BACKGROUND OF THE INVENTION
Field of the Invention
[0001] This invention relates to an erection unit for a building floor slab and the erection
method thereof, and more particularly to an erection unit for multiple floor slabs
and the erection method thereof.
Description of the Prior Arts
[0002] The floor slab is used to vertically divide the space of a building into plural floors
according to customer's requirements. At present, the floor slab of most buildings
is made of concrete, as shown in Fig. 1, and the erection method is to install the
next upper floor slab after the load-bearing structure (such as concrete structure)
for each floor or the load-bearing structure for the whole building has been completed.
After the concrete of the lower floor is poured, it needs to wait for a certain period
of time until the concrete has hardened enough to bear a certain weight. And then
support frame can be installed on this floor slab so as to carry out another installation
for the next upper floor slab. However, this erection method still has two disadvantages
which are described as follows: 1) it has to wait for a certain period of time before
the floor slab hardens, then the next upper floor slab can be installed. Furthermore,
it is time-consuming since the support frame and the floor slab mould should be assembled
and dismantled repeatedly after each floor is completed. 2) It will have a bad effect
on the structural strength of the floor slab since the lower floor slab has to bear
the weight of the plural upper floor slabs, the support frame and the floor slab mould
when multiple floor slabs are installed synchronously, which will likely lead deformation
of the floor slab, as shown in Fig. 1. Accordingly, the requirement for structural
strength of the support frame will be relatively higher. In view of the above-mentioned
conditions, an improved erection method for a building floor slab is disclosed in
SIPO Patent No. 01,129,796 (Oct 22, 2001) titled "an erection unit for a building
floor slab and the erection method thereof. This method is used to install the floor
slab downwardly starting from the upper floor to lower floor of a building, which
generally includes the following steps: fixing a first plurality of positioning members
on the load-bearing structure of the building, placing the floor slab mould on the
first plurality of positioning members, the floor slab mould is supported with a support
structure which is hung on the first plurality of positioning members through a traction
member, then pouring concrete; installing a second plurality of positioning members
at the position where the lower floor slab lies after the concrete has cured to a
certain extent, hanging the support structure on the positioning member of the lower
floor through the traction member, then taking off the first plurality of positioning
members of the upper floor slab, under the effect of gravity and by the aid of the
traction of the traction member, the floor slab mould is lowered to the position where
the lower floor slab lies and placed on an upper end of the positioning member, then
pouring the concrete. With this erecting method, multiple floor slabs can be installed
concurrently. Furthermore, the assembly and disassembly of the floor slab mould is
omitted, so as to speed up the installation and to prevent the upper floor slab being
loaded on the lower floor slab. However, this erection method still has to wait a
certain period of time until the floor slab becomes hard enough to support its deadweight,
then the floor slab mould can be taken away.
[0003] The present invention has arisen to mitigate and/or obviate the afore-described disadvantages.
SUMMARY OF THE INVENTION
[0004] The primary object of the present invention is to provide an erection unit for a
building floor slab and the erection method thereof, which is capable of taking off
the floor slab mould and installing the next lower layer after the floor slab is solidified
to a certain level. Thus, not only the installation speed is increased, but also the
quality of the floor slab is improved.
[0005] The erection unit for a building floor slab in accordance with the present invention
includes a load-bearing member for lifting the floor slab, said load-bearing member
located higher than a plane where the floor slab lies and connected to the floor slab
through a traction member.
the mounting member can be a mounting block fixed on the wall through screw bolt
or can be a truss of the positioning member supporting the upper floor slab or can
be a traction member pulling the upper floor slab.
[0006] The traction member can be tension rod, threaded rod, steel cord or iron chain.
[0007] The method for erecting floor slab in accordance with the present invention includes
the following processes: installing the floor slab mould and reinforced bars, connecting
the upper end of a traction member to a load-bearing member above the floor slab;
placing a lower end of the traction member on a height where the floor slab is located;
then pouring concrete; dismantling the floor slab mould and installing the next lower
layer after the floor slab is solidified to a certain level; taking off the traction
member after the floor has solidified to a strength enough to support its deadweight.
