[0001] The invention relates to a drilling rig, comprising a mast to be placed above or
close to a well and means connected to the mast for carrying drill pipes to be lowered
into the well. Such a drilling rig is generally known and is used to form wells at
locations where oil or gas is present in the ground.
[0002] The most characteristic component of the known drilling rig is the mast or derrick
construction, generally a slender framework pyramid which is placed above the drilling
location or erected thereon and which rests on a foundation adjacently of or around
the drilling location. Arranged at the top of this mast is a hoisting gear with which
drill pipes can be successively picked up from the ground at the front side of the
mast and subsequently lowered in controlled manner into the well. The hoisting gear
is situated some distance directly above the well.
[0003] The known drilling rig is further provided with a rig floor which forms an integral
carrying component thereof and is rigidly connected to the mast. An opening is formed
in this rig floor for passage of the drill pipes. Means are further present on this
rig floor with which the drill pipes can be rotatingly driven, usually in the form
of a rotary table having therein a displacing rod of non-round cross-section, the
so-called kelly.
[0004] Finally, the drilling rig is further provided with means for pumping a drill fluid
downward through the drill pipes into the ground, whereafter this drill fluid comes
up again through the hollow space between the drill pipes and the wall of the well.
[0005] The drilling rig is thus in fact a crane with multiple functions, i.e. the raising
or lowering of the drill pipes, the rotation of the drill pipes during the drilling
process, and storage of the drill pipes during changing of the drill head.
[0006] In modern drilling rigs, see for example
US-B-6.199.641, use is in fact usually made, instead of a rotary table in the rig floor, of a so-called
"top drive" at the top of the mast to rotate the drill pipes. Such a top drive consists
of one or more motors connected via a transmission to a rotatable connecting piece
to which one drill pipe at a time is attached. The top drive is suspended from the
hoisting gear in the mast and can be moved up and downward thereby.
[0007] The basic functions of the drilling rig are therefore to move the drill pipes up
and downward in controlled manner, to impart a rotating movement to the drill pipes
if necessary, and to pump drill fluid. The controlled movement of the drill pipe comprises
of compensating for the downward force exerted by the force of gravity on the drill
pipes, so their weight.
[0008] Use is made for the drilling process of drill pipes of a limited length which, when
screwed together, form the final drill string. Due to the physical limitation of the
drill pipes and the screwing required, the process of constructing a drill string
is an interrupted process of placing and screwing on new pipes and subsequently lowering
the whole drill string. The drill string can herein move no further downward each
time than the length of the newly placed drill pipe. During placing of each new drill
pipe the drill string is stationary and is supported by a non-movable mechanical support
in the form of the rig floor. The actual hoisting gear is used during this operation
for placing of the new drill pipe to be screwed on.
[0009] During the whole drilling process the drill string is supported by the rig floor
during the stationary part of the movement process and by the hoisting gear of the
drilling rig during the dynamic part.
[0010] The above described process can also take place in reverse sequence, wherein the
drill string is pulled up in steps by the hoisting gear.
[0011] In addition to the above described basic functions of the drilling rig, control of
the pressures occurring in the well are an important factor in the overall drilling
process. Controlling of the pressures occurring in the well, also referred to as well
control, is based on the principle that the force exerted on the well by the column
of liquid, the drill fluid, is equal to or slightly greater than the ground pressure
present in the well. This is referred to as "balanced", or even as "overbalanced",
drilling.
[0012] Mounted on the well are blowout preventers which can close the well if said balance
were to be temporarily disrupted. If the ground pressure becomes greater than the
back-pressure exerted by the liquid column, the liquid column will then be pressed
upward out of the well. This is prevented by closing blowout preventers, whereafter
the balance can once again be restored by increasing the weight of the liquid column,
and the drilling process can hereby be resumed.
[0013] In order to be also able to maintain this overbalanced drilling process in rocks
with a high permeability and porosity, two prerequisites necessary to be able to speak
of a reservoir rock, the drill fluid is provided with solids. These solids serve to
reduce the permeability of the reservoir rock by cementing, in order to give sufficient
support to enable support for the liquid column essential to the drilling process.
