Field of the invention
[0001] The present invention generally relates to the field of large infrastructures and
it particularly relates to a scaffolding bridge which can be positioned in a tunnel
to allow its construction, as well as a method for constructing a tunnel.
Definitions
[0002] In the present document, with the expression "inverted arch" and derivatives reference
will be made to the overturned arch arranged at the base of a tunnel which has the
function of closing the arch already made in the roof, distributing the mechanical
stresses thereof.
[0003] In the present document, with the expression
"invert" and derivatives reference will be made to a portion made of concrete, cement or the
like which is obtained at the inverted arch in a tunnel and which acts as a base for
the road or railway.
State of the Art
[0004] Generally, parallel to tunnel excavation works, therefore there arises the need to
carry out operations for reinforcing the internal structure of the latter for example
by means of the per se known lining, the dome with prefabricated ashlars or the like.
Subsequently, whether the tunnel is a road or railway tunnel, service pipes or iron
rods are laid on the inverted arch for reinforcement.
[0005] During such construction, the passage of the vehicles required for excavation and
for carrying out the inner lining of the tunnel and possibly also of the emergency
vehicles normally occurs through the inverted arch portion, which, as a result, is
occupied throughout the time required to complete the operations mentioned above and
therefore which cannot be constructed.
[0006] Therefore, the construction of the invert by casting cement or concrete along the
entire inverted arch portion of the tunnel is carried out only once through with the
excavation works, the dome reinforcement operations and the operations for laying
the pipes and iron rods on the inverted arch.
[0007] Therefore, this results in a dilatation of the tunnel construction times, therefore
resulting in a significant waste of time and financial resources.
[0008] Furthermore, during the construction of the invert, the construction vehicles and
emergency vehicles must necessarily access from one or the other end, therefore resulting
- on the one hand - in an increase in the times and costs and - on the other - in
an increase of the rescue times in case of need.
Summary of the invention
[0009] An object of the present invention to provide a scaffolding bridge which can be positioned
in a tunnel so as to allow its construction that is highly efficient and cost-effective.
[0010] Another object of the present invention is to provide a scaffolding bridge which
can be positioned in a tunnel capable of quickening the construction thereof.
[0011] Another object of the present invention is to provide a scaffolding bridge which
can be positioned in a tunnel which allows the passage of heavy-duty or emergency
vehicles even during the construction of the inverted arch.
[0012] A further object of the present invention is to provide a method for constructing
a tunnel that is particularly easy.
[0013] A further object of the present invention is to provide a method for constructing
a tunnel that is easy to implement.
[0014] A further object of the present invention is to provide a method for constructing
a tunnel that is markedly beneficial from a financial and construction point of view.
[0015] These and other objects that will be more apparent hereinafter, are attained by an
scaffolding bridge and/or method for constructing a tunnel as described, illustrated
and/or claimed herein.
[0016] The dependent claims describe advantageous embodiments of the invention.
Brief description of the drawings
[0017] Further characteristics and advantages of the invention will be more apparent in
the light of the detailed description of the main embodiments, shown by way of non-limiting
example with reference to the attached drawings, wherein:
FIG. 1 is a lateral view of a scaffolding bridge 1 positioned in a tunnel, while FIGS. 1A and 1B show enlarged views of some details of the scaffolding bridge 1 in which there is respectively shown a front access portion 12 and a rear access portion 11 of the scaffolding bridge 1;
FIGS. 2A and 2B show two top views of the scaffolding bridge 1: in the first, the decks 131 are in closed position to provide the walkway 130, while in the second only some decks 131 are in closed position;
FIG.3 is a cross-sectional view along plane A-A of FIG. 1;
FIG.4 is a cross-sectional view along plane B-B of FIG. 1A;
FIG.5 is a cross-sectional view along plane C-C of FIG. 1A;
FIG.6 is a cross-sectional view along plane D-D of FIG. 1;
FIGS.7A and 7B are cross-sectional views along plane E-E of FIG. 1B, with respectively the containment frame 41 in distal position and in proximal position.
Detailed description of some preferred embodiments
[0018] With reference to the aforementioned figures, herein described is a scaffolding bridge
1 which can be positioned in a tunnel
G, for example a road or railway tunnel, and which can be moved in the latter to allow
its construction.
[0019] As known, the tunnel
G may have an inner section that is substantially circular and therefore a cylindrical
development which extends from the entrance of the tunnel up to the excavation area,
if any, so as to identify an extension axis
X.
