Technical Field
[0001] The present invention relates to a charge control method and a charge control device
of a battery including a lithium-ion battery.
Background Art
[0002] There has been known a charge/discharge control method of a secondary battery that
determines such that when a temperature of a battery is a predetermined temperature
or less or the predetermined temperature or more, a charge power upper limit value
Pin-s and a discharge power upper limit value Pout-s are smaller than those at an
ordinary temperature, detects the temperature of the battery, determines charge power
and discharge power so as to be the charge/discharge power upper limit values Pin-s,
Pout-s or less at the detected temperature, and performs charge control of the battery
(for example, Patent Document 1).
Prior Art Document
Patent Document
Summary of Invention
Problems to Be Solved by Invention
[0004] However, when charge of a battery of a vehicle is controlled by the above-described
conventional control method by the charge control device, there is a problem that
an upper limit of a chargeable power set at a low temperature of the battery lowers
and absorbing a power generated according to a running scene of a vehicle by the battery
is difficult.
[0005] A problem to be solved by the present invention is to provide a charge control method
and a charge control device that allow absorbing a power generated according to a
running scene of a vehicle by a battery.
Means for Solving Problems
[0006] The present invention solves the above-described problem by: calculating a long-term
chargeable power; calculating a short-term chargeable power larger than the long-term
chargeable power; calculating a continuous chargeable power based on the short-term
chargeable power and the long-term chargeable power; and restricting an upper limit
of a charge power of the battery to the continuous chargeable power.
Effects of Invention
[0007] According to the present invention, a power generated according to a running scene
of a vehicle can be absorbed by the battery.
Brief Description of Drawings
[0008]
FIG. 1 is a block diagram illustrating a drive system according to one embodiment
of the present invention.
FIG. 2(a) is a graph illustrating voltage characteristics of a battery, and FIG. 2(b)
is a graph illustrating charge power characteristics of the battery.
FIG. 3 is a graph illustrating response characteristics of a short-term chargeable
power, an intermediate-term chargeable power, and a long-term chargeable power.
FIG. 4 is a block diagram illustrating a function block of a chargeable power calculation
unit.
FIG. 5 is a graph illustrating characteristics of short-term/long-term chargeable
powers, a target maintaining power, an actual charge power, and a continuous chargeable
power.
FIG. 6 is a flowchart of a charge control method according to the embodiment.
FIG. 7 is a block diagram illustrating a drive system according to another embodiment
of the present invention.
FIG. 8 is a table for describing a correlation between a battery temperature, an SOC,
the short-term chargeable power, and the target maintaining power.
FIG. 9 is a conceptual diagram of a map stored in an upper limit SOC calculation unit.
FIG. 10 is a block diagram illustrating a control flow of a calculation method of
the upper limit SOC by the upper limit SOC calculation unit.
FIG. 11 is a flowchart of a charge control method in another embodiment of the present
invention.
FIG. 12 is a block diagram illustrating a drive system according to another embodiment
of the present invention.
FIG. 13 is a block diagram illustrating a control flow of a warming-up determination
method by a warming-up determination unit.
FIG. 14 is a timing chart of various parameters related to warming-up determination
and a warming-up determination result, FIG. 14(a) illustrates a timing chart at a
cryogenic temperature and FIG. 14(b) illustrates a timing chart at a low temperature.
FIG. 15 is a flowchart of a charge control method in another embodiment of the present
invention.
Mode(s) for Carrying out the Invention
«First Embodiment»
[0009] The following describes one embodiment of a charge control system according to the
present invention with reference to the drawings. FIG. 1 is a block diagram illustrating
a drive system according to one embodiment of the present invention. The drive system
is a drive system of a hybrid vehicle and includes a battery 1, an engine 30, an electric
generator 40, a motor/inverter 50, and a charge control device 100. A battery charge/discharge
control system according to the embodiment is a part of the drive system and controls
a discharge power supplied from the battery 1 to the motor 50 and a charge power that
charges the battery 1 by a generated power of the electric generator 40. A charge
control method and a charge control device according to the embodiments mainly relate
to control during charging the battery 1, and hereinafter the charge control of the
battery 1 is mainly described.
[0010] The battery 1 is a power source disposed in the hybrid vehicle and includes a plurality
of lithium-ion batteries. The lithium-ion battery charges and discharges by movement
of lithium ions between a positive electrode and a negative electrode. The engine
30, the electric generator 40, and the motor 50 constitute a drive system of a series
hybrid, the engine 30 is used to drive the electric generator 40, and the power generated
by the electric generator 40 is supplied to the battery 1 to charge the battery 1.
At this time, the charge control device 100 controls a rotation speed of the electric
generator 40 to control the charge power supplied from the electric generator 40 to
the battery 1. The motor/inverter 50 includes an inverter that converts a voltage
output from the battery 1 from a direct current into an alternate current and a motor
that drives at the converted alternate voltage.
[0011] The charge control device 100 is a control unit (processor) that controls the charge
power of the battery 1 while managing a State of Charge (SOC) of the battery 1. The
charge control device 100 includes a voltage detection unit 2, a current detection
unit 3, a temperature detection unit 4, an SOC estimation unit 5, a short-term chargeable
power calculation unit 6, a long-term chargeable power calculation unit 7, a chargeable
power calculation unit 8, and a vehicle controller 20.
[0012] The voltage detection unit 2, the current detection unit 3, and the temperature detection
unit 4 are units that detect a state inside the battery 1, and detect a voltage of
each cell included in the battery 1, a current flowing through each cell, and a temperature
inside a battery pack by a voltage sensor, a current sensor, and a temperature sensor
of the battery 1.
