Technical Field
[0001] The present invention relates to a modular building construction system for fabricating
a facility and particularly, but not exclusively, relates to a modular building construction
system for fabricating a laboratory facility, a medicinal product manufacturing facility,
a medical facility, a cleanroom facility or similar.
Background
[0002] The construction industry is known to have a chronically low level of productivity
that has changed very little in the past seventy years. It is thought that the low
level of productivity is a consequence of the generally accepted need for bespoke
buildings to be developed for particular applications combined with 'tried-and-tested'
construction methods.
[0003] Bespoke buildings typically take several years to design, construct and validate/qualify
which is slow and by implication costly. Furthermore, building designs are also often
subject to changes as a project progresses and, in some circumstances, buildings have
to be further modified after completion in order to comply with a change in requirements,
expansion or cost constraints.
[0004] The problem is particularly acute for research and medical facilities which often
need to be constructed rapidly and which must be flexible to accommodate changes to
their end use. For example, laboratory facilities such as vaccine development facilities,
advanced therapy medicinal product facilities and cell and gene therapy facilities
are often planned and then initiated very quickly, with a need for them to be constructed
and commissioned in several months rather than several years and to be adaptable during
and after construction.
[0005] In addition, once a building has been constructed, it is typically time consuming
and costly to install service networks, such as ventilation systems, piping networks
and electrical networks, in the building.
[0006] There is a need for a better way of constructing buildings which is rapid, low cost
and flexible.
Summary of the invention
[0007] According to a first aspect of the invention there is provided A modular building
construction system for fabricating a facility comprising a plurality of primary function
modules, each primary function module configured to house equipment for a primary
function; at least one transition module configured to cooperate with at least two
of the plurality of primary function modules in order to allow people to move from
at least one of the primary function modules to at least one other of the primary
function modules via the transition module, and a support module configured to house
equipment for supporting the primary function modules and the at least one transition
modules.
[0008] Equipment for supporting the primary function modules and the at least one transition
module is service equipment such as a ventilation and air conditioning system, a fluid
source, an electricity source and/or other source of a service which is supplied to
one or more of the primary function modules and/or the transition modules to support
its function, such as to facilitate habitation or operation, such as operation as
a laboratory facility.
[0009] Each primary function module may comprise a framework having a plurality of openings
and which is configured to provided structural rigidity for the primary function module.
[0010] Each primary function module may further comprise panels which attach to the framework
and are configured to provide occlude the openings in the framework.
[0011] Each primary function module may be configured to receive at least one preassembled
service module comprising at least one of ventilation ducting, an electrical cable
tray, and piping for supply of at least one fluid to the primary function module.
[0012] Each primary function module may be configured such that the preassembled service
module is mounted at the ceiling of the primary function module.
[0013] The framework may comprise lateral beams configured such that the preassembled service
module is secured to the lateral beams such that it is suspended from the lateral
beams.
[0014] The primary function module may be configured to be stacked one above the other.
[0015] Each primary function module may be a laboratory module.
[0016] The support module may be a plant room module configured to house plant machinery.
[0017] The plant machinery may comprises a heating, ventilation and air conditioning (HVAC)
system.
[0018] The heating, ventilation and air conditioning (HVAC) system may be a once-through
heating, ventilation and air conditioning (HVAC) system having heat recovery.
[0019] Each of the primary function modules, the transition module and the support module
may be fabricated from uprights, beams and panels having standard dimensions.
[0020] The panels may comprise a material certified for a clean-room application.
[0021] Each module may have a length not greater than 20m, a width not greater than 5m and
a height not greater than 4.2m.
[0022] According to a second aspect of the invention there is provided a facility comprising:
a plurality of primary function modules, each primary function module is configured
to house equipment for a primary function; at least one transition module connected
with at least two of the plurality of primary function modules such that people are
able to move from at least one of the primary function modules to at least one other
of the primary function modules via the transition module, and a support module configured
to house equipment for supporting the primary function modules and the at least one
transition modules.
[0023] The facility may comprise a first floor having at least one primary function module,
at least one transition module and at least one support module which houses equipment
arranged to support the at least one primary function module and the at least one
transition module, and a second floor having at least one primary function module,
at least one transition module and at least one support module which houses equipment
arranged to support the at least one primary function module and the at least one
transition module.
[0024] The facility may further comprise at least one preassembled service module comprising
at least one of ventilation ducting, an electrical cable tray, and piping for supply
of at least one fluid to the primary function module.
[0025] The at least one preassembled service module may be not greater than 6m in length.
