[0001] The invention relates to a system for heating and/or cooling environments and a method
for controlling a system for heating and/or cooling for environments. More particularly,
the invention relates to a method for adjusting the power or temperature of a heat
generator (for example a gas boiler, a heat pump and/or a resistive electric heater)
in a heating or cooling system (hereinafter reference will be made to heating without
excluding the summer cooling function) with a central heating circuit to which a plurality
of zone heating circuits is connected.
Background of the art
Central circuit
[0002] In the central circuit, the central heat generator heats the water and a central
circulator (for example a water pump) conveys the heated water to a so-called zone
distributor, which may be configured for example as a hydraulic separator or hydraulic
compensator or in the form of separate hydraulic manifolds. From the zone distributor
the cooled water (after having released part of its heat) returns to the central heat
generator.
Zone circuits
[0003] The zone distributor distributes the hot water coming from the central heat generator
to a plurality of zone circuits, each with its own zone circulator (for example a
water pump), which feeds a user unit, e.g.:
- an underfloor heating system requiring a temperature of for example 30°C,
- a series of radiators requiring a temperature of for example 50°C.
[0004] The cooled water (after having transferred heat to the respective user unit) is recirculated
by all the individual zone circuits (for example through the zone distributor) into
the central circuit and returns as cooled water to the central heat generator.
[0005] In zone circuits (for example underfloor heating) that require a lower temperature
(e.g. 30°C) than a higher temperature (e.g. 50°C for the radiators) required by other
heating zones, the zone distributor mixes the supply water, heated, coming from the
central heat generator with a portion of the return cooled water from the zone circuits
to obtain the temperature required by the respective zone circuit (e.g. only 30°C
instead of 50°C). In technical jargon, these zones or zone circuits are called "mixed
zones" or "mixed zone circuits".
[0006] In the known art, the central heat generator is energised, without a feedback control,
based on a target temperature of the supply water, heated by the central heat generator,
which target temperature is determined in a fixed manner based on the zone circuits
that require heat, as the sum of:
- a so-called base temperature corresponding to the highest of the target temperatures
of the zone circuits (e.g. 50°C in the presence of a zone with radiators) requiring
thermal power, and
- an additional temperature value depending on the number of individual zone circuits
connected to the central circuit and requiring thermal power, e.g. the number of zone
circuits multiplied by a fixed coefficient (e.g. 5°C).
[0007] Therefore, in the known art, the objective is that the supply water temperature in
the central circuit reaches and maintains the target temperature value calculated
as a fixed value, but the control strategy used is limited to supplying the central
heat generator with an electric power or an amount of methane gas corresponding to
the calculated target value, without any feedback control.
[0008] The control methods and systems of heating systems of the known art present the drawback
of not reaching the target temperatures in the individual zone circuits quickly and
of not optimally exploiting the thermal energy of the heated water coming from the
central heat generator. Therefore, there is still room for improvement in the living
comfort and energy efficiency of heating systems.
[0009] A further, more specific drawback of the methods and systems of the known art is
the tendency to excessively mix the heated supply water coming from the central heat
generator with the return cooled water from the zone circuits to feed the so-called
"mixed" zone circuits, with the consequence that the central heat generator is required
to produce a supply temperature that is generally too high compared to the target
temperatures of the mixed zone circuits. Instead, a more direct communication - with
less mixing - of the heated water coming from the central heat generator with the
mixed zone circuit would be desirable.
Object of the invention
[0010] The object of the invention is therefore to improve the method and system for controlling
the central heat generator for centralised heating and/or cooling systems of the type
illustrated in the introduction, so as to overcome at least some of the drawbacks
of the known art.
[0011] A specific object of the invention is to be able to adjust and control the power
of the central heat generator in such a way as to reduce energy consumption and to
reach the target temperatures in the individual zone circuits more quickly.
[0012] A further specific object of the invention is to achieve a more direct communication
- with less mixing - of the heated water coming from the central heat generator with
the "mixed" zone circuits, still with the aim of better energy efficiency and more
rapid achievement of the target temperatures in the zone circuits.
[0013] These and other objects are achieved by means of a heating and/or cooling system
according to claim 1 and by means of a control method according to claim 10.
[0014] The dependent claims concern advantageous and preferred embodiments.
Summary of the invention
[0015] A water-based thermal system 1 for heating and/or cooling an environment and/or for
supplying domestic hot water, comprises:
- a primary (water) circuit 2 with a zone distributor 21, for example a hydraulic separator,
a hydraulic compensator or separate hydraulic manifolds,
- a thermal generator 22 of heat and/or cold (comprising, for example, a heat pump and/or
a gas boiler and/or a resistive electric water heater) having a heat exchanger 23
connected in the primary circuit 2,
- a primary circulator 24 (for example a water pump) for circulating a primary water
flow 25.1, 25.2 in the primary circuit 2, sending the primary water flow 25.1, 25.2
as a primary return flow 25.2 from the zone distributor 21 into the heat exchanger
23, and as a primary supply flow 25.1 from the heat exchanger 23 into the zone distributor
21,
- a plurality of (water) zone circuits 3 connected with the primary circuit 2 through
the interposition of the zone distributor 21 and each having an own zone circulator
31 for circulating respective secondary water flows 32.1, 32.2, as a secondary supply
flow 32.1, from the zone distributor 21 to thermal emitters 33 and/or thermal accumulators
34 of said zone circuits 3 and, as a secondary return flow 32.2, from the thermal
emitters 33 and/or thermal accumulators 34 back to the zone distributor 21,
wherein OPTIONALLY at least one or more mixed zone circuits 3' of said zone circuits
3 are connected to the zone distributor 21 by means of a mixing valve 35 configured
to adjustably mix a part of the primary supply flow 25.1 with a part of the secondary
return flow 32.2 to form and feed into the mixed zone circuit 3' said mixed secondary
supply flow 32.1,
- a plurality of thermal demand devices 36, comprising for example a thermostat or an
ambient temperature sensor, associated with the zone circuits 3 and configured to
generate a thermal power demand signal (heat demand or cold demand) for the respective
zone circuit 3,
- a plurality of zone (delivery) temperature sensors 37 associated with the zone circuits
3 and configured to detect a temperature of the secondary supply flow 32.1 and generate
a corresponding detected zone temperature signal T_zone for the respective zone circuit
3,
- an electronic control system 4, connected with the thermal demand devices 36, the
zone temperature sensors 37, the thermal generator 22, the primary circulator 24,
the zone circulators 31 and OPTIONALLY the one or more mixing valves 35, and configured
to:
control the thermal generator 22, the primary circulator 24, the zone circulators
31, the one or more mixing valves 35, and
adjust or vary a power P of the thermal generator 22 depending on a primary target
temperature Tset of the primary supply flow 25.1, and
OPTIONALLY adjust the opening of the mixing valve 35 of the one or more mixed zone
circuits 3' depending on a difference (T_set_zone - T_zone) between a preset zone
target temperature T_set_zone of the secondary supply flow 32.1 and the detected zone
temperature T_zone of said mixed zone circuit 3'.
