[Technical Field]
[0001] The present disclosure relates to a management system, an air-conditioning equipment
management method, and a program.
[Background Art]
[0002] Patent Literature 1 discloses a temperature control device of an air conditioner
which performs control so that a set temperature of the air conditioner changes stepwise
in accordance with change of an outside air temperature.
[Citation List]
[Patent Literature]
[Summary of Invention]
[Technical Problem]
[0004] The present disclosure provides a management system capable of maintaining comfort
in an air-conditioned space and reducing energy consumption of air-conditioning equipment.
[Solution to Problem]
[0006] A management system in the present disclosure includes a setting unit that sets a
set temperature to air-conditioning equipment, an acquisition unit that acquires operation
data indicating temperature change operation of changing the set temperature of the
air-conditioning equipment, a determination unit that determines whether or not the
acquired operation data acquired by the acquisition unit in a predetermined period
satisfies a condition necessary for processing of determining a control parameter
for executing control of the air-conditioning equipment, and a processing unit that
determines the control parameter including at least the set temperature of the air-conditioning
equipment based on the acquired operation data in a case where it is determined that
the acquired operation data satisfies the condition, and in a case where the determination
unit determines that the acquired operation data does not satisfy the condition, the
setting unit changes the set temperature of the air-conditioning equipment, and the
acquisition unit acquires the operation data.
[Advantageous Effects of Invention]
[0007] A management system in the present disclosure can acquire sufficient data regarding
operation of changing a set temperature of air-conditioning equipment to determine
a control parameter of the air-conditioning equipment. It is therefore possible to
determine an appropriate control parameter regarding control of the air-conditioning
equipment.
[Brief Description of Drawings]
[0008]
Fig. 1 is a view illustrating a configuration of a management system.
Fig. 2 is a block diagram of a management server.
Fig. 3 is a flowchart indicating operation of the management system.
Fig. 4 is a sequence diagram indicating operation data acquisition processing.
Fig. 5 is a flowchart indicating operation data determination processing.
Fig. 6 is a diagram indicating an example of a regression straight line.
Fig. 7 is a flowchart indicating an example of control parameter generation processing.
Fig. 8 is a diagram indicating an example of a regression straight line.
Fig. 9 is a flowchart indicating another example of the control parameter generation
processing.
Fig. 10 is a flowchart indicating still another example of the control parameter generation
processing.
Fig. 11 is an explanatory diagram indicating an aspect of operation of air-conditioning
equipment based on a control parameter.
Fig. 12 is a sequence diagram indicating operation of the management system
Fig. 13 is a diagram indicating an example of display data based on comparison data.
Fig. 14 is a diagram indicating another example of the display data based on the comparison
data.
[Description of Embodiment]
(Knowledge, and the like, that are basis of the present disclosure)
[0009] At the time when the present inventors have conceived of the present disclosure,
there has been a technique of detecting an outside air temperature of a building in
which air-conditioning equipment is installed and changing a set temperature of the
air-conditioning equipment in accordance with change of the outside air temperature.
[0010] However, the outside air temperature is merely one of the elements that affect comfort
in an air-conditioned space, and thus, even if the set temperature of the air-conditioning
equipment is changed based on the outside air temperature, comfort in the air-conditioned
space is less likely to be secured. Thus, the present inventors have found a problem
that the set temperature of the air-conditioning equipment is often changed to secure
comfort in the air-conditioned space, which makes it difficult to reduce energy consumption
of the air-conditioning equipment, and have achieved a configuration of a subject
matter of the present disclosure to solve the problem. Further, the present inventors
have also found a problem that in a case where the set temperature of the air-conditioning
equipment is changed, a user typically tends to excessively demand comfort, which
makes it more likely to increase energy consumption of the air-conditioning equipment,
and have achieved the configuration of the subject matter of the present disclosure
to solve the problem. Note that excessively demanding comfort indicates, for example,
lowering the set temperature more than necessary during cooling operation and raising
the set temperature more than necessary during heating operation.
[0011] The present disclosure therefore provides a management system capable of maintaining
comfort in an air-conditioned space and reducing energy consumption of air-conditioning
equipment.
[0012] An embodiment will be described in detail below with reference to the drawings. However,
explanation that is detailed more than necessary may be omitted. For example, detailed
description of matters that have already been well known or redundant description
of components that are substantially the same may be omitted.
[0013] Note that the accompanying drawings and the following description are provided for
a person skilled in the art to sufficiently understand the present disclosure and
are not intended to limit the subject matter recited in the claims.
[1. Configuration of air-conditioning monitoring system]
[0014] Fig. 1 is a view illustrating a configuration of a management system 1000.
[0015] The management system 1000 is a management system of air-conditioning equipment 10,
the management system including a management server 100 communicably connected to
a plurality of pieces of air-conditioning equipment 10, and the management server
100 making setting regarding operation of the air-conditioning equipment 10.
[0016] The air-conditioning equipment 10 to be managed by the management server 100 only
requires to be communicably connected to the management server 100. There is no limitation
in the number of pieces of the air-conditioning equipment 10 connected to the management
server 100 and a place where the air-conditioning equipment 10 is installed. Fig.
1 illustrates an example where air-conditioning equipment 10A is installed in a facility
1A, air-conditioning equipment 10B is installed in a facility 1B, air-conditioning
equipment 10C is installed in a facility 1C, and air-conditioning equipment 10D is
installed in a facility 1D. In a case where the respective pieces of the air-conditioning
equipment 10A, 10B, 10C and 10D are not distinguished, they will be expressed as air-conditioning
equipment 10. Further, there is no limitation in a specific configuration of the air-conditioning
equipment 10. While in the present embodiment, description will be provided assuming
that the air-conditioning equipment 10 is a packaged air conditioner or a room air
conditioner which operates with electric power, the air-conditioning equipment 10
may be gas heat pump (GHP)-type air conditioning equipment that operates with gas
energy.
[0017] Each of the facilities 1A, 1B, 1C and 1D has an air-conditioned space. The air-conditioned
space is a space in which air is to be conditioned by the air-conditioning equipment
10. In a case where the facilities 1A, 1B, 1C and 1D are not distinguished, they will
be expressed as a facility 1. The air-conditioned space of the facility 1 may be the
entire building or may be a space partitioned inside the building. Scales and types
of the facility 1 and the air-conditioned space are not limited. The air-conditioned
space is, for example, a house, an office, a store, a medical facility, a public facility
or other facilities. While examples of air conditioning of the air-conditioned space
can include heating, cooling, dehumidification, blast, ventilation, and the like,
in the present embodiment, a case will be described where the air-conditioned space
is cooled and heated by the air-conditioning equipment 10.
[0018] The management server 100 may be constituted with one server computer or may have
a configuration in which a plurality of server computers functions as the management
server 100. The management server 100 may be a so-called cloud server.
[0019] A communication network N is a communication line including a dedicated line, a public
network, the Internet, and the like. The communication network N may include network
devices (not illustrated) such as a Wi-Fi (registered trademark) router, a switch,
a router, a gateway and various kinds of server devices. Further, the communication
network N may include a wireless base station installed by a telecommunication carrier.
[0020] The management system 1000 includes a device to be used by a manager who manages
the air-conditioning equipment 10. In the example in Fig. 1, the management system
1000 includes a terminal device 5 and a mobile terminal device 7 as examples of a
device to be used by the manager. The terminal device 5 and the mobile terminal device
7 have a function of communicating with the management server 100. Specific configurations
of the terminal device 5 and the mobile terminal device 7 are not limited. For example,
the terminal device 5 may be a personal computer (PC), a smartphone, a tablet computer,
or a wearable terminal such as a smartwatch. This similarly applies to the mobile
terminal device 7. The number of terminal devices 5 and mobile terminal devices 7
included in the management system 1000 is not limited.
[0021] The terminal device 5 illustrated in Fig. 1 is a laptop-type PC and includes a display
51. The mobile terminal device 7 is a smartphone and includes a display 71 that functions
as a touch panel. The terminal device 5 and the mobile terminal device 7 display information
regarding a power consumption amount and a use state of the air-conditioning equipment
10 on the displays 51 and 71 based on data generated by the management server 100.
[0022] The air-conditioning equipment 10A includes a control device 11, an outdoor unit
12, an indoor unit 13, an operation unit 14, a communication device 15, and an outside
air temperature sensor 18. The air-conditioning equipment 10B, 10C, 10D and other
air-conditioning equipment 10 are constituted in a similar manner. Note that the configuration
in Fig. 1 is one example, and there is no limitation in the number of outdoor units
12 and indoor units 13 included in the air-conditioning equipment 10A. For example,
the air-conditioning equipment 10A may have a configuration in which a plurality of
indoor units 13 performs air conditioning of a plurality of air-conditioned spaces
in the facility 1A.
[0023] The outdoor unit 12, while not illustrated, includes a compressor, various kinds
of valves such as a four-way valve and an on-off valve, an outdoor heat exchanger
and a refrigerant circuit that connects these. The indoor unit 13 includes various
kinds of valves such as an expansion valve and an on-off valve, an indoor heat exchanger
and a refrigerant circuit that connects these. The refrigerant circuit of the outdoor
unit 12 is connected to the refrigerant circuit of the indoor unit 13.
[0024] The control device 11 is connected to the outdoor unit 12, the indoor unit 13, the
operation unit 14 and the outside air temperature sensor 18. The control device 11
causes the air-conditioning equipment 10 to operate so that an air temperature of
the air-conditioned space becomes a set target temperature by controlling operation
of the compressor provided in the outdoor unit 12 and opening and closing of valves
provided in the outdoor unit 12 and the indoor unit 13. The control device 11, for
example, includes a memory and a processor and controls the air-conditioning equipment
10A in accordance with data stored in the memory by the processor executing the program
stored in the memory. The processor of the control device 11 is, for example, a micro
controller integrated with the memory. The control device 11 corresponds to one example
of a control unit in the present disclosure.
[0025] The outside air temperature sensor 18 is connected to the control device 11. The
outside air temperature sensor 18 is a temperature sensor that detects an air temperature,
and a detection scheme of the outside air temperature sensor 18 is not limited. The
outside air temperature sensor 18 is, for example, installed in the outdoor unit 12.
[0026] The target temperature set in the air-conditioning equipment 10A will be referred
to as a "set temperature" in the following description.
