CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application is a Continuation-in-Part of International Application No.
PCT/US2019/059283, filed October 31, 2019, and a Continuation-in-Part of
U.S. Application No. 16/670,628, filed October 31, 2019, both of which claim the benefit of
U.S. Provisional Application No. 62/753,050, filed October 30, 2018, all of which are hereby incorporated by reference in their entireties.
TECHNICAL FIELD
[0002] This disclosure relates generally to systems, apparatus, and methods for fluid run-off
management systems. In particular, this disclosure relates to enhancing efficiency
and efficacy of fluid run-off system maintenance.
BACKGROUND
[0003] Fluid run-off systems include systems designed to process rainwater or other fluid
run-off and particularly stormwater. Related stormwater management systems known in
the art include chamber systems including those available from Advanced Drainage Systems,
Inc. under the STORMTECH
® brand. Such systems are designed primarily for use under parking lots, roadways,
and heavy earth loads.
[0004] STORMTECH
® chambers are thermoplastic, injection molded, and formed of polypropylene, polyethylene,
or a combination thereof. Such a chamber has an arched cross-section, and is formed
to have a long, narrow configuration with an advantageously compact footprint that
optimizes use of space. The arch-shaped chamber defines an open bottom. The chamber
is installed and placed on crushed stone or other porous medium, which constitutes
a floor of the chamber underlying the arch. The chamber may be formed to include corrugations,
which may be advantageously shaped and configured to accommodate efficient stormwater
or fluid run-off management and debris collection. One or more chambers include an
inlet configured to connect to a stormwater collection system, which may include one
or more drain basins that receive fluid run-off from a parking lot, roof, or street.
The one or more chambers are designed to distribute collected stormwater into the
ground.
[0005] During a storm, stormwater or rainwater run-off enters the chamber from the one or
more drain basins, and in some system configurations, may exit the chamber by flowing
through a conduit connecting the chamber to another system component, such as a basin
or another chamber. By way of example, a chamber-type stormwater management system
may include an array of chambers buried in crushed stone. The chambers may be connected
in parallel or in series.
[0006] Stormwater carries debris and solid contaminants that can pass into and through basins,
traps, and filters of conventional stormwater management systems. Stormwater may include
suspended solids, including dirt, sand, organic debris such as leaves, paper, and
plastic. Stormwater management system chambers such as the STORMTECH
® chambers are configured to receive stormwater and allow debris to settle to a bottom
of the chamber before the stormwater is released into the ground.
[0007] Related stormwater management systems known in the art have been developed that prevent
some debris and solid contaminants from reaching the chambers. For example, some chamber-type
stormwater management systems are configured to divert surface stormwater to a solids
retention system, and then into the array of chambers so that an amount of debris
and solid contaminants that enter the one or chambers connected to the system is minimized.
Solids suspended or entrained in the stormwater are retained by the solids retention
system using a combination of settling and filtering actions. When stormwater inflow
exceeds a capacity of the solids retention system, the water rises in the diverter
to an overflow point at which water flows through a bypass line to the chamber array.
Such systems are disclosed in
U.S. Patent No. 6,991,734 to Smith et al., titled
Solids retention in stormwater system, the entire disclosure of which is hereby incorporated by reference herein.
[0008] In another example, related stormwater management systems known in the art may include
a subsystem by which stormwater first flows to a primary row of chambers dedicated
to capturing a large amount of debris. The primary chamber is called an isolator row
in a stormwater management system provided by Advanced Drainage Systems, Inc. The
isolator row chamber is encased in a geotextile mesh or filter fabric forming a fine
mesh made of any suitable now known or later developed material. Other chambers in
the system may also be encased in a geotextile mesh or filter fabric forming a fine
mesh made of any suitable material. The filter fabric encases the chamber, interposing
the chamber and the crushed stone floor. Debris and solid contaminants have been found
to locally mask and block exit points in the filter fabric, impeding outflow of fluid
or water from the chamber into the ground.
[0009] Accordingly, maintenance is required to ensure optimal functionality of chambers,
whether they are isolator row chambers, other chambers in an isolator row system,
chambers in a system without an isolator row, or chambers in systems with or without
other means of debris and solid contaminant collection. Debris is typically manually
removed from an interior of a chamber using a device configured to jet water into
and through an interior of the chamber to force debris and fluid out of the chamber
for collection by vacuum. In particular, jetvac systems use a high pressure water
nozzle to propel water through a length of a chamber to suspend and remove sediment.
The high pressure spray from the nozzle causes the sediment to exit the chamber into,
for example, a connected basin wherein the collected sediment is collected by vacuuming.
The jetvac system and similar cleaning devices can snag, tear, or otherwise disrupt
the filter fabric material, damaging an efficacy and functionality of the chamber.
Accordingly, systems have been designed to protect a floor of the chamber. For example,
some systems include a multi-layer mat as an additional component used to protect
the filter fabric material during a cleaning and maintenance process.
[0010] Related chambers known in the art and used in chamber-type stormwater management
systems such as those available from Advanced Drainage Systems, Inc., under the STORMTECH
® brand, include end caps that attach to, and form a closed end of, the chambers. The
ends of the chambers are capped to prevent entry of gravel, earth, or other particulates
that would disrupt the filter and drainage functionality of the chamber. The chamber
end cap may be formed to include a conduit or pipe stub extending therethrough and
defining a channel connecting an interior of the chamber to an exterior thereof. An
example end cap and chamber configuration is disclosed by
U.S. Patent 7,237,981 to Vitarelli, titled
End cap having integral pipe stub for use with stormwater chamber, the entire disclosure of which is hereby incorporated herein by reference.
[0011] Vitarelli discloses a detachable end cap for a molded plastic stormwater chamber
with an integrally welded pipe stub. The stub cantilevers outwardly from an exterior
surface of the end cap for connection to a line that carries fluid to or from the
chamber. The end cap may be formed of polyethylene, for example, for use with a polypropylene
chamber.
[0012] Vitarelli discloses an end cap having a convex exterior or dome shaped, which is
preferred over planar or flat end caps. Vitarelli discloses ensuring proper fit of
the dome shaped end cap to a chamber using flared or flange portions mating with an
end of the chamber to close off the chamber and prevent entry of undesired matter.
SUMMARY
[0013] A need has been recognized for further enhancing ease of chamber maintenance in chamber-type
stormwater management systems. A need has been recognized for a method and configuration
that enhances chamber cleaning efficacy to ensure that an interior of chambers is
clear of debris that blocks outflow and downward dispersion of fluid from the chamber.
It has been found that debris becomes lodged and packed on the back or interior side
of the dome shaped, flared end cap. The debris is not easily removed using conventional
maintenance techniques including jetting and vacuuming. Additionally, nozzles and
other components of jetting and cleaning devices have been found to become lodged
and caught on an interior side of the end cap when being extracted from the chamber
through a chamber outlet or pipe stub attached to the end cap. Solutions are disclosed
including systems, apparatus, and methods that allow the debris to be removed from
the chamber during jetting, and prevent debris from collecting on an interior surface
side of an end cap of the chamber.
