Technical field
[0001] The present invention generally relates to the field of railway infrastructure safety
systems, and more particularly to the field of systems and methods for re-commissioning
railway track sections monitored by axle counter systems.
Background of the Invention
[0002] In modern railway systems, train detection is essential for ensuring safe operation,
particularly for managing track occupancy, routing, and signalling.
[0003] Document JP
WO2018/021198 A1 discloses a system for resetting an axle counter on a single railway track section
located between two fixed stations. This process requires a reset request from an
operator at one station and a manual approval from an operator at the other station,
following a visual inspection. However, this system is not scalable for the simultaneous
re-commissioning of multiple track sections and requires the physical presence of
personnel at fixed posts.
[0004] CN 213594271 U describes the use of portable or remotely accessible systems. It discloses a portable
diagnostic device for testing axle counter components. Other documents like "Smart
Track Vacany Detection for Cost-effective Rail Services usa.siemens.com/rail-automation
clear guard ACM 200 Axle counting system" describe a system that can be monitored
remotely via a web interface. However, these systems are focused on diagnostics and
monitoring, not on performing safety-critical control actions such as the operational
re-commissioning of a track section.
[0005] Consequently, these existing systems lack a method to safely, coordinately, and efficiently
re-commission multiple, physically separated track sections simultaneously, without
requiring personnel at multiple fixed locations.
[0006] A widely adopted detection method involves the use of axle counter systems, wherein
dedicated sensors at section entry and exit points detect passing train axles. These
sensors are connected to axle counter control units which maintain a running count
of axles within a given track section. When the number of axles detected at the exit
equals the number detected at the entry, the track section is considered unoccupied.
Axle counter systems are commonly used across both national and regional railway networks,
including areas controlled by interlockings, relay buildings, or Radio Block Centres
(RBCs), and have become a standard component of safety-critical railway infrastructure.
[0007] During scheduled maintenance or emergency works, it is often necessary to temporarily
take one or more railway track sections out of operation - a process known as decommissioning.
In axle counter-based systems, this typically involves suppressing counting logic
or simulating section occupancy to prevent trains from being routed into the affected
area. After work is completed, however, the affected sections must be safely brought
back into normal operation, a process known as re-commissioning. In current practice,
re-commissioning generally requires manual reset of the axle counter control units
to clear their internal state and declare the section available for train movement.
Due to the safety-critical nature of this operation, such resets may only be carried
out by certified personnel, often requiring physical access to the axle counter system
or interlocking.
[0008] This process presents several challenges in both safety and operational efficiency.
First, once a section has been decommissioned, the axle counter cannot independently
verify whether the section is physically clear of rolling stock. A reset merely clears
the count, based on the assumption that the section is unoccupied - an assumption
that, if incorrect, may lead to hazardous situations. Second, the need for physically
present, certified personnel creates a labour bottleneck, particularly in large-scale
or time-sensitive operations. Third, in complex railway zones such as yards, terminals,
or harbour areas, multiple sections managed by separate axle counter systems may need
to be re-commissioned in a coordinated manner, yet current systems lack the ability
to centrally and securely reset multiple axle counters across different control domains.
These limitations lead to increased risk, inefficiencies, and operational delays.
[0009] It is therefore a goal of the present invention to provide a more reliable and secure
system for re-commissioning railway track sections monitored by axle counter control
units, thereby overcoming the above-mentioned disadvantages of the prior art at least
in part.
Summary
[0010] One aspect of the present invention relates to a system for re-commissioning one
or more railway track sections that are each monitored by a respective axle counter
control unit, comprising a plurality of re-commissioning devices, a remote server
and a mobile device, each re-commissioning device comprising:
- a re-commissioning interface configured to be connected to a respective axle counter
control unit;
- communication means configured to communicate with the remote server;
- control means configured to control the re-commissioning interface and to send and
receive data via the communication means;
wherein the remote server is configured to define a common re-commissioning command
associated with a plurality of railway track sections, each associated with a different
axle counter control unit;
wherein the mobile device is configured to:
- receive the common re-commissioning command from the remote server;
- transmit, upon operator input provided by an operator physically located near the
respective railway track sections and authenticated by means of location verification,
an execution signal associated with the common re-commissioning command;
and wherein the control means of each re-commissioning device is configured to:
- initiate, in response to the execution signal, a reset operation via the re-commissioning
interface of the respective re-commissioning device, thereby simultaneously re-commissioning
a plurality of railway track sections associated with separate axle counter control
units.
[0011] Another aspect of the present invention relates to a method for re-commissioning
one or more railway track sections that are each monitored by a respective axle counter
control unit, comprising the steps of:
providing a plurality of re-commissioning devices, each comprising a re-commissioning
interface connected to a respective axle counter control unit, communication means,
and control means;
connecting each re-commissioning device to a remote server via the communication means;
characterised by:
generating, at the remote server, a single re-commissioning command associated with
a plurality of railway track sections monitored by separate axle counter control units;
preparing the re-commissioning command for execution by receiving a first authorisation
input from a first authenticated operator;
executing the re-commissioning command by receiving, preferably via a mobile device,
a second execution input from a second authenticated operator located in the field;
transmitting the re-commissioning command from the remote server to each of the re-commissioning
devices;
performing, at each re-commissioning device, a reset operation via the re-commissioning
interface to re-commission the respective railway track section, thereby simultaneously
re-commissioning a plurality of track sections associated with separate axle counter
control units.
[0012] The second authenticated operator located in the field is to be understood as an
operator physically located near the respective railway track sections and authenticated
by means of location verification.
