TECHNICAL FIELD
[0001] A refrigerant amount measurement system and a refrigerant use system.
BACKGROUND ART
[0002] In order to repair a refrigeration cycle apparatus such as an air conditioner, in
some cases, a refrigerant is charged on the basis of a difference between an initial
charge amount of the refrigerant in the refrigeration cycle apparatus and an amount
of the refrigerant recovered at the time of repair.
[0003] Patent Literature 1 (
JP 2010-190545 A) discloses a refrigeration apparatus capable of detecting a shortage state of the
refrigerant by a receiver tank internally connected to a refrigerant circuit. The
refrigeration apparatus disclosed in Patent Literature 1 displays a shortage of a
refrigerant amount based on a detection value of the refrigerant detected by a liquid
level detector of the receiver tank incorporated in the apparatus.
SUMMARY OF THE INVENTION
<Technical Problem>
[0004] The refrigeration apparatus disclosed in Patent Literature 1 detects a shortage state
of the refrigerant by the receiver tank internally connected to the refrigerant circuit.
The refrigerant also flows into the receiver tank incorporated in the apparatus during
a normal operation (such as air conditioning operation). Therefore, the refrigeration
apparatus disclosed in Patent Literature 1 requires a refrigerant amount corresponding
to the volume of the receiver tank in addition to a refrigerant amount corresponding
to the existing refrigerant circuit. The refrigeration apparatus disclosed in Patent
Literature 1 causes a pressure loss of the refrigerant when the refrigerant passes
through the receiver tank.
[0005] The present disclosure proposes a refrigerant amount measurement system that is externally
connected to a refrigerant circuit of a refrigeration cycle apparatus, does not generate
an additional refrigerant amount or a pressure loss, and clarifies a refrigerant leakage
amount from a start of use to disposal of the refrigeration cycle apparatus.
<Solution to Problem>
[0006] A refrigerant amount measurement system according to a first aspect includes a connecting
portion, a reservoir, a measurer, and a storage. The connecting portion is connected
to a first refrigerant circuit of a first refrigeration cycle apparatus. The reservoir
reserves a refrigerant in the first refrigerant circuit via the connecting portion,
and returns the reserved refrigerant to the first refrigerant circuit via the connecting
portion. The measurer measures an amount of the refrigerant in the reservoir. The
storage stores a measurement result measured by the measurer.
[0007] This refrigerant amount measurement system reserves the refrigerant in the first
refrigerant circuit in the reservoir externally connected to the first refrigerant
circuit. The refrigerant amount measurement system measures the amount of the refrigerant
in the reservoir and stores the measurement result. The refrigerant amount measurement
system returns the reserved refrigerant to the first refrigerant circuit from the
reservoir externally connected to the first refrigerant circuit. Therefore, the refrigerant
amount measurement system can clarify a leakage amount of the refrigerant in the first
refrigerant circuit without generating an additional refrigerant amount or a pressure
loss.
[0008] A refrigerant amount measurement system according to a second aspect is the refrigerant
amount measurement system according to the first aspect, in which the connecting portion
includes a first pipe and a second pipe. Each of the first pipe and the second pipe
is provided with an on-off valve.
[0009] The connecting portion of this refrigerant amount measurement system includes the
first pipe and the second pipe. Therefore, this refrigerant amount measurement system
can be connected to the first refrigerant circuit by the first pipe and the second
pipe separately for each state of the refrigerant. Each of the first pipe and the
second pipe is provided with an on-off valve. Therefore, this refrigerant amount measurement
system can allow or interrupt communication between the first pipe and the second
pipe.
[0010] A refrigerant amount measurement system according to a third aspect is the refrigerant
amount measurement system according to the second aspect and further includes a control
unit. The control unit performs a first refrigerant amount measurement operation.
The first refrigerant amount measurement operation is an operation of controlling
the first refrigeration cycle apparatus and the on-off valve to transfer the refrigerant
from the first refrigerant circuit to the reservoir, cause the measurer to measure
the amount of the refrigerant, and return the refrigerant from the reservoir to the
first refrigerant circuit.
[0011] The control unit of this refrigerant amount measurement system performs the first
refrigerant amount measurement operation. Therefore, the refrigerant amount measurement
system can reduce the time and effort required for the work of clarifying the leakage
amount of the refrigerant in the first refrigerant circuit.
[0012] A refrigerant amount measurement system according to a fourth aspect is the refrigerant
amount measurement system according to the third aspect, in which the connecting portion
is also connected to a second refrigerant circuit of a second refrigeration cycle
apparatus. The control unit further includes a third pipe and a fourth pipe each provided
with the on-off valve. The connecting portion is connected to the first refrigerant
circuit by the first pipe and the second pipe, and is connected to the second refrigerant
circuit by the third pipe and the fourth pipe.
[0013] The connecting portion of this refrigerant amount measurement system is also connected
to the second refrigerant circuit of the second refrigeration cycle apparatus. Therefore,
this refrigerant amount measurement system can also clarify a leakage amount of the
refrigerant in the second refrigerant circuit. The connecting portion of this refrigerant
amount measurement system includes the third pipe and the fourth pipe. Therefore,
this refrigerant amount measurement system can be connected to the second refrigerant
circuit by the third pipe and the fourth pipe separately for each state of the refrigerant.
Each of the third pipe and the fourth pipe is provided with an on-off valve. Therefore,
this refrigerant amount measurement system can allow or interrupt communication between
the third pipe and the fourth pipe.
[0014] A refrigerant amount measurement system according to a fifth aspect is the refrigerant
amount measurement system according to the fourth aspect, in which the control unit
further performs a second refrigerant amount measurement operation. The second refrigerant
amount measurement operation is an operation of controlling the second refrigeration
cycle apparatus and the on-off valve to transfer the refrigerant from the second refrigerant
circuit to the reservoir, cause the measurer to measure the amount of the refrigerant,
and return the refrigerant from the reservoir to the second refrigerant circuit.
[0015] The control unit of this refrigerant amount measurement system further performs the
second refrigerant amount measurement operation. Therefore, the refrigerant amount
measurement system can also reduce the time and effort required for the work of clarifying
the leakage amount of the refrigerant in the second refrigerant circuit.
[0016] A refrigerant amount measurement system according to a sixth aspect is the refrigerant
amount measurement system according to the fifth aspect, in which the control unit
performs the first refrigerant amount measurement operation and the second refrigerant
amount measurement operation at different times.
[0017] The control unit of this refrigerant amount measurement system performs the first
refrigerant amount measurement operation and the second refrigerant amount measurement
operation at different times. Therefore, this refrigerant amount measurement system
can separately clarify the leakage amount of the refrigerant in the first refrigerant
circuit and the leakage amount of the refrigerant in the second refrigerant circuit
[0018] A refrigerant amount measurement system according to a seventh aspect is the refrigerant
amount measurement system according to the fifth or sixth aspect, in which the control
unit performs the first refrigerant amount measurement operation in a time zone in
which a normal operation of the first refrigeration cycle apparatus is stopped. The
control unit performs the second refrigerant amount measurement operation in a time
zone in which a normal operation of the second refrigeration cycle apparatus is stopped.
[0019] The control unit of this refrigerant amount measurement system performs the first
refrigerant amount measurement operation in a time zone in which the normal operation
of the first refrigeration cycle apparatus is stopped. Therefore, this refrigerant
amount measurement system is not affected by the normal operation of the first refrigeration
cycle apparatus, and can further clarify the leakage amount of the refrigerant in
the first refrigerant circuit. The control unit performs the second refrigerant amount
measurement operation in a time zone in which the normal operation of the second refrigeration
cycle apparatus is stopped. Therefore, this refrigerant amount measurement system
is not affected by the normal operation of the second refrigeration cycle apparatus,
and can further clarify the leakage amount of the refrigerant in the second refrigerant
circuit.
[0020] A refrigerant amount measurement system according to an eighth aspect is the refrigerant
amount measurement system according to any of the fifth to seventh aspects, in which
the control unit performs a first reserving operation and a second reserving operation.
The first reserving operation is an operation of transferring the refrigerant from
the first refrigerant circuit to the reservoir when the refrigerant leaks from the
first refrigerant circuit. The second reserving operation is an operation of transferring
the refrigerant from the second refrigerant circuit to the reservoir when the refrigerant
leaks from the second refrigerant circuit.
[0021] The control unit of this refrigerant amount measurement system performs the first
reserving operation. Therefore, when the refrigerant in the first refrigerant circuit
leaks, this refrigerant amount measurement system can reserve the refrigerant in the
first refrigerant circuit in the reservoir to suppress release of the refrigerant
to the atmosphere. In addition, the control unit of this refrigerant amount measurement
system performs the second reserving operation. Therefore, when the refrigerant in
the second refrigerant circuit leaks, this refrigerant amount measurement system can
reserve the refrigerant in the second refrigerant circuit in the reservoir to suppress
release of the refrigerant into the atmosphere.
[0022] A refrigerant amount measurement system according to a ninth aspect is the refrigerant
amount measurement system according to any of the first to eighth aspects, in which
the measurer includes an electrode rod.
[0023] The measurer of this refrigerant amount measurement system includes the electrode
rod. Therefore, this refrigerant amount measurement system can further clarify the
leakage amount of the refrigerant by using the electrode rod.
[0024] A refrigerant amount measurement system according to a tenth aspect is the refrigerant
amount measurement system according to any of the ninth aspect, in which the measurer
further includes a cylindrical member surrounding the electrode rod.
[0025] The measurer of this refrigerant amount measurement system further includes the cylindrical
member surrounding the electrode rod. Therefore, this refrigerant amount measurement
system can further clarify the leakage amount of the refrigerant by using the cylindrical
member.
[0026] A refrigerant amount measurement system according to an eleventh aspect is the refrigerant
amount measurement system according to one of the first to tenth aspects, in which
the measurer measures the amount of the refrigerant by at least one method of a radio
wave method, an ultrasonic method, a float method, a pressure method, a differential
pressure method, and an electrostatic capacitance method.
[0027] In this refrigerant amount measurement system, the measurer measures the amount of
the refrigerant by at least one method of the radio wave method, the ultrasonic method,
the float method, the pressure method, the differential pressure method, and the electrostatic
capacitance method. Therefore, this refrigerant amount measurement system can further
clarify the leakage amount of the refrigerant on the basis of various methods.
[0028] A refrigerant use system according to a twelfth aspect includes the refrigerant amount
measurement system according to one of the first to eleventh aspects, and a refrigeration
cycle apparatus.
[0029] This refrigerant use system includes the refrigerant amount measurement system and
the refrigeration cycle apparatus. Therefore, this refrigerant use system can clarify
the leakage amount of the refrigerant of the refrigeration cycle apparatus included
in this refrigerant use system.
BRIEF DESCRIPTION OF THE DRAWINGS
[0030]
FIG. 1 is a schematic configuration diagram showing a refrigerant use system 1.
FIG. 2 is a control block diagram of a control unit 140.
FIG. 3 is a control block diagram of a calculation device 470.
FIG. 4 is a schematic configuration diagram showing a flow of a refrigerant R in a
first half operation of an operation of transferring the refrigerant R to a reservoir
460.
