(19)
(11) EP 4 739 616 A1

(12)

(43) Date of publication:
13.05.2026 Bulletin 2026/20

(21) Application number: 24740837.0

(22) Date of filing: 04.07.2024
(51) International Patent Classification (IPC): 
B66C 23/18(2006.01)
E04H 12/34(2006.01)
F03D 13/25(2016.01)
E02D 27/42(2006.01)
F03D 13/20(2016.01)
(52) Cooperative Patent Classification (CPC):
F03D 13/25; F03D 13/20; E04H 12/34; E02B 2017/0091; E02D 27/425; F03D 13/10; E02B 17/027; B66C 23/185
(86) International application number:
PCT/EP2024/068957
(87) International publication number:
WO 2025/008494 (09.01.2025 Gazette 2025/02)
(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated Extension States:
BA
Designated Validation States:
GE KH MA MD TN

(30) Priority: 05.07.2023 GB 202310295

(71) Applicant: Aker Solutions AS
1325 Lysaker (NO)

(72) Inventors:
  • INGVALDSEN, Ove Ronny
    7657 Verdal (NO)
  • BRUUN, Per Kristian
    3117 Tønsberg (NO)
  • REBERG, Andreas
    7630 Åsen (NO)

(74) Representative: HGF 
HGF Limited 4th Floor, 1 City Square
Leeds LS1 2ES
Leeds LS1 2ES (GB)

   


(54) CONSTRUCTION OF OFFSHORE WIND POWER FOUNDATIONS