(19)
(11) EP 4 796 857 A1

(12) EUROPEAN PATENT APPLICATION

(43) Date of publication:
26.08.2026 Bulletin 2026/35

(21) Application number: 26155530.4

(22) Date of filing: 30.01.2026
(51) International Patent Classification (IPC): 
F24F 11/30(2018.01)
F24F 11/63(2018.01)
F24F 110/12(2018.01)
F24F 110/22(2018.01)
F24F 140/50(2018.01)
F24F 11/46(2018.01)
F24F 110/10(2018.01)
F24F 110/20(2018.01)
F24F 130/20(2018.01)
(52) Cooperative Patent Classification (CPC):
F24F 2110/10; F24F 2110/12; F24F 11/30; F24F 11/46; F24F 11/63; F24F 2110/20; F24F 2110/22; F24F 2130/20; F24F 2140/50
(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated Extension States:
BA
Designated Validation States:
GE KH LA MA MD TN

(30) Priority: 25.02.2025 IT 202500003723

(71) Applicant: Trigenia S.r.l.
10128 Torino (IT)

(72) Inventors:
  • PELLEREY, Valeria
    10128 TORINO (IT)
  • DEGIOVANNI, Luca
    10128 Torino (IT)
  • MARESTA, Federico
    10128 Torino (IT)

(74) Representative: Studio Torta S.p.A. 
Via Viotti, 9
10121 Torino
10121 Torino (IT)

   


(54) METHOD AND SYSTEM FOR OPTIMIZED MANAGEMENT OF AIR TREATMENT PLANTS OF A BUILDINGS AND RELATED COMPUTER PROGRAM PRODUCT


(57) Method for optimized management of an air treatment plant (2) of a building (3); the method comprises the steps of: determining (S10-S15) one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet one or more predefined values of indoor temperature or set-point (Tsetpoint) and a prediction of the trend of one or more values of a temperature (T) inside the building (3) consequent to the determined one or more values of heat output (P) on the basis of one or more environmental quantities related to the environment outside the building (3) and one or more environmental quantities related to the indoor environment of the building (3); determining (S16, S20-S25) one or more adjustable environmental quantities related to the indoor environment of the building (3) on the basis of the one or more values of heat output (P) and the prediction of the trend of one or more values of a temperature (T) inside the building (3); and determining (S17, S26) one or more actions to adjust the one or more environmental quantities related to the indoor environment of the building (3) to adjust the one or more adjustable environmental quantities related to the indoor environment of the building (3).




Description

CROSS-REFERENCE TO RELATED APPLICATIONS



[0001] This patent application claims priority from Italian patent application no. 102025000003723 filed on February 25, 2025, the entire disclosure of which is incorporated herein by reference.

TECHNICAL FIELD



[0002] The invention generally relates to the field of management of air treatment plants of buildings, in particular of industrial type; in greater detail, the present invention relates to a method and a system for optimized management of an air treatment plant of a building, in particular of industrial type, and to a related computer program product or software.

PRIOR ART



[0003] As is known, the optimization of environmental comfort in buildings, even of industrial type, is an increasingly important issue. In fact, it is known that several aspects of comfort, in particular thermal comfort and air quality, are directly linked to the well-being of the occupants and, in the workplace, to their productivity. It is also known that, on the basis of the intended use of the building, the type of plant installed and the times and methods of occupation, the environmental parameters can be controlled in various manners; in this regard, in recent years, interest has grown in the management of the comfort parameters related to air treatment plants, also referred to as AHU (Air Handling Unit).

[0004] Systems and methods are known which are aimed at maintaining the desired values of parameters such as temperature, relative humidity and concentration of pollutants in an environment.

DESCRIPTION OF THE INVENTION



[0005] The Applicant has observed that the known systems and methods are susceptible to improvements, in particular for the management of parameters related to the air input into air treatment plants, in particular in the industrial field. In greater detail, the Applicant has observed that the management of the heat output supplied by the air treatment plant is of considerable importance, as well as the maintenance of the temperature in an efficient and economic manner inside the building in which the air treatment plant is present.

[0006] The object of the present invention is therefore to provide a method and a system for optimized management of an air treatment plant of a building, in particular of industrial type, and a related computer program product or software, which allow to solve at least in part the problems affecting the solutions of the prior art.

[0007] According to the present invention, a method and a system for optimized management of an air treatment plant of a building, in particular of industrial type, and a related computer program product or software are provided, as claimed in the appended claims.

