade
heat exchanger 3. In cascade heat exchanger 3, the second refrigerant flows into condenser
unit 32. The second refrigerant having flowed into condenser unit 32 in second refrigeration
cycle 2 is condensed by heat exchange with the first refrigerant having flowed into
condenser unit 32 of cascade heat exchanger 3 in second refrigeration cycle 2.
[0047] The second refrigerant condensed in condenser unit 32 of cascade heat exchanger 3
is changed into a liquid phase refrigerant and is supplied to second expansion valve
23. In second expansion valve 23, the second refrigerant condensed in condenser unit
32 is expanded and reduced in pressure, with the result that the second refrigerant
becomes a low-pressure two-phase refrigerant. The second refrigerant expanded by second
expansion valve 23 is supplied to evaporator 24.
[0048] The second refrigerant having flowed into evaporator 24 in second refrigeration cycle
2 exchanges heat with the outdoor air, with the result that the two-phase refrigerant
is evaporated to become a gas refrigerant and is supplied to the suction side of second
compressor 21. By sending air to evaporator 24 by third fan 25, evaporation of the
second refrigerant in evaporator 24 is promoted. Controller 100 controls a rotation
speed of third fan 25 so as to control an amount of air to be sent by third fan 25
to evaporator 24.
(Operation of Binary Refrigeration Apparatus 10 during Pressure Increase Suppression
Operation)
[0049] Next, an operation of binary refrigeration apparatus 10 in a pressure increase suppression
operation will be described with reference to Fig. 2. In Fig. 2, the flow of the first
refrigerant in the pressure increase suppression operation is indicated by straight
arrows.
[0050] The pressure increase suppression operation is an operation for suppressing pressure
increase in second refrigeration cycle 2 when the cooling operation is stopped, by
cooling second refrigeration cycle 2 in cascade heat exchanger 3 using first refrigeration
cycle 1 in such a manner that first compressor 11 of first refrigeration cycle 1 is
driven with second compressor 21 of second refrigeration cycle 2 being stopped.
[0051] When the cooling operation is stopped, if both first compressor 11 of first refrigeration
cycle 1 and second compressor 21 of second refrigeration cycle 2 are stopped, the
pressure in second refrigeration cycle 2 is increased as follows. In second refrigeration
cycle 2, if both second compressor 21 are stopped, heat received from the outdoor
air at a portion such as a tube may cause an excessive increase of pressure in the
tube in second refrigeration cycle 2. Since the carbon dioxide refrigerant is used
as the second refrigerant in second refrigeration cycle 2, a component such as the
tube may be damaged by the excessive increase of pressure in the tube.
[0052] To address this, when the cooling operation is stopped, controller 100 performs control
to stop second compressor 21 of second refrigeration cycle 2 and perform the pressure
increase suppression operation for circulating the first refrigerant by driving first
compressor 11 of first refrigeration cycle 1. The circulation of the first refrigerant
in first refrigeration cycle 1 when the cooling operation is stopped promotes heat
exchange between the first refrigerant and the second refrigerant in cascade heat
exchanger 3 to suppress a temperature increase in second refrigeration cycle 2, with
the result that the pressure increase in the tube of second refrigeration cycle 2
can be suppressed.
[0053] In the pressure increase suppression operation, as shown in Fig. 2, in condensation
device 12 of first refrigeration cycle 1, first heat exchanger unit 121 is used as
a condenser, and second heat exchanger unit 122 is used as an evaporator. The operation
of binary refrigeration apparatus 10 during the pressure increase suppression operation
will be described below with reference to Fig. 2.
[0054] In the pressure increase suppression operation, second compressor 21 is stopped in
second refrigeration cycle 2, and the second refrigerant does not basically circulate
as shown in Fig. 2.
[0055] In the pressure increase suppression operation, first compressor 11 is driven in
first refrigeration cycle 1. In the pressure increase suppression operation, in first
refrigeration cycle 1, the first refrigerant circulates by performing the same operation
as the above-described cooling operation except for condensation device 12.
[0056] In the pressure increase suppression operation, in condensation device 12, first
heat exchanger unit 121 is used as a condenser, and second heat exchanger unit 122
is used as an evaporator. In the pressure increase suppression operation, controller
100 brings first on-off valve 81, second on-off valve 82, and fifth on-off valve 85
into the closed state and brings third on-off valve 83 and fourth on-off valve 84
into the opened state in switching device 80.
[0057] With such states of first to fourth on-off valves 81 to 84, in the pressure increase
suppression operation, a path in which the first refrigerant flows through only first
heat exchanger unit 121 is formed in condensation device 12 between the suction side
of first compressor 11 and first expansion valve 13. Thus, in the pressure increase
suppression operation, the high-temperature and high-pressure first refrigerant discharged
from first compressor 11 flows only through first heat exchanger unit 121 in condensation
device 12 as indicated by arrows in the figure, with the result that only first heat
exchanger unit 121 is used as a condenser.
[0058] In the pressure increase suppression operation, condensation device 12 condenses
the first refrigerant by exchanging heat only by first heat exchanger unit 121 between
the high-temperature and high-pressure first refrigerant having flowed thereinto and
the outdoor air.
[0059] In the pressure increase suppression operation, since fifth on-off valve 85 is in
the closed state and third on-off valve 83 and fourth on-off valve 84 are each in
the opened state, the first refrigerant expanded by first expansion valve 13 is supplied
to evaporator unit 31 of cascade heat exchanger 3 through fourth on-off valve 84,
second heat exchanger unit 122, and third on-off valve 83. The first refrigerant having
flowed into second heat exchanger unit 122 exchanges heat with the outdoor air to
result in a first stage of evaporation. By sending air to second heat exchanger unit
122 by second fan 124, the evaporation of the first refrigerant in second heat exchanger
unit 122 is promoted. Controller 100 controls the rotation speed of third fan 25 so
as to control an amount of air to be sent by third fan 25 to evaporator 24.
[0060] In cascade heat exchanger 3, the first refrigerant having flowed into evaporator
unit 31 exchanges heat with the second refrigerant to result in a second stage of
evaporation to become a gas refrigerant, and is supplied to the suction side of first
compressor 11. In cascade heat exchanger 3, heat exchange is performed between the
first refrigerant in first refrigeration cycle 1 and the second refrigerant in second
refrigeration cycle 2, with the result that the second refrigerant is cooled. Thus,
in the pressure increase suppression operation, second refrigeration cycle 2 is cooled
by first refrigeration cycle 1, thereby suppressing the pressure increase in second
refrigeration cycle 2.
[0061] Since not only evaporator unit 31 of cascade heat exchanger 3 but also second heat
exchanger unit 122 of condensation device 12 are each used as an evaporator in the
pressure increase suppression operation in this way, evaporation capacity of first
refrigeration cycle 1 is increased as compared with that in the cooling operation.
Thus, in the pressure increase suppression operation, the evaporation capacity of
first refrigeration cycle 1 is increased, thereby stabilizing the operation state
of the first refrigeration cycle in the stopped state of second refrigeration cycle
2.
(Function Switching Control for Second Heat Exchanger Unit 122 in Pressure Increase
Suppression Operation)
[0062] Next, the following describes function switching control for switching the function
of second heat exchanger unit 122 from the condenser to the evaporator when performing
the pressure increase suppression operation.
[0063] Fig. 4 is a flowchart of the function switching control for second heat exchanger
unit 122 in the pressure increase suppression operation. The function switching control
of Fig. 4 is performed by controller 100.
[0064] In a step S 1, controller 100 determines whether or not the cooling operation is
currently being performed. The determination in step S 1 as to whether or not the
cooling operation is being performed is made by checking, by controller 100, the operation
state of binary refrigeration apparatus 10 in accordance with detection signals from
various sensors provided in second refrigeration cycle 2. For example, when second
compressor 21 is being operated, it can be determined that the cooling operation is
currently being performed. Each of the various sensors may be a sensor that can check
the operation state of binary refrigeration apparatus 10. Controller 100 determines
whether or not second compressor 21 is being operated, in accordance with, for example,
a frequency of second compressor 12 detected by the second frequency sensor. It should
be noted that second suction pressure sensor 44, second suction temperature sensor
45, second discharging pressure sensor 46, and the like may be each used as a sensor
that can check the operation state of binary refrigeration apparatus 10.
[0065] When it is determined in step S 1 that the cooling operation is not currently being
performed, controller 100 ends the processing. On the other hand, when it is determined
in step S 1 that the cooling operation is currently being performed, controller 100
determines in a step S2 whether or not it is detected that the operation of the second
refrigeration cycle is stopped. The determination in step S2 as to whether or not
the operation of the second refrigeration cycle is stopped is made by checking, by
controller 100, the operation state of binary refrigeration apparatus 10 in accordance
with the detection signals from the various sensors provided in second refrigeration
cycle 2 as described above. For example, when the operation of second compressor 21
is stopped, it can be determined that the operation of the second refrigeration cycle
is stopped.
[0066] When it is not detected in step S2 that the operation of the second refrigeration
cycle is stopped, controller 100 repeats the determination in step S2. On the other
hand, when it is detected in step S2 that the operation of the second refrigeration
cycle is stopped, controller 100 performs the processing of steps S3 to S6 because
switching from the cooling operation to the pressure increase suppression operation
is being performed.
[0067] In step S3, controller 100 increases the flow rate of the heat medium in first heat
exchanger unit 121. The heat medium is air to be sent to first heat exchanger unit
121 by first fan 123. In other words, in step S3, the rotation speed of first fan
123 is increased to increase an amount of air by first fan 123. In step S3, the amount
of air by first fan 123 may be increased to the maximum value of a setting value of
the amount of air, or may be increased by a predetermined amount of air.
[0068] After a first reference period has elapsed from the increase of the amount of air
by first fan 123 in step S3, controller 100 increases the flow rate of the heat medium
in second heat exchanger unit 122 in step S4. The heat medium is air to be sent to
second heat exchanger unit 122 by second fan 124. In other words, in step S4, the
rotation speed of second fan 124 is increased to increase an amount of air by second
fan 124. In step S4, the amount of air by second fan 124 may be increased to the maximum
value of a setting value of the amount of air, or may be increased by a predetermined
amount of air.
[0069] After a second reference period has elapsed from the increase of the amount of air
by second fan 124 in step S4, controller 100 switches the opened/closed states of
first on-off valve 81, second on-off valve 82, third on-off valve 83, and fourth on-off
valve 84 of switching device 80 to the opened/closed states in the pressure increase
suppression operation as shown in Fig. 2 in step S5. The second reference period is
set to a period having a length equal to or less than the first reference period.
Then, in step S6, controller 100 switches the opened/closed state of fifth on-off
valve 85 of switching device 80 to the opened/closed state in the pressure increase
suppression operation as shown in Fig. 2, and ends the processing.
[0070] Thus, second heat exchanger unit 122 is switched by switching device 80 between the
first state in which second heat exchanger unit 122 serves as a condenser configured
to condense the first refrigerant and the second state in which second heat exchanger
unit 122 serves as an evaporator configured to evaporate the first refrigerant. Controller
100 performs control to make switching to the first state in which second heat exchanger
unit 122 serves as a condenser when the cooling operation is performed, and make switching
to the second state in which second heat exchanger unit 122 serves as an evaporator
when the pressure increase control operation is performed.