[0016] According to one aspect of the invention, the control method provides and/or the
control system 4 is configured to:
select, from all the zone circuits 3, a guide zone circuit with presence of a thermal
power demand signal and
determine the primary target temperature Tset depending on:
- a difference (T_set_zone - T_zone) between the preset zone target temperature T_set_zone
and the detected zone temperature T_zone of said guide zone circuit, in such a way
that an increase in an absolute value of said difference results in an increase of
the primary target temperature Tset in heating mode or a decrease of the primary target
temperature Tset in cooling mode or, more generically, in an increase of the power
P of the thermal generator 22. In other words, the greater the absolute value of the
difference (T_set_zone - T_zone) of the guide zone circuit, the greater the power
P of the thermal generator 22.
- OPTIONALLY, in the case in which the guide zone circuit is a mixed zone circuit 3'
with mixing valve 35 only partially open, a mitigating value T_mitigate which decreases
the primary target temperature Tset in heating mode or increases the primary target
temperature Tset in cooling mode or, more generically, modifies the primary target
temperature Tset so as to reduce the power P of the thermal generator 22.
[0017] The system makes it possible to adjust and control the power of the central heat
generator so as to reduce energy consumption and to reach the target temperatures
in the individual zone circuits more rapidly.
[0018] In most of the contemplated applications, the system comprises at least one of said
mixed zone circuits 3', but the invention also contemplates applications without mixed
zone circuits. In that case, no mitigating value T_mitigate is applicable, and in
the following description of exemplary embodiments, in the absence of mixed zone circuits,
this mitigating value T_mitigate would be non-existent and therefore zero.
[0019] In the presence of at least one or more mixed zone circuits 3', the system achieves
further advantages due to the use of the mitigating value T_mitigate.
[0020] This attenuation favours a greater opening of the mixing valve 35 (and therefore
a greater exploitation of the thermal energy already currently contained in the primary
supply flow 25.1) compared to an increase in the power P of the thermal generator
22 (and therefore a higher energy consumption).
[0021] In other words, if the guide zone circuit 3 (the one that requires more thermal power
than the other zone circuits 3) is a mixed zone circuit 3', the control system 4 and
the method provide and achieve that, before increasing the power P of the thermal
generator 22, the mixing valve 35 is opened more and more until reaching a "direct"
supply with only water coming from the primary supply flow 25.1, no longer mixed with
water coming from the secondary return flow 32.2.
[0022] This attenuation of the thermal power demand in some cases even results in a lowering
of the power P of the thermal generator 22 to further provoke and/or speed up the
maximum possible opening of the mixing valve 35 of the guide mixed zone circuit 3',
and consequently save energy.
[0023] According to one aspect of the invention, the control method provides and/or the
control system 4 is configured to calculate the primary target temperature Tset as
the sum of an extremal value max(T_set_zone); min(T_set_zone) of the preset zone target
temperatures T_set_zone of the zone circuits 3 with presence of a thermal power demand
signal, of a fixed initial additional temperature value T_initial_offset equal for
all zone circuits 3, and of a variable additional temperature value T_PID_offset,
wherein the variable additional temperature value T_PID_offset is determined depending
on the difference (T_set_zone - T_zone) between the preset zone target temperature
T_set_zone and the detected zone temperature T_zone of the guide zone circuit, and,
if the guide zone circuit is a mixed zone circuit 3' with mixing valve 35 only partially
open, on the mitigating value T_mitigate of the guide zone circuit, for example by
means of the following formula:
Tset = max(T _set_zone) + T_initial_offset + T_PID_offset in heating mode, and/or
Tset = min(T_set_zone) + T_initial_offset + T_PID_offset in cooling mode.

[0024] In accordance with a further aspect of the invention, the control method provides
and/or the control system 4 is configured to select as the guide zone circuit 3 that
zone circuit 3 for which the sum of the following addends is extremal:
the extremal value max(T_set_zone); min(T_set_zone) of the preset zone target temperatures
T_set_zone of the zone circuits 3 with presence of a thermal power demand signal,
the difference (T_set_zone - T_zone) between the preset zone target temperature T_set_zone
and the detected zone temperature T_zone of the zone circuit 3 under consideration,
the initial additional temperature value T_initial_offset,
the previously determined variable additional temperature value T_PID_offset.
[0025] In accordance with yet another aspect of the invention, the control method provides
and/or the control system 4 is configured to determine the variable additional temperature
value T_PID_offset by means of a PI or PID adjustment algorithm, using as the input
error value of the adjustment algorithm the sum (T_set_zone - T_zone) + T_mitigate
of the difference (T_set_zone - T_zone) and of the mitigating value T_mitigate of
the guide zone circuit 3.
Brief description of the figures
[0026] Further advantageous aspects of the invention will result from the following description
of some embodiments thereof by way of non-limiting example, with reference to the
accompanying figures, in which:
- Figure 1 shows a thermal system for heating and/or cooling with a primary circuit
and a plurality of zone circuits,
- Figure 2 shows an exemplary flow diagram of a control method of a thermal system for
heating and/or cooling with a primary circuit and a plurality of zone circuits,
- Figure 3 shows a thermal system for heating and/or cooling with a primary circuit
and a plurality of zone circuits that is to be considered both distinct from and in
combination with the system shown in figure 1.
Description of embodiments
[0027] With reference to the figures, a water-based thermal system 1 for heating and/or
cooling an environment and/or for supplying domestic hot water, comprises:
- a primary (water) circuit 2 with a zone distributor 21, for example a hydraulic separator,
a hydraulic compensator or separate hydraulic manifolds,
- a thermal generator 22 of heat and/or cold (comprising, for example, a heat pump and/or
a gas boiler and/or a resistive electric water heater) having a heat exchanger 23
connected in the primary circuit 2,
- a primary circulator 24 (for example a water pump) for circulating a primary water
flow 25.1, 25.2 in the primary circuit 2, sending the primary water flow 25.1, 25.2
as a primary return flow 25.2 from the zone distributor 21 into the heat exchanger
23, and as a primary supply flow 25.1 from the heat exchanger 23 into the zone distributor
21,
- a plurality of (water) zone circuits 3 connected with the primary circuit 2 through
the interposition of the zone distributor 21 and each having its own zone circulator
31 for circulating respective secondary water flows 32.1, 32.2, as a secondary supply
flow 32.1, from the zone distributor 21 to thermal emitters 33 and/or thermal accumulators
34 of said zone circuits 3 and, as a secondary return flow 32.2, from the thermal
emitters 33 and/or thermal accumulators 34 back to the zone distributor 21,
wherein at least one or more mixed zone circuits 3' of said zone circuits 3 are connected
to the zone distributor 21 by means of a mixing valve 35 configured to adjustably
mix a part of the primary supply flow 25.1 with a part of the secondary return flow
32.2 to form and feed into the mixed zone circuit 3' said mixed secondary supply flow
32.1,
- a plurality of thermal demand devices 36, comprising for example a thermostat or an
ambient temperature sensor, associated with the zone circuits 3 and configured to
generate a thermal power demand signal (heat demand or cold demand) for the respective
zone circuit 3,
- a plurality of zone (supply) temperature sensors 37 associated with the zone circuits
3 and configured to detect a temperature of the secondary supply flow 32.1 and generate
a corresponding detected zone temperature signal T_zone for the respective zone circuit
3,
- an electronic control system 4, connected to the thermal demand devices 36, the zone
temperature sensors 37, the thermal generator 22, the primary circulator 24, the zone
circulators 31 and the one or more mixing valves 35, and configured to:
control the thermal generator 22, the primary circulator 24, the zone circulators
31, the one or more mixing valves 35, and
adjust or vary a power P of the thermal generator 22 depending on a primary target
temperature Tset of the primary supply flow 25.1, and
adjust the opening of the mixing valve 35 of the one or more mixed zone circuits 3'
depending on a difference (T_set_zone - T_zone) between a preset zone target temperature
T_set_zone of the secondary supply flow 32.1 and the detected zone temperature T_zone
of said mixed zone circuit 3'.
