TECHNICAL FIELD
[0001] The present disclosure relates to a work machine, a system including a work machine,
and a method of controlling a work machine.
BACKGROUND ART
[0002] WO2016/152994 (PTL 1) discloses control to move a boom and a bucket to target positions obtained
in accordance with a moving distance of a wheel loader when the wheel loader is in
a state of loaded forward travel in which the wheel loader travels forward with the
bucket being loaded.
CITATION LIST
PATENT LITERATURE
SUMMARY OF INVENTION
TECHNICAL PROBLEM
[0004] A wheel loader that repeatedly performs an excavation work and a loading work has
been demanded to achieve reduction in cycle time of works to improve workability.
[0005] The present disclosure proposes a work machine, a system including a work machine,
and a method of controlling a work machine that achieve reduction in cycle time of
works.
SOLUTION TO PROBLEM
[0006] Each of a work machine and a system including the work machine according to one aspect
of the present disclosure includes a main body of the work machine including a travel
unit, a work implement attached in front of the main body of the work machine, the
work implement including a bucket at a tip end, a work implement actuator that drives
the work implement with respect to the main body of the work machine, a travel sensor
that detects a state of travel of the travel unit, a work implement posture sensor
that detects a posture of the work implement, an object sensor that detects an object
around the main body of the work machine, and a controller that provides a command
to drive the work implement actuator based on detection values from the travel sensor,
the work implement posture sensor, and the object sensor. The controller recognizes
a loading target into which loads in the bucket are to be loaded, based on detection
of the object. The controller starts drive of the work implement actuator to operate
the bucket in a dump direction while forward travel of the travel unit continues,
at a time point when a feature point of the bucket reaches a first target position
in front of the loading target and higher than the loading target while the work implement
approaches the loading target by forward travel of the travel unit.
[0007] A method of controlling a work machine according to one aspect of the present disclosure
includes recognizing a loading target into which loads in a bucket are to be loaded,
based on an object detection signal, causing a travel unit to travel forward to bring
a work implement closer to the loading target, and starting drive of a work implement
actuator to operate the bucket in a dump direction while forward travel of the travel
unit continues, at a time point when a feature point of the bucket reaches a first
target position in front of the loading target and higher than the loading target.
ADVANTAGEOUS EFFECTS OF INVENTION
[0008] According to the work machine, the system including the work machine, and the method
of controlling the work machine in the present disclosure, the cycle time of works
can be reduced.
BRIEF DESCRIPTION OF DRAWINGS
[0009]
Fig. 1 is a side view of a wheel loader as an exemplary work machine.
Fig. 2 is a block diagram showing an overall configuration of a control system that
controls the wheel loader.
Fig. 3 is a plan view of the wheel loader that performs excavation and loading works.
Fig. 4 is a block diagram showing a configuration of an automatic control system that
controls the wheel loader.
Fig. 5 is a flowchart showing a flow of operations to load loads carried in a bucket
into a loading target under automatic control.
Fig. 6 is a diagram schematically showing arrangement of a vessel and the wheel loader
at the time of start of dump approach.
Fig. 7 is a diagram schematically showing a posture of the wheel loader when a bucket
dump operation is started.
Fig. 8 is a diagram schematically showing a posture of the wheel loader when a cutting
edge reaches a farthest position.
Fig. 9 is a diagram schematically showing a posture of the wheel loader when the bucket
dump operation is stopped.
Fig. 10 is a diagram schematically showing a posture of the wheel loader when a boom
raising operation is stopped.
Fig. 11 shows a graph of change in cylinder length during a loading work.
DESCRIPTION OF EMBODIMENTS
[0010] An embodiment will be described below with reference to the drawings. The same components
and constituent elements in the description below have the same reference characters
allotted and their labels and functions are also the same. Therefore, detailed description
thereof will not be repeated. Extraction of any features from the embodiment and any
combination thereof are also originally intended.
<Overall Construction of Wheel Loader 1>
[0011] In an embodiment, a wheel loader 1 as an exemplary work machine will be described.
Fig. 1 is a side view of wheel loader 1 as an exemplary work machine.
[0012] As shown in Fig. 1, wheel loader 1 includes a vehicular body frame 2, a work implement
3, a travel apparatus 4, and a cab 5. A vehicular body of wheel loader 1 is composed
of vehicular body frame 2, cab 5, and the like. Work implement 3 and travel apparatus
4 are attached to the vehicular body of wheel loader 1. A main body of wheel loader
1 includes the vehicular body and travel apparatus 4.
[0013] Travel apparatus 4 serves for travel of the vehicular body of wheel loader 1 and
includes running wheels 4a and 4b. Wheel loader 1 is a wheeled vehicle provided with
running wheels 4a and 4b as rotational bodies for travel, on opposing sides in a lateral
direction of the vehicular body. Wheel loader 1 is self-propelled as running wheels
4a and 4b are rotationally driven and can perform desired works with work implement
3. Travel apparatus 4 corresponds to an exemplary "travel unit."
[0014] A direction in which wheel loader 1 travels straight is herein referred to as a fore/aft
direction of wheel loader 1. In the fore/aft direction of wheel loader 1, a side where
work implement 3 is arranged with respect to vehicular body frame 2 is defined as
the fore direction and a side opposite to the fore direction is defined as the aft
direction. The lateral direction of wheel loader 1 refers to a direction orthogonal
to the fore/aft direction when wheel loader 1 on a flat ground is viewed in a plan
view. A right side and a left side in the lateral direction when one faces the fore
direction are defined as a right direction and a left direction, respectively. An
upward/downward direction of wheel loader 1 is a direction orthogonal to the plane
defined by the fore/aft direction and the lateral direction. A side where the ground
is located and a side where the sky is located in the upward/downward direction are
defined as a lower side and an upper side, respectively.
[0015] Vehicular body frame 2 includes a front frame 2a and a rear frame 2b. Front frame
2a is arranged in front of rear frame 2b. Front frame 2a and rear frame 2b are attached
to each other as being laterally swingable.
[0016] A pair of steering cylinders 11 is attached across front frame 2a and rear frame
2b. Steering cylinder 11 is a hydraulic cylinder. As steering cylinder 11 extends
and contracts with hydraulic oil from a steering pump, a direction of travel of wheel
loader 1 laterally changes. Vehicular body frame 2 in an articulated structure is
composed of front frame 2a and rear frame 2b. Wheel loader 1 is an articulated work
machine in which front frame 2a and rear frame 2b are coupled to allow a flection
operation.