[0008] By using the erection unit for a building floor slab and the erection method in accordance
with the present invention, the floor slab will not pressed by the upper floor slab
during the solidification process, so that the lower floor slab is prevented from
deformation caused by the weight of the upper floor slab. Furthermore, by the aid
of the traction member, the floor slab mould can be taken off and the next lower floor
slab can be installed before the floor slab is completely solidified, thus the installation
speed is substantially increased. Since the installation of the floor slab is carried
out starting from the top layer to the lower layer, after taking off the floor slab
mould, the floor slab can be easily lowered to and installed on the next layer under
the effect of gravity by using the traction member, so that the installation and transportation
of the floor slab mould is simplified.
[0009] The present invention will become more obvious from the following description when
taken in connection with the accompanying drawings, which show, for purpose of illustrations
only, the preferred embodiments in accordance with the present invention.
BRIEF DESCRIPTION OF THE DRAWINGS
[0010]
Fig. 1 is a schematic plan view for showing the conventional erection method for erecting
the floor slab;
Fig. 2 is a first schematic plan view for showing the installation process for the
floor slab in accordance with a first embodiment of the present invention;
Fig. 3 is a second schematic plan view for showing the installation process for the
floor slab in accordance with the first embodiment of the present invention;
Fig. 4 is a third schematic plan view for showing the installation process for the
floor slab in accordance with the first embodiment of the present invention;
Fig. 5 is a fourth schematic plan view for showing the installation process for the
floor slab in accordance with the first embodiment of the present invention;
Fig. 6 is a top view of the first embodiment of the present invention;
Fig. 7 is an enlarged view of the portion "A" in Fig. 1;
Fig. 8 is a structural view of a second embodiment of the present invention;
Fig. 9 is an enlarged view of the part "B" in Fig. 8;
Fig. 10 is an enlarged view of the part "C" in Fig. 8;
Fig. 11 is a structural view of a third embodiment of the present invention;
Fig. 12 is an enlarged view of the part "D" in Fig. 11;
Fig. 13 is an enlarged view of the part "E" in Fig. 11;
Fig. 14 is a structural view of a fourth embodiment of the present invention;
Fig. 15 is an enlarged view of the part "F" in Fig. 14;
Fig. 16 is an enlarged view of the part "G" in Fig. 14;
Fig. 17 is a structural view of a fifth embodiment of the present invention;
Fig. 18 is an enlarged view of the part "H" in Fig. 17;
Fig. 19 is a structural view of a sixth embodiment of the present invention;
Fig. 20 is an enlarged view of the part "I" in Fig. 19;
Fig. 21 is a structural view of a seventh embodiment of the present invention;
Fig. 22 is an enlarged view of the part "J" in Fig. 21.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] An erection unit for quick erection of a building floor slab and the erection method
thereof in accordance with the present invention can be used in various ways, such
as that disclosed in SIPO patent No. 01,129,796, which is illustrated as follows:
[0012] Referring to Fig. 2, a first plurality of positioning members 5 are fixed at a height
where a floor slab 3 is to be installed, and a floor slab mould 4 is then installed
on the first plurality of positioning members 5. Through a plurality of traction members
6, a supporting structure 8 is hung on a lower end of the positioning member 5 and
employed to support the floor slab mould 4. The floor slab 3 is then to be cast by
pouring concrete into the floor slab mould 4. Before pouring concrete, a plurality
of tension rods 2 having a threaded head 10 at their lower end are obliquely inserted,
from the above, into the floor slab mould 4 in a manner that upper hook ends of the
tension rods 2 are hung on a plurality of load-bearing members that are mounting members
1 on the wall 9 (as shown in Figs. 2 and 7). After the concrete is poured and cured
to a certain extent, a second plurality of positioning members 5 are reinstalled at
a position of the lower floor, and the supporting member 8 and the floor-slab mould
4 are connected to the second plurality of positioning members 5 through the traction
members 6. The floor slab 3, after being cast, is pulled by plural tension rods 2.
Then the mounting members 1 is dismantled, after the floor slab 3 is cured, and the
tension rods 2 are taken away while leaving the threaded head 10 in the floor slab
mould 4. The holes left during the installation of the floor slab are filled up with
cement.