[0027] The operation unit 14 includes a switch, and the like, that operate the air-conditioning
equipment 10A. The operation unit 14 is, for example, a controller installed in the
facility 1A. By operating the operation unit 14, it is possible to instruct the control
device 11 to start operation, stop operation and change the set temperature of the
air-conditioning equipment 10A. The control device 11 starts operation, stops operation,
changes the set temperature, or the like, of the air-conditioning equipment 10A in
accordance with operation of the operation unit 14. In the following description,
operation of changing the set temperature of the air-conditioning equipment 10 among
the operation to be performed by the operation unit 14 will be referred to as temperature
change operation.
[0028] The communication device 15 is a device that executes communication with the management
server 100 via the communication network N. The communication device 15 is connected
to the communication network N via a public network, a wide area network (WAN), a
local area network (LAN), an IP communication network, or the like, and executes data
communication. The communication device 15 may be a wireless communication device
that is connected to the communication network N by executing wireless communication
such as a cellular communication scheme and Wi-Fi. The communication device 15 receives
setting data SD which will be described later from the management server 100 and transmits
operation data RD which will be described later to the management server 100. The
communication device 15 corresponds to one example of a transmission unit in the present
disclosure.
[0029] The air-conditioning equipment 10B, 10C and 10D and other air-conditioning equipment
10 included in the management system 1000 have configurations similar to the configuration
of the air-conditioning equipment 10A. The air-conditioning equipment 10 includes
the control device 11. The control device 11 performs air conditioning of the air-conditioned
space by causing the outdoor unit 12 and the indoor unit 13 to operate in accordance
with operation of the operation unit 14.
[0030] The management server 100 transmits the setting data SD to the air-conditioning equipment
10 connected to the management server 100. The setting data SD and operation regarding
the operation data RD which will be described later are common among all pieces of
the air-conditioning equipment 10 managed by the management server 100.
[0031] The setting data SD includes the set temperature of the air-conditioning equipment
10 and specifically includes the set temperature during cooling operation and the
set temperature during heating operation. The control device 11 receives the setting
data SD by the communication device 15 and causes the air-conditioning equipment 10
to operate at the set temperature designated by the received setting data SD.
[0032] The setting data SD may include information regarding temperature change operation.
Specifically, the setting data SD may include information as to whether or not to
allow the temperature change operation. The setting data SD may include information
that gives an instruction to restore the set temperature to the temperature before
the change in a case where the control device 11 changes the set temperature in accordance
with the temperature change operation. In this case, the setting data SD may include
information that designates a time limit from when the set temperature is changed
until when the set temperature is restored to the temperature before the change.
[0033] The control device 11 determines whether or not to allow the temperature change
operation in accordance with the setting data SD. In a case where the setting data
SD designates allowance of the temperature change operation, the control device 11
changes the set temperature in accordance with the temperature change operation.
[0034] Further, the management server 100 transmits to the air-conditioning equipment 10,
a control parameter CP to be used by the control device 11 to determine the set temperature
of the air-conditioning equipment 10 based on the outside air temperature detected
by the outside air temperature sensor 18. The control device 11 autonomously determines
the set temperature of the air-conditioning equipment 10 based on the control parameter
CP received by the communication device 15. The control parameter CP will be described
later.
[0035] In the present embodiment, in the facility 1, it is possible to start operation,
stop operation and switch operation between cooling and heating of the air-conditioning
equipment 10 by the operation of the operation unit 14. The set temperature of the
air-conditioning equipment 10 is a temperature designated by the setting data SD or
a temperature determined by the control device 11 in accordance with the control parameter
CP. Further, in the air-conditioning equipment 10, it is allowed to change the set
temperature in accordance with operation of the temperature change operation. In a
case where the control device 11 accepts the temperature change operation, the control
device 11 changes the set temperature in accordance with the temperature change operation
and restores the set temperature to the temperature before the change after a predetermined
time limit has elapsed since the change of the set temperature.
[0036] The control device 11 generates the operation data RD indicating that the temperature
change operation has been accepted, and the communication device 15 transmits the
operation data RD to the management server 100. As illustrated in Fig. 1, the operation
data RD includes, for example, at least one of a facility ID or an air conditioner
ID. The facility ID is identification information that identifies each of the facilities
1A, 1B, 1C, 1D and other facilities 1. The air conditioner ID is identification information
that identifies each of the air-conditioning equipment 10A, 10B, 10C, 10D and other
air-conditioning equipment 10.
[0037] The operation data RD includes date and time at which the temperature change operation
has been performed and an outside air temperature when the operation has been performed.
The operation data RD may include the changed set temperature.
[0038] The management server 100 receives and stores the operation data RD transmitted by
the air-conditioning equipment 10. The management server 100 determines the control
parameter CP to be used for processing of determining the set temperature of the air-conditioning
equipment 10 in accordance with the outside air temperature based on the operation
data RD. The management server 100 determines the control parameter CP for each facility
1 or for each of the air-conditioning equipment 10.
[0039] Setting the set temperature of the air-conditioning equipment 10 while giving priority
to comfort of a person in the air-conditioned space is not recommended in terms of
energy saving. Specifically, for example, if the person in the air-conditioned space
is allowed to freely change the set temperature by operating the operation unit 14,
energy consumption of the air-conditioning equipment 10 is not taken into account,
and thus, it is considered that energy consumption becomes large. It is therefore
considered to limit the set temperature of air conditioning in terms of energy saving.
For example, the Ministry of Economy, Trade and Industry recommends that the set temperature
of air conditioning should be 28 °C during cooling operation in summer and should
be 20 °C during heating operation in winter. However, in a case where these temperatures
are set as the set temperature of the air-conditioning equipment 10, comfort in the
air-conditioned space may become low, which means that achieving both comfort in the
air-conditioned space and energy saving is a challenge.
[0040] An indoor temperature of the air-conditioned space is affected by the outside air
temperature. Further, a position and a shape of a building, a position of the air-conditioned
space in the building, sunlight of the air-conditioned space, and the like, affect
the indoor temperature of the air-conditioned space. If the set temperature of the
air-conditioning equipment 10 is determined based on only the outside air temperature
without these factors being taken into account, a possibility of lowering the comfort
in the air-conditioned space of the air-conditioning equipment 10 cannot be excluded.
[0041] Thus, the management system 1000 of the present embodiment enables determination
of the set temperature of the air-conditioning equipment 10 in accordance with characteristics
of the air-conditioned space. In other words, the management server 100 generates
the control parameter CP for determining the set temperature of the air-conditioning
equipment 10 based on the outside air temperature for each of the air-conditioning
equipment 10 and transmits the control parameter CP to the air-conditioning equipment
10. The air-conditioning equipment 10 determines the set temperature from the outside
air temperature detected by the outside air temperature sensor 18 in accordance with
the control parameter CP transmitted by the management server 100. The control parameter
CP generated by the management server 100 is adapted to a state of each of the air-conditioning
equipment 10. Thus, in each of the air-conditioning equipment 10, it is possible to
achieve reduction in energy consumption while maintaining comfort in the air-conditioned
space.
[2. Configuration of management server]
[0042] Fig. 2 is a block diagram of the management server 100.
[0043] The management server 100 includes a control unit 110 and a server communication
device 150.
[0044] The control unit 110 includes a processor 120 and a memory 130. The processor 120
is constituted with a central processing unit (CPU), a micro-processing unit (MPU),
and other arithmetic processing devices. The memory 130 is a storage device that stores
programs to be executed by the processor 120 and data in a non-volatile manner. The
memory 130 is constituted with a magnetic storage device, a semiconductor storage
element or other types of non-volatile storage devices. Specifically, the memory 130
includes a hard disk drive (HDD), a flash read only memory (ROM), a solid state drive
(SSD) constituted with the flash ROM, and the like. The memory 130 may include a random
access memory (RAM) constituting a work area of the processor 120. The processor 120
is one example of a computer in the present disclosure.
[0045] The memory 130 stores a control program 131 to be executed by the processor 120.
The control program 131 corresponds to one example of a program in the present disclosure.
[0046] The memory 130 stores temperature setting data 132, a history database (DB) 133,
the control parameter CP and a power consumption amount DB 135. These are data to
be processed or generated by the processor 120.
[0047] The temperature setting data 132 is data of the set temperature of the air-conditioning
equipment 10. The temperature setting data 132 includes data of the set temperature
included in the setting data SD. The temperature setting data 132 may be data of the
set temperature common to all the air-conditioning equipment 10. Further, the temperature
setting data 132 may include data of the set temperature different for each of the
air-conditioning equipment 10 or each facility 1.
[0048] The history DB 133 includes history of the temperature change operation in the air-conditioning
equipment 10.
[0049] Fig. 2 illustrates a configuration example of the history DB 133. The history DB
133 stores data of the temperature change operation performed in the air-conditioning
equipment 10. The data stored in the history DB 133 is, for example, data in a record
format in which the air conditioner ID is associated with a setting change history.
This configuration is one example, and in place of the air conditioner ID, the facility
ID may be associated with the setting change history in the record stored in the history
DB 133.
[0050] One record stored in the history DB 133 corresponds to one time of the temperature
change operation in one piece of air-conditioning equipment 10. In the record of the
history DB 133, the setting change history includes date and time at which setting
has been changed, a type of operation, an outside air temperature, a set temperature
and the changed set temperature. The date and time at which setting has been changed
is date and time at which the set temperature has been changed in accordance with
operation of the operation unit 14 and is substantially the same as date and time
at which the control device 11 has accepted the operation of the operation unit 14.
The type of operation indicates an operating state of the air-conditioning equipment
10 when the temperature change operation is performed. In the present embodiment,
the type of operation is either cooling or heating. The outside air temperature is
an outside air temperature when the temperature change operation is performed. The
set temperature is a set temperature of the air-conditioning equipment 10 when the
temperature change operation is performed. This set temperature is a temperature designated
by the management server 100 to the air-conditioning equipment 10 by the setting data
SD. The changed set temperature is the set temperature of the air-conditioning equipment
10 changed as a result of the temperature change operation being performed.
[0051] In this manner, the history DB 133 includes a history of the temperature change operation
in association with the air conditioner ID for each of the air-conditioning equipment
10. While the example of Fig. 2 illustrates only records in a case where the type
of operation is cooling, the history DB 133 can store data received by the management
server 100 throughout the year.