[0013] The SOC estimation unit 5 estimates the SOC of the battery 1 based on the battery
voltage detected by the voltage detection unit 2 and/or the battery current detected
by the current detection unit 3. The SOC estimation unit 5 has an SOC-OCV map in which
an OCV is made correspond to the SOC of the battery 1. The SOC estimation unit 5 acquires
a voltage in an unloaded state (OCV) of the battery 1 from the voltage detection unit
2 at a start of a vehicle, refers to the SOC-OCV map, and sets an initial SOC. The
SOC estimation unit 5 integrates the current after the start of the vehicle and adds
a current integrated value to the initial SOC to estimate an SOC after the start.
[0014] The short-term chargeable power calculation unit 6 calculates a short-term chargeable
power based on the SOC of the battery 1 and a temperature of the battery 1 (battery
temperature). The short-term chargeable power is a power that allows charging the
battery 1 for a short term. The short-term chargeable power is equivalent to a power
generated by overshooting of an engine rotation speed after the start of the engine
30 or a power that allows absorbing a regenerative charge power during running a vehicle
(especially at a high speed). Note that a time to determine the short-term chargeable
power is in a range from several seconds to several tens of seconds or less, is determined
by, for example, a time from the engine start until the overshooting of the engine
rotation speed and/or a time in which the large regenerative power generated during
vehicle deceleration is absorbed by the battery 1, and is at least shorter than a
range of a time to determine a long-term chargeable power described later.
[0015] The short-term chargeable power calculation unit 6 calculates an upper limit current
at which lithium is not deposited based on the temperature of the battery 1 and the
SOC estimated by the SOC estimation unit 5. The upper limit current indicates a current
upper limit value at which lithium is not deposited when the battery 1 is charged
for a short time. The short time corresponds to a short term in the short-term chargeable
power. The upper limit current is a value determined from the temperature of the battery
1 and the SOC, and the lower the battery temperature is or the higher the SOC is,
the smaller the upper limit current is. The upper limit current is a value experimentally
determined according to characteristics of the battery 1 or the like. The short-term
chargeable power calculation unit 6 has a map in which the temperature of the battery
1, the SOC, and the upper limit current correspond to one another, and calculates
the upper limit current by map calculation using the temperature of the battery 1
and the SOC as inputs.
[0016] Next, the short-term chargeable power calculation unit 6 calculates an internal resistance
of the battery 1. The short-term chargeable power calculation unit 6 refers to the
map and calculates the internal resistance with the temperature of the battery 1 and
the SOC as inputs. Alternatively, the short-term chargeable power calculation unit
6 may calculate the internal resistance from the voltage of the battery 1 and a charge/discharge
current during running the vehicle in a stable state of the voltage of the battery
1. Note that the calculation method of the internal resistance may be another well-known
method.
[0017] The short-term chargeable power calculation unit 6 calculates a voltage increased
by the internal resistance when the upper limit current is flowed to the battery 1
(upper limit current × internal resistance). Furthermore, the short-term chargeable
power calculation unit 6 adds the calculated voltage (upper limit current × internal
resistance) to the OCV corresponding to the SOC of the battery 1 to calculate a voltage
when the battery 1 is charged at the upper limit current (voltage during charging
the upper limit current). The short-term chargeable power calculation unit 6 multiplies
the voltage during charging the upper limit current by the upper limit current to
calculate a short-term chargeable power (P
s1). Thus, the short-term chargeable power calculation unit 6 calculates the short-term
chargeable power (P
s1) based on the upper limit current.
[0018] In addition to the short-term chargeable power (P
s1), the short-term chargeable power calculation unit 6 calculates a short-term chargeable
power (P
s2) that does not exceed the upper limit voltage usable of the battery. The short-term
chargeable power (P
s1) is a short-term chargeable power based on the upper limit current at which lithium
is not deposited, and the short-term chargeable power (P
s2) is a short-term chargeable power based on the upper limit voltage of a battery usable
voltage range. For the battery 1, the usable voltage is preliminarily determined to
avoid excessive discharge and overcharge, and the charge control device 100 controls
the charge/discharge of the battery 1 such that the voltage of the battery 1 falls
within the usable voltage range.
[0019] FIG. 2(a) is a graph illustrating characteristics of a voltage of the battery 1 (cell
voltage), and FIG. 2(b) is a graph illustrating characteristics of a charge power
of the battery 1. The horizontal axis of FIG. 2 is a time, and respective vertical
axes are the cell voltage and the charge power. When the battery 1 is charged, the
voltage of the battery 1 increases from the OCV by the internal resistance and transitions
at the characteristics of FIG. 2(a).
[0020] The short-term chargeable power calculation unit 6 calculates the short-term chargeable
power (P
s2) when the voltage of the battery 1 matches the upper limit voltage of the usable
voltage range by the following formula (1). In the formula (1), the internal resistance
is an internal resistance value in a short term, and, for example, it is only necessary
to be calculated based on, for example, the temperature of the battery and/or a deterioration
rate. It is only necessary that the OCV is calculated from the SOC-OCV map.
[Math. 1]
Short-term chargeable power [Ps2] = (upper limit voltage - OCV)/internal resistance × upper limit voltage
[0021] Thus, the short-term chargeable power calculation unit 6 calculates the short-term
chargeable power [P
s2] that does not exceed the upper limit voltage based on the temperature of the battery
1 and the SOC.