[0071] In the function switching control of Fig. 4, when switching from the cooling operation
to the pressure increase suppression operation, the condensation by first heat exchanger
unit 121 can be promoted by increasing the flow rate of the heat medium to be sent
to first heat exchanger unit 121 used as the condenser in step S3. Since the condensation
by first heat exchanger unit 121 is promoted, the amount of the first refrigerant
in second heat exchanger unit 122 to be switched to the evaporator can be relatively
reduced. Since the amount of the first refrigerant in second heat exchanger unit 122
to be switched to the evaporator is reduced in this way, occurrence of liquid back
can be suppressed in the suction portion of first compressor 11 when second heat exchanger
unit 122 is switched to the evaporator.
[0072] In the function switching control of Fig. 4, since the flow rate of the heat medium
to be sent to second heat exchanger unit 122 to be used as the evaporator after the
switching is increased in step S4 when switching from the cooling operation to the
pressure increase suppression operation, the heat medium at a high flow rate can be
sent to second heat exchanger unit 122 immediately after switching to the pressure
increase suppression operation. This makes it possible to further promote evaporation
of the first refrigerant in second heat exchanger unit 122 after switching to the
pressure increase suppression operation.
[0073] In the function switching control of Fig. 4, since the second reference period from
the increase of the flow rate of the heat medium to be sent to second heat exchanger
unit 122 in step S4 to the switching of the on-off valves in switching device 80 in
step S5 is set to the length equal to or less than that of the first reference period
from the increase of the flow rate of the heat medium to be sent to first heat exchanger
unit 121 in step S3 to the increase of the flow rate of the heat medium to be sent
to second heat exchanger unit 122 in step S4, the first refrigerant can be suppressed
from being condensed before second heat exchanger unit 122 is used as an evaporator.
[0074] In the function switching control of Fig. 4, after the opened/closed states of first
on-off valve 81, second on-off valve 82, third on-off valve 83, and fourth on-off
valve 84 are switched to the opened/closed states in the pressure increase suppression
operation in step S5, the opened/closed state of fifth on-off valve 85 is switched
to the opened/closed state in the pressure increase suppression operation in step
S6, with the result that part of the two-phase refrigerant having flowed out from
first expansion valve 13 flows into second heat exchanger unit 122, and the two-phase
refrigerant pushes out the liquid refrigerant in second heat exchanger unit 122. Thus,
when fifth on-off valve 85 is brought into the closed state, the flow velocity of
the two-phase refrigerant in second heat exchanger unit 122 is slower than that when
a whole of the two-phase refrigerant having flowed out from first expansion valve
13 flows into second heat exchanger unit 122 at once, with the result that the first
refrigerant can be brought into a more superheated gas state at the outlet portion
of second heat exchanger unit 122.
[0075] First heat exchanger unit 121 has a structure with a larger volume of heat exchange
than that of second heat exchanger unit 122. For example, when the total of the heat
exchange volume of first heat exchanger unit 121 and the heat exchange volume of second
heat exchanger unit 122 in condensation device 12 is unchanged, the heat exchange
volume of first heat exchanger unit 121 is larger than the heat exchange volume of
second heat exchanger unit 122. In such a configuration, heat exchange performance
of condensation device 12 as a condenser is higher than that in a configuration in
which the heat exchange volume of first heat exchanger unit 121 and the heat exchange
volume of second heat exchanger unit 122 are the same. Thus, in the configuration
in which the heat exchange volume of first heat exchanger unit 121 is larger than
the heat exchange volume of second heat exchanger unit 122, the condensation performance
during the pressure increase control operation is improved as compared with a case
where these heat exchange volumes are the same, with the result that the pressure
in first refrigeration cycle 1 can be suppressed from being excessively increased
during the pressure increase control operation. Further, since the pressure in first
refrigeration cycle 1 can be suppressed from being excessively increased during the
pressure increase control operation, power consumption necessary for the operation
state of first refrigeration cycle 1 during the pressure increase control operation
can be suppressed.
[0076] It should be noted that each of first on-off valve 81 and second on-off valve 82
may be provided at a position as close as possible to a branch position at which the
path between first compressor 11 and first expansion valve 13 is branched toward second
heat exchanger unit 122. With such a configuration, the first refrigerant can be prevented
from remaining in a path from the branch position to the position of first on-off
valve 81 and in a path from the branch position to the position of second on-off valve
82. Since the refrigerant can be prevented from remaining therein in this way, a total
amount of the first refrigerant required in first refrigeration cycle 1 can be suppressed.
[0077] In binary refrigeration apparatus 10 of the first embodiment, the following effects
can be obtained.
[0078] In the pressure increase suppression operation, since second heat exchanger unit
122 of condensation device 12 is switched by switching device 80 to the state in which
the first refrigerant is evaporated, a capacity for evaporating the first refrigerant
in first refrigeration cycle 1 is increased in the pressure increase suppression operation.
This makes it possible to stabilize the operation state of first refrigeration cycle
1 when second refrigeration cycle 2 is stopped.
[0079] Specifically, the following effect can be obtained. In the pressure increase suppression
operation, since the capacity for evaporating the first refrigerant in first refrigeration
cycle 1 is increased, evaporation of the first refrigerant is promoted, thereby suppressing
occurrence of liquid back to first compressor 11. This makes it possible to stabilize
the operation state of first refrigeration cycle 1 when second refrigeration cycle
2 is stopped.
[0080] Since the occurrence of the liquid back to first compressor 11 can be suppressed
in the pressure increase suppression operation, it is possible to prevent occurrence
of seizing-up of first compressor 11 caused by refrigeration oil being diluted due
to the liquid back. Thus, reliability of binary refrigeration apparatus 10 can be
improved.
[0081] Since the capacity for evaporating the first refrigerant in first refrigeration cycle
1 is increased in the pressure increase suppression operation, the first refrigerant
suctioned into first compressor 11 can be stably formed into a superheated gas, with
the result that controller 100 can be suppressed from performing control to repeatedly
stop and restart first compressor 11 due to insufficient capacity for evaporating
the first refrigerant in first refrigeration cycle 1. This makes it possible to stabilize
the operation state of first refrigeration cycle 1 when second refrigeration cycle
2 is stopped.
[0082] In binary refrigeration apparatus 10, the temperature and pressure of the second
refrigerant in second refrigeration cycle 2 can be stabilized by suppressing first
compressor 11 from being stopped and restarted repeatedly in the pressure increase
suppression operation. Thus, in the pressure increase suppression operation, the tube
of second refrigeration cycle 2 can be suppressed from being raptured due to an instantaneous
pressure increase in the second refrigerant of second refrigeration cycle 2.
[0083] In first refrigeration cycle 1, when a plurality of first compressors 11 are connected
in parallel to operate, the capacity for evaporating the first refrigerant can be
increased as compared with a case where one first compressor 11 is operated. However,
in such a case, the operation state of binary refrigeration apparatus 10 becomes unstable,
disadvantageously. On the other hand, since the control is performed in the pressure
increase suppression operation to switch second heat exchanger unit 122 of condensation
device 12 to the state in which the first refrigerant is evaporated, the capacity
for evaporating the first refrigerant can be increased, thereby stabilizing the operation
state of binary refrigeration apparatus 10.
[0084] As compared with the configuration in which the plurality of first compressors 11
are connected in parallel to operate in first refrigeration cycle 1, the refrigeration
oil is not supplied to any of the first compressors in an imbalanced manner in binary
refrigeration apparatus 10, with the result that the reliability of the operation
of binary refrigeration apparatus 10 can be improved.
[0085] As compared with the configuration in which the plurality of first compressors 11
are connected in parallel to operate in first refrigeration cycle 1, binary refrigeration
apparatus 10 does not need to be provided with, for example, a uniform oil mechanism
or the like to avoid the imbalance of the refrigeration oil among the plurality of
first compressors 11, with the result that an increase in the number of components
of binary refrigeration apparatus 10 can be suppressed to suppress increased manufacturing
cost.
[0086] The flow rate of the heat medium can be adjusted individually depending on whether
second heat exchanger unit 122 is used as a condenser or an evaporator. Thus, when
second heat exchanger unit 122 is used as a condenser, controller 100 can control
the flow rate of the heat medium to be supplied to second heat exchanger unit 122
by second fan 124 so as to cause the condensation temperature of second heat exchanger
unit 122 to have a reference temperature. When second heat exchanger unit 122 is used
as an evaporator, controller 100 can control the flow rate of the heat medium to be
supplied to second heat exchanger unit 122 by second fan 124 so as to cause the suction
portion of first compressor 11 to have an appropriate evaporation temperature.
[0087] In binary refrigeration apparatus 10, since the high-pressure refrigerant such as
a carbon dioxide refrigerant is used as the second refrigerant sealed in second refrigeration
cycle 2, even when the tube connecting outdoor unit 4 and cooling unit 5 is long,
an increase in pressure loss due to the long tube can be suppressed.
[0088] Further, in binary refrigeration apparatus 10, since the non-toxic refrigerant such
as a carbon dioxide refrigerant is used as the second refrigerant sealed in second
refrigeration cycle 2, an influence on human body can be suppressed even if the second
refrigerant is leaked in the room in which cooling unit 5 is provided when a person
comes in or out of the room.
[0089] Further, in binary refrigeration apparatus 10, since the non-combustible refrigerant
such as a carbon dioxide refrigerant is used as the second refrigerant sealed in second
refrigeration cycle 2, occurrence of fire can be suppressed even if the second refrigerant
is leaked in the room in which cooling unit 5 is provided.
[0090] Further, in binary refrigeration apparatus 10, since the two-system refrigerant circuit
with first refrigeration cycle 1 and second refrigeration cycle 2 are provided and
the high-pressure refrigerant such as a carbon dioxide refrigerant is used as the
second refrigerant sealed in second refrigeration cycle 2, an increase of pressure
in second refrigeration cycle 2 can be suppressed to a reference pressure or less.
Thus, a device and a tube each having a pressure resistance setting that is not very
high can be used in binary refrigeration apparatus 10. Since the device and tube each
having a pressure resistance setting that is not very high, the manufacturing cost
of the entire system of binary refrigeration apparatus 10 can be suppressed from being
increased.
Second Embodiment.
(Overall Configuration of Binary Refrigeration Apparatus 10A Having Natural Circulation
Path)
[0091] Next, as a second embodiment, the following describes an example in which a natural
circulation path for the second refrigerant is provided in second refrigeration cycle
2 of binary refrigeration apparatus 10 configured as indicated in the first embodiment.
[0092] Each of Figs. 5 and 6 is an overall configuration diagram of a binary refrigeration
apparatus 10A according to a second embodiment. Referring to Figs. 5 and 6, binary
refrigeration apparatus 10A of the second embodiment is different from binary refrigeration
apparatus 10 of the first embodiment in that a natural circulation path 20 for the
second refrigerant is provided in second refrigeration cycle 2.
[0093] In Fig. 5, flow of the refrigerant in the cooling operation is indicated by arrows.
In Fig. 6, flow of the refrigerant in the pressure increase suppression operation
is indicated by arrows.
[0094] Natural circulation path 20 is a path allowing for natural circulation of the second
refrigerant in the pressure increase suppression operation. Natural circulation path
20 comprises a first tube 27, a second tube 28, a third tube 29, a liquid receiver
25A, and a check valve 26. Liquid receiver 25A is provided between cascade heat exchanger
3 and second expansion valve 23 in second refrigeration cycle 2.
[0095] First tube 27 is provided between an inlet of condenser unit 32 of cascade heat exchanger
3 and liquid receiver 25A. First tube 27 is provided with a check valve 26 that allows
the second refrigerant to flow only in a direction from liquid receiver 25A toward
the inlet of condenser unit 32 of cascade heat exchanger 3. Second tube 28 is provided
between an outlet of condenser unit 32 of cascade heat exchanger 3 and liquid receiver
25A. Third tube 29 is provided between second expansion valve 23 and liquid receiver
25A.