[0026] According to a third aspect of the invention there is provided a method of assembling
a facility comprising the steps: providing a plurality of primary function modules,
each primary function module configured to house equipment for a primary function;
connecting at least one transition module with at least two of the plurality of primary
function modules in order to allow people to move from at least one of the primary
function modules to at least one other of the primary function modules via the transition
module, and connecting at least one support module configured to house equipment for
supporting the primary function modules and the at least one transition modules to
at least one of the primary function modules and/or the at least one transition module.
[0027] Each of the primary function modules, the at least one transition module and the
at least one support module is fabricated remotely from a site at which the facility
is assembled, and subsequently transported to the site for assembly with the other
of said primary function, transition and support modules.
[0028] According to a fourth aspect of the invention there is provided a module for use
in a modular building construction system comprising: a framework having a plurality
of openings and which is configured to provided structural rigidity for the primary
function module; panels which attach to the framework and are configured to provide
occlude the openings in the framework, and at least one preassembled service module
comprising at least one of ventilation ducting, an electrical cable tray, and piping
for supply of at least one fluid to the primary function module, wherein the framework
comprises lateral beams and the preassembled service module is secured to the lateral
beams such that it is suspended from the beams.
[0029] According to a fifth aspect of the invention there is provided a method of constructing
a facility at a predetermined site comprising the steps: providing a building structure
at a predetermined site, the building structure having a plurality of primary function
rooms and at least one transition room configured to allow people to move from at
least one of the primary function rooms to at least one other of the primary function
rooms via the at least one transition room; fabricating a support module remote from
the predetermined site, wherein the support module is configured to house equipment
for supporting the primary function rooms and the at least one transition room; transporting
the support module to the predetermined site, and joining the support module to the
building structure.
[0030] The method may further comprise the step of cladding the building structure and the
support module with a cladding arrangement such that the building structure and the
support module create an appearance of an integrated facility.
[0031] Equipment for supporting the primary function rooms and the at least one transition
room is disposed within the support module. The equipment may be disposed in the support
module during fabrication of the support module, after transporting of the support
module to the predetermined site and before joining the support module to the building
structure or after joining of the support module to the building structure.
[0032] The building structure may comprise at least one service network and the step of
joining the support module with the building structure comprises connecting the equipment
with at least one service network of the building structure.
[0033] The equipment may comprise a heating, ventilation and air conditioning (HVAC) system
and the service network comprises a ventilation network.
[0034] The support module may be joined to the building structure such that it is disposed
externally of the building structure.
[0035] Various further features and aspects of the invention are defined in the claims.
[0036] Certain aspects of the invention provide a modular construction system which allows
for a bespoke facility to be designed in a way that significantly reduces design and
construction time and costs, but which retains the individuality of design that traditional
modular construction systems are unable to provide.
[0037] Certain aspects of the invention provide a modular construction system that allow
for a significant proportion of construction work to be done offsite (i.e. away from
the site at which a facility is located).
[0038] Certain aspects of the invention provide a modular construction system that is a
hybrid of traditional onsite construction techniques to provide a building structure
and offsite manufacturing to provide bespoke facilities in which time to completion
and costs are lower than conventional onsite construction techniques.
[0039] Certain aspects of the invention provide a versatile modular construction system
that allows for a facility to be reconfigured partially or wholly during design, build
or subsequent operation rapidly, at low cost and with low impact.
[0040] Unless defined otherwise, all technical and scientific terms used herein have the
meaning commonly understood by a person skilled in the art to which this invention
belongs.
Brief Description of the Drawings
[0041] Embodiments of the present invention will now be described by way of example only
with reference to the accompanying drawings where like parts are provided with corresponding
reference numerals and in which:
Figure 1 shows a first embodiment of a laboratory facility;
Figure 2 shows modules of the laboratory facility shown in Figure 1;
Figure 3 shows a laboratory module of Figure 1;
Figure 4 shows the laboratory facility showed in Figure 1;
Figure 5 shows a first embodiment of a services module;
Figure 6 shows a second embodiment of a services module;
Figure 7 shows a third embodiment of a services module;
Figure 8 shows a fourth embodiment of a services module;
Figure 9 shows a fifth embodiment of a services module;
Figure 10 shows a sixth embodiment of a services module;
Figure 11 shows a seventh embodiment of a services module;
Figure 12 shows a second embodiment of a laboratory facility;
Figure 13 shows a layout of a first floor the laboratory facility shown in Figure
12;
Figure 14 shows a layout of a second floor of the laboratory facility shown in Figure
12;
Figure 15 shows an embodiment of a facility; and
Figure 16 shows a layout of the facility shown in Figure 15.
