TECHNICAL FIELD
[0001] The present disclosure relates to a method of controlling a sintering process, an
operation guidance method, a method of producing sintered ore, a sintering process
control unit, an operation guidance apparatus, a sintering operation guidance system,
and a terminal apparatus.
BACKGROUND
[0002] In the steelmaking industry, iron ore grades are declining due to years of mining.
A higher proportion of fine ore, which is dressed at the mine to have a high fineness
ratio, is therefore in use, and the sintering process, whereby sintered ore is produced
by condensing fine ore before the ore is charged into a blast furnace, has become
more important. To secure gas permeability in the blast furnace, sintered ore with
less than a predetermined grain size is not charged into the blast furnace, but rather
is sintered again in a sintering machine as return ore. The improvement of yield,
i.e., the percentage that is at least a predetermined grain size, is directly related
to the productivity of the sintering machine. A strong demand to improve yield therefore
exists.
[0003] FIG. 1 is a diagram illustrating an overview of the sintering process. At the entry
side of the sintering machine, fine ore, coke breeze, limestone, quicklime, and the
like are mixed and granulated into a sintering raw material (quasiparticles) via a
surge hopper. The sintering raw material is melted by the heat of combustion of coke
breeze in the sintering machine. Quasiparticles are then fused to each other, cooled
by air drawn from the top, and discharged. The heat pattern during this series of
heating and cooling processes has a significant impact on product yield. The heat
pattern is the temperature distribution of the sintering raw material in the longitudinal
and thickness directions of the sintering machine.
[0004] Although it is difficult to actually measure heat patterns, the Burn Rising Point
(BRP) and Burn Through Point (BTP) are known as feature values of the heat pattern
that can be measured. The BRP is the position in the longitudinal direction where
the exhaust gas temperature in the wind box at the bottom of the sintering machine
exceeds a threshold. The BTP is the position in the longitudinal direction where the
temperature of the exhaust gas measured at the wind box at the bottom of the sintering
machine is the highest.
[0005] Here, as conventional heat pattern control methods, Patent Literature (PTL) 1 and
PTL 2 disclose methods to control the position of the BTP to be constant.
CITATION LIST
Patent Literature
SUMMARY
(Technical Problem)
[0007] Here, the control in PTL 1 and 2 performs feedback control based on actual measured
values. However, a time delay of about 30 to 40 minutes exists between when raw material
is charged into and discharged from the sintering machine. Therefore, with conventional
feedback control, the control accuracy may deteriorate due to the inherent time delay
in the process.
[0008] It is an aim of the present disclosure to provide a method of controlling a sintering
process, an operation guidance method, a method of producing sintered ore, a sintering
process control unit, an operation guidance apparatus, a sintering operation guidance
system, and a terminal apparatus that can present appropriate operation actions that
take into account the time delay of a process.
(Solution to Problem)
[0009]
- (1) A method of controlling a sintering process according to an embodiment of the
present disclosure is
a method of controlling a sintering process using a physical model capable of calculating
a state of the sintering process including a temperature distribution of sintering
raw material in a longitudinal direction and a thickness direction in a sintering
machine, the method including:
a first prediction step of determining a first predicted value of a control variable
in the future for a case in which current manipulated variables are maintained using
the physical model; and
an operation amount calculation step of calculating an operation amount of at least
one specified manipulated variable, which is a portion of the manipulated variables,
to reduce a deviation between a target value and a superimposed predicted value of
the control variable, the superimposed predicted value being based on the first predicted
value and a step response for a case in which the specified manipulated variable is
changed by a unit amount.
- (2) As an embodiment of the present disclosure, (1) further includes
a second prediction step of determining a second predicted value of the control variable
in the future for a case in which the specified manipulated variable is changed using
the physical model; and
a step response calculation step of calculating a step response for the specified
manipulated variable based on the first predicted value and the second predicted value.
- (3) As an embodiment of the present disclosure, in (1) or (2),
the control variable is a feature value of a temperature distribution of the sintering
raw material.
- (4) As an embodiment of the present disclosure, in (3),
the control variable is the BRP or the BTP.
- (5) As an embodiment of the present disclosure, in any one of (1) to (4),
in the operation amount calculation step, the operation amount of the specified manipulated
variable is calculated to minimize or maximize an evaluation function having a term
corresponding to the deviation and a term corresponding to the operation amount of
the specified manipulated variable.
- (6) As an embodiment of the present disclosure, in any one of (1) to (5),
the at least one specified manipulated variable includes at least one of pallet speed,
bed gas flow rate, agglomeration agent ratio, and raw material water content.
- (7) An operation guidance method according to an embodiment of the present disclosure
includes
a guidance operation amount presentation step of presenting, as a guidance operation
amount, an operation amount of the specified manipulated variable calculated by the
method of controlling a sintering process of any one of (1) to (6).
- (8) A method of producing sintered ore according to an embodiment of the present disclosure
includes
producing sintered ore using the guidance operation amount presented by the operation
guidance method of (7).
- (9) A method of producing sintered ore according to an embodiment of the present disclosure
includes
producing sintered ore using the operation amount of the specified manipulated variable
calculated by the method of controlling a sintering process of any one of (1) to (6).