[0020] Although in the present description reference will be made to a tunnel
G generally having a longitudinal extension, the tunnel
G may possibly have curves or different heights: in this case, the reasoning below
may be applied in these areas in an entirely equivalent manner.
[0021] As known, the tunnel
G may have an upper roof portion
C and a lower inverted arch portion
R.
[0022] The same roof
C and inverted arch
R portions may be continuous along the entire length of the tunnel
G and arranged facing each other.
[0023] During the construction of the
invert, the inverted arch
R may therefore have ab constructed area
R1, and therefore provided with the
invert, and an area to be constructed
R2, and therefore without the
invert, subsequent to the former, so as to identify a works advancement direction
d' oriented from
R1 to
R2. Generally, such works direction
d' may coincide with the extension axis
X of the tunnel.
[0024] The areas
R1 and
R2 may have two different heights, given that the area
R1, provided with
invert, will have a thickness greater than the area
R2, without
invert instead.
[0025] Although in the present description particular reference will be made to an area
R1 and an area
R2 subsequent to the latter, it is clear that the tunnel
G may also have multiple areas
R1 and multiple areas
R2, without departing from the scope of protection of the attached claims.
[0026] Generally, the scaffolding bridge
1 may have a longitudinal extension along the axis
X', as shown in
FIGS. 1, 2A and
2B.
[0027] During use, the scaffolding bridge
1 may be positioned in the tunnel so that its axis
X' is substantially coincident with the extension axis
X of the tunnel
G.
[0028] The scaffolding bridge
1 may include a rear access portion
11 and a front access portion
12 arranged along the axis
X' and designed to rest, during use, respectively on the area
R1 and on the area
R2.
[0029] The latter may actually guarantee a safe and stable support to the scaffolding bridge
1 during use.
[0030] In order to guarantee the support and anchoring of the scaffolding bridge
1 during the construction operations, it may include support means
20 connected to the rear and front access portions
11, 12 to support the scaffolding bridge
1 respectively at the area
R1 and at the area
R2.
[0031] In a preferred but non-exclusive embodiment, the support means
20 may be in the form of one or more rear support legs
21 connected with the rear portion
11 and resting, during use, on the area
R1 and one or more front support legs
22 integrally connected with the front portion
12 and resting, during use, on the area
R2.
[0032] Each rear and front support leg
21, 22 may therefore comprise an upper portion
21', 22' integrally coupled with the respective rear
11 or front
12 portion and a lower portion
21", 22" designed instead to rest, during use, on the respective area
R1, R2.
[0033] In order to guarantee a stable support even at the area
R2, which is curvilinear, each lower portion
22", and possibly also each lower portion
21" if need be, may comprise - at the end thereof - appropriate support elements
220", made of plastic material, such as for example neoprene rubber or the like, so as
to adapt to the angular change and the curvilinear configuration of the inverted arch
R at the area
R2 and possibly at the area
R1.
[0034] The scaffolding bridge
1 may move step by step along a direction
d. Such direction may be defined by the sum of the individual advancement pitches.
[0035] Suitably, such direction
d may substantially coincide with the works direction
d' so that the scaffolding bridge
1 advancing step by step along
d allows to construct subsequent sections along
d'.
[0036] Suitably, there may be provided for appropriate guide means for guiding the movement
of the scaffolding bridge
1 so that it advances along the works direction
d'. In other words, thanks to the guide means, the direction
d defined by the step-by-step advancement may coincide with the direction
d'.
[0037] Advantageously, the guide means may be configured to guide the scaffolding bridge
1 even should the tunnel reveal discontinuity and/or have slight bends and/or should
it not be symmetrical with respect to the central axis
X.
[0038] For example, there may be provided for a front crosspiece element
23 which extends transversely to the axis
X' so as to interact with two lateral sections opposite to the axis
X of the base surface of the planimetric curve of the inverted arch
R, for example as shown in FIG. 5.
[0039] In other words, the crosspiece
23 may comprise two curved opposite operative areas each designed to interact with the
curved surface of the inverted arch
R so that the crosspiece
23 is centred with respect to the inverted arch
R. This may allow to prevent the displacement perpendicular to the axis
X of the crosspiece
23.
[0040] In this manner, the crosspiece
23 may guide the advancement pitch
d of the scaffolding bridge so that the latter is along the works direction
d'.