[0028] The control method provides and/or the control system 4 is configured to:
select, from all the zone circuits 3, a guide zone circuit with presence of a thermal
power demand signal and
determine the primary target temperature Tset depending on:
- a difference (T_set_zone - T_zone) between the preset zone target temperature T_set_zone
and the detected zone temperature T_zone of said guide zone circuit, in such a way
that an increase in the absolute value of said difference results in an increase of
the primary target temperature Tset in heating mode or a reduction of the primary
target temperature Tset in cooling mode or, more generically, in an increase of the
power P of the thermal generator 22, and
- in the case in which the guide zone circuit is a mixed zone circuit 3' with mixing
valve 35 only partially open, a mitigating value T_mitigate which decreases the primary
target temperature Tset in heating mode or increases the primary target temperature
Tset in cooling mode or, more generically, modifies the primary target temperature
Tset so as to reduce the power P of the thermal generator 22.
[0029] According to one aspect of the invention, the control method provides and/or the
control system 4 is configured to calculate the primary target temperature Tset as
the sum of an extremal value max(T_set_zone); min(T_set_zone) of the preset zone target
temperatures T_set_zone of the zone circuits 3 with presence of a thermal power demand
signal, of a fixed initial additional temperature value T_initial_offset equal for
all zone circuits 3, and of a variable additional temperature value T_PID_offset,
wherein the variable additional temperature value T_PID_offset is determined depending
on the difference (T_set_zone - T_zone) between the preset zone target temperature
T_set_zone and the detected zone temperature T_zone of the guide zone circuit, and
depending on the mitigating value T_mitigate of the guide zone circuit, for example
by means of the following formula:
Tset = max(T_set_zone) + T_initial_offset + T_PID_offset in heating mode, and/or Tset
= min(T_set_zone) + T_initial_offset + T_PID_offset in cooling mode.

[0030] In accordance with a further aspect, the control method provides and/or the control
system 4 is configured to select as the guide zone circuit that zone circuit 3 for
which the sum of the following addends is extremal:
the extremal value max(T_set_zone); min(T_set_zone) of the preset zone target temperatures
T_set_zone of the zone circuits 3 with presence of a thermal power demand signal,
the difference (T_set_zone - T_zone) between the preset zone target temperature T_set_zone
and the detected zone temperature T_zone of the zone circuit 3,
the initial additional temperature value T_initial_offset,
the previously determined variable additional temperature value T_PID_offset.
[0031] In accordance with yet another aspect of the invention, the control method provides
and/or the control system 4 is configured to determine the variable additional temperature
value T_PID_offset by means of a PI or PID adjustment algorithm, using as input error
value of the adjustment algorithm the sum (T_set_zone - T_zone) + T_mitigate of the
difference (T_set_zone - T_zone) and the mitigating value T_mitigate of the guide
zone circuit 3.
Description of the adjustment of the thermal generator power P gen
Method step M1 (monitoring thermal power demand):
[0032] According to one embodiment, the method provides and/or the control system 4 is configured
to verify, for each zone circuit 3, the presence of a thermal power demand signal
(i.e. heat demand in case of heating, cold demand in case of cooling) supplied by
the thermal demand device 36, for example a thermostat or an ambient temperature sensor.
[0033] In the absence of a thermal power demand signal for a specific zone circuit 3, the
control system 4 does not activate the zone circulator 31 for this zone circuit 3
and reiterates the verification of the presence of a thermal power demand signal.
[0034] In the presence of a thermal power demand signal for a specific zone circuit 3, the
control system 4 activates the zone circulator 31 for this zone circuit 3 and activates
the primary circulator 24.
Method step M2 (generator activation and initial setting of the primary target temperature Tset):
[0035] According to one embodiment, in the presence of a thermal power demand signal for
at least one of the zone circuits 3, the method and/or the control system 4 starts
the operation of the thermal generator 22, setting the power P of the thermal generator
22 depending on the primary target temperature Tset of the primary supply flow 25.1,
and
- determines the primary target temperature Tset initially in a constant manner depending
on:
- the extremal value (maximum in heating mode, minimum in cooling mode) among the preset
values of zone target temperature T_set_zone of the secondary supply flow 32.1 of
each of the zone circuits 3 with presence of a thermal power demand signal,
- the fixed initial additional temperature value T_initial_offset equal for each zone
circuit 3,
but initially without taking into account the aforementioned variable additional temperature
value T_PID_offset,
for example according to the formula:

and/or

[0036] According to examples, the preset values of zone target temperature T_set_zone may
be T_set_zone = 50°C for radiators, T_set_zone = 30°C for underfloor heating, T_set_zone
= 70°C for a domestic hot water storage tank, T_set_zone = 7°C for fan coil units
in cooling mode.
[0037] According to examples, the fixed value of initial additional temperature T_initial_offset
may be T_initial_offset = 1°C or chosen in the range from > 0°C to 40°C.
Method step M3 (verification of control stability):
[0038] According to one embodiment, in the presence of a thermal power demand signal for
at least one of the zone circuits 3, and with activation of the zone circulator 31
for this zone circuit 3, activation of the thermal generator 22 and of the primary
circulator 24, the method and/or the control system 4 verifies a control stability
condition by verifying the permanence of the detected zone temperature T_zone within
a predetermined stabilization temperature range T_set_zone - T_stab for a predetermined
stabilization time interval t_stab, indicative of a convergence trend of the detected
zone temperature T_zone towards the zone target temperature T_set_zone, in order to
exclude that the thermal system 1 is in a transient phase of high thermal oscillation.
[0039] The predetermined stabilization temperature range T_set_zone - T_stab may be a predetermined
limit difference between the detected zone temperature T_zone and the zone target
temperature T_set_zone.