[0014] In an embodiment, a ramp apparatus may be provided that is attachable to an interior
surface of an end cap of a chamber of a stormwater management system. In this configuration,
fluid and solid materials may exit an interior of the chamber by traversing the ramp
and passing through an exit defined by the end cap of the chamber. In an embodiment,
the ramp may be attached to the end cap interior surface and left in place during
chamber operation. The ramp may be configured to have a shape, form, and profile that
is non-obtrusive and does not significantly impede or diminish chamber function. Rather,
the ramp may be configured to improve chamber function over time by enhancing outflow
of solid debris that would otherwise collect at an end of the chamber and block fluid
outflow and inflow during operation, and prevent outflow of fluid and solids during
maintenance. In an alternative embodiment, the ramp may be configured for retrofitting
on an interior of, for example, removable end caps. Time savings and costs savings
are achieved by preventing clogs in inlets of chambers and achieving substantially
complete removal of debris contained therein.
[0015] An embodiment may include a ramp useful for chamber-type stormwater management systems,
and the ramp may include an inclined surface including a first end and a second end.
The ramp may be configured to connect to a chamber end cap having a stub pipe centrally
disposed therethrough. The ramp may be connected to the stub pipe at the second end
of the ramp, a ramp surface inclined to form a slope rising from the first end to
the second end. In an embodiment, the apparatus may include support feet. The support
feet may be directly connected to the first end of the ramp to provide support to
the first end while the second end may be supported by the stub pipe to which the
ramp is attached or fitted. In an embodiment, a width of the support feet may extend
equal to or beyond a width of a bottom of a chamber to which the chamber end cap is
fixed.
[0016] In an embodiment, a ramp and end cap system may include a ramp having an inclined
surface. The ramp may include a first end and a second end configured to connect to
a chamber end cap. The chamber end cap may be configured for use in a chamber-type
stormwater management system. The chamber end cap has an interior surface to which
the ramp may be connected, either directly, or by way of a stub pipe passing through
the end cap. An interior surface of the end cap faces an interior of a chamber enclosure
formed by the end cap when connected to a chamber. In an embodiment of a ramp and
end cap system, the ramp may include support feet disposed a first end thereof. A
ramp surface inclines from the first end to a second end, which may be connected to
the end cap, for example, at a stub pipe attached thereto. In an embodiment, a stub
pipe may be formed to have a cylindrical shape. The stub pipe has a first end and
a second end. The second end may be configured to extend within a chamber enclosure
formed by a chamber connected to the end cap. In an embodiment, the ramp may be configured
to conform to a shape of the stub pipe. In an embodiment, the ramp may be fitted directly
to the stub pipe, and may be configured to form-fit to a portion of the periphery
of the stub pipe. In an embodiment, the ramp may be configured to conform to a periphery
at the first end of the stub pipe. In an embodiment, the ramp may include a width
that is less than a width of a bottom of a chamber to which an end cap connected to
the ramp is attached. In an embodiment, the ramp may be formed of polypropylene. In
another embodiment, the ramp may be formed of high density polyethylene. In another
embodiment, the ramp may be formed of a material selected from the group including
steel, stainless steel, aluminum, and fiberglass.
[0017] In an embodiment, a process useful for forming a ramp and chamber end cap system
includes providing a ramp having a first end and a second end, and a ramp surface
configured to incline from the first end to the second end, the ramp surface formed
to enhance flowability of fluid and passage of debris, the ramp configured to connect
to a chamber end cap of a chamber-type stormwater management system. In an embodiment,
methods include providing a chamber end cap including a stub pipe; and attaching or
fitting the ramp to a chamber end cap. In an embodiment, methods may include providing
a chamber useful for stormwater management systems; and attaching the ramp and end
cap system to the chamber. In an embodiment, methods include providing a support member
attached to or extending from the ramp, the support member configured to support the
ramp in operation.
[0018] In another embodiment, a stormwater management system for containing and filtering
runoff may be provided. The stormwater management system may include at least one
stormwater chamber configured for placement underground. The stormwater chamber may
be configured to store runoff and may extend between a first end cap with at least
one opening and a second end cap. The stormwater chamber may include at least one
of an open-bottom chamber having a side wall with an arch-shaped, round, elliptical,
or polygonal cross-section, or a cylindrical, corrugated pipe. The stormwater management
system may also include a flared end ramp configured to receive runoff through the
at least one opening in the first end cap to guide the runoff into the stormwater
chamber. An outlet end of the flared end ramp may be configured to distribute sediment
across a width of the stormwater chamber. The stormwater management system may also
include a filtration fabric configured to be situated beneath at least a portion of
the open bottom of the stormwater chamber. The filtration fabric may be configured
to capture sediment from the runoff in the stormwater chamber while the runoff flows
out of the stormwater chamber.
[0019] In a further embodiment, a stormwater management system for containing and filtering
runoff may be provided. The stormwater management system may include an inlet apparatus
configured to receive runoff from a surface-level drain. The inlet apparatus may include
at least one of an elevated bypass manifold or an overflow weir. The stormwater management
system may also include a first stormwater chamber configured for placement underground
to store runoff, the first stormwater chamber extending between a first end cap with
at least one opening and a second end cap. The first stormwater chamber may include
at least one of an open-bottom chamber having a side wall with an arch-shaped, round,
elliptical, or polygonal cross-section, or a cylindrical, corrugated pipe. The stormwater
management system may also include a flared end ramp configured to receive the runoff
through the at least one opening in the first end cap of the first stormwater chamber
to guide the runoff into the first stormwater chamber. An outlet end of the flared
end ramp may be configured to distribute sediment across a width of the first stormwater
chamber. The stormwater management system may also include an inlet pipe configured
to extend between, and to fluidly connect, the inlet apparatus with an inlet end of
the flared end ramp. The stormwater management system may also include a filtration
fabric configured to be situated beneath at least a portion of the open bottom of
the first stormwater chamber. The filtration fabric may be configured to capture sediment
from the runoff in the first stormwater chamber while the runoff flows out of the
first stormwater chamber. The stormwater management system may also include a non-woven
geotextile fabric configured to cover the first end cap and at least a portion of
an exterior surface of the first stormwater chamber. The stormwater management system
may also include at least one additional stormwater chamber arranged side-by-side
with the first stormwater chamber to form an array of stormwater chambers. The array
of stormwater chambers may be fluidly connected via the inlet apparatus and may be
configured to receive the runoff from the inlet apparatus and to disperse filtered
runoff into at least one of the earth or an underground drainage structure.
[0020] In yet another embodiment, a flared end ramp for managing flow of material into a
stormwater chamber may be provided. The flared end ramp may include an inlet end configured
for connection with a pipe, a side wall of the flared end ramp having a rounded profile
at the inlet end. The flared end ramp may also include an outlet end configured for
placement within the stormwater chamber. The flared end ramp may also include an inclined
surface extending between the inlet end and the outlet end of the flared end ramp
and configured to deliver material from the pipe into the stormwater chamber. The
outlet end of the flared end ramp may have a larger width than the inlet end of the
flared end ramp such that the inclined surface is angled laterally outward from the
inlet end toward the outlet end. The stormwater chamber may be an open-bottom chamber
or a cylindrical pipe.
[0021] In a further embodiment, a flared end ramp and end cap apparatus for a stormwater
chamber may be provided. The apparatus may include a flared end ramp having an inlet
end configured for connection with a pipe, an outlet end configured for placement
within the stormwater chamber, and an inclined surface extending between the inlet
end of the flared end ramp and the outlet end of the flared end ramp. The inclined
surface may be configured to deliver material from the pipe into the stormwater chamber.
