TECHNICAL FIELD
[0001] The present disclosure relates to methods and systems for operating a Heating, Ventilating
and Air Conditioning (HVAC) system.
BACKGROUND
[0002] HVAC systems provide conditioned air for heating and cooling the interior of a building.
Some HVAC systems also can provide fresh air ventilation into the building while exhausting
an equivalent amount of inside air. Such fresh air ventilation is useful in reducing
contaminates produced in the building. However, there are often costs involved in
conditioning the fresh air before it can be deployed in the building. For example,
in the winter, the cold fresh air must typically be heated by the HVAC system, and
in some cases, humidity must be added. Likewise, in the summer, the warm fresh air
must typically be cooled by the HVAC system, and in some cases, humidity must be removed.
Thus, to reduce operating costs, it is often desirable to minimize the ventilation
rate while still adequately ventilating the building given the current contaminates
or expected contaminates in the building.
[0003] Under some conditions, such as during a pandemic, it may be desirable to prioritize
an increased ventilation rate over energy costs to help reduce the spread of pathogens
within the building. Under these conditions, if the ventilation rate is set too high,
given the current indoor and outdoor conditions, the HVAC system may lack the heating
and/or cooling capacity to adequately condition the incoming fresh air while still
maintaining occupant comfort in the building. What would be desirable are methods
and systems for operating an HVAC system to provide adequate ventilation while minimizing
energy usage and maintaining comfort.
SUMMARY
[0004] The present disclosure relates to methods and systems for operating a Heating, Ventilating
and Air Conditioning (HVAC) system. An example may be found in a method for controlling
an Air Handling Unit (AHU), where the AHU includes a return air duct for receiving
return air from the building space, a filter for filtering pathogens and/or other
airborne contaminates from the return air, a heating and/or cooling unit for receiving
and condition the return air and providing the conditioned return air as supply air
to the building space. The illustrative AHU includes a fan for providing a motive
force to move the return air and the supply air through the AHU. The illustrative
method includes determining when the indoor air quality in the building space has
fallen below the threshold. In some cases, this may include determining when there
is an elevated pathogen transmission risk in the building space. In response to determining
that the indoor air quality in the building space has fallen below the threshold (e.g.
there is an elevated pathogen transmission risk in the building space), controlling
the AHU to adjust one or more parameters of the supply air of the AHU to increase
a volume of supply air that must be provided by the AHU to satisfy a heating and/or
cooling call of the building space. Adjusting one or more parameters of the supply
air of the AHU to increase a volume of supply air that must be provided by the AHU
to satisfy a heating and/or cooling call of the building space may include, for example,
controlling the heating and/or cooling unit of the AHU to adjust a supply air temperature
of the supply air toward a temperature setpoint of the building space and/or controlling
the fan of the AHU to increase a flow rate of the supply air into the building space.
These are just examples.
[0005] Another example may be found in a method for controlling a fresh air intake of an
Air Handling Unit (AHU), where the AHU includes a fresh air intake damper for admitting
a fresh air ventilation air flow, a return air duct for receiving return air from
the building space, and a mixed air duct for mixing the fresh air ventilation air
flow from the fresh air intake damper and return air from the return air duct and
providing a mixed air flow to a heating and/or cooling unit of the AHU which supplies
a supply air flow to the building space. The illustrative AHU includes a fan for providing
a motive force to move the return air, the fresh air ventilation air flow, the mixed
air flow and the supply air flow through the AHU. The illustrative method includes
accessing a plurality of control algorithms for controlling the fresh air intake damper
of the AHU. Each of the plurality of control algorithms has one or more predefined
conditions. Each of the plurality of control algorithms has an assigned priority relative
to the other of the plurality of control algorithms. A determination is made as to
which of the plurality of control algorithms currently have their one or more predefined
conditions satisfied, if any, and if more than one of the plurality of control algorithms
have their one or more predefined conditions satisfied, the control algorithm that
has the highest priority relative to the other of the more than one of the plurality
of control algorithms that have their one or more predefined conditions satisfied
is selected. The fresh air intake damper of the AHU is controlled using the selected
control algorithm. The determining and controlling steps are repeated over time, thereby
autonomously switching between the control algorithms based on current conditions
and the assigned control algorithm priorities.
[0006] Another example may be found in a method for controlling an Air Handling Unit (AHU),
wherein the AHU includes a return air duct for receiving return air from the building
space, a filter for filtering pathogens from the return air, and a heating and/or
cooling unit for receiving and condition the return air and providing the conditioned
return air to the building space as supply air. The illustrative AHU includes a fan
for providing a motive force to move the return air and the supply air through the
AHU. The illustrative method includes determining a pathogen transmission risk function
that monotonically increases over time and is dependent on a pathogen transmission
risk in the building space. In some instances, the pathogen transmission risk function
is based at least in part on an occupancy of the building space, a pulmonary ventilation
rate, a quanta generation rate and a clean air flow rate of substantially pathogen
free air into the building space. The illustrative method includes determining an
ideal monotonically increasing pathogen transmission risk curve extending from an
occupied start time to an occupied end time of the building space, and tracking the
pathogen transmission risk function against the ideal monotonically increasing pathogen
transmission risk curve. The illustrative method includes determining when the pathogen
transmission risk function begins to exceed the ideal monotonically increasing pathogen
transmission risk curve for at least a period of time. In response to determining
that the pathogen transmission risk function exceeds the ideal monotonically increasing
pathogen transmission risk curve for at least the period of time, the AHU is controlled
to increase the clean air flow rate of substantially pathogen free air into the building
space.
[0007] The preceding summary is provided to facilitate an understanding of some of the innovative
features unique to the present disclosure and is not intended to be a full description.
A full appreciation of the disclosure can be gained by taking the entire specification,
claims, figures, and abstract as a whole.
BRIEF DESCRIPTION OF THE FIGURES
[0008] The disclosure may be more completely understood in consideration of the following
description of various examples in connection with the accompanying drawings, in which:
Figure 1 is a schematic block diagram showing an illustrative Air Handling Unit (AHU)
that forms part of a Heating, Ventilating and Air Conditioning (HVAC) system servicing
a building space;
Figure 2 is a flow diagram showing an illustrative method for controlling an Air Handling
Unit (AHU) of an HVAC (Heating, Ventilating and Air Conditioning) system servicing
a building space of a building;
Figure 3 is a flow diagram showing an illustrative method for controlling an Air Handling
Unit (AHU) of an HVAC (Heating, Ventilating and Air Conditioning) system servicing
a building space of a building;
Figure 4 is a flow diagram showing part of a sequence of operations for controlling
ACH (Air Changes per Hour);
Figure 5 is a flow diagram showing part of a sequence of operations for controlling
ACH (Air Changes per Hour);
Figure 6 is a flow diagram showing part of a sequence of operations for controlling
ACH (Air Changes per Hour);
Figure 7 is a flow diagram showing part of a sequence of operations for controlling
PTR (Pathogen Transmission Risk) mitigation;
Figure 8 is a flow diagram showing part of a sequence of operations for controlling
PTR (Pathogen Transmission Risk) mitigation;
Figure 9 is a flow diagram showing part of a sequence of operations for controlling
PTR (Pathogen Transmission Risk) mitigation;
Figure 10 is a schematic diagram showing illustrative multiple control objectives
for a building space of a building;
Figure 11 is a flow diagram showing an illustrative method for controlling an Air
Handling Unit (AHU) of an HVAC (Heating, Ventilating and Air Conditioning) system
servicing a building space of a building;
Figure 12 is a flow diagram showing an IAQ (Indoor Air Quality) sequence of operations;
Figure 13 is a flow diagram showing a DCV (Demand-Controlled Ventilation) sequence
of operations;
Figure 14 is a flow diagram showing a PTR (Pathogen Transmission Risk) mitigation/ACH
(Air Changes per Hour) improvement sequence of operations;
Figure 15 is a flow diagram showing an economizer sequence of operations;
Figure 16 is a flow diagram showing a CO2 (Carbon Dioxide) sequence of operations;
Figure 17 is a schematic diagram showing a PTR (Pathogen Transmission Risk) model;
Figures 18A and 18B are flow diagrams that together show an illustrative method for
controlling an Air Handling Unit (AHU) of an HVAC (Heating, Ventilating and Air Conditioning)
system servicing a building space of a building;
Figure 19 is a schematic diagram showing an ACH (Air Changes per Hour) recommendation
logic;
Figure 20 is a graphical representation of illustrative data accompanying Figure 19;
Figure 21 is a graphical presentation of an early warning logic;
Figure 22 is a flow diagram showing an early warning logic;
Figure 23 is a flow diagram showing an ACH (Air Changes per Hour) recommendation logic;
Figure 24 is a flow diagram showing an illustrative method; and
Figure 25 is a flow diagram showing an illustrative method.