- (10) A sintering process control unit according to an embodiment of the present disclosure
is
a sintering process control unit for controlling a sintering process using a physical
model capable of calculating a state of the sintering process including a temperature
distribution of sintering raw material in a longitudinal direction and a thickness
direction in a sintering machine, the sintering process control unit including:
a first predictor configured to determine a first predicted value of a control variable
in the future for a case in which current manipulated variables are maintained using
the physical model; and
an operation amount calculator configured to calculate an operation amount of at least
one specified manipulated variable, which is a portion of the manipulated variables,
to reduce a deviation between a target value and a superimposed predicted value of
the control variable, the superimposed predicted value being based on the first predicted
value and a step response for a case in which the specified manipulated variable is
changed by a unit amount.
- (11) An operation guidance method according to an embodiment of the present disclosure
includes
a guidance operation amount presenter configured to present, as a guidance operation
amount, an operation amount of the specified manipulated variable calculated by the
sintering process control unit of (10).
- (12) A sintering operation guidance system according to an embodiment of the present
disclosure is
a sintering operation guidance system including an operation data server, a sintering
process control unit, and a terminal apparatus, wherein
the operation data server includes a database storing operation data acquired from
each device in a sintering process and operation control target values of the sintering
process,
the sintering process control unit includes
a first predictor configured to determine a first predicted value of a control variable
in the future for a case in which current manipulated variables are maintained using
a physical model capable of calculating a state of the sintering process including
a temperature distribution of sintering raw material in a longitudinal direction and
a thickness direction in a sintering machine,
an operation amount calculator configured to calculate an operation amount of at least
one specified manipulated variable, which is a portion of the manipulated variables,
to reduce a deviation between a target value and a superimposed predicted value of
the control variable, the superimposed predicted value being based on the first predicted
value and a step response for a case in which the specified manipulated variable is
changed by a unit amount,
a guidance operation amount presenter configured to output a guidance operation amount
including the operation amount of the specified manipulated variable, and
an operation amount transmitter configured to transmit, to each device in the sintering
process, the operation amount of the specified manipulated variable calculated by
the operation amount calculator or an operation amount of the specified manipulated
variable as corrected by an operator, and
the terminal apparatus includes
a guidance operation amount display configured to acquire and display the guidance
operation amount from the sintering process control unit,
an input interface for change in operation amount configured to acquire input of a
change in the operation amount of the specified manipulated variable from the operator,
and
a transmitter for input of change in operation amount configured to transmit the input
of the change to the sintering process control unit.
- (13) A terminal apparatus according to an embodiment of the present disclosure includes
a guidance operation amount display configured to acquire and display a guidance operation
amount, including an operation amount of a specified manipulated variable, from a
sintering process control unit;
an input interface for change in operation amount configured to acquire input of a
change in the operation amount of a specified manipulated variable from an operator;
and
a transmitter for input of change in operation amount configured to transmit the input
of the change to the sintering process control unit, wherein
the operation amount of the specified manipulated variable is calculated by the sintering
process control unit to reduce a deviation between a target value and a superimposed
predicted value of a control variable, the superimposed predicted value being based
on a first predicted value and a step response for a case in which the specified manipulated
variable, which is a portion of manipulated variables, is changed by a unit amount,
the first predicted value being a predicted value of the control variable in the future
for a case in which current manipulated variables are maintained and being determined
using a physical model capable of calculating a state of a sintering process including
a temperature distribution of sintering raw material in a longitudinal direction and
a thickness direction in a sintering machine.
(Advantageous Effect)
[0010] According to the present disclosure, a method of controlling a sintering process,
an operation guidance method, a method of producing sintered ore, a sintering process
control unit, an operation guidance apparatus, a sintering operation guidance system,
and a terminal apparatus that can present appropriate operation actions that take
into account the time delay of a process can be provided.
BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In the accompanying drawings:
FIG. 1 is a diagram illustrating an overview of the sintering process;
FIG. 2 is a diagram illustrating input/output information of a physical model used
in the present disclosure;
FIG. 3 is a diagram illustrating predicted values of the BRP;
FIG. 4 is a diagram illustrating the step response of the BRP when the pallet speed
is increased by a unit amount;
FIG. 5 is a diagram illustrating predicted values of the BRP;
FIG. 6 is a diagram illustrating the step response of the BRP when the bed gas flow
rate is increased by a unit amount;
FIG. 7 is a diagram illustrating the change in the actual value and the estimated
value of the bed gas flow rate;
FIG. 8 is a diagram illustrating the change in explanatory variables in an estimation
equation for the bed gas flow rate;
FIG. 9 is a diagram illustrating the BRP, pallet speed, and quicklime ratio when operation
guidance was implemented;
FIG. 10 is a diagram illustrating a configuration example of a sintering process control
unit according to an embodiment;
FIG. 11 is a flowchart illustrating a method of controlling a sintering process (operation
guidance method) according to an embodiment; and
FIG. 12 is a diagram illustrating a configuration example of a sintering operation
guidance system according to an embodiment.
DETAILED DESCRIPTION
[0012] A method of controlling a sintering process, an operation guidance method, a method
of producing sintered ore, a sintering process control unit, an operation guidance
apparatus, a sintering operation guidance system, and a terminal apparatus according
to an embodiment of the present disclosure will be described below with reference
to the drawings.