[0017] Work implement 3 and a pair of running wheels (front wheels) 4a are attached to front
frame 2a. Work implement 3 is attached in front of the main body of wheel loader 1.
Work implement 3 is supported by the vehicular body of wheel loader 1. Work implement
3 includes a boom 14 and a bucket 6. Bucket 6 is arranged at a tip end of work implement
3. Bucket 6 is a work tool for excavation and loading. A cutting edge 6a is a tip
end portion of bucket 6. A rear surface 6b is a part of an outer surface of bucket
6. Rear surface 6b is formed from a plane. Rear surface 6b extends rearward from cutting
edge 6a.
[0018] Boom 14 has a base end portion rotatably attached to front frame 2a by a boom pin
9. Bucket 6 is rotatably attached to boom 14 by a bucket pin 17 located at a tip end
of boom 14. Boom pin 9 and bucket pin 17 correspond to "a plurality of articulations"
of work implement 3.
[0019] Work implement 3 further includes a bell crank 18 and a link 15. Bell crank 18 is
rotatably supported on boom 14 by a support pin 18a located substantially in a center
of boom 14. Link 15 is coupled to a coupling pin 18c provided at a tip end portion
of bell crank 18. Link 15 couples bell crank 18 and bucket 6 to each other.
[0020] Front frame 2a and boom 14 are coupled to each other by a pair of boom cylinders
16. Boom cylinder 16 is a hydraulic cylinder. Boom cylinder 16 rotationally drives
boom 14 upward and downward around boom pin 9. Boom cylinder 16 has a base end attached
to front frame 2a. Boom cylinder 16 has a tip end attached to boom 14. Boom cylinder
16 is a hydraulic actuator that operates boom 14 upward and downward with respect
to front frame 2a. With movement upward and downward of boom 14, bucket 6 attached
at the tip end of boom 14 also moves upward and downward.
[0021] A bucket cylinder 19 couples bell crank 18 and front frame 2a to each other. Bucket
cylinder 19 has a base end attached to front frame 2a. Bucket cylinder 19 has a tip
end attached to a coupling pin 18b provided at a base end portion of bell crank 18.
Bucket cylinder 19 is a hydraulic actuator to cause bucket 6 to pivot upward and downward
with respect to boom 14. Bucket cylinder 19 is a work tool cylinder that drives bucket
6. Bucket cylinder 19 rotationally drives bucket 6 around bucket pin 17. Bucket 6
is constructed as being operable with respect to boom 14. Bucket 6 is constructed
as being operable with respect to front frame 2a.
[0022] Boom cylinder 16 and bucket cylinder 19 correspond to an exemplary "work implement
actuator" that drives work implement 3.
[0023] Cab 5 on which an operator rides and a pair of running wheels (rear wheels) 4b are
attached to rear frame 2b. Cab 5 in a box shape is arranged in the rear of boom 14.
Cab 5 is carried on vehicular body frame 2. In cab 5, a seat where the operator of
wheel loader 1 is seated, an operation apparatus 8 which will be described later,
and the like are arranged.
<System Configuration>
[0024] Fig. 2 is a block diagram showing an overall configuration of a control system that
controls wheel loader 1.
[0025] An engine 21 is a drive source that generates drive force to drive work implement
3 and travel apparatus 4, and it is, for example, a diesel engine. A motor driven
by a power storage, instead of engine 21, may be employed as the drive source, or
both of the engine and the motor may be employed. Output from engine 21 is controlled
by adjustment of an amount of fuel to be injected into a cylinder of engine 21.
[0026] Drive force generated by engine 21 is transmitted to a transmission 23. Transmission
23 converts drive force into appropriate torque and a rotation speed. An axle 25 is
connected to an output shaft of transmission 23. Drive force converted by transmission
23 is transmitted to axle 25. Drive force is transmitted from axle 25 to running wheels
4a and 4b (Fig. 1). Wheel loader 1 thus travels. In wheel loader 1 in the embodiment,
both of running wheel 4a and running wheel 4b implement drive wheels for travel of
wheel loader 1 upon receiving drive force.
[0027] Some of drive force from engine 21 is transmitted to a work implement pump 13. Work
implement pump 13 is a hydraulic pump driven by engine 21 to activate work implement
3 with hydraulic oil it delivers. Work implement 3 is driven by hydraulic oil from
work implement pump 13. Hydraulic oil delivered by work implement pump 13 is supplied
to boom cylinder 16 and bucket cylinder 19 through a main valve 32. As boom cylinder
16 extends and contracts upon receiving supply of hydraulic oil, boom 14 moves upward
and downward. As bucket cylinder 19 extends and contracts upon receiving supply of
hydraulic oil, bucket 6 pivots upward and downward.
[0028] Wheel loader 1 includes a vehicular body controller 50. Vehicular body controller
50 includes an engine controller 60, a transmission controller 70, and a work implement
controller 80.
[0029] Vehicular body controller 50 is generally implemented by reading of various programs
by a central processing unit (CPU). Vehicular body controller 50 includes a not-shown
memory. The memory functions as a work memory, and various programs for performing
functions of wheel loader 1 are stored in the memory.
[0030] Operation apparatus 8 is provided in cab 5. Operation apparatus 8 is operated by
an operator. Operation apparatus 8 includes a plurality of types of operation members
operated by the operator to operate wheel loader 1. Operation apparatus 8 includes
an accelerator pedal 41 and a work implement control lever 42. Operation apparatus
8 may include a steering wheel, a shift lever, and the like which are not shown.
[0031] Accelerator pedal 41 is operated to set the target number of rotations of engine
21. Engine controller 60 controls output from engine 21 based on an amount of operation
onto accelerator pedal 41. With increase in amount of operation (amount of pressing)
onto accelerator pedal 41, output from engine 21 increases. With decrease in amount
of operation onto accelerator pedal 41, output from engine 21 decreases. Transmission
controller 70 controls transmission 23 based on the amount of operation onto accelerator
pedal 41.
[0032] Work implement control lever 42 is operated to operate work implement 3. Work implement
controller 80 controls electromagnetic proportional control valves 35 and 36 based
on the amount of operation onto work implement control lever 42.
[0033] Electromagnetic proportional control valve 35 switches main valve 32 such that bucket
cylinder 19 contracts to move bucket 6 in a dump direction (a direction in which the
cutting edge of bucket 6 is lowered). Electromagnetic proportional control valve 35
switches main valve 32 such that bucket cylinder 19 extends to move bucket 6 in a
tilt direction (a direction in which the cutting edge of bucket 6 is raised). Electromagnetic
proportional control valve 36 switches main valve 32 such that boom cylinder 16 contracts
to lower boom 14. Electromagnetic proportional control valve 36 switches main valve
32 such that boom cylinder 16 extends to raise boom 14.