[0052] The control parameter CP is data for the control device 11 to autonomously determine
the set temperature of the air-conditioning equipment 10. The control parameter CP
may be data to be processed by the control device 11. Further, the control parameter
CP may be a program that specifies arithmetic processing to be executed by the control
device 11 or an arithmetic expression for the arithmetic processing to be executed
by the control device 11. Further, the control parameter CP may include coefficients
and constants to be used in the arithmetic processing to be executed by the control
device 11. The control parameter CP includes at least the set temperature of the air-conditioning
equipment 10 corresponding to the outside air temperature or data for determining
the set temperature.
[0053] The power consumption amount DB 135 stores data indicating a power consumption amount
of the air-conditioning equipment 10. The power consumption amount DB 135, for example,
stores data indicating the power consumption amount in association with the air conditioner
ID of the air-conditioning equipment 10. The data to be stored in the power consumption
amount DB 135 is, for example, data of the power consumption amount for each day.
A range of the data can be changed as appropriate, and the data to be stored in the
power consumption amount DB 135 may be data of the power consumption amount for each
facility 1.
[0054] The processor 120 controls respective units of the management server 100 by executing
the control program 131. The processor 120 includes an acquisition unit 121, a determination
unit 122, a setting unit 123 and a processing unit 124 as functional units. These
respective functional units are implemented by cooperation of software and hardware
by the processor 120 executing the control program 131.
[0055] A server communication device 150 is connected to the control unit 110. The server
communication device 150 is a communication device connected to the communication
network N. The server communication device 150 includes, for example, a connector
connecting a communication cable, and an interface circuit that inputs/outputs signals
through the connector. Further, for example, the server communication device 150 may
be a wireless communication device which includes an antenna and a wireless circuit
and which is connected to the communication network N via a wireless communication
line.
[0056] The acquisition unit 121 executes communication with the air-conditioning equipment
10 by the server communication device 150 to receive the operation data RD from the
air-conditioning equipment 10. The acquisition unit 121 adds the data to the history
DB 133 based on the operation data RD to update the history DB 133.
[0057] Further, the acquisition unit 121 executes communication with the air-conditioning
equipment 10 by the server communication device 150 to receive data regarding the
power consumption amount from the air-conditioning equipment 10. The acquisition unit
121 adds the data to the power consumption amount DB 135 based on the received data
to update the power consumption amount DB 135.
[0058] The determination unit 122 determines whether or not the data acquired by the acquisition
unit 121 satisfies a condition necessary for processing of determining the control
parameter CP. For example, the determination unit 122 determines whether or not the
number of pieces of the data acquired by the acquisition unit 121 is equal to or larger
than the number necessary for processing of determining the control parameter CP.
[0059] The setting unit 123 sets the set temperature of the air-conditioning equipment 10.
For example, the setting unit 123 generates the setting data SD based on the temperature
setting data 132 and transmits the setting data SD to the air-conditioning equipment
10 by the server communication device 150.
[0060] The processing unit 124 generates the control parameter CP based on the data stored
in the history DB 133. Generating the control parameter CP is synonymous with determining
the control parameter CP. The processing unit 124, for example, generates the control
parameter CP for each of the air-conditioning equipment 10 and stores the control
parameter CP in the memory 130. The control parameter CP stored in the memory 130
is transmitted to the air-conditioning equipment 10 by the temperature setting data
132.
[0061] The processing unit 124 generates comparison data that compares a case where the
air-conditioning equipment 10 operates not based on the control parameter CP and a
case where the air-conditioning equipment 10 operates in accordance with the control
parameter CP. The processing unit 124, for example, generates the comparison data
that compares the power consumption amount based on the data stored in the power consumption
amount DB 135. In this case, the comparison data is data that compares the power consumption
amount in a case where the air-conditioning equipment 10 operates at a temperature
designated by the setting data SD and the power consumption amount in a case where
the air-conditioning equipment 10 operates while determining the set temperature in
accordance with the control parameter CP. The comparison data includes, for example,
a graph and a table that visually compares the power consumption amount in a case
where the air-conditioning equipment 10 operates at the set temperature designated
by the setting data SD and the power consumption amount in a case where the air-conditioning
equipment 10 operates while determining the set temperature in accordance with the
control parameter CP. The comparison data is transmitted to one or both of the terminal
device 5 and the mobile terminal device 7 and displayed at the display 51 and the
display 71.
[3. Operation of management system]
[0062] Fig. 3 is a flowchart indicating operation of the management system 1000.
[0063] In Fig. 3, operation in step SA1 to SA2, SA4 to SA9, SA1 1, and SA13 to SA15 is executed
by the management server 100. Operation in step SA3, SA10 and SA12 is executed by
the management server 100 and the air-conditioning equipment 10.
[0064] The processing unit 124 determines a control parameter generation condition (step
SA1). The processing unit 124 generates the control parameter CP corresponding to
each of the air-conditioning equipment 10 that is to be managed by the management
server 100. Further, the processing unit 124 generates the control parameter CP for
heating operation of the air-conditioning equipment 10 and the control parameter CP
for cooling operation. Thus, in step SA1, the processing unit 124 determines the control
parameter generation condition that is a condition regarding generation of the control
parameter CP. The control parameter generation condition specifically includes the
air conditioner ID of the air-conditioning equipment 10 to which the control parameter
CP is to be applied. The control parameter generation condition may include a type
of operation to which the control parameter CP is to be applied. The type of operation
is heating or cooling.
[0065] By the determination in step SA1, the air-conditioning equipment 10 for which the
control parameter CP is to be generated is specified. The management server 100 can
execute operation in Fig. 3 on a plurality of pieces of the air-conditioning equipment
10 in parallel. In the following description, an example of a case will be described
where in step SA1, it is determined that the air-conditioning equipment for which
the control parameter CP is to be generated is the air-conditioning equipment 10A.
[0066] The setting unit 123 transmits the setting data SD including the set temperature
to the air-conditioning equipment 10A for which the control parameter CP is to be
generated (step SA2).
[0067] The acquisition unit 121 executes operation data acquisition processing on the air-conditioning
equipment 10A (step SA3). The operation data acquisition processing is processing
of acquiring the operation data RD from the air-conditioning equipment 10A and accumulating
the operation data RD in the history DB 133.
[0068] Fig. 4 is a sequence diagram indicating the operation data acquisition processing
to be executed in step SA3 in Fig. 3. In Fig. 4, step SB1 to SB4 indicates operation
of the management server 100, and step SC1 to SC9 indicates operation of the air-conditioning
equipment 10. Here, an example will be described where the air-conditioning equipment
10A executes step SC1 to SC9.
[0069] The control device 11 receives the setting data SD transmitted by the management
server 100 and starts operation of the air-conditioning equipment 10A in accordance
with the setting data SD (step SC1). During operation of the air-conditioning equipment
10A, the control device 11 determines whether or not temperature change operation
is performed by the operation unit 14 (step SC2). In a case where it is determined
that the temperature change operation is not performed (step SC2: No), the processing
of the control device 11 transitions to step SC7 which will be described later.
[0070] In a case where it is determined that the temperature change operation is performed
(step SC2: Yes), the control device 11 changes the set temperature of the air-conditioning
equipment 10A in accordance with the temperature change operation (step SC3). The
control device 11 generates the operation data RD including content of the temperature
change operation by the operation unit 14 (step SC4). The control device 11 determines
whether or not a restoration timing of restoring the set temperature has come (step
SC5), and in a case where the restoration timing has not come (step SC5: No), the
control device 11 stands by while continuing operation of the air-conditioning equipment
10A.
[0071] The restoration timing is, for example, determined by a time limit from when the
set temperature has been changed in accordance with the temperature change operation.
The time limit is, for example, designated by the setting data SD. For example, in
a case where the time limit is 30 minutes, the control device 11 determines that the
restoration timing has come when 30 minutes have elapsed since the change of the set
temperature in step SC3 (step SC5). The restoration timing may be determined based
on a time point. For example, the control device 11 may set the first hour after the
set temperature has been changed as the restoration timing or may set the second hour
after the set temperature has been changed as the restoration timing. Also in this
case, the restoration timing is designated by the setting data SD. This configuration
can be applied to a case where the control device 11 includes a real time clock (RTC)
and can acquire current time.
[0072] In a case where it is determined that the restoration timing has come (step SC5:
Yes), the control device 11 returns the set temperature of the air-conditioning equipment
10A to the set temperature before the change (step SC6). The set temperature before
the change is the set temperature before the set temperature has been changed in step
SC3. Then, the processing of the control device 11 transitions to step SC6.
[0073] In step SC6, the control device 11 determines whether or not a transmission timing
of transmitting the operation data RD has come (step SC7). In a case where it is determined
that the transmission timing has not come (step SC7: No), the processing of the control
device 11 returns to step SC2. In a case where it is determined that the transmission
timing has come (step SC7: Yes), the control device 11 transmits the operation data
RD to the management server 100 by the communication device 15 (step SC8).
[0074] The transmission timing is designated by the setting data SD or set to the control
device 11 in advance. The transmission timing may be one or a plurality of time points
in a day. In this case, the control device 11 transmits the operation data RD once
or a plurality of times in one day. The control device 11 generates the operation
data RD corresponding to the temperature change operation performed until the transmission
timing has come and transmits the operation data RD to the management server 100.
The control device 11 may generate the operation data RD including data regarding
a plurality of times of the temperature change operation or may collectively transmit
a plurality of pieces of the operation data RD each corresponding to one time of the
temperature change operation to the management server 100. The transmission timing
may be once in a plurality of days or may be a longer period. Further, the transmission
timing may be determined by the number of times of the temperature change operation.
For example, the transmission timing may be a timing every time the temperature change
operation is performed the set number of times.
[0075] The acquisition unit 121 receives the operation data RD transmitted by the air-conditioning
equipment 10A (step SB1). The acquisition unit 121 stores information included in
the received operation data RD in the history DB 133 in association with the air conditioner
ID of the air-conditioning equipment 10A to update the history DB 133 (step SB2).
[0076] Further, the control device 11 transmits data indicating the power consumption amount
of the air-conditioning equipment 10A to the management server 100 (step SC9). The
acquisition unit 121 receives the data of the power consumption amount transmitted
by the air-conditioning equipment 10A (step SB3). The acquisition unit 121 stores
the received data of the power consumption amount in the power consumption amount
DB 135 in association with the air conditioner ID of the air-conditioning equipment
10A to update the power consumption amount DB 135 (step SB4).