[0013] As mentioned above, the BRP and the BTP are examples of feature values of a heat
pattern. The BRP is used as an index of the heat pattern in the present embodiment,
and a control method to keep this index constant is described. As an overview, the
method of controlling a sintering process according to the present embodiment uses
a physical model of a sintering machine to predict the heat pattern with high accuracy
and to determine the operation amounts of manipulated variables, such as the bed gas
flow rate, so that the future BRP is maintained near a target value. Here, the BTP
can also be used as an index of the heat pattern by replacing the BRP with the BTP
in the description below.
[0014] The physical model used in the present disclosure is the same as the model of the
method described in the reference
Yamaoka et al., ISIJ International, Vol. 45, No. 4, pp. 522. That is, the physical model consists of a set of partial differential equations
that take into account the physical phenomena of combustion of coke breeze, thermal
decomposition of limestone, and evaporation of moisture, and that can calculate the
state inside the sintering machine. In the present embodiment, this physical model
is a two-dimensional non-steady state model that can calculate the state of the sintering
process, including the temperature distribution (heat pattern) of sintering raw material
in the longitudinal direction and thickness direction in the sintering machine. The
BRP can also be known from the calculated heat pattern.
[0015] As illustrated in FIG. 2, among the input variables given to the non-steady state
model, the main input variables that vary with time are the pallet speed, exhaust
gas flow rate, raw material bulk density, raw material water content, raw material
limestone ratio, and raw material coke ratio. These input variables can be the manipulated
variables or manipulation factors of the sintering machine. Here, as discussed below,
direct operation may be difficult depending on the type of exhaust gas flow rate.
The pallet speed is the speed at which the pallet of the sintering machine on which
the sintering raw material is placed moves. The exhaust gas flow rate is the flow
rate per unit time of the exhaust gas from the sintering machine and can be regulated
by an exhaust fan, for example. The raw material bulk density is the bulk density
of the sintering raw material as calculated from the layer thickness, sintering machine
width, and the like. The raw material water content, raw material limestone ratio,
and raw material coke ratio are the ratios of water, limestone, and coke, respectively,
in the sintering raw material. Coke is the main agglomeration agent, and the raw material
coke ratio is also referred to as the agglomeration agent ratio.
[0016] The main output variables of the physical model are the BTP, the exhaust gas composition,
and the BRP. The exhaust gas composition includes the ratios of O
2, CO
2, and CO. The output variables, which change from moment to moment, are calculated
using the physical model. The time interval for this calculation (the time difference
between "t + 1" and "t" in the physical model equations described below) is not particularly
limited, but may be one minute as an example.
[0017] The physical model can be expressed by Expressions (1) and (2) below.

[0018] Here, u(t) represents the aforementioned input variables, which can be manipulated
by the operator of the sintering machine, and x(t) represents state variables calculated
in the physical model. The state variables are, for example, the heat pattern in the
sintering machine, the coke reaction rate, and the gas fractions of CO, CO
2, and the like. Also, y(t) is the aforementioned output variables, such as the BTP,
the O
2 ratio in the exhaust gas composition, the CO
2 ratio, the BRP, and the like. In the present embodiment, y(t) includes at least the
BRP. Here, the output variables of y(t), such as the BTP, the exhaust gas composition,
and the BRP, are also referred to as control variables. Control variables are variables
that should be controlled during operation, but which are difficult or impossible
to manipulate directly and are thus changed via correlated manipulated variables.
[0019] A model predictive control system is constructed to control the BRP using the physical
model in Expressions (1) and (2). The detailed configuration of the model predictive
control system (control unit) is described below, whereas the processing is described
here. In the model predictive control system, the future BRP is predicted first assuming
that the current input variables hold in the future. The BRP(y
f(t
0 + k)) is determined under the fixed condition that u(t
0 + k) = u(t
0) with the current time step as t
0. The response y
f(t) determined in this way is called the free response. Hereafter, the predicted value
in the free response is also referred to as the "first predicted value". FIG. 3 is
a diagram illustrating predicted values of the BRP. The BRP is indicated by the distance
[m] from the surge hopper position in the movement direction of the pallet. In the
example in FIG. 3, the point in time at which the prediction is made (the aforementioned
"current time") is indicated by t
0 = 0, and the prediction is made for 90 minutes ahead. That is, in u(t
0 + k) = u(t
0), k is from 1 to 90. In FIG. 3, the free response is indicated as a solid line ("no
action" in FIG. 3).
[0020] In the model predictive control system, predictions are made by changing a portion
of the manipulated variables (corresponding to the specified manipulated variables
described below) among u(t), which are the aforementioned input variables. Hereafter,
the predicted value when a portion of the manipulated variables is changed is also
referred to as the "second predicted value". In the example in FIG. 3, the pallet
speed was changed (increased) by ΔPS
0. The BRP(y'(t
0 + k)) was determined under the condition that u(t
0 + k) = u(t
0) + Δu
1, where Δu
1 is the change in the input variable corresponding to a change of ΔPS
0 in the pallet speed. The predicted values of the BRP in this case are illustrated
by the dashed line ("pallet speed increase" in FIG. 3).
[0021] Furthermore, the step response of the BRP is determined in the model predictive control
system. FIG. 4 is a diagram illustrating the step response of the BRP when the pallet
speed is increased by a unit amount. By taking the difference between the solid and
dashed lines in FIG. 3 and converting the ΔPS
0 of the pallet speed to a unit amount, the step response of the BRP is obtained as
illustrated in FIG. 4. The step response, S
PS(k | t
0), is illustrated in Expression (3) below.