[0013] A system may be understood as a combination of hardware and/or software components
that interact to perform a coordinated function. In the context of the present invention,
a system includes distributed physical components such as electronic devices, servers,
interfaces, and communication modules, which together perform the function of re-commissioning
railway track sections. An example of such a system is a network of embedded field
devices installed in relay cabinets, each connected to different railway subsystems,
which are centrally coordinated via a cloud-based control platform.
[0014] A railway track section may be understood as a segment of railway infrastructure
delimited by detection points, such as axle counter sensors or insulated joints, and
controlled as a unit for signalling and safety purposes. Track sections are typically
bounded in a way that allows train presence to be monitored and route occupancy to
be managed. An example is a block between two signals on a main line or an individual
siding in a shunting yard.
[0015] An axle counter control unit may be understood as an electronic or electromechanical
device configured to receive signals from axle detection sensors positioned at the
boundaries of a railway track section. The control unit maintains a count of entering
and exiting train axles and determines the track section's occupancy status. Common
commercial examples include Frauscher FAdC (Flexible Axle Counter), Siemens Trackguard
Westrace, or Thales Az LM systems. These systems are often housed in interlockings
or cabinets near the track.
[0016] A re-commissioning device may be understood as an electronic apparatus that is installed
locally or near a respective axle counter control unit and configured to perform the
task of resetting or otherwise re-enabling the respective axle counter control unit
such that the associated railway track section can be returned to normal operation.
In practice, such a device could be installed in a signal relay building or junction
box adjacent to the section it serves.
[0017] A re-commissioning interface may be understood as a hardware and/or software interface
capable of establishing a connection to an axle counter control unit and delivering
a control signal, such as a reset pulse or digital message, according to the protocol
supported by the axle counter system. A re-commissioning interface may comprise galvanic
relays, digital outputs (e.g., TTL or 24V logic), or protocol-specific communication
modules (e.g., RS485, CAN, Profibus). A real-world example is a module connected to
a Frauscher or Siemens reset terminal that mimics a manual reset input.
[0018] Communication means may be understood as any module, component or interface capable
of exchanging data between two nodes over a wired or wireless communication link.
This may include Ethernet ports, cellular radio modules (e.g., 4G, LTE, GSM-R), FRMCS,
Wi-Fi modules, or satellite communication interfaces. In the present context, communication
means enable the re-commissioning devices to communicate with a remote server or central
control application. An example is a GSM-R enabled terminal with a secured APN to
the infrastructure provider's server.
[0019] A remote server may be understood as a computational platform external to the re-commissioning
devices, configured to manage centralised coordination, logging, and issuing of commands.
The server may be implemented as a cloud-based service, a centralised railway operations
server, or an enterprise server in a control centre. A real-world example is a secure
backend system hosted by the national railway infrastructure manager, accessible over
VPN by authorised users and systems.
[0020] Control means may be understood as one or more processors, microcontrollers, programmable
logic controllers (PLCs), or logic devices programmed to perform specific tasks, including
managing communication, interpreting commands, handling timing logic, and executing
control signals. In the present invention, control means within each re-commissioning
device governs local reset actions based on remote inputs. A practical embodiment
could include a microcontroller board with internal firmware and safety timer watchdogs.
[0021] A common re-commissioning command may be understood as a single digital instruction
or message structure issued by the remote server and directed to a set of re-commissioning
devices for simultaneous execution. The command may include section identifiers, time
windows, and reset authorisations, and is interpreted individually by each device.
This command may be formatted according to a proprietary railway protocol or standard
industrial communication schema.
[0022] A reset operation may be understood as a defined signal or procedure that instructs
the axle counter control unit to clear its stored axle count and resume normal detection
logic. The operation may require internal consistency checks or authentication, and
may vary per axle counter vendor. A real-world example is triggering a 'reset' function
in a Frauscher or Siemens unit via digital I/O or serial command.
[0023] A dual-component command may be understood as a logical construct that splits the
re-commissioning command into two required authorisations: one for preparing the command
for execution and another for triggering its execution. This command structure supports
the safety principle of "geven en nemen," commonly used in railway maintenance, wherein
a first operator (e.g., control centre) prepares the command, and a second operator
(e.g., field staff) executes it.
[0024] An authorisation signal may be understood as a confirmation input, typically from
a back-office or remote operator, indicating that the re-commissioning command is
valid and ready to be taken. The signal may be generated through a secure interface,
authenticated with user credentials, and logged by the remote server. An example is
a dispatcher clicking "prepare" on a GUI to arm a command.
[0025] An execution signal may be understood as a confirmation input from a second, independently
authenticated operator, typically in the field, indicating that the re-commissioning
command is to be executed. Execution may only be possible if the authorisation signal
has been received and verified. An example is a foreman confirming on a tablet device
with GPS presence verification and a user PIN code.
[0026] A graphical user interface may be understood as a visual display system that allows
operators to view and interact with system information. It may be deployed on tablets,
laptops, control room monitors, or dedicated terminals, and show the layout of sections,
command status, and operator inputs. In practice, a COSS (Controller of Site Safety)
may see the track layout and colour-coded reset status on a secure tablet application.
[0027] A local presence authentication means may be understood as a mechanism to verify
that the field operator is physically present at or near the track section being re-commissioned.
This may be implemented via GPS geofencing, NFC tag scans, QR code scans on axle counter
cabinets, or Bluetooth proximity checks. A real-life example is a worker scanning
an NFC badge attached to a relay cabinet to confirm presence.