[0014] This cementing, which is essential during the drilling process, has the effect of
slowing production considerably during the production phase of the well. As the prevailing
ground pressure decreases due to the extraction of oil or gas from the well during
the production phase, an increasing amount of cementing will be necessary as time
passes to enable a liquid column to be supported. The ultimate result hereof is a
steadily increasing production loss.
[0015] In order to prevent this production loss immediately after the drilling phase as
well as during later drilling activities, another method of well control has been
developed. In this modified process use is no longer made of the basic principle that
the liquid column must compensate the prevailing ground pressure, with all the side-effects
this entails. Operation takes place instead with a liquid column which is lighter
than the prevailing ground pressure, or a liquid column is even no longer used at
all. This new process, in which no liquid column or too light a liquid column is used,
is often referred to with the term" underbalanced" drilling.
[0016] This fundamental change in the drilling process requires replacement measures which
can compensate for the effect of removing (a part of) the liquid column.
[0017] The most important measure is that the blowout preventers must be and remain closed,
since the ground pressure will no longer be balanced. This underbalanced situation
is translated into a pressure in the well which can be detected at the surface. The
drill string will also have to be internally safeguarded against the now prevailing
well pressure, this being achieved by means of valves closing in one direction.
[0018] In addition to these direct modifications, the whole process of handling the drill
pipes, thus the moving up and downward and rotating thereof, must now be performed
by the now permanently closed blowout preventers. Since the blowout preventers are
going to be used in this situation not only in the case of very short-lived disturbances
in balance but will serve instead as important component in the performing of a continuous
process, additional blowout preventers, diverse of which are specially equipped for
this new task, must be placed on the well. This applies all the more because the new
process will also cause wear of the valves since the drill pipes are moved through
them.
[0019] In addition to the above stated results, the well pressure caused by the process
change has another consequence. A force which is uniform in all directions will be
exerted by the prevailing well pressure, and thus also on the closed underside of
the now closed drill string. Since only atmospheric pressure is exerted on the portion
of the drill string protruding from the well, the difference in pressure inside and
outside the well will result in an upward directed force on the drill string. As soon
as this upward directed force becomes greater than the weight of the drill string,
which does after all depend on the length of the drill string and so the number of
drill pipes, the upward directed force will press the drill string out of the closed
well. As the length of the drill string decreases, the upward directed differential
force will become increasingly greater. Since a conventional drilling rig is only
adapted to overcome the forces caused by the force of gravity, which are by definition
directed downward, the upward directed forces caused by the well pressure cannot be
controlled by the drilling rig.
[0020] In addition to the changed play of forces in the well and the consequences ensuing
herefrom, it is no longer possible, due to the operation with closed blowout preventers,
to move through the closed blowout preventer drill pipes with a form other than that
for which the blowout preventer is designed. In order to be able to do this special
techniques, so-called sluice techniques, have been developed which cannot be incorporated
directly, and certainly not without consequences, in the normal operating pattern
of a drilling rig. Specialist companies are then usually called in for this purpose
which have at their disposal suitable equipment, the so-called hydraulic workover
units or snubbing units, which must then co-act with the drilling rig already on site.
[0021] Making the necessary changes to the system of blowout preventers, arranging the hydraulic
workover unit in the conventional drilling rig are not only time-consuming and so
expensive, but also involve an increased safety risk.
[0022] The invention therefore has for its object to provide a drilling rig with which,
in addition to normal drilling, special operations in an underbalanced well can also
be performed without use having to be made for this purpose of separate constructions
and services of third parties. According to the invention this is achieved in a drilling
rig of the above described type in that the carrying means comprise at least three
carriers which are connected at different heights to the mast and displaceable in
height direction therealong and which are adapted to exert a pulling force or pressing
force as required on the drill pipes. By manipulating the drill pipes in suitable
manner using these three carriers which are displaceable independently of each other
and the lower of which in fact replaces the fixed rig floor of a conventional drilling
rig, different functions can be carried out with one and the same drilling rig in
both the overbalanced and underbalanced situation of the well. Because the drilling
rig itself is in this way made suitable to not only lower drill pipes in controlled
manner into a well but to really press them therein, it is possible to dispense with
the use of a separate unit such as a hydraulic workover unit or a snubbing unit when
the pressure ratio in the well becomes underbalanced.