[0096] Liquid receiver 25A is a tank having an inner space for storing the second refrigerant
having flowed thereinto from first tube 27. An end portion of each of first tube 27
and second tube 28 is opened at an upper portion of the inner space of liquid receiver
25A. Third tube 29 is opened at a lower portion of the inner space of liquid receiver
25A.
[0097] Condenser unit 32 of cascade heat exchanger 3 is provided such that the outlet side
thereof is located at a position lower than that of the inlet side thereof. Liquid
receiver 25A is provided at a position lower than that of the outlet of condenser
unit 32 of cascade heat exchanger 3. Liquid receiver 25A is a tank having an inner
space for storing the second refrigerant having flowed from first tube 27.
[0098] An end portion of each of first tube 27 and second tube 28 is opened at an upper
portion of the inner space of liquid receiver 25A. Third tube 29 is opened at a lower
portion of the inner space of liquid receiver 25A.
[0099] As shown in Fig. 5, during the cooling operation, the second refrigerant, which has
become a supercooled refrigerant due to heat exchange by condenser unit 32 of cascade
condenser 30, is dropped from second tube 28 into the inner space of liquid receiver
25A, and is supplied to second expansion valve 23 through third tube 29.
[0100] As shown in Fig. 6, during the pressure increase suppression operation, the second
refrigerant, which has become a supercooled refrigerant due to heat exchange by condenser
unit 32 of cascade condenser 30, is dropped from second tube 28 into the inner space
of liquid receiver 25A, passes through first tube 27 and check valve 26, and is supplied
to the inlet side of condenser unit 32.
[0101] Specifically, during the pressure increase suppression operation, as the second refrigerant,
which has become a supercooled refrigerant, is dropped into the inside of liquid receiver
25A, the volume of the second refrigerant existing on the upper side with respect
to condenser unit 32 is decreased. Thus, the pressure is negative on the upper side
with respect to condenser unit 32 and the pressure is positive on the liquid receiver
25A side, i.e., the lower side with respect to condenser unit 32. Thus, the gas refrigerant
of the second refrigerant stored in liquid receiver 25A passes through first tube
27 and check valve 26, and is suctioned up to the inlet side of condenser unit 32.
The gas refrigerant suctioned up to the inlet side of condenser unit 32 flows into
condenser unit 32, and exchanges heat again. The second refrigerant having exchanged
heat in condenser unit 32 becomes a supercooled refrigerant, and is dropped into liquid
receiver 25A through second tube 28.
[0102] During the pressure increase suppression operation, the pressure increase in second
refrigeration cycle 2 can be effectively suppressed by repeating such natural circulation
of the second refrigerant flowing in natural circulation path 20.
[0103] In binary refrigeration apparatus 10A, since liquid receiver 25A is provided between
cascade heat exchanger 3 and second expansion valve 23, the pressure in second refrigeration
cycle 2 can be stabilized with respect to variation of load in second refrigeration
cycle 2. Further, since liquid receiver 25A is provided between cascade heat exchanger
3 and second expansion valve 23 in binary refrigeration apparatus 10A, it is possible
to readily handle a change in sealing amount of the second refrigerant that is required
depending on the length of the tube connecting outdoor unit 4 and cooling unit 5.
[0104] In such a configuration, as with the first embodiment, first heat exchanger unit
121 has a structure having a larger heat exchange volume than that of second heat
exchanger unit 122. In the configuration in which the second refrigerant flows in
natural circulation path 20 during the pressure increase suppression operation, the
heat exchange volume of second heat exchanger unit 122 is smaller than that of first
heat exchanger unit 121, with the result that the evaporation capacity of second heat
exchanger unit 122 can be prevented from becoming too large.
Third Embodiment.
(Overall Configuration of Binary Refrigeration Apparatus 10B Comprising Intermediate
Cooler 35 in Second Refrigeration Cycle 2)
[0105] Next, as a third embodiment, the following describes an example in which an intermediate
cooler 35 is provided between second compressor 21 and condenser unit 32 of cascade
heat exchanger 3 in second refrigeration cycle 2 of each of binary refrigeration apparatuses
10, 10A having the configuration shown in the second embodiment. In the third embodiment,
the configuration in which intermediate cooler 35 is provided in binary refrigeration
apparatus 10A of the second embodiment will be described as a representative example.
[0106] Each of Figs. 7 and 8 is an overall configuration diagram of a binary refrigeration
apparatus 10B according to the third embodiment. Referring to Figs. 7 and 8, binary
refrigeration apparatus 10B of the third embodiment is different from binary refrigeration
apparatus 10A of the second embodiment in that intermediate cooler 35 and a fourth
fan 36 are provided in second refrigeration cycle 2.
[0107] In Fig. 7, flow of the refrigerant in the cooling operation is indicated by arrows.
In Fig. 8, flow of the refrigerant in the pressure increase suppression operation
is indicated by arrows.
[0108] Intermediate cooler 35 is provided between second compressor 21 and condenser unit
32 of cascade heat exchanger 3. Fourth fan 36 sends air to intermediate cooler 35.
As shown in Fig. 2, controller 100 outputs a control signal to fourth fan 36 so as
to control fourth fan 36.
[0109] As shown in Fig. 7, during the cooling operation, the high-temperature and high-pressure
second refrigerant discharged from second compressor 21 flows to condenser unit 32
of cascade heat exchanger 3 through intermediate cooler 35.
[0110] Since intermediate cooler 35 is provided between second compressor 21 and condenser
unit 32 of cascade heat exchanger 3 in binary refrigeration apparatus 10B, heat of
the second refrigerant can be radiated by intermediate cooler 35 in second refrigeration
cycle 2 during the cooling operation. By radiating the heat of the second refrigerant
by intermediate cooler 35, the condensation capacity of condenser unit 32 of cascade
heat exchanger 3 can be reduced. Since the evaporation capacity required for evaporator
unit 31 of cascade heat exchanger 3 of first refrigeration cycle 1 can be suppressed
by reducing the condensation capacity of condenser unit 32, heat exchange efficiency
between the first refrigerant and the second refrigerant in cascade heat exchanger
3 can be improved.
[0111] It should be noted that intermediate cooler 35 and fourth fan 36 shown in Figs. 7
and 8 may be provided in binary refrigeration apparatus 10 shown in Figs. 1 and 2.
Fourth Embodiment.
(Configuration of Heat Exchanger 70 in which Condensation Device 12 and Intermediate
Cooler 35 Are Integrated)
[0112] Next, as a fourth embodiment, the following describes an example in which a heat
exchanger 70 in which condensation device 12 and intermediate cooler 35 are integrated
is provided as a modification of binary refrigeration apparatus 10B comprising intermediate
cooler 35 shown in the third embodiment.
[0113] Fig. 9 is a diagram showing a configuration of heat exchanger 70 according to the
fourth embodiment. Referring to Fig. 9, heat exchanger 70 of the fourth embodiment
is configured as a heat exchanger in which first heat exchanger unit 121 in condensation
device 12 shown in Fig. 9 and intermediate cooler 35 shown in Fig. 9 are integrated.
In Fig. 9, second heat exchanger unit 122 and switching device 80 in condensation
device 12 are not shown.
[0114] Heat exchanger 70 shown in Fig. 9 comprises first heat exchanger unit 121 and intermediate
cooler 35 shown in Fig. 9, and these are configured as one heat exchanger unit structure.
A fifth fan 128 configured to send air to heat exchanger 70 is provided in the vicinity
of heat exchanger 70. As shown in Fig. 2, controller 100 outputs a control signal
to fifth fan 128 so as to control fifth fan 128.
[0115] It should be noted that the following configurations may be each employed as an example
of integration of condensation device 12 and intermediate cooler 35. As the integrated
heat exchanger, first heat exchanger unit 121, second heat exchanger unit 122, and
intermediate cooler 35 may be integrated. As the integrated heat exchanger, second
heat exchanger unit 122 and intermediate cooler 35 may be integrated.
[0116] Thus, when heat exchanger 70 in which condensation device 12 and intermediate cooler
35 are integrated is provided, the number of components of the binary refrigeration
apparatus can be reduced. Further, an installation area of the binary refrigeration
apparatus can be smaller in space.
Fifth Embodiment.
(Configuration of Switching Unit in which Headers and Switching Device 80 Are Integrated)
[0117] Next, as a fifth embodiment, the following describes an example in which a switching
unit in which headers provided in condensation device 12 are integrated with switching
device 80 is provided.
[0118] Fig. 10 is a diagram showing configurations of the headers according to the fifth
embodiment. Referring to Fig. 10, a first header 91 and a second header 92 are connected
to both ends of a tube body of first heat exchanger unit 121. A third header 93 and
a fourth header 94 are connected to both ends of a tube body of second heat exchanger
unit 122.
[0119] First header 91 is provided at a portion at which the tube from first compressor
11 is branched to condensation device 12 and switching device 80. First header 91
is configured to distribute, to first heat exchanger unit 121 and switching device
80, the first refrigerant supplied from first compressor 11.
[0120] Second header 92 is provided at a portion at which the tube from first heat exchanger
unit 121 to first expansion valve 13 and the tube from second on-off valve 82 of switching
device 80 are merged together. Second header 92 is configured to merge the first refrigerant
flowing out from first heat exchanger unit 121 with the first refrigerant flowing
out from second on-off valve 82, and supply the merged first refrigerant to first
expansion valve 13.
[0121] Third header 93 is provided between first on-off valve 81 and third on-off valve
83. Third header 93 is configured to supply, to second heat exchanger unit 122, the
first refrigerant supplied through first on-off valve 81 during the cooling operation,
or to supply, toward third on-off valve 83, the first refrigerant flowing out from
second heat exchanger unit 122 during the pressure increase suppression operation.
[0122] Fourth header 94 is provided between second on-off valve 82 and fourth on-off valve
84. Fourth header 94 is configured to supply, toward second on-off valve 82, the first
refrigerant flowing out from second heat exchanger unit 122 during the cooling operation,
or to supply, to second heat exchanger unit 122, the first refrigerant supplied through
fourth on-off valve 84 during the pressure increase suppression operation.
[0123] First header 91, first on-off valve 81, third header 93, and third on-off valve 83
may be provided as individual components, or may be integrated as a switching unit
901 as shown in Fig. 10. Second header 92, second on-off valve 82, fourth header 94,
and fourth on-off valve 84 may be provided as individual components, or may be integrated
as a switching unit 902 as shown in Fig. 10.
[0124] When switching unit 901 in which first header 91, first on-off valve 81, third header
93, and third on-off valve 83 are integrated and switching unit 902 in which second
header 92, second on-off valve 82, fourth header 94, and fourth on-off valve 84 are
integrated are provided, the number of components of the binary refrigeration apparatus
can be reduced. Further, an installation area of the binary refrigeration apparatus
can be smaller in space.
Sixth Embodiment.
(Configuration in which Headers and Switching Device 80 Are Separated from Each Other)
[0125] Next, as a sixth embodiment, the following describes an example in which headers
provided in condensation device 12 are separated from switching device 80.
[0126] Fig. 11 is a diagram showing configurations of the headers according to the sixth
embodiment. The configuration of Fig. 11 is different from the configuration of Fig.
10 in that first header 91, second header 92, third header 93, and fourth header 94
are provided to be separated from switching device 80 and are provided close to first
heat exchanger unit 121 and second heat exchanger unit 122 with respect to switching
device 80.
[0127] First header 91 is provided at a position close to first heat exchanger unit 121
with respect to a branch portion at which the tube from first compressor 11 is branched
to condensation device 12 and switching device 80. First header 91 is configured to
supply, to first heat exchanger unit 121 through first header 91, the first refrigerant
supplied from the branch portion.
