(19)
(11) EP 1 600 413 A3

(12) EUROPEAN PATENT APPLICATION

(88) Date of publication A3:
14.12.2005 Bulletin 2005/50

(43) Date of publication A2:
30.11.2005 Bulletin 2005/48

(21) Application number: 05005494.9

(22) Date of filing: 14.03.2005
(51) International Patent Classification (IPC)7B65H 54/26, D01H 15/013
(84) Designated Contracting States:
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR
Designated Extension States:
AL BA HR LV MK YU

(30) Priority: 18.05.2004 JP 2004147227

(71) Applicant: MURATA KIKAI KABUSHIKI KAISHA
Minami-ku Kyoto-shi Kyoto 601 (JP)

(72) Inventor:
  • Susami, Hiroyuki
    Otsu-shi Shiga (JP)

(74) Representative: Liedl, Christine et al
c/o Hansmann & Vogeser, Albert-Rosshaupter-Strasse 65
81369 München
81369 München (DE)

   


(54) Service carriage control system


(57) The present invention enables efficient operations in a control system that operates in response to a request for yarn splicing made by each of a plurality of processing units 3, to stop one of a plurality of service carriages running along the same running path 6, at the processing unit for yarn splicing. Work areas are assigned to yarn splicing carriages 11, 12; for example, spinning units 3 nos. 1 to 17 are assigned to the work area A1 of the first yarn splicing carriage 11 and spinning units 3 nos. 18 to 34 are assigned to the work area A2 of the second yarn splicing carriage 12. If the spinning unit 3 no. 18 makes a yarn yarn splicing request, the system performs control such that the second yarn yarn splicing carriage 12 is dispatched, which covers the work area A2 to which the spinning unit 3 no. 18 belongs. The first yarn splicing carriage 11 calculates the distance between the current position of the carriage 11 and the yarn splicing requesting unit (no. 18). If the distance has at most a predetermined value, the system performs control such that the second yarn splicing carriage is withdrawn and moved away from the yarn splicing requesting unit (Fig.1)







Search report