The apparatus may also include a stormwater chamber end cap having an interior surface
configured to delimit a chamber enclosure formed by the stormwater chamber and the
end cap. The stormwater chamber may be an open-bottom chamber or a cylindrical pipe.
[0022] Additional features and advantages of the disclosed embodiments will be set forth
in part in the description that follows, and in part will be obvious from the description,
or may be learned by practice of the disclosed embodiments. The features and advantages
of the disclosed embodiments will be realized and attained by the elements and combinations
particularly pointed out in the appended claims.
[0023] It is to be understood that both the foregoing general description and the following
detailed description are examples and explanatory only and are not restrictive of
the disclosed embodiments as claimed.
[0024] The accompanying drawings constitute a part of this specification. The drawings illustrate
several embodiments of the present disclosure and, together with the description,
serve to explain the principles of the disclosed embodiments as set forth in the accompanying
claims.
BRIEF DESCRIPTION OF THE DRAWINGS
[0025]
FIG. 1 depicts a schematic of an exemplary stormwater management system, consistent
with various embodiments of the present disclosure.
FIG. 2 depicts inlet ends of a stormwater chamber array of the stormwater management
system of FIG. 1, consistent with various embodiments of the present disclosure.
FIG. 3A depicts a side plan view of a stormwater chamber of the stormwater management
system of FIG. 1, consistent with various embodiments of the present disclosure.
FIG. 3B depicts an enlarged view of an inlet end of the stormwater chamber of FIG.
3A, consistent with various embodiments of the present disclosure.
FIG. 4A depicts an exemplary underdrain for a stormwater management system, consistent
with various embodiments of the present disclosure.
FIGS. 4B and 4C depict cross-sectional views of the exemplary underdrain as indicated
in FIG. 4A, consistent with various embodiments of the present disclosure.
FIG. 5A depicts a plan view of an outlet end of an exemplary stormwater chamber configured
with a flared end ramp, consistent with various embodiments of the present disclosure.
FIG. 5B depicts a perspective overhead view of an exemplary inlet end cap of the stormwater
chamber of FIG. 5A, consistent with various embodiments of the present disclosure.
FIG. 5C depicts a perspective overhead view of the flared end ramp and inlet end cap
of the stormwater chamber of FIG. 5A, consistent with various embodiments of the present
disclosure.
FIG. 5D depicts a perspective overhead view of the stormwater chamber of FIG. 5A,
including the flared end ramp and inlet end cap of FIG. 5C, consistent with various
embodiments of the present disclosure.
FIG. 5E depicts a perspective overhead view of another exemplary flared end ramp and
inlet end cap of the stormwater chamber of FIG. 5A, consistent with various embodiments
of the present disclosure.
FIG. 5F depicts a perspective bottom view of the stormwater chamber of FIG. 5A, including
the flared end ramp and inlet end cap of FIG. 5E, consistent with various embodiments
of the present disclosure.
FIG. 6 depicts a flow diagram of an exemplary process for forming a flared end ramp
and stormwater chamber inlet end cap system, consistent with various embodiments of
the present disclosure.
FIGS. 7A-7E depict another exemplary flared end ramp, consistent with various embodiments
of the present disclosure.
FIG. 8A depicts another exemplary stormwater management system with the flared end
ramp of FIGS. 7A-7E, consistent with various embodiments of the present disclosure.
FIG. 8B depicts an interior view of the stormwater management system of FIG. 8A, consistent
with various embodiments of the present disclosure.
DETAILED DESCRIPTION
[0026] Exemplary embodiments are described with reference to the accompanying drawings.
In the figures, which are not necessarily drawn to scale, the left-most digit(s) of
a reference number identifies the figure in which the reference number first appears.
Wherever convenient, the same reference numbers are used throughout the drawings to
refer to the same or like parts. While examples and features of disclosed principles
are described herein, modifications, adaptations, and other implementations are possible
without departing from the spirit and scope of the disclosed embodiments. Also, the
words "comprising," "having," "containing," and "including," and other similar forms
are intended to be equivalent in meaning and be open ended in that an item or items
following any one of these words is not meant to be an exhaustive listing of such
item or items, or meant to be limited to only the listed item or items. It should
also be noted that as used in the present disclosure and in the appended claims, the
singular forms "a," "an," and "the" include plural references unless the context clearly
dictates otherwise.
[0027] A solution may be provided by embodiments disclosed herein to the recognized need
for further enhancing ease of chamber maintenance in chamber-type stormwater management
systems, for methods that enhance chamber cleaning efficacy. In particular, apparatuses
and methods in accordance with embodiments of the present disclosure may enable effective
cleaning of chamber-type stormwater management systems for removing cleaning equipment
and sediment and debris. Solutions are disclosed that may include systems, apparatus,
and methods that,
inter alia, prevent debris from collecting on an interior surface side of an end cap of the
chamber.
[0028] In various embodiments, a ramp apparatus may be provided that is constructed and
arranged to attach to, or be placed within, a chamber useful for a chamber-type stormwater
management system. In particular, the ramp may be constructed and arranged to attach
to, or be placed within, an interior surface of an end cap of a chamber of a stormwater
management system. In this configuration, fluid and solid materials may exit an interior
of the chamber by traversing the ramp and passing through an exit defined by the end
cap of the chamber. For example, the ramp may be left in place during use of the stormwater
system may be available for periodic cleaning.
[0029] The ramp apparatus may be configured to improve chamber function over time, and may
have a shape, form, and profile that is non-obtrusive and does not frustrate chamber
function. For example, the ramp apparatus may provide an inclined surface from a ground
on which the chamber is positioned to an exit passage at an end of the chamber. The
ramp apparatus may be shaped to guide fluid and debris through the exit and away from
the portions of the chamber interior at which debris and sediment that otherwise collects
in related art systems, such as at the end cap interior around the exit of the chamber.
[0030] In various embodiments, the ramp may be configured for retrofitting on an interior
of, for example, removable end caps to form a ramp and chamber end cap system. Stormwater
management systems having a ramp apparatus in accordance with various embodiments
may prevent clogs in inlets of chambers and enhance cleaning effectiveness and efficiency.
[0031] FIG. 1 depicts a top plan view of an exemplary stormwater management system 100.
System 100 may include an array 102 of stormwater chambers 110 arranged side-by-side
in a row. FIG. 2 depicts a view of the stormwater chamber array 102 showing the inlet
ends of the stormwater chambers. In the embodiment depicted in FIG. 1, array 102 may
include a first stormwater chamber 110 and additional stormwater chambers 110a-110i,
all of which may have similar shapes and dimensions. However, any suitable number
of stormwater chambers may be utilized with system 100. Each stormwater chamber of
array 102 may be an open-bottom chamber with a side wall having a round or polygonal
cross-section; in various embodiments, the side wall of one or more stormwater chambers
of array 102 may be perforated. The stormwater chambers of array 102 may be corrugated
in various embodiments and may be constructed of plastic (e.g., polypropylene, HDPE,
LDPE, PVC), metal, and/or any other suitable material. The stormwater chambers of
array 102 may each include an inlet end cap 112 and an outlet end cap 114 at its two
respective ends.
[0032] As shown in FIG. 2, the chamber array 102 (including the first stormwater chamber
110) may be configured for placement beneath the surface 280 of the earth (e.g., under
an automobile parking lot) within a layer of water permeable media 284, which may
include crushed stone, gravel, round stone, and/or slag. Fill material 282 may fill
the space between the surface 280 and the top of the water permeable media 284. In
some embodiments, no spacing is required between two adjacent chambers when the chamber
array 102 is installed underground. Alternatively, a gap 204b may be provided between
two adjacent chambers.