[0028] A failsafe protocol may be understood as a communication or system protocol that
defaults to a safe state in the event of communication loss, inconsistent commands,
or internal error. This may include timeouts, heartbeat supervision, and redundant
paths. In the context of the invention, a failsafe protocol may cause a re-commissioning
device to abort or lock out the reset if verification or connectivity is lost.
[0029] A lockout state may be understood as a blocked or disabled state in which the re-commissioning
device prevents further reset operations until manual intervention or system validation.
This ensures safety under ambiguous conditions. For example, if two conflicting reset
instructions are received or a counter mismatch is detected, the device may enter
a lockout and display a fault indicator.
[0030] A simulation input may be understood as a signal emulating the passage of a train
axle or a valid detection event, used to test the functionality of an axle counter
after re-commissioning. A practical implementation may generate an artificial pulse
to verify the reset behaviour of the counter.
[0031] An audit log may be understood as a time-stamped, tamper-proof record of system operations,
including operator inputs, command transmissions, confirmations, and re-commissioning
outcomes. In practice, this may be stored in the remote server or downloaded for inspection
by infrastructure safety authorities.
[0032] The above-mentioned goal is achieved with a re-commissioning device according to
an aspect of the present disclosure.
[0033] One aspect of the present invention relates to a system for re-commissioning one
or more railway track sections that are each monitored by a respective axle counter
control unit. A system may be understood as a combination of interrelated components
configured to function as a whole. Re-commissioning may be understood as restoring
a railway track section into an operational state after it has been temporarily taken
out of service. A railway track section may be understood as a bounded portion of
railway infrastructure equipped with train detection and signalling interfaces, and
typically delimited by detection points such as axle sensors. An axle counter control
unit may be understood as an electronic system configured to receive signals from
axle sensors positioned at entry and exit points of a railway track section, maintain
a count of axles detected, and determine the occupancy status of the section based
on the correspondence of entry and exit counts.
[0034] The system comprises a plurality of re-commissioning devices. A re-commissioning
device may be understood as an electronic device configured to interact with an axle
counter control unit and initiate a reset or similar operation that brings the respective
section back into service. The use of a plurality of such devices allows the system
to address multiple track sections in parallel. An effect of this arrangement is that
it enables distributed re-commissioning across physically separated areas, reducing
the need for centralised physical access and improving response times in complex rail
environments.
[0035] Each re-commissioning device comprises a re-commissioning interface configured to
be connected to a respective axle counter control unit. A re-commissioning interface
may be understood as a hardware and/or software interface capable of transmitting
control signals compatible with the protocol of the axle counter control unit, such
as digital reset commands or electrical pulses. This arrangement enables direct actuation
of the reset functionality at the control unit level without requiring manual intervention.
An effect is that reset operations may be securely automated while remaining compliant
with existing safety logic embedded in the axle counter infrastructure.
[0036] Each re-commissioning device further comprises communication means configured to
communicate with a remote server. Communication means may be understood as a network
interface module, such as a modem, radio unit, or Ethernet module, capable of establishing
a bidirectional communication channel over public or private networks. A remote server
may be understood as a network-connected computing system configured to issue commands
and manage status updates from the distributed devices. This arrangement allows central
management of the re-commissioning process, including command preparation, distribution,
and logging. An effect is that bandwidth usage can be optimised by transmitting only
necessary commands and acknowledgements, while processing power at the edge devices
can be minimised due to the delegation of orchestration to the remote server.
[0037] Each re-commissioning device comprises control means configured to control the re-commissioning
interface and to send and receive data via the communication means. Control means
may be understood as a processor, microcontroller, or logic circuit programmed to
coordinate internal operations of the device, including interpreting received commands,
managing state transitions, and enforcing timing and authentication protocols. This
arrangement enables deterministic and traceable execution of reset operations based
on external inputs. An effect is that system integrity is maintained even in distributed
deployments, and local decision-making capabilities reduce latency and reliance on
continuous connectivity.
[0038] The control means of each re-commissioning device is configured to obtain from the
remote server a common re-commissioning command associated with a plurality of railway
track sections, each associated with a different axle counter control unit. A common
re-commissioning command may be understood as a single data structure or instruction
transmitted by the server and intended to trigger coordinated reset actions across
multiple devices. This arrangement ensures synchronisation of re-commissioning activities
across multiple independent control domains. An effect is that the command structure
simplifies orchestration and allows for reduced protocol overhead, improving overall
system scalability and reducing the likelihood of human error in complex environments.
[0039] The control means is further configured to initiate, in response to the obtained
command, a reset operation via the re-commissioning interface of the respective re-commissioning
device, thereby simultaneously re-commissioning a plurality of railway track sections
associated with separate axle counter control units. A reset operation may be understood
as a signal or procedure that instructs the axle counter control unit to clear its
internal count and transition the track section to a state of availability. Simultaneous
re-commissioning may be understood as performing the reset actions in a coordinated
manner within a defined operational window. This arrangement enables consistent and
time-aligned return to service of multiple sections, even when managed by independent
systems. An effect is that service restoration becomes faster and more predictable,
while system-wide coordination supports efficient scheduling and improved safety oversight.