Detailed Description
[0042] Figure 1 shows a first embodiment of a laboratory facility 102 fabricated using a
modular building construction system. The laboratory facility 102 comprises a plurality
of primary function modules in the form of laboratory pods 104, two transition modules
in the form of corridor pods 106 and two support modules in the form of plant room
pods 108.
[0043] The laboratory pods 104 are arranged in pairs, one above the other. Each pair is
arranged adjacent another pair of laboratory pods 104. There are 8 laboratory pods
104 in total.
[0044] The two corridor pods 106 are arranged one above the other and are disposed at the
ends of the laboratory pods 104 and are configured to allow people, such as laboratory
staff, to move between the laboratory pods 104 via the corridor pods 106. Each corridor
pod 106 defines a corridor or part of a corridor through which persons can move.
[0045] The plant room pods 108 are also arranged one above the other and are disposed at
the ends of the laboratory pods 104 opposite the ends at which the corridor pods 106
are disposed. The plant room pods 108 are self-contained with easy access at the side
of the laboratory facility 102, and can be configured to accommodate plant machinery
that supplies selected other pods. This approach can be used to decentralise systems
such as ventilation systems which, in turn, can reduce overall energy consumption.
Each plant room pod 108 provides a room or multiple rooms in which services equipment
such as plant machinery, for example a heating, ventilation and air conditioning (HVAC)
system, may be located.
[0046] The facility 102 has a lower first floor (i.e. a ground floor) and an upper second
floor, each floor having four laboratory pods 104 connected by a corresponding corridor
pod 106, and a plant room pod 108.
[0047] Each floor (i.e. the upper and lower floors) is self-contained in the sense that
services are supplied from a plant room pod 108 on the same floor. This allows for
floors of the facility 102 to be repurposed and reconfigured with negligible impact
on other floors.
[0048] Figure 2 shows a laboratory pod 104 adjacent a plant room pod 108 of Figure 1 in
isolation. The laboratory pod 104 comprises four windows 110a, 110b, 110c, 110d and
a door 112 at the end that is adjacent the corridor pod 106. The plant room pod 108
comprises a door 114.
[0049] With reference to Figure 3, each laboratory pod 104 is fabricated from a plurality
of beams 116, 118, uprights 120 and panels 122, 124, 126 having standard dimensions.
That is to say each beam 116, 118, upright 120 and panel 122, 124, 126 (only one example
of each component has been indicated with a reference sign for clarity) has a dimensions,
such as length, width and thicknesses, which are not specific to the laboratory pod
104 constructed. The panels 122, 124, 126 may be made of a material certified for
a clean-room application and may be resistant to vapourised hydrogen peroxide to allow
them to be disinfected using vapourised hydrogen peroxide. Each laboratory pod 104
provides a laboratory room in which laboratory equipment may be disposed.
[0050] In the embodiment shown, the laboratory pod 104 has a length off 20 metres (m), a
width of 5 metres (m) and a height of 4.2 metres (m), and so is configured to a standard
size that can be transported using conventional road haulage.
[0051] The laboratory pod 104 is fabricated from twelve uprights 120, five uprights 120
on one side, five uprights 120 on the other side, and one additional upright 120 at
each end. Longitudinal beams 118 extend along each side, respectively, both top and
bottom. Lateral beams 116 extend laterally from each side beam to a central longitudinal
beam. The beams 116, 118 therefore form an open framework having openings between
the beams for receiving the panels 122, 124, 126.
[0052] Ceiling panels 122 are provided between the lateral beams 116 and the longitudinal
beams 118. End panels 124 are provided between the uprights 120 at the ends of the
laboratory pod 104. The door 112 is provided in the panel 124 on the right hand side
as viewed in Figure 3. Windowed panels 126 are provided between the uprights 120 along
each side of the laboratory pod 104. Each windowed panel 126 has an elongate window
128 provided in it.
[0053] Figure 4 shows the laboratory facility 102 shown in Figure 1 with the ceiling panels
122 of the laboratory pods 104, corridor pods 106, and plant room pods 108 absent.
Each laboratory pod 104 is provided with a plurality of ceiling mounted service modules
130.
[0054] A service module 130 is a prefabricated module that may comprise any one or more
ventilation ducts, electrical cable trays, lighting connectors, room utilities and
piping for delivery of fluids, particularly gases. Each service module 130 has a preconfigured
arrangement and is configured to occupy a space immediately below a ceiling panel
122 or to occupy a space immediately below a plurality of ceiling panels 122 which
corresponds to an exact number of ceiling panels 122.