[0033] The stormwater chambers of array 102 may be configured to receive and temporarily
store rainwater and other fluids (referred to herein as "runoff") from one or more
surface level drains. Over time, the chambers may disperse the runoff stored therein
by percolation into the surrounding water permeable media 284 through the open bottoms
of the chambers. In some embodiments, one or more stormwater chambers in array 102
may be configured to provide between 10 ft
3 and 150 ft
3 of chamber storage space for receiving the runoff, although persons of ordinary skill
will understand that stormwater chambers having a storage volume greater than 150
ft
3 or less than 10 ft
3 may additionally or alternatively be used with system 100.
[0034] Returning to FIG. 1, stormwater management system 100 may include a subterranean
inlet apparatus 140 configured to receive the runoff from one or more surface drains,
such as a combination of spaced-part catch basins interconnected by buried pipes.
In some embodiments, runoff from the surface drains may flow through one or more settling
devices before entering inlet apparatus 140, in order to settle out solids and floating
matter. Inlet apparatus 140 may optionally include a diverter 141 configured to direct
the received runoff into the first stormwater chamber 110 in the chamber array 102.
As discussed below, a single layer filtration fabric 130 may be placed beneath the
open-bottom of the stormwater chamber 110 in order to capture and filter out sediment
and other media from the runoff as the runoff flows out of the chamber. In various
embodiments, filtration fabric 130 may be formed from a single layer of a woven geotextile
fabric, such as a woven polypropylene material. Advantageously, providing filtration
fabric 130 to capture sediment may protect the water permeable media 284 surrounding
the stormwater chamber from sediment accumulation, which can slow or altogether halt
the percolation of the filtered runoff into the earth. Additionally, filtration fabric
130 may provide scour protection for the underlying ground, including water permeable
media 284. In some embodiments, fabric 130 may cover the entire open-bottom of stormwater
chamber 110; alternatively, fabric 130 may cover a portion of the open-bottom of stormwater
chamber 110, such as a section adjacent to the inlet end cap 112. In some embodiments,
a single continuous piece of filtration fabric 130 may extend beneath the entire stormwater
chamber array 102. Alternatively, one or more chambers 110 in the array 102 may have
separate pieces of filtration fabric 130.
[0035] In some embodiments, when the first stormwater chamber 110 is full, or otherwise
unable to receive additional runoff, diverter 141 may direct runoff to an inlet manifold
142 for delivery into one or more additional stormwater chambers 110a-110i of the
chamber array 102. As illustrated in FIG. 3A, diverter 141 may include an elevated
bypass manifold 344 and/or an overflow weir 347 that may create a differential between
the first stormwater chamber 110 and the rest of the chamber array 102, thus allowing
chamber 110 and filtration fabric 130 to settle and filter the received runoff. Returning
to FIG. 1, at least one of the additional chambers 110a-110i may include a single
layer filtration fabric 132 that is similarly configured as filtration fabric 130.
In alternative embodiments, the additional chambers 110a-110i may not have a filtration
fabric. Optionally, one or more stormwater chambers in array 102 may include an outflow
pipe 150 configured to discharge runoff from the chambers at a predetermined rate
via an outlet control structure 152 (which may include, e.g., a fluid valve). The
outlet may discharge runoff to a municipal storm sewer, pond, watercourse, or other
receiving point via an underground drainage structure.
[0036] In alternative embodiments, one or more cylindrical pipes may be implemented within
stormwater management system 100 instead of open-bottom chamber 110. For example,
array 102 may include one or more corrugated pipes configured for placement underground
for drainage and transportation of runoff. Optionally, the corrugated pipes of array
102 may include perforations along some or all of their respective longitudinal lengths,
which may allow the gradual percolation of runoff into the surrounding water permeable
media 284. Pipes of stormwater management system 100 may be constructed of plastic
(e.g., polypropylene, HDPE, LDPE, PVC), metal, and/or any other suitable material.
In some embodiments, filtration fabric 130 may be placed beneath a corrugated pipe
of array 102 to filter the runoff released from the pipe. Additionally, or alternatively,
filtration fabric 130 may line some or all of the interior or exterior surface of
a corrugated pipe of array 102, so as to filter the runoff within the pipe before
the runoff is released from the pipe. However, in some embodiments, a corrugated pipe
may be provided in array 102 without a corresponding filtration fabric.
[0037] FIG. 3A depicts a side plan view of the first stormwater chamber 110 of stormwater
management system 100. FIG. 3B depicts an enlarged view of a portion of the stormwater
chamber 110 near the inlet end cap 112. As shown in FIG. 3A, a non-woven geotextile
fabric 316 may cover the outer surface 313 of the stormwater chamber 110 to protect
the chamber and extend its service life. For example, fabric 316 may cover the entire
outer surface 313 of the chamber, including inlet end cap 112 and/or outlet end cap
114. In some embodiments, stormwater management system 100 may include an inspection
port 346 allowing for inspection and maintenance of the subterraneous components of
system 100.
[0038] As shown in FIGS. 3A and 3B, an inlet pipe 345 (e.g., a stub pipe) may be provided
to fluidly connect the inlet apparatus 140 to the stormwater chamber 110. An interior
end 345b of the inlet pipe may connect to a flared end ramp 320 that is positioned,
at least partially, within the stormwater chamber 110 and that is angled downwards
from the inlet pipe to convey the runoff away from the inlet end cap 112 and further
into the chamber 110. In some embodiments, the inlet pipe 345 may extend through an
opening in the inlet end cap and connect with an inlet end 321 of the flared end ramp.
In these embodiments, flared end ramp 320 may be situated entirely within stormwater
chamber 110. Alternatively, the inlet end 321 of the flared end ramp may be situated
within the opening in the inlet end cap 112 or external to the stormwater chamber
110 (i.e., to the left of inlet end cap 112 in FIG. 3B). In such embodiments, the
flared end ramp 320 may extend through an opening in the inlet end cap 112 and into
the stormwater chamber 110. As discussed in detail below, the inlet end 321 of the
flared end ramp may have a larger width than an outlet end 323 of the flared end ramp.
As a result, the flared end ramp 320 may receive runoff from inlet pipe 345 (which
may have a much smaller cross-section than chamber 110) and distribute the runoff
across the width of the chamber 110. For example, the outlet end 323 of the flared
end ramp may extend across the entire width of stormwater chamber 110 and may abut
the chamber's inner surface 311 in some embodiments. Advantageously, this configuration
may enable the flared end ramp 320 to prevent sediment in the runoff from accumulating
around the inlet end cap 112 by distributing the runoff (and the sediment contained
therein) away from the chamber's inlet end and across the entire width of the chamber.
[0039] Flared end ramp 320 may include at least one support foot 324 attached to a bottom
portion of the ramp at or near the outlet end 322. The at least one support foot 324
may extend laterally from the flared end ramp 320 to form a wide structure configured
to support the ramp. In the embodiment of FIG. 3B, filtration fabric 130 may pass
beneath the flared end ramp 320 (including the at least one support foot 324), as
well as the inlet end cap 112 and the interior end 345b of the inlet pipe. This placement
may ensure that any runoff that leaks or splashes while flowing between the inlet
pipe and the flared end ramp is still filtered by the fabric. Alternatively, the end
of the filtration fabric 130 (i.e., the left end of fabric 130 in FIG. 3B) may be
placed at any other suitable location relative to the inlet end cap 112 and flared
end ramp 320.