[0034] A machine monitor 51 shows various types of information upon receiving input of a
command signal from vehicular body controller 50. The various types of information
shown on machine monitor 51 may be, for example, information on works performed by
wheel loader 1, vehicular body information such as an amount of remaining fuel, a
temperature of coolant, and a temperature of hydraulic oil, an image of surroundings
obtained by image pick-up of the surroundings of wheel loader 1, and the like. Machine
monitor 51 may be implemented by a touch panel, and in this case, a signal generated
by touching by the operator onto a part of machine monitor 51 is outputted from machine
monitor 51 to vehicular body controller 50.
<Excavation and Loading Works>
[0035] Wheel loader 1 in the present embodiment performs excavation and loading works to
scoop an excavation target such as soil and to load the excavation target onto a loading
target such as a dump truck. Fig. 3 is a plan view of wheel loader 1 that performs
excavation and loading works. Fig. 3 illustrates wheel loader 1 that performs what
is called a V shape work.
[0036] Fig. 3 (A) illustrates wheel loader 1 that performs what is called unloaded forward
travel. Wheel loader 1 travels forward along an excavation path R1 toward an excavation
target 310 such as soil. Wheel loader 1 plunges bucket 6 into excavation target 310
and stops forward travel. By raising bucket 6 with cutting edge 6a of bucket 6 dug
into excavation target 310, the excavation work to scoop excavation target 310 in
bucket 6 is performed.
[0037] Fig. 3 (B) illustrates wheel loader 1 that performs what is called loaded rearward
travel. Excavation target 310 has been loaded in bucket 6. Wheel loader 1 travels
rearward along excavation path R1 to a position from which it started forward travel
in Fig. 3 (A).
[0038] Fig. 3 (C) illustrates wheel loader 1 that performs what is called loaded forward
travel. With excavation target 310 having been loaded in bucket 6, wheel loader 1
travels forward toward a vessel 301 of a dump truck 300. Wheel loader 1 travels forward
along a loading path R2 from the position where it started forward travel in Fig.
3 (A) toward dump truck 300. When wheel loader 1 approaches dump truck 300 and reaches
a prescribed position, it loads excavation target 310 in bucket 6 into vessel 301.
Vessel 301 corresponds to an exemplary "loading target" into which loads in bucket
6 are to be loaded.
[0039] Fig. 3 (D) illustrates wheel loader 1 that performs what is called unloaded rearward
travel. While bucket 6 is empty as a result of full ejection of excavation target
310 in bucket 6 into vessel 301 of dump truck 300, wheel loader 1 travels rearward
along loading path R2 to the position where it started forward travel in Fig. 3 (C).
[0040] Wheel loader 1 can thus repeatedly perform a series of works including excavation,
rearward travel, dump approach, soil ejection, and rearward travel.
<Automatic Control System that Controls Wheel loader 1>
[0041] In automating a loading work for loading onto dump truck 300 by wheel loader 1, in
order to more quickly perform the loading work while an amount of works is ensured
without contact of bucket 6 with vessel 301, reproduction of operations of work implement
3 by a skilled operator under automatic control has been desired. Fig. 4 is a block
diagram showing a configuration of an automatic control system that controls wheel
loader 1.
[0042] An automation controller 100 is configured to transmit and receive a signal to and
from vehicular body controller 50 described with reference to Fig. 2. Automation controller
100 is configured to transmit and receive a signal to and from an external information
obtaining unit 110. External information obtaining unit 110 includes a perception
device 111 and a positional information obtaining device 112. Perception device 111
and positional information obtaining device 112 are mounted on wheel loader 1.
[0043] Perception device 111 obtains information on surroundings of wheel loader 1. Perception
device 111 is attached, for example, to an upper front surface of cab 5. Perception
device 111 corresponds to an exemplary "object sensor" that detects an object around
the main body of wheel loader 1.
[0044] Perception device 111 contactlessly detects a direction of an object outside wheel
loader 1 and a distance to the object. Perception device 111 is implemented, for example,
by light detection and ranging (LiDAR) that obtains information on an object by emission
of laser beams. Perception device 111 may be implemented by a visual sensor including
a camera. Perception device 111 may be implemented by radio detection and ranging
(Radar) that obtains information on an object by emission of radio waves. Perception
device 111 may be implemented by an infrared sensor.
[0045] Positional information obtaining device 112 obtains information on a current position
of wheel loader 1. Positional information obtaining device 112 obtains, for example,
positional information of wheel loader 1 in a global coordinate system with the Earth
being defined as a reference, with the use of a satellite positioning system. Positional
information obtaining device 112 uses, for example, global navigation satellite systems
(GNSS) and includes a GNSS receiver. The satellite positioning system calculates a
position of wheel loader 1 by computing a position of an antenna of the GNSS receiver
based on a positioning signal received from a satellite by the GNSS receiver.
[0046] External information on the outside of wheel loader 1 obtained by perception device
111 and positional information of wheel loader 1 obtained by positional information
obtaining device 112 are inputted to automation controller 100.
[0047] Vehicular body controller 50 is configured to transmit and receive a signal to and
from a vehicle information obtaining unit 120, and receives input of information on
wheel loader 1 obtained by vehicle information obtaining unit 120. Vehicle information
obtaining unit 120 is composed of various sensors mounted on wheel loader 1. Vehicle
information obtaining unit 120 includes an articulation angle sensor 121, a vehicle
speed sensor 122, a boom angle sensor 123, a bucket angle sensor 124, and a boom cylinder
pressure sensor 125.
[0048] Articulation angle sensor 121 detects an articulation angle which is an angle formed
between front frame 2a and rear frame 2b, and generates a signal indicating the detected
articulation angle. Articulation angle sensor 121 outputs a signal indicating the
articulation angle to vehicular body controller 50.
[0049] Vehicle speed sensor 122 detects a speed of movement of wheel loader 1 by travel
apparatus 4, for example, by detection of a rotation speed of an output shaft of transmission
23 and generates a signal indicating the detected vehicle speed. Vehicle speed sensor
122 outputs the signal indicating the vehicle speed to vehicular body controller 50.
Vehicle speed sensor 122 corresponds to an exemplary "travel sensor" that detects
a status of travel of travel apparatus 4 (travel unit).