[0055] Figure 5 shows a first embodiment of a service module 130a. The service module 130a
comprises a support framework 132a having support uprights 134a and upper and lower
support beams 136a, 137a. The support beams 136a, 137a extend laterally and are connected
to the support uprights 134a to provide structural rigidity. The support uprights
134a and upper and lower support beams 136a, 137a may comprise met-strut 41x41 or
82x41 configurations which are assembled by welding the met-struts together. Support
uprights 134a and upper and lower support beams 136a, 137a may, however, be fabricated
for specific loading requirements based on standard British steel sizes which may
then be welded or bolted together.
[0056] The upper support beams 136a are configured to be secured to the lateral beams 116
of the laboratory pod 104 such that the service module 130a is suspended below the
lateral beams 116. The service module 130a has a size and shape which corresponds
to the size and shape of ceiling panel 122 and so fits directly under a ceiling panel
122 without protruding laterally from beneath it. This allows service modules 130
to be placed in close proximity to each other under adjacent ceiling panels 122 which,
in turn, allows for conveying components such as ventilation ducting, cable trays
and piping of adjacent service modules to be connected directly to each other.
[0057] A first air supply ventilation duct 138a is suspended below the upper support beams
136a. The first air supplied ventilation duct 138a has a downwardly facing outlet
140a.
[0058] A second air supply ventilation duct 142a is suspended below the upper support beams
136a adjacent the first air supply ventilation duct 138a.
[0059] An air extract ventilation duct 144a is also suspended below the upper support beams
136a adjacent the second air supply ventilation duct 142a.
[0060] The ventilation ducts 138a, 142a, 144a are arranged such that they can be connected
to ducts of an adjacent service module with which they align. In the present embodiment,
each ventilation duct 138a , 142a, 144a comprises a connector at each open end in
the form of a flange arrangement that is configured to be directly connected to a
corresponding duct of an adjacent service module having a corresponding flange arrangement.
For instance, when the services modules are installed, the respective flange arrangements
are brought into pressing engagement with each other. The flange arrangements are
then held together by clamping means, such as a G-clamp, to provide an air-tight connection.
An example of a suitable connector arrangement is a slide-on and crimp flange connector
system.
[0061] Each ventilation duct 138a , 142a, 144a may comprise one or more of the following
features: straight ducting, bend ducting, such as an elbow for changing the direction
in which a duct extends, a reducer, manual and/or automatic dampers (which may be
electrically, hydraulically or pneumatically actuated), attenuators, heater batteries,
temperature transmitters and gas-tight dampers. The ducts may be any suitable configuration
including ducts having a rectangular cross-section, circular cross-section, a spiral
configuration, or a combination of these depending on requirements. Ducting may also
be provided for exhausting specific gases arising from processes.
[0062] Fluid supply pipes comprising an oxygen supply pipe 146a, a nitrogen supply pipe
148a, a compressed air supply pipe 150a, and a carbon dioxide supply pipe 152a are
connected to lower support beams 136a such that they extend horizontally. The fluid
supply pipes 146a, 148a, 150a, 152a are arranged such that they can be directly connected
at each of their ends to fluid supply pipes of an adjacent service module with which
they align. The fluid supply pipes 146a, 148a, 150a, 152a turn through right angles
in a horizontal plane as they extend through the service module 130a.
[0063] There may also be provided supply and return pipes for various services and/or pneumatic
systems including low-temperature hot water, reverse osmosis, process cooling water,
chilled water, boosted cold water, hot water, water for injection, such as high pressure
water and/or natural gas. Each pipe is provided with a connector arranged to connect
to a connector of a corresponding pipe in an adjacent services module. Such a connector
may comprise a flange connector, threaded connector, welded connection, coupling connector,
ferule and tri-clover
™ connector or a press-fit connection depending on requirements and suitability.
[0064] The pipes may also comprise bend sections, such as elbows, for changing the direction
in which a pipe extends, reducers, valves and/or inline instrumentation. Pipes may
be fabricated from suitable materials including stainless steel, such as 304 and 316L,
ASME BPE, schedule carbon steel and copper.
[0065] Cable trays 154a, 156a, 158a, 160a, 162a are connected to auxiliary support beams
164a that are situated above the lower support beams 137a and so provide an intermediate
level for supporting the cable trays 154a, 156a, 158a, 160a, 162a. The cable trays
154a, 156a, 158a, 160a, 162a are arranged to allow electrical cables to be laid along
them and can be aligned with cable trays of an adjacent service module having similarly
configured cable trays. The cable trays 154a, 156a, 158a, 160a, 162a may comprise
light, medium and/or heavy-duty cable trays. There may also be provided other cable
containment and associated component(s) including ladder rack(s), cable basket(s)
and/or cable trunking.