[0128] Second header 92 is provided at a position close to first heat exchanger unit 121
with respect to the merging portion at which the tube from first heat exchanger unit
121 toward first expansion valve 13 is merged with the tube from second on-off valve
82 of switching device 80. Second header 92 is configured to supply, to the merging
portion through second header 92, the first refrigerant flowing out from first heat
exchanger unit 121.
[0129] Third header 93 is provided in a tube branched from between first on-off valve 81
and third on-off valve 83 to reach second heat exchanger unit 122. Third header 93
is configured to supply, to second heat exchanger unit 122, the first refrigerant
supplied through first on-off valve 81 during the cooling operation, or to supply,
to third on-off valve 83, the first refrigerant flowing out from second heat exchanger
unit 122 during the pressure increase suppression operation.
[0130] Fourth header 94 is provided in a tube branched from between second on-off valve
82 and fourth on-off valve 84 to reach second heat exchanger unit 122. Fourth header
94 is configured to supply, toward second on-off valve 82, the first refrigerant flowing
out from second heat exchanger unit 122 during the cooling operation, or to supply,
toward second heat exchanger unit 122, the first refrigerant supplied through fourth
on-off valve 84 during the pressure increase suppression operation.
Seventh Embodiment.
(First Heat Exchanger Unit 121 and Second Heat Exchanger Unit 122 Are Arranged Side
by Side in Upward/Downward Direction)
[0131] Next, as a seventh embodiment, the following describes an example in which first
heat exchanger unit 121 and second heat exchanger unit 122 are arranged side by side
in an upward/downward direction in condensation device 12.
[0132] Fig. 12 is a diagram showing arrangements of first heat exchanger unit 121 and second
heat exchanger unit 122 according to the seventh embodiment.
[0133] In condensation device 12, it is desirable that an air sending direction of first
fan 123 to first heat exchanger unit 121 and an air sending direction of second fan
124 to second heat exchanger unit 122 do not overlap with each other. This is due
to the following reason: when one of first heat exchanger unit 121 and second heat
exchanger unit 122 is affected by air sent by the other, the heat exchange capacity
for the first refrigerant is suppressed.
[0134] Fig. 12 shows a configuration in which first heat exchanger unit 121 and first fan
123 are arranged side by side with second heat exchanger unit 122 and second fan 124
in the upward/downward direction. In Fig. 12, first heat exchanger unit 121 is shown
to be larger than second heat exchanger unit 122 because first heat exchanger unit
121 has a larger volume for heat exchange than that of second heat exchanger unit
122. As shown in Fig. 12, when first heat exchanger unit 121 and first fan 123 are
arranged side by side with second heat exchanger unit 122 and second fan 124 in the
upward/downward direction, air sending direction 201 of first fan 123 to first heat
exchanger unit 121 and air sending direction 202 of second fan 124 to second heat
exchanger unit 122 do not overlap with each other.
[0135] According to the configuration shown in Fig. 12, since air sending direction 201
of first fan 123 to first heat exchanger unit 121 and air sending direction 202 of
second fan 124 to second heat exchanger unit 122 do not overlap with each other, one
of first heat exchanger unit 121 and second heat exchanger unit 122 can be suppressed
from being affected by the heat of the air sent from the other. Accordingly, heat
exchange of the first refrigerant is promoted in each of first heat exchanger unit
121 and second heat exchanger unit 122, thereby improving the heat exchange capacity
for the first refrigerant. Thus, the pressure in first refrigeration cycle 1 can be
suppressed from being increased excessively.
Eighth Embodiment.
(Configuration in which First Heat Exchanger Unit 121 and Second Heat Exchanger Unit
122 Are Arranged Side by Side in Leftward/Rightward Direction)
[0136] Next, as an eighth embodiment, the following describes an example in which first
heat exchanger unit 121 and second heat exchanger unit 122 are arranged side by side
in the leftward/rightward direction in condensation device 12.
[0137] Fig. 13 is a diagram showing arrangements of first heat exchanger unit 121 and second
heat exchanger unit 122 according to the eighth embodiment.
[0138] Fig. 13 shows a configuration in which first heat exchanger unit 121 and first fan
123 are arranged side by side with second heat exchanger unit 122 and second fan 124
in the leftward/rightward direction. In Fig. 13, first heat exchanger unit 121 is
shown to be larger than second heat exchanger unit 122 because the volume of first
heat exchanger unit 121 for heat exchange is larger than that of second heat exchanger
unit 122. As shown in Fig. 13, when first heat exchanger unit 121 and first fan 123
are arranged side by side with second heat exchanger unit 122 and second fan 124 in
the leftward/rightward direction, air sending direction 201 of first fan 123 to first
heat exchanger unit 121 and air sending direction 202 of second fan 124 to second
heat exchanger unit 122 do not overlap with each other. Thus, the same effect as the
effect obtained by the seventh embodiment can be obtained, for example, the heat exchange
capacity for the first refrigerant in each of first heat exchanger unit 121 and second
heat exchanger unit 122 is improved.
Ninth Embodiment.
(Configuration in which Each of First Heat Exchanger Unit 121A and Second Heat Exchanger
Unit 122A Individually Employs Water For Heat Exchange)
[0139] Next, as a ninth embodiment, the following describes an example in which each of
a first heat exchanger unit 121A and a second heat exchanger unit 122A employs water
for heat exchange in condensation device 12.
[0140] Fig. 14 is a diagram showing arrangements of first heat exchanger unit 121A and second
heat exchanger unit 122A according to the ninth embodiment.
[0141] In condensation device 12, instead of first heat exchanger unit 121 and second heat
exchanger unit 122 that each exchange heat with air as shown in Fig. 12 and the like,
first heat exchanger unit 121A and second heat exchanger unit 122A that each employs
water for heat exchange as shown in Fig. 14 may be provided.
[0142] Each of first heat exchanger unit 121A and second heat exchanger unit 122A individually
performs heat exchange using water as a heat medium. When exchanging heat using water
as the heat medium, a first pump 141 configured to supply water to first heat exchanger
unit 121A and a second pump 142 configured to supply water to second heat exchanger
unit 122A are each provided as a device configured to supply the heat medium as shown
in Fig. 14. In Fig. 14, first heat exchanger unit 121A is shown to be larger than
second heat exchanger unit 122A because first heat exchanger unit 121A has a larger
volume for heat exchange than that of second heat exchanger unit 122A.
[0143] First heat exchanger unit 121A comprises a first heat exchanger unit 1211 and a second
heat exchanger unit 1212. Water is supplied from first pump 141 to first heat exchanger
unit 1211. The first refrigerant is supplied from switching device 80 to second heat
exchanger unit 1212. With this configuration, in first heat exchanger unit 121A, heat
exchange is performed between the first refrigerant in first heat exchanger unit 1211
and the water in second heat exchanger unit 1212.
[0144] Second heat exchanger unit 122A comprises a first heat exchanger unit 1221 and a
second heat exchanger unit 1222. Water is supplied from second pump 142 to first heat
exchanger unit 1221. The first refrigerant is supplied from switching device 80 to
second heat exchanger unit 1222. With this configuration, in first heat exchanger
unit 121A, heat exchange is performed between the first refrigerant in first heat
exchanger unit 1211 and the water in second heat exchanger unit 1212.
[0145] In Fig. 14, water is supplied from first pump 141 to first heat exchanger unit 121A,
and water is supplied from second pump 142 to second heat exchanger unit 122A. Thus,
water for heat exchange is supplied to first heat exchanger unit 121A and second heat
exchanger unit 122A from the different sources through the different paths.
[0146] According to the configuration shown in Fig. 14, since water for heat exchange is
supplied to first heat exchanger unit 121A and second heat exchanger unit 122A from
the different sources through the different paths, one of first heat exchanger unit
121A and second heat exchanger unit 122A can be suppressed from being affected by
heat of the water from the other. Accordingly, heat exchange of the first refrigerant
is promoted in each of first heat exchanger unit 121A and second heat exchanger unit
122A, thereby improving the heat exchange capacity for the first refrigerant. Thus,
pressure in first refrigeration cycle 1 can be suppressed from being increased excessively.
Tenth Embodiment.
(Configuration in which Flat Tube Heat Exchanger Is Used as First Heat Exchanger Unit
121 of Condensation device 12)
[0147] Next, as a tenth embodiment, the following describes an example in which a flat tube
heat exchanger is used as first heat exchanger unit 121 in condensation device 12.
[0148] For each of the various types of heat exchangers each comprising the condenser and
the evaporator as shown in the above-described embodiments, a flat tube heat exchanger
or a circular tube heat exchanger may be used. When the flat tube heat exchanger of
the various types of heat exchangers is used at least for first heat exchanger unit
121 of condensation device 12, pressure in first refrigeration cycle 1 can be suppressed
from being increased excessively in each of the cooling operation and the pressure
increase suppression operation. This is because the flat tube heat exchanger has higher
heat exchanger efficiency than those of the other types of heat exchangers.
[0149] Fig. 15 is a cross sectional view showing an exemplary flat tube 50 provided in the
flat tube heat exchanger. Referring to Fig. 15, a plurality of paths 51 in each of
which the refrigerant flows are provided in flat tube 50 by partitioning the inside
of the flat and elliptic tube. With such a configuration, the flat tube heat exchanger
using flat tube 50 as first heat exchanger unit 121 can have higher heat exchange
efficiency than those when the other types of heat exchangers are used. Thus, the
heat exchange efficiency of first heat exchanger unit 121 can be improved.
[0150] Since second heat exchanger unit 122 of condensation device 12 is used for both a
condenser and an evaporator, a circular tube heat exchanger may be used therefor in
order to defrost and drain a generated frost in a short time when second heat exchanger
unit 122 is used as the evaporator.
Eleventh Embodiment.
(Pressure Control for Second Refrigeration Cycle 2 during Pressure Increase Suppression
Operation)
[0151] Next, as an eleventh embodiment, the following describes exemplary pressure control
for second refrigeration cycle 2 during the pressure increase suppression operation
of the binary refrigeration apparatus described in each of the first to tenth embodiments.
[0152] During the pressure increase suppression operation, controller 100 controls a high-stage
expansion valve 300 so as to cause a degree of superheat of the outlet side of cascade
heat exchanger 3 to be a predetermined reference value with the frequency of first
compressor 11 being set to a reference frequency in the pressure increase suppression
operation. During the pressure increase suppression operation, as described below,
controller 100 controls the flow rate of the heat medium to be supplied by second
fan 124 to second heat exchanger unit 122 used as an evaporator, so as to cause the
pressure in second refrigeration cycle 2 to fall within a predetermined threshold
value range of the pressure with the frequency of first compressor 11 being set to
the reference frequency in the pressure increase suppression operation.
[0153] In the eleventh embodiment, the following describes pressure control for second refrigeration
cycle 2 as performed by controller 100 in the above-described pressure increase suppression
operation. In the binary refrigeration apparatus described in each of the first to
tenth embodiments, the pressure in second refrigeration cycle 2 may be controlled
to one pressure target value in the pressure increase suppression operation, or the
pressure in second refrigeration cycle 2 may be controlled to fall within a target
pressure range. In the eleventh embodiment, exemplary pressure control will be described
in which the pressure in second refrigeration cycle 2 is controlled to fall within
the target pressure range.
[0154] Fig. 16 is a flowchart of the pressure control for second refrigeration cycle 2 in
the pressure increase suppression operation. The pressure control of Fig. 16 is a
subroutine program that is invoked and executed repeatedly at a certain cycle during
execution of the processing of the pressure increase suppression operation as included
in the main program of the control by controller 100.