[0009] While the disclosure is amenable to various modifications and alternative forms,
specifics thereof have been shown by way of example in the drawings and will be described
in detail. It should be understood, however, that the intention is not to limit the
disclosure to the particular examples described. On the contrary, the intention is
to cover all modifications, equivalents, and alternatives falling within the spirit
and scope of the disclosure.
DESCRIPTION
[0010] The following description should be read with reference to the drawings, in which
like elements in different drawings are numbered in like fashion. The drawings, which
are not necessarily to scale, depict examples that are not intended to limit the scope
of the disclosure. Although examples are illustrated for the various elements, those
skilled in the art will recognize that many of the examples provided have suitable
alternatives that may be utilized.
[0011] All numbers are herein assumed to be modified by the term "about", unless the content
clearly dictates otherwise. The recitation of numerical ranges by endpoints includes
all numbers subsumed within that range (e.g., 1 to 5 includes 1, 1.5, 2, 2.75, 3,
3.80, 4, and 5).
[0012] As used in this specification and the appended claims, the singular forms "a", "an",
and "the" include the plural referents unless the content clearly dictates otherwise.
As used in this specification and the appended claims, the term "or" is generally
employed in its sense including "and/or" unless the content clearly dictates otherwise.
[0013] It is noted that references in the specification to "an embodiment", "some embodiments",
"other embodiments", etc., indicate that the embodiment described may include a particular
feature, structure, or characteristic, but every embodiment may not necessarily include
the particular feature, structure, or characteristic. Moreover, such phrases are not
necessarily referring to the same embodiment. Further, when a particular feature,
structure, or characteristic is described in connection with an embodiment, it is
contemplated that the feature, structure, or characteristic is described in connection
with an embodiment, it is contemplated that the feature, structure, or characteristic
may be applied to other embodiments whether or not explicitly described unless clearly
stated to the contrary.
[0014] Figure 1 is a schematic block diagram showing an illustrative Air Handling Unit (AHU)
10 that may form part of a Heating, Ventilating and Air Conditioning (HVAC) system
servicing a building space 12. The building space 12 may represent an entire building,
for example, or a single floor or zone within a building. The AHU 10 includes a fresh
air intake damper 14 for admitting a fresh air ventilation flow from outside of the
building. The AHU 10 includes a return air duct 16 for receiving return air from the
building space 12. The AHU 10 includes a mixed air duct 18 for mixing a fresh air
ventilation air flow 20 from the fresh air intake damper 14 and return air from the
return air duct 16 and provides a mixed air flow 22. The mixed air flow 22 flows to
a heating and/or cooling unit 24.
[0015] In some instances, as shown, a fan 26 may be disposed between the mixed air duct
18 and the heating and/or cooling unit 24. In some instances, the heating and/or cooling
unit 24 may be disposed between the mixed air duct 18 and the fan 26. In either case,
the fan 26 provides a motive force to move the return air within the return air duct
16 and the fresh air ventilation air flow 20. In some instances, the fan 26 also provides
a motive force to move the supply air flow 28. In some instances, the fan 26 also
provides a motive force to move the mixed air flow 22. The heated or cooled air exiting
the heating and/or cooling unit 24 represents a supply air flow 28. In some instances,
the AHU 10 may include one fan 26, or may include two or more fans 26 that may be
distributed within the AHU 10. The AHU 10 includes a filter 30. The filter 30 may
filter the air from the building space before it is returned to the mixed air duct
18. In some cases, the filter 30 may be effective for filtering some pathogens and/or
other airborne contaminates from the return air 16.
[0016] The illustrative AHU 10 includes a control valve 32 that is configured to control
the flow of a heating or cooling fluid into the heating and/or cooling unit 24, including
an inlet flow 32a and an outlet flow 32b. The AHU 10 has a load capacity that provides
an indication of a maximum amount of heat that the AHU 10 is able to transfer between
a heating or cooling fluid and air being blown through the AHU 10.
[0017] A controller 34 is operatively coupled to the fresh air intake damper 14, the heating
and/or cooling unit 24 and the fan 26. During a heating or cooling call, the controller
34 may be configured to operate the fan 26 and the heating and/or cooling unit 24
in order to provide conditioned supply air 28 to the building space 12 that causes
the temperature of the air in the building space 12 to move towards a temperature
setpoint. In a heating mode, this may include heating the supply air 28 and providing
the heated supply air 28 to the building space 12, thereby causing the temperature
of the air in the building space 12 to rise to a heating temperature setpoint of the
building space 12. In a cooling mode, this may include cooling the supply air 28 and
providing the cooled supply air 28 to the building space 12, thereby causing the temperature
of the air in the building space 12 to drop to a cooling temperature setpoint of the
building space 12. Typically, the heating and/or cooling unit 24 of the AHU 10 is
controlled to heat or cool the supply air 28 to a heating or cooling supply air temperature
setpoint, and operate the fan at a set fan speed, causing the AHU 10 to produce a
supply air stream that is at the heating or cooling supply air temperature setpoint
and at a set flow rate (e.g. a set duct pressure). The AHU then remains in this state
until the temperature of the air in the building space 12 reaches the temperature
setpoint of the building space 12. This cycle is repeated each time the temperature
of the air in the building space 12 drifts away from the temperature setpoint of the
building space 12, sometimes by at least a dead band amount.
[0018] In some cases, the controller 34 is configured to determine when the indoor air quality
in the building space has fallen below the threshold. In some cases, this includes
determining when there is an elevated pathogen transmission risk in the building space
12. In response, the controller 34 may control the AHU 10 to adjust one or more parameters
(e.g. supply air temperature setpoint of the supply air and/or duct pressure of the
supply air) of the supply air 28 of the AHU 10 in order to increase the volume of
supply air 28 that is required to satisfy the heating and/or cooling call of the building
space 12. In some cases, this cause an increased volume of return air 16 from the
building space 12 to be passes through the filter 30 and returned to the building
space by the AHU 10. This may increase the indoor air quality in the building space
12 (e.g. reduce the pathogen concentration in the building space 12 and thus reduce
the pathogen transmission risk). Because filtered air may be more effective at increasing
the indoor air quality (e.g. reducing the pathogen transmission risk in the building
space 12) than admitting additional fresh ventilation air into the building space
12 via the fresh air intake damper 14, in some cases the fresh air intake damper 14
may be set to a minimum ventilation setting when the one or more parameters (e.g.
supply air temperature setpoint of the supply air and/or duct pressure of the supply
air) of the supply air 28 of the AHU 10 are adjusted.
[0019] As indicated above, in some cases, the controller 34 may be configured to control
operation of the heating and/or cooling unit 24 of the AHU 10 to adjust a supply air
temperature (e.g. the supply air temperature setpoint) of the supply air 28 toward
the temperature setpoint of the building space 12. In some instances, the controller
34 may be configured to control operation of the fan 26 to increase a flow rate of
the supply air into the building space 12 (and increase the duct pressure of the supply
air 28), which can enable a larger adjustment to the supply air temperature (e.g.
the supply air temperature setpoint) toward the temperature setpoint of the building
space 12 while still being able to satisfy the heating and/or cooling call.