[0023] When at least the upper carrier has means for rotatingly driving the drill pipes,
it can be used in all operations, both drilling and workovers, in an overbalanced
situation. In this case it is recommended that the rotating drive means of the upper
carrier are formed by a so-called top drive.
[0024] The carriers in the drilling rig according to the invention are advantageously adapted
to co-act during a "normal" drilling operation when the well is (over)balanced, wherein
the upper carrier is adapted to lower drill pipes in a downward movement into the
well, and the middle or lower carrier is adapted to take over and hold the drill pipes
fixedly at the end of the downward movement. The drilling rig can thus be used conventionally
in an overbalanced situation.
[0025] The lower carrier is preferably connected releasably to the mast. This lower carrier
can thus be removed and stored when it is not required, thus during normal use of
the drilling rig, whereby the two other carriers can move unimpeded along the mast.
[0026] When the lower carrier has flexible means for connecting thereof to a blowout preventer
placed on the well, this prevents the construction of the well being loaded during
operations in an underbalanced situation by downward directed forces occurring here.
[0027] The middle and lower carrier can then be adapted to co-act during an operation when
underbalancing prevails in the well, wherein the middle carrier is adapted to urged
components in a downward stroke into the well, and the lower carrier remains in place
and is adapted to hold the components fast and to transfer forces that occur into
the mast.
[0028] The drilling rig is advantageously further provided with at least one platform connected
to the mast and displaceable therealong in height direction. Tools and instruments
used during drilling can be kept on this platform, which itself does not fulfil a
supporting function in the drilling process, and personnel who must be present in
the drilling rig can take up position thereon. Because the platform is height-adjustable,
the process of assembling the drill string or removing drill pipes therefrom can take
place at any desired height.
[0029] The platform can be connected to one of the carriers. The number of separate components
of the drilling rig can thus be limited.
[0030] In a preferred embodiment the drilling rig according to the invention is further
provided with a device for supplying drill pipes which co-acts with the carrying means.
The process of introducing or removing the drill pipes can hereby be for the greater
part mechanized, so that a human contribution is not necessary here, or hardly so.
This is important because handling of drill pipes on the rig floor is one of the most
hazardous operations on and around a drilling rig. This supply device preferably has
means for raising the drill pipes from a lying position and transferring them to the
carrying means. The pipes can thus be stored simply lying next to the drilling rig.
[0031] The invention further relates to a method for introducing one or more drill pipes
into an underbalanced well. As stated, when a well is underbalanced, a separate hydraulic
workover or snubbing unit has heretofore been placed adjacently of or in the drilling
rig. This hydraulic workover or snubbing unit, which is usually operated by staff
specially employed for that purpose, has provisions for urging drill pipes along or
through the blowout preventers in the well without oil or gas escaping. The use of
such units and the associated staff is expensive and results in long delays.
[0032] The invention now has for its object to propose such a method wherein the use of
separate installations or the employment of third parties can be dispensed with. According
to the invention this is achieved by making use of a drilling rig as described above
for introducing one or more drill pipes into an underbalanced well, wherein the method
comprises of suspending the drill pipe(s) from the carrying means and urging the pipe(s)
downward into the well while exerting a pressing force.
[0033] As part of this method the lower carrier is preferably connected in flexible manner
to a blowout preventer placed on the well and fixed to the mast prior to urging of
the drill pipe(s) into the well. Due to the rigid attachment of the carrier to the
mast and its flexible connection to the blowout preventer(s), the well is safeguarded
from any downward directed load resulting from the processes carried out by the drilling
rig.
[0034] The method is advantageously adapted here such that the middle carrier urges the
drill pipe(s) in a downward stroke into the well and the lower carrier remains in
place, holds the drill pipe(s) fast and transfers forces which occur into the mast.
The middle and lower carrier can be provided for this purpose with holding elements
or "slips", of which one engages on the drill pipe and one allows passage of the drill
pipe in alternating manner, whereby these slips as it were pass the drill pipes to
each other. Because the operations necessary to introduce the drill pipes are performed
by the middle and lower carriers, the upper carrier can carry out other operations,
such as supplying and fastening to each other or, conversely, taking apart drill pipes,
while the space above the middle carrier remains available for temporary storage of
the drill pipes.