[0013] Referring to Fig. 3, the first plurality of positioning members 5 are dismantled
before casting the next lower floor slab, so that the supporting frame 8 and the floor
slab mould 4 are loaded on the second plurality positioning members 5. With reference
to Figs. 4 and 5, under the effect of gravity and by the aid of the traction of the
traction member 6, the floor slab mould 4 is lowered on the second mounting member
5. After that, the installation for the next lower floor is to be carried out.
[0014] Referring to Figs. 8, 9 and 10, which show an erection unit in accordance with a
second embodiment of the present invention, the traction members 2 in this embodiment
are hook-like tension rods. After installation of the floor slab mould 4 and the steel
bar, an end of each of the hook-shaped tension rods 2 is inserted in the floor slab
3 and folded to into an angle, and another end of each of the tension rods 2 is folded
into a hook and connected to the steel bar 9' on the wall 9. The tension rod 2 is
obliquely arranged.
[0015] Referring to Figs. 11, 12 and 13, which show an erection unit in accordance with
a third embodiment of the present invention, wherein a plate 7 is soldered with a
connecting rod 14 to create a "T"-shaped mounting member that is to be inserted in
the wall 9. A lower end of the connecting rod 14 is formed with threads and protrudes
out of the wall 9, and alike, the connection between the traction member 6 and the
floor slab 3 is also achieved through the "T"-shaped mounting member formed by the
plate 7 and the connecting rod 14. The traction member 6 can be in the form of a sleeve
11 formed with threads.
[0016] The traction member shown in Figs. 11-13 is a tension rod 2, both ends of the tension
rod 2 are connected to the floor slab 3 and the wall 9, respectively, via the plate
7. The plate 7 is threadedly connected to the tension rod 2.
[0017] Referring to Figs. 14-16, which show an erection unit in accordance with a fourth
embodiment of the present invention, both ends of the tension rod 2 in this embodiment
are folded into a hook and connected to the steel bars 3' of the floor slab 3 and
to the steel bars 9' on the wall 9, respectively. The tension rod 2 is threadedly
connected to the sleeve 11, so that the tension rod 2 can be tensioned or released
by rotating the sleeve 11 in different directions.
[0018] Referring to Figs. 17 and 18, which show an erection unit in accordance with a fifth
embodiment of the present invention, a first end of a reinforced bar 2' is inserted
through the uncured floor slab 3, and a second end of which is connected to the load-bearing
member above the uncured floor slab 3. In installation, the reinforced bar 2' passes
through the floor slab 3 before pouring concrete, and the concrete will inflate after
being solidified and will produce pressure effect on the reinforced bar 2'. Since
the reinforced bar 2' is formed with lines and grooves, when the uncured floor slab
3 is a little deformed under the effect of gravity, the friction force generated between
the reinforced bar 2' and the concrete will be greater enough to limit the deformation
of the floor slab 3 within an acceptable range. When the load-bearing member above
the uncured floor slab 3 is connected to the truss of the mounting member, an upper
end of the reinforced bar 2' is connected to the truss while a lower end of the reinforced
bar 2' passes through the uncured floor slab 3. If the traction member above the uncured
floor slab 3 is the traction member serving to pull the next upper floor slab, namely
a reinforced bar 2', then the reinforced bars 2' are connected to each other by soldering
methods, and the soldering point is located above the respective floor slabs.
[0019] Referring to Figs. 19 and 20, which show an erection unit in accordance with a sixth
embodiment of the present invention, wherein the traction member in this embodiment
is a steel cord 2", a first end of which is connected to the uncured floor slab 3
through an upper drop hanger 12, and a second end of which is connected to the load-bearing
member above the uncured floor slab 3. A lower end of the upper drop hanger 12 is
connected with a wedge block 13 having a small upper end and a big lower end, the
wedge block 13 passes through the floor slab 3. A lower end of the wedge block 13
is connected with a lower drop hanger 12 which is used to tighten the steel cord 2"
by hanging weight, so that, after pouring concrete, a pulling force can be produced
to counteract the weight of the uncured floor siab 3. When the load-bearing member
above the floor slab 3 is connected with the truss of the positioning member, the
upper end of the steel cord 2" is connected to the truss, and the lower end of the
steel cord 2" passes through the uncured floor slab 3 through the wedge block 13.
If the load-bearing member above the uncured floor slab 3 is the traction member of
upper floor slab, the steel cord 2" is able to pass through plural floor slabs in
a manner that the respective parts of the steel cord 22" are connected with one another
by the drop hanger 12 and the wedge block 13.