[Math. 2]

[0022] As illustrated in FIG. 3, as the pallet speed increases, the BRP moves to the exit
side of the sintering machine. Here, in the present embodiment, the predicted value
yielded by changing a portion of the manipulated variables is also determined when
determining the predicted value of the free response of the BRP, and the step response
is calculated from the difference of these predicted values. However, it is also possible
to use values calculated beforehand (in advance).
[0023] In the examples in FIGS. 3 and 4, the manipulated variable to be changed is the palette
speed, but other manipulated variables may be changed. The following describes a case
in which predictions are made after changing the bed gas flow rate in the model predictive
control system. Here, the bed gas flow rate is one specific example of the exhaust
gas flow rate and is the flow rate of exhaust gas in the lower portion of the sintering
bed.
[0024] In the model predictive control system, the predicted value of the BRP in the free
response is determined in the same way as above. FIG. 5 is a diagram illustrating
predicted values of the BRP. In FIG. 5, the free response is indicated as a solid
line ("no action" in FIG. 5).
[0025] In the example in FIG. 5, the bed gas flow rate was changed (increased) by Δv
0. The BRP(y'(t
0 + k)) was determined under the condition that u(t
0 + k) = u(t
0) + Δu
2, where Δu
2 is the change in the input variable corresponding to a change of Δv
0 in the bed gas flow rate. The predicted values of the BRP in this case are illustrated
by the dashed line ("air flow rate increase" in FIG. 5).
[0026] Furthermore, the step response of the BRP is determined in the model predictive control
system. FIG. 6 is a diagram illustrating the step response of the BRP when the bed
gas flow rate is increased by a unit amount. By taking the difference between the
solid and dashed lines in FIG. 5 and converting the Δv
0 of the bed gas flow rate to a unit amount, the step response of the BRP is obtained
as illustrated in FIG. 6. In this case, the step response, S
v(k | t
0), is illustrated in Expression (4) below.
[Math. 3]

[0027] As illustrated in FIG. 5, as the bed gas flow rate increases, the BRP moves to the
entry side of the sintering machine, because sintering proceeds more quickly.
[0028] In the model predictive control system, the evaluation function J is used to determine
the operation amounts of the manipulated variables, for which the step response was
determined, so as to reduce the deviation between the predicted value and target value
of the BRP. For example, in a case in which the step response of the BRP when the
pallet speed and bed gas flow rate are increased by a unit amount is determined, the
operation amount of the pallet speed (ΔPS) and the operation amount of the bed gas
flow rate (Δv) are determined using the evaluation function J. To reduce the predicted
deviation of the BRP in the prediction interval (from the time of prediction to 90
minutes ahead in the above example), and also to reduce excessive manipulation of
each manipulated variable (an excessive operation amount), the evaluation function
J can be Expression (5) below, for example.
[Math. 4]

[0029] In the model predictive control system, the operation amount of the pallet speed
(ΔPS) and the operation amount of the bed gas flow rate (Δv) are determined so as
to minimize the evaluation function J in Expression (5). The weight coefficients,
a and b, in Expression (5) may be used to adjust which manipulated variables are selected
or combined. For example, by setting b = 0, it is possible to manipulate only the
pallet speed. Here, y
ref is the target value of the BRP, and y
pre is the predicted value of the BRP. As an assumption for predictive control using
this physical model, it may be assumed that the future BRP can be approximated by
superimposing the response y
f(t), which is the free response, and the step response. The predicted value of the
BRP, i.e., y
pre (superimposed predicted value), can be expressed by Expression (6) below.
[Math. 5]

[0030] In the following, a portion of the manipulated variables for which a step response
is obtained in a case in which the manipulated variables are changed by a unit amount
are referred to as "specified manipulated variables". The terms in Expressions (5)
and (6) for the operation amounts (ΔPS and Δv) can be increased or decreased depending
on the specified manipulated variables. For example, in a case of further determining
the step response of the BRP (S
CR(k | t
0)) when the agglomeration agent ratio is increased by a unit amount, a term for the
operation amount (ΔCR) of the agglomeration agent ratio is added. In other words,
the term "+c(ΔCR)
2" is added to Expression (5) with c as a weighting factor, and the term "+S
CR(k | t
0) × ΔCR" is added to Expression (6). For example, in a case of further determining
the step response of the BRP (S
WR(k | t
0)) when the raw material water content is increased by a unit amount, a term for the
operation amount (ΔWR) of the raw material water content is added. In other words,
the term "+d(ΔWR)
2" is added to Expression (5) with d as a weighting factor, and the term "+S
WR(k | t
0) × ΔWR" is added to Expression (6). For example, in a case in which the step response
of the BRP when the pallet speed is increased by a unit amount is not determined,
the term "+a(ΔPS)
2" may be excluded from Expression (5), or a may be set to 0, and the term "+Sps(k
| t
0) × ΔPS" may be excluded from Expression (6).
[0031] Here, Expression (6) is a linear expression for the operation amounts (ΔPS and Δv)
of the specified manipulated variables, which are unknown variables, and the evaluation
function J is a quadratic expression for the unknown variables. Therefore, ΔPS and
Δv can be determined by quadratic programming.