[0022] After calculating the short-term chargeable power (P
s1) and the short-term chargeable power (P
s2), the short-term chargeable power calculation unit 6 finally calculates the smaller
power as the short-term chargeable power. Thus, while the charge control device 100
according to the embodiment reduces the deposition of lithium, the charge control
device 100 can control the charge of the battery 1 so as not to exceed the upper limit
voltage of the battery usable voltage range. Note that the short-term chargeable power
calculation unit 6 does not necessarily need to calculate both powers of the short-term
chargeable power (P
s1) and the short-term chargeable power (P
s2), and may calculate any one of the short-term chargeable powers. For example, as
long as the battery 1 is used within a setting range of the usable voltage range or
the battery 1 is used at the cell voltage within the usable voltage range according
to a usage environment of the battery 1 or the like, when the deposition of the lithium
can be reduced, the short-term chargeable power calculation unit 6 only needs to calculate
at least the short-term chargeable power (P
s2).
[0023] The long-term chargeable power calculation unit 7 calculates the long-term chargeable
power based on the SOC of the battery 1 and the temperature of the battery 1. The
long-term chargeable power is a power that can charge the battery 1 for a long term.
The long-term chargeable power is equivalent to a chargeable power required to complete
warming-up of the battery 1 by charge. Note that the time to determine the long-term
chargeable power is a time within a range from several hundreds of seconds to several
tens of minutes.
[0024] The long-term chargeable power calculation unit 7 calculates the upper limit current
at which the lithium is not deposited based on the temperature of the battery 1 and
the SOC estimated by the SOC estimation unit 5, and calculates the long-term chargeable
power (P
L1) based on the upper limit current. A calculation method of the long-term chargeable
power (P
L1) is similar to the calculation method of the short-term chargeable power (P
L1) by the short-term chargeable power calculation unit 6. However, the upper limit
current is an upper limit current at which the lithium is not deposited when the battery
1 is charged for a long time. The internal resistance of the battery 1 is an internal
resistance value for long term and is calculated with reference to the map.
[0025] Next, in addition to the long-term chargeable power (P
L1), the long-term chargeable power calculation unit 7 calculates the long-term chargeable
power (P
L2) that does not exceed the usable upper limit voltage of the battery. The long-term
chargeable power (P
L1) is a long-term chargeable power based on the upper limit current at which the lithium
is not deposited, and the long-term chargeable power (P
L2) is a long-term chargeable power based on the upper limit voltage of the battery
usable voltage range. A calculation method of the long-term chargeable power (P
L2) is similar to the calculation method of the short-term chargeable power (P
s2) by the short-term chargeable power calculation unit 6 and the operation expression
is also similar to the formula (1). However, the internal resistance of the battery
1 is an internal resistance value for a long term, and, for example, it is only necessary
to be calculated based on, for example, the temperature of the battery and/or the
deterioration rate. It is only necessary that the OCV is calculated from the SOC-OCV
map. Thus, a long-term chargeable power calculation unit 7 calculates the long-term
chargeable power (P
L2) that does not exceed the upper limit voltage based on the temperature of the battery
1 and the SOC.
[0026] After calculating the long-term chargeable power (P
L1) and the long-term chargeable power (P
L2), the long-term chargeable power calculation unit 7 finally calculates the smaller
power as the long-term chargeable power. Thus, while the charge control device 100
according to the embodiment reduces the deposition of lithium, the charge control
device 100 can control the charge of the battery 1 so as not to exceed the upper limit
voltage of the battery usable voltage range. Note that, similarly to the short-term
chargeable power calculation unit 6, the long-term chargeable power calculation unit
7 does not necessarily need to calculate both powers of the long-term chargeable power
(P
L1) and the long-term chargeable power (P
L2), and may calculate any one of the long-term chargeable powers.
[0027] FIG. 3 is a graph illustrating response characteristics of the short-term chargeable
power, the intermediate-term chargeable power, and the long-term chargeable power.
The graph in FIG. 3 indicates transition of the chargeable powers that transition
as a charge time passes when the battery 1 is charged by each power of the short-term
chargeable power, the intermediate-term chargeable power, and the long-term chargeable
power. With reference to the graph in FIG. 3, a relationship between the short-term/long-term
chargeable powers and the charge of the battery is described.
[0028] The short-term chargeable power (P
s1 or P
s2) becomes a power generated by the overshooting of the engine rotation speed after
starting the engine 30 or a power that is chargeable in a range from several seconds
to several tens of seconds or less such that a regenerative charge power during running
the vehicle (especially at high speed) can be absorbed. On the other hand, the long-term
chargeable power (P
L1 or P
L2) becomes a power that is chargeable within the range from several hundreds of seconds
to several tens of minutes such that the charge power required to complete the warming-up
of the battery 1 by charge can be ensured. Therefore, the short-term chargeable power
is a power larger than the long-term chargeable power. Additionally, the long-term
chargeable power is a power that is chargeable for a long term and the short-term
chargeable power is a power that is chargeable for a short time shorter than the long
term.
[0029] When the battery 1 is charged by the short-term chargeable power, the charge time
becomes short, and when the battery 1 is charged by the long-term chargeable power,
the charge time becomes long. On the other hand, since the use of the short-term chargeable
power reduces the chargeable power in a short time, for example, charge cannot be
performed when charge is required to absorb the power by regeneration. Additionally,
when the battery 1 is charged by the long-term chargeable power, the charge power
decreases. Although the charge power has a margin compared with the short-term chargeable
power, when the battery 1 is warmed-up by charge, the warming-up takes time.
[0030] That is, when the charge of the battery 1 is controlled by the chargeable power of
only any one of the short-term chargeable power and the long-term chargeable power,
it is difficult to achieve both of having the margin for a power chargeable power
to absorb the regenerative power and reduction in the long warming-up time at the
same time. Therefore, the charge control device 100 according to the embodiment calculates
the chargeable power in combination of the short-term chargeable power and the long-term
chargeable power and controls the charge of the battery 1 based on the calculated
chargeable power.