[0040] FIG. 4A depicts an underdrain 454 for an exemplary stormwater management system 400.
FIGS. 4B and 4C depict cross-sectional views of different portions of the underdrain
454, as indicated in FIG. 4A. In the example of FIGS. 4A-4C, the stormwater management
system may include stormwater chambers 410a, 410b, and 410c, each of which may have
a filtration fabric 430a, 430b, and 430c, respectively, placed beneath it. However,
persons of ordinary skill will understand that any suitable number of stormwater chambers
and filtration fabrics may be employed consistent with the present disclosure. In
the example shown in FIGS. 4A-4C, the filtration fabrics may be larger in area than
the open-bottoms of the stormwater chambers, such that the fabrics may extend outward
beyond the edges of the chambers. For example, filtration fabric 430c in FIG. 4B extends
to the right beyond the right-most edge of chamber 410c. Advantageously, the large
area of the filtration fabric may ensure that the entire open-bottom of the stormwater
chamber is covered by the filtration fabric in order to maximize filtration of the
runoff received within the chamber.
[0041] In addition to an outflow pipe 450, filtered runoff from chambers 410a-410c may be
dispersed into water permeable media 284 through the open bottoms of the chambers
and collected in underdrain 454 for removal to a receiving point. As shown in FIGS.
4B and 4C, underdrain 454 may be located within the layer of water permeable media
284 and beneath (i.e., at a lower position than) the stormwater chambers and filtration
fabrics.
[0042] FIG. 5A shows a plan view of an inlet end of a stormwater chamber 510 configured
with a flared end ramp 520 in accordance with various embodiments. In particular,
FIG. 5A shows a stormwater management system 500, including an inlet end cap 512 and
flared end ramp 520 connected to a stormwater chamber 510 configured for stormwater
management. Stormwater chamber 510 may be connected to the inlet end cap 512, which
may have an interior surface 512b facing an interior of the stormwater chamber to
form an enclosure when positioned on the ground and/or when installed underground.
[0043] FIG. 5A shows an interior surface 512b of the inlet end cap 512. Flared end ramp
520 may be connected to the end cap interior surface 512b by way of a stub pipe (not
shown). The stub pipe may be constructed and arranged to provide a passageway from
an interior of the stormwater chamber 510 to an exterior thereof. The stormwater chamber
510 may be of any suitable size and form, and the flared end ramp 520 may be sized
and shaped to a particular chamber size or form, and a particular stub pipe size and
form.
[0044] The flared end ramp 520 shown in FIG. 5A shows an advantageous configuration wherein
the ramp 520 inclines from a first bottom end (i.e., the outlet end) upwards toward
a second top end (i.e., the inlet end), relative to a bottom of the connected stormwater
chamber 510. The flared end ramp 520 may be formed to surround a portion of the periphery
of the "interior" end of the stub pipe at the interior surface 512b of the inlet end
cap. A surface of the flared end ramp 520 may be formed to facilitate effective and
rapid passage of fluid and materials through the interior end of the stub pipe to
enter the stormwater chamber 510.
[0045] Flared end ramp 520 may take any suitable shape and form that provides an inclined
surface extending from a bottom of a chamber enclosure interior to a fluid inlet thereof
formed by a stub pipe of the inlet end cap. In an embodiment, the flared end ramp
520 may be formed of polypropylene or high density polyethylene. In alternative embodiments,
the ramp 520 may be formed of materials selected from the group of materials including
steel, stainless steel, aluminum, fiberglass, and other like now known or later developed
materials.
[0046] Flared end ramp 520 may be fastened to the stub pipe at an end thereof that directly
connects to the interior of the stormwater chamber enclosure. The stub pipe may be
formed by any now known or later developed methods and materials and configured for
fluid delivery. The stub pipe connected to the flared end ramp 520 shown in FIG. 5A
may have a cylindrical shape. The flared end ramp 520 may be fastened to the stub
pipe by any now known or later developed suitable mechanisms, materials, and methods.
In an alternative embodiment, the flared end ramp 520 may be attached directly to
the interior surface 512b of the inlet end cap, or may be attached directly to both
the stub pipe and the interior surface 512b of the inlet end cap.
[0047] FIG. 5B shows a perspective overhead view of a stormwater chamber inlet end cap 512
including a stub pipe 545 extending through an opening defined in the inlet end cap.
Inlet end cap 512 may be dome shaped and flared, and configured to connect to an open
end of the stormwater chamber. A first end 545a of the stub pipe 545 extends away
from an exterior side surface (not shown) of the inlet end cap, while a second end
545b of the stub pipe 545 extends away from the interior surface 512b of the inlet
end cap.
[0048] FIG. 5C shows a perspective overhead view of a flared end ramp and stormwater chamber
inlet end cap apparatus in accordance with various embodiments. In particular, FIG.
5C shows a ramp and end cap apparatus 501 including inlet end cap 512 and a flared
end ramp 520 connected thereto. The flared end ramp 520 may be configured and arranged
to prevent debris and solid contaminants from collecting and becoming lodged at the
interior surface 512b of the inlet end cap. Accordingly, debris and solid contaminants
may be guided up the flared end ramp 520 and through the passageway defined by the
stub pipe 545 during maintenance and cleaning. Flared end ramp 520 may prevent the
debris and solid contaminants from collecting at the end cap interior surface 512b,
and may guide the debris and solid contaminants along with fluid through an exit from
the interior of the stormwater chamber provided by the stub pipe 545. Additionally,
a nozzle or other component of a jetvac system or another chamber maintenance device
will not become lodged and caught on an interior of the end cap.
[0049] FIG. 5D shows a perspective overhead view of stormwater management system 500, in
accordance with various embodiments. In particular, FIG. 5D shows an assembled flared
end ramp, stormwater chamber, and inlet end cap system 500. Stormwater management
system 500 may include a stormwater chamber 510 with the inlet end cap and flared
end ramp apparatus 501 connected thereto.
[0050] FIG. 5D shows an exterior surface 512a of the inlet end cap, and a stub pipe 545.
The stub pipe 545 may include a first end 545a extending from the exterior surface
512a of the inlet end cap. The stub pipe 545 may extend transversely through the inlet
end cap, with a second, interior end 545b extending away from an interior surface
(not shown) of the inlet end cap and communicating with a flared end ramp 520 in an
interior of the stormwater chamber 510. The stub pipe 545 may be welded, for example,
at the interface of the stub pipe with the inlet end cap exterior surface 512a.
[0051] FIG. 5E shows a perspective overhead view of a ramp and chamber end cap in accordance
with various embodiments. In particular, FIG. 5E shows an alternative flared end ramp
and inlet end cap apparatus 501a, which may be similarly configured as apparatus 501
shown in FIG. 5C. FIG. 5E shows a ramp and end cap apparatus 501a including an inlet
end cap 512 and a flared end ramp 520 connected thereto. The flared end ramp 520 may
be configured and arranged to prevent debris and solid contaminants from collecting
and becoming lodged at the interior surface 512b of the inlet end cap. Accordingly,
debris and solid contaminants are guided up the ramp and through the passageway defined
by the stub pipe 545 during maintenance and cleaning. The flared end ramp 520 of the
embodiment shown in FIG. 5E may include supports or feet 524.