BRIEF DESCRIPTION OF THE DRAWINGS



[0008] In order to better understand the invention, an embodiment thereof is described in the following by way of non-limiting example and with reference to the accompanying drawings, wherein:
  • Figure 1 schematically shows a system for optimized management of an air treatment plant of a building according to the present invention;
  • Figure 2 schematically shows a block diagram of a method for optimized management of an air treatment plant of a building according to the present invention implemented by the system for optimized management of an air treatment plant of a building according to Figure 1; and
  • Figure 3 schematically shows a block diagram of a method for determining adjustment parameters of an air treatment plant forming part of the method for optimized management of an air treatment plant of a building according to the present invention.

EMBODIMENTS OF THE INVENTION



[0009] Figure 1 shows a system 1 for optimized management of an air treatment plant 2 of a building 3 comprising electronic processing and storage resources 4, the latter being designed to manage one or more environmental quantities related to the indoor environment of the building 3, as also described in greater detail in the following paragraphs. In particular, according to an aspect of the present invention, the building 3 is an industrial building, for example a factory.

[0010] By way of non-limiting example, in order to facilitate the understanding of the present invention, reference will be made in the following to the management of a single air treatment plant 2; according to a further aspect of the present invention, the system 1 is employable for the management of a plurality of air treatment plants similar to the air treatment plant 2.

[0011] According to an aspect of the present invention, the electronic processing and storage resources 4 are of a local type, for example one or more local servers; alternatively and preferably, the electronic processing and storage resources 4 are distributed resources, for example nodes of a network implementing the cloud computing paradigm. According to a preferred aspect of the present invention, the electronic processing and storage resources 4 are resources of a local type, for example one or more computers, possibly connected to each other, and allocated in the building 3.

[0012] With joint reference to Figures 1 and 2, the electronic processing and storage resources 4 comprise:
  • a controller 5 of conditions inside the building 3 designed to determine (blocks S10-S15 in Figure 2) one or more values of heat output P to be supplied to the indoor environment of the building 3 to meet one or more predefined values of indoor air temperature or set-point Tsetpoint and a prediction of the trend of one or more predicted values of a temperature T of the indoor air (i.e. of the air inside the building 3) consequent to the determined one or more values of heat output P on the basis of one or more environmental quantities related to the environment outside the building 3 and one or more environmental quantities related to the indoor environment of the building 3; and
  • an optimization module 6 designed to be in communication with the controller 5 of conditions inside the building 3.


[0013] In detail, with joint reference to Figures 2 and 3, the optimization module 6 is designed to:
  • determine (block S16 of Figure 2 and blocks S20-S25 of Figure 3) one or more adjustable environmental quantities related to the indoor environment of the building 3 on the basis of the one or more values of heat output P and the prediction of the trend of one or more predicted values of a temperature T of the indoor air; and
  • determine (block S17 of Figure 2 and block S26 of Figure 3) one or more actions to adjust the one or more environmental quantities related to the indoor environment of the building 3 to adjust the one or more adjustable environmental quantities related to the indoor environment of the building 3.


[0014] In particular, according to an aspect of the present invention, the one or more values of heat output P to be supplied to the indoor environment of the building 3 and the prediction of the trend of one or more values of a temperature T of the indoor air are respectively profiles of heat output P and profiles of temperature T of the indoor air. In greater detail, it is noted that, in the following, the term "profile", unless otherwise indicated, refers to a set of values assumed based on a quantity in a considered time interval, also defined in a similar manner as the simulation period. In other words, as also described in greater detail below, the aforementioned quantities are processed in the form of a profile of hourly values, i.e. values of the aforementioned quantities in a predetermined time interval and selected for prediction and optimization; according to an aspect of the present invention and without any limitation for the same, the management system 1 is designed to consider a time interval equal to twenty-four hours.

[0015] According to an aspect of the present invention, the one or more environmental quantities related to the indoor environment of the building 3 comprise an actual indoor air temperature (in particular of the building 3) Tint of the building 3 and an actual indoor relative humidity (in particular of the building 3) URin, in particular acquired by the electronic processing and storage resources 4 in particular by means of a relative field reading or through communication protocols such as ModBus, OPC UA, Mqtt and the like.

[0016] According to a further aspect of the present invention, the one or more adjustable environmental quantities related to the indoor environment of the building 3, adjustable by the aforementioned electronic processing and storage resources 4 according to the methods described in greater detail in the following, comprise a temperature of the air input into the environment Timm of the building 3 and a flow rate of air input Qimm into the indoor environment of the building 3. Therefore, the optimization module 6 is designed to determine values of flow rate and temperature related to the air to be input into the indoor environment of the building 3, in particular hourly profiles of optimal values of flow rate and temperature, to obtain values of hourly heat output to be input into the indoor environment of the building 3 and indoor temperature, the latter in particular determined by the prediction determined by the controller 5 of conditions inside the building 3.