[0031] With reference to FIG. 1, the chargeable power calculation unit 8 calculates the
continuous chargeable power that is continuously chargeable to the battery 1 based
on the short-term chargeable power calculated by the short-term chargeable power calculation
unit 6 and the long-term chargeable power calculated by the long-term chargeable power
calculation unit 7. FIG. 4 is a block diagram illustrating a function block of the
chargeable power calculation unit 8. The chargeable power calculation unit 8 includes
a target maintaining power calculation unit 81 and a calculation unit 82. The target
maintaining power calculation unit 81 calculates a target maintaining power according
to a vehicle condition. The target maintaining power indicates a target value of the
chargeable power required to maintain running the vehicle. The vehicle condition is
a condition, such as an ON/OFF state of the engine 30 and a vehicle speed. When the
engine 30 is in an off state, the target maintaining power calculation unit 81 calculates
the chargeable power prepared for starting the engine 30 as the target maintaining
power. When the vehicle speed is high, the target maintaining power calculation unit
81 calculates the chargeable power ensured in preparation for later regenerative deceleration
as the target maintaining power. The target maintaining power calculated according
to the vehicle speed becomes high as the vehicle speed becomes high. That is, the
target maintaining power is a target value desired to maintain the short-term chargeable
power and is a chargeable power such that the regenerative charge power during running
the vehicle and the charge power generated by overshooting of the rotation speed after
starting the engine of a series hybrid vehicle can be absorbed.
[0032] The calculation unit 82 calculates the continuous chargeable power based on the target
maintaining power, the short-term chargeable power, and the long-term chargeable power.
First, the calculation unit 82 subtracts the target maintaining power from the short-term
chargeable power to calculate a power difference (ΔP). The calculation unit 82 has
a rate table that determines a use rate (rate) between the short-term chargeable power
and the long-term chargeable power. As illustrated in FIG. 4, the rate table is a
table making the power difference (ΔP) correspond to the use rate (rate). For example,
when the power difference (ΔP) is 5 kW, the use rate (rate) becomes 100%, the smaller
the power difference (ΔP) is, the lower the use rate (rate) becomes, and when the
power difference (ΔP) is 1 kW, the use rate (rate) becomes 0%. In the example of the
rate table in FIG. 4, when the power difference (ΔP) decreases by 1 kW from 5 kw,
the use rate (rate) decreases by 25%. For example, when the deterioration of the battery
1 proceeds, the short-term chargeable power becomes smaller than the target maintaining
power, and the power difference (ΔP) becomes zero or negative, the use rate (rate)
becomes 0%.
[0033] Next, the calculation unit 82 calculates the continuous chargeable power by the following
formula (2).
[Math. 2]
Continuous chargeable power = (short-term chargeable power - long-term chargeable
power) × rate + long-term chargeable power
[0034] Thus, the chargeable power calculation unit 8 calculates the target maintaining power,
calculates the rate between the short-term chargeable power and the long-term chargeable
power according to the difference between the short-term chargeable power and the
target maintaining power, and calculates the continuous chargeable power according
to the calculated rate.
[0035] FIG. 5 illustrates response of the chargeable power in a timing chart. FIG. 5 is
a graph illustrating characteristics of the short-term/long-term chargeable powers,
the target maintaining power, an actual charge power, and the continuous chargeable
power. As illustrated in FIG. 5, when the short-term chargeable power has a margin
for the target maintaining power, that is, when the power difference (ΔP) is large,
the rate of the short-term chargeable power is increased and continuous chargeable
power is calculated. In FIG. 5, when the difference between the short-term chargeable
power and the target maintaining power is large (ΔP ≥ 5 kW), in the continuous chargeable
power, the use rate of the short-term chargeable power becomes 100%. When the short-term
chargeable power decreases and the power difference (ΔP) decreases (1 kW < ΔP < 5
kW), the smaller the power difference (ΔP) becomes, the lower the use rate of the
short-term chargeable power becomes. Therefore, when the short-term chargeable power
decreases in the timing chart as illustrated in FIG. 5, a continuous chargeable power
lowers at a decrease rate larger than the short-term chargeable power. When the short-term
chargeable power further decreases and the power difference (ΔP) decreases (ΔP ≤ 1
kW), the use rate of the short-term chargeable power becomes 0% and the continuous
chargeable power matches the long-term chargeable power.
[0036] Thus, when the short-term chargeable power has the margin for the target maintaining
power, the chargeable power calculation unit 8 calculates the continuous chargeable
power such that the rate of the short-term chargeable power increases. On the other
hand, when the short-term chargeable power does not have the margin for the target
maintaining power, the chargeable power calculation unit 8 calculates the continuous
chargeable power such that the rate of the long-term chargeable power increases. Thus,
when the short-term chargeable power has the margin for the target maintaining power,
charge is performed to ensure promoting the warming-up of the battery. Additionally,
when there is no margin, suppressing the charge power allows maintaining the state
in which the short-term chargeable power becomes the target maintaining power or more.
[0037] With reference to FIG. 1, the vehicle controller 20 has a function of controlling
the charge/discharge of the battery 1 and a function of controlling the drive system
while managing the state of the battery 1. The vehicle controller 20 transmits a torque
command to the engine 30 and a rotation speed command to the electric generator 40
to generate a power and charge the battery 1. Additionally, the vehicle controller
20 transmits the torque command to the motor/inverter 50 to generate a driving power
required for running the vehicle. To charge the battery 1, the vehicle controller
20 restricts the upper limit of the charge power of the battery 1 to the continuous
chargeable power calculated by the chargeable power calculation unit 8 and charges
the battery 1.
[0038] Next, with reference to FIG. 6, a control flow of the charge control method performed
by a processor included in the charge control device 100 is described. FIG. 6 is the
flowchart of the charge control method. Note that each step does not necessarily need
to be performed in the order depicted in FIG. 6 and the order may be changed as necessary.