[0050] Boom angle sensor 123 is implemented, for example, by a rotary encoder provided in
boom pin 9 which is a portion of attachment of boom 14 to vehicular body frame 2.
Boom angle sensor 123 detects an angle of boom 14 with respect to a horizontal direction
and generates a signal indicating the detected angle of boom 14. Boom angle sensor
123 outputs the signal indicating the angle of boom 14 to vehicular body controller
50.
[0051] Bucket angle sensor 124 is implemented, for example, by a rotary encoder provided
in support pin 18a which is a rotation shaft of bell crank 18. Bucket angle sensor
124 detects an angle of bucket 6 with respect to boom 14 and generates a signal indicating
the detected angle of bucket 6. Bucket angle sensor 124 outputs the signal indicating
the angle of bucket 6 to vehicular body controller 50.
[0052] Boom angle sensor 123 and bucket angle sensor 124 correspond to an exemplary "work
implement posture sensor" that detects a posture of work implement 3.
[0053] Boom cylinder pressure sensor 125 detects a pressure on a bottom side (boom bottom
pressure) of boom cylinder 16 and generates a signal indicating the detected boom
bottom pressure. The boom bottom pressure becomes higher while bucket 6 is loaded
and becomes lower while the bucket is unloaded. Boom cylinder pressure sensor 125
outputs a signal indicating the boom bottom pressure to vehicular body controller
50.
[0054] Vehicular body controller 50 outputs information inputted from vehicle information
obtaining unit 120 to automation controller 100. Automation controller 100 receives
detection values from vehicle speed sensor 122, boom angle sensor 123, and bucket
angle sensor 124 through vehicular body controller 50.
[0055] An actuator 140 is configured to transmit and receive a signal to and from vehicular
body controller 50. Upon receiving a command signal from vehicular body controller
50, actuator 140 is driven. Actuator 140 includes a brake EPC (electromagnetic proportional
control valve) 141 for activation of a brake of travel apparatus 4, a steering EPC
142 for adjustment of a travel direction of wheel loader 1, a work implement EPC 143
for operations of work implement 3, and a hydraulic mechanical transmission (HMT)
144.
[0056] Electromagnetic proportional control valves 35 and 36 shown in Fig. 2 implement work
implement EPC 143. Transmission 23 shown in Fig. 2 is implemented as HMT 144 that
utilizes electronic control. Transmission 23 may be a hydro-static transmission (HST).
A power transmission apparatus that transmits motive power from engine 21 to running
wheels 4a and 4b may include an electric drive apparatus such as a diesel electric
drive apparatus, and may include any combination of the HMT, the HST, and the electric
drive apparatus.
[0057] Transmission controller 70 includes a brake control unit 71 and an accelerator control
unit 72. Brake control unit 71 outputs a command signal for control of activation
of the brake to brake EPC 141. Accelerator control unit 72 outputs a command signal
for control of the vehicle speed to HMT 144.
[0058] Work implement controller 80 includes a steering control unit 81 and a work implement
control unit 82. Steering control unit 81 outputs a command signal for control of
the travel direction of wheel loader 1 to steering EPC 142. Work implement control
unit 82 outputs a command signal for control of operations of work implement 3 to
work implement EPC 143.
[0059] Automation controller 100 includes a position estimator 101, a path planning unit
102, and a path tracking control unit 103.
[0060] Position estimator 101 estimates an own position of wheel loader 1 based on the positional
information obtained by positional information obtaining device 112. Position estimator
101 recognizes a target position based on the external information obtained by perception
device 111. The target position is, for example, a position of excavation target 310
or dump truck 300 shown in Fig. 3. Perception device 111 may recognize the target
position and input the target position to automation controller 100, or position estimator
101 may recognize the target position based on a result of detection by perception
device 111.
[0061] Path planning unit 102 generates an optimal path that connects the own position of
wheel loader 1 and the target position to each other. The optimal path includes a
path for travel by travel apparatus 4 and a path for operations of work implement
3.
[0062] Path tracking control unit 103 controls the accelerator, the brake, and steering
such that wheel loader 1 travels as following the optimal path generated by path planning
unit 102. Path tracking control unit 103 outputs a command signal for travel of wheel
loader 1 along the optimal path to brake control unit 71, accelerator control unit
72, and steering control unit 81. Path tracking control unit 103 controls boom cylinder
16 and bucket cylinder 19 such that work implement 3 operates along the optimal path
generated by path planning unit 102. Path tracking control unit 103 outputs a command
signal for movement of work implement 3 along the optimal path to work implement control
unit 82.
[0063] An interface 130 is configured to transmit and receive a signal to and from vehicular
body controller 50. Interface 130 includes an automation switch 131, an engine emergency
stop switch 132, and a mode indicator 133.
[0064] Automation switch 131 is operated by the operator. The operator operates automation
switch 131 to switch between a manual operation of wheel loader 1 and automatic control
of wheel loader 1. Engine emergency stop switch 132 is operated by the operator. When
an event that requires emergency stop of engine 21 occurs, the operator operates engine
emergency stop switch 132. A signal resulting from an operation onto automation switch
131 and engine emergency stop switch 132 is inputted to vehicular body controller
50.
[0065] Mode indicator 133 indicates whether wheel loader 1 is currently in a mode of the
manual operation by the operator or an automatic control mode. Vehicular body controller
50 outputs a command signal for control of turn-on of the indicator to mode indicator
133.
<Flow of Automatic Loading on Dump>
[0066] Fig. 5 is a flowchart showing a flow of operations to load loads carried in bucket
6 into the loading target under automatic control of wheel loader 1.
[0067] Initially, as advance preparation, before start of the loading work, in step S100,
a shape of vessel 301 of dump truck 300 which is the loading target is recognized.
For example, the shape of dump truck 300 is obtained by LiDAR which is perception
device 111. Point group data indicating three-dimensional coordinate values of measurement
points on dump truck 300 is obtained by irradiating dump truck 300 with laser beams
from LiDAR. Dump truck 300 is sensed from four directions of the fore direction, the
aft direction, the right direction, and the left direction, and the shape of vessel
301 can be recognized based on information on a point group. The recognized shape
of vessel 301 is inputted to automation controller 100.
[0068] In step S101, perception device 111 recognizes a reference point P of dump truck
300. Dump truck 300 is sensed by LiDAR which is perception device 111. Automation
controller 100 recognizes the position of vessel 301 based on comparison between the
point group sensed by perception device 111 and a master point group representing
the shape of vessel 301. Automation controller 100 sets as reference point P, an upper
end of a side surface of vessel 301 of dump truck 300 recognized by LiDAR which is
perception device 111.