[0040] The verification of the control stability condition may be carried out, for example,
by means of the criterion:

and/or

and/or
abs[T_set_zone - T_zone] ≤ T_stab for a time t ≥ t_stab both in heating and cooling
mode.
[0041] According to examples, the predetermined stabilization temperature range T_stab may
be T_stab = 15°C and/or the predetermined stabilization time interval t_stab may be
t_stab = 500 s.
[0042] If for a zone circuit 3 the control stability criterion is not satisfied, and therefore
the control stability condition is verified and not confirmed, the control system
4 returns to method step M1 and reiterates the verification of the presence of a thermal
power demand signal for this zone circuit 3.
Method step M4 (verification of mixing valve stop):
[0043] If for a zone circuit 3 the control stability criterion is satisfied, and therefore
the control stability condition is verified and confirmed, and the zone circuit 3
is a mixed zone circuit 3' with a mixing valve 35, the control system 4 verifies a
mixing valve stop condition (in any opening position, even at full opening) by verifying
the stroke position for a predetermined observation time interval t_obs, indicative
of the achievement of a balance condition in the adjustment of the mixing valve 35,
in order to exclude that the thermal system 1 is in a transient phase of valve adjustment.
[0044] The verification of the mixing valve stop condition may be carried out, for example,
by means of the valve stop criterion: Mixing valve 35 stroke position constant for
a time t ≥ t_obs.
[0045] According to examples, the predetermined observation time interval t_obs may be t_obs
= 20 s or in the range 15 s < t_obs < 25 s.
[0046] If for a mixed zone circuit 3' the valve stop criterion is not satisfied, and therefore
the valve stop condition has been verified and not confirmed, the method and/or the
control system 4 returns to method step M1 and reiterates the verification of the
presence of a thermal power demand signal for this mixed zone circuit 3'.
Method step M5 (verification of continuous control stability):
[0047] If the zone circuit 3 is a so-called "direct" zone circuit, without a mixing valve
35, or the zone circuit 3 is a mixed zone circuit 3' with mixing valve 35 and the
valve stop condition is also confirmed, the method and/or the control system 4 verifies
a continuous control stability condition by (re-)verifying the permanence of the detected
zone temperature T_zone within the predetermined stabilization temperature range T_set_zone
- T_stab (this time preferably a single instantaneous verification without taking
into account the stabilization time interval t_stab), in order to ascertain the continuous
control stability of the thermal system 1 or the presence of a transient phase of
high thermal oscillation.
[0048] Similarly to what was explained with reference to method step M3, the verification
of the continuous control stability condition may be carried out, for example, by
means of the criterion:

and/or

and/or
abs [T_set_zone - T_zone] =< T_stab both in heating and cooling mode.
[0049] According to examples, the predetermined stabilization temperature range T_stab may
be T_stab = 15°C and/or the predetermined stabilization time interval t_stab may be
t_stab = 500 s.
[0050] If for a zone circuit 3 the continuous control stability criterion is not satisfied,
and therefore the continuous control stability condition is verified and not confirmed,
the method and/or the control system 4 returns to method step M1 and reiterates the
verification of the presence of a thermal power demand signal for this zone circuit
3.
Method step M6 (verification of continuous thermal power demand):
[0051] According to one embodiment, if for a zone circuit 3 the continuous control stability
criterion is satisfied, and therefore the continuous control stability condition is
verified and confirmed, the method and/or the control system 4 does not return to
method step M1, but nevertheless performs a step of verifying the continuous presence
of the thermal power demand signal for this zone circuit 3 (the same zone circuit
3 whose thermal power demand initially triggered the execution of the algorithm starting
from method step M1).
[0052] In the absence of the thermal power demand signal, the method and/or the control
system 4 returns to method step M1 and reiterates the verification of the presence
of a thermal power demand signal for this zone circuit 3.
Method step M7 (verification of correct functioning of the control system 4):
[0053] According to one embodiment, if for a zone circuit 3 the continuous control stability
criterion is satisfied, and therefore the continuous control stability condition is
verified and confirmed, the control system 4 may in addition verify the correct functioning
of an own zone management data processing module 41 dedicated to signal processing
aimed at carrying out the control method, by comparing one or more operating parameters
of the zone management data processing module 41 with respective one or more reference
values or ranges, for example predetermined or calculated by means of predetermined
formulas, and indicative of correct functioning.
[0054] In case of detection of a malfunction of the zone management data processing module
41, the control system 4 generates a malfunction warning signal and/or returns to
method step M1 and reiterates the verification of the presence of a thermal power
demand signal for this zone circuit 3.
[0055] According to method examples, method step M6 (verification of continuous thermal
power demand) and method step M7 (verification of correct functioning of the control
system 4) may be executed in parallel or sequentially, one after the other. Method
step M7 (verification of correct functioning of the control system 4) may also be
omitted.
Method step M8 (waiting step):
[0056] According to one embodiment, for example following the determination of correct functioning
of the zone management data processing module 41 and/or in the presence of a thermal
power demand signal, the method and/or the control system 4 executes a waiting step
for a limit waiting time t_PID, for example predetermined, for example t_PID = 60
s, in order to allow the completion of a thermal generator 22 adjustment step (method
step M12 described later) and an adjustment stabilization of the thermal system 1
before executing a subsequent adjustment step of the thermal generator 22 resulting
from the thermal power demand for the zone circuit 3 under processing. A criterion
for completing the waiting step is, for example, t >= t_PID.
[0057] According to one embodiment, until the waiting time t has reached the limit waiting
time t_PID, the method and/or the control system 4 returns to method step M6 and reiterates
the verification of the continuous presence of the thermal power demand signal for
the zone circuit 3, or reiterates the sequence of method steps M6, M7, M8.
Method step M9 (selection of the guide zone circuit):
[0058] According to one embodiment, for example when the waiting time t has reached the
limit waiting time t_PID, the method and/or the control system 1 performs a selection
of a single guide zone circuit among all the zone circuits 3 with presence of a thermal
power demand signal. In particular, the guide zone circuit is the one that would require
the highest power P of the thermal generator 22, or in other words, the highest primary
target temperature Tset in heating mode or the lowest primary target temperature Tset
in cooling mode. For example, if for three different zone circuits 3 of the thermal
system 1 there are thermal power demand signals, the guide zone circuit selection
step will provide a positive outcome ("yes") for only one and a negative outcome ("no")
for all the others.