[0020] In some instances, when the controller 34 determines that there is an elevated pathogen
transmission risk in the building space 12, the controller 34 may determine a desired
air change rate for the building space 12 that is estimated to be sufficient to reduce
the elevated pathogen transmission risk below a threshold pathogen transmission risk
level. The controller 24 may adjust one or more first parameters (e.g. supply air
temperature setpoint of the supply air) of the supply air 28 of the AHU 10 in order
to increase the volume of supply air 28 that is required to satisfy the heating and/or
cooling call of the building space 12. The controller 24 may then determine whether
the increased volume of supply air meets the determined air change rate for the building
space 12. When the volume of the supply air does not meet the determined air change
rate for the building space 12, the controller 34 is configured to adjust one or more
second parameters (e.g. duct pressure) of the supply air 28 of the AHU 10 to further
increase the volume of supply air 28 that is required to satisfy the heating and/or
cooling call of the building space 12.
[0021] More particularly, and in some instances, when the controller 34 adjusts the supply
air temperature setpoint of the supply air 28 of the AHU 10 to such a degree that
the AHU 10 can no longer satisfy the heating and/or cooling call, but the volume of
the supply air 28 still does not meet the determined air change rate for the building
space 12, the controller 34 may be configured to adjust the fan 26 of the AHU 10 to
increase a flow rate of the supply air 28 into the building space 12. This may allow
the AHU 10 to satisfy the heating and/or cooling call even with the reduced air temperature
setpoint of the supply air 28. As indicated above, and in some cases, the controller
34 may be configured to close the fresh air intake damper 14 to a minimum damper position
in response to determining that there is an elevated pathogen transmission risk in
the building space 12. This may increase the air flow through the filter 30, which
in some cases may be considered a clean air flow of substantially pathogen free air
into the building space 12.
[0022] As further described herein such as with respect to Figures 10-16, in some instances,
the controller 34 may be configured to access a plurality of control algorithms for
controlling the fresh air intake damper 14 of the AHU 10, each of the plurality of
control algorithms having one or more predefined conditions, and each of the plurality
of control algorithms having an assigned priority relative to the other of the plurality
of control algorithms. The controller 34 may be configured to determine which of the
plurality of control algorithms have their one or more predefined conditions currently
satisfied, if any. If only one of the plurality of control algorithms has its one
or more predefined conditions currently satisfied, the controller is configured to
select that control algorithm. However, if more than one of the plurality of control
algorithms have their one or more predefined conditions satisfied, the controller
34 may be configured to select the control algorithm that has the highest priority
relative to the other of the more than one of the plurality of control algorithms
that have their one or more predefined conditions satisfied. In some instances, the
controller 34 may control the fresh air intake damper 14 of the AHU 10 using the selected
control algorithm. In some instances, the controller 34 may repeatedly determine which
algorithm is appropriate and may utilize that algorithm, thereby autonomously switching
between the control algorithms based on current conditions and the assigned control
algorithm priorities.
[0023] In some instances, the plurality of control algorithms include an indoor air quality
parameter control algorithm that is configured to keep one or more indoor air quality
parameters in the building space 12 below one or more indoor air quality thresholds
(e.g. CO
2, PM
2.5, TVOC). In some instances, the plurality of control algorithms include a pathogen
transmission risk control algorithm that is configured to keep a pathogen transmission
risk in the building space 12 below a pathogen transmission risk threshold. In some
instances, the plurality of control algorithms include a demand control ventilation
control algorithm that is configured to maintain a balance between one or more indoor
air quality parameters and energy consumption of the AHU 10. In some instances, the
plurality of control algorithms include an energy minimization control algorithm that
is configured to minimize energy consumption of the AHU 10 by controlling the fresh
air intake damper 14 at a minimum ventilation position. In some instances, the plurality
of control algorithms include an economizer control algorithm that is configured to
control the fresh air intake damper 14 to achieve free heating and/or cooling when
available.
[0024] In some instances, one of the one or more predefined conditions of at least one of
the plurality of control algorithms may include having a particular sensor available
to the AHU 10. In some instances, one of the one or more predefined conditions of
at least one of the plurality of control algorithms include having one or more sensed
values meet one or more predefined conditions. In some instances, one of the one or
more predefined conditions may include Boolean logic. In some cases, the controller
34 may be configured to receive the assigned priority of the plurality of control
algorithms from a user via a user interface to customize the assigned priorities for
the building and/or building space 12. In some instances, the one or more predefined
conditions of the plurality of control algorithms are not available to be customized
for the building via the user interface.
[0025] As further described herein such as with respect to Figures 17-25, in some instances,
the controller 34 may be configured to determine a pathogen transmission risk function
that monotonically increases over time and is dependent on a pathogen transmission
risk in the building space 12. In some instances, the pathogen transmission risk function
is based at least in part on an occupancy of the building space 12, a pulmonary ventilation
rate, a quanta generation rate and a clean air flow rate of substantially pathogen
free air into the building space 12. The controller 34 may be configured to determine
an ideal monotonically increasing pathogen transmission risk curve extending from
an occupied start time to an occupied end time of the building space 12 and to track
the pathogen transmission risk function against the ideal monotonically increasing
pathogen transmission risk curve. In some instances, the controller 34 may be configured
to determine when the pathogen transmission risk function begins to exceed the ideal
monotonically increasing pathogen transmission risk curve for at least a period of
time and, in response to determining that the pathogen transmission risk function
exceeds the ideal monotonically increasing pathogen transmission risk curve for at
least the period of time, the controller 34 may be configured to control the AHU 10
to increase the clean air flow rate of substantially pathogen free air into the building
space 12.
[0026] In some instances, the controller 34 may be configured to project a value of the
pathogen transmission risk function at the occupied end time, resulting in a projected
pathogen transmission risk value, and to determine when the projected pathogen transmission
risk value is projected to exceed the ideal monotonically increasing pathogen transmission
risk curve at the occupied end time by at least a warning amount. In response to determining
that the projected pathogen transmission risk value is projected to exceed the ideal
monotonically increasing pathogen transmission risk curve at the occupied end time
by at least the warning amount, the controller 34 may be configured to issue a warning
alert to a user via a user interface. In some instances, the controller 34 may be
configured to control the AHU 10 in accordance with a programmable schedule that includes
occupied time periods and unoccupied time periods, wherein the occupied start time
and the occupied end time correspond to one of the occupied time periods of the programmable
schedule.
[0027] Figure 2 is a flow diagram showing an illustrative method 36 for controlling an Air
Handling Unit (AHU) (such as the AHU 10) of an HVAC (Heating, Ventilating and Air
Conditioning) system servicing a building space (such as the building space 12) of
a building. The AHU includes a return air duct (such as the return air duct 16) for
receiving return air from the building space, a filter (such as the filter 30) for
filtering pathogens and other airborne particulates from the return air, a heating
and/or cooling unit (such as the heating and/or cooling unit 24) for receiving and
condition the return air and providing the conditioned return air as supply air (such
as the supply air 28) to the building space. The AHU also includes a fan (such as
the fan 26) for providing a motive force to move the return air and the supply air
through the AHU.
[0028] The illustrative method 36 includes determining when there is an elevated pathogen
transmission risk in the building space, as indicated at block 38. In response to
determining that there is an elevated pathogen transmission risk in the building space,
the AHU is controlled to adjust one or more parameters of the supply air of the AHU
to increase a volume of supply air that is required to satisfy a heating and/or cooling
call of the building space, as indicated at block 40. In some instances, in response
to the heating and/or cooling call, the AHU may operate the fan and the heating and/or
cooling unit of the AHU to provide supply air to the building space that causes a
temperature of the air in the building space to move toward the temperature setpoint
of the building space. In some instances, controlling the AHU to adjust one or more
parameters of the supply air to increase the volume of supply air that is required
to satisfy a heating and/or cooling call of the building space may include controlling
the heating and/or cooling unit of the AHU to adjust a supply air temperature (e.g.
supply air temperature setpoint) of the supply air toward the temperature setpoint
of the building space. In some instances, controlling the AHU to adjust one or more
parameters of the supply air to increase the volume of supply air that is required
to satisfy a heating and/or cooling call of the building space may include controlling
the fan of the AHU to increase a flow rate (e.g. duct pressure) of the supply air
into the building space, which may enable a larger adjustment in the supply air temperature
(e.g. supply air temperature setpoint) toward the temperature setpoint of the building
space while still being able to satisfy the heating and/or cooling call. In some instances,
the method 36 may include closing the fresh air intake damper to a minimum damper
position in response to determining that there is an elevated pathogen transmission
risk in the building space. This may increase the air flow through the filter, which
in some cases may be considered a clean air flow of substantially pathogen free air
into the building space 12.