[0069] In step S102, automation controller 100 sets coordinates with respect to reference
point P, of target positions a to d of cutting edge 6a of bucket 6 moved under automatic
control. Cutting edge 6a of bucket 6 corresponds to an exemplary "feature point" set
in work implement 3. The feature point is not limited to cutting edge 6a of bucket
6, and another point of work implement 3 may be set as the feature point.
[0070] Reference point P and target positions a to d will now be described. Fig. 6 is a
diagram schematically showing arrangement of vessel 301 and wheel loader 1 at the
time of start of dump approach. Fig. 6 and subsequent Figs. 7 to 10 schematically
show vessel 301 viewed from the fore/aft direction of dump truck 300, and schematically
show a part on a front side of wheel loader 1 that approaches vessel 301 from the
left side or the right side of dump truck 300.
[0071] Target position a is set as a position through which cutting edge 6a of bucket 6
passes during forward travel of wheel loader 1 toward dump truck 300. Target position
a is a position where the operation of bucket 6 in the dump direction is started for
loading loads in bucket 6 into vessel 301. Target position a is set as a point more
distant from vessel 301 than reference point P. Target position a is set as a point
in front of reference point P of vessel 301. Target position a is set as a point higher
than reference point P of vessel 301. Target position a corresponds to an exemplary
"first target position."
[0072] Target position b is set as a position where cutting edge 6a of bucket 6 passes after
it passes through target position a and moves beyond reference point P. Target position
b is set as a point where cutting edge 6a of bucket 6 moves toward a farthest side
(the left side in Figs. 6 to 10) while wheel loader 1 travels forward to approach
vessel 301. Target position b is located above vessel 301. Target position b corresponds
to an exemplary "second target position."
[0073] Target position c is set as a position where cutting edge 6a of bucket 6 passes after
it passes through target position b. Target position c is a position where the operation
of bucket 6 in the dump direction is stopped. The operation of bucket 6 in the dump
direction is continued during a period from passage of cutting edge 6a of bucket 6
through target position a until cutting edge 6a of bucket 6 reaches target position
c. Target position c is located above vessel 301. Target position c is set to be closer
to reference point P than target position b.
[0074] Target position d is set as a position where cutting edge 6a of bucket 6 passes after
it passes through target position c. Target position d is a position where the operation
to raise boom 14 is stopped. In order to avoid interference with vessel 301 by work
implement 3, wheel loader 1 during forward travel toward dump truck 300 is performing
the operation to raise boom 14. The operation to raise boom 14 is continued during
a period from start of dump approach by wheel loader 1 until cutting edge 6a of bucket
6 reaches target position d. Target position d is located above vessel 301. Target
position d is set to be closer to reference point P than target position c.
[0075] As shown in Fig. 6, an xy coordinate system with reference point P being defined
as an origin is set. An x axis represents the lateral direction of dump truck 300
that passes through reference point P. A direction away from vessel 301 with reference
point P being defined as the reference is defined as a +x direction. A y axis represents
the upward/downward direction that passes through reference point P. An upward direction
from reference point P is defined as a +y direction.
[0076] A bucket angle θ shown in Fig. 6 represents an angle formed between the ground and
rear surface 6b of bucket 6. Bucket angle θ may be an angle formed between rear surface
6b of bucket 6 and a horizontal plane with the vehicular body being defined as the
reference.
[0077] Target positions a to d are determined by giving horizontal and vertical positions,
that is, an x coordinate and a y coordinate, of cutting edge 6a of bucket 6 with reference
point P being defined as the reference. Target position a is set as a position where
a height position of cutting edge 6a is highest (the y coordinate having a maximum
value) during the loading work. Target position c is set as a position where the height
position of cutting edge 6a is lowest (the y coordinate having a minimum value) during
soil ejection from bucket 6. Target position a is set at a position where the y coordinate
is on a positive side. Target position c is set at a position where the y coordinate
is on a negative side.
[0078] Target position a is set at a position where the x coordinate is on the positive
side. Target positions b, c, and d are set at positions where the x coordinates are
on the negative side. Target position b is set as a position where the x coordinate
has a minimum value during soil ejection from bucket 6.
[0079] Bucket angle θ at the time when cutting edge 6a of bucket 6 is located at each target
position is also set. The posture of work implement 3 at the time when cutting edge
6a of bucket 6 is located at each target position is determined by the x coordinate
and the y coordinate of each target position and bucket angle θ at each target position.
The posture (a target posture) of work implement 3 at the time when cutting edge 6a
of bucket 6 is located at each target position is stored in automation controller
100. A length of boom cylinder 16 and a length of bucket cylinder 19 at the time when
cutting edge 6a of bucket 6 is located at each target position are determined based
on the target posture at the time when cutting edge 6a of bucket 6 is located at each
target position.
[0080] The x coordinate and the y coordinate of each target position and bucket angle θ
at each target position can be determined by analyzing a trace of cutting edge 6a
when the skilled operator performs the loading work to extract a characterizing position
and extracting the posture of work implement 3 at that characteristic position.
[0081] Fig. 7 is a diagram schematically showing the posture of wheel loader 1 when a dump
operation of bucket 6 is started. Fig. 8 is a diagram schematically showing the posture
of wheel loader 1 when cutting edge 6a reaches the farthest position. Fig. 9 is a
diagram schematically showing the posture of wheel loader 1 when the dump operation
of bucket 6 is stopped. Fig. 10 is a diagram schematically showing the posture of
wheel loader 1 when the operation to raise boom 14 is stopped. In Fig. 7, cutting
edge 6a of bucket 6 is located at target position a. In Fig. 8, cutting edge 6a is
located at target position b. In Fig. 9, cutting edge 6a is located at target position
c. In Fig. 10, cutting edge 6a is located at target position d.
[0082] Fig. 11 shows a graph of change in cylinder length during the loading work. The abscissa
in Fig. 11 represents lapse of time and extension lines are drawn at times when cutting
edge 6a passes through target positions a, b, c, and d. The ordinate in Fig. 11 represents
the lengths of boom cylinder 16 and bucket cylinder 19.
[0083] As shown in Fig. 11 and Figs. 6 and 7, before cutting edge 6a reaches target position
a, wheel loader 1 is traveling forward. The length of boom cylinder 16 increases,
and hence boom 14 is being raised. The length of bucket cylinder 19 is constant, and
hence the posture of bucket 6 is constant. Bucket 6 is in a tilted state with the
excavation target having been carried therein. Bucket 6 is in a posture in which it
can transport loads therein in a stable manner.