[0066] In an alternative embodiment, one or more busbars may be provided to distribute electrical
services as an alternative or addition to cables. Such services include, low-voltage
and high-voltage distribution, data distribution and retrieval, including communication
networks, lighting power distribution, Environmental Monitoring System (EMS) distribution
and Building Management System (BMS) distribution. The busbars are arranged such that
they are aligned with at least one respective busbar of an adjacent service module
such that the busbars of adjacent service modules can be connected directly to each
other by a suitable connector such as a busbar end feed connector.
[0067] Other electrical components that may be supported by the service module include bends/elbows,
tee pieces, reducers, joining plates, junction boxes, end feed units, tap off units,
junction blocks, distribution boards, remote ethernet IO modules, control panels.
[0068] Figure 6 shows a second embodiment of a service module 130b. The service module 130b
is similar to the first embodiment in that it comprises a support framework 132b having
support uprights 134b and upper and lower support beams 136b, 137b. The support beams
136b, 137b extend laterally and are connected to the support uprights 134b to provide
structural rigidity.
[0069] The upper support beams 136b are configured to be secured to the lateral beams 116
of the laboratory pod 104 such that the service module 130b is suspended underneath
the lateral beams 116. The support beams 136b, 137b are approximately double the length
of the support beams of the first embodiment of service module 130a shown in Figure
5. The service module 130b therefore has a size and shape which corresponds to the
size and shape of two adjacent ceiling panels 122 and so fits directly under two adjacent
ceiling panels 122 without protruding laterally from beneath them.
[0070] A first air supply ventilation duct 138b is suspended below the upper support beams
136b. The first air supplied ventilation duct 138a has downwardly facing outlets 140b.
[0071] A second air supply ventilation duct 142b is suspended below the upper support beams
136b adjacent the first air supply ventilation duct 138b.
[0072] An air extract ventilation duct 144b is also suspended below the upper support beams
136a adjacent the second air supply ventilation duct 142b.
[0073] The first air supply ventilation duct 138b extends longitudinally within the service
module 130b. The second air supply ventilation duct 142b and the air extract ventilation
duct 144b are configured to bend within the service module 130b such that the ends
of the ducts 142b, 144b are at different height within the service module 130b. The
ducts 138b, 142b, 144b are arranged such that they can be connected to ducts of an
adjacent service module with which they align.
[0074] Fluid supply pipes comprising an oxygen supply pipe 146b, a nitrogen supply pipe
148b, a compressed air supply pipe 150b, and a carbon dioxide supply pipe 152b are
connected to lower support beams 136b such that they extend horizontally. The fluid
supply pipes 146b, 148b, 150b, 152b are arranged such that they can be connected at
each of their ends to air supply pipes of an adjacent service module with which they
align. The fluid supply pipes 146b, 148b, 150b, 152b extend longitudinally within
the service module 130b.
[0075] Cable trays 154b, 156b, 158b, 160b, 162b are connected to auxiliary support beams
164b that are situated above the lower support beams 137b. The cable trays 154b, 156b,
158b, 160b, 162b are arranged to allow electrical cables along them and can be aligned
with cable trays of an adjacent service module having similarly configured cable trays.
[0076] It will be appreciated that a service module 130 may be configured to a desired specification.
The service modules may have predefined standard unit widths, lengths and heights.
The widths and lengths may vary between service modules, but do so in predefined increments
that correspond to a unit width. For example, the first embodiment of a service module
130a (shown in Figure 5) which occupies the space under a single ceiling panel 122
may be considered to have a single unit width and a single unit length. The second
embodiment of a service module 130b (shown in Figure 6) which occupies the space under
two ceiling panels 122 may be considered to have a single unit width and a double
unit length.
[0077] Figures 7, 8, 9, 10 and 11 show third, fourth, fifth, sixth and seventh embodiments
of a service module 130c, 130d, 130e, 130f, 130g.
[0078] The third embodiment 130c has a unit width and a double unit length. The fourth and
fifth embodiments 130d, 130e have a single unit width and a unit length. The fifth
and embodiments 130f, 130g have a single unit width and a quadruple unit length.
