[0001] The invention relates to a method for the layered placing of upright or sloping dam
cores of material bound with bitumen and/or plastic and/or a natural binder in a constant
or upward-tapering thickness for dams such as barrage dams.
[0002] The method can be employed, for example, for barrage dams with or without transitional
zone, consisting of finely-grained filter material.
[0003] Various methods are currently known for placing dam cores. One technique involves
the use of formwork moulds or walls within or inbetween which the core material is
dumped. The formwork is removed as soon as the transitional material bordering the
core has been placed up to the top edge of the core. Subsequently core material and
transitional material are compacted, either simultaneously or at different times.
[0004] This method is time-consuming because of the discontinuous nature of the operation,
both in the horizontal and in the vertical direction. Furthermore, no clear-cut separation
is achieved between the core material and the,adjacent transitional material.
[0005] One method developed in the past, whereby both the core material and the transitional
material are placed simultaneously but are physically separated by walls, brought
some improvement. The drawback of this method, however, is that compaction is not
effected until the wall separating core material and transitional material has disappeared,
so that during compaction the transitional material is forced sideways into the core
material. Although this brings about a certain degree of interpenetration between
core material and transitional material, it does have the drawback that the zone where
core material and transitional material interpenetrate is less compact and will exhibit
cracks or fissures, with the result that the effective width of the watertight core
is diminished.
[0006] Systems subsequently employed, whereby the core material, after being pre-compacted,
stands free until the transitional material is placed against the core material, have
the drawback that contamination of the core surface occurs during placing of the transitional
material; furthermore, damaging of the free-standing core is possible.
[0007] The invention envisages an improved method for the placing of dam cores and relates
to the method stated in the preamble. It is characterized in that the core material
is placed from a silo of a travelling machine; that at the same time transitional
material is placed, from one or more silos of that machine, alongside and against
the placed core material; that the dam core is formed with the aid of a sliding formwork
located on the machine to give lateral support to the core until and while the transitional
material is placed; that the core material, immediately after it has been placed and
before the transitional material is placed, is pre-compacted both vertically and laterally;
and that subsequently the core material and the transitional material are (further)
compacted.
[0008] The machine preferably travels over the already compacted transitional material of
an underlying layer.
[0009] Pre-compaction of the core material can be effected by means of vibrating plates
located on or in the formwork.
[0010] The method is preferably executed in such a way that the transitional material is
driven by means of a conveying worm in the direction of the core material, while a
second worm removes excess material and while the top of the core is protected by
a covering plate.
[0011] It is also preferable to effect the re-compaction of the core material and the compaction
of the transitional material simultaneously behind the sliding formwork by means of
vibrating plates located at the rear of the machine.
[0012] If, for example, a bituminous binder is used, the core material is preferably placed
after the underlying layer of the core material has been heated by means of, for example,
infra-red radiators.
[0013] By adjustment of the sliding formwork, the height, breadth and form of the dam core
can be varied.
[0014] The invention likewise relates to a machine for executing the present method, characterized
in that it is provided with travelling elements such as caterpillar tyres, a silo
for core material, one or more silos for transitional material and a sliding formwork
for forming the dam core.
[0015] Vibrators are preferably located on or in the formwork for both vertical and lateral
pre-compaction of the dam core.
[0016] At the rear, conveying worms for driving and removing the transitional material can
be located.
[0017] A covering plate is preferably provided to protect the top of the dam core during
the placing of the transitional material.
[0018] Moreover, infra-red radiators may be present at the front and vibrating plates at
the rear. The height, breadth and form of the sliding formwork can be varied.
[0019] By means of the described method, the transitional material remains separated from
the core material by the sliding formwork while the covering plate on top of the newly-laid
core prevents the transitional material from contaminating the core material.
[0020] An embodiment of the invention is described in further detail below with the aid
of the drawings.