[0077] The air-conditioning equipment 10A executes operation in accordance with operation
of starting operation, operation of ending operation and operation of changing the
temperature by the operation unit 14 unless an instruction is provided from the management
server 100 and repeats operation from step SC1 to SC10.
[0078] In the operation example in Fig. 4, a frequency of the control device 11 transmitting
the operation data RD is equal to a frequency of transmitting the data of the power
consumption amount. This is one example, and, for example, a timing of transmitting
the data of the power consumption amount may be different from a timing of transmitting
the operation data RD. For example, the control device 11 may transmit the data of
the power consumption amount of the air-conditioning equipment 10A of each day to
the management server 100 at a timing of once per week or once per month in step SC9.
[0079] Further, the control device 11 may be configured to generate the operation data RD
only for temperature change operation of giving an instruction to change the temperature
in a specific direction among the temperature change operation. The specific direction
is, for example, a direction of improving comfort in the air-conditioned space of
the air-conditioning equipment 10A. In this case, the temperature change operation
of giving an instruction to change the temperature in the specific direction is specifically
temperature change operation of changing the set temperature to a lower temperature
during cooling operation of the air-conditioning equipment 10A and temperature change
operation of changing the set temperature to a higher temperature during heating operation.
Further, the specific direction may be a direction in which the power consumption
amount of the air-conditioning equipment 10A increases.
[0080] In this case, in a case where it is determined that the temperature change operation
is performed (step SC2: Yes), the control device 11 changes the set temperature of
the air-conditioning equipment 10A in step SC3 regardless of a temperature change
direction. Then, the control device 11 generates the operation data RD in step SC4
in a case where the temperature change operation is temperature change operation of
changing the set temperature in the specific direction. Further, in a case where the
temperature change operation is not operation of changing the set temperature in the
specific direction, the control device 11 skips step SC4. By this means, data regarding
the temperature change operation in the specific direction is accumulated in the history
DB 133.
[0081] Returning to Fig. 3, the determination unit 122 determines whether or not a predetermined
period set in advance has elapsed since start of the operation data acquisition processing
in step SA3 (step SA4). The predetermined period is a period set in advance and may
be, for example, one week, one month, several months or a longer period.
[0082] In a case where it is determined that the predetermined period has not elapsed (step
SA4: No), the determination unit 122 determines whether or not an amount of the operation
data RD acquired in step SA3 is excessive (step SA5). The acquisition unit 121 and
the air-conditioning equipment 10A repeatedly execute the operation data acquisition
processing in step SA3 until the predetermined period elapses. The determination unit
122 determines whether or not the number of pieces of the acquired operation data
RD is excessive at a halfway time point until the predetermined period elapses. In
step SA5, the determination unit 122, for example, compares a threshold determined
corresponding to a period from when the operation data acquisition processing in step
SA3 has been started with the number of pieces of data stored in the history DB 133.
[0083] In a case where the determination unit 122 determines that the acquired data is not
excessive (step SA5: No), the processing returns to step SA3, and the acquisition
unit 121 executes operation data acquisition processing with the air-conditioning
equipment 10A.
[0084] In a case where the determination unit 122 determines that the acquired data is excessive
(step SA5: Yes), the setting unit 123 changes an operating condition of the air-conditioning
equipment 10A (step SA6). The operating condition includes the set temperature of
the air-conditioning equipment 10A. The operating condition includes the restoration
timing of the air-conditioning equipment 10A. In step SA6, the setting unit 123 transmits
the setting data SD that designates the changed operating condition of the air-conditioning
equipment 10A to the air-conditioning equipment 10A.
[0085] In step SA6, the setting unit 123 changes the operating condition so as to reduce
or make it difficult to increase the number of times of temperature change operation
at the air-conditioning equipment 10A. In other words, the setting unit 123 changes
the operating condition so as to increase comfort in the air-conditioned space of
the air-conditioning equipment 10A. For example, the setting unit 123 changes the
set temperature to a lower temperature in a case where the air-conditioning equipment
10A performs cooling operation and sets the set temperature to a higher temperature
during heating operation. Further, the setting unit 123 may delay the restoration
timing. In this case, a period required for the set temperature changed by the temperature
change operation to return to the temperature before the change becomes longer, so
that it is possible to prevent the temperature change operation.
[0086] On the other hand, in a case where it is determined that the predetermined period
has elapsed (step SA4: Yes), the determination unit 122 executes operation data determination
processing (step SA7). The operation data determination processing is processing of
determining whether or not data included in the history DB 133 is data sufficient
for determining the control parameter CP.
[0087] As described above, the determination unit 122 may set the number of times of temperature
change operation as a criterion for determining whether or not the data is sufficient
for determining the control parameter CP. In this case, the determination unit 122
determines whether or not the data acquired from the air-conditioning equipment 10A
satisfies the condition by determining whether or not the number of times of temperature
change operation performed in a predetermined period is equal to or larger than a
threshold set in advance in step SA7. Then, the determination unit 122 determines
that the data acquired from the air-conditioning equipment 10A does not satisfy the
condition in a case where the number of times of the temperature change operation
performed in the predetermined period is less than the threshold in step SA7, and
determines that the data acquired from the air-conditioning equipment 10A satisfies
the condition in a case where the number of times of the temperature change operation
performed in the predetermined period is equal to or larger than the threshold. The
number of times of the temperature change operation executed in the air-conditioning
equipment 10A in the predetermined period can be determined from data of the temperature
change operation included in the history DB 133.
[0088] In the present embodiment, an example where the determination unit 122 performs determination
including quality of the data of the history DB 133 will be described with reference
to Fig. 5. Fig. 5 is a flowchart indicating the operation data determination processing
to be executed in step SA7 in Fig. 3.
[0089] The determination unit 122 specifies the air conditioner ID of a target of the determination
processing (step SD1) and extracts data of a setting change history associated with
the specified air conditioner ID from the history DB 133 (step SD2).
[0090] The determination unit 122 tallies the number of times of the temperature change
operation for each date and for each outside air temperature based on the data extracted
in step SD2 (step SD3). By this means, the determination unit 122 associates the number
of times of the temperature change operation per day with the outside air temperature.
The determination unit 122 performs regression analysis on a correlation between the
number of times of the temperature change operation per day and the outside air temperature
to obtain a regression straight line (step SD4).
[0091] Fig. 6 is a diagram indicating an example of the regression straight line. Fig. 6
is a scatter diagram in which data is plotted while the outside air temperature is
set on a horizontal axis and the number of times of the temperature change operation
per day is set on a vertical axis, and points P1 in the diagram indicate data tallied
in step SD3. Fig. 6 indicates an example of a regression straight line RG1 obtained
by the regression analysis. The regression straight line RG1 is a straight line generated
using a least-square method, but this is one example. As a method of regression analysis,
geometric mean regression, principal-component regression or other methods can be
used in addition to the least-square method, and it is only necessary to use a method
with which a regression straight line can be obtained as an approximation expression.
Further, the determination unit 122 may perform processing of simply obtaining an
approximation expression in step SD4.
[0092] A magnitude of a slope of the regression straight line RG1 indicates a degree of
change of the number of times of temperature change operation by the outside air temperature.
A large magnitude of the slope of the regression straight line RG1 indicates large
change of the number of times of temperature change operation by the outside air temperature.
Here, the magnitude of the slope of the regression straight line RG1 means a magnitude
of an absolute value of the slope. While in the example in Fig. 6, the number of times
of the temperature change operation per day has a positive correlation with the outside
air temperature, the number of times of the temperature change operation can have
a negative correlation with the outside air temperature.
[0093] Returning to Fig. 5, the determination unit 122 determines whether or not the slope
of the regression straight line obtained in step SD4 is equal to or larger than a
threshold (step SD5). The threshold is a value set in advance by the control unit
110 and, for example, stored in the memory 130. In a case where the slope of the regression
straight line is equal to or larger than the threshold (step SD5: Yes), the determination
unit 122 determines that the data acquired from the air-conditioning equipment 10A
in the operation data acquisition processing satisfies the condition (step SD6), and
the processing returns to the processing in Fig. 3.
[0094] On the other hand, in a case where the slope of the regression straight line is smaller
than the threshold (step SD5: No), the determination unit 122 determines that the
data acquired from the air-conditioning equipment 10A does not satisfy the condition
(step SD7), and the processing returns to the processing in Fig. 3.
[0095] The determination unit 122 refers to a determination result of the operation data
determination processing (step SA8). Here, in a case where it is determined that the
data acquired from the air-conditioning equipment 10A in the operation data acquisition
processing satisfies the condition (step SA8: Yes), the processing unit 124 executes
control parameter generation processing based on the data in the history DB 133 (step
SA9). The control parameter generation processing will be described later.
[0096] Thereafter, in step SA10, operation of the air-conditioning equipment 10A based
on the control parameter CP is started (step SA10). Here, the setting unit 123 transmits
the control parameter CP generated in step SA9 to the air-conditioning equipment 10A,
and the air-conditioning equipment 10A receives the control parameter CP. The control
device 11 detects the outside air temperature by the outside air temperature sensor
18 and determines the set temperature of the air-conditioning equipment 10A by applying
the outside air temperature to the control parameter CP. The control device 11 executes
operation based on the set temperature determined by the control parameter CP.
[0097] In a case where it is determined that the data does not satisfy the condition in
the operation data determination processing (step SA8: No), the setting unit 123 changes
the operating condition of the air-conditioning equipment 10A (step SA11). Details
of the operating condition are as described regarding step SA6.
[0098] In step SA11, the operating condition of the air-conditioning equipment 10A in the
operation data acquisition processing is changed so as to make it easier to acquire
the operation data RD. In other words, the setting unit 123 changes the operating
condition so as to increase the number of times of the temperature change operation
at the air-conditioning equipment 10A. This change is change of the operating condition
so as to lower comfort in the air-conditioned space of the air-conditioning equipment
10A. For example, the setting unit 123 changes the set temperature to a higher temperature
in a case where the air-conditioning equipment 10A performs cooling operation and
changes the set temperature to a lower temperature during heating operation. Further,
the setting unit 123 may advance the restoration timing. In this case, a period required
for the set temperature changed by the temperature change operation to return to the
temperature before the change becomes shorter, so that it is possible to promote the
temperature change operation. In step SA11, the setting unit 123 transmits the setting
data SD that designates the changed operating condition of the air-conditioning equipment
10A to the air-conditioning equipment 10A.