[0059] The method and/or the control system 4 calculates, for all the zone circuits 3 with
presence of a thermal power demand signal, a fictional primary target temperature
value Tset_i using the formula:
Tset_i = max or min (T_set_zone_i + (T_set_zone_i - T_zone_i) + (T_initial_offset
+ T_PID_offset)

where:
Tset_i is the fictional primary target temperature value of the primary supply flow
25.1 in the primary circuit 2 referring to zone circuit 3 i (meaning the i-th zone
circuit 3),
T_set_zone_i is the preset zone target temperature T_set_zone of the secondary supply
flow 32.1 of zone circuit 3 i,
T_set_zone_i is the target temperature of zone of preset zone T_set_zone of the secondary
delivery flow 32.1 of the zone circuit 3 i,
T_zone_i is the detected zone temperature T_zone of the secondary supply flow 32.1
of zone circuit 3 i,
T_PID_offset is the previously calculated and currently still applied variable additional
temperature value,
T_initial_offset is the constant initial additional temperature,
and selects as the guide zone circuit the zone circuit 3 having the maximum fictional
primary target temperature value max(Tset_i) in heating mode and/or the minimum fictional
primary target temperature value min(Tset_i) in cooling mode.
[0060] The zone circuit(s) 3 for which the respective zone temperature sensor 37 does not
provide detected zone temperature signals T_zone (for example in the case of a faulty
zone temperature sensor 37) are excluded from the selection of the guide zone circuit.
[0061] According to one embodiment, for all the zone circuits 3 that are deselected, meaning
that they are not the guide zone circuit, the method and/or the control system 4 returns
to method step M6 and reiterates the verification of the continuous presence of the
thermal power demand signal for the zone circuit 3, or reiterates the sequence of
method steps M6, M7, M8, M9.
Method step M10 (determination of a PID_error control input value for the guide zone circuit):
[0062] For the guide zone circuit only, the method and/or the control system 4 verifies
whether the guide zone circuit 3 is:
- A) a so-called "direct" zone circuit 3, without a mixing valve 35, or a mixed zone circuit
3' but with mixing valve 35 fully open, and therefore supplied 100% with water from
the primary supply flow 25.1 (hot in heating mode or cold in cooling mode), or
- B) a mixed zone circuit 3' with mixing valve 35 only partially open, and therefore supplied
with both water from the primary supply flow 25.1 and water from the secondary return
flow 32.2.
[0063] In case
A) the method and/or the control system 4 determines as the PID_error control input
value the difference between the zone target temperature T_set_zone and the detected
zone temperature T_zone, by means of the formula PID_error = T_set_zone - T_zone.
[0064] In case
B) the method and/or the control system 4 determines the PID_error control input value
as the sum of the difference between the zone target temperature T_set_zone and the
detected zone temperature T_zone, and a mitigating value T_mitigate, for example by
means of the formula PID_error = (T_set_zone - T_zone) + T_mitigate, wherein the mitigating
value T_mitigate is chosen so as to decrease the PID_error control input value in
heating mode and/or to increase the PID_error control input value in cooling mode.
[0065] This attenuation makes it possible to achieve a so-called "error reduction" and thus
favours a greater opening of the mixing valve 35 (and therefore a greater exploitation
of the thermal energy already currently contained in the primary supply flow 25.1)
over an increase of the power P of the thermal generator 22 (and thus a higher energy
consumption).
[0066] In other words, if the guide zone circuit 3 (the one that requires more thermal power
than the other zone circuits 3) is a mixed zone circuit 3', the control system 4 and
the method provide and achieve that, before increasing the power P of the thermal
generator 22, the mixing valve 35 is opened more and more until reaching a "direct"
supply with only water coming from the primary supply flow 25.1 and no longer mixed
with water coming from the secondary return flow 32.2.
[0067] The attenuation of the PID_error control input value in some cases even results in
a reduction of the power P of the thermal generator 22 to further cause and/or speed
up the maximum possible opening of the mixing valve 35 of the guide mixed zone circuit
3', and consequently save energy.
Method step M11 (calculation of the variable additional temperature value T_PID_offset):
[0068] According to one embodiment, the method and/or the control system 4 calculates the
variable additional temperature value T_PID_offset depending on the PID_error control
input value (determined in method step M10), for example by means of a proportional-integral
(PI) or proportional-integral-derivative (PID) control algorithm, configured (tuned)
so as to provide, in response to the PID_error control input value, as output a variable
additional temperature value T_PID_offset intended to influence the adjustment of
the power P of the thermal generator 22 so that the PID_error control input value
tends to zero.
Method step M12 (calculation of the primary target temperature value Tset and adjustment of the thermal
generator 22):
[0069] According to one embodiment, the method and/or the control system 4 calculates the
primary target temperature Tset as the sum of the extremal value (maximum in heating
mode, minimum in cooling mode) of zone target temperature T_set_zone, the constant
initial additional temperature value T_initial_offset and the variable additional
temperature value T_PID_offset, for example by means of the formula:

and/or

where:
Tset is the primary target temperature value of the primary supply flow 25.1 in the
primary circuit 2,
max(T_set_zone) is the maximum value of preset zone target temperature T_set_zone
of the secondary supply flow 32.1 among all the zone circuits 3 with presence of a
thermal power demand signal, in heating mode,
min(T_set_zone) is the minimum value of preset zone target temperature T_set_zone
of the secondary supply flow 32.1 among all the zone circuits 3 with presence of a
thermal power demand signal, in cooling mode,
T_initial_offset is the constant initial additional temperature value equal for each
zone circuit 3,
T_PID_offset is the variable additional temperature value.
[0070] In heating mode T_initial_offset may be positive. In cooling mode T_initial_offset
may be negative.
[0071] According to embodiments, in heating mode, T_initial_offset may be T_initial_offset
= 1°C or in the range > 0°C to 40°C; in cooling mode, T_initial_offset may be T_initial_offset
= - 10°C or in the range < 0°C to -20°C.
[0072] According to examples, the preset zone target temperature values T_set_zone may be:
T_set_zone = 50°C for radiators, T_set_zone = 30°C for underfloor heating, T_set_zone
= 70°C for domestic hot water storage, T_set_zone = 7°C for fan coil units in cooling
mode.
[0073] The method and/or the control system 4 regulates the power P of the thermal generator
22 as a function of the primary target temperature Tset, for example based on tables
or correlation curves between Tset and P, or via a specific power control algorithm,
such as a PI or PID adjustment algorithm.
Method step M13 (adjustment of the opening of mixing valves 35)
[0074] According to one embodiment, the method and/or the control system 4 regulates the
opening of the mixing valves 35 of the mixed zone circuits 3' with a thermal power
demand signal, depending on the difference (T_set_zone_i - T_zone_i) between the preset
zone target temperature T_set_zone and the detected zone temperature T_zone.
[0075] According to one embodiment, until the recalculation of the variable additional temperature
value T_PID_offset, the method and/or the control system 4 continues to (retain in
memory and) apply the previously calculated variable additional temperature value
T_PID_offset, for example according to or based on the combination of zones with a
thermal power demand.
[0076] According to one embodiment, upon first activation of the thermal generator 22, and
until the first calculation of the variable additional temperature value T_PID_offset,
the method and/or the control system 4 may apply a variable additional temperature
value T_PID_offset equal to zero.