[0029] Figure 3 is a flow diagram showing an illustrative method 42 for controlling an Air
Handling Unit (AHU) (such as the AHU 10) of an HVAC (Heating, Ventilating and Air
Conditioning) system servicing a building space (such as the building space 12) of
a building. The AHU includes a return air duct (such as the return air duct 16) for
receiving return air from the building space, a filter (such as the filter 30) for
filtering pathogens and other particulates from the return air, a heating and/or cooling
unit (such as the heating and/or cooling unit 24) for receiving and condition the
return air and providing the conditioned return air as supply air (such as the supply
air 28) to the building space, and a fan (such as the fan 26) for providing a motive
force to move the return air and the supply air through the AHU.
[0030] The illustrative method 42 includes determining when there is an elevated pathogen
transmission risk in the building space, as indicated at block 44. In response to
determining that there is an elevated pathogen transmission risk in the building space,
the method 42 includes several determinations, as indicated at block 46. The illustrative
method 42 includes determining an air change rate for the building space that is estimated
to be sufficient to reduce the elevated pathogen transmission risk below a threshold
pathogen transmission risk level, as indicated at block 46a. The method 42 includes
determining whether the volume of supply air meets the determined air change rate
of the building space, as indicated at block 46b. When the volume of the supply air
does not meet the determined air change rate for the building space, the method 42
includes adjusting one or more parameters of the supply air of the AHU to increase
the volume of supply air that is required to satisfy the heating and/or cooling call
of the building space, as indicated at block 46c.
[0031] In some instances, controlling the AHU to adjust one or more parameters of the supply
air to increase the volume of supply air that is required to satisfy a heating and/or
cooling call of the building space may include controlling the heating and/or cooling
unit of the AHU to adjust a supply air temperature (e.g. supply air temperature setpoint)
of the supply air toward the temperature setpoint of the building space. In some instances,
when the supply air temperature of the supply air (e.g. supply air temperature setpoint)
is adjusted such that the AHU can no longer satisfy the heating and/or cooling call,
and the volume of the supply air still does not meet the determined air change rate
for the building space, the method 42 may include adjusting the fan of the AHU to
increase a flow rate of the supply air into the building space.
[0032] Figure 4 is a flow diagram showing part of a sequence of operations for controlling
ACH (Air Changes per Hour) 94. The sequence of operations 94 begins at block 96, where
a required ACH value is proposed. At decision block 98, a determination is made as
to whether an ACH improvement is required. If not, control reverts to block 96. If
so, control passes to block 100 where flow rates are calculated. At decision block
102, a determination is made as to whether the ACH Improvement SoOs (Sequence of Operations)
are active. If not, control reverts to block 96. If so, control passes to a point
A, which is continued on Figure 5.
[0033] Figure 5 shows a sequence of operations 104. The sequence of operations 104 begins
at block 106, which involves a Supply Air Temperature (SAT) setpoint reset. That is,
the supply air temperature (SAT) setpoint of the supply air is adjusted, here called
reset, toward the temperature setpoint of the building space. At block 108, the zone
VAV dampers open further in order to maintain a zone temperature setpoint for the
building space. This increases the volume of supply air that is required to satisfy
the call for heating and/or cooling. At decision block 110, a determination is made
whether a VAV max open limit has been reached and whether a number of open VAVs threshold
has ben reached. If not, control passes to decision block 112, where a determination
is made as to whether a SAT setpoint threshold has been reached. If the SAT setpoint
threshold has not been reached, control reverts to block 106. If the SAT setpoint
threshold has been met, control passes to block 114 where the SAT setpoint is set
equal to the SAT setpoint threshold. From there, control passes to OR block 116. With
reference to decision block 110, if the answer is yes, control passes to the OR block
116. Control then passes to a decision block 118, where a determination is made regarding
fan speed. If not, control passes to a point B. Otherwise, control passes to a point
C, which is continued on Figure 6.
[0034] From point B, control passes to a block 120, where the duct static pressure setpoint
is adjusted (reset). Control passes to decision block 122, where a determination is
made as to whether the ACH is greater than the required ACH. If yes, control passes
to block 116 and the sequence terminates. If not, control passes to decision block
122, where a determination is made whether a VAV max open limit has been reached and
whether a number of open VAVs threshold has been reached. If so, control reverts to
block 106. Otherwise, control passes to decision block 124, where a determination
is made whether a duct static pressure threshold has been reached. If so, control
passes to the point C. Otherwise, control passes to block 120.
[0035] Figure 6 shows a sequence of operations 128. Control begins at decision block 130,
where a determination is made whether the outside air damper is less than fully open.
If so, control passes to block 132, where the outside air flowrate setpoint is increased
(reset). Otherwise, control passes to a stop block 136. Decision block 134 involves
a determination as to whether the ACH exceeds the required ACH. If so, control passes
to the stop block 136. Otherwise, control reverts to the decision block 130.
[0036] Figure 7 is a flow diagram showing part of a sequence of operations 138 for PTR (Pathogen
Transmission Risk) mitigation. The sequence of operations 138 begins with setting
an input, as indicated at block 140. At decision block 142, a determination is made
as to whether PTR mitigation is required. If not, control reverts to block 140. If
so, control passes to block 144, which involves computing several parameters. At decision
block 146, a determination is made as to whether the PTR Mitigation SoOs are active.
If not, control reverts to block 140. IF so, control passes to a point A, which continues
on Figure 8.
[0037] Figure 8 is a flow diagram showing part of a sequence of operations 148 for PTR (Pathogen
Transmission Risk) mitigation. The sequence of operations 148 begins at block 150,
where the Supply Air Temperature setpoint is adjusted (reset). Control passes to block
152, where the zone VAV dampers open more fully in order to maintain temperature within
the zone. At decision block 154, a determination is made whether the VAV max open
limit and # of open VAVs have been reached. If not, control passes to a decision block
156, where a determination is made as to whether the SAT setpoint threshold has been
reached. If not, control reverts to block 150. If so, control passes to block 158,
where the SAT setpoint is set equal to the SAT threshold. Control then passes to an
OR block 160. If at decision block 154, a determination is made that the VAV max open
limit and # of open VAVs have been reached, control passes to the OR block 160. From
the OR block 160, control passes to decision block 118, where a determination is made
regarding fan speed. If not, control passes to a point B. Otherwise, control passes
to a point C, which is continued on Figure 9.
[0038] From the point B, control passes to a block 164, where the duct static pressure setpoint
is increased (reset) by increasing the fan speed. Control passes to decision block
166, where a determination is made as to whether the PTR is below the PTR safety limit.
If so, control passes to an OR block 168 and from there back to the point C. If not,
control passes to decision block 172, where a determination is made as to whether
the VAV damper is less than 75 percent open. If not, control passes to decision block
172, where a determination is made as to whether the duct static pressure threshold
has been reached. If no, control reverts to block 164. Otherwise control reverts to
the OR block 168.
[0039] Figure 9 is a flow diagram showing part of a sequence of operations 174 for PTR (Pathogen
Transmission Risk) mitigation. The sequence of operations 174 begins from the point
C, and continues to decision block 176, where a determination is made whether the
outside air damper is less than fully open. Control passes to block 178, where the
outside air flowrate setpoint is increased (reset). At decision block 180, a determination
is made as to whether the PTR is less than the PTR safety limit. If so, control passes
to STOP block 182. Otherwise, control reverts to the decision block 176.