[0155] In a step S 11, controller 100 sets the operation frequency of first compressor 11
to the reference frequency in the pressure increase suppression operation. The reference
frequency in the pressure increase suppression operation is lower than the reference
frequency set in the cooling operation, for example. Once the reference frequency
set in step S11 is set in the pressure increase suppression operation, the set value
is not changed during the pressure increase suppression operation.
[0156] In a step S12, controller 100 determines whether or not a detection value of the
pressure in second refrigeration cycle 2 is lower than a first threshold value. The
first threshold value is a value used to set the upper limit of the target pressure
range of second refrigeration cycle 2 in the pressure increase suppression operation.
Specifically, in step S12, it is determined whether or not the pressure detected by
second discharging pressure sensor 46 is lower than the first threshold value. When
the pressure detected by second discharging pressure sensor 46 is not lower than the
first threshold value, the evaporation temperature of the second refrigerant is high
to be equal to or higher than the upper limit value of the control, and it is necessary
to increase an amount of heat to be exchanged in cascade heat exchanger 3.
[0157] When it is determined in step S12 that the detection value of the pressure is not
lower than the first threshold value, controller 100 decreases, in a step S 13, the
flow rate of the heat medium to be supplied to second heat exchanger unit 122 or second
heat exchanger unit 122A, and returns to step S12. When the flow rate of the heat
medium to be supplied to second heat exchanger unit 122 is decreased, a degree of
dryness at the outlet of second heat exchanger unit 122 is decreased to decrease the
outlet temperature of cascade heat exchanger 3, thus resulting in a decreased degree
of superheat. In that case, controller 100 performs control to decrease the degree
of opening of first expansion valve 13, thereby decreasing the evaporation temperature
in first refrigeration cycle 1.
[0158] In the pressure increase suppression operation, second heat exchanger unit 122 is
used as an evaporator. The flow rate of the heat medium in the case of second heat
exchanger unit 122 is a flow rate of air to be supplied by first fan 123. The flow
rate of the heat medium in the case of second heat exchanger unit 122A is the flow
rate of the water to be supplied by first pump 141.
[0159] When it is determined that the detection value of the pressure is lower than the
first threshold value in step S12, controller 100 determines whether or not the detection
value of the pressure in second refrigeration cycle 2 is higher than a second threshold
value in step S14. The second threshold value is a value used to set the lower limit
of the target pressure range of second refrigeration cycle 2 in the pressure increase
suppression operation. When the pressure detected by second discharging pressure sensor
46 is not higher than the second threshold value, the evaporation temperature of the
second refrigerant is low to be equal to or lower than the lower limit value of the
control, and it is necessary to decrease an amount of heat to be exchanged in cascade
heat exchanger 3.
[0160] When it is determined in step S14 that the detection value of the pressure is not
higher than the second threshold value, controller 100 increases, in a step S 15,
the flow rate of the heat medium to be supplied to second heat exchanger unit 122
or second heat exchanger unit 122A, and returns to step S14. When the flow rate of
the heat medium supplied to second heat exchanger unit 122 is increased, the degree
of dryness at the outlet of second heat exchanger unit 122 becomes high to increase
the outlet temperature of cascade heat exchanger 3, thus resulting in an increased
degree of superheat. In that case, controller 100 performs control to increase the
degree of opening of first expansion valve 13, thereby increasing the evaporation
temperature in first refrigeration cycle 1.
[0161] When it is determined in step S14 that the detection value of the pressure is higher
than the second threshold value, controller 100 returns to the main routine. Thereafter,
the pressure control for second refrigeration cycle 2 as shown in Fig. 16 is repeatedly
performed during the pressure increase suppression operation.
[0162] Exemplary setting values of the first threshold value and the second threshold value
will be described below. When the second refrigerant sealed in second refrigeration
cycle 2 is carbon dioxide and the pressure resistance of the device of second refrigeration
cycle 2 is 4.15 MPaG that is the pressure resistance of a commonly used refrigeration
cycle such as R410A, the first threshold value is set to, for example, +7.7°C, and
the second threshold value is set to, for example, -29°C that is a temperature higher
than a temperature corresponding to the lower limit of the low pressure during the
operation of first compressor 11. More specifically, each of the first threshold value
and the second threshold value is preferably around 0°C, for example, the first threshold
value may be set to +2°C and the second threshold value may be set to -2°C in order
to prevent freezing while securing a margin to the upper limit of the pressure of
the pressure resistance.
[0163] It should be noted that when the second threshold value is set to a value equal to
or higher than 0°C, freezing of second refrigeration cycle 2 can be prevented. In
an exemplary case of the saturation temperature of carbon dioxide, when the first
threshold value is 7.7°C or lower, it is possible to use a device and a tube each
having a low pressure resistance and each used for R410A or the like. It should be
noted that when the first refrigerant is carbon dioxide, the first threshold value
may be set to, for example, 5°C with a margin to the upper limit of the pressure resistance,
or may be set to 3°C with a further margin to the upper limit of the pressure resistance.
[0164] Since the pressure control for second refrigeration cycle 2 in the above-described
pressure increase suppression operation is performed, controller 100 can control the
pressure in second refrigeration cycle 2 to fall within the pressure range between
the first threshold value and the second threshold value. Further, since the heat
medium to be supplied to second heat exchanger unit 122 by second fan 124 is controlled
to cause the pressure detected by second discharging pressure sensor 46 to fall within
the reference range between the first threshold value and the second threshold value,
the heat exchange capacity of cascade heat exchanger 3 can be adjusted in accordance
with a situation that changes the pressure in second refrigeration cycle 2, such as
outdoor air temperature and disturbance.
(State of First Refrigerant during Pressure Increase Suppression Operation)
[0165] Next, the following describes a state of the first refrigerant in first refrigeration
cycle 1 when the pressure control for second refrigeration cycle 2 as shown in Fig.
16 is performed in the pressure increase suppression operation.
[0166] Fig. 17 is a Mollier diagram showing a state of the first refrigerant during the
pressure increase suppression operation. In Fig. 17, the vertical axis represents
a pressure P, and the horizontal axis represents a specific enthalpy. In Fig. 17,
saturated liquid line and saturated vapor line are indicated by curves.
[0167] In Fig. 17, a compression process a for the first refrigerant, a condensation process
b for the first refrigerant, an expansion process c for the first refrigerant, and
an evaporation process d for the first refrigerant are shown in association with devices
involved in the respective processes in first refrigeration cycle 1 during the pressure
increase suppression operation.
[0168] In compression process a, the first refrigerant is compressed by first compressor
11 to increase the pressure and specific enthalpy of the first refrigerant. In condensation
process b, the first refrigerant is condensed by first heat exchanger unit 121 (121A)
to decrease the specific enthalpy of the first refrigerant with the pressure of the
first refrigerant being maintained. In expansion process c, the first refrigerant
is expanded by first expansion valve 13 to decrease the pressure of the first refrigerant
with the specific enthalpy of the first refrigerant being maintained. In evaporation
process d, a second stage of evaporation is performed by second heat exchanger unit
122 (122A) and a second stage of evaporation is then performed by evaporator unit
31 of cascade heat exchanger 3 to increase the specific enthalpy of the first refrigerant
with the pressure of the first refrigerant being maintained.
[0169] As indicated by an arrow in Fig. 17, in evaporation process d, a relative ratio of
an amount of increase of the specific enthalpy by second heat exchanger unit 122 and
an amount of increase of the specific enthalpy by evaporator unit 31 of cascade heat
exchanger 3 is increased or decreased depending on an amount of supply of the heat
medium by second fan 124 (second pump 142).
[0170] For example, when the flow rate of the heat medium to be supplied to second heat
exchanger unit 122 (122A) is decreased as in step S13 of Fig. 16, the ratio of increase
of the specific enthalpy by second heat exchanger unit 122 (122A) is decreased and
the ratio of increase of the specific enthalpy by evaporator unit 31 of cascade heat
exchanger 3 is increased. On the other hand, when the flow rate of the heat medium
supplied to second heat exchanger unit 122 (122A) is increased as in step S15 of Fig.
16, the ratio of increase of the specific enthalpy by second heat exchanger unit 122
(122A) is increased and the ratio of increase of the specific enthalpy by evaporator
unit 31 of cascade heat exchanger 3 is decreased.
Twelfth Embodiment.
(Stop Control for First Refrigeration Cycle 1 during Pressure Increase Suppression
Operation)
[0171] Next, as a twelfth embodiment, the following describes exemplary stop control for
first refrigeration cycle 1 during the pressure increase suppression operation of
the binary refrigeration apparatus described in each of the first to eleventh embodiments.
[0172] For example, second refrigeration cycle 2 when the operation of the binary refrigeration
apparatus is stopped has a pressure corresponding to an outdoor air temperature when
first refrigeration cycle 1 is not operated. For example, when a carbon dioxide refrigerant
is used as the second refrigerant, if the outdoor air temperature reaches 30°C, the
pressure in second refrigeration cycle 2 may exceed the pressure resistance of each
of tubes and devices used in a general refrigeration cycle.
[0173] In order to prevent the pressure in second refrigeration cycle 2 from being increased
excessively in this way when the operation is stopped, the binary refrigeration apparatus
performs the pressure increase suppression operation as described above when the operation
is stopped. However, when the pressure in second refrigeration cycle 2 is sufficiently
lower than the pressure resistance of each of the tubes and devices, for example,
when the outdoor air temperature is 7°C or lower, there is no possibility that the
pressure resistance of each of the tubes and devices is exceeded even though the pressure
increase suppression operation is not performed. Thus, in the twelfth embodiment,
an example will be described in which controller 100 performs control to stop first
refrigeration cycle 1 when the pressure in second refrigeration cycle 2 becomes lower
than a threshold value during the pressure increase suppression operation.
[0174] In order to perform such stop control for first refrigeration cycle 1 during the
pressure increase suppression operation, an outdoor air temperature sensor 49 configured
to detect an outdoor air temperature of the binary refrigeration apparatus is provided
as shown in Fig. 3. A detection signal of outdoor air temperature sensor 49 is input
to controller 100.
[0175] Fig. 18 is a flowchart of the stop control for first refrigeration cycle 1 during
the pressure increase suppression operation. The control of Fig. 18 is a subroutine
program that is invoked and executed repeatedly at a certain cycle during execution
of the processing of the pressure increase suppression operation as included in the
main program of the control by controller 100.
[0176] In a step S21, controller 100 determines whether or not a detection value of the
outdoor air temperature detected by outdoor air temperature sensor 49 is lower than
a third threshold value. The third threshold value is set to an outdoor air temperature
value equal to or lower than an outdoor air temperature corresponding to the pressure
of the setting value of the pressure resistance of each of the tubes and devices of
second refrigeration cycle 2. When it is determined that the detection value of the
outdoor air temperature is not a temperature lower than the third threshold value
in step S21, controller 100 brings first refrigeration cycle 1 into the operation
state in a step S22 or maintains the operation state of first refrigeration cycle
1 and returns to the main routine.
[0177] On the other hand, when it is determined that the detection value of the outdoor
air temperature is a temperature lower than the fourth threshold value in step S21,
controller 100 determines in a step S23 whether or not the detection value of the
pressure in second refrigeration cycle 2 is lower than a fourth threshold value. The
fourth threshold value is a pressure set to be equal to or lower than the first threshold
value, and is a pressure value recognized as having no possibility of exceeding the
pressure resistance of each of the tubes and devices even though the pressure increase
suppression operation is not performed. Specifically, in step S21, it is determined
whether or not the pressure detected by second discharging pressure sensor 46 is lower
than the first threshold value.