At Step S1, the voltage detection unit 2 detects the voltage of the battery 1. At
Step S2, the current detection unit 3 detects the current of the battery 1. At Step
S3, the temperature detection unit 4 detects the temperature of the battery 1. At
Step S4, the SOC estimation unit 5 estimates the SOC based on the voltage and the
current of the battery 1. For example, the SOC estimation unit 5 uses an SOC obtained
from an average voltage of the battery 1 at starting the vehicle as an initial value
and integrates the current flowing through the battery 1 to estimate the SOC of the
battery 1.
[0039] At Step S5, the short-term chargeable power calculation unit 6 calculates the short-term
chargeable power based on the temperature of the battery 1 and the SOC. At Step S6,
the long-term chargeable power calculation unit 7 calculates the long-term chargeable
power based on the temperature of the battery 1 and the SOC. At Step S7, the chargeable
power calculation unit 8 calculates the continuous chargeable power based on the short-term
chargeable power, the long-term chargeable power, and the target maintaining power.
At Step S8, the vehicle controller 20 restricts the upper limit of the charge power
to the battery 1 to the continuous chargeable power and controls the charge of the
battery 1.
[0040] As described above, the charge control method and the charge control device according
to the embodiment calculate the long-term chargeable power, calculate the short-term
chargeable power larger than the long-term chargeable power, calculate the continuous
chargeable power based on the short-term chargeable power and the long-term chargeable
power, and restrict the upper limit of the charge power of the battery 1 to the continuous
chargeable power. Thus, the power generated according to the running scene of the
vehicle can be absorbed by the battery. Additionally, a shortage of the chargeable
power during the cryogenic temperature can be reduced, regenerative charge during
vehicle deceleration can be ensured, and running the vehicle can be maintained.
[0041] As the characteristics of the lithium-ion battery, when the battery temperature is
low, the chargeable power decreases. Therefore, as the charge control method of the
battery 1, decreasing the chargeable power as the battery temperature lowers has been
conventionally performed. However, with the method of decreasing the chargeable power
depending on only the battery temperature, the chargeable power becomes minute during
a low temperature, and there is a problem that is it difficult to absorb the charge
by the regenerative power during running the vehicle and the power generated by overshooting
of the rotation speed after starting the engine of the series hybrid vehicle by the
battery. Especially, when low temperature performance is inferior due to the deterioration
of the battery 1, the chargeable power during a low temperature is further reduced
and this problem becomes more remarkable.
[0042] The charge control according to the embodiment calculates the short-term chargeable
power, calculates the long-term chargeable power, calculates the continuous chargeable
power in combination with the short-term chargeable power and the long-term chargeable
power, restricts the upper limit of the charge power of the battery to the continuous
chargeable power, and performs the battery charge control in the vehicle drive system.
This allows absorbing the power generated according to the running scene of the vehicle
by the battery.
[0043] The charge control method and the charge control device according to the embodiment
calculate the target maintaining power, calculate the rate between the short-term
chargeable power and the long-term chargeable power according to a difference between
the short-term chargeable power and the target maintaining power, and calculate the
continuous chargeable power according to the rate. Thus, when there is a margin for
a short-term chargeable power, by calculating the continuous chargeable power such
that the rate of the short-term chargeable power increases, the charge power can be
significantly ensured and the warming-up of the battery is promoted. On the other
hand, when there is no margin for the short-term chargeable power, by calculating
the continuous chargeable power such that a rate of a long-term chargeable power increases,
absence of the chargeable power can be reduced, and running the vehicle can be maintained.
Additionally, the short-term chargeable power can be maintained to be the target power
or more, the power generated by the overshooting of the rotation speed at the start
of the engine of the series hybrid vehicle can be absorbed by the battery, and running
the vehicle can be maintained.
[0044] The charge control method and the charge control device according to the embodiment
calculate the short-term chargeable power and the long-term chargeable power based
on the upper limit current at which the lithium is not deposited. Thus, the deterioration
of the battery and the decrease in performance can be suppressed and the life can
be extended. When the upper limit of the charge power of the battery 1 is restricted
to be the continuous chargeable power, the charging current of the battery 1 can be
suppressed to the upper limit current or less, and therefore the deposition of the
lithium of the battery can be reduced.
[0045] Additionally, the charge control method and the charge control device according to
the embodiment calculate the short-term chargeable power and the long-term chargeable
power based on the usable upper limit voltage of the battery 1. Thus, the deterioration
of the battery and the decrease in performance can be suppressed and the life can
be extended. When the upper limit of the charge power of the battery 1 is restricted
to be the continuous chargeable power, the charging voltage of the battery 1 can be
suppressed to the upper limit voltage or less, and therefore the overcharge of the
battery can be reduced.
[0046] The charge control method and the charge control device according to the embodiment
detect the temperature of the battery 1, calculate the SOC of the battery 1, and calculate
the upper limit current based on the temperature and the SOC. Thus, the deterioration
of the battery and the decrease in performance can be suppressed and the life can
be extended.
[0047] The charge control method and the charge control device according to the embodiment
detect the temperature of the battery 1, calculate the SOC of the battery 1, and calculate
the short-term chargeable power and the long-term chargeable power not exceeding the
upper limit voltage based on the temperature and the SOC. Thus, the deterioration
of the battery and the decrease in performance can be suppressed and the life can
be extended.
<<Second Embodiment>>
[0048] Next, a charge control device and a charge control method according to the second
embodiment are described. In the second embodiment, a deterioration rate estimation
unit 9 and an upper limit SOC calculation unit 10 are provided in the first embodiment.