[0040] Surprisingly, it was found that by equipping each re-commissioning device with control
means configured to obtain a common re-commissioning command from a remote server
and to initiate, in response to the obtained command, a reset operation via a re-commissioning
interface connected to a respective axle counter control unit, an intermediate level
of control is achieved that effectively bridges the operational gap between centrally
prepared command structures and locally constrained axle counter systems. This arrangement
functions as a middleware-like architecture, allowing a plurality of independently
operated axle counter control units-each traditionally requiring local handling by
a dedicated operator-to be virtually combined into a configurable set of railway track
sections. These sections may be flexibly selected in advance of execution, such that
one re-commissioning command issued from the remote server can dynamically address
a customised combination of track sections. As a result, complex re-commissioning
procedures that would typically demand sequential local operations are now reduced
to a single coordinated reset action, while preserving the necessary safety and verification
measures. This enables scalable, context-sensitive, and operator-verifiable re-commissioning
in environments such as railway yards, terminals, and harbour tracks, where conventional
systems lack the adaptability and synchronisation required for safe and efficient
return to normal operation.
[0041] The system comprises a mobile device configured to receive the common re-commissioning
command from the remote server and to transmit, upon operator input provided in the
field and location-verified with respect to the one or more railway track sections
to be re-commissioned, an execution signal associated with the common re-commissioning
command. A mobile device may be understood as a portable operator terminal, such as
a tablet, smartphone or embedded control unit, capable of secure bidirectional communication
with the remote server and/or re-commissioning devices. The operator input may comprise
a confirmation action performed by a field-certified user after visual inspection
of the track sections, whereas location-verification may be achieved through GPS,
QR-scanning, NFC, or proximity-based mechanisms. This arrangement allows the common
re-commissioning command-whether pre-defined by the server or dynamically assembled
in the field-to be authorised and triggered in real time by a single operator situated
near the affected railway track sections.
[0042] An effect of this architecture is that the final safety-critical decision to re-commission
the track sections remains in the hands of the field operator with situational awareness,
while the coordination, timing and execution of the reset operations are centrally
managed and synchronised via the remote server. By integrating the mobile device as
a control and validation point in the field, the system enables fast, decentralised
and operator-verifiable re-commissioning of multiple axle counter-controlled track
sections. This reduces the operational delay typically associated with sequential
reset procedures, eliminates dependency on backoffice-only workflows, and improves
overall safety integrity by ensuring that the command is only executed when the track
sections are physically observed to be clear.
[0043] In an example, the mobile device is further configured to generate the common re-commissioning
command locally in the field upon operator input and to transmit the execution signal
to the re-commissioning devices via the remote server. It may be provided that the
generation of the re-commissioning command occurs entirely on the mobile device operated
by a field-authorised person, based on locally available information and/or information
obtained through the remote server and real-time visual verification of the affected
railway track sections. This feature enables decentralised operation in scenarios
where remote connectivity is limited or where operational independence is required,
such as in maintenance zones with temporary isolation from central infrastructure.
An effect is that the re-commissioning process becomes highly responsive, as the field
operator is able to both verify safety conditions and directly trigger the system
reset without waiting for remote coordination or approval.
[0044] The generation and execution of the common re-commissioning command may be flexibly
distributed between the remote server and the mobile device to accommodate different
operational requirements, safety protocols, and field conditions. The system may be
configured to operate in several distinct modes, including a centralized, a decentralized,
and a hybrid mode.
[0045] In a first, centralized operational mode, the common re-commissioning command is
fully prepared and defined at the remote server, for instance by a central operator
such as a dispatcher or a safety coordinator in a control centre. In this mode, the
server defines all parameters of the command, including the specific set of railway
track sections to be re-commissioned. The mobile device then acts as a secure terminal
for receiving the prepared command and for enabling its execution. The field operator's
role is to verify the command and the physical state of the track sections in the
field, and upon providing a location-verified execution input, to trigger the transmission
of the execution signal. This mode enforces a strict dual-operator or "geven en nemen"
(give and take) safety principle, where command preparation and execution are performed
by separate, authenticated operators.
[0046] In a second, decentralized operational mode, the common re-commissioning command
is generated locally on the mobile device 230 by an authenticated field operator.
This mode is particularly advantageous in scenarios with limited network connectivity
or where the field operator possesses primary authority over the re-commissioning
task, for instance during specific on-site maintenance activities. The operator uses
an interface on the mobile device 230 to select the relevant track sections 110 and
define the command. Upon local generation and confirmation, the mobile device 230
transmits the execution signal, which may be routed via the remote server 220 for
logging and coordination or transmitted directly to the re-commissioning devices 210
if a direct communication channel is available.
[0047] In a further, hybrid operational mode, the command generation is a collaborative
process between the central server and the local operator. For example, a command
plan or template may be prepared centrally at the remote server 220, defining a proposed
set of track sections for a scheduled work package. This command plan is then transmitted
to the mobile device 230 in a pending or non-executable state. The field operator
may then review, amend, complete, and/or finally approve the command locally. For
instance, the operator could amend the plan by deselecting a track section that could
not be visually confirmed as clear, or complete the plan by adding a final authorisation.
Only after this local validation and final approval by the field operator is the command
armed and the execution signal transmitted. This hybrid approach combines the benefits
of central planning with the necessity of on-site situational awareness and final
verification.
[0048] This configurable architecture provides the system with the flexibility to adapt
to any combination of these workflows, ensuring that the re-commissioning process
can be tailored to the specific risk level, operational context, and prevailing safety
regulations.
[0049] In an example, the mobile device is further configured to receive the common re-commissioning
command prepared at the remote server and to transmit the execution signal only upon
operator input confirming validation of the command in the field. It may be provided
that the command is composed centrally, for example by a dispatcher or safety coordinator,
and is held in a pending state on the mobile device until the operator in the field
confirms, based on physical presence and track visibility, that it is safe to proceed.