[0178] When it is determined that the detection value of the pressure in second refrigeration
cycle 2 is not a temperature lower than the fourth threshold value in step S23, controller
100 brings first refrigeration cycle 1 into the operation state in step S22 or maintains
the operation state of first refrigeration cycle 1 and returns to the main routine.
On the other hand, when it is determined in step S23 that the detection value of the
pressure in second refrigeration cycle 2 is a temperature lower than the fourth threshold
value, the operation of first refrigeration cycle 1 is stopped in step S25, and it
returns to the main routine. Specifically, in step S25, at least first compressor
11 is stopped.
[0179] As described above, in the stop control for first refrigeration cycle 1 during the
pressure increase suppression operation, when the detection value of the outdoor air
temperature detected by outdoor air temperature sensor 49 is a temperature lower than
the third threshold value and the pressure detected by second discharging pressure
sensor 46 is lower than the fourth threshold value, the operation of first refrigeration
cycle 1 is stopped.
[0180] Since the stop control for first refrigeration cycle 1 during the pressure increase
suppression operation as shown in Fig. 18 is performed, the operation of first refrigeration
cycle 1 can be stopped when it is recognized that there is no possibility that the
pressure resistance of each of the tubes and devices is exceeded even through the
pressure increase suppression operation is performed. Since the operation of first
refrigeration cycle 1 can be stopped in accordance with the detection value of the
outdoor air temperature and the detection value of the pressure in second refrigeration
cycle 2 in this way, power consumption of the binary refrigeration apparatus can be
reduced.
Thirteenth Embodiment.
(Example in which Switching Device 800 Comprising Four-Way Valve Is Provided)
[0181] Next, as a thirteenth embodiment, the following describes an example in which a switching
device 800 comprising four-way valves is provided instead of switching device 80 described
above.
[0182] Each of Figs. 19 and 20 is a diagram showing an overall configuration of a binary
refrigeration apparatus 10C comprising switching device 800 according to the thirteenth
embodiment. Switching device 800 shown in each of Figs. 19 and 20 is different from
switching device 80 shown in Fig. 5 and the like in the following points. A first
four-way valve 86 is provided instead of first on-off valve 81 and third on-off valve
83. A second four-way valve 87 is provided instead of second on-off valve 82 and fourth
on-off valve 84. Thus, switching device 800 comprises first four-way valve 86, second
four-way valve 87, and fifth on-off valve 85. Each of first four-way valve 86 and
second four-way valve 87 are used in such a manner that one port is sealed.
[0183] Fig. 21 is a block diagram showing an exemplary control configuration of binary refrigeration
apparatus 10C. The configuration of Fig. 21 is different from the configuration of
Fig. 3 in that controller 100 outputs a control signal to each of first four-way valve
86, second four-way valve 87, and fifth on-off valve 85 so as to control switching
device 800.
[0184] It should be noted that Fig. 21 also shows an exemplary connection among a first
three-way valve 88, a second three-way valve 89, a six-way valve 90, and a sixth on-off
valve 95, which are not provided in the thirteenth embodiment but are provided in
other embodiments described later.
(Operation of Switching Device 800 during Cooling Operation)
[0185] Next, an operation of binary refrigeration apparatus 10C in the cooling operation
will be described with reference to Fig. 19. In Fig. 19, flow of the first refrigerant
and flow of the second refrigerant in the cooling operation are indicated by straight
arrows.
[0186] In the cooling operation, in condensation device 12, both first heat exchanger unit
121 and second heat exchanger unit 122 are each used as a condenser. In the cooling
operation, controller 100 controls first four-way valve 86 and second four-way valve
87 to form, between first compressor 11 and first expansion valve 13 in switching
device 800, a path in which second heat exchanger unit 122 is connected to first heat
exchanger unit 121 in parallel. In that case, controller 100 controls fifth on-off
valve 85 to the opened state.
[0187] With such states of first four-way valve 86 and second four-way valve 87, in the
cooling operation, a first path in which the first refrigerant flows through first
heat exchanger unit 121, and a second path in which the first refrigerant flows through
first four-way valve 86, second heat exchanger unit 122 and second four-way valve
87 are formed between first compressor 11 and first expansion valve 13. Thus, in the
cooling operation, both first heat exchanger unit 121 and second heat exchanger unit
122 are each used as a condenser in condensation device 12.
(Operation of Switching Device 800 during Pressure Increase Suppression Operation)
[0188] Next, the operation of binary refrigeration apparatus 10C during the pressure increase
suppression operation will be described with reference to Fig. 20. In Fig. 20, flow
of the first refrigerant and flow of the second refrigerant in the cooling operation
are indicated by straight arrows.
[0189] In the pressure increase suppression operation, first heat exchanger unit 121 is
used as a condenser and second heat exchanger unit 122 is used as an evaporator in
condensation device 12. In the pressure increase suppression operation, controller
100 controls the first four-way valve and second four-way valve 87 so as to form,
in switching device 800, a path in which second heat exchanger unit 122 is connected
between first expansion valve 13 and evaporator unit 31 of cascade heat exchanger
3. In that case, controller 100 controls fifth on-off valve 85 to the closed state.
[0190] With such states of first four-way valve 86 and second four-way valve 87, in the
pressure increase suppression operation, a path in which the first refrigerant flows
through second four-way valve 87, second heat exchanger unit 122, and first four-way
valve 86 is formed between first expansion valve 13 and evaporator unit 31 of cascade
heat exchanger 3. Thus, in the pressure increase suppression operation, first heat
exchanger unit 121 is used as a condenser and second heat exchanger unit 122 is used
as an evaporator in condensation device 12.
[0191] In this way, switching device 800 is controlled by controller 100 so as to form the
same path as that in switching device 80 described above during each of the cooling
operation and the pressure increase suppression operation. Thus, in binary refrigeration
apparatus 10C, the same path for the first refrigerant as the path in each of binary
refrigeration apparatus 10, binary refrigeration apparatus 10A, and binary refrigeration
apparatus 10B is formed during each of the cooling operation and the pressure increase
suppression operation.
[0192] It should be noted that the four-way valve used as each of first four-way valve 86
and second four-way valve 87 may be a four-way valve driven based on a differential
pressure between the suction temperature of first compressor 11 detected by first
suction temperature sensor 42 and the discharging pressure of first compressor 11
detected by first discharging pressure sensor 43.
[0193] Since switching device 800 comprises the two four-way valves in binary refrigeration
apparatus 10D, the number of components can be reduced, thereby suppressing increased
manufacturing cost. Further, since switching device 800 comprises two four-way valves
in binary refrigeration apparatus 10D, the number of valves controlled by controller
100 can be reduced.
Fourteenth Embodiment.
(Example in which Switching Device 801 Comprising Four-Way Valve Is Provided)
[0194] Next, as a fourteenth embodiment, the following describes an example in which a switching
device 801 comprising four-way valves is provided instead of switching device 80 described
above.
[0195] Each of Figs. 22 and 23 is a diagram showing an overall configuration of a binary
refrigeration apparatus 10D comprising switching device 801 according to the fourteenth
embodiment. Switching device 801 shown in Figs. 22 and 23 is different from switching
device 800 shown in Fig. 20 and the like in the following points. A first three-way
valve 88 is provided instead of first four-way valve 86. A second three-way valve
89 is provided instead of second four-way valve 87. Thus, switching device 801 comprises
first four-way valve 86, second three-way valve 89, and fifth on-off valve 85.
[0196] As shown in Fig. 21, controller 100 outputs a control signal to each of first three-way
valve 88, second three-way valve 89, and fifth on-off valve 85 so as to control switching
device 801.
(Operation of Switching Device 801 during Cooling Operation)
[0197] Next, an operation of binary refrigeration apparatus 10D in the cooling operation
will be described with reference to Fig. 22. In Fig. 22, flow of the first refrigerant
and flow of the second refrigerant in the cooling operation are indicated by straight
arrows.
[0198] In the cooling operation, in condensation device 12, both first heat exchanger unit
121 and second heat exchanger unit 122 are each used as a condenser. In the cooling
operation, controller 100 controls first three-way valve 88 and second three-way valve
89 to form, between first compressor 11 and first expansion valve 13 in switching
device 801, a path in which second heat exchanger unit 122 is connected to first heat
exchanger unit 121 in parallel. In that case, controller 100 controls fifth on-off
valve 85 to the opened state.
[0199] With such states of first three-way valve 88 and second three-way valve 89, in the
cooling operation, a first path in which the first refrigerant flows through first
heat exchanger unit 121, and a second path in which the first refrigerant flows through
first three-way valve 88, second heat exchanger unit 122 and second three-way valve
89 are formed between first compressor 11 and first expansion valve 13. Thus, in the
cooling operation, both first heat exchanger unit 121 and second heat exchanger unit
122 are each used as a condenser in condensation device 12.
(Operation of Switching Device 801 during Pressure Increase Suppression Operation)
[0200] Next, an operation of binary refrigeration apparatus 10D in the pressure increase
suppression operation will be described with reference to Fig. 23. In Fig. 23, flow
of the first refrigerant and flow of the second refrigerant in the pressure increase
suppression operation are indicated by straight arrows.
[0201] In the pressure increase suppression operation, first heat exchanger unit 121 is
used as a condenser and second heat exchanger unit 122 is used as an evaporator in
condensation device 12. In the pressure increase suppression operation, controller
100 controls first three-way valve 88 and second three-way valve 89 so as to form,
in switching device 801, a path in which second heat exchanger unit 122 is connected
between first expansion valve 13 and evaporator unit 31 of cascade heat exchanger
3. In that case, controller 100 controls the fifth on-off valve to the closed state.
[0202] With such states of first three-way valve 88 and second three-way valve 89, in the
pressure increase suppression operation, a path in which the first refrigerant flows
through second three-way valve 89, second heat exchanger unit 122, and first three-way
valve 88 is formed between first expansion valve 13 and evaporator unit 31 of cascade
heat exchanger 3. Thus, in the pressure increase suppression operation, first heat
exchanger unit 121 is used as a condenser and second heat exchanger unit 122 is used
as an evaporator in condensation device 12.
[0203] In this way, switching device 801 is controlled by controller 100 so as to form the
path similar to that in switching device 80 described above during each of the cooling
operation and the pressure increase suppression operation. Thus, in binary refrigeration
apparatus 10C, the path for the first refrigerant similar to that in each of binary
refrigeration apparatus 10, binary refrigeration apparatus 10A, binary refrigeration
apparatus 10B, and binary refrigeration apparatus 10C is formed during each of the
cooling operation and the pressure increase suppression operation.
[0204] Since switching device 801 comprises the two three-way valves in binary refrigeration
apparatus 10D, the number of components can be reduced, thereby suppressing increased
manufacturing cost. Further, since switching device 801 comprises the two three-way
valves in binary refrigeration apparatus 10D, the number of valves controlled by controller
100 can be reduced. As compared with first four-way valve 86 and second four-way valve
87 of the thirteenth embodiment, a work of sealing the port is not necessary for each
of first three-way valve 88 and second three-way valve 89, thereby improving workability
in constructing binary refrigeration apparatus 10E. With such an improvement in workability,
processing cost for devices can be reduced.
Fifteenth Embodiment.
(Example in which Switching Device 802 Comprising Four-Way Valve Is Provided)
[0205] Next, as a fifteenth embodiment, the following describes an example in which a switching
device 802 comprising a six-way valve is provided instead of switching device 80 described
above.