[0032] In the present embodiment, the case in which the specified manipulated variables
are the pallet speed and the bed gas flow rate is specifically described, but the
specified manipulated variables are not limited to these. For example, the specified
manipulated variables may include at least one of the pallet speed, bed gas flow rate,
agglomeration agent ratio (raw material coke ratio), and raw material water content,
or other variables may be used. Although the unknown variables are determined for
the case in which the evaluation function J is minimized in the present embodiment,
the evaluation function J may be designed so that the minimization of the deviation
between the predicted value and target value of the BRP and the minimization of the
operation amounts of the unknown variables correspond to the maximization of the evaluation
function J. In other words, the operation amounts of the unknown variables may be
determined so that the evaluation function J is minimized or maximized.
[0033] The specified manipulated variables are not limited to manipulated variables that
can be directly manipulated by the operator. In the case in which the bed gas flow
rate is used as a specified manipulated variable, an operation amount of a manipulated
variable that is correlated with the bed gas flow rate and can be directly manipulated
is further determined, since it is difficult to manipulate the bed gas flow rate directly.
A case in which the operation amount of the quicklime ratio is calculated to manipulate
the bed gas flow rate is described below.
[0034] The bed gas flow rate depends on the gas permeability resistance of the sintering
bed. The gas permeability resistance can be suppressed by mixing the fine ore that
is the raw material with quicklime, which acts as a binder, to form quasiparticles.
To quantify the sensitivity of the quicklime ratio relative to the bed gas flow rate,
a regression formula, i.e., an estimation formula for the bed gas flow rate (v), can
be expressed by Expression (7) below.
[Math. 6]

[0035] Here, M is the number of explanatory variables and is assumed to be "5" in the present
embodiment, and p
i and q
i are coefficients. The manipulated variables x
1 to x
5, which are correlated with the bed gas flow rate (v), are the damper opening degree,
quicklime ratio, layer thickness, return ore ratio, and raw material water content,
respectively. The damper opening degree is the degree of opening of the air flow rate
control damper for adjusting the air flow rate under the bed and is, for example,
100% when fully open. The quicklime ratio is the percentage of quicklime in the sintering
raw material. The layer thickness is the thickness of the layer of sintering raw material
on the pallet. The return ore ratio is the percentage of return ore in the sintered
ore after firing. The raw material water content is the percentage of water in the
sintering raw material. These explanatory variables are non-limiting examples, and
any combination of factors that affect the bed gas flow rate may be adopted.
[0036] FIG. 7 illustrates estimated values using Expression (7) and actual values. FIG.
8 also illustrates the changes in the five manipulated variables over the same estimation
period as in FIG. 7. The changes in the five manipulated variables are illustrated
as differences from typical operating conditions. With a
CaO as the partial regression coefficient of quicklime in Expression (7), the operation
amount of the quicklime ratio, i.e., ΔCaO, is determined by the formula "Δv
0pt/a
CaO". Here, Δv
0pt is the optimal operation amount of the bed gas flow rate as calculated by the above
processing using the evaluation function J.
[0037] The model predictive control system outputs the optimal operation amounts determined
by the above processing so that the process computer that manages the sintering process
can reflect the optimal operation amount. Here, the output of the optimal operation
amounts includes output as guidance to the operator who is operating the sintering
machine. During output as guidance, not only information on the optimal operation
amounts, but also, for example, information on the free response prediction curve
as illustrated in FIGS. 3 to 6, the prediction curve in the case of changing a portion
of the manipulated variables (specified manipulated variables), and the curve illustrating
the step response of the BRP may be outputted. In other words, the information outputted
as operation guidance includes at least the guidance operation amounts (optimal operation
amounts) and may be displayed on a display that can be seen by the operator.
[0038] FIG. 9 illustrates an example in which the optimal operation amounts of the pallet
speed and quicklime ratio are determined by the above control method, presented to
the operator as guidance information, and then reflected in the sintering process
by the operator's final decision. In the example illustrated in FIG. 9, it was possible
to keep the BRP near the target value (approximately in the range of -1.0 m to +1.0
m relative to the target value).
[0039] FIG. 10 is a diagram illustrating a configuration example of a sintering process
control unit 10 according to an embodiment. As illustrated in FIG. 10, the sintering
process control unit 10 includes a memory 11, a first predictor 12, a second predictor
13, a step response calculator 14, an operation amount calculator 15, and a guidance
operation amount presenter 16. The sintering process control unit 10 acquires the
actual values and target values in the operating process of the sintering machine
from the operation data server 60. The actual values may include various measurement
values and current manipulated variables that indicate operating conditions. The target
value is the BRP target value. The operation data server 60 is capable of communicating
with the sintering process control unit 10 via a network and may, for example, be
realized on a computer that manages the production of sintered ore. The network is,
for example, the Internet. The sintering process control unit 10 executes the aforementioned
processing, i.e., processing to predict the BRP using a physical model and to determine
the operation amounts of specified manipulated variables, such as the bed gas flow
rate, so that the future BRP is maintained near a target value. In the present embodiment,
the sintering process control unit 10 includes a function to include the operation
amounts of the specified manipulated variables in the guidance operation amounts for
presentation via the guidance operation amount presenter 16, thereby functioning as
an operation guidance apparatus. A display 30 displays the guidance operation amounts
outputted from the sintering process control unit 10 (operation guidance apparatus).