[0052] The supports 524 may be configured as shown in FIG. 5F to extend beyond a width of
the stormwater chamber 510, and underneath bottom edges of sides of the stormwater
chamber to which the ramp and end cap apparatus 501 is connected. FIG. 5F shows a
stormwater management system 500 of an embodiment from a bottom perspective view.
[0053] In particular, FIG. 5F shows a ramp and end cap apparatus 501 including an inlet
end cap 512 and a flared end ramp 520 connected thereto by way of a stub pipe 545.
The flared end ramp 520 may be configured and arranged to prevent debris and solid
contaminants from collecting and becoming lodged at the interior surface 512b of the
inlet end cap. Accordingly, debris and solid contaminants are guided up the ramp and
through the passageway defined by the stub pipe 545 during maintenance and cleaning.
The flared end ramp 520 of the embodiment shown in FIG. 5F includes supports or feet
524.
[0054] FIG. 5F shows an interior surface 511 of the stormwater chamber 510. The feet 524
of the flared end ramp 520 may be configured to extend under the sides of the stormwater
chamber 510. Accordingly, the flared end ramp 520 may be configured to lift relative
to the ground to an extent limited by the contact between the feet 524 and the stormwater
chamber walls. Additionally, or alternatively, the feet 524 may be constructed and
arranged to provide support against the ground or surface upon which the fluid management
system 500 rests.
[0055] FIG. 6 shows a process of forming a stormwater chamber, flared end ramp, and inlet
end cap system in accordance with various embodiments. In particular, FIG. 6 shows
a method 600 including a step S610 of providing a flared end ramp having a first end
and a second end, and a ramp surface configured to incline from the first end to the
second end. The ramp surface may be formed to enhance flowability of fluid and passage
of debris. For example, the flared end ramp may include a curved surface meeting and
conforming with a shape of an end of a cylindrical stub pipe connected to an inlet
end cap.
[0056] FIG. 6 shows step S620 of forming feet attached to the flared end ramp. The feet
may include a same material as the flared end ramp, or a different material, formed
to provide a support structure configured to support the flared end ramp in operation.
For example, a flared end ramp positioned in a stormwater management system may rest
on a ground on which the stormwater chamber is installed. A first, lower end (i.e.,
an outlet end) of the inclined ramp may rest on the feet or support structure. In
an embodiment, the feet may be configured to have a width equal to or larger than
a width of a bottom of the stormwater chamber. The feet may be configured to be positioned
beneath the stormwater chamber wall for additional support. Thus, structural distortion
caused by movement of the flared end ramp connected to the stormwater chamber during
operation may be minimized.
[0057] Methods including a step S630 of providing an inlet end cap useful for stormwater
management systems. The inlet end cap may include a stub pipe passing through a central
portion of the inlet end cap. Methods include a step S640 of attaching or fitting
the flared end ramp to the inlet end cap. The flared end ramp has a first end, a second
end, and a ramp surface inclined from the first end to the second toward the pipe
stub when connected thereto.
[0058] The flared end ramp may be configured and arranged to prevent debris and solid contaminants
from collecting and becoming lodged at the interior surface of the inlet end cap.
In an embodiment, the flared end ramp may be connected to an interior surface of the
inlet end cap. In another embodiment, the flared end ramp may be connected to the
inlet end cap by way of a third member, for example, attached or fitted to a stub
pipe to which the inlet end cap is attached.
[0059] The chamber end cap may be configured to attach to the stormwater chamber and form
a chamber enclosure. In an embodiment, the end cap may be welded to the stormwater
chamber. FIG. 6 shows a step S650 of attaching the flared end ramp and end cap apparatus
to the stormwater chamber. The flared end ramp and end cap apparatus is configured
to connect to the stormwater chamber to form an enclosure containing the flared end
ramp. A bottom of the flared end ramp is in facing relation to a ground on which the
stormwater chamber is placed. A top surface of the ramp surface is in facing relation
to an interior top surface of the stormwater chamber. The ramp surface may be curved
or otherwise shaped and fitted to the stub pipe to form a smooth, inclined transition
from a chamber interior into a stub pipe, the bottom of which is located above a bottom
or lower portion of the stormwater chamber.
[0060] FIGS. 7A-7E illustrate another exemplary flared end ramp 720 configured for use in
a stormwater management system. For example, flared end ramp 720 may be configured
to manage flow of material, such as runoff, into a stormwater chamber. Flared end
ramp 720 may include an inlet end 721 configured to receive runoff from an inlet pipe.
In some embodiments, ramp side wall 723 may have a rounded profile at the inlet end
721 to form an inlet opening 727. For example, FIG. 7D illustrates an embodiment in
which side wall 723 has an annular profile at inlet end 721 to form the inlet opening,
and FIG. 7E illustrates an alternative embodiment in which side wall 723 has a semi-circular
profile at inlet end 721 to form the inlet opening. An end of an inlet pipe may be
received within the inlet opening 727, which may conform to the end of the inlet pipe
to form a fluid-tight connection. Additionally, or alternatively, the inlet pipe and
flared end ramp 720 may be connected via one or more fixation means, such as welding,
adhesive, and/or a mechanical connector.
[0061] In some embodiments, the diameter of inlet opening 727 of the flared end ramp may
be designed to receive an inlet pipe having a known outer diameter, such that the
inlet pipe may fit securely within the inlet opening 727. In some embodiments, inlet
opening 727 of the flared end ramp may have a diameter of between 6.0 inches and 60.0
inches. For example, inlet opening 727 may have a diameter of approximately 18 inches
to receive an inlet pipe with an 18-inch diameter, or a diameter of approximately
24 inches to receive an inlet pipe with a 24-inch diameter.
[0062] Flared end ramp 720 may also include an outlet end 722 at an opposite end of the
ramp from the inlet end 721, and an inclined surface 725 extending between the inlet
end 721 and outlet end 722. As shown in FIG. 7A, inclined surface 725 may have a rounded
profile near the inlet end 721, similar to the profile of the inlet opening 727. The
inclined surface 725 may have a different profile at the outlet end 722, including
a flattened bottom portion 725a and first and second upstanding side portions 725b,
725c. In some embodiments, outlet end 722 may have a larger width than inlet end 721;
specifically, inclined surface 725 may have a greater width at the outlet end 722
and a smaller width at the inlet end 721. As a result, ramp side walls 723 may be
angled laterally outward (i.e., may extend away from the center of the inclined surface
725) from the inlet end 721 toward the outlet end 722.
[0063] Flared end ramp 720 may include at least one support foot 724 configured to support
the flared end ramp on a support surface. As shown in FIG. 7B, the at least one support
foot 724 may be connected to a bottom surface of the flared end ramp at, or in close
proximity to, the outlet end 722 by known methods such as welding, adhesive, and/or
a mechanical connector. In the embodiments depicted in FIGS. 7A-7E, the flared end
ramp may include a single support foot 724 extending laterally, and continuously,
between the side walls 723a and 723b at the outlet end of the ramp. In alternative
embodiments, the flared end ramp may include at least two support feet, a first of
which may extend laterally from first side wall 723a and a second of which may extend
laterally from second side wall 723b. As shown in FIG. 7C, the at least one support
foot 724 extends laterally from the side walls of the flared end ramp. As a result,
a distance between support foot edges 724a and 724b may form the widest portion of
the flared end ramp 720.