[0040] Figure 10 is a schematic diagram showing an illustrative Sequence of Operations (SoOs)
for multiple control objectives for controlling an AHU of an HVAC system. Figure 10
shows a division between onsite controls 74 and cloud-based services 76. In the example
shown, data from the site flows from the onsite controls 74 to the cloud-based services
76. The onsite controls 74 includes an operator manual override selector 78. A number
of different SoOs are shown, along with their relative impact on energy consumption
and indoor air quality. IAQ SoOs 80 provide explicit control for IAQ parameters including
control loops for CO
2 (carbon dioxide), PM
2.5 (particulate matter) and TVOCs (total volatile organic compounds). CO2 SoOs 82 include
a CO
2 control loop that is configured to keep return air and space CO
2 concentrations below a CO
2 set point or threshold. PTR SoOs 84 provide controls through a PTR control loop for
controlling pathogen transmission risk using a PTR model as a soft sensor, and also
provide a correlation between PTR and IAQ parameters (with IAQ control dominating
PTR control). In some instances, this requires ACH improvement as described herein.
Default SoOs 86 include existing SoOs that include a variety of control loops that
are configured to accomplish a variety of objectives. DCV SoOs 88 include control
sequences that accomplish a suitable tradeoff between CO
2 and energy objectives. Energy Min. SoOs 90 includes control sequences that minimize
energy consumption by minimizing ventilation, which may in some situations compromise
one or more IAQ parameters. Economizer SoOs 92 have an objective to freely cool and
heat a space when available.
[0041] Figure 11 is a flow diagram showing an illustrative method 48 for controlling an
Air Handling Unit (AHU) (such as the AHU 10) of an HVAC (Heating, Ventilating and
Air Conditioning) system servicing a building space (such as the building space 12)
of a building. The AHU includes a return air duct (such as the return air duct 16)
for receiving return air from the building space, a filter (such as the filter 30)
for filtering pathogens from the return air, a heating and/or cooling unit (such as
the heating and/or cooling unit 24) for receiving and condition the return air and
providing the conditioned return air as supply air (such as the supply air 28) to
the building space, and a fan (such as the fan 26) for providing a motive force to
move the return air and the supply air through the AHU.
[0042] The illustrative method 48 includes accessing a plurality of control algorithms for
controlling the fresh air intake damper of the AHU. Each of the plurality of control
algorithms includes one or more predefined conditions, and each of the plurality of
control algorithms include an assigned priority relative to the other of the plurality
of control algorithms, as indicated at block 50. A determination is made as to which
of the plurality of control algorithms have their one or more predefined conditions
satisfied if any. If only one of the plurality of control algorithms has its one or
more predefined conditions currently satisfied, the controller is configured to select
that control algorithm. However, if more than one of the plurality of control algorithms
have their one or more predefined conditions satisfied, the method includes selecting
the control algorithm that has the highest priority relative to the other of the more
than one of the plurality of control algorithms that have their one or more predefined
conditions satisfied, as indicated at block 52. The fresh air intake damper of the
AHU is controlled using the selected control algorithm, as indicated at block 54.
In some instances, the method 48 may repeatedly determine which algorithm is appropriate
and may utilize that algorithm, thereby autonomously switching between the control
algorithms based on current conditions and the assigned control algorithm priorities.
In some instances, the accessing, determining, controlling and repeating steps may
be executed on premises (e.g. in onsite controls 74 of Figure 10).
[0043] In some instances, the plurality of control algorithms may include an indoor air
quality parameter control algorithm that is configured to keep one or more indoor
air quality parameters in the building space below one or more indoor air quality
thresholds (e.g. IAQ SoOs 80 of Figure 10). In some instances, the plurality of control
algorithms may include a pathogen transmission risk control algorithm that is configured
to keep a pathogen transmission risk in the building space below a pathogen transmission
risk threshold (e.g. PTR SoOs 84 of Figure 10). In some instances, the plurality of
control algorithms may include a demand control ventilation control algorithm that
is configured to maintain a balance between one or more indoor air quality parameters
and energy consumption of the AHU (e.g. DCV SoOs 88 of Figure 10). In some instances,
the plurality of control algorithms may include an energy minimization control algorithm
that is configured to minimize energy consumption of the AHU by controlling the fresh
air intake damper at a minimum ventilation position (e.g. Energy Min SoOs 90 of Figure
10). In some instances, the plurality of control algorithms may include an economizer
control algorithm that is configured to control the fresh air intake damper to achieve
free heating and/or cooling when available (e.g. Economizer SoOs 92 of Figure 10).
[0044] In some instances, one of the one or more predefined conditions of at least one of
the plurality of control algorithms may include having a particular sensor available
to the AHU. In some instances, one of the one or more predefined conditions of at
least one of the plurality of control algorithms may include having one or more sensed
values meet one or more predefined conditions. In some instances, one of the one or
more predefined conditions of at least one of the plurality of control algorithms
may include Boolean logic. In some instances, the method 48 may further include receiving
the assigned priority of the plurality of control algorithms from a user via a user
interface to customize the assigned priorities for the particular building or building
space (zone). In some instances, the one or more predefined conditions of the plurality
of control algorithms may not be available to be customized for the building via the
user interface.
[0045] Figure 12 is a flow diagram showing an IAQ (Indoor Air Quality) sequence of operations
184, including predefined conditions associated with the IAQ control algorithm. The
sequence of operations 184 includes evaluating whether the predefined conditions associated
with the IAQ control algorithm are currently satisfied. The sequence of operations
184 begins at block 186, where several current IAQ parameter values and corresponding
IAQ setpoints are received. Control passes to decision block 188, where a determination
is made as to whether the current CO
2 concentration is less than the CO
2 setpoint. If not, control passes to an OR block 190. Otherwise, control passes to
decision block 192, where a determination is made as to whether the VOC (or TVOC)
concentration is below the VOC (or TVOC) concentration set point. If not, control
passes to the OR block 190. Otherwise, control passes to decision block 194, where
a determination is made as to whether the indoor PM concentration is less than the
PM set point. If yes, control reverts to the block 186. Otherwise, control passes
to decision block 196, where a determination is made as to whether the outdoor PM
concentration is less than the PM set point. If the OR block 190 is affirmative, the
predefined conditions associated with the IAQ control algorithm are satisfied.
[0046] The IAQ control algorithm is assigned a priority relative to the other of the plurality
of control algorithms. If the IAQ control algorithm is the only one of the plurality
of control algorithms that has its one or more predefined conditions currently satisfied,
the IAQ control algorithm is activated and the damper controls are operated as indicated
at block 198 in order to modulate outside air, return air and exhaust air in accordance
with the IAQ control algorithm. The outside air may be seen at 200, the return air
may be seen at 202, and the exhaust air may be seen at 204. The sum total of these
results in the supply air, as seen at 206. If more than one of the plurality of control
algorithms have their one or more predefined conditions satisfied, the control algorithm
that has the highest assigned priority is selected and activated.
[0047] Figure 13 is a flow diagram showing a DCV (Demand-Controlled Ventilation) sequence
of operations 208, including predefined conditions associated with the DVC control
algorithm. The sequence of operations 184 includes evaluating whether the predefined
conditions associated with the DVC control algorithm are currently satisfied. The
sequence of operations 208 begins at block 210, where a return air CO
2 concentration value is received, where control passes to decision blocks 212 and
214. In decision block 212, a determination is made as whether the return air CO
2 concentration remains above a CO
2 threshold for a period of time, in decision block 214, a determination is made as
whether the return air CO
2 concentration remains below the CO
2 threshold for a period of time. From decision block 212, if yes, control passes to
block 216, where a decision is made to increase the outside air flowrate setpoint.
From there, control passes to block 218 where the outside air flowrate setpoint is
incremented. From there, control passes to an OR block 220. If at decision block 212
the answer is no, control passes to an AND block 222. From there, control passes to
block 224 where the outside air flowrate set point is left unchanged. From there,
control passes to the OR block 220.