[0041] Possibly, the walkway
130 and/or the portion
13 may be operatively connected with the crosspiece
23 so as to allow the transversal displacement of the axis
X' with respect to the crosspiece
23.
[0042] To this end, there may be provided for appropriate adjustment means
24,for example in the form of one or more oil-hydraulic cylinders.
[0043] This characteristic may allow to operate precisely, for example precisely follow
the desired works direction
d', even should the tunnel not be perfectly symmetrical and/or should the inverted arch
be slightly uneven.
[0044] Furthermore, the guide means may comprise an element
414 which may interact with the central channel of the area
R2. Such channel may have an extension defining the axis
X.
[0045] In this manner, the scaffolding bridge
1 may be guided frontally by means of the crosspiece
23 which prevents the lateral movement, and possibly using means
24 which allow the centring of the scaffolding bridge 1, and at the rear part using
the element
414.
[0046] The element
414 may actually act as a rotary pin. This aspect is particularly clear upon the movement
of the means
24.
[0047] In any case, upon the advancement of the scaffolding bridge 1 it may be guided along
the direction d' thanks to the guide means
30.
[0048] The scaffolding bridge
1 may further include a central operative area
13 interposed between the rear access portion
11 and the front access portion
12.
[0049] The operative area
13 may further have an extension that is substantially planar along an extension plane
π parallel to the median extension plane of the tunnel
G. Preferably, the axis
X may be coplanar or parallel to the plane
π.
[0050] Suitably, the operative area
13 may define a walkway
130. The operative area
13 may therefore be arranged - in use - facing the inverted arch
R. The area
13 may have a main extension along the axis
X'.
[0051] Although in the present description particular reference will be made to the particular
case in which the scaffolding bridge has a single central walkway
130, there may also be present multiple central walkways
130 possibly operatively connected to each other, without departing from the scope of
protection of the attached claims.
[0052] In this case, the reasoning below may be applied in an entirely equivalent manner.
[0053] In any case, the walkway
130 may therefore lie on the extension plane
π and be suitably configured and/or dimensioned to allow the passage of heavy-duty
vehicles, such as for example trucks, multi-service vehicles, concrete mixers or the
like, as well as emergency vehicles, such as ambulances or the like.
[0054] In this sense, the walkway
130 will be advantageously walkable.
[0055] To this end, the walkway
130 may comprise one or more decks
131. For example, should there be multiple decks
131, the latter may be arranged sequentially to form the walkway
130.
[0056] It is clear that the decks
131 may be configured so as to have a high resistance and allow the passage of heavy-duty
vehicles over them.
[0057] According to a preferred but non-exclusive embodiment, one or more of the decks
131 may be movable between a closed position in which they allow the passage of people,
heavy-duty vehicle, emergency vehicles and the like, and an open position in which
they allow, for example, one or more operators to access the inverted arch
R, as schematically shown in
FIGS. 2A, 2B, 5 and
6.
[0058] Such aspect may be particularly advantageous should there arise the need for emergency
rescue operations or other operations such as the manual laying of pipes, cables,
reinforcement iron rods or the like at the inverted arch
R underlying the walkway
130.
[0059] Possibly, the scaffolding bridge
1 may also include a jib crane
132 which can be controlled by an operator so as to allow an easier laying of pipes,
iron rods, armours or anything else.
[0060] Possibly, the pipes may be stored in a special rack
133 arranged on the operative area
13.
[0061] The operative area
13 may comprise a central walkway so as to allow the passage of heavy-duty vehicles.
In addition, it may include one or more lateral walkways so as to allow operators
to cross the scaffolding bridge
1 by foot.
[0062] Advantageously, the operators may therefore cross the scaffolding bridge
1 entirely safely and both during the construction steps and during the passage of
the heavy-duty vehicles.
[0063] Suitably, the scaffolding bridge
1 may include one or more access ramps
110, 120 operatively connected with the central portion
13. In greater detail, one or more access ramps
110, 120 may be at the access areas
11 and/or at the access area
12.
[0064] There may preferably be provided for a ramp
110 arranged at the rear area
11 so as to allow the passage of the vehicles between the section
R1 and the portion
13, that is the central walkway
130, and a ramp
120 arranged at the front area
12 so as to allow the passage of the vehicles between the section
R2 and the portion
13, that is the central walkway
130.