[0017] In particular, the values of the air flow rate Qimm substantially represent an adjustment profile of the fan of the air treatment plant 2 by means of which the flow rate of air input into the indoor environment of the building 3 is managed. Furthermore, according to another aspect of the present invention, the one or more environmental quantities related to the environment outside the building 3 comprise an external temperature Text outside the building 3 and an irradiance Irr related to the environment outside the building 3; according to an aspect of the present invention, such environmental quantities related to the environment outside the building 3 are acquired, for example, by means of API (Application Programming Interface) calling, i.e. the electronic processing and storage resources 4 are designed to request, in particular by means of relative application interfaces, such environmental quantities for example from a sensory system (not shown) in communication with the same electronic processing and storage resources 4, in particular through relative application interfaces.

[0018] In addition, it should be noted that the values of heat output P are variable and allow the determination of the temperature and the flow rate of air to be input into the indoor environment of the building 3.

[0019] With particular reference to Figure 2, without this being limiting for the invention itself, a method for optimized management of the air treatment plant 2 according to the present invention is now described in greater detail.

[0020] As also described in greater detail in the following, the electronic processing and storage resources 4 are designed to employ a hybrid predictive model, in particular developed with Python language, and comprising:
  • a model obtained through mathematical modelling and linear programming (Model Predictive Control, MPC), in particular employed to determine the one or more values of heat output P to be supplied to the indoor environment of the building 3 to meet the one or more values of set-point indoor air temperature Tsetpoint and the prediction of the trend of the one or more predicted values of a temperature T of the indoor air consequent to the determined one or more values of heat output P; and
  • a model obtained by means of a deterministic algorithm, the latter loadable and executable by the electronic processing and storage resources 4, in particular in the optimization module 6, to determine the one or more environmental quantities related to the indoor environment of the building 3 and the one or more actions to adjust the one or more environmental quantities related to the indoor environment of the building 3.


[0021] In particular, in order to determine (blocks S10-S15) the one or more values of heat output P to be supplied to the indoor environment of the building 3 to meet the one or more values of set-point indoor air temperature Tsetpoint and the prediction of the trend of the one or more predicted values of a temperature T of the indoor air consequent to the determined one or more values of heat output P, the controller 5 of conditions inside the building 3 is designed to:
  • acquire (block S10) one or more average environmental quantities related to the environment outside the building 3, in particular the predicted average daily temperature Tav of the air outside the building 3;
  • set (block S11) an operating model chosen from one or more operating models, each related to a respective seasonal operating period, of the air treatment plant 2 on the basis of the acquired one or more average environmental quantities related to the environment outside the building 3;
  • set (block S12) target or set-point values related to the indoor environment of the building 3, i.e. the one or more values of set-point indoor air temperature Tsetpoint and a value of set-point humidity URsetpoint of the indoor environment of the building 3 on the basis of the determined model.


[0022] Furthermore, in order to determine (blocks S10-S15) the one or more values of heat output P to be supplied to the indoor environment of the building 3 to meet the one or more values of set-point indoor air temperature Tsetpoint and the prediction of the trend of the one or more predicted values of a temperature T of the indoor air consequent to the determined one or more values of heat output P, the controller 5 of conditions inside the building 3 is designed to:
  • acquire (block S13) data related to the one or more environmental quantities related to the environment outside the building 3;
  • verify (block S14) that the acquired data are sufficient to be able to determine the one or more values of heat output P to be supplied to the indoor environment of the building 3 to meet the one or more values of set-point indoor air temperature Tsetpoint and the prediction of the trend of the one or more predicted values of a temperature T of the indoor air consequent to the determined one or more values of heat output P;
  • if the acquired data are determined to be sufficient, determine (block S15) the one or more values of heat output P to be supplied to the indoor environment of the building 3 to meet the one or more values of set-point indoor air temperature Tsetpoint and the prediction of the trend of the one or more predicted values of a temperature T of the indoor air consequent to the determined one or more values of heat output P.


[0023] According to an aspect of the present invention, the one or more operating periods comprise:
  • a winter model, i.e. a model representing conditions associable with the winter season, i.e. characterized for example by a value of set-point indoor air temperature Tsetpoint substantially equal to -20°C;
  • a summer model, i.e. a model representing conditions associable with the summer season, i.e. characterized for example by a value of set-point indoor air temperature Tsetpoint substantially equal to 24°C; and
  • a mid-season model, i.e. a model representing conditions associable with the spring or autumn season.