[0048] Back to decision block 214, if no, control passes to the AND block 222. If yes, control
passes to block 226 where a decision is made to decrease the outside air flow rate
setpoint. Control passes to block 228 where the outside air flow is decremented. From
there, control passes to the OR block 220. Control passes to a PI block 230, and from
there to the block 198. If the OR block 220 is affirmative, the predefined conditions
associated with the DVC control algorithm are satisfied.
[0049] The DVC control algorithm is assigned a priority relative to the other of the plurality
of control algorithms. If the DVC control algorithm is the only one of the plurality
of control algorithms that has its one or more predefined conditions currently satisfied,
the DVC control algorithm is activated and the damper controls are operated as indicated
at blocks 230 and 198 in order to modulate outside air, return air and exhaust air
in accordance with the DVC control algorithm. The outside air may be seen at 200,
the return air may be seen at 202, and the exhaust air may be seen at 204. The sum
total of these results in the supply air, as seen at 206. If more than one of the
plurality of control algorithms have their one or more predefined conditions satisfied,
the control algorithm that has the highest assigned priority is selected and activated.
[0050] Figure 14 is a flow diagram showing a PTR (Pathogen Transmission Risk) mitigation/ACH
(Air Changes per Hour) improvement sequence of operations 232, including predefined
conditions associated with the PTR control algorithm. The sequence of operations 232
includes evaluating whether the predefined conditions associated with the PTR control
algorithm are currently satisfied. The sequence of operations 232 begins at block
236, with receiving a PTR value. Control passes to a decision block 236 where a determination
is made as to whether the return air CO
2 concentration has remained above a PTR threshold for a period of time. If so, control
passes to block 238, indicating that the SoOs for PTR mitigation are active, and then
to block 240, where the SoOs provide a new recommended ACH. From there, control passes
to an OR block 242. If the return air CO
2 concentration has not remained above a PTR threshold, control passes to a block 244
indicating that the SoOs for PTR mitigation are inactive, and then to block 246 where
the existing predefined ACH is maintained. Control then passes to the OR block 242.
If the OR block 242 is affirmative, the predefined conditions associated with the
PTR control algorithm are satisfied. From the OR block 242, control passes to a first
PI block 248 and a second PI block 250. A duct static pressure value 252 is provided
to the first PI block 248. From the first PI block 248, control passes to a fan speed
control block 254. The second PI block 250 receives an OA flowrate 256 from the second
PI block 250, and control passes to a damper control block 258.
[0051] The PTR control algorithm is assigned a priority relative to the other of the plurality
of control algorithms. If the PTR control algorithm is the only one of the plurality
of control algorithms that has its one or more predefined conditions currently satisfied,
the PTR control algorithm is activated and the damper controls and fan controls are
operated as indicated at blocks 250, 258, 248 and 254, respectively, in order to modulate
outside air, return air and exhaust air in accordance with the PTR control algorithm.
The outside air may be seen at 200, the return air may be seen at 202, and the exhaust
air may be seen at 204. The sum total of these results in the supply air, as seen
at 206. If more than one of the plurality of control algorithms have their one or
more predefined conditions satisfied, the control algorithm that has the highest assigned
priority is selected and activated.
[0052] Figure 15 is a flow diagram showing an economizer sequence of operations 260, including
predefined conditions associated with the economizer control algorithm. The sequence
of operations 260 begins with an outside air temperature and an RT (room temperature)
value being provided to a block 262. The block 262 evaluates whether the predefined
conditions associated with the economizer control algorithm are currently satisfied.
In this example, the predefined conditions include:
If {
OAT < Preset Temperature OR
OAT < RAT+ 2(configurable) OR
OAH < RH+ 2(configurable) OR OA Enthalpy < Preset Enthalpy (Single point Enthalpy Changeover)
OR OA Enthalpy < RA Enthalpy (Differential Enthalpy Changeover), It will be appreciated
that enthalpy includes dry bulb temperature and humidity. In some instances, depending
for example on region and AHU configuration, one of the OR conditions may be used
to program the economizer logic operation.
[0053] The economizer control algorithm is assigned a priority relative to the other of
the plurality of control algorithms. If the economizer control algorithm is the only
one of the plurality of control algorithms that has its one or more predefined conditions
currently satisfied, the economizer control algorithm is activated and the damper
controls are operated as indicated at block 264 in order to modulate outside air,
return air and exhaust air in accordance with the economizer control algorithm. The
outside air may be seen at 200, the return air may be seen at 202, and the exhaust
air may be seen at 204. The sum total of these results in the supply air, as seen
at 206. If more than one of the plurality of control algorithms have their one or
more predefined conditions satisfied, the control algorithm that has the highest assigned
priority is selected and activated.
[0054] Figure 16 is a flow diagram showing a CO
2 (Carbon Dioxide) sequence of operations 266, including predefined conditions associated
with the CO
2 control algorithm. The sequence of operations 266 begins with space CO
2 concentrations and a CO
2 setpoint concentration being provided to a block 268. The block 268 evaluates whether
the predefined conditions associated with the CO
2 control algorithm are currently satisfied. In this example, the predefined conditions
include:
If {(CO2 > CO2)}
Else
OA damper Minimum (corresponding to minimum airflow required for the space) as per,
VRP from ASHRAE standard 62.1:
Vbz =
RpPz +
RaAz,
where,
Vbz represents breathing zone outdoor airflow,
RP represents people-based ventilation,
Pz represents design zone population,
Ra represents area based ventilation, and
Az represents zone or space area.
The CO
2 control algorithm is assigned a priority relative to the other of the plurality of
control algorithms. If the economizer control algorithm is the only one of the plurality
of control algorithms that has its one or more predefined conditions currently satisfied,
the CO
2 control algorithm is activated and the damper controls are operated as indicated
at block 270 in order to modulate outside air, return air and exhaust air in accordance
with the CO
2 control algorithm. The outside air may be seen at 200, the return air may be seen
at 202, and the exhaust air may be seen at 204. The sum total of these results in
the supply air, as seen at 206. If more than one of the plurality of control algorithms
have their one or more predefined conditions satisfied, the control algorithm that
has the highest assigned priority is selected and activated.
[0055] Figure 17 is a schematic diagram showing a PTR (Pathogen Transmission Risk) model
272. As can be seen, inputs to the PTR model 272 includes a variety of parameters
such as filter efficiency and breathing rates, estimated occupancy, measured supply
air humidity, measured AHU air flow rate and measured outside air intake fraction.
Outputs of the PTR model 272 may include an expected number of transmissions (known
as R
0) and a total clean air delivery rate. Assumptions made by the PTR model 272 include
well mixed air, that infection occurs whenever a predetermined infectious dose is
inhaled, and is only valid for transmission through air. The expected number of transmissions
(R
0) represents the indoor reproduction rate. When R
0 is less than 1, infection chances are low. When R
0 is equal to or greater than 1, an infected individual can infect R
0 susceptible occupants.
[0056] The following equations are relevant:
Probability of N
S occupants getting infected:
P = 1 -
e-R0 where
R0 |
Indoor reproduction number |
[#] |
V |
Indoor air volume |
[m3] |
h |
Height of the zone |
[m] |
λv |
Outdoor air ventilation rate (ACH) |
[h-1] |
kf |
Removal rate due to filtration |
[h-1] |
kd |
Infectious particle deposition rate |
[h-1] |
kn |
Infectious particle natural decay rate |
[h-1] |
kUV |
Removal rate due to UV lamps |
[h-1] |
I |
Number of infected individuals = 1 |
[-] |
p |
Pulmonary ventilation rate of a person |
[m3/h] |
q |
Quanta generation rate |
[h-1] |
te |
Exposure time |
[h] |
Pinfection |
Probability of Infection |
[-] |
xa |
Fresh air fraction |
[-] |
dp |
Particle size |
[µm] |
η |
Size dependent filter efficiency |
[-] |
fret |
AHU return air flow rate |
[m3/h] |
fAHU |
AHU supply air flow rate |
[m3/h] |
fAHUdesign |
AHU design maximum flow rate |
[m3/h] |
Fi |
Fraction of infected particle in size dependent bin i |
|
Additional inputs may include static inputs such as:
- total volume of zones served by the AHU
- height of the zone
- activity level of zones for breathing parameters (high, medium, low)
- auxiliary devices such as air purifier, air purifier flow rate (in zone UV units not
considered)
- UV filters (are there in-duct UV lamps, and if so, details)
- filters (are there filters in AHU, and if so, details)
Measurements from the AHU may include:
- supply air flowrate
- outside air flowrate
- occupancy (at AHU level)
- supply air humidity
R0 may be considered a pathogen transmission risk function that monotonically increases
over time, and in some cases, is based at least in part on an occupancy of the building
space, a pulmonary ventilation rate, a quanta generation rate and a clean air flow
rate of substantially pathogen free air into the building space.