The sintering process control unit 10 may be configured by a computer separate from
the operation data server 60 (for example, a process computer that manages operation
of the sintering machine, or a sintering process control calculation server 10A as
in the example in FIG. 12). The display 30 may be a display apparatus such as a liquid
crystal display (LCD) or an organic electro-luminescence panel (OLED panel). The display
30 may be realized by the display of a terminal apparatus 30A (see FIG. 12), such
as a smartphone or tablet. The terminal apparatus 30A can communicate with the sintering
process control unit 10 via the network. A sintering operation guidance system may
be configured by the sintering process control calculation server 10A that has the
functions of the sintering process control unit 10 and the terminal apparatus 30A
that has the function of the display 30. The sintering process control calculation
server 10A and the terminal apparatus 30A may be in the same location (for example,
in the same plant) or physically located apart. The sintering operation guidance system
may be configured to include an operation data server 60.
[0040] The components of the sintering process control unit 10 are described below. The
memory 11 stores a physical model. The memory 11 also stores programs and data related
to control of the sintering process. The memory 11 may store the acquired actual values
and target values. The memory 11 may store various types of information (for example,
the characteristic curves illustrated in FIGS. 3 to 6) obtained by the processing
for controlling the sintering process. The memory 11 may include any storage devices,
such as semiconductor storage devices, optical storage devices, and magnetic storage
devices. A semiconductor storage device may, for example, include a semiconductor
memory. The memory 11 may include a plurality of types of storage devices.
[0041] The first predictor 12 determines a first predicted value of a control variable in
the future for a case in which current manipulated variables are maintained using
the physical model. The control variable is the BRP in the present embodiment.
[0042] The second predictor 13 determines a second predicted value of the control variable
in the future for a case in which the specified manipulated variables are changed
using the physical model. As described above, the specified manipulated variables
are a portion of the manipulated variables, and the step response of the BRP is determined
in the case in which each of the specified manipulated variables is changed by a unit
amount.
[0043] The step response calculator 14 calculates a step response for the specified manipulated
variables based on the first predicted value and the second predicted value.
[0044] The operation amount calculator 15 calculates the operation amounts of the specified
manipulated variables to reduce the deviation between the target value and the superimposed
predicted value of the control variable based on the first predicted value and the
step response. The superimposed predicted value is calculated using Expression (6)
above. In the present embodiment, the operation amounts of the specified manipulated
variables are calculated using the evaluation function J. As in Expression (5) above,
the evaluation function J has a term corresponding to the deviation and a term corresponding
to the operation amount of the specified manipulated variable.
[0045] The guidance operation amount presenter 16 presents, on the display 30 as guidance
operation amounts, the operation amounts of the specified manipulated variables that
were calculated. In addition to the guidance operation amounts, the guidance operation
amount presenter 16 may output, to the display 30, information such as the free response
prediction curve as illustrated in FIGS. 3 to 6, the prediction curve in the case
of changing a portion of the manipulated variables (specified manipulated variables),
and the curve illustrating the step response of the BRP.
[0046] The operator may change the operating conditions of the sintering machine based on
the guidance operation amounts displayed on the display 30. Such operation guidance
for the sintering machine can also be implemented as part of a production process
for producing sintered ore.
[0047] The sintering process control unit 10 can be realized by a computer as described
above, for example. The computer includes a memory and hard disk drive (storage device),
a CPU (processing unit), and the like, for example. Programs can be stored on the
hard disk drive and read from the hard disk drive into memory when the programs are
to be executed by the CPU. Data during processing is stored in the memory and on the
HDD as necessary. The memory 11 may, for example, be realized by a storage device.
The first predictor 12, second predictor 13, step response calculator 14, operation
amount calculator 15, and guidance operation amount presenter 16 may, for example,
be realized by the CPU reading and executing programs.
[0048] FIG. 11 is a flowchart illustrating a method of controlling a sintering process according
to an embodiment. The sintering process control unit 10 calculates, and outputs as
guidance operation amounts, the operation amounts of the specified manipulated variables
according to the flowchart illustrated in FIG. 11. The method of controlling a sintering
process illustrated in FIG. 11 is also an operation guidance method and may be executed
as part of a method of producing sintered ore.
[0049] The sintering process control unit 10 acquires actual values and target values (step
S1). The first predictor 12 determines a first predicted value of a control variable
in the future for a case in which current manipulated variables are maintained using
the physical model (step S2, first prediction step). The second predictor determines
a second predicted value of the control variable in the future for a case in which
the specified manipulated variable is changed using the physical model (step S3, second
prediction step). The step response calculator 14 calculates a step response for the
specified manipulated variable based on the first predicted value and the second predicted
value (step S4, step response calculation step). The operation amount calculator 15
calculates the operation amounts of the specified manipulated variables to reduce
the deviation between the target value and the superimposed predicted value of the
control variable based on the first predicted value and the step response for the
specified manipulated variables (step S5, operation amount calculation step). The
guidance operation amount presenter 16 presents, as guidance operation amounts, the
operation amounts of the specified manipulated variables that were calculated (step
S6, guidance operation amount presentation step).
[0050] FIG. 12 is a diagram illustrating a configuration example of a sintering operation
guidance system according to an embodiment. The sintering operation guidance system
can be configured to include the operation data server 60, the sintering process control
unit 10, and the terminal apparatus 30A. Here, in the example in FIG. 12, the operation
data server 60 includes a database storing operation data acquired from each device
in a sintering process and operation control target values of the sintering process.