[0021] Fig. 1 represents a top view of the machine, Fig. 2 a longitudinal section of the
machine and Fig. 3 a layout sketch of the dam core.
[0022] In the diagrams, the arrow indicates the direction of travel of the machine. Furthermore,
the following nomenclature applies in the diagrams:
1 Infra-red burners
2 Core material silo
3 Core height control effected by means of a strike-off bar, which is controlled for
example with the aid of a laser beam
4 Pre-compactor (vibrating plates)
5 Transitional material silos
6 Transitional material height control effected by means of two strike-off bars
7 Core covering plate and lateral guide plate
8 Filling and levelling screw (controllable)
9 Vibrating plates
10 Travelling caterpillars
[0023] Moreover, Fig. 3 shows the following zones:
A Pre-heating of already laid core
B Placing of core
C Pre-compaction of core (in lateral direction as well)
D Placing of transitional material
E Filling of transitional material against core wall
F Levelling of core material
G Compaction of core and transitional material
[0024] One advantage of the present method is that the core material is situated in a protective
tunnel until and while the transitional material is placed. The start of this tunnel
is joined up to the outlet of the silo 2 whence the core material is dosed and which
is provided with a vertically adjustable strike-off bar 3 to control the height of
the layer to be placed.
[0025] In the case of bituminous core consolidation, the surface of the underlying core
layer is heated by infra-red radiators 1 in order to ensure optimum adhesion between
the successive layers.
[0026] Immediately downstream of the outlet of the silo, the tunnel is provided with vibrating
plates 4 (compactors), both on the sidewalls and on the top. The advantage of lateral
compaction in conjunction with vertical compaction is that the core material is endowed
with optimum properties in terms of watertightness in that direction in which the
core is subjected to the severest loads (horizontal water pressures) under ultimate
conditions of use. Depending upon the consistency of the core material, the number
of compactors in the longitudinal direction of the tunnel can be increased.
[0027] In the longitudinal direction, the tunnel can consist of several segments hinge-connected
to one another. This makes it possible to construct a horizontally- curved core should
the geometry of the barrage dam so require.
[0028] The transitional material is dosed from two silos 5. The height of the placed transitional
material is in the first instance controlled by two strike-off bars 6 which are adjustable
in height. This setting can be effected independently for either strike-off bar, thereby
permitting layers of transitional material with differing thicknesses to be placed
on either side of the core material. As the entire machine travels, with the aid of,
for example, caterpillar tyres 10, on the compacted transitional material of the previously
placed layer, it is hereby possible to tilt the machine and thus construct a sloping
core.
[0029] After the height of the transitional material has been controlled by the bars 6,
two worm screws 8 on either side of the core ensure that the transitional material
is levelled by means of a movement towards the core while a second pair of worm screws
removes any excess transitional material.
[0030] A plate 7 on the top of the core ensures that the core material remains free of contamination.
[0031] Subsequently, vibrating plates 9 ensure that the transitional material is compacted
and that the core material is finally compacted.
[0032] The entire machine moves on, for example, caterpillar tyres over the compacted transitional
material of the previously placed layer. This layer forms a sufficiently level driving
surface for the equipment in order to place a layer of core material having a thickness
lying within acceptable tolerances.
[0033] At the same time, the thickness of the layer can be controlled by the strike-off
bar 3, which can receive its signals from a laser beam.
[0034] In the longitudinal direction, positioning is effected, for example, by sighting
a paint line on the underlying layer of core material by means of a sighting device.
This paint line can be made by a device located in the axis of the tunnel underneath
plate 7.
[0035] A more sophisticated system for positioning both in the vertical and in the horizontal
direction can be achieved by suspending the silo with core material (2), the tunnel
with the vibrating plates for pre-consolidation (4) and the silos with transitional
material (5) together with the strike-off devices (3) and (6) in a separate frame
which is to be positioned relative to the chassis of the travelling part of the machine.