[0024] In particular, the mid-season model is associated with average external temperature values that determine the one or more values of set-point indoor air temperature Tsetpoint; in particular, in the event of the mid-season model, the electricity consumption associated with the air treatment plant 2 (in particular, the fans of the latter) is minimized, since the external climatic conditions are considered substantially less adverse for the management of the temperature inside the building 3.

[0025] In addition to what is described above, the Applicant observes that the Equation (1) is valid, employed in the model considered to determine the behaviour of the air treatment plant 2, i.e. the trend of the temperature inside the building 3 in a simulation period (i.e. in a predefined period of time considered optimal for the evaluation of the trend of the environmental quantities and, therefore, useful for the performance of the present method):

wherein:
  • Tout is the temperature outside the building 3;
  • P is the heat output of the air treatment plant 2.


[0026] It should be noted in particular that the coefficients R and C are respectively a resistance and an equivalent thermal capacity associated with the indoor environment of the building 3 and represent the thermodynamic behaviour of the same indoor environment of the building 3 in relation to the variables that influence the behaviour thereof, in particular the one or more environmental quantities outside the environment of the building 3. Such coefficients R and C assume variable values depending on the season (and, therefore, the model) considered.

[0027] It should further be noted that, if there is more than one air treatment plant 2, the Equation (1) is appropriately modified to take into account the number of air treatment plants, in particular by substituting the value of heat output P for the sum of heat outputs related to all the air treatment plants considered.

[0028] Furthermore, as a function of the imported model, the Applicant has observed that there are additional rules that characterize a daily simulation (i.e. a time period of one day in which the selected model is applied); such additional rules are in particular related, for example, to on/off periods of the air treatment plant 2. By way of example, in the event of the mid-season model, the on/off periods are of particular importance for limiting the energy consumption of the same air treatment plant 2; furthermore, in the event of the winter model, the on period has a longer duration so as to meet requirements related to comfort during working hours, so as to meet the one or more values of set-point indoor air temperature Tsetpoint.

[0029] In particular, the step of verifying (block S14) that the acquired data are sufficient comprises the step of performing (block S14) a reading of the acquired data to verify that they are sufficient for the subsequent operating steps.

[0030] Furthermore, the controller 5 of conditions inside the building 3 is designed to determine (block S15) the one or more values of heat output P to be supplied to the indoor environment of the building 3 to meet the value of set-point indoor air temperature Tsetpoint on the basis of the acquired data, of the one or more values of set-point indoor air temperature Tsetpoint and of the set operating model. In particular, the controller 5 of conditions inside the building 3 is designed to determine a profile of values of heat output P, hereinafter referred to for simplicity as heat output profile PP; in greater detail, the output profile PP comprises an optimal hourly sequence of values of heat output to be sent to the environment to maintain the indoor temperature of the building 3 in the vicinity of the one or more values of set-point indoor air temperature Tsetpoint.

[0031] Furthermore, the controller 5 of conditions inside the building 3 is designed to determine (block S14) the prediction of the trend of the one or more predicted values of a temperature T of the indoor air consequent to the one or more values of heat output P determined by applying a predictive temperature model to the acquired data, to the one or more values of heat output P determined, of the one or more values of set-point indoor air temperature Tsetpoint and the set operating model. In particular, the controller 5 of conditions inside the building 3 is designed to determine a profile of predicted values of a temperature T of the indoor air, hereinafter referred to for simplicity as temperature profile PT; in greater detail, the temperature profile PT comprises hourly values of indoor temperature of the building 3, predicted by the controller 5 of conditions inside the building 3 that correspond to the application of the optimal values of heat output sent to the environment, i.e. the values described by the output profile PP.

[0032] With joint reference to Figures 2 and 3, in order to determine (block S16) the one or more adjustable environmental quantities related to the indoor environment of the building 3, the optimization module 6 is designed to:
  • receive (block S20) in input the temperature and output profiles PT, PP;
  • set (block S30) a minimum air flow rate Qmin on the basis of the temperature and output profiles PT, PP;
  • determine (block S21) one or more values of the temperature of the air input Timm into the indoor environment of the building 3 on the basis of the minimum air flow rate value Qmin and the temperature and output profiles PT, PP;
  • verify (block S22) that the determined one or more values of the temperature of the air input Timm into the indoor environment of the building 3 is lower than a value of predefined minimum temperature Tmin;
  • if at least one value of the temperature of the air input Timm into the indoor environment of the building 3 is determined to be lower than the predefined minimum temperature value Tmin, set (block S31) a value of the temperature of air intake in the building 3 to a minimum Tmin, in particular equal to at least one value of the temperature of the air input Timm into the indoor environment of the building 3;
  • determine (block S23) one or more air flow rate values Qimm on the basis of the at least one value of the temperature of the air input Timm into the indoor environment of the building 3 and the temperature and output profiles PT, PP;
  • verify (block S24) that the one or more determined air flow rate values Qimm is greater than a predefined maximum air flow rate value Qmax;
  • if at least one determined air flow rate value Qimm is greater than the predefined maximum air flow rate value Qmax, set (block S32) the at least one air flow rate value Qimm to the predefined maximum air flow rate value Qmax.