FIG. 5 is a schematic configuration diagram showing a flow of the refrigerant R in
a second half operation of the operation of transferring the refrigerant R to the
reservoir 460.
FIG. 6 is a schematic configuration diagram showing the reservoir 460 in which the
refrigerant R is reserved and an electrode rod 461.
FIG. 7 is a diagram showing a relationship between an electrostatic capacitance C
and a liquid level height h in accordance with a temperature.
FIG. 8 is a schematic configuration diagram showing a flow of the refrigerant R in
an operation of returning the refrigerant R to a refrigerant circulation path 150.
FIG. 9 is a schematic configuration diagram showing the flow of the refrigerant R
in the operation of returning the refrigerant R to the refrigerant circulation path
150.
FIG. 10 is a schematic configuration diagram showing a flow of the refrigerant R in
a first half operation of a first reserving operation.
FIG. 11 is a schematic configuration diagram showing a flow of the refrigerant R in
a second half operation of the first reserving operation.
FIG. 12A is a schematic configuration diagram showing the reservoir 460, the electrode
rod 461, and a cylindrical member 462.
FIG. 12B is a sectional view showing a cross section A in FIG. 12A.
DESCRIPTION OF EMBODIMENTS
<First embodiment>
(1) Overall configuration
[0031] Description is made to a refrigerant use system 1 according to a first embodiment
of the present disclosure. FIG. 1 is a schematic configuration diagram showing the
refrigerant use system 1.
[0032] The refrigerant use system 1 includes a first refrigeration cycle apparatus 100A,
a second refrigeration cycle apparatus 100B, and a refrigerant amount measurement
system 4. The refrigerant amount measurement system 4 measures an amount of a refrigerant
R of the first refrigeration cycle apparatus 100A and the second refrigeration cycle
apparatus 100B. The first refrigeration cycle apparatus 100A communicates with the
refrigerant amount measurement system 4 through a first pipe 410 and a second pipe
420. The second refrigeration cycle apparatus 100B communicates with the refrigerant
amount measurement system 4 through a third pipe 430 and a fourth pipe 440.
[0033] The first refrigeration cycle apparatus 100A is electrically connected to a control
unit 140a of the refrigerant amount measurement system 4. The second refrigeration
cycle apparatus 100B is electrically connected to a control unit 140b of the refrigerant
amount measurement system 4.
[0034] FIG. 1 shows a state where the refrigerant amount measurement system 4 is attached
to the first refrigeration cycle apparatus 100A and the second refrigeration cycle
apparatus 100B. Note that the number of refrigeration cycle apparatuses 100 included
in the refrigerant use system 1 is not limited to two, and for example, the number
of refrigeration cycle apparatuses 100 may be one or three or more.
[0035] The first refrigeration cycle apparatus 100A and the second refrigeration cycle apparatus
100B have similar devices and have similar functions. Therefore, in the following
description common to the first refrigeration cycle apparatus 100A and the second
refrigeration cycle apparatus 100B, the description will be made as the refrigeration
cycle apparatus 100. In the description in which requiring distinction between the
first refrigeration cycle apparatus 100A and the second refrigeration cycle apparatus
100B, "A" or "B" is added to reference signs of devices constituting the first refrigeration
cycle apparatus 100A and the second refrigeration cycle apparatus 100B for distinction.
[0036] The control unit 140a and the control unit 140b have similar devices and have similar
functions. Therefore, in the following description common to the control unit 140a
and the control unit 140b, the description will be made as the control unit 140. In
the description in which requiring distinction between the control unit 140a and the
control unit 140b, "a" or "b" is added to reference signs of devices constituting
the control unit 140a and the control unit 140b for distinction.
[0037] Note that, in the following description, the same reference signs are given to the
same or corresponding configurations in the individual embodiments and modifications,
and a description thereof is appropriately omitted.
(2) Detailed configuration
(2-1) Refrigeration cycle apparatus
[0038] The refrigeration cycle apparatus 100 is an air conditioner that cools and heats
an air conditioning target space (not shown) by using a vapor compression refrigeration
cycle. The refrigeration cycle apparatus 100 includes an indoor unit 110, an outdoor
unit 120, a gas-side connection pipe 131, and a liquid-side connection pipe 132. The
refrigeration cycle apparatus 100 is a multi-type air conditioner for a building and
includes two indoor units 110. The number of the indoor units 110 included in the
refrigeration cycle apparatus 100 is not limited to two, and for example, the number
of the indoor units 110 may be one or three or more.
[0039] Although details will be described later, the indoor unit 110 includes an indoor
refrigerant flow path 111, and the outdoor unit 120 has an outdoor refrigerant flow
path 121. The indoor refrigerant flow path 111, the outdoor refrigerant flow path
121, the gas-side connection pipe 131, and the liquid-side connection pipe 132 form
a refrigerant circulation path 150. The refrigerant circulation path 150 of the first
refrigeration cycle apparatus 100A is an example of a first refrigerant circuit. The
refrigerant circulation path 150 of the second refrigeration cycle apparatus 100B
is an example of a second refrigerant circuit. The refrigerant R is charged in the
refrigerant circulation path 150. The refrigerant R charged into the refrigerant circulation
path 150 is not limited, but is, for example, a fluorocarbon-based refrigerant R such
as R32 and R410A having lower flammability (A2L). For example, the refrigerant R may
have flammability or toxicity. Note that the refrigeration cycle apparatus 100 is
not limited to the air conditioner, and may be, for example, a refrigerator, a freezer,
a water heater, a floor heating apparatus, or the like.
(2-1-1) Indoor unit
[0040] The indoor unit 110 is installed in the air conditioning target space. The indoor
unit 110 includes the indoor refrigerant flow path 111 and a detector 116.
[0041] The indoor refrigerant flow path 111 constitutes a part of the refrigerant circulation
path 150. The indoor refrigerant flow path 111 is formed by connecting an indoor heat
exchanger 112 and an indoor expansion mechanism 113 via a refrigerant pipe.
[0042] The indoor heat exchanger 112 exchanges heat between the refrigerant R flowing inside
the indoor heat exchanger 112 and air in the air conditioning target space. The indoor
heat exchanger 112 functions as an evaporator of the refrigerant R during a cooling
operation, and functions as a radiator of the refrigerant R during a heating operation.
One end of the indoor heat exchanger 112 is connected to a gas-side connecting portion
114 via a refrigerant pipe. The other end of the indoor heat exchanger 112 is connected
to the indoor expansion mechanism 113 via a refrigerant pipe.
[0043] The indoor expansion mechanism 113 adjusts a pressure and a flow rate of the refrigerant
R flowing through the refrigerant circulation path 150. The indoor expansion mechanism
113 is an electronic expansion valve whose opening degree is adjusted by an actuator
(not shown). The indoor expansion mechanism 113 is connected to the indoor heat exchanger
112 and a liquid-side connecting portion 115 via a refrigerant pipe. An opening degree
of the indoor expansion mechanism 113 is controlled by the control unit 140.
[0044] The gas-side connecting portion 114 is one end of the indoor refrigerant flow path
111. The gas-side connecting portion 114 is connected to the gas-side connection pipe
131.
[0045] The liquid-side connecting portion 115 is the other end of the indoor refrigerant
flow path 111. The liquid-side connecting portion 115 is connected to the liquid-side
connection pipe 132.
[0046] The detector 116 detects leakage of the refrigerant R from the refrigerant circulation
path 150. The detector 116 is installed inside a casing (not shown) of the indoor
unit 110. The detector 116 is not limited in terms of mode as long as a leakage of
the refrigerant R from the refrigerant circulation path 150 is detected, and may be
alternatively a sensor that detects the refrigerant R, or may detect a leakage of
the refrigerant R through a sudden change in an air temperature inside the casing
of the indoor unit 110 or a temperature of the pipe. After the detector 116 detects
a leakage of the refrigerant R, the detector 116 transmits a signal indicating the
leakage of the refrigerant R to the control unit 140.
(2-1-2) Outdoor unit
[0047] The outdoor unit 120 is disposed outside the air conditioning target space. The outdoor
unit 120 is installed, for example, on a rooftop of a building where the refrigeration
cycle apparatus 100 is installed or adjacent to the building. The outdoor unit 120
includes the outdoor refrigerant flow path 121, a gas-side branch pipe 128, and a
liquid-side branch pipe 129.
[0048] The outdoor refrigerant flow path 121 constitutes a part of the refrigerant circulation
path 150. The outdoor refrigerant flow path 121 is formed by connecting a first compressor
122, an outdoor heat exchanger 123, an outdoor expansion mechanism 124, a flow path
switching mechanism 125, a gas-side connecting portion 126, and a liquid-side connecting
portion 127 via a refrigerant pipe 121a. The refrigerant pipe 121a includes a first
refrigerant pipe 121b, a second refrigerant pipe 121c, and a third refrigerant pipe
121d.
[0049] The first compressor 122 suctions the low-pressure refrigerant R in the refrigeration
cycle from a suction pipe 122a, compresses the refrigerant R by a compression mechanism
(not shown), and discharges the compressed refrigerant R to a discharge pipe 122b.
The operation of the first compressor 122 is controlled by the control unit 140.
[0050] The outdoor heat exchanger 123 exchanges heat between the refrigerant R flowing inside
the outdoor heat exchanger 123 and air (heat source air) at an installation location
of the outdoor unit 120. The outdoor heat exchanger 123 functions as a radiator of
the refrigerant R during the cooling operation, and functions as an evaporator of
the refrigerant R during the heating operation. One end of the outdoor heat exchanger
123 is connected to the flow path switching mechanism 125 via a refrigerant pipe.
The other end of the outdoor heat exchanger 123 is connected to the outdoor expansion
mechanism 124 via a refrigerant pipe.
[0051] The outdoor expansion mechanism 124 adjusts the pressure and the flow rate of the
refrigerant R flowing through the refrigerant circulation path 150. The outdoor expansion
mechanism 124 is an electronic expansion valve whose opening degree is adjusted by
an actuator (not shown). An opening degree of the indoor expansion mechanism 113 is
controlled by the control unit 140. The outdoor expansion mechanism 124 is connected
to the outdoor heat exchanger 123 and the liquid-side connecting portion 127 via a
refrigerant pipe.
[0052] The flow path switching mechanism 125 changes a state of the refrigerant circulation
path 150 between a first state and a second state by switching a flow direction of
the refrigerant R. When the refrigerant circulation path 150 is in the first state,
the outdoor heat exchanger 123 functions as a radiator of the refrigerant R, and the
indoor heat exchanger 112 functions as an evaporator of the refrigerant R. When the
refrigerant circulation path 150 is in the second state, the outdoor heat exchanger
123 functions as an evaporator of the refrigerant R, and the indoor heat exchanger
112 functions as a radiator of the refrigerant R. The flow path switching mechanism
125 is controlled by the control unit 140. In the present embodiment, the flow path
switching mechanism 125 is a four-way switching valve. However, the flow path switching
mechanism 125 is not limited to the four-way switching valve. For example, the flow
path switching mechanism 125 may be configured by combining a plurality of electromagnetic
valves and refrigerant pipes so that the flow direction of the refrigerant R can be
switched as described below.