This feature reflects a dual-operator safety model often applied in railway maintenance
practices and ensures that re-commissioning is only executed after human validation
near the track. An effect is that centralised safety oversight is combined with local
situational awareness, thereby reducing the risk of premature or unsafe reset actions
in complex or dynamic field environments.
[0050] In an example, the system is further configured to determine and display, prior to
or during execution of the re-commissioning command, the current operational status
of each railway track section associated with the command, including whether the section
is presently in a decommissioned state. Such status determination may be performed
by the remote server based on feedback signals from the re-commissioning devices,
by querying axle counter control units directly, or by evaluating internal flags within
the command execution logic. The mobile device may be configured to display this status
information to the operator prior to enabling execution, thereby allowing verification
that all selected sections are indeed in a non-operational or decommissioned state.
An effect of this feature is that the system can prevent re-commissioning of sections
that are not currently out of service, reduce the risk of conflicting control inputs,
and provide traceable assurance that the preconditions for safe reset have been satisfied.
The status may also be updated during or after execution, providing real-time feedback
on command progression and reset outcome for each section.
[0051] In an example, the system is configured such that the remote server issues the re-commissioning
command in the form of a dual-component command comprising a first authorisation signal
configured to be issued by a first authenticated operator and a second execution signal
configured to be issued by a second authenticated operator, and the re-commissioning
devices are configured to initiate the reset operation only upon reception of both
signals. It may be provided that a dual-component command comprises separate control
signals, each independently generated by different authenticated operators with distinct
roles. This feature enables a distributed safety mechanism that ensures mutual oversight
between remote control and local execution. It may be understood that only after both
the authorisation and execution signals are received by the re-commissioning devices
is the reset operation triggered. An effect of this configuration is that the operational
risk of unauthorised or unintended re-commissioning is significantly reduced, while
maintaining operational flexibility and avoiding delays caused by requiring both operators
to be co-located. This separation of control paths also enables better allocation
of bandwidth and improves command traceability.
[0052] In an example, the system is configured such that the first operator is located at
a remote control centre and configured to prepare the command for execution without
the ability to initiate the reset, and the second operator is located in the field
and authorised to execute the reset command without the ability to prepare the command.
It may be provided that the preparation and execution of the re-commissioning command
are structurally decoupled and assigned to different operators based on their physical
location and operational role. This feature reflects a known safe working practice
in railway maintenance, known as "geven en nemen," and ensures that the operator who
prepares the command cannot execute it, and vice versa. An effect is that both spatial
and role-based separation are enforced, improving human factor safety and making errors
or misuse less likely. This also simplifies role management and command logging, since
permissions can be strictly divided and recorded per operator profile.
[0053] In an example, the control means of each re-commissioning device is configured to
permit execution of the reset command only upon receiving, from the operator terminal,
a field confirmation input authenticated by a role-based access protocol. It may be
provided that a role-based access protocol defines different levels of command rights
for different user roles, with specific authentication credentials linked to each
role. This feature enables controlled authorisation flows and prevents unauthorised
users from triggering re-commissioning operations. An effect is that system integrity
is maintained across the field network, while only those operators who are appropriately
certified and present at the field location can contribute to safety-critical control
decisions. This also supports compliance with railway safety standards that require
field-level confirmation by accredited personnel.
[0054] In a further example, the system is configurable to operate in different safety modes
depending on operational requirements or available personnel. In a first mode, the
execution of the re-commissioning command is permitted by a single operator using
a mobile device, provided that the operator is physically located near the affected
railway track sections and authenticated by means of location verification, such as
NFC, GPS, or proximity-based scanning. In a second mode, the system enforces a dual-operator
procedure in which the re-commissioning command is prepared by a remote operator and
must be executed by a separate operator in the field, in accordance with the "geven
en nemen" principle. In a third mode, both validation mechanisms may be applied in
combination, such that even in the case of a single operator, execution requires both
physical presence and confirmation of a centrally prepared command. This configurability
allows the system to adapt to the safety protocol in effect, the nature of the track
environment, or the risk level associated with the re-commissioning operation. An
effect is that the system remains compliant with varying railway safety regulations
while maintaining operational flexibility across different deployment contexts.
[0055] In an example, the re-commissioning devices are configured to display on a local
user interface a graphical representation of the respective railway track section
and an indication of whether a re-commissioning command is pending, executed, or blocked
and/or the status of the one or more sections, e.g. whether or not they are currently
de-commissioned. It may be provided that the local user interface comprises a visual
display module, which renders the current command state using graphical symbols, colours,
or text. This feature supports immediate situational awareness for the field operator,
allowing visual confirmation of the command status without requiring verbal or radio
communication with the control centre. An effect is that visualisation reduces the
likelihood of operator error and shortens response times, while also improving transparency
in the field.
[0056] In an example, the remote server comprises a graphical user interface configured
to display, in real time, the status of the railway track sections associated with
the re-commissioning command. It may be provided that the graphical user interface
of the remote server is updated with status messages transmitted from the re-commissioning
devices. This feature allows the remote operator to monitor which sections have accepted,
are processing, or have completed the reset operation. An effect is that operational
coordination is improved without needing to query individual systems manually. Real-time
feedback enables proactive fault detection, faster decision-making, and efficient
scheduling of further operations.
[0057] In an example, the remote server is further configured to subdivide the re-commissioning
command into a plurality of zone-specific subcommands, each associated with one or
more re-commissioning devices and requiring confirmation by an authorised field operator
located within the corresponding zone. It may be provided that a re-commissioning
command can be logically segmented based on spatial or operational zones, with each
zone tied to a particular group of devices and field staff. This feature supports
decentralised but coordinated re-commissioning across large or complex rail networks.