[0084] As shown in Fig. 11 and Figs. 7 and 8, wheel loader 1 continues forward travel until
cutting edge 6a reaches target position b after it passes through target position
a. The length of boom cylinder 16 keeps increasing, and hence boom 14 keeps rising.
At the time point when cutting edge 6a reaches target position a, the operation of
bucket 6 in the dump direction is started, and bucket 6 continues operating in the
dump direction until the cutting edge reaches target position b. The length of bucket
cylinder 19 keeps decreasing. In movement of cutting edge 6a from target position
a to target position b, the dump operation of bucket 6 affects the position of cutting
edge 6a more greatly than rise of boom 14. Therefore, target position b is lower in
height position than target position a. The value of the y coordinate of target position
b is smaller than the value of the y coordinate of target position a.
[0085] As shown in Fig. 11, after cutting edge 6a reaches target position a, a rate of rise
of boom 14 decreases. The operation to raise boom 14 becomes gentle. Before cutting
edge 6a reaches target position b, the rate of rise of boom 14 again increases.
[0086] As shown in Fig. 11 and Figs. 8 and 9, wheel loader 1 continues forward travel until
cutting edge 6a reaches target position c after it passes through target position
b. The length of boom cylinder 16 keeps increasing, and hence boom 14 keeps rising.
The length of bucket cylinder 19 keeps decreasing, and hence bucket 6 continues operating
in the dump direction. In movement of cutting edge 6a from target position b to target
position c, the dump operation of bucket 6 affects the position of cutting edge 6a
more greatly than rise of boom 14. Therefore, target position c is lower in height
position than target position b. The value of the y coordinate of target position
c is smaller than the value of the y coordinate of target position b.
[0087] During the dump operation of bucket 6, boom 14 keeps rising. During soil ejection
from bucket 6, boom 14 keeps rising. During loading of loads into dump truck 300,
boom 14 keeps rising. During the dump operation of bucket 6, wheel loader 1 moves
toward vessel 301 of dump truck 300, and hence it also continues forward travel.
[0088] As shown in Fig. 11 and Figs. 9 and 10, at the time when cutting edge 6a passes through
target position c, wheel loader 1 is traveling forward, and at the time when cutting
edge 6a passes through target position d, wheel loader 1 is traveling rearward. While
cutting edge 6a is moving between target position c and target position d, the travel
direction of wheel loader 1 is switched from forward travel to rearward travel. The
length of boom cylinder 16 keeps increasing, and hence boom 14 keeps rising. The length
of bucket cylinder 19 is constant, and hence the posture of bucket 6 with respect
to the vehicular body is constant. Target position c is the position where the operation
of bucket 6 in the dump direction is stopped, and while cutting edge 6a is moving
from target position c to target position d, bucket 6 keeps a full dump posture.
[0089] As shown in Figs. 10 and 11, after cutting edge 6a of bucket 6 passes through target
position d, the length of boom cylinder 16 is set to be constant. At this time, the
height position of boom 14 is highest. At the time when boom 14 stops rising, loads
in bucket 6 have already been loaded in vessel 301 and bucket 6 is in an unloaded
state. Since a weight of loads in bucket 6 has become smaller, influence by inertia
at the time when boom 14 is stopped is less. Therefore, vibration of the vehicular
body is less likely.
[0090] In switching of the travel direction of wheel loader 1 from forward travel to rearward
travel, the center of gravity varies in the fore direction. In decrease of rise of
boom 14, the center of gravity of the loads in bucket 6 moves. By thus smoothly moving
the loads in bucket 6 into vessel 301, a time period required for the loading work
can be reduced and the cycle time of the loading work can be reduced.
[0091] Loads in bucket 6 can be loaded into vessel 301 without contact of bucket 6 with
vessel 301, by moving cutting edge 6a of bucket 6 to sequentially pass through target
position a, target position b, target position c, and target position d. By applying
automatic control to thus move bucket 6 to wheel loader 1, operations of work implement
3 equivalent to operations performed by the skilled operator can be realized.
[0092] Referring back to Fig. 5, description of the loading work under automatic control
is continued. In step S103, automation controller 100 recognizes the current positions
of wheel loader 1 and work implement 3. Positional information obtaining device 112
obtains the current position of the vehicular body of wheel loader 1 and obtains the
posture of the work implement with respect to the vehicular body with boom angle sensor
123 and bucket angle sensor 124, to thereby recognize the current positions of wheel
loader 1 and work implement 3 in the global coordinate system. The position of cutting
edge 6a of bucket 6 relative to vessel 301 of dump truck 300 can be calculated based
on the current positions of wheel loader 1 and work implement 3 and the current position
of dump truck 300 in the global coordinate system.
[0093] Alternatively, perception device 111 may be used to obtain the direction and the
distance of reference point P of vessel 301 of dump truck 300 from a position of arrangement
of perception device 111, to thereby calculate the current position of cutting edge
6a of bucket 6 relative to reference point P.
[0094] At which position with respect to each of target positions a to d cutting edge 6a
of bucket 6 is located is recognized based on the current position of work implement
3. For example, cutting edge 6a is recognized as not having reached target position
a yet, cutting edge 6a is recognized as having passed through target position a and
being located between target position a and target position b, cutting edge 6a is
recognized as having passed through target position b and being located between target
position b and target position c, etc. Furthermore, a target position to which cutting
edge 6a is headed next is recognized. For example, when cutting edge 6a has not yet
reached target position a, target position a is recognized as a position to which
the cutting edge is headed next, when cutting edge 6a is located between target position
a and target position b, target position b is recognized as a position to which the
cutting edge is headed next, etc.
[0095] In step S104, automation controller 100 recognizes the length of boom cylinder 16
and the length of bucket cylinder 19 at the current position. Boom angle sensor 123
detects the angle of boom 14. Bucket angle sensor 124 detects the angle of bucket
6. The posture of work implement 3 is determined by the angle of boom 14 and the angle
of bucket 6. The length of boom cylinder 16 and the length of bucket cylinder 19 at
the current position are recognized based on the posture of the work implement.
[0096] Instead of or in addition to boom angle sensor 123 and bucket angle sensor 124, an
angle sensor that detects an angle of bell crank 18 and an angle sensor that detects
an angle of link 15 may be provided. A stroke sensor that detects a length of a cylinder
stroke may be provided in boom cylinder 16 and bucket cylinder 19.