[0064] As shown in FIGS. 7D and 7E, flared end ramp 720 may include one or more drainage
grooves formed in the inclined surface 725 to promote flow of runoff from the inlet
end 721 towards the outlet end 722. For example, the ramp may include a drainage groove
726a extending along the center or midline of the inclined surface 725. Additionally,
or alternatively, the ramp may include one or more drainage grooves originating near
the center of the inclined surface at the inlet end 721, and extending laterally outward
towards the outlet end 722. For example, the flared end ramp may include drainage
grooves 726b and 726c extending from the center of the inclined surface 725 near the
inlet end of the ramp towards the first side wall 723a and the second side wall 723b,
respectively, at the outlet end of the ramp. Advantageously, drainage groove 726a
may promote runoff flow along a midline of the ramp and into the center of the stormwater
chamber, while drainage grooves 726b and 726c may guide runoff away from the center
of the stormwater chamber and towards the chamber side walls.
[0065] FIG. 8A illustrates an exterior view of another exemplary stormwater management system
800, which may include the flared end ramp 720. FIG. 8B illustrates an interior view
of stormwater management system 800. Stormwater management system 800 may have a similar
configuration as systems 100, 400, and 500 discussed herein, and may include a stormwater
chamber 810 with an inlet end cap 812, an inlet pipe 845 configured to convey runoff
from an inlet apparatus (not shown) to flared end ramp 720, and a filtration fabric
830 covering the open-bottom of stormwater chamber 810 to filter runoff percolating
from the chamber into the earth. In the embodiment shown in FIGS. 8A and 8B, inlet
pipe 845 may pass through the inlet end cap 812 and into the stormwater chamber 810,
where the inlet pipe may connect with the inlet end 721 of the flared end ramp; accordingly,
flared end ramp 720 may be wholly contained within stormwater chamber 810. Alternatively,
inlet end 721 of the flared end ramp may be situated within the opening formed in
the inlet end cap 812 or at a location outside of the stormwater chamber. In such
embodiments, the flared end ramp 720 may pass through the opening in the inlet end
cap and into the stormwater chamber.
[0066] Flared end ramp 720 may be configured to convey runoff away from the inlet end cap
812 and further into the stormwater chamber 810. In some embodiments, the outlet end
722 of the flared end ramp may rest on the filtration fabric 830 and may have a large
width, relative to the inlet end 721, such that the flared end ramp may distribute
sediment across the width of the stormwater chamber. In some embodiments, flared end
ramp 720 may include at least one support foot 724 having a larger width than the
stormwater chamber 810; this may cause the at least one support foot 724 to extend
out of the stormwater chamber 810 through the open-bottom of the chamber, as shown
in FIG. 8A. Advantageously, the contact between the at least one support foot 724
and the bottom edge of the stormwater chamber 810 may secure the flared end ramp and
stormwater chamber together against relative movement.
[0067] In some embodiments, the at least one support foot 724 may have a small height (i.e.,
the vertical dimension in FIGS. 8A and 8B), such as a height of less than one inch.
For example, the at least one support foot 724 may have a height of approximately
0.25 inches. Advantageously, the small height of the support foot 724 allows the outlet
end of the inclined surface 725 to rest on the bottom of the stormwater chamber (i.e.,
on the filtration fabric 830), allowing smooth, non-turbulent flow of runoff from
the flared end ramp 720 into the stormwater chamber 810 and allowing sediment in the
runoff to settle more quickly for faster filtration.
[0068] Additionally, or alternatively, the at least one support foot 724 may have a width
(i.e., the distance between support foot edges 724a and 724b) that is equal to or
larger than the width of the stormwater chamber 810. This may allow the support foot
to engage the bottom edge of the chamber to secure the ramp and chamber together.
In some embodiments, the at least one support foot 724 may have a width of between
25.0 inches and 125.0 inches, such as a width of approximately 50 inches, 78 inches,
or 100 inches.
[0069] In the embodiment shown in FIGS. 8A and 8B, inlet pipe 845 may pass through an opening
in inlet end cap 812 such that flared end ramp 720 is not in contact with the inlet
end cap. For example, a distance of between 0.5 and 3.0 inches (e.g., a distance of
between 1.0 and 2.0 inches) may be provided between inlet end cap 812 and flared end
ramp 720. Inlet pipe 845 may be secured to inlet end cap 812, such as by welding.
Additionally, or alternatively, inlet pipe 845 may be secured to the flared end ramp
720, such as by welding the inlet opening 727 of the ramp directly to an outer surface
of the inlet pipe or by a mechanical connector (e.g., a threaded rod and nut).
[0070] In various embodiments, filtration fabric 130, 430, 830 (referred to hereafter as
filtration fabric 130) may be formed from a single layer of a woven geotextile fabric,
such as a woven polypropylene material. Advantageously, implementing filtration fabric
130 with stormwater management system 100 has been found to increase the filtration
rate of runoff that is stored in the stormwater chamber, while also providing high
rates of sedimental removal efficency. For example, material properties of an exemplary
filtration fabric 130 and prior filtration fabric SKAPS SW315 (referred to hereafter
as "SW315," which is a woven geotextile having two layers) were tested by the Applicant
to evaluate the suitability of each fabric for use with the exemplary stormwater management
system 100. The properties of both fabrics are provided below:
| Property |
Filtration Fabric 130 (MARV1) |
SW315 Fabric (MARV1) |
| Grab Tensile Strength |
325 lbs. |
315 lbs. |
| Grab Elongation |
15% |
15% |
| CBR Puncture Resistance |
1124 lbs. |
1000 lbs. |
| Weight |
8 oz/yd2 |
6 oz/yd2 |
| Trapezoidal Tear Strength |
200 lbs. |
120 lbs. |
| Apparent Opening Size (AOS) |
0.425 mm |
0.425 mm |
| Permittivity |
0.15 sec-1 |
0.05 sec-1 |
| Hydraulic loading rate |
4.1 gpm/ft2 |
2.5 gpm/ft2 |
| 1 Minimum Average Roll Values (MARV) is calculated as the average minus two standard
deviations. Statistically, it yields approximately 97.5% degree of confidence that
any samples taken from quality assurance testing will meet or exceed the values described
above. |
[0071] As shown above, filtration fabric 130 was found to have a greater tear strength and
puncture resistance than the prior two-layer fabric, indicating that filtration fabric
130 is more resilient against tearing, compared to the prior fabric, when used for
runoff filtration in a stormwater chamber. Additionally, filtration fabric 130 was
also found to have a greater permittivity, which is a measure of the rate at which
water flows through a material. Specifically, filtration fabric 130 was found to have
a permittivity of 0.15 sec
-1, while the prior fabric was found to have a lower permittivity of 0.05 sec
-1. This finding indicates that filtration fabric 130 may filter runoff at a greater
rate than the prior fabric, allowing runoff to be released from the stormwater chamber
110 more quickly and minimizing the likelihood that the capacity of stormwater chamber
110 will be exceeded by additional runoff. This conclusion was borne out by the measurement
of each fabric's hydraulic loading rate, which is a measure of the volume of water
that can pass through a given area of media during a set duration of time. Filtration
fabric 130 was found to have a hydraulic loading rate of 4.1 gpm/ft
2, compared to the prior fabric's hydraulic loading rate of 2.5 gpm/ft
2. This finding suggests that the single-layer filtration fabric 130 filters runoff
at a greater rate than the prior, two-layer fabric of the same size.