[0099] The acquisition unit 121 executes operation data acquisition processing similar to
that in step SA7 (step SA12). Then, the determination unit 122 determines whether
or not a predetermined period set in advance has elapsed since start of the operation
data acquisition processing in step SA12 (step SA13). The predetermined period is
similar to that in step SA4.
[0100] In a case where the determination unit 122 determines that the predetermined period
has not elapsed (step SA13: No), the processing returns to step SA12. The acquisition
unit 121 and the air-conditioning equipment 10A repeatedly execute the operation data
acquisition processing in step SA12 until the predetermined period elapses.
[0101] In a case where it is determined that the predetermined period has elapsed (step
SA13: Yes), the determination unit 122 executes operation data determination processing
in a similar manner to step SA7 (step SA14). Then, the determination unit 122 refers
to a determination result of the operation data determination processing (step SA15).
Here, in a case where it is determined that the data acquired from the air-conditioning
equipment 10A in the operation data acquisition processing does not satisfy the condition
(step SA15: No), the processing of the control unit 110 returns to step SA12. Here,
the processing of the control unit 110 may return to step SA11, and the setting unit
123 may change the operating condition. Specifically, the setting unit 123 may further
change the operating condition of the air-conditioning equipment 10A in the operation
data acquisition processing so as to make it easier to acquire the operation data
RD.
[0102] In a case where it is determined that the data acquired from the air-conditioning
equipment 10A in the operation data acquisition processing satisfies the condition
(step SA15: Yes), the processing transitions to step SA9, and the processing unit
124 executes control parameter generation processing (step SA9).
[0103] Fig. 7 is a flowchart indicating an example of the control parameter generation
processing to be executed in step SA9 in Fig. 3.
[0104] The processing unit 124 specifies the air conditioner ID of the air-conditioning
equipment 10 to which the control parameter CP is to be applied (step SE1). Here,
the processing unit 124 specifies the air conditioner ID of the air-conditioning equipment
10A. The processing unit 124 extracts data corresponding to the air conditioner ID
specified in step SE1 from the history DB 133 (step SE2).
[0105] The processing unit 124 further extracts the outside air temperature and the set
temperature changed by the temperature change operation from the data extracted in
step SE2 (step SE3). The set temperature changed by the temperature change operation
will be referred to as the changed temperature. The processing unit 124 executes regression
analysis of obtaining a correlation between the outside air temperature and the changed
temperature to obtain a regression straight line (step SE4). A method of regression
analysis is as described in step SD4, and as one example, processing of obtaining
an approximation expression using a least-square method can be employed.
[0106] Fig. 8 is a diagram indicating an example of the regression straight line and indicates
an example of the regression straight line calculated in step SE4 in Fig. 7. Fig.
8 is a scatter diagram in which data is plotted while the outside air temperature
is set on a horizontal axis and an average set temperature in the air-conditioning
equipment 10A is set on a vertical axis. The set temperature on the vertical axis
is the set temperature after change by the temperature change operation in the air-conditioning
equipment 10A. In the diagram in Fig. 7, a value of the set temperature to be plotted
may be an average value obtained by averaging a plurality of values of the changed
set temperature corresponding to one outside air temperature. Points P2 in the drawing
indicate the data extracted in step SE3.
[0107] Fig. 7 indicates an example of a regression straight line RG2 obtained by the regression
analysis. While the regression straight line RG2 is a straight line generated using
a least-square method, this is one example. As a method of regression analysis, geometric
mean regression, principal-component regression or other methods can be used in addition
to the least-square method, and it is only necessary to use a method with which a
regression straight line can be obtained as an approximation expression. Further,
the processing unit 124 may perform processing of simply obtaining an approximation
expression in step SE4.
[0108] The regression straight line RG2 indicates a correlation between the outside air
temperature and the set temperature of the air-conditioning equipment 10A set by the
operation of the operation unit 14. For example, it indicates that in a case where
the set temperature is set at a low temperature in a state where the outside air temperature
is high, a person in the air-conditioned space feels that it is hot in the air-conditioned
space.
[0109] Returning to Fig. 7, the processing unit 124 calculates a recommended set temperature
for each outside air temperature by utilizing the regression straight line obtained
in step SE4 (step SE5). The processing unit 124 generates the control parameter CP
that enables the control device 11 to perform processing of obtaining the recommended
set temperature based on the outside air temperature (step SE6). The processing unit
124 stores the generated control parameter CP in the memory 130 in association with
the air conditioner ID of the air-conditioning equipment 10A (step SE7). As illustrated
in Fig. 8, the control parameter CP generated in this manner reflects the correlation
between the set temperature set by the person in the air-conditioned space and the
outside air temperature. Based on this, the control parameter CP is a parameter that
determines the set temperature of the air-conditioning equipment 10A so as to operate
the air-conditioning equipment 10A so that energy consumption of the air-conditioning
equipment 10A becomes smaller.
[0110] The air-conditioning equipment 10A determines the set temperature of the air-conditioning
equipment 10A based on the outside air temperature detected by the outside air temperature
sensor 18 by utilizing the control parameter CP generated in the processing in Fig.
7. The air-conditioning equipment 10A can execute control appropriate for an environment
of the air-conditioned space of the air-conditioning equipment 10A by utilizing the
control parameter CP generated by utilizing the operation data RD generated by the
air-conditioning equipment 10A. Thus, the air-conditioning equipment 10A can be made
to operate while influence of an environment of a building including the air-conditioned
space, sunlight of the air-conditioned space, and the like, is taken into account,
so that it is possible to maintain comfort in the air-conditioned space. Further,
it is possible to prevent the set temperature of the air-conditioning equipment 10A
from being set to an excessively low temperature or an excessively high temperature,
so that it is possible to reduce energy consumption of the air-conditioning equipment
10A while maintaining comfort in the air-conditioned space.
[0111] The number of times the operation in Fig. 3 is executed in the management system
1000 is not limited to once. The management system 1000 may execute the operation
in Fig. 3 to generate the control parameter CP for cooling operation when the air-conditioning
equipment 10 performs cooling operation and may apply the control parameter CP to
the air-conditioning equipment 10. In this case, the operation in Fig. 3 is started
at a timing at which the air-conditioning equipment 10 starts cooling operation. For
example, in a case where operation of designating cooling operation as the type of
operation is performed, the air-conditioning equipment 10 transmits the operation
data RD indicating start of the cooling operation to the management server 100, and
the management server 100 executes the processing in Fig. 3 by being triggered by
the operation data RD. In a similar manner, the management system 1000 may execute
the operation in Fig. 3 to generate the control parameter CP for heating operation
when the air-conditioning equipment 10 starts heating operation and may apply the
control parameter CP to the air-conditioning equipment 10.
[0112] The processing unit 124 can generate the control parameter CP for cooling operation
by extracting and utilizing data during cooling operation from the history DB 133,
and in a similar manner, can generate the control parameter CP for heating operation.
[0113] Further, the management system 1000 may execute the operation in Fig. 3 while the
air-conditioning equipment 10 is executing operation by utilizing the control parameter
CP. In this case, the operation in step SA1 and SA2 can be omitted. For example, the
operation in Fig. 3 may be executed with a period of one year, two years or with a
longer period. In this case, the control parameter CP can be updated in accordance
with change of an environment of the air-conditioned space and change of a use form
of the air-conditioned space. Further, in a case where the air-conditioned space is
a working place, the control parameter CP can be updated in accordance with change
of persons who work in the air-conditioned space. Still further, it is also possible
to employ a configuration where the control parameter CP is updated by the operation
in Fig. 3 being executed at a timing designated by the operation of the operation
unit 14. In this case, the control parameter CP can be updated in accordance with
usage states of a manager who manages the air-conditioning equipment 10 and a user
in the air-conditioned space.
[0114] In this case, the management system 1000 only requires to manage date on which the
control parameter CP is applied to each of the air-conditioning equipment 10 by the
management server 100. The management server 100 updates the control parameter CP
for which a predetermined period has elapsed since the application by the operation
in Fig. 3.
[0115] Fig. 9 is a flowchart indicating another example of the control parameter generation
processing. The operation in Fig. 9 is executed by the processing unit 124 in place
of the operation indicated in Fig. 7.
[0116] In Fig. 9, operation from step SE1 to SE6 is in common with the operation in Fig.
7. After the control parameter CP is generated in step SE6, the processing unit 124
tallies the number of times of the temperature change operation for each outside air
temperature based on the data extracted in step SE2 (step SE11).
[0117] The processing unit 124 generates additional data to be added to the control parameter
CP (step SE12). In step SE12, the processing unit 124 determines the allowable number
of times of the temperature change operation for each outside air temperature and
a temperature width in which the set temperature can be changed by the temperature
change operation based on the number of times tallied in step SE11. Then, the processing
unit 124 generates additional data indicating the determined allowable number of times
and temperature width.
[0118] The processing unit 124 updates the control parameter CP by adding the additional
data generated in step SE12 to the control parameter CP generated in step SE6 and
stores the updated control parameter CP in the memory 130 (step SE13).
[0119] The allowable number of times of the temperature change operation determined in step
SE12 indicates whether or not the air-conditioning equipment 10A allows the temperature
change operation and the number of times of the temperature change operation to be
accepted by the air-conditioning equipment 10A per day or per predetermined period.
The allowable number of times of the temperature change operation can be set at, for
example, once, three times, five times, or the like, per day or per predetermined
period. Further, the processing unit 124 can make determination so as to set the allowable
number of times of the temperature change operation at 0 times, that is, so as not
to allow the temperature change operation. The processing unit 124 determines the
allowable number of times of the temperature change operation for each outside air
temperature. It is only necessary to determine a width of the outside air temperature
range as appropriate and it is possible to set the width at 5 °C, 2 °C or 1 °C.