An effect is that each local operator only authorises the re-commissioning of sections
within their own oversight area, increasing precision and reducing cognitive load
while still enabling a centralised control structure.
[0058] In an example, the control means is configured to validate the physical presence
of the field operator at or near the respective railway track section using location
data from a mobile device or local presence authentication means. It may be provided
that such validation is based on GPS geofencing, NFC scans, or QR code checks, depending
on the environment. This feature ensures that the operator performing the reset is
physically present at the relevant site. An effect is that remote or spoofed execution
is prevented, and that safety-critical visibility of the track section is genuinely
confirmed before control actions are allowed.
[0059] In an example, the communication means comprises a secured bidirectional communication
channel configured to communicate with the remote server over a public or private
mobile network, and further comprises authentication, encryption, and integrity check
mechanisms. It may be provided that the communication means implements secure transport
protocols such as VPN, TLS, or similar, combined with digital signatures or hash-based
integrity verification. This feature ensures that commands and responses are reliably
transmitted and cannot be tampered with or intercepted by unauthorised third parties.
An effect is that both confidentiality and system correctness are preserved, which
is especially important in systems involving safety operations and mobile networks.
[0060] In an example, the re-commissioning interface comprises a control output that generates
a reset signal compliant with the protocol of the respective axle counter control
unit, and the reset signal is transmitted via a relay interface, digital signal, or
safety bus protocol. It may be provided that the control output of the re-commissioning
interface includes hardware and logic circuitry capable of producing a signal pattern
recognised as valid input by the axle counter control unit. This feature ensures compatibility
with existing safety systems without requiring hardware modifications. An effect is
that integration is simplified, the solution can be deployed as a retrofit, and reliability
is maintained by using existing validated protocols such as relay-based toggling or
PROFIBUS-based safety frames.
[0061] In an example, the control means is configured to record, for each re-commissioning
action, a command identifier, a timestamp, a field operator identifier, the geographical
location of the input, and the status of each associated track section, and to transmit
this information to the remote server for audit logging. It may be provided that a
log record is automatically generated each time a reset action is completed, and that
the information is stored in structured form. This feature enables full traceability
of control actions, supports post-incident analysis, and satisfies compliance requirements
of safety-critical railway operations. An effect is that digital records of operator
activity, location, and track status are available for review, allowing infrastructure
managers to maintain accountability and transparency.
[0062] In an example, each re-commissioning device further comprises a local signal output
configured to activate a physical status indicator near the track, such as a light
signal or audible alarm, to indicate that the section is being re-commissioned. It
may be provided that the signal output energises an external lamp, LED strip, or acoustic
horn during re-commissioning actions. This feature enhances the visibility of safety-relevant
operations in the physical environment. An effect is that nearby workers and machine
operators are made aware of control operations in progress, thereby reducing the likelihood
of unexpected track use during transition to operational state.
[0063] In an example, the remote server is configured to transmit a warning notification
to other systems, including interlockings, scheduling servers, and maintenance logging
systems, prior to the execution of the re-commissioning command. It may be provided
that this notification is a machine-readable message, pushed to relevant systems on
the infrastructure network. This feature ensures that dependent systems are updated
on the re-commissioning status and can react accordingly. An effect is that signalling,
scheduling, and maintenance systems can synchronise their internal state with the
real-world track status, preventing routing errors or operational conflicts.
[0064] In an example, the re-commissioning interface is configured to provide a simulation
input to the axle counter control unit, simulating passage of a train axle to verify
post-reset operation of the axle counter. It may be provided that the simulation input
mimics a pulse train or sensor activation sequence typically associated with a real
train axle. This feature allows in-situ testing of the axle counter's responsiveness
after a reset. An effect is that the operational readiness of the detection logic
can be verified without needing an actual train movement, enabling more efficient
commissioning and maintenance workflows.
[0065] In an example, the re-commissioning device is installed in a housing selected from:
a signal equipment building, a relay cabinet, a Radio Block Centre, or a junction
box adjacent to the railway track. It may be provided that the housing is tailored
to railway environment requirements, such as IP-rated enclosures and vibration resistance.
This feature allows the system to be deployed in existing railway infrastructure spaces
without introducing new civil engineering requirements. An effect is that installation
costs and deployment time are reduced, and the device benefits from proximity to the
axle counter wiring and trackside power.
[0066] In an example, the communication means comprises a mobile radio module selected from:
GSM-R, LTE, 4G, 5G, or FRMCS-compatible radio modules. It may be provided that the
radio module supports protocols used in railway operations, including current and
next-generation railway communication standards. This feature ensures broad coverage
and long-term compatibility with evolving infrastructure standards. An effect is that
the system can maintain reliable communication even in remote areas, and future-proof
connectivity is supported for migration to FRMCS networks.
[0067] In an example, each re-commissioning device is powered by an integrated uninterruptible
power supply (UPS) charged by a trackside power source and operable for at least a
defined fallback duration in case of power loss. It may be provided that the UPS comprises
a rechargeable battery and charging circuit, dimensioned for sustained operation.
This feature ensures that the re-commissioning device can complete time-critical operations
or enter a safe state during power disruptions. An effect is that power-related faults
do not compromise the integrity of safety logic, and autonomous operation is supported
in degraded power conditions.