[0206] Each of Figs. 24 and 25 is a diagram showing an overall configuration of a binary
refrigeration apparatus 10E comprising switching device 802 according to the fifteenth
embodiment. Switching device 802 shown in Figs. 24 and 25 is different from switching
device 80 shown in Fig. 5 and the like in the following points. A six-way valve 90
and a sixth on-off valve 95 are provided instead of first on-off valve 81, second
on-off valve 82, third on-off valve 83, fourth on-off valve 84, and fifth on-off valve
85. Thus, switching device 802 comprises six-way valve 90 and sixth on-off valve 95.
[0207] As shown in Fig. 21, controller 100 outputs a control signal to each of six-way valve
90 and sixth on-off valve 95 so as to control switching device 802.
(Operation of Switching Device 802 during Cooling Operation)
[0208] Next, an operation of binary refrigeration apparatus 10E in the cooling operation
will be described with reference to Fig. 24. In Fig. 24, flow of the first refrigerant
and flow of the second refrigerant in the cooling operation are indicated by straight
arrows.
[0209] In the cooling operation, in condensation device 12, both first heat exchanger unit
121 and second heat exchanger unit 122 are each used as a condenser. In the cooling
operation, controller 100 controls six-way valve 90 and sixth on-off valve 95 to form,
between first compressor 11 and first expansion valve 13 in switching device 802,
a path in which second heat exchanger unit 122 and first heat exchanger unit 121 are
connected in parallel. In that case, controller 100 controls sixth on-off valve 95
to an opened state.
[0210] With such states of six-way valve 90 and sixth on-off valve 95, in the cooling operation,
a first path in which the first refrigerant flows through first heat exchanger unit
121, six-way valve 90, and sixth on-off valve 95, and a second path in which the first
refrigerant flows through six-way valve 90 and second heat exchanger unit 122 are
formed between first compressor 11 and first expansion valve 13. Thus, in the cooling
operation, both first heat exchanger unit 121 and second heat exchanger unit 122 are
each used as a condenser in condensation device 12.
(Operation of Switching Device 802 during Pressure Increase Suppression Operation)
[0211] Next, an operation of binary refrigeration apparatus 10E in the pressure increase
suppression operation will be described with reference to Fig. 25. In Fig. 25, flow
of the first refrigerant and flow of the second refrigerant in the pressure increase
suppression operation are indicated by straight arrows.
[0212] In the pressure increase suppression operation, first heat exchanger unit 121 is
used as a condenser and second heat exchanger unit 122 is used as an evaporator in
condensation device 12. In the pressure increase suppression operation, controller
100 controls six-way valve 90 and sixth on-off valve 95 so as to form, between first
compressor 11 and first expansion valve 13 in switching device 802, a path in which
the first refrigerant flows through first heat exchanger unit 121 and six-way valve
90. Further, controller 100 controls six-way valve 90 and sixth on-off valve 95 so
as to form, between first expansion valve 13 and evaporator unit 31 of cascade heat
exchanger 3 in switching device 802, a path in which the first refrigerant flows through
second heat exchanger unit 122 and six-way valve 90. In that case, controller 100
controls sixth on-off valve 95 to the closed state.
[0213] With such states of six-way valve 90 and sixth on-off valve 95, a path in which the
first refrigerant flows through first heat exchanger unit 121 and six-way valve 90
is formed between first compressor 11 and first expansion valve 13, and a path in
which the first refrigerant flows through second heat exchanger unit 122 and six-way
valve 90 is formed between first expansion valve 13 and evaporator unit 31 of cascade
heat exchanger 3. Thus, in the pressure increase suppression operation, first heat
exchanger unit 121 is used as a condenser and second heat exchanger unit 122 is used
as an evaporator in condensation device 12.
[0214] In this way, switching device 802 is controlled by controller 100 so as to form the
path similar to that in switching device 80 described above during each of the cooling
operation and the pressure increase suppression operation. Thus, in binary refrigeration
apparatus 10E, the path for the first refrigerant similar to the path in each of binary
refrigeration apparatus 10, binary refrigeration apparatus 10A, binary refrigeration
apparatus 10B, binary refrigeration apparatus 10C, and binary refrigeration apparatus
10D is formed during each of the cooling operation and the pressure increase suppression
operation.
[0215] Since switching device 802 comprises one six-way valve in binary refrigeration apparatus
10E, the number of components can be reduced, thereby suppressing increased manufacturing
cost. Further, since switching device 802 comprises one six-way valve in binary refrigeration
apparatus 10E, the number of valves controlled by controller 100 can be reduced. As
compared with first four-way valve 86 and second four-way valve 87 of the thirteenth
embodiment, a work of sealing the port is not necessary for six-way valve 90, thereby
improving workability in constructing binary refrigeration apparatus 10E. With such
an improvement in workability, processing cost for devices can be reduced.
Sixteenth Embodiment.
(Example in which Evaporation of First Refrigerant Is Performed in Second Heat Exchanger
Unit 122 After Cascade Heat Exchanger 3)
[0216] Next, as a sixteenth embodiment, the following describes an example in which the
first refrigerant expanded by first expansion valve 13 is evaporated in evaporator
unit 31 of cascade heat exchanger 3, is then evaporated in second heat exchanger unit
122, and is supplied to first compressor 11 in the pressure increase suppression operation.
[0217] Fig. 26 is a diagram showing an overall configuration of a binary refrigeration apparatus
10F according to the sixteenth embodiment. Binary refrigeration apparatus 10F shown
in Fig. 26 is different from binary refrigeration apparatus 10A shown in Fig. 5 and
the like in the following point. Between first expansion valve 13 and the inlet of
first compressor 11, switching device 80 and cascade heat exchanger 3 are provided
in a positional relation opposite to that of binary refrigeration apparatus 10A.
[0218] Specifically, between first expansion valve 13 and the suction side of first compressor
11, cascade heat exchanger 3 is provided at a position close to first expansion valve
13 with respect to switching device 80. In other words, between first expansion valve
13 and the suction side of first compressor 11, switching device 80 is provided at
a position close to the suction side of first compressor 11 with respect to cascade
heat exchanger 3.
(Operation of Binary Refrigeration Apparatus 10F during Cooling Operation)
[0219] An operation of binary refrigeration apparatus 10F during the cooling operation is
the same as the operation of binary refrigeration apparatus 10A during the cooling
operation shown in Fig. 5 and the like. However, during the cooling operation of binary
refrigeration apparatus 10F, the first refrigerant expanded by first expansion valve
13 is evaporated in evaporator unit 31 of cascade heat exchanger 3, and is then supplied
to the inlet of first compressor 11 through fifth on-off valve 85.
(Operation of Switching Device 802 during Pressure Increase Suppression Operation)
[0220] Next, an operation of binary refrigeration apparatus 10E in the pressure increase
suppression operation will be described with reference to Fig. 26. In Fig. 26, flow
of the first refrigerant and flow of the second refrigerant in the pressure increase
suppression operation are indicated by straight arrows.
[0221] In the pressure increase suppression operation, controller 100 brings first on-off
valve 81, second on-off valve 82, and fifth on-off valve 85 into the closed state
and brings third on-off valve 83 and fourth on-off valve 84 into the opened state
in switching device 80.
[0222] With such states of first on-off valve 81 to fifth on-off valve 85, in the pressure
increase suppression operation, a path in which the first refrigerant flows through
only first heat exchanger unit 121 of condensation device 12 is formed between the
suction side of first compressor 11 and first expansion valve 13. Thus, in the pressure
increase suppression operation, since the high-temperature high-pressure first refrigerant
discharged from first compressor 11 flows only to first heat exchanger unit 121 as
indicated by an arrow in the figure, only first heat exchanger unit 121 is used as
a condenser in condensation device 12.
[0223] In the pressure increase suppression operation, the first refrigerant expanded by
first expansion valve 13 is first supplied to evaporator unit 31 of cascade heat exchanger
3 and exchanges heat with the outdoor air to result in a first stage of evaporation.
In switching device 80, fifth on-off valve 85 is in the closed state and third on-off
valve 83 and fourth on-off valve 84 are each in the opened state. Therefore, the first
refrigerant that has passed through evaporator unit 31 of cascade heat exchanger 3
is supplied to the inlet of first compressor 11 through fourth on-off valve 84, second
heat exchanger unit 122, and third on-off valve 83. The first refrigerant having flowed
into second heat exchanger unit 122 exchanges heat with the outdoor air to result
in a second stage of evaporation.
[0224] Controller 100 controls the flow rate of the heat exchange medium to be supplied
from second fan 124 to second heat exchanger unit 122 such that a temperature or degree
of superheat obtained through the detection value of first suction temperature sensor
42 becomes a predetermined threshold value.
[0225] In binary refrigeration apparatus 10F according to the sixteenth embodiment, basically,
various types of control similar to those in binary refrigeration apparatus 10 according
to the first embodiment are performed by controller 100.
[0226] It should be noted that binary refrigeration apparatus 10F according to the sixteenth
embodiment is different from binary refrigeration apparatus 10 according to the first
embodiment in that the degree of superheat obtained through the detection value of
first suction temperature sensor 42 can be set up to a degree of superheat corresponding
to the outdoor air temperature.
[0227] Since switching device 80 is provided between cascade heat exchanger 3 and first
compressor 11 in first refrigeration cycle 1 in the configuration of binary refrigeration
apparatus 10F, the state of the refrigerant on the outlet side of cascade heat exchanger
3 does not need to be the superheated gas state in order to suppress the liquid back
to first compressor 11.
[0228] Since the state of the refrigerant at the outlet side of cascade heat exchanger 3
does not need to be the superheated gas state in the configuration of binary refrigeration
apparatus 10F, the cooling in second refrigeration cycle 2 can be performed more efficiently.
Thus, the evaporation temperature of second refrigeration cycle 2 when the pressure
in second refrigeration cycle 2 becomes the reference pressure can be made higher
than that in binary refrigeration apparatus 10 of the first embodiment.
[0229] Since the evaporation temperature of second refrigeration cycle 2 when the pressure
in second refrigeration cycle 2 becomes the reference pressure can be made higher
than that in binary refrigeration apparatus 10 of the first embodiment in the configuration
of binary refrigeration apparatus 10F, a compression ratio of first compressor 11
in first refrigeration cycle 1 in the pressure increase suppression operation can
be made small, thereby reducing driving electric power for first compressor 11. Thus,
power consumption of binary refrigeration apparatus 10F can be reduced.
[0230] In the configuration of binary refrigeration apparatus 10F, the suction temperature
of first compressor 11 can be made higher than that in the first embodiment. Thus,
occurrence of liquid back to first compressor 11 can be more suppressed than in the
first embodiment, thereby improving reliability of binary refrigeration apparatus
10F.
(Conclusion of the Embodiments)
[0231] The embodiments described above will be described again with reference to the figures.
[0232] The present disclosure relates to a binary refrigeration apparatus 10. Binary refrigeration
apparatus 10 comprises: a first refrigeration cycle 1 in which a first refrigerant
circulates, first refrigeration cycle 1 comprising a first compressor 11, a condensation
device 12, a first expansion valve 13, and a cascade heat exchanger 3; and a second
refrigeration cycle 2 in which a second refrigerant circulates, second refrigeration
cycle 2 comprising a second compressor 21, cascade heat exchanger 3, a second expansion
valve 23, and an evaporator 24. Cascade heat exchanger 3 is used as an evaporator
in first refrigeration cycle 1 and as a condenser in second refrigeration cycle 2
by performing heat exchange between the first refrigerant and the second refrigerant.