[0097] In step S105, automation controller 100 calculates a difference between the length
of boom cylinder 16 and the length of bucket cylinder 19 at the current position recognized
in step S104 and the length of boom cylinder 16 and the length of bucket cylinder
19 (which will be referred to as a target cylinder length below) at the target position
to which cutting edge 6a is headed next. Automation controller 100 calculates how
much the cylinder is to be moved until cutting edge 6a reaches the next target position.
[0098] In step S106, automation controller 100 refers to a current vehicle speed and determines
a target cylinder stroke speed that achieves the target cylinder length at the time
when cutting edge 6a reaches the target position to which the cutting edge is headed
next. Automation controller 100 controls boom cylinder 16 and bucket cylinder 19 such
that work implement 3 takes, when cutting edge 6a reaches the target position to which
it is headed next, a target posture corresponding to that target position. The current
vehicle speed is obtained by vehicle speed sensor 122. Time until the cutting edge
reaches the next target position can be calculated based on the current position of
cutting edge 6a and the current vehicle speed. The target cylinder stroke speed can
be determined by dividing the difference in cylinder length calculated in step S105
by time until the cutting edge reaches the next target position.
[0099] An amount of cylinder stroke while wheel loader 1 travels a unit distance may be
determined. Travel of the unit distance by wheel loader 1 may be determined based
on the vehicle speed or may be sensed by perception device 111.
[0100] In step S107, automation controller 100 outputs a command current corresponding to
the target cylinder stroke speed to vehicular body controller 50. Automation controller
100 outputs a command to extend and contract boom cylinder 16 and bucket cylinder
19 at the target cylinder stroke speed to work implement control unit 82 of work implement
controller 80. The command to extend and contract boom cylinder 16 and bucket cylinder
19 at the target cylinder stroke speed is outputted from work implement control unit
82 to work implement EPC 143.
[0101] In step S108, as work implement EPC 143 that has received the command signal adjusts
an opening, appropriate hydraulic oil is supplied to boom cylinder 16 and bucket cylinder
19. Boom cylinder 16 and bucket cylinder 19 thus operate.
[0102] In step S109, automation controller 100 recognizes the current lengths of boom cylinder
16 and bucket cylinder 19 as in step S104. Automation controller 100 determines whether
or not the current lengths of boom cylinder 16 and bucket cylinder 19 have reached
the target cylinder lengths.
[0103] When determination as having reached the target cylinder lengths is made in determination
in step S109 (YES in step S109), the process proceeds to step S110 and automation
controller 100 determines whether or not there is a next target position.
[0104] When determination as not having reached the target cylinder length is made in determination
in step S109 (NO in step S109) and when it is determined in step S 110 that there
is a next target position (YES in step S110), the process returns to step S103 and
processing for extending and contracting boom cylinder 16 and bucket cylinder 19 based
on the current position of work implement 3 is repeated. The cylinder speed is successively
changed in accordance with the current position of cutting edge 6a of bucket 6. When
the current position of cutting edge 6a is displaced from a position based on the
cylinder speed set in previous processing, the cylinder speed is adjusted.
[0105] When it is determined in step S 110 that there is no next target position (NO in
step S110), the loading work ends, which corresponds to a case where the next target
position is not set after the end of target position d in the present embodiment.
<Functions and Effects>
[0106] Characteristic features and functions and effects of the present embodiment will
be summarized as below, although some description may overlap with the description
above.
[0107] As shown in Figs. 7 and 11, when work implement 3 approaches vessel 301 which is
the loading target by forward travel of travel apparatus 4, at the time point when
cutting edge 6a of bucket 6 reaches target position a more distant from vessel 301
than reference point P, automation controller 100 starts drive of bucket cylinder
19 to operate bucket 6 in the dump direction.
[0108] When cutting edge 6a passes through target position a in front of reference point
P, boom 14 is being raised. At a time point before cutting edge 6a of bucket 6 reaches
vessel 301, bucket 6 starts dumping. Before boom 14 is raised to the highest position,
the dump operation of bucket 6 is started. By simultaneously performing forward travel
of wheel loader 1 toward dump truck 300, rise of boom 14, and the dump operation of
bucket 6 and performing a plurality of operations as temporally overlapping with one
another, the cycle time of the loading work can be reduced. Therefore, workability
can be improved.
[0109] When boom 14 is raised to the highest position and rise of boom 14 is stopped, the
vehicular body may sway forward and rearward and become unstable by being affected
by inertia. With bucket 6 being loaded, the weight of the loads is great and influence
by inertia is great. By starting the dump operation of bucket 6 during rise of boom
14 before boom 14 reaches the highest position and performing the loading work without
stopping the operation of work implement 3, sway of the vehicle by inertia can be
suppressed.
[0110] By starting the dump operation while cutting edge 6a of bucket 6 is located in front
of reference point P, loads in bucket 6 can be loaded from the front side of vessel
301. A shape of the load is thus more readily adjusted in a next loading operation.
[0111] As shown in Figs. 8 and 11, automation controller 100 continues drive of bucket cylinder
19 to operate bucket 6 in the dump direction until cutting edge 6a of bucket 6 moves
beyond reference point P and reaches target position b above vessel 301. With such
an operation, loads in bucket 6 can reliably be loaded in vessel 301.
[0112] As shown in Figs. 9 and 11, automation controller 100 continues drive of bucket cylinder
19 to operate bucket 6 in the dump direction also after cutting edge 6a of bucket
6 passes through target position b. With such an operation, loads can more reliably
be ejected from bucket 6.
[0113] As shown in Figs. 6 to 8 and 11, automation controller 100 starts drive of boom cylinder
16 to raise boom 14 before cutting edge 6a of bucket 6 reaches target position a and
continues drive of boom cylinder 16 to raise boom 14 also after cutting edge 6a passes
through target position a. The operation to start dump of bucket 6 while boom 14 is
being raised can thus reliably be realized. Contact between the upper end of the side
surface of vessel 301 set as reference point P and work implement 3 can be avoided.
[0114] As shown in Figs. 7 to 8 and 11, automation controller 100 continues drive of boom
cylinder 16 to raise boom 14 until cutting edge 6a of bucket 6 reaches target position
b. With such an operation, the loading work can reliably be performed without the
operation of work implement 3 being stopped.
[0115] As shown in Figs. 8 to 9 and 11, automation controller 100 continues drive of boom
cylinder 16 to raise boom 14 also after cutting edge 6a of bucket 6 passes through
target position b. With such an operation, the loading work can reliably be performed
without the operation of work implement 3 being stopped.