[0053] During the cooling operation, the flow path switching mechanism 125 sets a state
of the refrigerant circulation path 150 to the first state. In other words, during
the cooling operation, the flow path switching mechanism 125 causes the suction pipe
122a to communicate with the gas-side connecting portion 126, and causes the discharge
pipe 122b to communicate with the outdoor heat exchanger 123 (see a broken line in
the flow path switching mechanism 125 in FIG. 1). During the heating operation, the
flow path switching mechanism 125 sets a state of the refrigerant circulation path
150 to the second state. In other words, during the heating operation, the flow path
switching mechanism 125 causes the suction pipe 122a to communicate with the outdoor
heat exchanger 123, and causes the discharge pipe 122b to communicate with the gas-side
connecting portion 126 (see a solid line in the flow path switching mechanism 125
in FIG. 1).
[0054] The gas-side connecting portion 126 is one end of the outdoor refrigerant flow path
121. The gas-side connection pipe 131 is connected to the gas-side connecting portion
126.
[0055] The liquid-side connecting portion 127 is the other end of the outdoor refrigerant
flow path 121. The liquid-side connection pipe 132 is connected to the liquid-side
connecting portion 127.
[0056] The first refrigerant pipe 121b connects the flow path switching mechanism 125 and
the gas-side connecting portion 126.
[0057] The second refrigerant pipe 121c connects the outdoor heat exchanger 123 and the
outdoor expansion mechanism 124.
[0058] The third refrigerant pipe 121d connects the outdoor expansion mechanism 124 and
the liquid-side connecting portion 127.
[0059] The gas-side branch pipe 128 is a pipe that causes the first refrigerant pipe 121b
and the refrigerant amount measurement system 4 to communicate with each other. In
the present embodiment, one end of the gas-side branch pipe 128 is connected to the
first refrigerant pipe 121b. The other end of the gas-side branch pipe 128 communicates
with the first pipe 410 or the third pipe 430.
[0060] The liquid-side branch pipe 129 is a pipe that causes the second refrigerant pipe
121c and the refrigerant amount measurement system 4 to communicate with each other.
In the present embodiment, one end of the liquid-side branch pipe 129 is connected
to the second refrigerant pipe 121c. The other end of the liquid-side branch pipe
129 communicates with the second pipe 420 or the fourth pipe 440.
(2-1-3) Gas-side connection pipe and liquid-side connection pipe
[0061] The gas-side connection pipe 131 and the liquid-side connection pipe 132 connect
the indoor refrigerant flow path 111 and the outdoor refrigerant flow path 121.
[0062] The gas-side connection pipe 131 is connected to the gas-side connecting portion
114 of the indoor refrigerant flow path 111 and the gas-side connecting portion 126
of the outdoor refrigerant flow path 121.
[0063] The indoor refrigerant flow path 111 is connected to the liquid-side connecting portion
115 of the indoor refrigerant flow path 111 and the liquid-side connecting portion
127 of the outdoor refrigerant flow path 121.
(2-2) Refrigerant amount measurement system
[0064] The refrigerant amount measurement system 4 is a system that reserves the refrigerant
R of the refrigeration cycle apparatus 100, measures the amount of the refrigerant
R, and returns the refrigerant R to the refrigeration cycle apparatus 100. The refrigerant
amount measurement system 4 includes an on-off valve 230, the first pipe 410, the
second pipe 420, the third pipe 430, the fourth pipe 440, a gas-side pipe 451, a liquid-side
pipe 452, a reservoir 460, an electrode rod 461, a calculation device 470, and the
control unit 140. The on-off valve 230, the first pipe 410, the second pipe 420, the
third pipe 430, and the fourth pipe 440 constitute a connecting portion 400. The electrode
rod 461 and a measurement calculator 471 constitute the measurer 401.
[0065] The refrigerant amount measurement system 4 is externally connected to the first
refrigeration cycle apparatus 100A by the first pipe 410 and the second pipe 420.
The refrigerant amount measurement system 4 is externally connected to the second
refrigeration cycle apparatus 100B by the third pipe 430 and the fourth pipe 440.
The number of the refrigeration cycle apparatuses 100 to which the refrigerant amount
measurement system 4 is connected is not limited to two, and for example, the number
of the refrigeration cycle apparatuses 100 may be one or three or more.
(2-2-1) Reservoir
[0066] The reservoir 460 is a cylindrical container that reserves the refrigerant R in the
refrigerant circulation path 150 by a refrigerant amount measurement operation described
later. The reservoir 460 is connected to the refrigeration cycle apparatus 100 by
the first pipe 410, the second pipe 420, the third pipe 430, and the fourth pipe 440
via the gas-side pipe 451 and the liquid-side pipe 452. The reservoir 460 is not limited
to a cylindrical container, and may be alternatively a container having another shape
capable of reserving the refrigerant R.
(2-2-2) Gas-side pipe and liquid-side pipe
[0067] The gas-side pipe 451 is a pipe for causing the first pipe 410 and the third pipe
430 to communicate with the reservoir 460. One end of the gas-side pipe 451 is connected
to the reservoir 460. The other end of the gas-side pipe 451 is connected to the gas-side
branch pipe 128 via the first pipe 410 or the third pipe 430.
[0068] The liquid-side pipe 452 is a pipe for causing the second pipe 420 and the fourth
pipe 440 to communicate with the reservoir 460. One end of the liquid-side pipe 452
is connected to the reservoir 460. The other end of the liquid-side pipe 452 is connected
to the liquid-side branch pipe 129 via the second pipe 420 or the fourth pipe 440.
(2-2-3) Connecting portion
[0069] The connecting portion 400 causes the refrigerant circulation path 150 of the refrigeration
cycle apparatus 100 and the reservoir 460 to communicate with each other. The connecting
portion 400 includes the on-off valve 230, the first pipe 410, the second pipe 420,
the third pipe 430, and the fourth pipe 440.
(2-2-3-1) First pipe
[0070] The first pipe 410 is a pipe that causes a gas-side branch pipe 128A of the first
refrigeration cycle apparatus 100A and the gas-side pipe 451 to communicate with each
other. One end of the first pipe 410 is connected to the gas-side branch pipe 128A
of the first refrigeration cycle apparatus 100A. The other end of the first pipe 410
is connected to the gas-side pipe 451.
(2-2-3-2) Second pipe
[0071] The second pipe 420 is a pipe that causes a liquid-side branch pipe 129A of the first
refrigeration cycle apparatus 100A and the liquid-side pipe 452 to communicate with
each other. One end of the second pipe 420 is connected to the liquid-side branch
pipe 129A of the first refrigeration cycle apparatus 100A. The other end of the second
pipe 420 is connected to the liquid-side pipe 452.
(2-2-3-3) Third pipe
[0072] The third pipe 430 is a pipe that causes a gas-side branch pipe 128B of the second
refrigeration cycle apparatus 100B and the gas-side pipe 451 to communicate with each
other. One end of the third pipe 430 is connected to the gas-side branch pipe 128B
of the second refrigeration cycle apparatus 100B. The other end of the third pipe
430 is connected to the gas-side pipe 451.
(2-2-3-4) Fourth pipe
[0073] The fourth pipe 440 is a pipe that causes a liquid-side branch pipe 129B of the second
refrigeration cycle apparatus 100B and the liquid-side pipe 452 to communicate with
each other. One end of the fourth pipe 440 is connected to the liquid-side branch
pipe 129B of the second refrigeration cycle apparatus 100B. The other end of the fourth
pipe 440 is connected to the liquid-side pipe 452.
(2-2-3-5) On-off valve
[0074] The on-off valve 230 is provided in the first pipe 410, the second pipe 420, the
third pipe 430, and the fourth pipe 440. The on-off valve 230 included in the refrigerant
amount measurement system 4 includes an on-off valve 230a, an on-off valve 230b, an
on-off valve 230c, and an on-off valve 230d.
(2-2-3-5-1) On-off valve 230a
[0075] The on-off valve 230a is provided in the first pipe 410. The on-off valve 230a allows
or interrupts communication of the first pipe 410. The on-off valve 230a is an electromagnetic
on-off valve, and is controlled to opened and closed by the control unit 140a.
(2-2-3-5-2) On-off valve 230b
[0076] The on-off valve 230b is provided in the second pipe 420. The on-off valve 230b allows
or interrupts communication of the second pipe 420. The on-off valve 230b is an electromagnetic
on-off valve, and is controlled to opened and closed by the control unit 140a.
(2-2-3-5-3) On-off valve 230c
[0077] The on-off valve 230c is provided in the third pipe 430. The on-off valve 230c allows
or interrupts communication of the third pipe 430. The on-off valve 230c is an electromagnetic
on-off valve, and is controlled to opened and closed by the control unit 140b.
(2-2-3-5-4) On-off valve 230d
[0078] The on-off valve 230d is provided in the fourth pipe 440. The on-off valve 230d allows
or interrupts communication of the fourth pipe 440. The on-off valve 230d is an electromagnetic
on-off valve, and is controlled to opened and closed by the control unit 140b.
(2-2-4) Electrode rod
[0079] The electrode rod 461 is a device for measuring the amount of the refrigerant R in
the reservoir 460. The electrode rod 461 is electrically connected to the measurement
calculator 471. The electrode rod 461 is controlled by the control unit 140 via the
measurement calculator 471. The electrode rod 461 is provided so as not to change
a positional relationship between the electrode rod 461 and the reservoir 460. The
detailed operation of the electrode rod 461 will be described later.
(2-2-5) Control unit
[0080] The control unit 140 controls operation of each unit constituting the refrigeration
cycle apparatus 100 and the refrigerant amount measurement system 4. The control unit
140 is electrically connected to the indoor expansion mechanism 113, the detector
116, the first compressor 122, the outdoor expansion mechanism 124, the flow path
switching mechanism 125, the on-off valve 230, and the calculation device 470 so as
to be able to exchange control signals and information.
[0081] FIG. 2 is a control block diagram of the control unit 140. In the present embodiment,
the control unit 140 is installed outside the refrigeration cycle apparatus 100. The
control unit 140 may be provided in a casing of the outdoor unit 120 or in a server
away from the refrigeration cycle apparatus 100.
[0082] The control unit 140 controls operations of each unit constituting the refrigeration
cycle apparatus 100 and the refrigerant amount measurement system 4 to execute an
air conditioning operation and a refrigerant amount measurement operation. The air
conditioning operation includes the cooling operation and the heating operation. The
refrigerant amount measurement operation includes a first refrigerant amount measurement
operation and a second refrigerant amount measurement operation. The refrigerant amount
measurement operation is an operation of transferring the refrigerant R from the refrigerant
circulation path 150 to the reservoir 460, causing the measurer 401 to measure the
amount of the refrigerant R, and returning the refrigerant R from the reservoir 460
to the refrigerant circulation path 150.
[0083] The first refrigeration cycle apparatus 100A is connected to the control unit 140a.
The second refrigeration cycle apparatus 100B is connected to the control unit 140b.