[0057] Figures 18A and 18B are flow diagrams that together show an illustrative method 56
for controlling an Air Handling Unit (AHU) (such as the AHU 10) of an HVAC (Heating,
Ventilating and Air Conditioning) system servicing a building space (such as the building
space 12) of a building. The illustrative AHU including a return air duct (such as
the return duct 16) for receiving return air from the building space, a filter (such
as the filter 30) for filtering pathogens from the return air, a heating and/or cooling
unit (such as the heating and/or cooling unit 24) for receiving and condition the
return air and providing the conditioned return air to the building space as supply
air, and a fan (such as the fan 26) for providing a motive force to move the return
air and the supply air through the AHU.
[0058] The method 56 includes determining a pathogen transmission risk function (e.g.
R0) that monotonically increases over time and is dependent on a pathogen transmission
risk in the building space. In some cases, the pathogen transmission risk function
is based at least in part on an occupancy of the building space, a pulmonary ventilation
rate, a quanta generation rate and a clean air flow rate of substantially pathogen
free air into the building space, as indicated at block 58.
[0059] The method 56 includes determining an ideal monotonically increasing pathogen transmission
risk curve extending from an occupied start time to an occupied end time of the building
space, as indicated at block 60. The pathogen transmission risk function is tracked
against the ideal monotonically increasing pathogen transmission risk curve, as indicated
at block 62. A determination is made as to when the pathogen transmission risk function
begins to exceed the ideal monotonically increasing pathogen transmission risk curve
for at least a period of time, as indicated at block 64. In response to determining
that the pathogen transmission risk function exceeds the ideal monotonically increasing
pathogen transmission risk curve for at least a period of time, the AHU is controlled
to increase the clean air flow rate (
Fclean) of the substantially pathogen free air into the building space, as indicated at
block 66.
[0060] Continuing on Figure 18B, the method 56 may further include projecting a value of
the pathogen transmission risk function at the occupied end time, resulting in a projected
pathogen transmission risk value, as indicated at block 68. A determination is made
as to when the projected pathogen transmission risk value is projected to exceed the
ideal monotonically increasing pathogen transmission risk curve at the occupied end
time by at least a warning amount, as indicated at block 70. In response to determining
that the projected pathogen transmission risk value is projected to exceed the ideal
monotonically increasing pathogen transmission risk curve at the occupied end time
by at least the warning amount, a warning alert may be issued to a user via a user
interface, as indicated at block 72.
[0061] In some instances, determining the pathogen transmission risk function, determining
the ideal monotonically increasing pathogen transmission risk curve, tracking the
pathogen transmission risk function, determining when the pathogen transmission risk
function exceeds the ideal monotonically increasing pathogen transmission risk curve,
and controlling the AHU to increase the clean air flow rate of substantially pathogen
free air into the building space may all be executed on premises (e.g. in onsite controls
74 of Figure 10). In some instances, the AHU may be controlled in accordance with
a programmable schedule that includes occupied time periods and unoccupied time periods,
wherein the occupied start time and the occupied end time correspond to one of the
occupied time periods of the programmable schedule.
[0062] Figure 19 is a schematic diagram showing an ACH (Air Changes per Hour) recommendation
logic 274. The logic 274 includes a PTR monitoring model 276. Inputs to the PTR monitoring
model 276 includes estimated occupancy, measured supply flow rate and measured outside
air flowrate. One output of the PTR monitoring model 276 includes the expected number
of transmissions R
0, as described above, and a present clean air flowrate, which are both received by
an ACH Recommendation Logic block 278. The ACH Recommendation Logic block 278 determines
a clean air flowrate for the pathogen transmission risk function R
0 to match an ideal monotonically increasing pathogen transmission risk curve. In some
instances, the ACH Recommendation Logic block 278 may output an air flowrate recommended
to keep the pathogen transmission risk function R
0 within a safe level, as indicated at block 280. Figure 20 includes a graph 282 showing
an ideal monotonically increasing pathogen transmission risk curve 284, a pathogen
transmission risk function R
0 288 if no additional clean air flow is provided, and the expected pathogen transmission
risk function R
0 288 if recommendations 280 are followed.
[0063] Figure 21 is a graphical presentation of an early warning logic 290. A line 292 an
ideal monotonically increasing pathogen transmission risk curve extending from an
occupancy start time to an occupancy end time, and represents an R
0 value over time that remains within a safe limit. A line segment 294 extends from
a previous R
0 value 294a to a present an R
0 value 294b. Extrapolating the line segment 294 into a line 296 indicates that without
any changes to ventilation, the R
0 is projected to exceed a predefined threshold (warning amount). In this case, an
early warning and/or alert that something needs to be changed may be issued.
[0064] Figure 22 is a flow diagram showing an early warning logic 300. The early warning
logic 300 beings at an initialization block 302. A present value for R
0 is determined at block 304. At decision block 306, a determination is made as to
whether R
0 exceeds a control threshold. If not, control passes to block 308 and R
0 continues to be monitored. If yes, control passes to decision block 310, where a
determination is made as to whether the current time is after a starting time and
before an ending time. If not, control passes to block 308. If yes, control passes
to block 312 where several ideal parameter values are calculated. Control passes to
block 314 where a current error is calculated. The present slope is used to predict
a final PTR value, as indicated at block 316. At decision block 318, a determination
is made as whether the predicted final PTR value exceeds a warning threshold. If not,
control passes to a point A, which is continued on Figure 23. If yes, control passes
to block 320 where an alarm is raised, and then control passes to the point A.
[0065] Figure 23 is a flow diagram showing part of an ACH (Air Changes per Hour) recommendation
logic 322. The ACH recommendation logic 322 begins at point A, and then passes to
a decision block 324, where a determination is made as to whether the current error
is larger than an offset (such as 0). If so, control passes to block 326 where several
parameters are updated. Control then passes to block 328. If at decision block 324
the answer was no, control passes to decision block 330, where a determination is
made as to whether the present slope exceeds a present ideal slope. If yes, control
passes to block 332 and several parameters are updated. If not, control passes to
block 334 and several parameters are updated. From each of block 332 and 334, control
passes to block 328, where the error is calculated. Control passes to block 336, where
a change in ACH is determined, and then to block 338, where a change in ACH is calculated.
From there, control passes to block 340, wherein an incremental change in the clean
air flowrate is recommended. Control then passes to point B.
[0066] Figures 24 and 25 provide alternates to what may happen starting from point B. In
Figure 24, an approach 342 begins at block 344 with determining a recommended change
in ACH. At block 346, the outside air flowrate may be set based on a site-specific
control strategy. At block 348, the required supply air flowrate is calculated.
[0067] Figure 25 shows an approach 350 that begins with determining a recommended change
in ACH, as indicated at block 352. An optimization problem is formulated, as indicated
at block 354. In some instances, the following equations pertain to the optimization
problem:

where,

and
RHMA = xa_reqRHOA + (1 -
xa_req)
RHRA, Subject to:
hMA = Mixed Air Enthalpy
TMA = Mixed Air Temperature
RHMA = Mixed Air Relative Humidity
hRA = Return Air Enthalpy
TRA = Return Air Temperature
RHRA = Return Air Relative Humidity
xa = OA fraction
η = Filter efficiency
Control then passes to block 356, where the optimal supply air flowrate and outside
air flowrates are determined.