Note that, except that points described below are different from the charge control
device and the charge control method according to the first embodiment, a configuration
similar to the first embodiment is provided, an operation or an action are similar
to the first embodiment, and the description in the first embodiment is appropriately
cited. In the embodiment, in addition to the condition of the chargeable power for
restricting the upper limit of the charge power of the battery 1 to the continuous
chargeable power, the upper limit SOC is set, and when the SOC reaches the upper limit
SOC during the charge of the battery 1, the charge of the battery 1 is controlled.
[0049] FIG. 7 is a block diagram illustrating a drive system according to another embodiment
of the present invention. The charge control device 100 includes the deterioration
rate estimation unit 9 and the upper limit SOC calculation unit 10 in addition to
the voltage detection unit 2 and the like. The deterioration rate estimation unit
9 divides a present value of the internal resistance of the battery 1 by an initial
value of the internal resistance of the battery 1 to estimate the deterioration rate
of the battery 1. The initial value of the internal resistance is an internal resistance
of a new product of a battery.
[0050] The upper limit SOC calculation unit 10 calculates the upper limit SOC based on the
temperature of the battery 1 and the deterioration rate. The upper limit SOC indicates
the upper limit value of the chargeable SOC of the battery 1. The upper limit SOC
calculation unit 10 calculates the upper limit SOC such that the short-term chargeable
power becomes the target maintaining power or more.
[0051] With reference to FIG. 8 and FIG. 9, an upper limit SOC calculation method is described.
FIG. 8 is a table for describing a correlation between the battery temperature, the
SOC, the short-term chargeable power, and the target maintaining power. FIG. 9 is
a conceptual diagram of a map stored in the upper limit SOC calculation unit 10.
[0052] As the characteristics of the battery 1, the lower the temperature of the battery
1 is, the smaller the short-term chargeable power becomes, and the higher the SOC
is, the smaller the short-term chargeable power becomes. Therefore, in a low-temperature
region of the battery 1, when the SOC becomes high, the short-term chargeable power
falls below the target maintaining power. For example, as illustrated in FIG. 8, in
a case where the temperature of the battery 1 is -30 [degC], when the SOC is higher
than 60%, the short-term chargeable power becomes less than the target maintaining
power. Thus, in a state where the SOC is high and the short-term chargeable power
is smaller than the target maintaining power, when the start of the engine is necessary
or when the regenerative deceleration is necessary during high speed running, the
power generated by the overshooting of the engine rotation speed or the regenerative
power during the regenerative deceleration possibly cannot be charged by the battery
1.
[0053] In the embodiment, within the range in which the short-term chargeable power becomes
less than the target maintaining power, the upper limit SOC is set from the temperature
of the battery 1 and the condition of the SOC, and the charge is restricted such that
the short-term chargeable power does not become less than the target maintaining power.
Specifically, the upper limit SOC calculation unit 10 has a map (an upper limit SOC
calculation map) as illustrated in FIG. 9 in which the temperature of the battery
1, the deterioration rate, and the upper limit SOC correspond to one another and calculates
the upper limit SOC using the map. The upper limit SOC calculation map is a map for
calculating the upper limit SOC with the temperature of the battery 1 and the deterioration
rate as inputs. In the SOC calculation map, in a low temperature region of the temperature
of the battery 1 (for example, a region of the temperature of less than 0 degC with
the deterioration rate of 100% (a state similar to the new product)), the lower the
battery temperature is, the smaller the upper limit SOC becomes. The upper limit SOC
of the part surrounded by the dotted line frame in FIG. 9 corresponds to the target
maintaining power in FIG. 8. That is, when the deterioration rate is 100% and the
temperature of the battery 1 is -30 [degC], restricting the upper limit SOC to 60%
reduces the short-term chargeable power being less than the target charge power.
[0054] Additionally, in a temperature region in which the upper limit SOC is restricted
to be less than 100% according to the battery temperature, as the deterioration of
the battery 1 proceeds, the temperature region gradually expands to a high temperature
side, and further the upper limit SOC lowers. Since the deterioration of the battery
1 increases the internal resistance and decreases the chargeable power, each of the
deterioration rates is made to correspond to the battery temperature and the upper
limit SOC and the relationship between the battery temperature and the upper limit
SOC is set on the map. Thus, the upper limit SOC is set in the upper limit SOC calculation
map such that the short-term chargeable power becomes the target maintaining power
or more. Note that the values of FIG. 9 are one example and are changeable as necessary
according to the characteristics of the battery 1 and the like.
[0055] The upper limit SOC calculation unit 10 may calculate the upper limit SOC in the
following manner besides the above-described calculation method using the upper limit
SOC calculation map. FIG. 10 is a block diagram illustrating a control flow of the
upper limit SOC calculation method by the upper limit SOC calculation unit 10.
[0056] As indicated in the formula (1) of the first embodiment, the target maintaining power
is calculated from the upper limit voltage, the internal resistance, and the OCV.
In the formula (1), when the OCV is replaced by the upper limit OCV, the following
formula (3) is derived.
[Math. 3]
Target maintaining power = (upper limit voltage - upper limit OCV)/internal resistance
× upper limit voltage
[0057] Furthermore, the formula (3) is expanded to derive the following formula (4) to obtain
the upper limit SOC.