The control unit 140a and the control unit 140b are mutually electrically connected.
Since the control unit 140a and the control unit 140b cooperate with each other to
execute the air conditioning operation and the refrigerant amount measurement operation,
hereinafter, the control unit 140a and the control unit 140b are collectively referred
to as the control unit 140.
[0084] Control of the refrigeration cycle apparatus 100 during the cooling operation and
the heating operation will be described. Details of the refrigerant amount measurement
operation will be described later.
(Cooling operation)
[0085] When execution of the cooling operation is instructed to the refrigeration cycle
apparatus 100, the control unit 140 controls the flow path switching mechanism 125
to be in a state indicated by the broken line in FIG. 1 to set a state of the refrigerant
circulation path 150 to the above-described first state, and operates the first compressor
122.
[0086] When the first compressor 122 is operated, a low-pressure gas refrigerant in the
refrigeration cycle is compressed into a high-pressure gas refrigerant in the refrigeration
cycle. The high-pressure gas refrigerant is sent to the outdoor heat exchanger 123
via the flow path switching mechanism 125, and exchanges heat with the heat source
air to be condensed into a high-pressure liquid refrigerant. The high-pressure liquid
refrigerant is sent to the indoor unit 110 via the indoor expansion mechanism 113
that is fully opened and the liquid-side connection pipe 132. The refrigerant R in
a gas-liquid two-phase state sent to the indoor unit 110 is decompressed to a pressure
close to a suction pressure of the first compressor 122 in the indoor expansion mechanism
113 having a reduced opening degree, becomes the refrigerant R in the gas-liquid two-phase
state, and is sent to the indoor heat exchanger 112. The refrigerant R in the gas-liquid
two-phase state exchanges heat with air in the air conditioning target space in the
indoor heat exchanger 112 and evaporates to become a low-pressure gas refrigerant.
The low-pressure gas refrigerant is sent to the outdoor unit 120 via the gas-side
connection pipe 131, and sucked again into the first compressor 122 via the flow path
switching mechanism 125. A temperature of air supplied to the indoor heat exchanger
112 decreases by heat exchange with the refrigerant R flowing through the indoor heat
exchanger 112. The air cooled by the indoor heat exchanger 112 is blown out into the
air conditioning target space.
(Heating operation)
[0087] When execution of the heating operation is instructed to the refrigeration cycle
apparatus 100, the control unit 140 controls the flow path switching mechanism 125
to be in a state indicated by the solid line in FIG. 1 to set a state of the refrigerant
circulation path 150 to the above-described second state, and operates the first compressor
122.
[0088] When the first compressor 122 is operated, a low-pressure gas refrigerant in the
refrigeration cycle is compressed into a high-pressure gas refrigerant in the refrigeration
cycle. The high-pressure gas refrigerant is sent to the indoor unit 110 via the flow
path switching mechanism 125 and the gas-side connection pipe 131. The refrigerant
R sent to the indoor unit 110 is sent to the indoor heat exchanger 112, and exchanges
heat with air in the air conditioning target space to be condensed into a high-pressure
liquid refrigerant. The temperature of air supplied to the indoor heat exchanger 112
rises by heat exchange with the refrigerant R flowing through the indoor heat exchanger
112. The air heated by the indoor heat exchanger 112 is blown out into the air conditioning
target space. The high-pressure liquid refrigerant flowing out of the indoor heat
exchanger 112 is sent to the outdoor unit 120 via the indoor expansion mechanism 113
that is fully opened and the liquid-side connection pipe 132. The refrigerant R sent
to the outdoor unit 120 is decompressed to a pressure close to a suction pressure
of the first compressor 122 in the outdoor expansion mechanism 124 having a reduced
opening degree, and becomes the refrigerant R in a gas-liquid two-phase state and
is sent to the outdoor heat exchanger 123. The refrigerant R in the gas-liquid two-phase
state exchanges heat with the heat source air in the outdoor heat exchanger 123 and
evaporates to become a low-pressure gas refrigerant. The low-pressure gas refrigerant
is sucked into the first compressor 122 again via the flow path switching mechanism
125.
[0089] The control unit 140 is implemented by a computer. The control unit 140 includes
a control calculation device and a storage device (both not shown). The control calculation
device may be a processor such as a CPU or a GPU. The control calculation device reads
a program stored in the storage device and executes predetermined image processing
or calculation processing in accordance with the program. The control calculation
device can write a calculation result to the storage device and read information stored
in the storage device in accordance with the program. The storage device can be used
as a database. Specific functions implemented by the control unit 140 will be described
later.
[0090] Note that the configuration of the control unit 140 described here is merely an example,
and the function of the control unit 140 described below may be implemented by software,
hardware, or a combination of software and hardware.
(2-2-6) Calculation device
[0091] The calculation device 470 is a device that performs calculation related to measurement
of the amount of the refrigerant R in the reservoir 460, and records and stores a
measurement result in the storage 472. FIG. 3 is a control block diagram of the calculation
device 470. The calculation device 470 includes the measurement calculator 471 and
the storage 472. The calculation device 470 is electrically connected to the electrode
rod 461 and the control unit 140. The calculation device 470 is controlled by the
control unit 140.
[0092] The calculation device 470 may be provided near the place where the reservoir 460
is provided, in a building where the refrigeration cycle apparatus 100 or the reservoir
460 is provided, in a server away from the refrigeration cycle apparatus 100, or the
like. The measurement calculator 471 and the storage 472 may be provided at different
locations.
[0093] The calculation device 470 is implemented by a computer. The calculation device 470
includes a control calculation device and a storage device (both not shown). The control
calculation device may be a processor such as a CPU or a GPU. The control calculation
device reads a program stored in the storage device and executes predetermined image
processing or calculation processing in accordance with the program. The control calculation
device can write a calculation result to the storage device and read information stored
in the storage device in accordance with the program. The storage device can be used
as a database.
[0094] Note that the configuration of the calculation device 470 described here is merely
an example, and the function of the calculation device 470 described below may be
implemented by software, hardware, or a combination of software and hardware.
(2-2-6-1) Measurement calculator
[0095] The measurement calculator 471 performs calculation related to measurement of the
amount of the refrigerant R in the reservoir 460 and records the measurement result
in the storage 472. The measurement calculator 471 is electrically connected to the
electrode rod 461 and the control unit 140. The measurement calculator 471 is controlled
by the control unit 140. The detailed operation of the measurement calculator 471
will be described later.
(2-2-6-2) Storage
[0096] The storage 472 is a storage device that stores the measurement result of the amount
of the refrigerant R in the reservoir 460. The storage 472 is electrically connected
to the measurement calculator 471 and the control unit 140. The storage 472 is controlled
by the control unit 140.
(3) Operation
[0097] The refrigerant amount measurement operation executed by the control unit 140 of
the refrigerant amount measurement system 4 will be described.
(3-1) Refrigerant amount measurement operation
[0098] The refrigerant amount measurement operation is an operation of transferring the
refrigerant R from the refrigerant circulation path 150 to the reservoir 460, causing
the measurer 401 to measure the amount of the refrigerant R, and returning the refrigerant
R from the reservoir 460 to the refrigerant circulation path 150. The refrigerant
amount measurement operation is performed to measure a refrigerant charge amount in
the refrigeration cycle apparatus at each time point from a start of use to disposal
of the refrigeration cycle apparatus, and clarify a leakage amount of the refrigerant
R from the refrigerant charge amount at the start of use, a refrigerant charge amount
after the start of use, a refrigerant charge amount immediately before the disposal,
and a difference between the refrigerant charge amount at the start of use and the
refrigerant charge amount at each time point. The refrigerant amount measurement operation
includes the first refrigerant amount measurement operation and the second refrigerant
amount measurement operation.
(3-1-1) First refrigerant amount measurement operation
[0099] The first refrigerant amount measurement operation is an operation of transferring
the refrigerant R from the refrigerant circulation path 150 of the first refrigeration
cycle apparatus 100A to the reservoir 460, causing the measurer 401 to measure the
amount of the refrigerant R, and returning the refrigerant R from the reservoir 460
to the refrigerant circulation path 150 of the first refrigeration cycle apparatus
100A. The first refrigerant amount measurement operation will be described separately
for an operation of transferring the refrigerant R to the reservoir 460, an operation
of causing the measurer 401 to measure the amount of the refrigerant R, and an operation
of returning the refrigerant R to the refrigerant circulation path 150.
(3-1-1-1) Operation of transferring refrigerant to reservoir
(First half operation)
[0100] A first half operation of the operation of transferring the refrigerant R to the
reservoir 460 is an operation of mainly reserving a liquid refrigerant in the refrigerant
R in the refrigerant circulation path 150. FIG. 4 is a schematic configuration diagram
showing a flow of the refrigerant R in the first half operation of the operation of
transferring the refrigerant R to the reservoir 460.
[0101] In the first half operation of the operation of transferring the refrigerant R to
the reservoir 460, the control unit 140a sets an indoor expansion mechanism 113A to
an open state for all indoor units 110A. For an outdoor unit 120A, the control unit
140a sets an outdoor expansion mechanism 124A of the first refrigeration cycle apparatus
100A to a closed state, sets a flow path switching mechanism 125A to the first state,
and operates the first compressor 122 (On). Furthermore, the control unit 140a sets
the on-off valve 230b to the open state and sets the on-off valves 230 other than
the on-off valve 230b to the closed state in the refrigerant amount measurement system
4. Specifically, the control unit 140a sets the on-off valve 230a, the on-off valve
230c, and the on-off valve 230d to the closed state.
[0102] The first half operation of the operation of transferring the refrigerant R to the
reservoir 460 is executed, and thus, the refrigerant R in an indoor refrigerant flow
path 111A is sucked by a first compressor 122A of the outdoor unit 120A as indicated
by an arrow in FIG. 4. The refrigerant R sucked into the first compressor 122A is
discharged from the first compressor 122A, and then passes through the flow path switching
mechanism 125A and an outdoor heat exchanger 123A. The refrigerant R having passed
through the outdoor heat exchanger 123A is sent to the outdoor expansion mechanism
124A, but flows into the liquid-side branch pipe 129A since the outdoor expansion
mechanism 124A is in the closed state. The refrigerant R having flowed into the liquid-side
branch pipe 129A passes through the second pipe 420 and the liquid-side pipe 452 and
flows into the reservoir 460. Since the on-off valve 230 other than the on-off valve
230b of the refrigerant amount measurement system 4 is in the closed state, the refrigerant
R having flowed in is reserved in the reservoir 460.
[0103] The control unit 140a executes the first half operation of the operation of transferring
the refrigerant R to the reservoir 460 for a predetermined time T 1 set in advance,
and then, ends the first half operation of the operation of transferring the refrigerant
R to the reservoir 460 and starts the second half operation of the operation of transferring
the refrigerant R to the reservoir 460. The predetermined time T1 is set to a length
that allows the liquid refrigerant inside the refrigerant circulation path 150A to
be reserved into the reservoir 460.