[0020] Referring to Figs. 21 and 22, which show an erection unit in accordance with a sixth
embodiment of the present invention, the traction member in this embodiment is an
iron chain 2, and other components are the same as the above-mentioned six embodiments,
thereby, further descriptions are omitted.
[0021] While we have shown and described various embodiments in accordance with the present
invention, it should be clear to those skilled in the art that further embodiments
may be made without departing from the scope of the present invention.
1. An erection unit for a building floor slab including a load-bearing member for lifting
the floor slab, said load-bearing member located higher than a plane where the floor
slab lies and connected to the floor slab through a traction member.
2. The erection unit for a building floor slab as claimed in claim 1, wherein the load-bearing
member is a mounting member fixed to on wall of a building.
3. The erection unit for a building floor slab as claimed in claim 2, wherein the mounting
member is a mounting block fixed to on wall of a building.
4. The erection unit for a building floor slab as claimed in claim 2, wherein the mounting
member is a steel bar on the wall.
5. The erection unit for a building floor slab as claimed in claims 3 or 4, wherein an
upper end of the traction member is connected to the mounting member.
6. The erection unit for a building floor slab as claimed in claim 2, wherein the mounting
member comprises a plate and a connecting rod which are connected with each other
to form in the shape of a "T", upper end of the plate and the connecting rod are located
inside the wall, a lower end of the connecting rod protrudes out of the wall.
7. The erection unit for a building floor slab as claimed in claim 6, wherein the connecting
rod is threadedly connected to the traction member.
8. The erection unit for a building floor slab as claimed in claims 2 or 6, wherein the
traction member is a tension rod.
9. The erection unit for a building floor slab as claimed in claim 1, wherein the load-bearing
member is a truss connected to a positioning member that is employed to support an
upper floor slab mould.
10. The erection unit for a building floor slab as claimed in claim 2 or 9, wherein the
traction member is a reinforced bar whose lower end is folded after inserting through
the floor slab, and the traction member also can be connected to a plate after passing
through the floor slab.
11. The erection unit for a building floor slab as claimed in claim 9, wherein the traction
member is a steel cord, and it also can be an iron chain.
12. The erection unit for a building floor slab as claimed in claim 10, wherein the plate
is threadedly connected to the traction member.
13. The erection unit for a building floor slab as claimed in claim 1, wherein the load-bearing
member is the traction member for pulling the upper floor slab.
14. The erection unit for a building floor slab as claimed in claim 13, wherein the traction
member is the reinforced bar, an upper end of the reinforced bar is connected to a
lower end of another reinforced bar for pulling the upper floor slab, and a lower
end of the reinforced bar passes through the floor slab.
15. The erection unit for a building floor slab as claimed in claim 14, wherein the reinforced
bars are connected to each other by soldering.
16. The erection unit for a building floor slab as claimed in claim 13, wherein the traction
member is the steel cord and also can be the iron chain passing through the floor
slab, the traction members are connected to each other by hook structure.
17. The erection unit for a building floor slab as claimed in claims 11 or 16, wherein
a lower end of the steel cord or the iron chain is connected with a wedge block which
is inserted in the floor slab, a lower end of the wedge block is provided with a drop
hanger for hanging weight.
18. A method for erecting floor slab including the following processes: installing the
floor slab mould and reinforced bars, connecting the upper end of a traction member
to a load-bearing member above the floor slab; placing a lower end of the traction
member on a height where the floor slab is located; then pouring concrete; dismantling
the floor slab mould and installing the next lower layer after the floor slab is solidified
to a certain level; taking off the traction member after the floor has solidified
to a strength enough to support its deadweight.
19. The method for erecting floor slab as claimed in claim 18, wherein a positioning member
is fixed on the wall initially, and then the floor slab mould is pressed on the positioning
member.
20. The method for erecting floor slab as claimed in claim 18, wherein the upper end of
the traction member is fixed on the wall above the floor slab, the lower end of the
traction member is connected to the reinforced steel in the floor slab mould, the
traction member is slantingly arranged.
21. The method for erecting floor slab as claimed in claim 18, wherein the upper end of
the traction member is connected to the truss of the positioning member that serves
to support the upper floor slab.
22. The method for erecting floor slab as claimed in claim 18, wherein the upper end of
the traction member is connected to the traction member that serves to pull the upper
floor slab, the lower end of the traction member passes through the floor slab, and
the traction member is obliquely arranged.