[0033] It should be noted that the aforementioned minimum and maximum values are related to technical limitations of the air treatment plant 2 (for example, the predefined maximum air flow rate value Qmax).

[0034] It should further be noted that, what is described above represents a first iteration of the method performed by the optimization module 6 as a function of technical constraints, in particular the minimum air flow rate value Qmin, the predefined minimum temperature value Tmin and the predefined maximum air flow rate value Qmax.

[0035] According to an aspect of the present invention, the optimization module 6 is further designed to determine (block S25) one or more values of further temperature of air intake Timm' inside the building 3 on the basis of the predefined maximum air flow value Qmax and the temperature and output profiles PT, PP. Therefore, the optimization module 6 is designed to perform a further iteration in order to identify the values of the temperature of the air input Timm into the indoor environment of the building 3 and of the air flow rate Q that are optimal and that respect the maximum and minimum values allowed.

[0036] Furthermore, the optimization module 6 is designed to determine (block S26) intake temperature adjustment profiles and air flow rate adjustment profiles, in particular of a fan of the air treatment plant 2, to be input into the indoor environment of the building 3 on the basis of at least one of the values of the temperature of the air inTimm into the indoor environment of the building 3, the values of the intake air flow rate Q inside the building 3 and the values of the further temperature Timm' of air intake inside the building

[0037] 3. In greater detail, in order to determine (block S26) the intake temperature adjustment profiles and air flow rate adjustment profiles to be input into the indoor environment of the building 3, the optimization module 6 is further designed to:
  • determine (block S26) the intake temperature adjustment profiles and air flow rate adjustment profiles to be input into the indoor environment of the building 3 on the basis of the value of the temperature of the air input Timm into the indoor environment of the building 3 if the value of the temperature of the air input Timm into the indoor environment of the building 3 is determined to be lower than a predefined minimum temperature value Tmin; and
  • determine (block S26) the intake temperature adjustment profiles and air flow rate adjustment profiles to be input into the indoor environment of the building 3 on the basis of the value of the air intake flow rate Qimm and the value of the temperature of the air input Timm into the indoor environment of the building 3 if the determined value of the air intake flow rate is determined to be lower than the predefined maximum air flow rate value Qmax.


[0038] In particular, it should be noted that the intake temperature adjustment profiles and air flow rate adjustment profiles to be input into the indoor environment of the building 3 are representative of intake temperature and air flow rate values to be input into the indoor environment of the building 3 by the air treatment plant 2 in a predetermined time interval, in particular the simulation period, even more in particular in twenty-four hours.

[0039] Again with reference to Figure 2, the optimization module 6 is designed to determine (block S17) the one or more actions to adjust the one or more environmental quantities related to the indoor environment of the building 3 to adjust the one or more environmental quantities related to the indoor environment of the building 3 on the basis of the intake temperature adjustment profiles and air flow rate adjustment profiles to be input into the indoor environment of the building 3.

[0040] According to a further aspect of the present invention, the electronic processing and storage resources 4 are further designed to:
  • verify (block S18) that the values of the temperature and of the heat output are consistent with the values of the intake temperature adjustment profiles and air flow rate adjustment profiles to be input into the indoor environment of the building 3 in a predefined time interval, for example after 4 hours; and
  • if the determined values of the temperature and of the heat output are not consistent with the values of the intake temperature adjustment profiles and air flow rate adjustment profiles to be input into the indoor environment of the building 3 in the predefined time interval, determine further temperature profiles PT' of the indoor environment of the building 3 and of the heat output profile PP' to be input into the indoor environment of the building 3 on the basis of the determined values of temperature and heat output, in particular by performing the steps described with reference to blocks S10-S17 of Figure 2 and S20-S26, S30-S32 of Figure 3 again.


[0041] In greater detail, the controller 5 of conditions inside the building 3 is designed to perform the steps described with reference to blocks S10-S17 of Figure 2. In particular, the controller 5 of conditions inside the building 3 is designed for further temperature profiles PT' of the indoor environment of the building 3 and of the heat output profile PP' to be input into the indoor environment of the building 3 on the basis of the determined values of temperature and heat output, the latter being the values of the one or more environmental quantities related to the environment outside the building 3 and of the one or more initial environmental quantities related to the indoor environment of the building 3 determined after the predefined time interval has elapsed.