(Second half operation)
[0104] The second half operation of the operation of transferring the refrigerant R to the
reservoir 460 is an operation for reserving mainly the gas refrigerant in the reservoir
460, the gas refrigerant remaining in the outdoor refrigerant flow path 121 without
being reserved in the reservoir 460 by the execution of the first half operation of
the operation of transferring the refrigerant R to the reservoir 460. FIG. 5 is a
schematic configuration diagram showing a flow of the refrigerant R in the second
half operation of the operation of transferring the refrigerant R to the reservoir
460.
[0105] In the second half operation of the operation of transferring the refrigerant R to
the reservoir 460, the control unit 140a sets the on-off valve 230a to the open state
for the reservoir 460. In the other devices, the state of the first half operation
of the operation of transferring the refrigerant R to the reservoir 460 is maintained.
[0106] The second half operation of the operation of transferring the refrigerant R to the
reservoir 460 is executed, and thus, the gas refrigerant in the refrigerant R reserved
in the reservoir 460 flows into the first pipe 410 through the on-off valve 230a as
indicated by an arrow in FIG. 5. The refrigerant R having flowed into the first pipe
410 is sent to the outdoor refrigerant flow path 121A, passes through the flow path
switching mechanism 125A, and is sucked by the first compressor 122A. The refrigerant
R sucked into the first compressor 122A is discharged from the first compressor 122A,
and passes through the outdoor heat exchanger 123A. The refrigerant R having passed
through the outdoor heat exchanger 123A is sent to the outdoor expansion mechanism
124A, but flows into the liquid-side branch pipe 129A since the outdoor expansion
mechanism 124A is in the closed state. The refrigerant R having flowed into the liquid-side
branch pipe 129A passes through the second pipe 420 and returns to the reservoir 460.
[0107] The control unit 140a executes the second half operation of the operation of transferring
the refrigerant R to the reservoir 460 for a predetermined time T2 set in advance,
and then, ends the second half operation of the operation of transferring the refrigerant
R to the reservoir 460. For example, the predetermined time T2 is set to a length
that allows the reservoir 460 to recover the refrigerant R remaining in the refrigerant
circulation path 150A after execution of the first half operation of the operation
of transferring the refrigerant R to the reservoir 460.
(3-1-1-2) Operation of causing measurer 401 to measure amount of refrigerant
[0108] The operation of causing the measurer 401 to measure the amount of the refrigerant
R is an operation of causing the measurer 401 to measure the amount of the refrigerant
R reserved in the reservoir 460. The control unit 140a causes the measurer 401 to
measure the amount of the refrigerant R when a predetermined time T3 set in advance
has elapsed from the time when the second half operation of the operation of transferring
the refrigerant R to the reservoir 460 ends.
(Principle of measurement)
[0109] FIG. 6 is a schematic configuration diagram showing the reservoir 460 in which the
refrigerant R is reserved and the electrode rod 461. An electrostatic capacitance
C is determined by a distance X between the electrode rod 461 and the reservoir 460,
dielectric constants ε of air and the refrigerant R, and an electrode area S.
[0110] The positional relationship between the electrode rod 461 and the reservoir 460 does
not change. Therefore, the distance X between the electrode rod 461 and the reservoir
460 is a fixed value.
[0111] When the temperature is constant, the dielectric constants ε of the air and the refrigerant
R are also fixed values. For example, when the temperature is 0 degrees, the dielectric
constant ε of the air is 1.00059. When the temperature is 25 degrees and the refrigerant
R is R32, the dielectric constant ε is 14.27. When the temperature is 25 degrees and
the refrigerant R is R410A, the dielectric constant ε is 7.88.
[0112] Therefore, the electrostatic capacitance C varies depending on the electrode area
S. A width d of the cylindrical reservoir 460 has a fixed value. Therefore, the electrode
area S is proportional to a liquid level height h of the refrigerant R.
[0113] FIG. 7 is a diagram showing a relationship between an electrostatic capacitance C
and a liquid level height h of the refrigerant R in accordance with the temperature.
The dielectric constant ε of the refrigerant R decreases at a high temperature and
increases at a low temperature.
[0114] Therefore, by measuring the electrostatic capacitance C and the temperature of the
refrigerant R and using other eigenvalues, the liquid level height h of the refrigerant
R can be calculated, and the refrigerant amount can be calculated.
(Operation of measurement)
[0115] In the storage 472, the distance X, the width d, the dielectric constants ε of the
air and the refrigerant R associated with the temperature, and the like are recorded
in advance.
[0116] The operation of causing the measurer 401 to measure the amount of the refrigerant
R is executed, and thus, the control unit 140a causes the electrode rod 461 to measure
the electrostatic capacitance C in the reservoir 460 via the measurement calculator
471. The control unit 140a causes a thermometer (not shown) to measure the temperature
of the refrigerant R. The measurement calculator 471 compares the measured temperature
of the refrigerant R with the dielectric constants ε of the air and the refrigerant
R associated with the temperature recorded in the storage 472 to obtain the dielectric
constants ε of the air and the refrigerant R. The measurement calculator 471 obtains
the liquid level height h of the refrigerant R and the amount of the refrigerant R
from the measured electrostatic capacitance C, the distance X and the width d recorded
in the storage 472, and the obtained dielectric constants ε of the air and the refrigerant
R. The measurement calculator 471 records the obtained amount of the refrigerant R
in the storage 472. The measurement calculator 471 may transmit the obtained amount
of the refrigerant R to the control unit 140a.
[0117] The measurement calculator 471 may calculate the dielectric constant ε of the air
as one regardless of a change in temperature.
[0118] The refrigerant amount measurement system 4 measures the amount of the refrigerant
R on the basis of the temperature of the refrigerant R measured by the thermometer.
Therefore, the refrigerant amount measurement system 4 can accurately obtain the amount
of the refrigerant R even when the temperature changes.
[0119] The measurement calculator 471 may perform calculation processing of obtaining a
difference between the measured refrigerant amount and the refrigerant charge amount
at the start of use. In this case, the storage 472 records in advance the refrigerant
charge amount at the start of use. The measurement calculator 471 performs calculation
processing on the basis of the refrigerant charge amount at the start of use stored
in the storage 472 and the measured refrigerant amount. As a result, the refrigerant
amount measurement system 4 can reduce a burden of work of clarifying the leakage
amount of the refrigerant R.
[0120] The measurement calculator 471 may determine whether the refrigerant R has leaked
on the basis of the refrigerant charge amount at the start of use, the refrigerant
charge amount after the start of use, the refrigerant charge amount immediately before
disposal, and the difference between the measured refrigerant amount and the refrigerant
charge amount at the start of use. In this case, the storage 472 records in advance
at least one of the refrigerant charge amount at the start of use, the refrigerant
charge amount after the start of use, or the refrigerant charge amount immediately
before disposal. The measurement calculator 471 determines whether the refrigerant
R has leaked from at least one of the refrigerant charge amounts at the start of use,
the refrigerant charge amount after the start of use, and the refrigerant charge amount
immediately before discarding stored in the storage 472, or the difference between
the measured refrigerant amount and the refrigerant charge amount at the start of
use. As a result, the refrigerant amount measurement system 4 can reduce a burden
of work of clarifying the leakage amount of the refrigerant R.
[0121] Furthermore, when determining that the refrigerant R has leaked, the measurement
calculator 471 may perform calculation processing of obtaining the leakage amount
of the refrigerant R on the basis of the refrigerant charge amount at the start of
use, the refrigerant charge amount after the start of use, the refrigerant charge
amount immediately before disposal, or the difference between the measured refrigerant
amount and the refrigerant charge amount at the start of use. As a result, the refrigerant
amount measurement system 4 can reduce a burden of work of clarifying the leakage
amount of the refrigerant R.
(3-1-1-3) Operation of returning refrigerant to refrigerant circulation path 150
[0122] The operation of returning the refrigerant R to the refrigerant circulation path
150 is an operation of charging the refrigerant R reserved in the reservoir 460 into
the refrigerant circulation path 150. In the following description, a case where the
refrigerant R is returned to the first refrigeration cycle apparatus 100A will be
described as an example. FIG. 8 is a schematic configuration diagram showing the flow
of the refrigerant R in the operation of returning the refrigerant R to the refrigerant
circulation path 150.
[0123] In the operation of returning the refrigerant R to the refrigerant circulation path
150, for the outdoor unit 120A, the control unit 140a sets the outdoor expansion mechanism
124A of the first refrigeration cycle apparatus 100A to the open state, sets the flow
path switching mechanism 125A to the first state, and operates the first compressor
122A (On). In addition, the control unit 140a sets the on-off valve 230a to the open
state and sets the on-off valve 230b, the on-off valve 230c, and the on-off valve
230d to the closed state.
[0124] The operation of returning the refrigerant R to the refrigerant circulation path
150, and thus, the suction pressure of the first compressor 122A of the outdoor unit
120A acts on the inside of the reservoir 460 via the flow path switching mechanism
125, the gas-side branch pipe 128A, and the first pipe 410 as indicated by an arrow
in FIG. 8. Due to the suction pressure acting inside the reservoir 460, the refrigerant
R inside the reservoir 460 flows into the first pipe 410 and is charged in the refrigerant
circulation path 150 via the gas-side branch pipe 128A.
[0125] The operation of returning the refrigerant R to the refrigerant circulation path
150 is executed for a predetermined time T4 set in advance, and then, the control
unit 140a ends the operation of returning the refrigerant R to the refrigerant circulation
path 150. The predetermined time T4 is set to, for example, a length that allows the
refrigerant R reserved in the reservoir 460 to be charged in the refrigerant circulation
path 150.
(3-1-2) Second refrigerant amount measurement operation
[0126] The second refrigerant amount measurement operation is an operation of transferring
the refrigerant R from the refrigerant circulation path 150 of the second refrigeration
cycle apparatus 100B to the reservoir 460, causing the measurer 401 to measure the
amount of the refrigerant R, and returning the refrigerant R from the reservoir 460
to the refrigerant circulation path 150 of the second refrigeration cycle apparatus
100B. The second refrigerant amount measurement operation is similar to the first
refrigerant amount measurement operation. Therefore, the second refrigerant amount
measurement operation will be briefly described.
(3-1-2-1) Operation of transferring refrigerant to reservoir
(First half operation)
[0127] In the first half operation of the operation of transferring the refrigerant R to
the reservoir 460, the control unit 140b sets an indoor expansion mechanism 113B to
the open state for all indoor units 110B. For an outdoor unit 120B, the control unit
140b sets an outdoor expansion mechanism 124B of the second refrigeration cycle apparatus
100B to the closed state, sets a flow path switching mechanism 125B to the first state,
and operates the first compressor 122 (On). Furthermore, the control unit 140b sets
the on-off valve 230d to the open state and sets the on-off valves 230 other than
the on-off valve 230d to the closed state. Specifically, the control unit 140b sets
the on-off valve 230a, the on-off valve 230b, and the on-off valve 230c to the closed
state.