[0072] As another example, the filtration efficacy of stormwater management system 100,
including filtration fabric 130, was evaluated according to the protocols of the New
Jersey Corporation for Advanced Technology's (NJCAT's) Technology Verification Program.
Specifically, two stormwater chambers were installed underground, each chamber having
a similar configuration as stormwater chamber 110 depicted in FIG. 3A. A total of
16 sediment removal efficiency testing runs were completed in which runoff having
a controlled flow rate and a controlled influent sediment concentration was supplied
to the stormwater chambers.
[0073] The results from all 16 runs were used to calculate the overall cumulative removal
efficiency of the stormwater management system 100. The results of this test indicated
that stormwater management system 100 has a sediment removal rate of 81.2%. The New
Jersey Department of Environmental Protection (NJDEP) test protocol requires a sediment
removal rate of at least 80% to verify the efficiency of a stormwater filtration system;
a sediment filtration rate of 80% is also the industry standard for evaluating sediment
filtration efficiency. See N.J. Admin. Code § 7:8-5.5 (2016). Accordingly, stormwater
management system 100 not only filters runoff at a faster rate than prior technologies
but also maintains highly efficient runoff filtration that exceeds the applicable
legal and industry standards.
[0074] The foregoing description has been presented for purposes of illustration. It is
not exhaustive and is not limited to precise forms or embodiments disclosed. Modifications
and adaptations of the embodiments will be apparent from consideration of the specification
and practice of the disclosed embodiments. For example, while certain components have
been described as being coupled to one another, such components may be integrated
with one another or distributed in any suitable fashion.
[0075] Moreover, while illustrative embodiments have been described herein, the scope includes
any and all embodiments having equivalent elements, modifications, omissions, combinations
(e.g., of aspects across various embodiments), adaptations and/or alterations based
on the present disclosure. The elements in the claims are to be interpreted broadly
based on the language employed in the claims and not limited to examples described
in the present specification or during the prosecution of the application, which examples
are to be construed as nonexclusive. Further, the steps of the disclosed methods can
be modified in any manner, including reordering steps and/or inserting or deleting
steps.
[0076] The features and advantages of the disclosure are apparent from the detailed specification,
and thus, it is intended that the appended claims cover all systems and methods falling
within the true spirit and scope of the disclosure. As used herein, the indefinite
articles "a" and "an" mean "one or more." Similarly, the use of a plural term does
not necessarily denote a plurality unless it is unambiguous in the given context.
Words such as "and" or "or" mean "and/or" unless specifically directed otherwise.
Further, since numerous modifications and variations will readily occur from studying
the present disclosure, it is not desired to limit the disclosure to the exact construction
and operation illustrated and described, and, accordingly, all suitable modifications
and equivalents may be resorted to, falling within the scope of the disclosure.
[0077] Other embodiments will be apparent from consideration of the specification and practice
of the embodiments disclosed herein. It is intended that the specification and examples
be considered as example only, with a true scope and spirit of the disclosed embodiments
being indicated by the following claims.
[0078] The disclosure is also directed to the following numbered embodiments:
- 1. A flared end ramp for managing flow of material into a stormwater chamber, the
flared end ramp comprising:
an inlet end configured for connection with a pipe, a side wall of the flared end
ramp having a rounded profile at the inlet end;
an outlet end configured for placement within the stormwater chamber; and
an inclined surface extending between the inlet end and the outlet end of the flared
end ramp and configured to deliver material from the pipe into the stormwater chamber,
wherein
the outlet end of the flared end ramp has a larger width than the inlet end of the
flared end ramp such that the inclined surface is angled laterally outward from the
inlet end toward the outlet end.
- 2. The flared end ramp of embodiment 1, further comprising:
at least one support foot configured to support the flared end ramp, the at least
one support foot being located at the outlet end of the flared end ramp and extending
laterally from the flared end ramp.
- 3. The flared end ramp of embodiment 2, wherein the flared end ramp includes a single
support foot extending laterally between a first side of the outlet end and a second
side of the outlet end, the single support foot forming the widest portion of the
flared end ramp.
- 4. The flared end ramp of embodiment 2, wherein the at least one support foot is configured
to secure the flared end ramp relative to the stormwater chamber.
- 5. The flared end ramp of embodiment 1, wherein the stormwater chamber is an open-bottom
chamber or a cylindrical pipe.
- 6. The flared end ramp of embodiment 1, wherein the side wall of the flared end ramp
has a semi-circular profile or an annular profile at the inlet end.
- 7. The flared end ramp of embodiment 1, wherein at the outlet end of the flared end
ramp, the inclined surface includes a flattened bottom portion and first and second
upstanding side portions.
- 8. The flared end ramp of embodiment 1, wherein the inclined surface includes at least
one drainage groove extending between the inlet end of the flared end ramp and the
outlet end of the flared end ramp.
- 9. The flared end ramp of embodiment 8, wherein the at least one drainage groove includes:
a first drainage groove extending along a midline of the inclined surface; and
a second drainage groove angled laterally outward from the inlet end toward the outlet
end.
- 10. The flared end ramp of embodiment 1, wherein the inlet end of the flared end ramp
is configured to receive an end of the pipe within the rounded profile of the inlet
end.
- 11. The flared end ramp of embodiment 1, wherein the inlet end of the flared end ramp
is configured to conform to an outer surface of the pipe.
- 12. The flared end ramp of embodiment 1, wherein the inlet end of the flared end ramp
is configured for placement within the stormwater chamber.
- 13. The flared end ramp of embodiment 1, wherein the flared end ramp is configured
to convey material away from an end cap of the stormwater chamber.
- 14. A flared end ramp and end cap apparatus for a stormwater chamber, the apparatus
comprising:
a flared end ramp comprising an inlet end configured for connection with a pipe, an
outlet end configured for placement within the stormwater chamber, and an inclined
surface extending between the inlet end of the flared end ramp and the outlet end
of the flared end ramp, the inclined surface configured to deliver material from the
pipe into the stormwater chamber; and
a stormwater chamber end cap having an interior surface configured to delimit a chamber
enclosure formed by the stormwater chamber and the end cap.
- 15. The apparatus of embodiment 14, wherein the stormwater chamber is an open-bottom
chamber or a cylindrical pipe.
- 16. The apparatus of embodiment 14, wherein the outlet end of the flared end ramp
has a larger width than the inlet end of the flared end ramp such that the inclined
surface is angled laterally outward from the inlet end toward the outlet end.
- 17. The apparatus of embodiment 14, wherein the flared end ramp further comprises:
at least one support foot located at the outlet end of the flared end ramp and extending
laterally from the flared end ramp, wherein the at least one support foot is configured
to secure the flared end ramp relative to the stormwater chamber.
- 18. The apparatus of embodiment 14, wherein at the outlet end of the flared end ramp,
the inclined surface includes a flattened bottom portion and first and second upstanding
side portions.
- 19. The apparatus of embodiment 14, wherein the flared end ramp and the end cap are
configured to be secured together by the pipe.
- 20. The apparatus of embodiment 14, wherein
the end cap includes at least one opening configured to receive the pipe, and
the flared end ramp is configured for placement within the stormwater chamber.