[0065] In other words, the scaffolding bridge
1 may allow to place the sections
R1 and
R2 in communication. Such configuration may therefore allow the passage of emergency
vehicles or heavy-duty vehicles, such as for example concrete casting means, trucks,
multi-service vehicles or the like, between the area
R1 and the area
R2.
[0066] Advantageously, as will also be detailed hereinafter, the aforementioned vehicles
may also be allowed passage even during the operations for constructing the inverted
arch
R, without the passage thereof jeopardising the operations.
[0067] Suitably, the access ramps
110, 120 may have a slope such to facilitate the passage of heavy-duty vehicles.
[0068] In particular, an advantageous slope may be comprised between 6 % and 10 %. A particularly
excellent slope of the ramp may be comprised between 7 % and 9 %, for example approximately
8 %.
[0069] According to an advantageous aspect of the invention, the scaffolding bridge 1 may
identify - at the lower part during use - a section
W1 interposed between the area
R1 and the area
R2 and designed to be constructed.
[0070] According to a preferred but non-exclusive embodiment, the section
W1 to be constructed may be constructed by casting one or more construction materials,
for example concrete, cement or the like, therefore allowing to obtain the invert
along the works advancement direction
d' mentioned above.
[0071] It is clear that the section
W1 to be constructed may be subject to other operations, as will also be detailed hereinafter,
without departing from the scope of protection of the attached claims.
[0072] Irrespective of the type of operation, the section
W1 may be constructed even during the passage of heavy-duty vehicles on the scaffolding
bridge
1, without the construction of the latter being jeopardised in any manner whatsoever.
[0073] The section
W1 may generally have a predetermined length defined with respect to the extension axis
X.
[0074] In particular, the length of the section
W1 may be preferably comprised between 10 m and 20 m. Preferably, the length of the
section
W1 may be of 15 m.
[0075] Once the section
W1 has been constructed, the scaffolding bridge
1 may be moved along an advancement direction
d from the operative position in which the operative area
13 is at the latter
W1 to a new operative position in which the operative area
13 is at a new section
W2 to be constructed of the inverted arch
R subsequent to the first
W1 so as to allow its construction.
[0076] Furthermore, once the scaffolding bridge has been moved, the constructed section
W1 may remain at the rear part with respect to the operative area
13 along the direction
d.
[0077] In other words, the constructed section
W1 may be external to the scaffolding bridge
1. Suitably, the constructed section
W1 may be stable and therefore it may define an area for supporting the scaffolding
bridge
1. In other words, the constructed section
W1 may define the area
R1.
[0078] According to a further particular aspect of the invention, the movement of the scaffolding
bridge
1 , may be carried out by a predetermined advancement pitch
p. As explained above, the sum of the pitches
p may define the direction
d.
[0079] The pitch
p may preferably be equal to the length
L1 of the area
W1 to be constructed.
[0080] As described above, the predetermined advancement pitch
p may preferably measure 10-20 m, preferably measuring about 15 m.
[0081] However, it is clear that even different advancement pitch
p values may be taken into account, without departing from the scope of protection
of the attached claims.
[0082] In greater detail, the length of the operative area
13 may coincide or, preferably, may be significantly greater than the pitch
p. The length of the operative area
13 may be substantially equal to the gap of the scaffolding bridge
1, that is the distance between the supports.
[0083] The length of the operative area
13 may measure about 20-40 m. Such length may be advantageous to avoid a high number
of movements like in the case of smaller lengths and simultaneously avoid the need
for particularly resistant structures like in the case of greater lengths.
[0084] Preferably, the length may measure about 30 m. Such length is excellent with respect
to the described above.
[0085] Suitably, the operative area
13 may have a length that is substantially double with respect to the pitch
p. In this manner, advantageously, beneath the operative area
13 there may be defined the section
W1 and the section
W2 which may have substantially the same length.
[0086] Advantageously, as better explained hereinafter, operations on the section
W1 (for example casting) may therefore be carried out and other preparation operations
(for example laying pipes and/or iron rods) may be carried out on the section
W2.
[0087] Suitably, the operations on the section
W1 and on the section
W2 may be carried out before moving the scaffolding bridge. Possibly, the operations
on the section
W1 and the preparation operations on the section
W2 may be carried out simultaneously.
[0088] The subsequent movement of the pitch
p may allow to construct a section
W1 which has already been subjected to preparation operations and carry out preparation
operations on a new section
W2.
[0089] Suitably, the scaffolding bridge
1 may comprise movement means
30 to selectively promote the movement of the scaffolding bridge
1 along the advancement direction
d, preferably by the predetermined pitch
p.