[0128] The first half operation of the operation of transferring the refrigerant R to the
reservoir 460 is executed, and thus, the refrigerant R in an indoor refrigerant flow
path 111B is sucked by a first compressor 122B of the outdoor unit 120B. The refrigerant
R sucked into the first compressor 122B is discharged from the first compressor 122B,
and then passes through the flow path switching mechanism 125B and an outdoor heat
exchanger 123B. The refrigerant R having passed through the outdoor heat exchanger
123B is sent to the outdoor expansion mechanism 124B, but flows into the liquid-side
branch pipe 129B since the outdoor expansion mechanism 124B is in the closed state.
The refrigerant R having flowed into the liquid-side branch pipe 129B passes through
the fourth pipe 440 and the liquid-side pipe 452 and flows into the reservoir 460.
Since the on-off valve 230 other than the on-off valve 230d of the refrigerant amount
measurement system 4 is in the closed state, the refrigerant R having flowed in is
reserved in the reservoir 460.
[0129] The control unit 140d executes the first half operation of the operation of transferring
the refrigerant R to the reservoir 460 for the predetermined time T1 set in advance,
and then, ends the first half operation of the operation of transferring the refrigerant
R to the reservoir 460 and starts the second half operation of the operation of transferring
the refrigerant R to the reservoir 460. The predetermined time T1 is set to a length
that allows the liquid refrigerant inside the refrigerant circulation path 150B to
be reserved into the reservoir 460.
(Second half operation)
[0130] In the second half operation of the operation of transferring the refrigerant R to
the reservoir 460, the control unit 140d sets the on-off valve 230c to the open state.
In the other devices, the state of the first half operation of the operation of transferring
the refrigerant R to the reservoir 460 is maintained.
[0131] The second half operation of the operation of transferring the refrigerant R to the
reservoir 460 is executed, and thus, the gas refrigerant in the refrigerant R reserved
in the reservoir 460 flows into the third pipe 430 through the on-off valve 230c.
The refrigerant R having flowed into the third pipe 430 is sent to the outdoor refrigerant
flow path 121B, passes through the flow path switching mechanism 125B, and is sucked
by the first compressor 122B. The refrigerant R sucked into the first compressor 122B
is discharged from the first compressor 122B, and passes through the outdoor heat
exchanger 123B. The refrigerant R having passed through the outdoor heat exchanger
123B is sent to the outdoor expansion mechanism 124B, but flows into the liquid-side
branch pipe 129B since the outdoor expansion mechanism 124B is in the closed state.
The refrigerant R having flowed into the liquid-side branch pipe 129B passes through
the fourth pipe 440 and returns to the reservoir 460.
[0132] The control unit 140b executes the second half operation of the operation of transferring
the refrigerant R to the reservoir 460 for the predetermined time T2 set in advance,
and then, ends the second half operation of the operation of transferring the refrigerant
R to the reservoir 460. For example, the predetermined time T2 is set to a length
that allows the reservoir 460 to recover the refrigerant R remaining in the refrigerant
circulation path 150B after execution of the second half operation of the operation
of transferring the refrigerant to the reservoir 460.
(3-1-2-2) Operation of causing measurer 401 to measure amount of refrigerant
[0133] The operation of causing the measurer 401 to measure the amount of refrigerant in
the second refrigerant amount measurement operation is similar to the operation of
causing the measurer 401 to measure the amount of refrigerant in the first refrigerant
amount measurement operation.
(3-1-2-3) Operation of returning refrigerant to refrigerant circulation path 150
[0134] In the operation of returning the refrigerant R to the refrigerant circulation path
150, for the outdoor unit 120B, the control unit 140b sets the outdoor expansion mechanism
124B of the second refrigeration cycle apparatus 100B to the open state, sets the
flow path switching mechanism 125B to the first state, and operates the first compressor
122B (On). In addition, the control unit 140b sets the on-off valve 230c to the open
state and sets the on-off valve 230a, the on-off valve 230b, and the on-off valve
230d to the closed state.
[0135] The operation of returning the refrigerant R to the refrigerant circulation path
150, and thus, the suction pressure of the first compressor 122B of the outdoor unit
120B acts on the inside of the reservoir 460 via the flow path switching mechanism
125, the gas-side branch pipe 128B, and the third pipe 430. Due to the suction pressure
acting inside the reservoir 460, the refrigerant R inside the reservoir 460 flows
into the third pipe 430 and is charged in the refrigerant circulation path 150 via
the gas-side branch pipe 128B.
[0136] The operation of returning the refrigerant R to the refrigerant circulation path
150 is executed for the predetermined time T4 set in advance, and then, the control
unit 140b ends the operation of returning the refrigerant R to the refrigerant circulation
path 150. The predetermined time T4 is set to, for example, a length that allows the
refrigerant R reserved in the reservoir 460 to be charged in the refrigerant circulation
path 150.
(4) Characteristics
[0137] (4-1)
The refrigerant amount measurement system 4 includes the connecting portion 400, the
reservoir 460, the measurer 401, and the storage 472. The connecting portion 400 is
connected to the first refrigerant circuit of the first refrigeration cycle apparatus
100A. The reservoir 460 reserves the refrigerant R in the first refrigerant circuit
via the connecting portion 400, and returns the reserved refrigerant R to the first
refrigerant circuit via the connecting portion 400. The measurer 401 measures the
amount of the refrigerant R in the reservoir 460. The storage 472 stores the measurement
result measured by the measurer 401.
[0138] The refrigeration apparatus disclosed in Patent Literature 1 detects a shortage state
of the refrigerant by the receiver tank internally connected to the refrigerant circuit.
The refrigerant also flows into the receiver tank incorporated in the apparatus during
a normal operation (such as air conditioning operation). Therefore, the refrigeration
apparatus of Patent Literature 1 requires a refrigerant amount corresponding to the
volume of the receiver tank in addition to a refrigerant amount corresponding to the
existing refrigerant circuit. The refrigeration apparatus disclosed in Patent Literature
1 causes a pressure loss of the refrigerant when the refrigerant passes through the
receiver tank.
[0139] This refrigerant amount measurement system 4 reserves the refrigerant R in the first
refrigerant circuit in the reservoir 460 externally connected to the first refrigerant
circuit. The refrigerant amount measurement system 4 measures the amount of the refrigerant
R and stores the measurement result. The refrigerant amount measurement system 4 returns
the reserved refrigerant R to the first refrigerant circuit from the reservoir 460
externally connected to the first refrigerant circuit. Since the reservoir 460 is
externally connected, the refrigerant R in the first refrigerant circuit does not
flow into the reservoir 460 when the first refrigeration cycle apparatus 100A is operated
normally. Therefore, the refrigerant amount measurement system can clarify a charge
amount and a leakage amount of the refrigerant in the first refrigerant circuit without
generating an additional refrigerant amount or a pressure loss.
[0140] In the refrigeration apparatus in Patent Literature 1, a liquid level detector measures
a difference in liquid level height. The user of the refrigeration apparatus can know
the difference in liquid level height between the time points when the liquid level
detector is used, and can know the shortage of the refrigerant (leakage of the refrigerant).
However, it is difficult for the user of the refrigeration apparatus to know the charge
amount (initial charge amount, charge amount at arbitrary time point, and the like).
Therefore, the user of the refrigeration apparatus cannot know details of circumstances
relating to charging and leakage in association with the charge amount and the time
point.
[0141] This refrigerant amount measurement system 4 can measure the charge amount at an
arbitrary time point. The user of this refrigerant amount measurement system 4 can
know not only whether the refrigerant R has leaked, but also an arbitrary time point
and a charge amount in association with each other. The user of this refrigerant amount
measurement system 4 can know details of circumstances relating to charging and leakage.
Therefore, the refrigerant amount measurement system 4 can further clarify the charge
amount and the leakage amount of the refrigerant R in the first refrigerant circuit.
[0142] When the measurement result of the charge amount is manually recorded, the time and
effort of the work increases, and there is a possibility of leakage of the measurement
result due to human error or omission of the measurement result due to aged deterioration
of a recording medium. This refrigerant amount measurement system 4 stores the measurement
result measured by the measurer 401 in the storage 472. The user of this refrigerant
amount measurement system 4 can know the measurement result of the charge amount without
omission, and can reduce the time and effort of work for storing the measurement result.
Therefore, the refrigerant amount measurement system 4 can further clarify the charge
amount and the leakage amount of the refrigerant R in the first refrigerant circuit,
and can reduce the time and effort of work for storing the measurement result.
[0143] (4-2)
In the refrigerant amount measurement system 4, the connecting portion 400 includes
the first pipe 410 and the second pipe 420. Each of the first pipe 410 and the second
pipe 420 is provided with the on-off valve 230.
[0144] The connecting portion 400 of this refrigerant amount measurement system 4 includes
the first pipe 410 and the second pipe 420. Therefore, this refrigerant amount measurement
system 4 can be connected to the first refrigerant circuit by the first pipe 410 and
the second pipe 420 separately for each state of the refrigerant R. Each of the first
pipe 410 and the second pipe 420 is provided with the on-off valve 230. Therefore,
this refrigerant amount measurement system 4 can allow or interrupt communication
between the first pipe 410 and the second pipe 420.
[0145] (4-3)
The refrigerant amount measurement system 4 further includes the control unit 140.
The control unit 140 performs the first refrigerant amount measurement operation.
The first refrigerant amount measurement operation is an operation of controlling
the first refrigeration cycle apparatus 100A and the on-off valve 230 to transfer
the refrigerant R from the first refrigerant circuit to the reservoir 460, cause the
measurer 401 to measure the amount of the refrigerant R, and return the refrigerant
R from the reservoir 460 to the first refrigerant circuit.
[0146] The control unit 140 of this refrigerant amount measurement system 4 performs the
first refrigerant amount measurement operation. Therefore, the refrigerant amount
measurement system 4 can reduce the time and effort required for the work of clarifying
the charge amount and the leakage amount of the refrigerant R in the first refrigerant
circuit.
[0147] This refrigerant amount measurement system 4 can automatically measure the charge
amount by the control unit 140. This refrigerant amount measurement system 4 stores
the automatically measured charge amount in the storage 472. The user of this refrigerant
amount measurement system 4 can know the charge amount automatically measured at a
past time point by the storage 472. Therefore, the user of this refrigerant amount
measurement system 4 can know circumstances relating to charging and leakage in more
detail in association with the charge amount and the past time point. Therefore, the
refrigerant amount measurement system 4 can further clarify the charge amount and
the leakage amount of the refrigerant R in the first refrigerant circuit.
[0148] (4-4)
In the refrigerant amount measurement system 4, the connecting portion 400 is also
connected to the second refrigerant circuit of the second refrigeration cycle apparatus
100B. The control unit 140 further includes the third pipe 430 and the fourth pipe
440 each provided with the on-off valve 230. The connecting portion 400 is connected
to the first refrigerant circuit by the first pipe 410 and the second pipe 420, and
is connected to the second refrigerant circuit by the third pipe 430 and the fourth
pipe 440.