[0042] Furthermore, the optimization module 6 is designed to perform the steps described with reference to blocks S20-S26, S30-S32 of Figure 3. In particular, the optimization module 6 is designed to:
  • determine further intake temperature adjustment profiles and air flow rate adjustment profiles to be input into the indoor environment of the building 3 on the basis of the further temperature profiles PT' of the indoor environment of the building 3 and the heat output profile PP' to be input into the indoor environment of the building 3; and
  • determine further one or more actions to adjust the one or more environmental quantities related to the indoor environment of the building 3 on the basis of the further intake temperature adjustment profiles and air flow rate adjustment profiles to be input into the indoor environment of the building 3.


[0043] In other words, the electronic processing and storage resources 4 are designed to perform again as described with reference to Figures 2 and 3 if the actual indoor air temperature Tint and the flow rate of air Qimm input into the indoor environment of the building 3 do not follow the previously determined prediction.

[0044] The present invention further relates to a computer program or software loadable and executable in the system 1 for optimized management of an air treatment plant 2 of the building 3, in particular in the electronic processing and storage resources 4; in particular, the computer program product comprises instructions which, when the computer program product is executed by the system 1, cause the system 1 to perform the method for optimized management of the air treatment plant 2 of the building 3 described in the previous paragraphs with reference to Figures 2 and 3.

[0045] Therefore, summarily, the present management system 1 provides the following characteristics:
  • a simplified mathematical modelling of the dynamics of the air treatment plant 2 to simulate the behaviour thereof;
  • definition of the objective and related constraints, i.e. the values of set-point indoor air temperature Tsetpoint, the latter to be followed in a predefined simulation period, for example twenty-four hours;
  • optimization of the control actions, in particular by determining the optimal values of heat output to maintain the temperature of the indoor environment of the building 3 at the values of set-point indoor air temperature Tsetpoint during the simulation period. It should be noted that the heat output is defined as control as it is adjustable to meet the predefined objectives and related constraints; and
  • implementation of a deterministic algorithm, comprising relationships and logics built on the basis of the study of the air treatment plant 2, so as to calculate the intake air flow rate and the intake air temperature for each hourly value of heat output and predicted indoor temperature.


[0046] From the foregoing, the advantages of the present invention are evident.

[0047] In particular, the present system 1 and the related method allow obtaining an optimized management of the air treatment plant 2, specifically in terms of flow rate and temperature of the air input into the building 3, here, for example, an industrial building. Furthermore, the present system 1 and the relative method allow minimizing the heat output delivered by the air treatment plant 2, as well as maintaining the temperature of the indoor environment of the building 3 at predetermined values, i.e. at set-point values.

[0048] Furthermore, the present invention, by combining advanced algorithms, allows, in particular for the industrial sector, to obtain the following advantages:
  • multi-objective/predictive optimization on the basis of external factors, in particular the aforementioned environmental quantities related both to the environment outside and to the indoor environment of the building 3;
  • adaptive customization for different areas of the building 3, as it allows, as a function of the quantities, to adapt the operation of the air treatment plant 2 appropriately; and
  • possible integration with energy management systems already present for the building 3.


[0049] Finally, it is clear that modifications and variations can be made to the present invention which however do not depart from the scope of protection defined by the claims.

[0050] In particular, with respect to what is known, the present invention allows obtaining an interaction between the external and indoor environmental quantities related to the building 3, allowing, as also evident from the above, the achievement of optimal environmental conditions in the indoor environment of the building 3, in particular regarding the comfort of those who are in the indoor environment of the building 3. Following the advantages listed above, the present invention allows obtaining energy savings and a reduction of emissions related to the use of air treatment plants, similar to the air treatment plant 2, in buildings 3 such as industrial plants.

[0051] In particular, the aforementioned system 1 can also be used if a plurality of air treatment plants 2 are to be managed.

[0052] Furthermore, the various illustrated embodiments can be combined with one another without any limitations, with particular reference to the various characteristics individually described in the various paragraphs of the description. Each of such characteristics is independently applicable to each of the embodiments described.