[0077] According to embodiments, for each zone circuit 3, 3', when selected as the guide
zone circuit, the method may include the step of storing and keeping in memory the
most recent variable additional temperature value T_PID_offset determined for said
zone circuit.
[0078] When the thermal power demand conditions change and, consequently, a different zone
circuit 3, 3' is selected as the guide zone circuit (e.g., without interruption in
the operation of the thermal system 1 and/or the thermal generator 22), or when the
thermal system 1 is restarted after a previous shutdown (e.g., due to a complete absence
of thermal power demand), the method and/or the control system 4 may apply, for the
newly selected guide zone circuit, as the first (or initial) variable additional temperature
value T_PID_offset, the last value stored in memory for that same zone circuit.
[0079] Alternatively, instead of storing the last variable additional temperature value
T_PID_offset, for each zone circuit 3, 3', when selected as the guide zone circuit,
the method may include the step of storing and keeping in memory the last combination
of thermal power demand requests.
[0080] In this embodiment, when the thermal power demand conditions change and, consequently,
a different zone circuit 3, 3' is selected as the guide zone circuit (e.g., without
interruption in the operation of the thermal system 1 and/or the thermal generator
22), or when the thermal system 1 is restarted after a previous shutdown (e.g., due
to a complete absence of thermal power demand), the method and/or the control system
4 may calculate for the selected guide zone circuit the first (or initial) variable
additional temperature value T_PID_offset based on the last combination of thermal
power demand requests stored in memory.
[0081] In the event that a zone circuit 3, 3' has never been previously selected as a guide
zone circuit, the method and/or the control system 4 may apply a first (or initial)
variable additional temperature value T_PID_offset equal to zero.
[0082] To increase adjustment stability, the variable additional temperature value T_PID_offset
or the sum value of the initial and variable additional temperature (T_initial_offset
+ T_PID_offset) is kept within a cut-off range, preset for heating mode (e.g., from
0°C to 10°C) and/or differently preset for cooling mode (e.g., from 0°C to -10°C).
[0083] The method and thermal system 1 described above achieve the objectives of the invention.
In particular, the guide zone circuit 3 (the one currently requiring more thermal
energy than the other zone circuits 3) predominantly influences the power demand P
of the thermal generator 22. With even greater energy efficiency, the same guide zone
circuit 3 that currently requires more thermal energy is brought to a condition where
the corresponding primary target temperature Tset, and thus the corresponding power
demand P of the thermal generator 22, is minimized as much as possible.
[0084] This is achieved thanks to the attenuation of thermal power demand in the case of
a mixed zone circuit 3' with the mixing valve 35 not yet fully open, in such a way
as to first force a greater opening of the mixing valve 35 (and thus greater exploitation
of the thermal energy already present in the primary supply flow 25.1), and only subsequently
to increase the power P of the thermal generator 22.
[0085] As a result, for a "direct" guide zone circuit, the control algorithm leads to a
rapid convergence of the detected zone temperature T_zone toward the zone target temperature
T_set_zone, whereas for a mixed guide zone circuit 3', the control algorithm leads
to a convergence of the detected zone temperature T_zone toward the zone target temperature
T_set_zone with the mixing valve 35 as open as possible or fully open.
Reference List
[0086]
thermal system 1
primary circuit 2
zone distributor 21
thermal generator 22
heat exchanger 23
primary circulator 24
primary water flow 25.1, 25.2
primary supply flow 25.1
primary return flow 25.2
zone circuits 3
mixed zone circuits 3'
zone circulator 31
secondary water flows 32.1, 32.2
secondary supply flow 32.1
secondary return flow 32.2
thermal emitters 33
thermal storage units 34
mixing valve 35
thermal demand devices 36
zone (supply) temperature sensors 37
detected zone temperature T_zone
power P of the thermal generator
primary target temperature Tset
zone target temperature T_set_zone
initial additional temperature T_initial_offset
variable additional temperature T_PID_offset
stabilization temperature range T_set_zone - T_stab
stabilization time interval t_stab
observation time interval t_obs
maximum wait time t_PID
control input value PID_error
control system 4
zone management data processing module 41
1. A water-based thermal system (1) for heating and/or cooling, comprising:
- a primary water circuit (2) having a zone distributor (21), a heat and/or cold thermal
generator (22) having a heat exchanger (23) connected in the primary circuit (2),
and a primary circulator (24) for circulating a primary water flow (25.1, 25.2) in
the primary circuit (2), sending the primary water flow (25.1, 25.2) as a primary
delivery flow (25.1) from the heat exchanger (23) into the zone distributor (21) and
as a primary return flow (25.2) from the zone distributor (21) into the heat exchanger
(23),
- a plurality of zone water circuits (3) connected to the primary circuit (2) through
the interposition of the zone distributor (21) and each having an own zone circulator
(31) for circulating respective secondary water flows (32.1, 32.2), as a secondary
delivery flow (32.1), from the zone distributor (21) to thermal emitters (33) and/or
thermal accumulators (34) of said zone circuits (3) and, as a secondary return flow
(32.2), from the thermal emitters (33) and/or thermal accumulators (34) back to the
zone distributor (21),
- a plurality of thermal demand devices (36) associated with the zone circuits (3)
and configured to generate a thermal power demand signal for the respective zone circuit
(3),
- a plurality of zone temperature sensors (37) associated with the zone circuits (3)
and configured to detect a temperature of the secondary delivery flow (32.1) and generate
a corresponding detected zone temperature signal (T_zone) for the respective zone
circuit (3),
- an electronic control system (4), connected to the thermal demand devices (36),
the zone temperature sensors (37), the thermal generator (22), the primary circulator
(24), the zone circulators (31), and configured to:
- control the thermal generator (22), the primary circulator (24), the zone circulators
(31), and
- adjust or vary a power (P) of the thermal generator (22) depending on a primary
target temperature (Tset) of the primary delivery flow (25.1),
characterized in that the control system (4) is configured to:
- select, from all the zone circuits (3), a guide zone circuit with the presence of
a thermal power demand signal and
- determine the primary target temperature (Tset) depending on a difference (T_set_zone
- T_zone) between the preset zone target temperature (T_set_zone) and the detected
zone temperature (T_zone) of said guide zone circuit, so that the greater the absolute
value of the difference (T_set_zone - T_zone) of the guide zone circuit, the greater
the power (P) of the thermal generator (22).