[0116] As shown in Figs. 9 to 11, automation controller 100 continues drive of boom cylinder
16 to raise boom 14 until it stops drive of bucket cylinder 19 to operate bucket 6
in the dump direction. With such an operation, the loading work can reliably be performed
without the operation of work implement 3 being stopped.
[0117] As shown in Figs. 9 to 11, automation controller 100 continues drive of boom cylinder
16 to raise boom 14 until forward travel of travel apparatus 4 is stopped. With such
an operation, the loading work can reliably be performed without the operation of
work implement 3 being stopped.
[0118] As shown in Figs. 4 and 5, the target posture of work implement 3 when cutting edge
6a of bucket 6 is located at target position a is stored in automation controller
100. Automation controller 100 controls boom cylinder 16 and bucket cylinder 19 to
set work implement 3 into the target posture when cutting edge 6a reaches target position
a. With such an operation, contact between work implement 3 and vessel 301 can reliably
be avoided.
[0119] Automation controller 100 included in the automatic control system for wheel loader
1 described in the embodiment above does not necessarily have to be mounted on wheel
loader 1. Such a system that a controller mounted on wheel loader 1 performs processing
for transmitting information obtained by external information obtaining unit 110,
vehicle information obtaining unit 120, and the like to an external controller and
the external controller that receives a signal automatically controls wheel loader
1 may be configured. The external controller may be arranged at a worksite of wheel
loader 1 or at a remote location distant from the worksite of wheel loader 1.
[0120] In the embodiment, an example in which wheel loader 1 is a manned vehicle including
cab 5 on which the operator rides is described. Wheel loader 1 may be an unmanned
vehicle. Wheel loader 1 does not have to include cab 5 on which the operator rides
for performing operations. Wheel loader 1 does not have to be equipped with a function
for manipulating by the operator who rides on the cab. Wheel loader 1 may be a work
machine dedicated for remote control. Wheel loader 1 may be manipulated through a
wireless signal from a remote control device.
<Additional Aspects>
[0121] The description above includes features additionally described below.
(Additional Aspect 1)
[0122] A work machine includes
a main body including a travel unit,
a work implement attached in front of the main body, the work implement including
a bucket at a tip end,
a work implement actuator that drives the work implement with respect to the main
body,
a travel sensor that detects a state of travel of the travel unit,
a work implement posture sensor that detects a posture of the work implement,
an object sensor that detects an object around the main body, and
a controller that provides a command to drive the work implement actuator based on
detection values from the travel sensor, the work implement posture sensor, and the
object sensor, and
the controller recognizes a loading target into which loads in the bucket are to be
loaded, based on detection of the object, and starts drive of the work implement actuator
to operate the bucket in a dump direction while forward travel of the travel unit
continues, at a time point when a feature point of the bucket reaches a first target
position in front of the loading target and higher than the loading target while the
work implement approaches the loading target by forward travel of the travel unit.
(Additional Aspect 2)
[0123] In the work machine according to Additional Aspect 1,
the controller continues drive of the work implement actuator to operate the bucket
in the dump direction until the feature point reaches a second target position above
the loading target.
(Additional Aspect 3)
[0124] In the work machine according to Additional Aspect 2,
the controller continues drive of the work implement actuator to operate the bucket
in the dump direction also after the feature point passes through the second target
position.
(Additional Aspect 4)
[0125] In the work machine according to Additional Aspect 2 or 3,
the work implement has a boom coupled to the main body, and
the controller starts drive of the work implement actuator to raise the boom before
the feature point reaches the first target position and continues drive of the work
implement actuator to raise the boom also after the feature point passes through the
first target position.
(Additional Aspect 5)
[0126] In the work machine according to Additional Aspect 4,
the controller continues drive of the work implement actuator to raise the boom until
the feature point reaches the second target position.
(Additional Aspect 6)
[0127] In the work machine according to Additional Aspect 5,
the controller continues drive of the work implement actuator to raise the boom also
after the feature point passes through the second target position.
(Additional Aspect 7)
[0128] In the work machine according to any one of Additional Aspects 4 to 6,
the controller continues drive of the work implement actuator to raise the boom until
drive of the work implement actuator to operate the bucket in the dump direction is
stopped.
(Additional Aspect 8)
[0129] In the work machine according to any one of Additional Aspects 4 to 7,
the controller continues drive of the work implement actuator to raise the boom until
forward travel of the travel unit is stopped.
(Additional Aspect 9)
[0130] In the work machine according to any one of Additional Aspects 1 to 8,
the controller sets an upper end of a side surface of the loading target recognized
by the object sensor as a reference point, and calculates a current position of the
feature point relative to the reference point.
(Additional Aspect 10)
[0131] In the work machine according to any one of Additional Aspects 1 to 9,
a target posture of the work implement at the time when the feature point is located
at the first target position is stored in the controller, and the controller controls
the work implement actuator to set the work implement into the target posture when
the feature point reaches the first target position.
[0132] It should be understood that the embodiment disclosed herein is illustrative and
non-restrictive in every respect. The scope of the present invention is defined by
the terms of the claims rather than the description above and is intended to include
any modifications within the scope and meaning equivalent to the terms of the claims.
REFERENCE SIGNS LIST
[0133] 1 wheel loader; 2 vehicular body frame; 2a front frame; 2b rear frame; 3 work implement;
4 travel apparatus; 4a, 4b running wheel; 5 cab; 6 bucket; 8 operation apparatus;
9 boom pin; 11 steering cylinder; 13 work implement pump; 14 boom; 15 link; 16 boom
cylinder; 17 bucket pin; 18 bell crank; 18a support pin; 18b, 18c coupling pin; 19
bucket cylinder; 21 engine; 23 transmission; 25 axle; 32 main valve; 35, 36 electromagnetic
proportional control valve; 41 accelerator pedal; 42 work implement control lever;
50 vehicular body controller; 51 machine monitor; 60 engine controller; 70 transmission
controller; 71 brake control unit; 72 accelerator control unit; 80 work implement
controller; 81 steering control unit; 82 work implement control unit; 100 automation
controller; 101 position estimator; 102 path planning unit; 103 path tracking control
unit; 110 external information obtaining unit; 111 perception device; 112 positional
information obtaining device; 120 vehicle information obtaining unit; 121 articulation
angle sensor; 122 vehicle speed sensor; 123 boom angle sensor; 124 bucket angle sensor;
125 boom cylinder pressure sensor; 130 interface; 131 automation switch; 132 engine
emergency stop switch; 133 mode indicator; 140 actuator; 141 brake EPC; 142 steering
EPC; 143 work implement EPC; 144 HMT.