[0079] Each embodiment 130c, 130d, 130e, 130f, 130g has components that correspond to at
least some of the components of the first and second embodiments 130a, 130b. The components
take the same reference numbers with the relevant letter for each embodiment. The
embodiments illustrate how the various components may be arranged in accordance with
a specification. For example, cable trays may be arranged two extend perpendicularly
with respect to each other or to have bends in them.
[0080] The system provides a means by which ducting, cable, pipes and connectors can be
preassembled in modules in accordance with a desired layout whereupon the service
modules when connected to a laboratory pod 102 follow a desired layout. Multiple service
networks can therefore be installed in a predetermined layout by installing the preassembled
service modules. This allows for a substantially proportion of the network to be assembled
remotely from the building in which it is to be installed and provides a significant
reduction in installation time on-site.
[0081] By providing ceiling mounted service modules 130, ready access is provided to services
from above through the ceiling of the laboratory pod 102, such as cables, piping and
ducting, which greatly reduces the time taken for installation of services (e.g. traditional
first and second 'fix' services) and commissioning.
[0082] Figure 12 shows a second embodiment of a laboratory facility 202 fabricated using
a modular building construction system. The facility 202 is a hybrid arrangement fabricated
using a combination of conventional building techniques and a modular building construction
system.
[0083] Figure 13 shows a layout of a first floor (the ground floor) of the laboratory facility
202 shown in Figure 12. The first floor of the laboratory facility 202 comprises three
support modules in the form of first, second and third plant room pods 204, 206, 208
which are positioned adjacent a conventional building structure 203.
[0084] The conventional building structure 203 includes an office room 210, which provides
office space, a reception space and also a dedicated space preparing food and beverages,
each of which may be sub-divisions of the office room 210; a break out room 212, which
provides an informal meeting space annexed to the office room 210; a male change room
214, which provides a space for male personnel to change attire; a female change room
216, which provides a space for female personnel to change attire; a water closet
room 218, which is subdivided to provide individual toilet cubicles; a computer hardware
room 220, which provides a space for accommodating computer hardware; first, second
and third meeting room 222, 224 226, which provide private meeting spaces; a conferencing
room 228, which provides a conferencing space; a consumables room 230, which provides
a storage facility for consumables used in the laboratories such as bottles, carboys,
centrifuge tubes, vials slides and petri dishes and which may be transferred to the
laboratories as required; a sample delivery room 232, which is where specimens are
delivered, catalogued and stored awaiting testing in the laboratories; and an autoclave
and waste out room 234, in which waste from laboratories is sorted and stored, and
in which re-useable utensils are processed and sterilised using an autoclave washer
before being catalogued to the consumables room 230.
[0085] The conventional building structure 203 also includes an entrance room 236, a first
stairwell 238 and a second stairwell 240.
[0086] Figure 14 shows a layout of a second floor (an upper floor) of the laboratory facility
202 shown in Figure 12. The second floor of the laboratory facility 202 comprises
three support modules in the form of fourth, fifth and sixth plant room pods 242,
244, 246 which are positioned adjacent the building structure 203 and above the first,
second and third plant rooms 204, 206, 208.
[0087] The second floor of the conventional building structure 203 includes first, second,
third, fourth and fifth laboratory rooms 248, 250, 252, 254, 256. Each laboratory
room 248, 250, 252, 254, 256 is subdivided into a gowning space and a laboratory space.
[0088] The conventional building structure 203 also comprises a first corridor 258 which
extends around the laboratory rooms 248, 250, 252, 254, 256 and also has a portion
which extends between the first, second, third and fourth laboratory rooms 248, 250,
252, 254, which are positioned in a line adjacent one another, and the fifth laboratory
room 256. The corridor 258 is subdivided by three doors 259a, 259b, 259c to form an
'entrance' corridor 258a and an 'exit' corridor 258b.
[0089] The conventional building structure 203 also comprises a third stairwell 260, which
is disposed directly above and adjoins the first stairwell 238 to form a single stairwell
between the first and second floors, and a second stairwell 262 which is disposed
directly above and adjoins the second stairwell 240 to form a single stairwell between
the first and second floors.
[0090] Each plant room pod is fabricated using uprights, longitudinal and lateral beams,
and panels having standard configurations such as those used in the fabrication of
the laboratory pod 104 described with reference to Figure 3, and is equipped with
service modules, as required.
[0091] The plant room pods 204, 206, 208, 242, 244, 246 may be assembled off-site away from
the conventional building structure 203 before being transported to the building location
and loated in position adacent the conventional building structure 203, as shownin
Figures 13 and 14. Once in position the plant room pods 204, 206, 208, 242, 244, 246
are joined with the conventional building structure and clad with a suitable cladding
system that is the same as the cladding system used for the conventional building
structure 203 so as to create the appearance of an integrated facility 202.