2. A thermal system (1) according to claim 1,
wherein at least one or more of the mixed zone circuits (3') of said zone circuits
(3) are connected to the zone distributor (21) by means of a mixing valve (35) configured
to adjustably mix part of the primary delivery flow (25.1) with part of a secondary
return flow (32.2) to feed into the mixed zone circuit (3') said secondary delivery
flow (32.1) as a mixed flow,
wherein the electronic control system (4) is also connected to the one or more mixing
valves (35) and configured to:
- control the one or more mixing valves (35), and
- adjust the opening of the mixing valve (35) of the one or more mixed zone circuits
(3') depending on a difference (T_set_zone - T_zone) between a preset zone target
temperature (T_set_zone) of the secondary delivery flow (32.1) and the detected zone
temperature (T_zone) of said mixed zone circuit (3'), and
- only when the guide zone circuit is a mixed zone circuit (3') with the mixing valve
(35) only partially open, determine the primary target temperature (Tset) also depending
on a mitigating value (T_mitigate) which changes the primary target temperature (Tset)
so as to reduce the power (P) of the thermal generator (22),
wherein, preferably:
an increase in the absolute value of said difference results in an increase in the
primary target temperature (Tset) in heating mode or a decrease in the primary target
temperature (Tset) in cooling mode, and
the mitigating value (T_mitigate) decreases the primary target temperature (Tset)
in heating mode or increases the primary target temperature (Tset) in cooling mode.
3. A thermal system (1) according to claim 2, wherein the control system (4) is configured
to calculate the primary target temperature (Tset):
- as the sum of an extremal value (max (T_set_zone); min (T_set_zone)) of the preset
zone target temperatures (T_set_zone) of the zone circuits (3) with the presence of
a thermal power demand signal, a fixed initial additional temperature value (T_initial_offset),
and a variable additional temperature value (T_PID_offset),
wherein the variable additional temperature value (T_PID_offset) is determined depending
on the difference (T_set_zone - T_zone) between the zone target temperature (T_set_zone)
and the detected zone temperature (T_zone) of the guide zone circuit, and on the mitigating
value (T_mitigate) of the guide zone circuit, or
- by means of the following formula:
Tset = max(T_set_zone) + T_initial_offset + T_PID_offset in heating mode, Tset = min(T_set_zone)
+ T_initial_offset + T_PID_offset in cooling mode.
4. A thermal system (1) according to claim 3, wherein the control system (4) is configured
to select as the guide zone circuit the zone circuit (3) for which the sum of the
following addends is extremal:
the extremal value (max (T_set_zone); min (T_set_zone)) of the zone target temperatures
(T_set_zone) of the zone circuits (3) with the presence of a thermal power demand
signal,
the difference (T_set_zone - T_zone) between the zone target temperature (T_set_zone)
and the detected zone temperature (T_zone) of the zone circuit (3) under consideration,
the initial additional temperature value (T_initial_offset),
the previously determined variable additional temperature value (T_PID_offset).
5. A thermal system (1) according to one of claims 3 and 4, wherein the control system
(4) is configured to determine the variable additional temperature value (T_PID_offset)
by means of a PI or PID adjustment algorithm, using as the input error value (PID_error)
of the adjustment algorithm the sum ((T_set_zone - T_zone) + T_mitigate) of the difference
(T_set_zone - T_zone) and the mitigating value (T_mitigate) of the guide zone circuit.
6. A thermal system (1) according to claim 1, wherein:
A) an increase in the absolute value of said difference results in an increase in
the primary target temperature (Tset) in heating mode or a decrease in the primary
target temperature (Tset) in cooling mode,
and/or
B) the control system (4) is configured to calculate the primary target temperature
(Tset):
- as the sum of an extremal value (max (T_set_zone); min (T_set_zone)) of the preset
zone target temperatures (T_set_zone) of the zone circuits (3) with the presence of
a thermal power demand signal, a fixed initial additional temperature value (T_initial_offset),
and a variable additional temperature value (T_PID_offset),
wherein the variable additional temperature value (T_PID_offset) is determined depending
on the difference (T_set_zone - T_zone) between the zone target temperature (T_set_zone)
and the detected zone temperature (T_zone) of the guide zone circuit, or
- by means of the following formula:
Tset = max(T_set_zone) + T_initial_offset + T_PID_offset in heating mode, Tset = min(T_set_zone)
+ T_initial_offset + T_PID_offset in cooling mode

and, preferably
wherein the control system (4) is configured to select as the guide zone circuit the
zone circuit (3) for which the sum of the following addends is extremal:
the extremal value (max (T_set_zone); min (T_set_zone)) of the zone target temperatures
(T_set_zone) of the zone circuits (3) with the presence of a thermal power demand
signal,
the difference (T_set_zone - T_zone) between the zone target temperature (T_set_zone)
and the detected zone temperature (T_zone) of the zone circuit (3) under consideration,
the initial additional temperature value (T_initial_offset),
the previously determined additional variable temperature value (T_PID_offset),
wherein the control system (4) is configured to determine the additional variable
temperature value (T_PID_offset) by means of a PI or PID adjustment algorithm, using
as the input error value (PID_error) of the adjustment algorithm the difference (T_set_zone
- T_zone) of the guide zone circuit.
7. A method for adjusting the power (P) of a thermal generator (22) of a water-based
heating and/or cooling thermal system (1), comprising:
- a primary water circuit (2) having a zone distributor (21), a heat and/or cold thermal
generator (22) having a heat exchanger (23) connected in the primary circuit (2),
and a primary circulator (24) for circulating a primary water flow (25.1, 25.2) in
the primary circuit (2), sending the primary water flow (25.1, 25.2) as a primary
delivery flow (25.1) from the heat exchanger (23) into the zone distributor (21) and
as a primary return flow (25.2) from the zone distributor (21) into the heat exchanger
(23),
- a plurality of zone water circuits (3) connected to the primary circuit (2) through
the interposition of the zone distributor (21) and each having its own zone circulator
(31) for circulating respective secondary water flows (32.1, 32.2), as a secondary
delivery flow (32.1), from the zone distributor (21) to thermal emitters (33) and/or
thermal accumulators (34) of said zone circuits (3) and, as a secondary return flow
(32.2), from the thermal emitters (33) and/or thermal accumulators (34) back to the
zone distributor (21),
- a plurality of thermal demand devices (36) associated with the zone circuits (3)
and configured to generate a thermal power demand signal for the respective zone circuit
(3),
- a plurality of zone temperature sensors (37) associated with the zone circuits (3)
and configured to detect a temperature of the secondary delivery flow (32.1) and generate
a corresponding detected zone temperature signal (T_zone) for the respective zone
circuit (3),
- an electronic control system (4), connected to the thermal demand devices (36),
the zone temperature sensors (37), the thermal generator (22), the primary circulator
(24), the zone circulators (31), and configured to:
- control the thermal generator (22), the primary circulator (24), the zone circulators
(31), and
- adjust or vary a power (P) of the thermal generator (22) depending on a primary
target temperature (Tset) of the primary delivery flow (25.1),
characterized in that the method comprises the step of:
- select, from all the zone circuits (3), a guide zone circuit with the presence of
a thermal power demand signal and
- determining the primary target temperature (Tset) depending on:
a difference (T_set_zone - T_zone) between the preset zone target temperature (T_set_zone)
and the detected zone temperature (T_zone) of said guide zone circuit, so that the
greater the absolute value of the difference (T_set_zone - T_zone) of the guide zone
circuit, the greater the power (P) of the thermal generator (22).