[0120] The temperature width of the temperature change operation refers to a temperature
range in which the set temperature of the air-conditioning equipment 10A can be changed
by the temperature change operation. For example, the processing unit 124 has a first
threshold T1 and a second threshold T2 as thresholds for the number of times of the
temperature change operation and sets T1 > T2. Concerning a first outside air temperature
range, the processing unit 124 sets the temperature width in which the set temperature
can be changed by the temperature change operation in the first outside air temperature
range at ±5 °C in a case where the number of times NT of the temperature change operation
tallied in step SE11 satisfies T1 < NT. Concerning a second outside air temperature
range, the processing unit 124 sets the temperature width in which the set temperature
can be changed by the temperature change operation in the second outside air temperature
range at ±3 °C in a case where the number of times NT of the temperature change operation
tallied in step SE11 satisfies T2 < NT < T1. Concerning a third outside air temperature
range, the processing unit 124 sets the temperature width in which the set temperature
can be changed by the temperature change operation in the third outside air temperature
range at ±1 °C in a case where the number of times NT of the temperature change operation
tallied in step SE11 satisfies NT < T2. Further, concerning a fourth outside air temperature
range, the processing unit 124 sets the temperature width in which the set temperature
can be changed by the temperature change operation in the fourth outside air temperature
range at 0 °C in a case where the number of times NT of the temperature change operation
tallied in step SE11 is 0.
[0121] According to the operation example in Fig. 9, the temperature change operation while
the air-conditioning equipment 10A is operating based on the control parameter CP
can be allowed in an appropriate range. It is therefore possible to further improve
comfort of a person in the air-conditioned space of the air-conditioning equipment
10A.
[0122] In the operation example in Fig. 9, the control parameter CP may include a time limit
from when the temperature change operation is performed until when the set temperature
is restored to the temperature before the change. In other words, the control parameter
CP may include additional data indicating the time limit in addition to or in place
of the temperature width in which the set temperature can be changed by the temperature
change operation. For example, the control parameter CP may designate a long time
limit in association with an outside air temperature range in which the number of
times of the temperature change operation is large or may designate a short time limit
in association with an outside air temperature range in which the number of times
of the temperature change operation is large. It is only necessary to determine the
time limit stepwise like, for example, 30 minutes, 60 minutes, 120 minutes, or the
like.
[0123] Fig. 10 is a flowchart indicating another example of the control parameter generation
processing. The operation in Fig. 10 is executed by the processing unit 124 in place
of the operation indicated in Fig. 7 or Fig. 9.
[0124] In Fig. 10, operation from step SE1 to SE5 are in common with the operation in Fig.
7.
[0125] The processing unit 124 executes processing of generating a first control parameter
CP (step SE21) and processing of generating a second control parameter CP (step SE22)
based on the recommended set temperature calculated in step SE5.
[0126] Both the first control parameter CP and the second control parameter CP enable the
control device 11 to perform processing of obtaining the recommended set temperature
based on the outside air temperature in the air-conditioning equipment 10A. Among
these, the first control parameter CP is used in a case where the air-conditioning
equipment 10A performs normal operation. The second control parameter CP is used in
a case where the air-conditioning equipment 10A performs energy saving operation.
In other words, the processing unit 124 generates the control parameter CP for normal
operation and the control parameter CP for energy saving operation in step SE21 and
SE22. The processing in Fig. 10 is effective in a case where operation can be switched
between the normal operation and the energy saving operation by the operation of the
operation unit 14 in the air-conditioning equipment 10A.
[0127] The processing unit 124 tallies the number of times of the temperature change operation
for each outside air temperature based on the data extracted in step SE2 (step SE23).
The processing unit 124 generates additional data to be added to the control parameter
CP (step SE24). In step SE24, the processing unit 124 determines the allowable number
of times of the temperature change operation for each outside air temperature and
a temperature width in which the set temperature can be changed by the temperature
change operation based on the number of times tallied in step SE22. This processing
is similar to the processing in step SE12. Further, the processing unit 124 generates
first additional data to be applied to the first control parameter CP and second additional
data to be applied to the second control parameter CP in step SE24.
[0128] In a case where the first control parameter CP is a parameter for normal operation,
and the second control parameter CP is a parameter for energy saving operation, the
second additional data has a narrower allowable range of the temperature change operation
than that of the first additional data. For example, the second additional data has
a smaller allowable number of times of the temperature change operation and a narrower
temperature width in which the set temperature can be changed than those of the first
additional data in the same outside air temperature range.
[0129] The processing unit 124 performs processing of updating the control parameter CP
and storing the updated control parameter CP in the memory 130 (step SE25). In step
SE25, the processing unit 124 updates the first control parameter CP by adding the
first additional data to the first control parameter CP. Further, the processing unit
124 updates the second control parameter CP by adding the second additional data to
the second control parameter CP. The processing unit 124 stores the updated first
control parameter CP and the updated second control parameter CP in the memory 130
in association with the air conditioner ID of the air-conditioning equipment 10A.
[0130] According to the operation example in Fig. 10, the manager of the air-conditioning
equipment 10A can set the set temperature of the air-conditioning equipment 10A based
on the outside air temperature in response to switching of the operating state of
the air-conditioning equipment 10A between the normal operation and the energy saving
operation. This makes it possible to change balance of comfort in the air-conditioned
space and energy consumption in accordance with a request of the manager in a range
in which comfort in the air-conditioned space of the air-conditioning equipment 10A
is not impaired.
[0131] The processing in step SE21, SE22 and SE25 explained in Fig. 10 can be also applied
to step SE6 and step SE7 in Fig. 7. In this case, the control parameter CP for normal
operation and the control parameter CP for energy saving operation can be respectively
generated in an aspect in which the control parameters do not include the allowable
number of times of temperature change operation and the temperature width in which
the set temperature can be changed.
[0132] In this manner, in the management system 1000, the management server 100 generates
the control parameter CP appropriate for each of the air-conditioning equipment 10
and causes the air-conditioning equipment 10 to operate based on the control parameter
CP. This makes it possible to reduce energy consumption while maintaining comfort
in the air-conditioned space by each of the air-conditioning equipment 10.
[0133] Fig. 11 is an explanatory diagram indicating an aspect of operation of the air-conditioning
equipment 10 based on the control parameter CP. Fig. 11 indicates an example of the
set temperature of the air-conditioning equipment 10 set in accordance with the outside
air temperature based on the control parameter CP. Further, Fig. 11 indicates the
set temperature during energy saving operation as a comparative example.
[0134] Air conditioners 1, 2, 3 and 4 in Fig. 11 indicate different pieces of air-conditioning
equipment 10. For example, the air conditioner 1 indicates the air-conditioning equipment
10A. In a similar manner, it may be considered that the air conditioner 2 indicates
the air-conditioning equipment 10B, the air conditioner 3 indicates the air-conditioning
equipment 10C, and the air conditioner 4 indicates the air-conditioning equipment
10D. Further, Fig. 11 indicates a case where the control parameter CP is applied during
cooling operation as one example.
[0135] As described above, the set temperature during energy saving operation is, for example,
28 °C regardless of the outside air temperature. On the other hand, if the control
parameter CP is applied, the air-conditioning equipment 10 can determine the set temperature
appropriate for an environment in which the air-conditioning equipment 10 is installed
in accordance with the outside air temperature.
[0136] For example, it is assumed that the set temperature of the air conditioner 1 in Fig.
11 is 25 °C in a case where the outside air temperature is lower than 22 °C and is
24 °C in a case where the outside air temperature is equal to or higher than 23 °C
and lower than 26 °C. In contrast, it is assumed that the set temperature of the air
conditioner 2 is 28°C in a case where the outside air temperature is lower than 24
°C. Different control parameters CP are provided to the air-conditioning equipment
10A, 10B, 10C and 10D from the management server 100. Thus, the respective pieces
of the air-conditioning equipment 10 can determine set temperatures different from
each other in accordance with the same outside air temperature as indicated in Fig.
11.
[0137] All the set temperatures during cooling operation of the air-conditioning equipment
10 indicated in Fig. 11 are lower than the set temperature during energy saving operation,
and thus, comfort in the air-conditioned space is improved. Further, by changing the
set temperature of the air-conditioning equipment 10 in accordance with the outside
air temperature, it is possible to reduce energy consumption of the air-conditioning
equipment 10 by avoiding a situation where cooling operation is too strong. Similar
effects can be obtained also during heating operation.
[0138] Further, the management system 1000 has a function of visualizing change in energy
consumption of the air-conditioning equipment 10 and comfort in the air-conditioned
space before and after the control parameter CP is applied and providing the visualized
change to the manager.
[0139] Fig. 12 is a sequence diagram indicating operation of the management system 1000.
Operation from step SF1 to SF7 in Fig. 12 indicates operation of the management server
100, and operation from step SG1 to SG3 indicates operation of the terminal device
5. The operation from step SG1 to SG3 may be executed by the mobile terminal device
7.
[0140] The terminal device 5 transmits a comparison data request to the management server
100 in accordance with operation by the manager who uses the terminal device 5 (step
SG1). The comparison data request includes the air conditioner ID that specifies the
air-conditioning equipment 10 for which comparison data is to be generated. The comparison
data request may specify a type of the comparison data. The type of the comparison
data includes, for example, one or more of comparison of the power consumption amount
and the number of times of temperature change operation. In the following description,
a case will be described where comparison of the power consumption amount is designated
as the type of the comparison data.
[0141] The acquisition unit 121 receives the comparison data request transmitted by the
terminal device 5 (step SF1). The processing unit 124 specifies the air conditioner
ID included in the comparison data request (step SF2). The processing unit 124 tallies
the power consumption amount of the air-conditioning equipment 10 before the control
parameter CP is applied by extracting data corresponding to the specified air conditioner
ID from the power consumption amount DB 135 (step SF3).
[0142] The processing unit 124 tallies the power consumption amount of the air-conditioning
equipment 10 after the control parameter CP is applied based on the data extracted
from the power consumption amount DB 135 (step SF4).
[0143] The processing unit 124 generates comparison data that compares before and after
the control parameter CP is applied based on a result of tallying in step SF3 and
a result of tallying in step SF4 (step SF5). The processing unit 124 generates display
data based on the comparison data by performing processing of visualizing the comparison
data (step SF6). The processing unit 124 transmits the generated display data to the
terminal device 5 that has transmitted the comparison data request (step SF7).
[0144] The terminal device 5 receives the display data transmitted by the management server
100 (step SG2) and displays the display data at the display 51 (step SG3).
[0145] Fig. 13 is a diagram indicating an example of the display data based on the comparison
data.
[0146] Fig. 13 is a scatter diagram in which data is plotted while the outside air temperature
is set on a horizontal axis and the power consumption amount per day or per predetermined
period is set on a vertical axis. Fig. 13 indicates the comparison data that compares
the power consumption amount in a case where the air-conditioning equipment 10A executes
normal operation in which the control parameter CP is not used, energy saving operation
in which the control parameter CP is not used and operation in which the control parameter
CP is used. The normal operation is operation in a state where the temperature change
operation can be executed without limitation by operation of the operation unit 14.