[0090] Specifically, the movement means
30 may be selectively activated to allow the movement of the scaffolding bridge
1 upon completing the construction of the section
W1.
[0091] In this manner, the portion
13 may be at a new section
W2 subsequent to the first. Such new section
W2 may therefore be a section of the inverted arch
R portion
R2 still to be constructed.
[0092] Upon identifying the new section
W2 to be constructed, the means
30 may be selectively disabled so as to allow the anchoring
1 of the scaffolding bridge and the operations on the section
W1and possibly on the new section
W2.
[0093] According to a preferred but non-exclusive embodiment, the movement means
30 may be in the form of at least one first and at least one second telescopic elements
31, 32 respectively positioned at the rear access portion
11 and at the front access portion
12 of the scaffolding bridge
1.
[0094] Preferably, the scaffolding bridge
1 may include a pair of telescopic elements
31 and a pair of telescopic elements
32 in the form of telescopic legs.
[0095] In any case, each telescopic element
31, 32 may include an upper portion
31', 32' which is fixed and integrally coupled to the respective front and rear access portion
11, 12 and a lower portion
31", 32" instead designed to interact with the inverted arch
R to support the scaffolding bridge
1.
[0096] As a matter of fact, the respective lower portions
31", 32" may be movable - with respect to the respective upper portion
31', 32' - between a proximal position (defined hereinafter as "retracted "position) and a
distal position (instead defined as "extended" position).
[0097] Preferably, the movement of each of the telescopic elements
31, 32 may be carried out along a transversal axis
Z with respect to the axis
X', preferably perpendicular to the latter.
[0098] Therefore, it is therefore clear that the telescopic elements
31, 32, when in the retracted and extended position may respectively have a minimum length
and a maximum length, defined along the axis
Z.
[0099] Specifically, the aforementioned minimum and maximum lengths may advantageously be
such to allow the scaffolding bridge
1 to rest on the support means
20 when the telescopic elements
31, 32 are in the retracted position and exclusively rest on the latter when they are in
the extended position.
[0100] In order to guarantee the movement of the scaffolding bridge
1, at least one of the lower portions
31", 32" may include respective rotatable elements, wheels in the preferred but non-limiting
embodiment.
[0101] The latter may for example be made of steel and neoprene. However, it is clear that
different embodiments may also be provided for without departing from the scope of
protection of the attached claims.
[0102] According to a preferred but non-exclusive embodiment, only the rear telescopic elements
31 may comprise respective wheels
311 designed to interact with the area
R1 when in extended position.
[0103] The front telescopic elements
32 may instead include one or more support feet
321susceptible - during use - to come into contact with the inverted arch
R, and in particular with the area
R2, when the telescopic elements
32 are in the extended position.
[0104] Although in the present description reference will be made to this particular embodiment,
it is however clear that the front telescopic elements
32 may include wheels at the respective ends, additionally or alternatively to the support
feet
321, so as to allow the movement of the scaffolding bridge
1, without departing from the scope of protection of the attached claims.
[0105] According to a further embodiment, the telescopic elements
32 may further be suitable to be moved between a position proximal to the operative
area
13 and a distal position with respect to the latter.
[0106] Preferably, such movement may be carried out along respective axes
X" parallel to the extension axis
X' of the scaffolding bridge
1.
[0107] To this end, according to a preferred but non-exclusive embodiment, each telescopic
element
32 may be connected - at the respective upper portion
32' - to a support arm
322 movable along a respective sliding track
135 extending longitudinally along an operative area
13.
[0108] In this manner, each telescopic element
32 may therefore be moved between the proximal position, in which respective support
arms
322 are inserted into the respective sliding track
135 and the telescopic elements
32 are in an inserted position, and the distal position, in which the respective support
arms
322 are instead partially inserted into the respective sliding track
135 and the telescopic elements
32 are in the removed position.
[0109] In this specific case, such movement may be carried out when the telescopic elements
32 will be in the retracted position, that is when the scaffolding bridge
1 is anchored to the inverted arch
R.
[0110] In particular, the support arms
322 may have a length such to allow the telescopic elements
32 a stroke along respective sliding tracks
132 with length equal to the predetermined advancement pitch
p of the scaffolding bridge
1.