The travelling gear itself effects rough positioning, while the frame is postioned
more precisely relative to the travelling undercarriage by means of hydraulic cylinders.
[0036] Vertical positioning can be effected by means of three cylinders which are controlled,
in conjunction with a system of clinometers, by a laser arranged in line with a spirit
level.
[0037] Horizontal positioning can likewise be effected by means of, for example, a system
of magnetic reading heads which control horizontal positioning with the aid of a metal
foil strip or wire that has been laid out beforehand.
[0038] To vary the width of the core, the tunnel with compaction vibrators can be interchanged.
1. Method for the layered placing of upright or sloping dam cores of material bound
with bitumen and/or plastic and/or a natural binder in a constant or upward-tapering
thickness for dams such as barrage dams characterized in that the core material is
placed from a silo of a travelling machine; that at the same time transitional material
is placed, from one or more silos of that machine, alongside and against the placed
core material; that the dam core is formed with the aid of a sliding formwork located
on the machine to give lateral support to the core until and while the transitional
material is placed; that the core material, immediately after it has been placed and
before the transitional material is placed, is pre-compacted both vertically and laterally;
and that subsequently the core material and the transitional material are (further)
compacted.
2. Method as claimed in claim 1, characterized in that the machine travels over the
already compacted transitional material of an underlying layer.
3. Method as claimed in claims 1 and/or 2, characterized in that pre-compaction of
the core material is effected with the aid of vibrating plates located on or in the
formwork.
4. Method as claimed in one or more of claims 1-3, characterized in that the transitional
material is driven by means of a conveying worm in the direction of the core material,
while a second worm removes excess material and while the top of the core is protected
by a covering plate.
5. Method as claimed in one or more of claims 1-4, characterized in that re-compaction
of the core material and compaction of the transitional material are effected simultaneously
behind the sliding formwork by means of vibrating plates located at the rear of the
machine.
6. Method as claimed in one or more of claims 1-5, characterized in that the core
material is placed after the underlying layer of the core material has been heated
with the aid of infra-red radiators.
7. Method as claimed in one or more of claims 1-6, characterized in that, by adjustment
of the sliding formwork, the height, breadth and form of the dam core can be varied.
8. Machine for the execution of the method as claimed in one or more of claims 1-7,
characterized in that it is provided with travelling elements such as caterpillar
tyres, a silo for core material, one or more silos for transitional material and a
sliding formwork for forming the dam core.
9. Machine as claimed in claim 8, characterized in that vibrating plates are located
on or in the formwork for pre-compaction of the dam core in both the vertical and
the lateral direction.
10. Machine as claimed in claims 8 and/or 9, characterized in that it is provided
at the rear with conveying worms for driving and removing the transitional material.
11. Machine as claimed in one or more of claims 8-10, characterized in that it is
provided with a covering plate to protect the top of the dam core during placing of
the transitional material.
12. Machine as claimed in one or more of claims 8-11, characterized in that it is
provided at the rear with vibrating plates.
13. Machine as claimed in one or more of claims 8-12, characterized in that it is
provided at the front with infra-red radiators.
14. Machine as claimed in one or more of claims 8-13, characterized in that the height,
breadth and form of the sliding formwork can be varied.
15. Machine as claimed in one or more of claims 1 to 14 inclusive, characterized in
that positioning is effected by means of a frame construction on and to which the
silos for dam core material and transitional material are attached, as are the compaction
tunnel and the strike-off bars and worms, with fine positioning in the vertical and
horizontal direction being effected by means of hydraulic cylinders fitted between
frame and chassis.
16. Machine as claimed in claim 15, characterized in that vertical positioning is
effected by a system of three vertical cylinders controlled by a laser with the aid
of two clinometers.
17. Machine as claimed in claims 15 and 16, characterized in that horizontal positioning
is effected by means of a horizontal hydraulic cylinder controlled by a system of
electro-magnetic reading heads following a metal conductor laid out beforehand.