Condensation device 12 comprises a first heat exchanger unit 121 configured to condense
the first refrigerant, and a second heat exchanger unit 122 configured to condense
or evaporate the first refrigerant. Binary refrigeration apparatus 10 further comprises
a switching device 80 configured to switch a state of second heat exchanger unit 122
between a first state in which the first refrigerant is condensed and a second state
in which the first refrigerant is evaporated. In a cooling operation that is a first
operation for performing cooling by evaporator 24 in second refrigeration cycle 2,
switching device 80 is configured to bring second heat exchanger unit 122 into the
first state, and in a pressure increase suppression operation that is a second operation
for suppressing a pressure in second refrigeration cycle 2, switching device 80 is
configured to bring second heat exchanger unit 122 into the second state.
[0233] With such a configuration, in the second operation for suppressing the pressure in
second refrigeration cycle 2, since second heat exchanger unit 122 of condensation
device 12 is switched by switching device 80 to the second state in which the first
refrigerant is evaporated, a capacity for evaporating the first refrigerant in first
refrigeration cycle 1 is increased in the second operation for suppressing the pressure
in second refrigeration cycle 2, thereby stabilizing the operation state of first
refrigeration cycle 1 when second refrigeration cycle 2 is stopped.
[0234] Preferably, switching device 80 comprises a first on-off valve 81, a second on-off
valve 82, a third on-off valve 83, a fourth on-off valve 84, and a fifth on-off valve
85, each of which serves as a switching valve. The switching valve is configured to
switch the state of second heat exchanger unit 122 between the first state and the
second state by switching a path in which the first refrigerant is supplied to second
heat exchanger unit 122.
[0235] With such a configuration, switching device 80 can use the switching valve such as
first on-off valve 81, second on-off valve 82, third on-off valve 83, fourth on-off
valve 84, and fifth on-off valve 85 so as to switch the path in which the first refrigerant
is supplied to second heat exchanger unit 122, thereby switching the state of second
heat exchanger unit 122 between the first state and the second state.
[0236] Preferably, binary refrigeration apparatus 10 further comprises a controller 100
configured to control switching device 80. Controller 100 is configured to control
the switching valve such as first on-off valve 81, second on-off valve 82, third on-off
valve 83, fourth on-off valve 84, and fifth on-off valve 85 so as to switch the path
in which the first refrigerant is supplied to second heat exchanger unit 122.
[0237] With such a configuration, by controlling switching device 80 by controller 100,
it is possible to perform the control to switch the path in which the first refrigerant
is supplied to second heat exchanger unit 122.
[0238] Preferably, the path in which the first refrigerant is supplied to the second heat
exchanger unit comprises a first path provided between first compressor 11 and first
expansion valve 13, and a second path provided between first expansion valve 13 and
cascade heat exchanger 3. Controller 100 is configured to control the switching valve
such as first on-off valve 81, second on-off valve 82, third on-off valve 83, fourth
on-off valve 84, and fifth on-off valve 85 so as to perform control to switch between
the first path and the second path.
[0239] With such a configuration, by controlling switching device 80 by controller 100,
it is possible to perform the control to switch the path in which the first refrigerant
is supplied to second heat exchanger unit 122.
[0240] Preferably, the switching valve comprises: a first on-off valve 81, a second on-off
valve 82, a third on-off valve 83, and a fourth on-off valve 84, each of which serves
as a first switching valve configured to switch between a first connection state and
a second connection state, the first connection state being a state in which second
heat exchanger unit 122 is connected to a path for the first refrigerant between first
compressor 11 and first expansion valve 13, the second connection state being a state
in which second heat exchanger unit 122 is connected to a path for the first refrigerant
between first expansion valve 13 and cascade heat exchanger 3; and a fifth on-off
valve 85 serving as a second switching valve configured to switch the path for the
first refrigerant between first expansion valve 13 and cascade heat exchanger 3 from
a first supply path to a second supply path in the second connection state, the first
supply path being a path in which the first refrigerant is directly supplied from
first expansion valve 13 to cascade heat exchanger 3, the second supply path being
a path in which the first refrigerant is supplied from the first expansion valve to
the cascade heat exchanger via the second heat exchanger unit. When switching from
the first operation to the second operation, controller 100 is configured to switch
second heat exchanger unit 122 to the second connection state using the first switching
valve and then switch the path for the first refrigerant from the first supply path
to the second supply path using second switching valve 185.
[0241] With such a configuration, part of the first refrigerant having flowed out from first
expansion valve 13 flows into second heat exchanger unit 122, and the first refrigerant
pushes out the liquid refrigerant in second heat exchanger unit 122. Thus, the flow
velocity of the first refrigerant in second heat exchanger unit 122 is slower than
that when a whole of the first refrigerant having flowed out from first expansion
valve 13 flows into second heat exchanger unit 122 at once, with the result that the
first refrigerant can be brought into a more superheated gas state at the outlet portion
of second heat exchanger unit 122.
[0242] Preferably, binary refrigeration apparatus 10 further comprises: a first fan 123
serving as a first supplying device configured to supply first heat exchanger unit
121 with a first heat exchange medium for adjusting an amount of heat exchange of
first heat exchanger unit 121; and a second fan 124 serving as a second supplying
device configured to supply second heat exchanger unit 122 with a second heat exchange
medium for adjusting an amount of heat exchange of second heat exchanger unit 122.
Controller 100 is configured to control an amount of supply of the first heat exchange
medium by the first supplying device, and is configured to control an amount of supply
of the second heat exchange medium by the second supplying device.
[0243] With such a configuration, since controller 100 can control the amount of supply
of the first heat exchange medium so as to allow first heat exchanger unit 121 to
have a temperature suitable for condensation and can control the amount of supply
of the first heat exchange medium so as to allow second heat exchanger unit 122 to
have a temperature suitable for condensation or evaporation, the amount of supply
of the first heat exchange medium and the amount of supply of the second heat exchange
medium can be adjusted so as to individually allow each of first heat exchanger unit
121 and second heat exchanger unit 122 to have a temperature suitable for condensation
or evaporation.
[0244] Preferably, a supply path for the first heat exchange medium is different from a
supply path for the second heat exchange medium. With such a configuration, one of
first heat exchanger unit 121 and second heat exchanger unit 122 can be suppressed
from being affected by heat from a heat medium that is the heat exchange medium supplied
to the other. Thus, heat exchange of the first refrigerant is promoted in each of
first heat exchanger unit 121 and second heat exchanger unit 122, thereby improving
a heat exchange capacity for the first refrigerant.
[0245] Preferably, when switching from the cooling operation serving as the first operation
to the pressure increase suppression operation serving as the second operation, controller
100 is configured to increase the amount of supply of the first heat exchange medium
by first fan 123 serving as the first supplying device as compared with the first
operation (step S3), and then increase the amount of supply of the second heat exchange
medium by second fan 124 serving as the second supplying device as compared with the
first operation (step S4).
[0246] With such a configuration, since the amount of supply of the first heat exchange
medium by first fan 123 serving as the first supplying device is increased as compared
with the first operation, condensation by first heat exchanger unit 121 can be promoted,
thereby relatively reducing the amount of the first refrigerant in second heat exchanger
unit 122. Since the amount of the first refrigerant in second heat exchanger unit
122 to be switched to the evaporator is reduced in this way, occurrence of liquid
back in first compressor 11 can be suppressed when second heat exchanger unit 122
is switched to the evaporator.
[0247] Preferably, when switching from the cooling operation serving as the first operation
to the pressure increase suppression operation serving as the second operation, controller
100 is configured to increase the amount of supply of the second heat exchange medium
by the second supplying device as compared with the first operation, and then switch
the state of the second heat exchanger unit to the second state using the switching
device.
[0248] With such a configuration, since a large amount of the heat exchange medium can be
supplied to second heat exchanger unit 122 immediately after switching to the pressure
increase suppression operation serving as the second operation, evaporation in second
heat exchanger unit 122 after switching to the second operation can be further promoted.
[0249] Preferably, when switching from the cooling operation serving as the first operation
to the pressure increase suppression operation serving as the second operation, controller
100 is configured to increase the amount of supply of the first heat exchange medium
by first fan 123 serving as the first supplying device as compared with the first
operation (step S3), and then increase the amount of supply of the second heat exchange
medium by second fan 124 serving as the second supplying device as compared with the
first operation (step S4), and is configured to switch the state of the second heat
exchanger unit to the second state using the switching device (step S5) after increasing
the amount of supply of the second heat exchange medium by the second supplying device
(step S4).
[0250] With such a configuration, the amount of the first refrigerant inside second heat
exchanger unit 122 to be switched to the evaporator is reduced, with the result that
occurrence of liquid back in first compressor 11 can be suppressed when second heat
exchanger unit 122 is switched to the evaporator. Then, a large amount of the heat
exchange medium can be supplied to second heat exchanger unit 122 immediately after
switching to the pressure increase suppression operation serving as the second operation,
thereby further promoting evaporation in second heat exchanger unit 122 after switching
to the second operation.
[0251] Preferably, binary refrigeration apparatus 10 further comprises a second suction
pressure sensor 44 serving as a pressure sensor configured to detect a pressure of
a path between second compressor 21 and cascade heat exchanger 3. In the pressure
increase suppression operation serving as the second operation, controller 100 is
configured to control the second heat exchange medium to be supplied from second fan
124 serving as the second supplying device to second heat exchanger unit 122, so as
to cause the pressure detected by the pressure sensor to fall within a reference range
(steps S12 to S14).
[0252] With such a configuration, since the second heat exchange medium to be supplied from
second fan 124 to second heat exchanger unit 122 is controlled to cause the pressure
in second refrigeration cycle 2 to fall within the reference range between a first
threshold value and a second threshold value, the heat exchange capacity of cascade
heat exchanger 3 can be adjusted in accordance with a situation that changes the pressure
in second refrigeration cycle 2, such as outdoor air temperature and disturbance.
[0253] Preferably, binary refrigeration apparatus 10 further comprises: an outdoor air temperature
sensor 49 configured to detect an outdoor air temperature; and a second suction pressure
sensor 44 serving as a pressure sensor configured to detect a pressure of a path between
second compressor 21 and the cascade heat exchanger. In the pressure increase suppression
operation serving as the second operation, controller 100 is configured to stop the
first compressor when the outdoor air temperature detected by outdoor air temperature
sensor 49 is lower than a first reference value and the pressure detected by the pressure
sensor is lower than a second reference value (step S25).
[0254] With such a configuration, for example, when it is recognized that there is no possibility
of exceeding the pressure resistance of each of tubes and devices even through the
pressure increase suppression operation is not performed, the operation of first refrigeration
cycle 1 can be stopped by stopping the first compressor.
[0255] Preferably, first heat exchanger unit 121 is a flat tube 50 type heat exchanger.
With such a configuration, heat exchange efficiency of first heat exchanger unit 121
can be improved.
[0256] Preferably, first heat exchanger unit 121 has a larger volume than a volume of second
heat exchanger unit 122. With such a configuration, condensation performance of first
heat exchanger unit 121 during the pressure increase control operation is improved,
thereby suppressing the pressure in first refrigeration cycle 1 from being increased
excessively during the pressure increase control operation.
[0257] The embodiments disclosed herein are illustrative and non-restrictive in any respect.
The scope of the present disclosure is defined by the terms of the claims, rather
than the embodiments described above, and is intended to include any modifications
within the scope and meaning equivalent to the terms of the claims.
REFERENCE SIGNS LIST
[0258] 10: binary refrigeration apparatus; 11: first compressor; 12: condensation device;
13: first expansion valve; 3: cascade heat exchanger; 1: first refrigeration cycle;
21: second compressor; 23: second expansion valve; 24: evaporator; 121: first heat
exchanger unit; 122: second heat exchanger unit; 80: switching device.