[0111] As a result, in order to enable the movement of the scaffolding bridge
1, it will be sufficient to move - first and foremost - the telescopic elements
32 from the proximal position to the distal position and subsequently move both telescopic
elements
31, 32 from the retracted position to the extended position, so as to allow the latter to
interact with the inverted arch
R.
[0112] In this specific case, the feet
321 of the telescopic elements
32 and the wheels
311 of the telescopic elements
31 may respectively rest at the area
R2 and at the area
R1.
[0113] At this point, the presence of the wheels
311, will allow to return the scaffolding bridge
1 to the initial position, translating the support structure towards the advancement
direction
d and allowing the support arms
322 to fully return into the respective sliding tracks
132.
[0114] At this point, the scaffolding bridge
1 will have moved along the advancement direction
d by a distance equal to the predetermined pitch
p.
[0115] Possibly, the movement may be carried out semi-automatically or automatically, through
suitable drive means that can be selectively activated by the operator, for example
upon completing the construction of the section
W1.
[0116] Advantageously, the scaffolding bridge
1 may move by a predetermined velocity, for example comprised between 0.5 m/min and
1.5 m/min, preferably about 1 m/min.
[0117] According to a further advantageous aspect of the invention, the scaffolding bridge
1 may further include means
40 for casting a construction material, such as for example concrete, cement or the
like.
[0118] In the description hereinafter, particular reference will be made to concrete. However,
it is clear that even other construction materials, and their potential combinations,
may be taken into account without departing from the scope of protection of the attached
claims.
[0119] The means
40 may be configured to allow the construction of the section
W1, for example the casting of construction material at the section
W1. Preferably, the means
40 may be operatively connected with the central portion
13. More preferably, the means
40 may be positioned beneath the central portion
13.
[0120] According to a particular aspect of the invention, the means
40 may be at half of the portion
13 close to the rear area
11 so as to allow to construct the section
W1 and not construct the section
W2.
[0121] Preferably, the concrete casting may be carried out by pouring through the walkway
130. Suitably, the walkway
130 may have a plurality of holes suitably arranged thereon. In other words, at least
one part of the portion
13 may comprise such holes.
[0122] Suitably, the means
40 may comprise such holes which may be configured to convey the concrete towards the
underlying area, that is the section
W1.
[0123] In particular, the holes may receive the concrete coming, for example, from the concrete
mixer trucks positioned on the walkway
130 or positioned externally to the scaffolding bridge
1 to convey and spread it evenly on the section
W1 under construction, as shown in
FIG. 1.
[0124] There may possibly be present suitable conveyance funnels arranged in proximity of
the holes to facilitate the pouring of the concrete into the holes and/or the spreading
of the concrete in the area underlying the walkway
130.
[0125] Upon completing the casting, it will therefore be possible to obtain a constructed
section
W1.
[0126] More specifically, the means
40 for the casting, particularly shown in
FIGS. 2, 7A and
7B, may further include a containment frame
41 of the concrete positioned beneath the central portion
13.
[0127] In other words, the containment frame
41 may be - in use - interposed between the central portion
13 and the inverted arch
R.
[0128] The containment frame
41 may further be suitable to be moved selectively between a position proximal to the
central portion
13, shown in
FIG. 7B, and a distal position with respect to the latter, shown instead in
FIG. 7A.
[0129] The movement of the containment frame
41 may preferably be carried out along a direction substantially perpendicular to the
axis
X' of the scaffolding bridge
1.
[0130] In particular, the containment frame
41 in proximal position may be spaced with respect to the inverted arch
R and, specifically, to the section
W1 to be constructed. Suitably, the frame
41 may be configured so that the proximal position can allow the movement of the scaffolding
bridge
1 without intercepting the constructed section
W1, which has a greater height with respect to the section
W1 to be constructed, due to the casting.
[0131] On the other hand, the containment frame
41 in distal position may instead be in proximity of or in contact with the inverted
arch
R. In particular, the frame
41 may delimit the section
W1 to be constructed, to contain the concrete during the casting.
[0132] According to a preferred but non-exclusive embodiment, the containment frame
41 may include a support structure
410 operatively connected with the central portion
13 through suitable connection means
42, preferably of the telescopic type such as for example one or more telescopic cylinders
420, for example oil hydraulic actuation hydraulic telescopic cylinders.
[0133] The connection means
42 may therefore allow to move the containment frame
41 from the proximal to the distal position and vice versa.
[0134] The support structure
410 may further include support feet
413 designed to come into contact with inverted arch
R at the section
W1, when in distal position, to support the containment frame
41 and hold it in position.