8. A method according to claim 7, wherein at least one or more mixed zone circuits (3')
of said zone circuits (3) are connected to the zone distributor (21) by means of a
mixing valve (35) configured to adjustably mix part of the primary delivery flow (25.1)
with part of a secondary return flow (32.2) to feed into the mixed zone circuit (3')
said secondary delivery flow (32.1) as a mixed flow,
wherein the electronic control system (4) is also connected to the one or more mixing
valves (35) and configured to:
- control the one or more mixing valves (35), and
- adjust the opening of the mixing valve (35) of the one or more mixed zone circuits
(3') depending on a difference (T_set_zone - T_zone) between a preset zone target
temperature (T_set_zone) of the secondary delivery flow (32.1) and the detected zone
temperature (T_zone) of said mixed zone circuit (3'), and
characterized in that the method comprises the step of:
- only when the guide zone circuit is a mixed zone circuit (3') with the mixing valve
(35) only partially open, determine the primary target temperature (Tset) also depending
on a mitigating value (T_mitigate) which changes the primary target temperature (Tset)
so as to reduce the power (P) of the thermal generator (22).
9. A method according to claim 8, comprising a step M12 of calculating the primary target
temperature (Tset):
- as the sum of an extremal value (max (T_set_zone); min (T_set_zone)) of the preset
zone target temperatures (T_set_zone) of the zone circuits (3) with the presence of
a thermal power demand signal, a fixed initial additional temperature value (T_initial_offset),
and a variable additional temperature value (T_PID_offset),
wherein the variable additional temperature value (T_PID_offset) is determined depending
on the difference (T_set_zone - T_zone) between the zone target temperature (T_set_zone)
and the detected zone temperature (T_zone) of the guide zone circuit, and on the mitigating
value (T_mitigate) of the guide zone circuit, or
- by means of the following formula:
Tset = max(T_set_zone) + T_initial_offset + T_PID_offset in heating mode, Tset = min(T_set_zone)
+ T_initial_offset + T_PID_offset in cooling mode.
10. A method according to claim 8 or 9, comprising a step M1 of monitoring the thermal
power demand through the steps:
- verifying, for each zone circuit (3), the presence of a thermal power demand signal
supplied by the thermal demand device (36),
- in the absence of a thermal power demand signal for one of the zone circuits (3),
not operating the zone circulator (31) for this zone circuit (3) and repeating the
verification of the presence of a thermal power demand signal,
- in the presence of a thermal power demand signal for one of the zone circuits (3),
operating the zone circulator (31) for this zone circuit (3) and operating the primary
circulator (24).
11. A method according to claim 9 or 10, comprising a step M2 of generator activation
and initial setting the primary target temperature (Tset), through the steps:
- in the presence of a thermal power demand signal for at least one of the zone circuits
(3), starting to operate the thermal generator (22) by setting the power (P) of the
thermal generator (22) depending on the primary target temperature (Tset) of the primary
delivery flow (25.1), and
- determining the primary target temperature (Tset) initially:
depending on:
the extremal value, maximum in heating mode or minimum in cooling mode, between the
preset zone target temperature values (T_set_zone) of the secondary delivery flow
(32.1) of each of the zone circuits (3) with the presence of a thermal power demand
signal, and
the initial fixed additional temperature value (T_initial_offset),
but without initially taking into account the variable additional temperature value
(T_PID_offset), or by means of the formula:


12. A method according to claim 10, comprising a step M3 of verifying the control stability,
through the steps:
in the presence of a thermal power demand signal for at least one of the zone circuits
(3) and with the zone circulator (31) of this zone circuit (3) activated, and activated
thermal generator (22) and activated primary circulator (24),
- verifying a control stability condition by verifying the permanence of the detected
zone temperature (T_zone) within a predetermined stabilization temperature range (T_set_zone
- T_stab)for a predetermined stabilization time interval (t_stab),
- if the control stability condition is not confirmed, repeating the verification
of the presence of a thermal power demand signal for the zone circuit (3) or performing
step M1.
13. A method according to any one of claims 8 to 12, comprising a step M4 of verifying
the mixing valve (35) stop, through the steps:
- if a zone circuit (3) with the presence of a thermal power demand signal is a mixed
zone circuit (3'), verifying a stop condition of the mixing valve (35) by verifying
the adjustment position of the valve (35) for a predetermined observation time interval
(t_obs),
- if the valve stop condition is not confirmed, repeating the verification of the
presence of a thermal power demand signal for said mixed zone circuit (3') or performing
step M1.
14. A method according to any one of claims 8 to 13, wherein step M9 of selecting the
guide zone circuit comprises the steps:
- calculating for all the zone circuits (3) with presence of a thermal power demand
signal a fictional primary target temperature value (Tset_i) using the formula:
Tset_i = max or min (T_set_zone_i + (T_set_zone_i - T_zone_i) + (T_initial_offset
+ T_PID_offset))

where:
Tset_i is the fictional primary target temperature value referring to the i-th zone
circuit (3),
T_set_zone_i is the preset zone target temperature (T_set_zone) of the i-th zone circuit
(3),
T_set_zone_i is the preset zone target temperature (T_set_zone) of the i-th zone circuit
(3),
T_zone_i is the detected zone temperature (T_zone) of the secondary delivery flow
(32.1) of the zone circuit (3 i),
T_PID_offset is the previously calculated and currently still applied variable additional
temperature value,
T_initial_offset is the constant initial additional temperature,
and
- selecting as the guide zone circuit the zone circuit (3) having the maximum fictional
primary target temperature value max(Tset_i) in heating mode and/or the minimum fictional
primary target temperature value min(Tset_i) in cooling mode.
15. A method according to any one of claims 8 to 14, comprising a step
M10 of determining a control input value (PID_error), through the steps:
- for the guide zone circuit only, verifying whether the guide zone circuit is:
A) a direct zone circuit (3), without a mixing valve, or a mixed zone circuit (3') but
with a mixing valve (35) completely open, and hence supplied 100% with water of the
primary delivery flow (25.1), or
B) a mixed zone circuit (3') having a mixing valve (35) only partially open, and hence
supplied with both water from the primary delivery flow (25.1) and water from the
secondary return flow (32.2).
- determining as the control input value (PID_error):
in case A) the difference (T_set_zone - T_zone ) between the target zone temperature (T_set_zone)
and the detected zone temperature (T_zone), by means of the formula PID_error = T_set_zone
- T_zone, AND
in case B) the sum of the difference (T_set_zone - T_zone ) between the zone target temperature
(T_set_zone) and the detected zone temperature (T_zone), and the mitigating value
(T_mitigate), by means of the formula PID_error = (T_set_zone - T_zone) + T_mitigate,
wherein the mitigating value (T_mitigate) is chosen so as to decrease the control
input value (PID_error) in heating mode and/or so as to increase the control input
value (PID_error) in cooling mode,
wherein the method comprises a step
M11 of calculating the variable additional temperature value (T_PID_offset) depending
on the control input value (PID_error).