The energy saving operation is operation in which a temperature determined by the
Ministry of Economy, Trade and Industry, or the like, is set as the set temperature
of the air-conditioning equipment 10A. The set temperature during the energy saving
operation is, for example, 28 °C during cooling operation and 20 °C during heating
operation. In the energy saving operation, the temperature change operation cannot
be executed, or the number of times of the temperature change operation or the temperature
width in which the set temperature can be changed are restricted more strictly than
in the normal operation.
[0147] Points P3 in the drawing indicate data of normal operation in which the control parameter
CP is not used, and points P4 indicate data of energy saving operation in which the
control parameter CP is not used. Points P5 indicate data of operation in which the
control parameter CP is used.
[0148] The display data in Fig. 13 includes regression curved lines obtained through regression
analysis to facilitate comparison of the data. A reference numeral RG3 indicates a
regression curved line obtained by performing regression analysis on the data of the
points P3. A reference numeral RG4 is a regression curved line obtained by performing
regression analysis on data of the points P4, and a reference numeral RG5 is a regression
curved line obtained by performing regression analysis on data of the points P5. These
regression curved lines are obtained by the processing unit 124 executing regression
analysis in step SF5. As a method of regression analysis, a least-square method, geometric
mean regression, principal-component regression or other methods can be used, and
the method is selected as appropriate as described above. The regression curved lines
RG3, RG4 and RG5 may be straight lines.
[0149] Through the display data in Fig. 13, an aspect where the power consumption amount
of the air-conditioning equipment 10A changes between a case where the air-conditioning
equipment 10A uses the control parameter CP and a case where the air-conditioning
equipment 10A does not use the control parameter CP is visualized and presented to
the manager. For example, the display data indicates that as a result of the air-conditioning
equipment 10A using the control parameter CP, the power consumption amount is reduced
compared to a case where the air-conditioning equipment 10A executes energy saving
operation in which the control parameter CP is not used.
[0150] Fig. 14 is a diagram indicating another example of the display data based on the
comparison data.
[0151] Fig. 14 indicates the comparison data obtained by comparing an execution state of
the temperature change operation in the air-conditioning equipment 10A. In other words,
Fig. 14 is a scatter diagram in which data is plotted while the outside air temperature
is set on a horizontal axis, and the number of times of the temperature change operation
per day or per predetermined period is set on a vertical axis.
[0152] The data in Fig. 14 compares the temperature change operation in a case where the
air-conditioning equipment 10A executes normal operation in which the control parameter
CP is not used, in a case where the air-conditioning equipment 10A executes energy
saving operation in which the control parameter CP is not used, and in a case where
the air-conditioning equipment 10A executes operation in which the control parameter
CP is used.
[0153] Points P6 in the drawing indicate data of normal operation in which the control parameter
CP is not used, and points P7 indicate data of energy saving operation in which the
control parameter CP is not used. Points P8 indicate data of operation in which the
control parameter CP is used.
[0154] The display data in Fig. 14 includes regression curved lines obtained through regression
analysis to facilitate comparison of the data. A reference numeral RG6 indicates a
regression curved line obtained by performing regression analysis on data of the points
P6. A reference numeral RG7 is a regression curved line obtained by performing regression
analysis on data of the points P7, and a reference numeral RG8 is a regression curved
line obtained by performing regression analysis on data of the points P8. These regression
curved lines are obtained by the processing unit 124 executing regression analysis
in step SF5.
[0155] Through the display data in Fig. 14, the number of times the temperature change operation
is performed in the air-conditioned space is visualized and presented to the manager
for each of a case where the air-conditioning equipment 10A uses the control parameter
CP and a case where the air-conditioning equipment 10A does not use the control parameter
CP. The temperature change operation is performed by a person in the air-conditioned
space to improve comfort in the air-conditioned space. It can be therefore considered
that as the number of times of the temperature change operation is larger, comfort
in the air-conditioned space is lower. Further, it is effective to restrict the temperature
change operation in terms of energy saving, and the points P7 and the regression curved
line RG7 indicate that the temperature change operation is restricted in the energy
saving operation.
[0156] The example in Fig. 14 indicates that in a case where the air-conditioning equipment
10A uses the control parameter CP, the number of times of the temperature change operation
is reduced compared to normal operation in which the control parameter CP is not used.
In other words, it can be said that comfort in the air-conditioned space is improved
by using the control parameter CP.
[0157] The display data in Fig. 13 and Fig. 14 is visualized data regarding any one piece
of air-conditioning equipment 10 connected to the management server 100. This is one
example, and data obtained by comparing the power consumption amount or the number
of times of the temperature change operation in a plurality of pieces of air-conditioning
equipment 10 may be collectively visualized to make one piece of display data, and
the display data may be displayed at the display 51, 71.
[4. Effects, and the like]
[0158] As described above, in the present embodiment, the management system 1000 includes
the setting unit 123 that sets the set temperature to the air-conditioning equipment
10, the acquisition unit 121 that acquires the operation data RD indicating temperature
change operation of changing the set temperature of the air-conditioning equipment
10, the determination unit 122 that determines whether or not the acquired operation
data RD acquired by the acquisition unit 121 in a predetermined period satisfies a
condition necessary for processing of determining the control parameter CP for executing
control of the air-conditioning equipment 10, and the processing unit 124 that determines
the control parameter CP including at least the set temperature of the air-conditioning
equipment 10 based on the acquired operation data RD in a case where it is determined
that the acquired operation data RD satisfies the condition, and in a case where the
determination unit 122 determines that the acquired operation data RD does not satisfy
the condition, the setting unit 123 changes the set temperature of the air-conditioning
equipment 10, and the acquisition unit 121 acquires the operation data RD.
[0159] By this means, the operation data RD can be efficiently acquired from the air-conditioning
equipment 10 to generate the control parameter CP of the air-conditioning equipment
10. This enables the management server 100 to acquire sufficient data regarding the
temperature change operation, the data being necessary for determination or generation
of the control parameter CP. It is therefore possible to generate an appropriate control
parameter CP regarding control of the air-conditioning equipment 10.
[0160] A management method of the air-conditioning equipment 10 of the present embodiment
includes setting a set temperature to the air-conditioning equipment 10, acquiring
operation data RD indicating temperature change operation of changing the set temperature
of the air-conditioning equipment 10, determining whether or not the acquired operation
data RD acquired in a predetermined period satisfies a condition necessary for processing
of determining the control parameter CP for executing control of the air-conditioning
equipment 10, and determining the control parameter CP including at least the set
temperature of the air-conditioning equipment 10 based on the acquired operation data
RD in a case where it is determined that the acquired operation data RD satisfies
the condition, and in a case where it is determined that the acquired operation data
RD does not satisfy the condition, the set temperature of the air-conditioning equipment
10 is changed, and the operation data RD is acquired. According to this method, it
is possible to efficiently acquire the operation data RD from the air-conditioning
equipment 10 to generate the control parameter CP of the air-conditioning equipment
10. By this means, it is possible to acquire sufficient data regarding the temperature
change operation from the air-conditioning equipment 10, the data being necessary
for determination or generation of the control parameter CP. It is therefore possible
to generate an appropriate control parameter CP regarding control of the air-conditioning
equipment 10.
[0161] The control program 131 of the present embodiment is a program executable by the
management server 100 which is a computer that manages the air-conditioning equipment
10. The control program 131 causes the management server 100 to function as the setting
unit 123 that sets a set temperature to the air-conditioning equipment 10, the acquisition
unit 121 that acquires operation data RD indicating temperature change operation of
changing the set temperature of the air-conditioning equipment 10, the determination
unit 122 that determines whether or not the acquired operation data RD acquired by
the acquisition unit 121 in a predetermined period satisfies a condition necessary
for processing of determining the control parameter CP for executing control of the
air-conditioning equipment 10, and the processing unit 124 that determines the control
parameter CP including at least the set temperature of the air-conditioning equipment
10 based on the acquired operation data RD in a case where the determination unit
122 determines that the acquired operation data RD satisfies the condition, and in
a case where the determination unit 122 determines that the acquired operation data
RD does not satisfy the condition, the program causes the management server 100 to
execute control so that the setting unit 123 changes the set temperature of the air-conditioning
equipment 10, and the acquisition unit 121 acquires the operation data RD. According
to this program, it is possible to efficiently acquire the operation data RD from
the air-conditioning equipment 10 to generate the control parameter CP of the air-conditioning
equipment 10. This makes it possible to acquire sufficient data regarding temperature
change operation from the air-conditioning equipment 10, the data being necessary
for determination or generation of the control parameter CP. It is therefore possible
to generate an appropriate control parameter CP regarding control of the air-conditioning
equipment 10.
[0162] As in the present embodiment, in a case where the determination unit 122 determines
that the acquired operation data RD does not satisfy the condition, the management
system 1000 may change the set temperature of the air-conditioning equipment 10 so
as to reduce energy consumption of the air-conditioning equipment 10 by the setting
unit 123 and acquire the operation data RD by the acquisition unit 121. By this means,
the set temperature is changed so as to make it easier for temperature change operation
of the air-conditioning equipment 10 to be performed in accordance with an acquisition
state of the operation data RD. It is therefore possible to efficiently acquire data
necessary for determination of the control parameter CP from the air-conditioning
equipment 10.
[0163] As in the present embodiment, the control parameter CP may be a parameter for executing
control so that the air-conditioning equipment 10 changes the set temperature in accordance
with change of the outside air temperature, the parameter including data that associates
the outside air temperature in a place where the air-conditioning equipment 10 is
installed and the set temperature of the air-conditioning equipment 10. By this means,
it is possible to appropriately set the set temperature of the air-conditioning equipment
10 in accordance with an environment and characteristics of the air-conditioned space
of the air-conditioning equipment 10 by causing the air-conditioning equipment 10
to operate in accordance with the control parameter CP. It is therefore possible to
implement control of the air-conditioning equipment 10 while achieving both comfort
in the air-conditioned space and reduction in energy consumption of the air-conditioning
equipment 10.