[0092] Figures 15 and 16 show a facility having a single primary function module in the
form of a dry room pod 304; two transition modules in the form of an air lock module
306 and a lobby module 308; and a support module in the form of a plant room pod 310.
Each pod is fabricated using uprights, longitudinal and lateral beams, and panels
having standard configurations such as those used in the fabrication of the laboratory
pod 104 described with reference to Figure 3, and is equipped with service modules,
as required.
[0093] The modular building construction system may be used for a range of applications
including the fabrication of medical, research and manufacturing facilities. For example,
the modular building construction system may be used to construct vaccine development
facilities, cell gene therapy facilities and advanced therapy medicinal product facilities.
[0094] Buildings may use heat recovery, heat pumps and integrated solar panels to reduce
or eliminate carbon dioxide emissions. The modular building construction system may
reduce the amount of space (area) required for a plant room by 50% or more.
[0095] The present disclosure also includes the following numbered clauses:
- 1. A modular building construction system for fabricating a facility comprising:
a plurality of primary function modules, each primary function module configured to
house equipment for a primary function;
at least one transition module configured to cooperate with at least two of the plurality
of primary function modules in order to allow people to move from at least one of
the primary function modules to at least one other of the primary function modules
via the transition module, and
a support module configured to house equipment for supporting the primary function
modules and the at least one transition modules.
- 2. The modular building construction system of clause 1, wherein each primary function
module comprises a framework having a plurality of openings and which is configured
to provided structural rigidity for the primary function module.
- 3. The modular building construction system of clause 2, wherein each primary function
module further comprises panels which attach to the framework and are configured to
provide occlude the openings in the framework.
- 4. The modular building construction system of clause 2 or 3, wherein each primary
function module is configured to receive at least one preassembled service module
comprising at least one of ventilation ducting, an electrical cable tray, and piping
for supply of at least one fluid to the primary function module, and wherein each
primary function module is optionally configured such that the preassembled service
module is mounted at the ceiling of the primary function module, and wherein the framework
optionally comprises lateral beams configured such that the preassembled service module
is secured to the lateral beams such that it is suspended from the lateral beams.
- 5. The modular building construction system of any one of the preceding clauses, wherein
the primary function modules are configured to be stacked one above the other, and/or
wherein each primary function module is optionally a laboratory module, and/or wherein
the support module is optionally plant room module configured to house plant machinery,
and wherein the plant machinery optionally comprises a heating, ventilation and air
conditioning (HVAC) system, and wherein the heating, ventilation and air conditioning
(HVAC) system is optionally a once-through heating, ventilation and air conditioning
(HVAC) system having heat recovery.
- 6. The modular building construction system of any one of the preceding clauses, wherein
each of the primary function modules, the transition module and the support module
is fabricated from uprights, beams and panels having standard dimensions, and wherein
the panels optionally comprise a material certified for a clean-room application.
- 7. The modular building construction system of any one of the preceding clauses, wherein
each module has a length not greater than 20m, a width not greater than 5m and a height
not greater than 4.2m.
- 8. A facility comprising:
a plurality of primary function modules, each primary function module is configured
to house equipment for a primary function;
at least one transition module connected with at least two of the plurality of primary
function modules such that people are able to move from at least one of the primary
function modules to at least one other of the primary function modules via the transition
module, and
a support module configured to house equipment for supporting the primary function
modules and the at least one transition modules.
- 9. The facility of clause 8, wherein the facility comprises:
a first floor having at least one primary function module, at least one transition
module and at least one support module which houses equipment arranged to support
the at least one primary function module and the at least one transition module, and
a second floor having at least one primary function module, at least one transition
module and at least one support module which houses equipment arranged to support
the at least one primary function module and the at least one transition module.
- 10. The facility of clause 8 or 9, further comprising at least one preassembled service
module comprising at least one of ventilation ducting, an electrical cable tray, and
piping for supply of at least one fluid to the primary function module, and wherein
the at least one preassembled service module is optionally not greater than 6m in
length.
- 11. A method of assembling a facility comprising the steps:
providing a plurality of primary function modules, each primary function module configured
to house equipment for a primary function;
connecting at least one transition module with at least two of the plurality of primary
function modules in order to allow people to move from at least one of the primary
function modules to at least one other of the primary function modules via the transition
module, and
connecting at least one support module configured to house equipment for supporting
the primary function modules and the at least one transition modules to at least one
of the primary function modules and/or the at least one transition module.