[0135] The support structure
410 may further include - frontally - a front closing element for the casting
411.
[0136] The latter may allow to prevent the outflow of the concrete during the construction
step, allowing to precisely delimit and define the section
W1 to be constructed.
[0137] To this end, the support structure
410 may have a lower portion
411' suitably dimensioned to adapt to the planimetric curve of the inverted arch
R and to come into contact with the latter when the containment frame
41 is in distal position.
[0138] In this manner, the concrete cast at the section
W1 will be frontally limited by the front closing element
410, at the rear part by the front of the area
R1 constructed previously and laterally by the profile of the tunnel
G.
[0139] When it is in proximal position, the front closing element
410 may instead remain suspended above the inverted arch
R, therefore preventing any interference with the movement of the scaffolding bridge
1.
[0140] Preferably, the containment frame
41 may further include means
43 for levelling the concrete.
[0141] According to a preferred but non-exclusive embodiment, the levelling means
43 may for example be one or more vibrating straight edges
430, per se known, integrally coupled with the support structure
410 so as to allow to level the concrete when the containment frame
41 is in distal position.
[0142] According to a further advantageous aspect of the invention, the scaffolding bridge
1 may further include anti-vibrating means
50 for selectively preventing the vibration of the frame
41. In particular, the means
50 may be configured to prevent the vibrations from passing through (for example cause
the passage of heavy-duty vehicles) from the portion
13 to the frame
41.
[0143] For example, the means
50 may be de-coupling means
50 acting on the containment frame
41 and possibly also on the operative area
13 so as to allow the functional de-coupling between the containment frame
41 and the operative area
13, and therefore the scaffolding bridge
1.
[0144] The expression functional de-coupling is used to indicate that when the de-coupling
means
50 are activated, the vibrations and stresses induced on the operative area
13 will not be transmitted to the containment frame
41 and vice versa.
[0145] Such aspect may therefore allow to carry out an excellent construction at the section
W1, therefore without the passage of heavy-duty vehicles simultaneously with the construction
affecting the latter.
[0146] When the de-coupling means
50 are disabled, the vibrations and the stresses induced on the operative area
13 may therefore also be transmitted to the al containment frame
41.
[0147] In particular, the de-coupling means
50 may be activated when the containment frame
41 will be in the distal position, so as to allow the construction of the section
W1, and they may instead be disabled when the containment frame
41 will be in the proximal position, so as to allow the movement of the scaffolding
bridge
1.
[0148] Possibly, the means
50 may comprise or consist of damping elements of the per se known type.
[0149] According to a preferred but non-exclusive embodiment, the de-coupling means
50 may comprise the one or more telescopic hydraulic cylinders
420.
[0150] Actually, the latter may allow to functionally de-couple the containment frame
41 of the operative area
13 during the construction of the section
W1, damping any vibrations and stresses induced, for example, by the passage of heavy-duty
vehicles on the operative area
13.
[0151] Upon completing the casting, the telescopic hydraulic cylinders may further allow
to return the frame
41 in proximal position.
[0152] At this point, the containment frame
41 will be functionally coupled to the portion
13 and therefore it may be integrally joined with the latter.
[0153] In this manner, upon completing the casting, the scaffolding bridge
1 may be moved as described above along the advancement direction
d so as to carry out the casting on a section
W2 subsequent to the section
W1 just constructed.
[0154] Possibly, the containment frame
41 may further include a raceway formwork
44 extending longitudinally along an axis parallel to the axis
X'.
[0155] The raceway formwork
44 may be suitably sized to allow to obtain of a channel at the casting in the section
W1 when the containment frame
41 is in distal position.
[0156] The channel thus made using the raceway formwork at the surface of the constructed
section
W1 may, if need be, house suitable water draining systems.
[0157] According to a particular inventive aspect of the invention, there may be provided
a method for constructing a tunnel
G.
[0158] Preferably, but not exclusively, such method may be implemented using the scaffolding
bridge
1 described above.
[0159] First and foremost, the method may provide for a step for preparing a scaffolding
bridge, preferably the scaffolding bridge
1 described above.
[0160] Subsequently to the preparation step, the scaffolding bridge
1 may be positioned in the tunnel
G.
[0161] The scaffolding bridge
1 may therefore be positioned in the latter so that the rear access portion
11 and the front access portion
12 can respectively rest on a constructed area
R1 and on an area
R2 to be constructed of the inverted arch
R.