[0068] In an example, the re-commissioning device is further configured to enter a lockout
state if inconsistent reset instructions are received or if conflicting occupancy
indications are detected by the axle counter control unit. It may be provided that
a logic condition is evaluated based on signal coherence, and that a lockout inhibits
further control actions until a manual or supervised reset is performed. This feature
adds a secondary layer of safety in the event of system ambiguity. An effect is that
misconfigurations, transient communication errors, or conflicting operator inputs
do not result in unsafe track conditions, and fault isolation is simplified for maintenance
teams.
[0069] In an example of the other aspect, the common re-commissioning command is generated
and transmitted from a mobile device located in the field upon operator input of the
second operator.
[0070] In an example of the other aspect, the common re-commissioning command is generated
at the remote server and transmitted to the mobile device in the field, and wherein
the execution of the command is performed only upon validation input from the second
operator at the mobile device.
Brief description of the drawings
[0071] The invention will now be explained in more detail with reference to a number of
figures, in which:
Figure 1 shows an axle counter system according to the prior art wherein no train
is present in a section of a railway network;
Figure 2 shows an axle counter system according to the prior art wherein a train is
present in the section of a railway network;
Figure 3 shows a system for re-commissioning one or more railway track sections according
to an aspect of the present disclosure;
Figure 4 shows a re-commissioning system according to an aspect of the present disclosure
for use in an axle counter system;
Figure 5 shows the steps of a method of re-commissioning one or more sections of a
railway network.
Detailed description
[0072] For a better understanding of the invention, like parts will be indicated by identical
numerals in the description of the figures below.
[0073] Figure 1 illustrates a schematic representation of a conventional axle counter system
100 used in railway networks to monitor the occupancy status of track sections 110.
The system includes axle counters 121 and 122, strategically positioned at the boundaries
of the track section 110. These sensors detect the presence and movement of train
axles and transmit signals to a control panel 130, often referred to as an axle counter
control unit or evaluation unit. The control panel maintains a running count of axles
within the section and communicates occupancy status to an interlocking system 140.
When the entry and exit counts match, indicating no train is present, the track section
is deemed unoccupied and available for routing.
[0074] Figure 2 depicts the same axle counter system 100 during track occupancy by a train
150. The train is detected by one of the axle counters, which updates the count in
the control panel 130 accordingly. A mismatch between the number of axles entering
and exiting the section results in the track section being marked as occupied by the
interlocking system 140, thereby preventing conflicting train movements. This illustrates
the basic principle of axle counter-based section supervision.
[0075] Figure 3 introduces a system 200 according to the present invention for re-commissioning
one or more railway track sections that are monitored by respective axle counter control
units. The system comprises a plurality of re-commissioning devices 210, each connected
to a respective axle counter control unit 130, and capable of communicating with a
remote server 220. The system further includes a mobile device, operated by a field-based
operator 160. Each re-commissioning device 210 includes communication means for receiving
commands from the remote server and control means for initiating a reset operation
via a re-commissioning interface connected to the axle counter control unit.
[0076] The remote server 220 is configured to define a common re-commissioning command associated
with a plurality of railway track sections. The mobile device of the operator 160,
which is physically located in the field near the track sections to be re-commissioned,
is configured to connect to the remote server, typically by logging into an application
or accessing an embedded website interface, where the re-commissioning command is
made available and maintained in a ready state. Upon operator input confirming that
the conditions for safe re-commissioning are met, optionally verified through location-based
mechanisms such as GPS, NFC, or QR code scanning, the mobile device transmits an execution
signal to the re-commissioning devices 210, typically via the remote server 220. In
a specific example, this may also be done via a direct local connection between the
mobile device and the re-commissioning device 210, but typically this is done through
the remote server. In response to this execution signal, the control means of each
re-commissioning device initiates a reset operation to simultaneously re-commission
the associated track sections, thereby transitioning them from a decommissioned to
an operational state. The mobile device used by the operator may be a dedicated device
specifically configured to interact with the system according to the invention. Preferably,
however, it is a conventional mobile (smart)phone on which a secure application, web-based
interface or service is used to access the server and perform re-commissioning operations.
[0077] Figure 4 provides a block diagram of a re-commissioning device 210. Each device comprises:
A communication interface 211, capable of secure bidirectional communication with
the remote server 220 and optionally with the mobile device 230;
A control unit 213, including processing logic for interpreting commands, authenticating
operator signals, and managing the timing and coordination of reset operations;
A re-commissioning interface 212, configured to transmit a reset signal to the connected
axle counter control unit 130, in compliance with its specific reset protocol;
A power management module 214, optionally including an uninterruptible power supply
(UPS) for fail-safe operation in the event of power loss.
Figure 5 outlines a method 300 for re-commissioning multiple railway track sections
using the system of the invention. The method includes the following steps:
Step 301: Providing a plurality of re-commissioning devices 210, each connected to
a respective axle counter control unit 130.
Step 302: Connecting each re-commissioning device to a remote server 220 via the communication
interface 211.
Step 303: Generating, at the remote server 220, a single common re-commissioning command
associated with multiple track sections.
Step 304: Preparing the command for execution, optionally requiring a first authorisation
input from a remote operator.
Step 305: Executing the command by receiving a second execution input from a field-based
operator 160 via a mobile device 230. This input may also include location-verification
to ensure the operator is physically near the relevant track sections.
Step 306: Transmitting the common re-commissioning command and/or execution signal
to the re-commissioning devices 210.
Step 307: Performing, at each re-commissioning device, a reset operation via the re-commissioning
interface 212 to re-enable the axle counter control units and return the track sections
to normal operation.