[0149] The connecting portion 400 of this refrigerant amount measurement system 4 is also
connected to the second refrigerant circuit of the second refrigeration cycle apparatus
100B. Therefore, this refrigerant amount measurement system 4 can also clarify the
charge amount and the leakage amount of the refrigerant R in the second refrigerant
circuit. The connecting portion 400 of this refrigerant amount measurement system
4 includes the third pipe 430 and the fourth pipe 440. Therefore, this refrigerant
amount measurement system 4 can be connected to the second refrigerant circuit by
the third pipe 430 and the fourth pipe 440 separately for each state of the refrigerant
R. Each of the third pipe 430 and the fourth pipe 440 is provided with the on-off
valve 230. Therefore, this refrigerant amount measurement system 4 can allow or interrupt
communication between the third pipe 430 and the fourth pipe 440.
[0150] (4-5)
In the refrigerant amount measurement system 4, the control unit 140 further performs
the second refrigerant amount measurement operation. The second refrigerant amount
measurement operation is an operation of controlling the second refrigeration cycle
apparatus 100B and the on-off valve 230 to transfer the refrigerant R from the second
refrigerant circuit to the reservoir 460, cause the measurer 401 to measure the amount
of the refrigerant R, and return the refrigerant R from the reservoir 460 to the second
refrigerant circuit.
[0151] The control unit 140 of this refrigerant amount measurement system 4 further performs
the second refrigerant amount measurement operation. Therefore, the refrigerant amount
measurement system 4 can also reduce the time and effort required for the work of
clarifying the charge amount and the leakage amount of the refrigerant R in the second
refrigerant circuit.
[0152] (4-6)
In the refrigerant amount measurement system 4, the measurer 401 includes the electrode
rod 461.
[0153] The measurer 401 of this refrigerant amount measurement system 4 includes the electrode
rod 461. Therefore, this refrigerant amount measurement system 4 can further clarify
the charge amount and the leakage amount of the refrigerant R by using the electrode
rod 461.
[0154] (4-7)
The refrigerant use system 1 includes the refrigerant amount measurement system 4
and the refrigeration cycle apparatus 100.
[0155] This refrigerant use system 1 includes the refrigerant amount measurement system
4 and the refrigeration cycle apparatus 100. Therefore, this refrigerant use system
1 can clarify the charge amount and the leakage amount of the refrigerant R of the
refrigeration cycle apparatus 100 included in this refrigerant use system 1.
(5) Modifications
(5-1) Modification 1A
[0156] In the refrigerant amount measurement operation of the above embodiment, the refrigerant
R is returned to the refrigerant circulation path 150 by the suction pressure. However,
the operation of returning the refrigerant R to the refrigerant circulation path 150
is not limited to this operation. For example, an operation of returning the refrigerant
R to the refrigerant circulation path 150 of the first refrigeration cycle apparatus
100A will be described. FIG. 9 is a schematic configuration diagram showing the flow
of the refrigerant R in the operation of returning the refrigerant R to the refrigerant
circulation path 150.
[0157] In the operation of returning the refrigerant R to the refrigerant circulation path
150, for the outdoor unit 120A, the control unit 140a sets the outdoor expansion mechanism
124A of the first refrigeration cycle apparatus 100A to the open state, sets the flow
path switching mechanism 125A to the second state, and operates the first compressor
122A (On). In addition, the control unit 140a sets the on-off valve 230a and the on-off
valve 230b to the open state and sets the on-off valve 230c and the on-off valve 230d
to the closed state.
[0158] The operation of returning the refrigerant R to the refrigerant circulation path
150, and thus, a discharge pressure of the first compressor 122A of the outdoor unit
120A acts on the inside of the reservoir 460 via the flow path switching mechanism
125, the gas-side branch pipe 128A, and the first pipe 410 as indicated by an arrow
in FIG. 9. Due to the discharge pressure acting on the inside of the reservoir 460,
the refrigerant R in the reservoir 460 bypasses a check valve 455, flows into the
second pipe 420, and is charged in the refrigerant circulation path 150 via the liquid-side
branch pipe 129.
[0159] The operation of returning the refrigerant R to the refrigerant circulation path
150 of the second refrigeration cycle apparatus 100B may be performed in a similar
manner to the above.
(5-2) Modification 1B
[0160] The control unit 140 may perform the first refrigerant amount measurement operation
and the second refrigerant amount measurement operation at different times. The control
unit 140a and the control unit 140b are electrically connected to each other and cooperate
with each other, so that the control unit 140a and the control unit 140b can perform
the first refrigerant amount measurement operation and the second refrigerant amount
measurement operation at different times.
[0161] The control unit 140 of the refrigerant amount measurement system 4 according to
the present embodiment performs the first refrigerant amount measurement operation
and the second refrigerant amount measurement operation at different times. Therefore,
this refrigerant amount measurement system 4 can separately clarify the charge amount
and the leakage amount of the refrigerant R in the first refrigerant circuit and the
charge amount and the leakage amount of the refrigerant R in the second refrigerant
circuit.
(5-3) Modification 1C
[0162] The control unit 140 may perform the first refrigerant amount measurement operation
in a time zone in which the normal operation of the first refrigeration cycle apparatus
100A is stopped. The control unit 140 may perform the second refrigerant amount measurement
operation in a time zone in which the normal operation of the second refrigeration
cycle apparatus 100B is stopped. Examples of the normal operation include the cooling
operation, the heating operation, a hot water supply operation, a refrigerating operation,
a freezing operation, and a floor heating operation.
[0163] The control unit 140 of the refrigerant amount measurement system 4 according to
the present embodiment performs the first refrigerant amount measurement operation
in a time zone in which the normal operation of the first refrigeration cycle apparatus
100A is stopped. Therefore, this refrigerant amount measurement system 4 is not affected
by the normal operation of the first refrigeration cycle apparatus 100A, and can further
clarify the charge amount and the leakage amount of the refrigerant R in the first
refrigerant circuit. The control unit 140 performs the second refrigerant amount measurement
operation in a time zone in which the normal operation of the second refrigeration
cycle apparatus 100B is stopped. Therefore, this refrigerant amount measurement system
4 is not affected by the normal operation of the second refrigeration cycle apparatus
100B, and can further clarify the charge amount and the leakage amount of the refrigerant
R in the second refrigerant circuit.
(5-4) Modification 1D
[0164] The on-off valve 230 according to the above embodiment is controlled by the control
unit 140, and automatically allows or interrupts communication of the pipes. However,
the on-off valve 230 may manually allow or interrupt communication of the pipes in
addition to or instead of the above embodiment.
[0165] By manually allowing or interrupting the communication of the pipes by the on-off
valve 230, the communication of the pipe can be allowed or interrupted even in a situation
where the control by the control unit 140 is difficult.
<Second embodiment>
(1) Configuration
[0166] A refrigerant use system 1 according to a second embodiment of the present disclosure
will be described focusing on differences from the refrigerant use system 1 according
to the first embodiment.
[0167] The control unit 140 of the refrigerant use system 1 according to the second embodiment
performs a reserving operation in addition to the operation executed by the control
unit 140 of the refrigerant use system 1 according to the first embodiment.
(2) Operation
(2-1) Reserving operation
[0168] The reserving operation is an operation of transferring the refrigerant R from the
refrigerant circulation path 150 to the reservoir 460 when the refrigerant R leaks
from the refrigerant circulation path 150. The reserving operation is executed, for
example, to prevent further leakage of the refrigerant R when the refrigerant R leaks
from the refrigerant circulation path 150. The reserving operation includes a first
reserving operation and a second reserving operation.
(2-1-1) First reserving operation
[0169] The first reserving operation is an operation of transferring the refrigerant R from
the refrigerant circulation path 150 to the reservoir 460 when the refrigerant R leaks
from the refrigerant circulation path 150 of the first refrigeration cycle apparatus
100A. The first reserving operation includes a first half operation and a second half
operation.
(First half operation)
[0170] The first half operation of the first reserving operation is an operation of mainly
reserving a liquid refrigerant in the refrigerant R in the refrigerant circulation
path 150. FIG. 10 is a schematic configuration diagram showing a flow of the refrigerant
R in the first half operation of the first reserving operation.
[0171] In the first half operation of the first reserving operation, the control unit 140a
sets the indoor expansion mechanism 113A to the open state for all the indoor units
110A. For the outdoor unit 120A, the control unit 140a sets the outdoor expansion
mechanism 124A of the first refrigeration cycle apparatus 100A to the closed state,
sets the flow path switching mechanism 125A to the first state, and operates the first
compressor 122 (On). Furthermore, the control unit 140a sets the on-off valve 230b
to the open state and sets the on-off valves 230 other than the on-off valve 230b
to the closed state in the refrigerant amount measurement system 4. Specifically,
the control unit 140a sets the on-off valve 230a, the on-off valve 230c, and the on-off
valve 230d to the closed state.
[0172] The first half operation of the first reserving operation is executed, and thus,
the refrigerant R in an indoor refrigerant flow path 111A is sucked by the first compressor
122A of the outdoor unit 120A as indicated by an arrow in FIG. 10. The refrigerant
R sucked into the first compressor 122A is discharged from the first compressor 122A,
and then passes through the flow path switching mechanism 125A and the outdoor heat
exchanger 123A. The refrigerant R having passed through the outdoor heat exchanger
123A is sent to the outdoor expansion mechanism 124A, but flows into the liquid-side
branch pipe 129A since the outdoor expansion mechanism 124A is in the closed state.
The refrigerant R having flowed into the liquid-side branch pipe 129A passes through
the second pipe 420 and the liquid-side pipe 452 and flows into the reservoir 460.
Since the on-off valve 230 other than the on-off valve 230b of the refrigerant amount
measurement system 4 is in the closed state, the refrigerant R having flowed in is
reserved in the reservoir 460.
[0173] The control unit 140a executes the first half operation of the first reserving operation
for a predetermined time T5 set in advance, and then, ends the first half operation
of the first reserving operation and starts a second half operation of the first reserving
operation. For example, the predetermined time T5 is set to a length that allows the
liquid refrigerant inside the refrigerant circulation path 150A to be reserved into
the reservoir 460.
(Second half operation)
[0174] The second half operation of the first reserving operation is an operation for reserving
mainly the gas refrigerant in the reservoir 460, the gas refrigerant remaining in
the outdoor refrigerant flow path 121without being reserved in the reservoir 460 by
the execution of the first half operation of the first reserving operation. FIG. 11
is a schematic configuration diagram showing a flow of the refrigerant R in the second
half operation of the first reserving operation.
[0175] In the second half operation of the first reserving operation, the control unit 140a
sets the on-off valve 230a to the open state. In the other devices, the state of the
first half operation of the first reserving operation is maintained.
[0176] The second half operation of the first reserving operation is executed, and thus,
the gas refrigerant in the refrigerant R reserved in the reservoir 460 flows into
the first pipe 410 through the on-off valve 230a as indicated by an arrow in FIG.
11. The refrigerant R having flowed into the first pipe 410 is sent to the outdoor
refrigerant flow path 121A, passes through the flow path switching mechanism 125A,
and is sucked by the first compressor 122A. The refrigerant R sucked into the first
compressor 122A is discharged from the first compressor 122A, and passes through the
outdoor heat exchanger 123A. The refrigerant R having passed through the outdoor heat
exchanger 123A is sent to the outdoor expansion mechanism 124A, but flows into the
liquid-side branch pipe 129A since the outdoor expansion mechanism 124A is in the
closed state. The refrigerant R having flowed into the liquid-side branch pipe 129A
passes through the second pipe 420 and returns to the reservoir 460.