[0164] As in the present embodiment, the control parameter CP may be a parameter for executing
control so that the air-conditioning equipment 10 changes the set temperature in accordance
with change of the outside air temperature and temperature change operation, the parameter
including data that associates the outside air temperature at a place where the air-conditioning
equipment 10 is installed, the set temperature of the air-conditioning equipment 10,
and a temperature width in which the air-conditioning equipment 10 can change the
set temperature in accordance with the temperature change operation. This makes it
possible to allow the temperature change operation in a case where the air-conditioning
equipment 10 is caused to operate in accordance with the control parameter CP, in
an appropriate range. It is therefore possible to further improve comfort in the air-conditioned
space and achieve reduction in energy consumption of the air-conditioning equipment
10.
[0165] As in the present embodiment, the management system 1000 may change the set temperature
of the air-conditioning equipment 10 in accordance with the temperature change operation
in a case where the temperature change operation is performed and may restore the
set temperature of the air-conditioning equipment 10 to a temperature before the temperature
change operation is performed after a predetermined period has elapsed since the change
of the set temperature of the air-conditioning equipment 10. This makes it possible
to efficiently acquire data necessary for determining the control parameter CP while
maintaining a preferred state of comfort in the air-conditioned space.
[0166] As in the present embodiment, the management system 1000 may change the set temperature
of the air-conditioning equipment 10 in accordance with the temperature change operation
in a case where the temperature change operation is performed and may restore the
set temperature of the air-conditioning equipment 10 to a temperature before the temperature
change operation is performed at a predetermined timing after the set temperature
of the air-conditioning equipment 10 has been changed. This makes it possible to efficiently
acquire data necessary for determining the control parameter CP while maintaining
a preferred state of comfort in the air-conditioned space.
[0167] As in the present embodiment, the processing unit 124 may generate the control parameter
CP for heating operation based on the operation data RD acquired by the acquisition
unit 121 while the air-conditioning equipment 10 is performing heating operation and
may determine the control parameter CP for cooling operation based on the operation
data RD acquired by the acquisition unit 121 while the air-conditioning equipment
10 is performing cooling operation. By this means, the control parameters CP respectively
corresponding to cooling operation and heating operation of the air-conditioning equipment
10 can be determined. It is therefore possible to implement control of the air-conditioning
equipment 10 while achieving comfort in the air-conditioned space and reduction in
energy consumption of the air-conditioning equipment 10 both in a case where the air-conditioning
equipment 10 executes heating operation and in a case where the air-conditioning equipment
10 executes cooling operation.
[0168] As in the present embodiment, the processing unit 124 may generate comparison data
that compares a power consumption amount of the air-conditioning equipment 10 in a
case where the air-conditioning equipment 10 is caused to operate using the control
parameter CP and a power consumption amount of the air-conditioning equipment 10 in
a case where the air-conditioning equipment 10 is caused to operate in accordance
with temperature change operation without using the control parameter CP. This enables
the manager or the user of the air-conditioning equipment 10 to visually grasp a reduction
effect of energy consumption in a case where the control parameter CP is used.
[0169] As in the present embodiment, the management system 1000 may include the air-conditioning
equipment 10 and the management server 100 that can perform communication with the
air-conditioning equipment 10, the air-conditioning equipment 10 may include the operation
unit 14 that accepts temperature change operation, the communication device 15 that
transmits the operation data RD to the management server 100 based on the temperature
change operation, and the control device 11 that controls the air-conditioning equipment
10 based on temperature setting data transmitted by the management server, and the
control device 11 may change the set temperature of the air-conditioning equipment
10 based on the control parameter CP generated by the management server 100 and the
outside air temperature at a place where the air-conditioning equipment 10 is installed.
By this means, the management server 100 transmits the control parameter CP to the
air-conditioning equipment 10, and the air-conditioning equipment 10 operates at the
set temperature corresponding to the outside air temperature based on the control
parameter CP provided by the management server 100. Thus, the set temperature of the
air-conditioning equipment 10 can be appropriately set under control of the management
server 100, so that it is possible to achieve both comfort in the air-conditioned
space and reduction in energy consumption of the air-conditioning equipment 10.
[5. Other embodiments]
[0170] The embodiment has been described above as an example of disclosure in the present
application. However, the technique in the present disclosure is not limited to this
and can be applied to embodiments in which changes, replacements, additions, omissions,
and the like, are performed. Further, a new embodiment can be obtained by combining
respective components described in the above-described embodiment.
[0171] Thus, other embodiments will be described as an example below.
[0172] While in the above-described embodiment, a configuration in which the outside air
temperature sensor 18 detects the outside air temperature has been described as an
example, this is one example. For example, the air-conditioning equipment 10 or the
management server 100 may acquire data of the outside air temperature at a place where
the facility 1 is installed using a weather information delivery service provided
by a cloud server, or the like, to acquire the outside air temperature that is not
affected by insolation, influence of the outdoor unit 12 being filled with heat, or
the like. In a case where the management server 100 can acquire data of the outside
air temperature, the operation data RD does not have to include the outside air temperature.
In this case, the data of the outside air temperature may be transmitted to the air-conditioning
equipment 10 from the management server 100.
[0173] In the above-described embodiment, a configuration has been described where linear
regression is performed as an example of regression analysis to be executed by the
determination unit 122 in step SD4 (Fig. 5) and regression analysis to be executed
by the processing unit 124 in step SE4 (Fig. 7). This is one example, and the determination
unit 122 and the processing unit 124 may, for example, perform processing of obtaining
a regression curved line. In this case, processing of comparing a slope of a regression
straight line with a threshold in step SD5 can be replaced with processing of comparing
a maximum value or an average value of the slope of the regression curved line with
a threshold.
[0174] Further, in the above-described embodiment, a configuration has been described where
each of the air-conditioning equipment 10 includes the communication device 15. In
this configuration, a plurality of pieces of air-conditioning equipment 10 may be
connected to a communication device which is independent of the air-conditioning equipment
10 or which is built in one piece of the air-conditioning equipment 10 and may execute
communication with the management server 100 using this communication device.
[0175] Further, a configuration has been described in the above-described embodiment where
each of the air-conditioning equipment 10 includes the control device 11 that determines
the set temperature based on the control parameter CP. In this configuration, a central
control device that controls a plurality of pieces of air-conditioning equipment 10
may be provided. In this case, the central control device may determine the set temperatures
of the respective pieces of air-conditioning equipment 10 in accordance with the control
parameters CP generated by the management server 100 so as to respectively correspond
to the plurality of pieces of air-conditioning equipment 10.
[0176] It is only necessary that a configuration of the communication unit in the present
disclosure enables communication between the device of the present disclosure and
external equipment. When a subject matter of the invention is expressed, there is
a case where the configuration that enables communication between the device of the
present disclosure and external equipment may be expressed as communication means,
a communication unit, transmission/reception means, a transmission/reception unit
or a term similar to these other than a communicator. The communicator constituting
the communication device 15, the server communication device 150 and the communication
unit (not illustrated) provided in the terminal device 5 or the mobile terminal device
7 may be implemented in various aspects. For example, the communicator may have an
aspect of connecting the device of the present disclosure and external equipment in
a wired manner or an aspect of connecting the device of the present disclosure and
external equipment in a wireless manner. A communicator that connects the device of
the present disclosure and the external equipment in a wired manner is effective in
communication security and communication reliability. Examples of the communicator
that performs connection in a wired manner can include, for example, a wired LAN based
on Ethernet (registered trademark) standards, a wired connection using an optical
fiber cable, and the like. Examples of the communicator that performs connection in
a wireless manner can include wireless connection with external equipment via a base
station, or the like, direct wireless connection to external equipment, and the like.
Examples of wireless connection to external equipment via a base station, or the like,
can include, for example, wireless LAN supporting IEEE802.11 in which communication
is performed with a Wi-Fi router in a wireless manner, a third generation mobile communication
system (which is called 3G), a fourth generation mobile communication system (which
is called 4G), WiMax (registered trademark) supporting IEEE802.16, a low power wide
area (LPWA), and the like. Using the communicator that directly connects the device
of the present disclosure and external equipment in a wireless manner is effective
to improve communication security and enables the device of the present disclosure
to communicate with external equipment even at a place where there is no relay equipment
such as a Wi-Fi router. Examples of the communicator that directly connects the device
of the present disclosure and external equipment in a wireless manner can include,
for example, communication using Bluetooth (registered trademark), communication using
near field communication (NFC) via a loop antenna, infrared communication, and the
like.
[0177] The respective units illustrated in Fig. 1 and Fig. 2 are one example, and a specific
implementation form is not particularly limited. In other words, hardware individually
corresponding to the respective units do not necessarily have to be mounted, and functions
of the respective units can be of course implemented by one processor executing programs.
Further, part of functions to be implemented by software in the above-described embodiment
may be implemented by hardware or part of functions to be implemented by hardware
may be implemented by software. In addition, specific detailed configurations of other
units of the air-conditioning equipment 10, the management server 100, the terminal
device 5 and the mobile terminal device 7 can be arbitrarily changed within a range
not deviating from the gist of the present disclosure.
[0178] Further, for example, a unit of step of the operation indicated in Figs. 3 to 5,
7, 9, 10 and 12 is a unit divided in accordance with main processing content to facilitate
understanding of operation of the respective units of the management system 1000,
and the present disclosure is not limited by how to divide a unit of the processing
or name of the unit of the processing.
[0179] Note that the above-described embodiment is an example of the technique in the present
disclosure, and various changes, replacements, additions, omissions, and the like,
can be made within the scope of the claims or its equivalent scope.
[Industrial Applicability]
[0180] As described above, the management system, the air-conditioning equipment management
method, and the program according to the present disclosure can be used in application
of managing operation of the air-conditioning equipment.
[Reference Signs List]
[0181]
- 5
- Terminal device
- 7
- Mobile terminal device
- 10, 10A, 10B, 10C, 10D
- Air-conditioning equipment
- 11
- Control device (control unit)
- 12
- Outdoor unit
- 13
- Indoor unit
- 14
- Operation unit
- 15
- Communication device (transmission unit)
- 18
- Outside air temperature sensor
- 51, 71
- Display
- 100
- Management server
- 110
- Control unit
- 120
- Processor
- 121
- Acquisition unit
- 122
- Determination unit
- 123
- Setting unit
- 124
- Processing unit
- 130
- Memory
- 131
- Control program (program)
- 132
- Temperature setting data
- 150
- Server communication device
- 1000
- Management system
- CP
- Control parameter
- RD
- Operation data
- N
- Communication network
- SD
- Setting data