LIST OF THE REFERENCE NUMERALS OF THE FIGURES



[0053] 
1
system for optimized management
2
air treatment plant
3
building
4
electronic processing and storage resources
5
controller of internal conditions
6
optimization module
P
Heat output
Tsetpoint
Predefined indoor air temperature or set-point
T
Predicted indoor air temperature
Tint
Actual indoor air temperature
URin
Actual indoor relative humidity
Timm
Temperature of the air input into the indoor environment of the building
Qimm
Flow rate of air input into the indoor environment of the building
Text
External air temperature
Irr
Irradiance related to the environment outside the building
Tav
Predicted daily average external air temperature
URsetpoint
Set-point humidity of the indoor environment of the building
PP
Heat output profile
PT
Temperature profile
Tmin
Minimum temperature of the input air
Qmax
Maximum air flow rate
Qmin
Minimum air flow rate
Timm'
Further temperature of air input into the indoor environment of the building
PP'
Further heat output profile
PT'
Further temperature profile
S10-S18
Blocks
S20-S26
Blocks
S30-S32
Blocks



Claims

1. A method for optimized management of an air treatment plant (2) of a building (3);
the method comprising the steps of:

- determining (S10-S15) one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet one or more predefined values of indoor temperature or set-point (Tsetpoint) and a prediction of the trend of one or more values of a temperature (T) inside the building (3) consequent to the determined one or more values of heat output (P) on the basis of one or more environmental quantities related to the environment outside the building (3) and one or more environmental quantities related to the indoor environment of the building (3);

- determining (S16, S20-S25) one or more adjustable environmental quantities related to the indoor environment of the building (3) on the basis of the one or more values of heat output (P) and the prediction of the trend of one or more values of a temperature (T) inside the building (3); and

- determining (S17, S26) one or more actions to adjust the one or more environmental quantities related to the indoor environment of the building (3) to adjust the one or more adjustable environmental quantities related to the indoor environment of the building (3).


 
2. The method according to claim 1, wherein:

- the one or more environmental quantities related to the indoor environment of the building (3) comprise an indoor temperature (Tint) of the building (3) and an indoor humidity (URin);

- the one or more adjustable environmental quantities related to the indoor environment of the building (3) comprise a temperature of air input into the environment (Timm) of the building (3) and a flow rate of air input (Qimm) into the indoor environment of the building (3); and

- the one or more environmental quantities related to the environment outside the building (3) comprise an external temperature (Text) outside the building (3) and an irradiance (Irr) related to the environment outside the building (3).


 
3. The method according to any one of claims 1-2, wherein the step of determining (S10-S15) one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet one or more predefined values of indoor temperature or set-point (Tsetpoint) and a prediction of the trend of one or more values of a temperature (T) inside the building (3) consequent to the one or more values of heat output (P) further comprises the steps of:

- acquiring (S10) one or more average environmental quantities related to the environment outside the building (3);

- setting (S11) an operating model chosen from one or more operating models, each related to a respective operating period, of the air treatment plant (2) on the basis of the acquired one or more average environmental quantities related to the environment outside the building (3);

- setting (block S12) target or set-point values (Tsetpoint, URsetpoint) related to the indoor environment of the building (3).


 
4. The method according to claim 3, wherein the step of determining (S10-S15) one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet one or more predefined values of indoor temperature or set-point (Tsetpoint) and a prediction of the trend of one or more values of a temperature (T) inside the building (3) consequent to the one or more values of heat output (P) further comprises the steps of:

- acquiring (S13) data related to the one or more environmental quantities related to the environment outside the building (3);

- verifying (S14) that the acquired data are sufficient to be able to determine the one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet the one or more predefined values of indoor temperature or set-point (Tsetpoint) and the prediction of the trend of the one or more values of a temperature (T) inside the building (3) consequent to the determined one or more values of heat output (P);

- if the acquired data are determined to be sufficient, determining (S15) the one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet the one or more predefined values of indoor temperature or set-point (Tsetpoint) and the prediction of the trend of the one or more values of temperature (T) inside the building (3) consequent to the determined one or more values of heat output (P).


 
5. The method according to claim 4, wherein the step of determining (S15) the one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet the value of set-point indoor temperature (Tsetpoint) on the basis of the acquired data, the one or more values of set-point indoor temperature (Tsetpoint), and the set operating model,
and wherein the step of determining (S14) the prediction of the trend of the one or more values of a temperature (T) inside the building (3) consequent to the one or more values of heat output (P) determined by applying a predictive temperature model to the acquired data, the one or more values of heat output (P) determined, the one or more values of set-point indoor temperature (Tsetpoint) and the set operating model.
 