In the example in FIG. 12, the sintering process control unit 10 is realized by the
sintering process control calculation server 10A, which is a server computer that
can communicate with the operation data server 60 and the terminal apparatus 30A via
a network. As in FIG. 10, the sintering process control calculation server 10A includes
the memory 11, the first predictor 12, the second predictor 13, the step response
calculator 14, the operation amount calculator 15, and the guidance operation amount
presenter 16. The sintering process control calculation server 10A further includes
an operation amount transmitter 17. The operation amount transmitter 17 transmits,
to each device in the sintering process, the operation amounts of the specified manipulated
variables calculated by the operation amount calculator 15 or operation amounts of
the specified manipulated variables as corrected by the operator. Here, the operation
amounts of the specified manipulated variables as corrected by the operator are obtained
from the terminal apparatus 30A. The terminal apparatus 30A includes a guidance operation
amount display 31, an input interface for change in operation amount 32, and a transmitter
for input of change in operation amount 33. The guidance operation amount display
31 acquires and displays the guidance operation amounts from the sintering process
control calculation server 10A. The guidance operation amounts include the operation
amounts of the specified manipulated variables calculated by the operation amount
calculator 15 and are outputted from the guidance operation amount presenter 16. The
input interface for change in operation amount 32 acquires input of a change in the
operation amount of a specified manipulated variable from the operator. The input
interface for change in operation amount 32 may, for example, be realized by a touch
panel included in the terminal apparatus 30A. The transmitter for input of change
in operation amount 33 transmits the input of the change in the operation amount of
a specified manipulated variable to the sintering process control calculation server
10A. The transmitter for input of change in operation amount 33 may transmit a signal
indicating no change to the sintering process control calculation server 10A in the
case of no change by the operator. The operation amount transmitter 17 transmits,
to each device in the sintering process, the operation amounts of the specified manipulated
variables after correction by the operator, but in the case of acquiring the signal
indicating no change, the operation amount transmitter 17 may transmit the operation
amounts of the specified manipulated variables calculated by the operation amount
calculator 15.
[0051] As described above, the method of controlling a sintering process (operation guidance
method), the method of producing sintered ore, the sintering process control unit
10 (operation guidance apparatus), and the sintering operation guidance system according
to the present embodiment can present appropriate operation actions that take into
account the time delay of the process. The terminal apparatus 30A according to the
present embodiment is used to present appropriate operation actions that take into
account the time delay of the process. For example, the operator can change the operating
conditions based on the indicated guidance operation amounts to keep the feature values
of the temperature distribution (heat pattern) of the sintering raw material near
the target values, thus improving the yield in the production of sintered ore.
[0052] While embodiments according to the present disclosure have been described with reference
to the drawings and examples, it should be noted that various modifications and amendments
may easily be implemented by those skilled in the art based on the present disclosure.
Accordingly, such modifications and amendments are included within the scope of the
present disclosure. For example, functions or the like included in each component,
each step, or the like can be rearranged without logical inconsistency, and a plurality
of components, steps, or the like can be combined into one or divided. Embodiments
according to the present disclosure can also be realized as a program executed by
a processor included in an apparatus or as a storage medium having the program recorded
thereon. Such embodiments are also to be understood as included in the scope of the
present disclosure.
[0053] The configuration of the sintering process control unit 10 as illustrated in FIG.
10 is an example. The sintering process control unit 10 need not include all of the
components illustrated in FIG. 10. The sintering process control unit 10 may include
components other than those illustrated in FIG. 10. For example, the sintering process
control unit 10 may be configured to further include a display 30. The second prediction
step (step S3) and the step response calculation step (step S4) may be omitted in
the flowchart of FIG. 11 when the step response calculated in advance and stored in
the memory 11 is used.
[0054] In the above embodiments, the calculated operation amounts are presented as guidance
operation amounts and are reflected in the sintering process through a final decision
by the operator. Such operation guidance has been described as being implemented as
part of a production method for producing sintered ore. Here, the sintering process
control unit 10 may directly output the calculated operation amounts of the specified
manipulated variables that were calculated to the facility for producing sintered
ore, and the manipulated variables may be automatically updated by the facility. In
other words, the calculation of the operation amounts of the specified manipulated
variables in the method of controlling the return ore ratio according to the present
embodiment may be performed as part of a production method for producing sintered
ore, without having to pass through the stage of operation guidance to the operator.
Here, the equipment from which the operation amounts operating volume of the specified
manipulated variables are outputted may, for example, be the sintering machine or
a process computer that manages the sintering process. In the case in which the manipulated
variables are automatically updated by the equipment, operations can be carried out
without operator intervention, freeing the operator from the task of determining the
operation amounts so that the operator can concentrate on monitoring the entire process
for the stable production of high-grade sintered ore.
REFERENCE SIGNS LIST
[0055]
- 10
- Sintering process control unit
- 10A
- Sintering process control calculation server
- 11
- Memory
- 12
- First predictor
- 13
- Second predictor
- 14
- Step response calculator
- 15
- Operation amount calculator
- 16
- Guidance operation amount presenter
- 17
- Operation amount transmitter
- 30
- Display
- 30A
- Terminal apparatus
- 31
- Guidance operation amount display
- 32
- Input interface for change in operation amount
- 33
- Transmitter for input of change in operation amount
- 60
- Operation data server
1. A method of controlling a sintering process using a physical model capable of calculating
a state of the sintering process including a temperature distribution of sintering
raw material in a longitudinal direction and a thickness direction in a sintering
machine, the method comprising:
a first prediction step of determining a first predicted value of a control variable
in the future for a case in which current manipulated variables are maintained using
the physical model; and
an operation amount calculation step of calculating an operation amount of at least
one specified manipulated variable, which is a portion of the manipulated variables,
to reduce a deviation between a target value and a superimposed predicted value of
the control variable, the superimposed predicted value being based on the first predicted
value and a step response for a case in which the specified manipulated variable is
changed by a unit amount.