[0078] Depending on system configuration, the command may be prepared entirely in the field
(e.g. wherein the mobile device is further configured to generate and/or execute the
common re-commissioning command locally in the field upon operator input and to transmit
or execute the execution signal to the re-commissioning devices), or centrally by
a remote operator and only validated and triggered by the field operator (e.g. wherein
the mobile device is further configured to receive the common re-commissioning command
prepared at the remote server and to transmit the execution signal only upon operator
input confirming validation of the command in the field). The mobile device 230 plays
a crucial role in enabling operator-verifiable and location-aware control, ensuring
that re-commissioning is only executed when the track sections are physically confirmed
to be clear.
[0079] This approach significantly reduces the time between decommissioning and re-commissioning,
eliminates the need for sequential resets, and avoids scenarios where the track state
may change during a prolonged reset process. It also supports real-time updates and
feedback to the central server regarding section status before, during, and after
the re-commissioning process.
1. A system for re-commissioning one or more railway track sections that are each monitored
by a respective axle counter control unit, comprising a plurality of re-commissioning
devices, a remote server and a mobile device, each re-commissioning device comprising:
- a re-commissioning interface configured to be connected to a respective axle counter
control unit;
- communication means configured to communicate with the remote server;
- control means configured to control the re-commissioning interface and to send and
receive data via the communication means;
wherein the remote server is configured to define a common re-commissioning command
associated with a plurality of railway track sections, each associated with a different
axle counter control unit;
wherein the mobile device is configured to:
- receive the common re-commissioning command from the remote server;
- transmit, upon operator input provided in the field and location-verified with respect
to the one or more railway track sections to be re-commissioned, an execution signal
associated with the common re-commissioning command;
and wherein the control means of each re-commissioning device is configured to:
- initiate, in response to the execution signal, a reset operation via the re-commissioning
interface of the respective re-commissioning device, thereby simultaneously re-commissioning
a plurality of railway track sections associated with separate axle counter control
units.
2. The system of claim 1, wherein the mobile device is further configured to receive
the common re-commissioning command prepared at the remote server and to transmit
the execution signal only upon operator input confirming validation of the command
in the field.
3. The system of claim 1, wherein the first operator is located at a remote control centre
and configured to prepare the command for execution without the ability to initiate
the reset, and the second operator is located in the field and authorised to execute
the reset command without the ability to prepare the command.
4. The system of any one of the preceding claims, wherein the control means of each re-commissioning
device is configured to permit execution of the reset command only upon receiving,
from the operator terminal, a field confirmation input authenticated by a role-based
access protocol.
5. The system of any one of the preceding claims, wherein the re-commissioning devices
are configured to display on a local user interface a graphical representation of
the respective railway track section and an indication of whether a re-commissioning
command is pending, executed, or blocked.
6. The system of any one of the preceding claims, wherein the remote server is further
configured to subdivide the re-commissioning command into a plurality of zone-specific
subcommands, each associated with one or more re-commissioning devices and requiring
confirmation by an authorised field operator located within the corresponding zone.
7. The system of any one of the preceding claims, wherein the control means is configured
to validate the physical presence of the field operator at or near the respective
railway track section using location data from a mobile device or local presence authentication
means.
8. The system of any one of the preceding claims, wherein the communication means comprises
a secured bidirectional communication channel configured to communicate with the remote
server over a public or private mobile network, and further comprises authentication,
encryption, and integrity check mechanisms.
9. The system of any one of the preceding claims, wherein the re-commissioning interface
comprises a control output that generates a reset signal compliant with the protocol
of the respective axle counter control unit, and wherein said reset signal is transmitted
via a relay interface, digital signal, or safety bus protocol.
10. The system of any one of the preceding claims, wherein the control means is configured
to record, for each re-commissioning action, a command identifier, a timestamp, a
field operator identifier, the geographical location of the input, and the status
of each associated track section, and to transmit this information to the remote server
for audit logging.
11. The system of any one of the preceding claims, wherein each re-commissioning device
further comprises a local signal output configured to activate a physical status indicator
near the track, such as a light signal or audible alarm, to indicate that the section
is being re-commissioned.
12. The system of any one of the preceding claims, wherein the re-commissioning interface
is configured to provide a simulation input to the axle counter control unit, simulating
passage of a train axle to verify post-reset operation of the axle counter.
13. The system of any one of the preceding claims, wherein the re-commissioning device
is further configured to enter a lockout state if inconsistent reset instructions
are received or if conflicting occupancy indications are detected by the axle counter
control unit.
14. The system according to any one of the preceding claims, wherein the control means
of each re-commissioning device is configured to read, prior to or during execution
of the re-commissioning command, operational status information of the associated
railway track section as currently recorded in the railway signalling system, in order
to verify that the section has been correctly decommissioned before initiating the
reset.
15. A method for re-commissioning one or more railway track sections that are each monitored
by a respective axle counter control unit, comprising the steps of:
providing a plurality of re-commissioning devices, each comprising a re-commissioning
interface connected to a respective axle counter control unit, communication means,
and control means;
connecting each re-commissioning device to a remote server via the communication means;
characterised by:
generating, at the remote server, a single re-commissioning command associated with
a plurality of railway track sections monitored by separate axle counter control units;
preparing the re-commissioning command for execution by receiving a first authorisation
input from a first authenticated operator;
executing the re-commissioning command by receiving a second execution input from
a second authenticated operator located in the field;
transmitting the re-commissioning command from the remote server to each of the re-commissioning
devices;
performing, at each re-commissioning device, a reset operation via the re-commissioning
interface to re-commission the respective railway track section, thereby simultaneously
re-commissioning a plurality of track sections associated with separate axle counter
control units.