6. The method according to any of the preceding claims, wherein the step of determining (S16) the one or more adjustable environmental quantities related to the indoor environment of the building (3) further comprises:

- receiving (S20) as input the one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet the one or more predefined values of indoor temperature or set-point (Tsetpoint) and the prediction of the trend of the one or more values of a temperature (T) inside the building (3) consequent to the determined one or more values of heat output (P);

- setting (S30) a minimum air flow rate profile (Qmin) on the basis of the one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet the one or more predefined values of indoor temperature or set-point (Tsetpoint) and the prediction of the trend of the one or more values of a temperature (T) inside the building (3) consequent to the determined one or more values of heat output (P);

- determining (S21) one or more values of the temperature (Timm) of air intake inside the building (3) on the basis of the minimum air flow rate value (Qmin) and the one or more values of heat output (P) to be supplied to the indoor environment of the building (3) in order to meet the one or more predefined values of indoor temperature or set-point (Tsetpoint) and of the prediction of the trend of the one or more values of a temperature (T) inside the building (3) consequent to the determined one or more values of heat output (P);

- verifying (S22) that the determined one or more values of the temperature (Timm) of air intake is lower than a predefined minimum temperature value (Tmin);

- if at least one value of the temperature (Timm) of air intake is determined to be lower than the predefined minimum temperature value (Tmin), setting (S31) a value of minimum temperature (Tmin) of air intake into the building (3);

- determining (S23) one or more values of the air flow rate (Qimm) on the basis of the at least one value of the minimum temperature (Timm) of air intake into the building and the one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet the one or more predefined values of indoor temperature or set-point (Tsetpoint) and of the prediction of the trend of the one or more values of a temperature (T) inside the building (3) consequent to the determined one or more values of heat output (P);

- verifying (S24) that the one or more determined air flow rate values (Qimm) is greater than a predefined maximum air flow rate value (Qmax);

- if at least one determined air flow rate value (Qimm) is greater than the predefined maximum air flow rate value (Qmax), setting (S32) the at least one air flow rate value (Qimm) to the predefined maximum air flow rate value (Qmax).


 
7. The method according to claim 6 and further comprising the step of determining (S25) one or more values of further temperature (Timm') of air intake inside the building (3) on the basis of the predefined maximum air flow rate value (Qmax) and the one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet the one or more predefined values of indoor temperature or set-point (Tsetpoint) and of the prediction of the trend of the one or more values of a temperature (T) inside the building (3) consequent to the one or more determined values of heat output (P).
 
8. The method according to claim 7, wherein the step of determining (S26) the one or more actions to adjust the one or more environmental quantities related to the indoor environment of the building (3) to adjust the one or more adjustable environmental quantities related to the indoor environment of the building (3) comprises determining (S26) intake temperature adjustment profiles and air flow rate adjustment profiles, in particular of a fan of the air treatment plant (2), to be input into the indoor environment of the building (3) on the basis of at least one of the values of the intake temperature (Timm), the values of the intake air flow rate (Qimm) inside the building (3) and the values of the further temperature (Timm') of air intake inside the building (3).
 
9. The method according to claim 8 and further comprising the steps of:

- verifying (S18) that the values of the temperature and the heat output are consistent with the values of the intake temperature adjustment profiles and air flow rate adjustment profiles, to be input into the indoor environment of the building (3) in a predefined time interval; and

- if the values of the temperature and of the heat output are determined as not consistent with the values of the intake temperature adjustment profiles and air flow rate adjustment profiles, to be input into the indoor environment of the building (3) in the predefined time interval, determining additional one or more values of heat output (P) to be supplied to the indoor environment of the building (3) to meet the one or more predefined values of indoor temperature or set-point (Tsetpoint) and a prediction of the trend of the one or more values of a temperature (T) inside the building (3) consequent to the one or more determined values of the heat output (P).


 
10. A system (1) for optimized management of an air treatment plant (2) of a building (3) comprising electronic processing and storage resources (4) designed to manage one or more environmental quantities related to the indoor environment of the building (3),
the system being designed to perform a method for optimized management of the air treatment plant (2) of the building (3) according to any one of claims 1-9.
 
11. A computer program product loadable and executable in a system (1) for optimized management of an air treatment plant (2) of a building (3) according to claim 10, the computer program product comprising instructions that, when the computer program product is executed by the system (1) for optimized management of the air treatment plant (2) of the building (3), cause the system (1) for optimized management of the air treatment plant (2) of the building (3) to perform a method for optimized management of the air treatment plant (2) of the building (3) according to any one of claims 1-9.
 




Drawing













Search report









Search report




Cited references

REFERENCES CITED IN THE DESCRIPTION



This list of references cited by the applicant is for the reader's convenience only. It does not form part of the European patent document. Even though great care has been taken in compiling the references, errors or omissions cannot be excluded and the EPO disclaims all liability in this regard.

Patent documents cited in the description