2. The method of controlling a sintering process according to claim 1, further comprising
a second prediction step of determining a second predicted value of the control variable
in the future for a case in which the specified manipulated variable is changed using
the physical model; and
a step response calculation step of calculating a step response for the specified
manipulated variable based on the first predicted value and the second predicted value.
3. The method of controlling a sintering process according to claim 1 or 2, wherein the
control variable is a feature value of a temperature distribution of the sintering
raw material.
4. The method of controlling a sintering process according to claim 3, wherein the control
variable is BRP or BTP.
5. The method of controlling a sintering process according to any one of claims 1 to
4, wherein in the operation amount calculation step, the operation amount of the specified
manipulated variable is calculated to minimize or maximize an evaluation function
having a term corresponding to the deviation and a term corresponding to the operation
amount of the specified manipulated variable.
6. The method of controlling a sintering process according to any one of claims 1 to
5, wherein the at least one specified manipulated variable includes at least one of
pallet speed, bed gas flow rate, agglomeration agent ratio, and raw material water
content.
7. An operation guidance method comprising a guidance operation amount presentation step
of presenting, as a guidance operation amount, an operation amount of the specified
manipulated variable calculated by the method of controlling a sintering process according
to any one of claims 1 to 6.
8. A method of producing sintered ore, the method comprising producing sintered ore using
the guidance operation amount presented by the operation guidance method according
to claim 7.
9. A method of producing sintered ore, the method comprising producing sintered ore using
the operation amount of the specified manipulated variable calculated by the method
of controlling a sintering process according to any one of claims 1 to 6.
10. A sintering process control unit for controlling a sintering process using a physical
model capable of calculating a state of the sintering process including a temperature
distribution of sintering raw material in a longitudinal direction and a thickness
direction in a sintering machine, the sintering process control unit comprising:
a first predictor configured to determine a first predicted value of a control variable
in the future for a case in which current manipulated variables are maintained using
the physical model; and
an operation amount calculator configured to calculate an operation amount of at least
one specified manipulated variable, which is a portion of the manipulated variables,
to reduce a deviation between a target value and a superimposed predicted value of
the control variable, the superimposed predicted value being based on the first predicted
value and a step response for a case in which the specified manipulated variable is
changed by a unit amount.
11. An operation guidance apparatus comprising a guidance operation amount presenter configured
to present, as a guidance operation amount, an operation amount of the specified manipulated
variable calculated by the sintering process control unit according to claim 10.
12. A sintering operation guidance system comprising an operation data server, a sintering
process control unit, and a terminal apparatus, wherein
the operation data server comprises a database storing operation data acquired from
each device in a sintering process and operation control target values of the sintering
process,
the sintering process control unit comprises
a first predictor configured to determine a first predicted value of a control variable
in the future for a case in which current manipulated variables are maintained using
a physical model capable of calculating a state of the sintering process including
a temperature distribution of sintering raw material in a longitudinal direction and
a thickness direction in a sintering machine,
an operation amount calculator configured to calculate an operation amount of at least
one specified manipulated variable, which is a portion of the manipulated variables,
to reduce a deviation between a target value and a superimposed predicted value of
the control variable, the superimposed predicted value being based on the first predicted
value and a step response for a case in which the specified manipulated variable is
changed by a unit amount,
a guidance operation amount presenter configured to output a guidance operation amount
including the operation amount of the specified manipulated variable, and
an operation amount transmitter configured to transmit, to each device in the sintering
process, the operation amount of the specified manipulated variable calculated by
the operation amount calculator or an operation amount of the specified manipulated
variable as corrected by an operator, and
the terminal apparatus comprises
a guidance operation amount display configured to acquire and display the guidance
operation amount from the sintering process control unit,
an input interface for change in operation amount configured to acquire input of a
change in the operation amount of the specified manipulated variable from the operator,
and
a transmitter for input of change in operation amount configured to transmit the input
of the change to the sintering process control unit.
13. A terminal apparatus comprising:
a guidance operation amount display configured to acquire and display a guidance operation
amount, including an operation amount of a specified manipulated variable, from a
sintering process control unit;
an input interface for change in operation amount configured to acquire input of a
change in the operation amount of a specified manipulated variable from an operator;
and
a transmitter for input of change in operation amount configured to transmit the input
of the change to the sintering process control unit, wherein
the operation amount of the specified manipulated variable is calculated by the sintering
process control unit to reduce a deviation between a target value and a superimposed
predicted value of a control variable, the superimposed predicted value being based
on a first predicted value and a step response for a case in which the specified manipulated
variable, which is a portion of manipulated variables, is changed by a unit amount,
the first predicted value being a predicted value of the control variable in the future
for a case in which current manipulated variables are maintained and being determined
using a physical model capable of calculating a state of a sintering process including
a temperature distribution of sintering raw material in a longitudinal direction and
a thickness direction in a sintering machine.