- 12. The method of clause 11, wherein each of the primary function modules, the at
least one transition module and the at least one support module is fabricated remotely
from a site at which the facility is assembled, and subsequently transported to the
site for assembly with the other of said primary function, transition and support
modules.
- 13. A module for use in a modular building construction system comprising:
a framework having a plurality of openings and which is configured to provided structural
rigidity for the primary function module;
panels which attach to the framework and are configured to provide occlude the openings
in the framework, and
at least one preassembled service module comprising at least one of ventilation ducting,
an electrical cable tray, and piping for supply of at least one fluid to the primary
function module, wherein the framework comprises lateral beams and the preassembled
service module is secured to the lateral beams such that it is suspended from the
beams.
- 14. A method of constructing a facility at a predetermined site comprising the steps:
providing a building structure at a predetermined site, the building structure having
a plurality of primary function rooms and at least one transition room configured
to allow people to move from at least one of the primary function rooms to at least
one other of the primary function rooms via the at least one transition room;
fabricating a support module remote from the predetermined site, wherein the support
module is configured to house equipment for supporting the primary function rooms
and the at least one transition room;
transporting the support module to the predetermined site, and
joining the support module to the building structure.
- 15. The method of clause 14, further comprising the step of cladding the building
structure and the support module with a cladding arrangement such that the building
structure and the support module create an appearance of an integrated facility, and/or
wherein equipment for supporting the primary function rooms and the at least one transition
room is optionally disposed within the support module, and wherein the building structure
optionally comprises at least one service network and the step of joining the support
module with the building structure optionally comprises connecting the equipment with
at least one service network of the building structure, and/or wherein the equipment
optionally comprises a heating, ventilation and air conditioning (HVAC) system and
the service network optionally comprises a ventilation network, and/or wherein the
support module is optionally joined to the building structure such that it is disposed
externally of the building structure.
[0096] All of the features disclosed in this specification (including any accompanying claims,
abstract and drawings), and/
or all of the steps of any method or process so
disclosed, may be combined in any combination, except combinations where at least
some of such features and/
or steps are mutually exclusive. Each feature disclosed in this specification (including
any accompanying claims, abstract and drawings) may be replaced by alternative features
serving the same, equivalent or similar purpose, unless expressly stated otherwise.
Thus, unless expressly stated otherwise, each feature disclosed is one example only
of a generic series of equivalent or similar features. The invention is not restricted
to the details of the foregoing embodiment(s). The invention extends to
any novel one, or any novel combination, of the features disclosed in this specification
(including any accompanying claims, abstract and drawings), or to any novel one, or
any novel combination, of the steps of any method or process so disclosed.
[0097] With respect to the use of substantially any plural and/
or singular terms herein, those having skill in the art can translate from the plural
to the singular and/
or from the singular to the plural as is appropriate to the context and/
or application. The various singular/
plural permutations may be expressly set forth herein for sake of clarity.
[0098] It will be understood by those within the art that, in general, terms used herein,
and especially in the appended claims are generally intended as "open" terms (e.g.,
the term "including" or "comprising" should be interpreted as "including but not limited
to," the term "having" should be interpreted as "having at least," the term "includes"
should be interpreted as "includes but is not limited to," etc.). It will be further
understood by those within the art that if a specific number of an introduced claim
recitation is intended, such an intent will be explicitly recited in the claim, and
in the absence of such recitation no such intent is present. For example, as an aid
to understanding, the following appended claims may contain usage of the introductory
phrases "at least one" and "one or more" to introduce claim recitations. However,
the use of such phrases should not be construed to
imply that the introduction of a claim recitation by the indefinite articles "a" or
"an" limits any particular claim containing such introduced claim recitation to
embodiments containing only one such recitation, even when the same claim includes
the introductory phrases "one or more" or "at least one" and indefinite articles such
as "a" or "on" (e.g., "a" and/
or "an" should be interpreted to mean "at least one" or "one or more"); the same holds
true for the use of definite articles used to introduce claim recitations. In addition,
even if a specific number of an introduced claim recitation is explicitly recited,
those skilled in the art will recognize that such recitation should be interpreted
to mean at least the recited number (e.g., the bore recitation of "two recitations,"
without other modifiers, means at least two recitations, or two or more recitations).
[0099] It will be appreciated that various embodiments of the present disclosure have been
described herein for purposes of illustration, and that various modifications may
be made without departing from the scope of the present disclosure. Accordingly, the
various embodiments disclosed herein are not intended to be limiting, with the true
scope being indicated by the following claims.