[0162] Upon positioning the scaffolding bridge
1, there may be defined - beneath it, for example beneath the operative area
13 - at least one section
W1 to be constructed interposed between the areas
R1 and
R2.
[0163] Subsequently, there may be carried out a step for constructing the section
W1 so as to obtain a constructed section
W1.
[0164] Upon completing the construction of the section
W1, the scaffolding bridge
1 may be moved along the advancement direction
d to allow the construction of a section
W2 subsequent to the constructed section
W1.
[0165] Possibly, upon the advancement, the constructed section
W1 may remain outside the scaffolding bridge
1 and it may subsequently become part of the support area
R1.
[0166] In particular, the steps for constructing the section
W1 and advancement step may be carried out iteratively until the completion of the inverted
arch
R.
[0167] In this case, the reasoning and expressions used for the sections
W1 and
W2 may therefore be repeated in an entirely equivalent manner at each construction cycle.
[0168] According to a preferred but non-exclusive embodiment, the construction step may
comprise or consist of a step for casting a construction material, preferably concrete
or the like.
[0169] In greater detail, the construction of the section
W1 may comprise the steps of:
- moving the containment frame 41 from the proximal to the distal position;
- casting the selected construction material, for example concrete, preferably such
casting step may be carried out through the operative area 13, for example by means of through holes present thereon;
- waiting for a period of time sufficient for the hardening of the casting;
- moving the frame 41 from the distal position to the proximal position.
[0170] Possibly, before the casting step there may be provided for a functional de-coupling
step between the operative area
13 and the containment frame
41 and before the step for moving the frame
41 there may be provided for the functional de-coupling step between the operative area
13 and the containment frame
41.
[0171] Subsequently to the construction of the section
W1, the scaffolding bridge
1 may be moved towards the section to be constructed subsequent to the section
W1 just constructed.
[0172] According to a particular aspect of the invention, before moving the scaffolding
bridge
1 there may be carried out a preparatory construction step on the section
W2, that is the section prior to the section
W1 at the scaffolding bridge
1. Such preparatory construction may possibly be carried out simultaneously with the
construction on the section
W1. This may allow to significantly save time.
[0173] Possibly, the preparatory construction on the section
W2 may be carried out during the step of waiting for the casting hardening time.
[0174] The preparatory construction step may comprise the laying of the reinforcement, iron
rods and/or pipes at the section
W2.
[0175] According to a particular aspect of the invention, the advancement pitch
p may be equal to the length
W1 which may be substantially equal to the length
W2. In this manner, in each advancement pitch there may be carried out the step for constructing
the section
W1 and the preparatory construction of the section
W2.
[0176] Although a method for carrying out a construction one the section
W1, in particular a casting operation, as well as other operations on the section prior
to
W2, in particular preparation operations, has been described, it is clear that the scaffolding
bridge
1 may be particularly adapted to carry out only some of such construction steps.
[0177] As a matter of fact, the method according to the present invention allows to obtain
any construction along the extension of the tunnel simultaneously always allowing
the passage of the vehicles through the tunnel.
[0178] For example, the method may provide for construction step for providing pipes and/or
wiring only.
[0179] The step for moving the scaffolding bridge 1 may preferably be carried out as described
above using telescopic means. In any case, the scaffolding bridge may be placed frontally
on a stable area
R2 still to be constructed, while - at the rear part it may be placed on a stable area
R1 which may be the section just constructed
W1.
[0180] It is clear that the areas
R1 and
R2 may be any areas having structural strength and not necessarily an area without the
invert and an area in which the invert has already been constructed.
[0181] As a matter of fact, the method and the scaffolding bridge
1 described above may be equally used for any maintenance operation, for example renovating
a part of the invert of a tunnel, in which both areas
R1 and
R2 provide for the invert.
[0182] In the light of the above, it is clear that the scaffolding bridge
1 attains the preestablished objectives.
[0183] Furthermore, it is clear that the present invention may include various parts and/or
similar or identical elements. Unless otherwise specified, similar or identical parts
and/or elements will be indicated using a single reference number, it being clear
that the described technical characteristics are common to all similar or identical
parts and/or elements.
[0184] The invention is susceptible to modifications and variants, all falling within the
scope of protection of the attached claims. All details can be replaced by other technically
equivalent elements, and the materials can be different depending on the needs, without
departing from the scope of protection of the invention defined by the attached claims.