[0068] Having thus described several illustrative embodiments of the present disclosure,
those of skill in the art will readily appreciate that yet other embodiments may be
made and used within the scope of the claims hereto attached. It will be understood,
however, that this disclosure is, in many respects, only illustrative. Changes may
be made in details, particularly in matters of shape, size, arrangement of parts,
and exclusion and order of steps, without exceeding the scope of the disclosure. The
disclosure's scope is, of course, defined in the language in which the appended claims
are expressed.
1. A method for controlling an Air Handling Unit (AHU) of an HVAC (Heating, Ventilating
and Air Conditioning) system servicing a building space of a building, the AHU including
a return air duct for receiving return air from the building space, a filter for filtering
the return air, a heating and/or cooling unit for receiving and conditioning the return
air and providing the conditioned return air as supply air to the building space,
the AHU including a fan for providing a motive force to move the return air and the
supply air through the AHU, the method comprising:
determining when the indoor air quality in the building space falls below a threshold;
and
in response to determining that the indoor air quality in the building space has fallen
below the threshold, controlling the AHU to adjust one or more parameters of the supply
air of the AHU to increase a volume of supply air that is required to pass through
the filter to satisfy a heating and/or cooling call of the building space.
2. The method of claim 1, wherein in response to the heating and/or cooling call, the
AHU operates the fan and the heating and/or cooling unit of the AHU to provide supply
air to the building space that causes a temperature of the air in the building space
to move toward a temperature setpoint.
3. The method of claim 2, wherein controlling the AHU to adjust one or more parameters
of the supply air to increase the volume of supply air that is required to satisfy
a heating and/or cooling call of the building space includes controlling the heating
and/or cooling unit of the AHU to adjust a supply air temperature of the supply air
toward the temperature setpoint.
4. The method of claim 3, wherein controlling the AHU to adjust one or more parameters
of the supply air to increase the volume of supply air that is required to satisfy
a heating and/or cooling call of the building space includes controlling the fan of
the AHU to increase a flow rate of the supply air into the building space, which enables
a larger adjustment in the supply air temperature toward the temperature setpoint
while still being able to satisfy the heating and/or cooling call.
5. The method of claim 2, wherein in response to determining that the indoor air quality
in the building space has fallen below the threshold, the method comprising:
determining an air change rate for the building space that is sufficient to increase
the indoor air quality in the building space above the threshold;
determining whether the increased volume of supply air meets the determined air change
rate of the building space; and
when the volume of the supply air does not meet the determined air change rate for
the building space, adjusting one or more parameters of the supply air of the AHU
to further increase the volume of supply air that is required to satisfy the heating
and/or cooling call of the building space.
6. The method of claim 5, wherein controlling the AHU to adjust one or more parameters
of the supply air to increase the volume of supply air that is required to satisfy
a heating and/or cooling call of the building space includes controlling the heating
and/or cooling unit of the AHU to adjust a supply air temperature of the supply air
toward the temperature setpoint.
7. The method of claim 6, wherein when the supply air temperature of the supply air is
adjusted such that the AHU can no longer satisfy the heating and/or cooling call,
but the volume of the supply air still does not meet the determined air change rate
for the building space, adjusting the fan of the AHU to increase a flow rate of the
supply air into the building space.
8. The method of claim 1, wherein the AHU includes a fresh air intake damper for admitting
a fresh air ventilation air flow, and a mixed air duct for mixing the fresh air ventilation
air flow from the fresh air intake damper and return air from the return air duct
and providing a mixed air flow to the heating and/or cooling unit of the AHU, the
method comprising:
closing the fresh air intake damper to a minimum damper position in response to determining
that the indoor air quality in the building space has fallen below the threshold.
9. A method for controlling a fresh air intake of an Air Handling Unit (AHU) of an HVAC
(Heating, Ventilating and Air Conditioning) system servicing a building space of a
building, the AHU including a fresh air intake damper for admitting a fresh air ventilation
air flow, a return air duct for receiving return air from the building space, a mixed
air duct for mixing the fresh air ventilation air flow from the fresh air intake damper
and return air from the return air duct and providing a mixed air flow to a heating
and/or cooling unit of the AHU which supplies a supply air flow to the building space,
the AHU including a fan for providing a motive force to move the return air, the fresh
air ventilation air flow, the mixed air flow and the supply air flow through the AHU,
the method comprising:
accessing a plurality of control algorithms for controlling the fresh air intake damper
of the AHU, each of the plurality of control algorithms has one or more predefined
conditions, and each of the plurality of control algorithms has an assigned priority
relative to the other of the plurality of control algorithms;
determining which of the plurality of control algorithms have their one or more predefined
conditions satisfied if any, and if more than one of the plurality of control algorithms
have their one or more predefined conditions satisfied, selecting the control algorithm
that has the highest priority relative to the other of the more than one of the plurality
of control algorithms that have their one or more predefined conditions satisfied;
controlling the fresh air intake damper of the AHU using the selected control algorithm;
and
repeating the determining and controlling steps over time.
10. The method of claim 9, wherein the accessing, determining, controlling and repeating
steps are executed on premises.
11. The method of claim 9, wherein the plurality of control algorithms comprise one or
more of:
an indoor air quality parameter control algorithm that is configured to keep one or
more indoor air quality parameters in the building space below one or more indoor
air quality thresholds;
a pathogen transmission risk control algorithm that is configured to keep a pathogen
transmission risk in the building space below a pathogen transmission risk threshold;
a demand control ventilation control algorithm that is configured to maintain a balance
between one or more indoor air quality parameters and energy consumption of the AHU;
an energy minimization control algorithm that is configured to minimize energy consumption
of the AHU by controlling the fresh air intake damper at a minimum ventilation position;
and
an economizer control algorithm that is configured to control the fresh air intake
damper to achieve free heating and/or cooling when available.
12. The method of claim 9, wherein one of the one or more predefined conditions of at
least one of the plurality of control algorithms includes having a particular sensor
available to the AHU.
13. The method of claim 9, wherein one of the one or more predefined conditions of at
least one of the plurality of control algorithms includes having one or more sensed
values meet one or more predefined conditions.
14. A method for controlling an Air Handling Unit (AHU) of an HVAC (Heating, Ventilating
and Air Conditioning) system servicing a building space of a building, the AHU including
a return air duct for receiving return air from the building space, a filter for filtering
pathogens from the return air, a heating and/or cooling unit for receiving and conditioning
the return air and providing the conditioned return air to the building space as supply
air, the AHU including a fan for providing a motive force to move the return air and
the supply air through the AHU, the method comprising:
determining a pathogen transmission risk function that monotonically increases over
time and is dependent on a pathogen transmission risk in the building space, the pathogen
transmission risk function is based at least in part on an occupancy of the building
space, a pulmonary ventilation rate, a quanta generation rate and a clean air flow
rate of substantially pathogen free air into the building space;
determining an ideal monotonically increasing pathogen transmission risk curve extending
from an occupied start time to an occupied end time of the building space;
tracking the pathogen transmission risk function against the ideal monotonically increasing
pathogen transmission risk curve;
determining when the pathogen transmission risk function begins to exceed the ideal
monotonically increasing pathogen transmission risk curve for at least a period of
time; and
in response to determining that the pathogen transmission risk function exceeds the
ideal monotonically increasing pathogen transmission risk curve for at least a period
of time, controlling the AHU to increase the clean air flow rate of substantially
pathogen free air into the building space.
15. The method of claim 14, further comprising:
projecting a value of the pathogen transmission risk function at the occupied end
time, resulting in a projected pathogen transmission risk value;
determining when the projected pathogen transmission risk value exceeds the ideal
monotonically increasing pathogen transmission risk curve at the occupied end time
by at least a warning amount; and
in response to determining that the projected pathogen transmission risk value exceeds
the ideal monotonically increasing pathogen transmission risk curve at the occupied
end time by at least the warning amount, issuing a warning alert to a user via a user
interface.