[Math. 4]
Upper limit OCV = upper limit voltage - target maintaining power × internal resistance/upper
limit voltage
[0058] The target maintaining power is determined by a vehicle condition. The upper limit
voltage is preliminarily determined by a usable voltage range according to the characteristics
of the battery 1. The internal resistance is calculated from the present current/voltage
of the battery 1. Therefore, assigning these parameters for the formula (4) allows
calculating the upper limit OCV. Further, as illustrated in FIG. 10, the upper limit
SOC calculation unit 10 refers to the relationship table between the OCV and the SOC
and calculates the SOC corresponding to the calculated upper limit OCV as the upper
limit SOC. Thus, the upper limit SOC calculation unit 10 calculates the upper limit
OCV at which the short-term chargeable power becomes the predetermined power or more
based on the upper limit voltage, the target maintaining power, and the internal resistance,
and calculates the upper limit SOC corresponding to the upper limit OCV.
[0059] With reference to FIG. 7, the vehicle controller 20 acquires the upper limit SOC
from the upper limit SOC calculation unit 10, restricts the upper limit of the SOC
of the battery 1 to the upper limit SOC, and charges the battery 1.
[0060] Next, with reference to FIG. 11, the control flow of the charge control method by
the charge control device 100 is described. FIG. 11 is a flowchart of the charge control
method. Note that each step does not necessarily need to be performed in the order
depicted in FIG. 11 and the order may be changed as necessary. Since the control flow
of Steps S1 1 to S17 is the same content as Steps S1 to S7 of the first embodiment,
the description is omitted.
[0061] At Step S18, the deterioration rate estimation unit 9 estimates the deterioration
rate of the battery from the average voltage and the current of the battery 1. At
Step S19, the upper limit SOC calculation unit 10 calculates the upper limit SOC such
that the short-term chargeable power becomes the target maintaining power or more
based on the temperature of the battery 1 and the deterioration rate. At Step S20,
the vehicle controller 20 restricts the upper limit of the charge power to the battery
1 to the continuous chargeable power, restricts the SOC of the battery 1 to the upper
limit SOC, and controls the charge of the battery 1.
[0062] As described above, the charge control method and the charge control device according
to the embodiment detect the temperature of the battery 1, calculate the deterioration
rate of the battery 1, calculate the upper limit SOC of the battery 1 based on the
temperature and the deterioration rate, restrict the SOC of the battery 1 to the upper
limit SOC, and charge the battery 1. By thus setting the upper limit of the SOC, the
chargeable power can be ensured and running the vehicle can be maintained. Additionally,
since the battery 1 has characteristics of reducing the chargeable power by the increase
in the SOC, by setting the upper limit SOC during the charge according to the temperature
and the deterioration rate of the battery, the chargeable power can be ensured while
the deterioration of the battery 1 is considered.
[0063] Additionally, the charge control method and the charge control device according to
the embodiment have the map in which the temperature of the battery 1, the deterioration
rate, and the upper limit SOC correspond to one another and calculate the upper limit
SOC using the map. Additionally, the upper limit SOC is set in the map such that the
short-term chargeable power becomes the target maintaining power or more. By thus
setting the upper limit of the SOC, the chargeable power can be ensured and running
the vehicle can be maintained.
[0064] The charge control method and the charge control device according to the embodiment
estimate the internal resistance of the battery, calculate the upper limit OCV such
that the short-term chargeable power becomes the predetermined power (equivalent to
the target maintaining power) or more based on the usable upper limit voltage of the
battery 1, the target maintaining power, and the internal resistance, calculate the
upper limit SOC corresponding to the upper limit OCV, restrict the SOC of the battery
to the upper limit SOC, and charge the battery. By thus setting the upper limit of
the SOC, the chargeable power can be ensured and running the vehicle can be maintained.
<<Third Embodiment>>
[0065] Next, a charge control device and a charge control method according to the third
embodiment are described. In the third embodiment, a warming-up determination unit
11 is provided in the first embodiment. Note that, except that points described below
are different from the charge control device and the charge control method according
to the first embodiment, a configuration similar to the first embodiment is provided,
an operation or an action are similar to the first embodiment, and the description
in the first embodiment and/or the second embodiment are appropriately cited. In the
embodiment, the deterioration rate estimation unit 9 and the upper limit SOC calculation
unit 10 may be added, and the battery 1 may be controlled under the control described
in the second embodiment.
[0066] FIG. 12 is a block diagram illustrating a drive system according to another embodiment
of the present invention. The charge control device 100 includes the warming-up determination
unit 11 in addition to the voltage detection unit 2 and the like. The warming-up determination
unit 11 determines whether or not the warming-up of the battery 1 is completed based
on the temperature of the battery 1 detected by the temperature detection unit 4 and
the chargeable power calculated by the chargeable power calculation unit 8 and outputs
the warming-up determination result to the vehicle controller 20.
[0067] With reference to FIG. 13, a warming-up determination method is described. FIG. 13
is a block diagram illustrating a control flow of the warming-up determination method
by the warming-up determination unit 11. The warming-up determination unit 11 performs
warming-up determination using the chargeable power condition and the temperature
condition. When the two conditions are met, the warming-up determination unit 11 determines
that the warming-up is completed. When the two conditions are not met, the warming-up
determination unit 11 determines that the warming-up is not completed. The warming-up
determination unit 11 performs the determination on the completion of warming-up after
the start of warming-up by charging the battery 1.
[0068] A warming-up determination power threshold is a threshold indicating that the chargeable
power required for the warming-up can be ensured when the battery 1 is warmed-up by
charging the battery 1. The warming-up determination power threshold is a preliminarily
set threshold and is set to a power higher than the target maintaining power. The
warming-up determination power threshold is a threshold set such that the short-term
chargeable power does not fall below the target maintaining power again after the
warming-up completion determination.
[0069] When a timer measures a state in which the continuous chargeable power is higher
than the warming-up determination power threshold and the measurement time (count)
is a predetermined time, the warming-up determination unit 11 determines that the
chargeable power condition is met. On the other hand, when the continuous chargeable
power is lower than the warming-up determination power threshold or a duration (the
measurement time) in a state in which the continuous chargeable power is higher than
the warming-up determination power threshold is less than the predetermined time,
the warming-up determination unit 11 determines that the chargeable power condition
is not met.