[0177] The control unit 140a executes the second half operation of the first reserving operation
for a predetermined time T6 set in advance, and then, ends the second half operation
of the first reserving operation. For example, the predetermined time T6 is set to
a length that allows the reservoir 460 to recover the refrigerant R remaining in the
refrigerant circulation path 150A after execution of the first half operation of the
first reserving operation.
[0178] As described above, even when the refrigerant R leaks from the refrigerant circulation
path 150A, since the refrigerant R inside the refrigerant circulation path 150A is
reserved in the reservoir 460 by executing the first reserving operation by the control
unit 140a, further leakage of the refrigerant R is prevented.
(2-1-2) Second reserving operation
[0179] The second reserving operation is an operation of transferring the refrigerant R
from the refrigerant circulation path 150 to the reservoir 460 when the refrigerant
R leaks from the refrigerant circulation path 150 of the second refrigeration cycle
apparatus 100B. The second reserving operation is similar to the first reserving operation.
(First half operation)
[0180] In the first half operation of the second reserving operation, the control unit 140b
sets the indoor expansion mechanism 113B to the open state for all the indoor units
110B. For the outdoor unit 120B, the control unit 140b sets the outdoor expansion
mechanism 124B of the second refrigeration cycle apparatus 100B to the closed state,
sets the flow path switching mechanism 125B to the first state, and operates the first
compressor 122 (On). Furthermore, the control unit 140b sets the on-off valve 230d
to the open state and sets the on-off valves 230 other than the on-off valve 230d
to the closed state. Specifically, the control unit 140b sets the on-off valve 230a,
the on-off valve 230b, and the on-off valve 230c to the closed state.
[0181] The first half operation of the second reserving operation is executed, and thus,
the refrigerant R in the indoor refrigerant flow path 111B is sucked by the first
compressor 122B of the outdoor unit 120B. The refrigerant R sucked into the first
compressor 122B is discharged from the first compressor 122B, and then passes through
the flow path switching mechanism 125B and the outdoor heat exchanger 123B. The refrigerant
R having passed through the outdoor heat exchanger 123B is sent to the outdoor expansion
mechanism 124B, but flows into the liquid-side branch pipe 129B since the outdoor
expansion mechanism 124B is in the closed state. The refrigerant R having flowed into
the liquid-side branch pipe 129B passes through the fourth pipe 440 and the liquid-side
pipe 452 and flows into the reservoir 460. Since the on-off valve 230 other than the
on-off valve 230d of the refrigerant amount measurement system 4 is in the closed
state, the refrigerant R having flowed in is reserved in the reservoir 460.
[0182] The control unit 140d executes the first half operation of the second reserving operation
for a predetermined time T7 set in advance, and then, ends the first half operation
of the second reserving operation and starts a second half operation of the second
reserving operation. The predetermined time T7 is set to a length that allows the
liquid refrigerant inside the refrigerant circulation path 150B to be reserved into
the reservoir 460.
(Second half operation)
[0183] In the second half operation of the second reserving operation, the control unit
140d sets the on-off valve 230c to the open state. In the other devices, the state
of the first half operation of the operation of transferring the refrigerant R to
the reservoir 460 is maintained.
[0184] The second half operation of the second reserving operation is executed, and thus,
the gas refrigerant in the refrigerant R reserved in the reservoir 460 flows into
the third pipe 430 through the on-off valve 230c. The refrigerant R having flowed
into the third pipe 430 is sent to the outdoor refrigerant flow path 121B, passes
through the flow path switching mechanism 125B, and is sucked by the first compressor
122B. The refrigerant R sucked into the first compressor 122B is discharged from the
first compressor 122B, and passes through the outdoor heat exchanger 123B. The refrigerant
R having passed through the outdoor heat exchanger 123B is sent to the outdoor expansion
mechanism 124B, but flows into the liquid-side branch pipe 129B since the outdoor
expansion mechanism 124B is in the closed state. The refrigerant R having flowed into
the liquid-side branch pipe 129B passes through the fourth pipe 440 and returns to
the reservoir 460.
[0185] The control unit 140b executes the second half operation of the second reserving
operation for a predetermined time T8 set in advance, and then, ends the second half
operation of the second reserving operation. For example, the predetermined time T8
is set to a length that allows the reservoir 460 to recover the refrigerant remaining
in the refrigerant circulation path 150B after execution of the second half operation
of the second reserving operation.
[0186] As described above, even when the refrigerant R leaks from the refrigerant circulation
path 150B, since the refrigerant R inside the refrigerant circulation path 150B is
reserved in the reservoir 460 by executing the second reserving operation by the control
unit 140b, further leakage of the refrigerant R is prevented.
(3) Characteristics
[0187] In the refrigerant amount measurement system 4, the control unit 140 performs the
first reserving operation and the second reserving operation. The first reserving
operation is an operation of transferring the refrigerant R from the first refrigerant
circuit to the reservoir 460 when the refrigerant R leaks from the first refrigerant
circuit. The second reserving operation is an operation of transferring the refrigerant
R from the second refrigerant circuit to the reservoir 460 when the refrigerant R
leaks from the second refrigerant circuit.
[0188] The control unit 140 of this refrigerant amount measurement system 4 performs the
first reserving operation. Therefore, when the refrigerant R in the first refrigerant
circuit leaks, this refrigerant amount measurement system 4 can reserve the refrigerant
R in the first refrigerant circuit in the reservoir 460 to suppress release of the
refrigerant R to the atmosphere. In addition, the control unit 140 of this refrigerant
amount measurement system 4 performs the second reserving operation. Therefore, when
the refrigerant R in the second refrigerant circuit leaks, this refrigerant amount
measurement system 4 can reserve the refrigerant R in the second refrigerant circuit
in the reservoir 460 to suppress release of the refrigerant R to the atmosphere.
<Third embodiment>
(1) Overall configuration
[0189] A refrigerant use system 1 according to a third embodiment of the present disclosure
will be described focusing on differences from the refrigerant use system 1 according
to the first embodiment.
[0190] The measurer 401 of the refrigerant use system 1 according to the third embodiment
further includes a cylindrical member 462 in addition to constituent elements of the
measurer 401 of the refrigerant use system 1 according to the first embodiment. The
measurer 401 includes the measurement calculator 471, the electrode rod 461, and the
cylindrical member 462.
(2) Detailed configuration
[0191] FIG. 12A is a schematic configuration diagram showing the reservoir 460, the electrode
rod 461, and the cylindrical member 462. The cylindrical member 462 is a member surrounding
the electrode rod 461. FIG. 12B is a sectional view showing a cross section A in FIG.
12A. Unlike the first embodiment, the measurement calculator 471 uses a distance X
between the electrode rod 461 and the cylindrical member 462 in the measurement of
the refrigerant amount.
[0192] The cylindrical member 462 enables the measurer 401 to accurately measure the refrigerant
amount even when the positional relationship between the reservoir 460 and the electrode
rod 461 changes or when the shape of a wall surface of the reservoir 460 changes.
In addition, since the refrigerant amount can be measured with high accuracy regardless
of the shape of the reservoir 460, the shape of the electrode rod 461, the position
of the electrode rod 461, and the like, the refrigerant amount measurement system
4 can be easily designed and manufactured.
(3) Characteristics
[0193] In the refrigerant amount measurement system 4, the measurer 401 includes the cylindrical
member 462 surrounding the electrode rod 461.
[0194] The measurer 401 of this refrigerant amount measurement system 4 includes the cylindrical
member 462 surrounding the electrode rod 461. Therefore, this refrigerant amount measurement
system 4 can further clarify the charge amount and the leakage amount of the refrigerant
R by using the cylindrical member 462.
(4) Modifications
(4-1) Modification 1A
[0195] In the above embodiment, the measurer 401 measures the amount of the refrigerant
R by an electrostatic capacitance method. However, the method of measuring the refrigerant
amount by the measurer 401 is not limited to this method. The measurer 401 may measure
the amount of the refrigerant R by at least any method of a radio wave method, an
ultrasonic method, a float method, a pressure method, a differential pressure method,
or an electrostatic capacitance method.
[0196] The radio wave method is a method of measuring the amount of the refrigerant by measuring
time until a radio wave is reflected by the liquid surface of the refrigerant R and
returned. The ultrasonic method is a method of measuring the amount of the refrigerant
by measuring time until an ultrasonic wave is reflected by the liquid surface of the
refrigerant R and returned. The float method is a method of measuring the amount of
refrigerant by measuring the height of a float floating on the liquid level of the
refrigerant R. The pressure method is a method of measuring the refrigerant amount
by measuring a pressure value of a liquid bottom surface of the refrigerant R. The
differential pressure method is a method of measuring the amount of refrigerant by
measuring a differential pressure value between the liquid bottom surface and an upper
surface of the reservoir 460.
[0197] In the refrigerant amount measurement system 4 according of the present embodiment,
the measurer 401 measures the amount of the refrigerant R by at least any method of
the radio wave method, the ultrasonic method, the float method, the pressure method,
the differential pressure method, or the electrostatic capacitance method.
[0198] In this refrigerant amount measurement system 4, the measurer 401 measures the amount
of the refrigerant R by at least any method of the radio wave method, the ultrasonic
method, the float method, the pressure method, the differential pressure method, or
the electrostatic capacitance method. Therefore, this refrigerant amount measurement
system 4 can further clarify the charge amount and the leakage amount of the refrigerant
R on the basis of various methods.
[0199] The embodiments of the present disclosure have been described above. It is understood
that various changes to modes and details should be available without departing from
the object and the scope of the present disclosure recited in the claims.
REFERENCE SIGNS LIST
[0200]
1 Refrigerant use system
4 Refrigerant amount measurement system
100 Refrigeration cycle apparatus
100A First refrigeration cycle apparatus
100B Second refrigeration cycle apparatus
110 Indoor unit
111 Indoor refrigerant flow path
112 Indoor heat exchanger
113 Indoor expansion mechanism
114 Gas-side connecting portion
115 Liquid-side connecting portion
116 Detector
120 Outdoor unit
121 Outdoor refrigerant flow path
121b First refrigerant pipe
121c Second refrigerant pipe
121d Third refrigerant pipe
122 First compressor
123 Outdoor heat exchanger
124 Outdoor expansion mechanism
125 Flow path switching mechanism
126 Gas-side connecting portion
127 Liquid-side connecting portion
128 Gas-side branch pipe
129 Liquid-side branch pipe
131 Gas-side connection pipe
132 Liquid-side connection pipe
140(140a, 140b) Control unit
150 Refrigerant circulation path
230(230a, 230b, 230c, 230d) On-off valve
400 Connecting portion
401 Measurer
410 First pipe
420 Second pipe
430 Third pipe
440 Fourth pipe
451 Gas-side pipe
452 Liquid-side pipe
455 Check valve
460 Reservoir
461 Electrode rod
462 Cylindrical member
470 Calculation device
471 Measurement calculator
472 Storage
CITATION LIST
PATENT LITERATURE