[0070] The warming-up determination unit 11 has a temperature threshold having a hysteresis
including a first temperature threshold and a second temperature threshold as the
temperature condition. The second temperature threshold is higher than the first temperature
threshold. The warming-up determination unit 11 compares the temperature of the battery
1 with the first/second temperature thresholds. When the temperature of the battery
1 is the first temperature threshold or less, a flag indicating that warming-up is
being performed is raised (set). When the temperature of the battery 1 is the first
temperature threshold or more and less than the second temperature threshold, the
flag is in the set state (set). When the temperature of the battery 1 becomes the
second temperature threshold or more, the flag is in a clear state (clear). The warming-up
determination unit 11 performs NOT calculation on the state of the flag, and when
the flag is not in the set state, the warming-up determination unit 11 determines
that the temperature condition for the warming-up completion determination is met.
When the flag is in the set state, the warming-up determination unit 11 determines
that the warming-up is being performed and the temperature condition for the warming-up
completion determination is not met.
[0071] FIG. 14 illustrates a timing chart of various parameters related to the warming-up
determination and the warming-up determination result. FIG. 14(a) illustrates a timing
chart during a cryogenic temperature and FIG. 14(b) illustrates a timing chart during
a low temperature. With reference to FIG. 14(a), during the cryogenic temperature,
the temperature of the battery 1 starts from a state of less than the first temperature
threshold and the warming-up is being performed. The temperature of the battery 1
gradually increases by the warming-up. When the continuous chargeable power increases
and becomes the warming-up determination power threshold or more, count by the timer
starts. When the temperature of the battery 1 becomes the second temperature threshold
or more and the count reaches the predetermined time, the warming-up determination
unit 11 determines completion of the warming-up.
[0072] At the low temperature, the temperature of the battery 1 starts from a state of the
first temperature threshold or more and warming-up does not start. When the temperature
of the battery 1 decreases and becomes less than the first temperature threshold,
the vehicle controller 20 starts warming-up. The warming-up determination unit 11
determines that warming-up is being performed. During the warming-up, when a continuous
chargeable power is reduced and becomes less than a warming-up determination power
threshold, the warming-up determination unit 11 resets the count by the timer. Afterwards,
when the continuous chargeable power becomes the warming-up determination power threshold
or more, the warming-up determination unit 11 starts the count by the timer. In the
example of FIG. 14(b), before the temperature of the battery 1 reaches the second
temperature threshold, the count reaches the predetermined time, and the warming-up
determination unit 11 determines that a chargeable power condition is met. Afterwards,
when the temperature of the battery 1 becomes high and reaches the second temperature
threshold, the warming-up determination unit 11 determines that a temperature condition
is met in addition to the chargeable power condition to determine the completion of
the warming-up.
[0073] With reference to FIG. 12, when the warming-up determination unit 11 determines that
the warming-up is being performed, the vehicle controller 20 restricts the upper limit
of the charge power of the battery 1 to the continuous chargeable power. When the
warming-up determination unit 11 determines the completion of warming-up, the vehicle
controller 20 restricts the upper limit of the charge power to a usual chargeable
power, for example, the short-term chargeable power or the intermediate-term chargeable
power, etc. The intermediate-term chargeable power is a power that is chargeable in
a time between the short term and the long term (equivalent to the "intermediate-term
chargeable power" in FIG. 3).
[0074] Next, with reference to FIG. 15, the control flow of the charge control method by
the charge control device 100 is described. FIG. 15 is a flowchart of the charge control
method. The control flow in FIG. 15 is a flow performed during the warming-up of the
battery 1. Note that each step does not necessarily need to be performed in the order
depicted in FIG. 15 and the order may be changed as necessary. Since the control flow
of Steps S21 to S27 is the same content as Steps S1 to S7 of the first embodiment,
the description is omitted.
[0075] At Step S28, the warming-up determination unit 11 determines whether or not the warming-up
of the battery 1 is completed based on the temperature of the battery 1 detected by
the temperature detection unit 4 and the chargeable power calculated by the chargeable
power calculation unit 8. When it is determined that the warming-up is not completed,
at Step S29, the vehicle controller 20 restricts the upper limit of the charge power
to the battery 1 to the continuous chargeable power and controls the charge of the
battery 1. When it is determined that the warming-up is completed, the vehicle controller
20 restricts the upper limit of the charge power to the battery 1 to the usual chargeable
power and controls the charge of the battery 1(S30).
[0076] As described above, the charge control method and the charge control device according
to the embodiment determine whether or not the warming-up of the battery 1 is completed
based on the temperature of the battery 1 and the continuous chargeable power. By
thus determining the warming-up completion of the battery, it can be switched to usual
chargeable power calculation.
[0077] Note that the embodiments described above are described for ease of understanding
of the present invention and are not described to limit the present invention. Accordingly,
each element disclosed in the above-described embodiment is intended to include all
design changes and equivalents that fall within the technical scope of the present
invention.
Description of Reference Numerals
[0078]
- 1
- Battery
- 2
- Voltage detection unit
- 3
- Current detection unit
- 4
- Temperature detection unit
- 5
- SOC estimation unit
- 6
- Short-term chargeable power calculation unit
- 7
- Long-term chargeable power calculation unit
- 8
- Chargeable power calculation unit
- 9
- Deterioration rate estimation unit
- 10
- Upper limit SOC calculation unit
- 11
- Warming-up determination unit
- 20
- Vehicle controller
- 30
- Engine
- 40
- Electric generator
- 50
- Motor/inverter
- 100
- Charge control device