[0035] In another variant of the method according to the invention there is arranged between
the middle and lower carrier a system of telescopic sluice tubes, of which a stationary
outer sluice tube is fixed to the lower carrier and an inner sluice tube is fixed
to the middle carrier and moved thereby. Using such a system of sluice tubes, also
referred to as telescopic deployment tubes (TDT), drill pipes of differing forms which
cannot be pressed in any other way into an underbalanced well can nevertheless be
introduced under pressure into the well.
[0036] In this method the drill pipe(s) are advantageously picked up and presented to the
middle carrier by the upper carrier. Because the operations necessary for introducing
the drill pipes are performed by the middle and lower carriers, the upper carrier
and the space above the middle carrier do after all remain available for other operations,
such as manipulation of drill pipes using the top drive, fastening together or, conversely,
taking apart drill pipes and the like. Operation can hereby take place efficiently
and safely.
[0037] The drill pipe(s) can herein also be driven rotatingly by the upper carrier.
[0038] The invention will now be further elucidated on the basis of an exemplary embodiment,
wherein reference is made to the accompanying drawing, in which:
Fig. 1 is a schematic side view of a drilling rig according to the invention during
normal operation, wherein an overbalanced pressure ratio prevails in the well,
Fig. 2 is a view corresponding with fig. 1 of the drilling rig during underbalanced
operation, thus when an underbalanced pressure ratio prevails in the well, and
Fig. 3 is a view corresponding with fig. 1 and 2 of the drilling rig used with a system
of telescopic sluice tubes.
[0039] A drilling rig 1 (fig. 1) which is erected at a drilling location DL comprises a
mast 2 which is placed eccentrically in the shown embodiment, so adjacently instead
of directly above a well 3 (of which only the upper part is shown here). This mast
2 is placed on a support or substructure 4 around well 3. Connected to mast 2 are
carrying means, here in the form of three carriers 5, 6 and 7, of which the lower
carrier 7 is releasable (and not shown in this figure). Carriers 5, 6, 7, which are
suspended directly above well 3 (as indicated schematically with a dot-dash line)
are movable independently of each other in height direction along mast 2. Further
suspended from the mast is a platform 8 which is likewise displaceable in height direction.
A cabin 9 is situated on this platform 8 on which operatives P can take position.
[0040] The upper carrier 5 is provided with means 17 (shown schematically here) for rotatingly
driving drill pipes to be fastened thereto (not shown here), in the form of a so-called
top drive. The middle carrier 6 is also provided with means (not shown here) for rotatingly
driving the drill pipes, in this case in the form of a rotary table.
[0041] Also disposed at the drilling location DL is a supply device 10 with which drill
pipes 29, which are stored lying on racks in the vicinity of drilling rig 1, can be
carried to drilling rig 1 and raised. This supply device 10 is provided here with
an arm 11 which has an engaging member 30 movable therealong which picks up drill
pipes 29. By raising the arm 11 and simultaneously rotating engaging member 30 the
drill pipe 29 is carried from the lying position to a vertical position at a determined
position above platform 8, where drill pipe 29 is then placed. Arm 11 with engaging
member 30 then returns to its starting position.
[0042] Well 3 is provided on the top side with a system 12 of blowout preventers, a so-called
BOP stack. In the shown embodiment, wherein the pressure in well 3 is greater than
the pressure in the formation in which drilling takes place and there is therefore
an overbalanced pressure ratio, the valve system 12 is opened. In the shown embodiment
this valve system 12 is formed by two ram BOPs 13, 14 and an annular BOP 15, while
a further conduit 16 for drill fluid is connected to the underside of valve system
12.
[0043] Drilling rig 1 is used as follows in this configuration. Supply device 10 feeds one
drill pipe at a time which is parked at a position assigned therefor on platform 8.
Here the drill pipe is taken over by upper carrier 5 which for this purpose is first
displaced along mast 2 to its lowest position 5'. The first carrier 5 is then moved
upward, while the drill pipe is moved from its parked position to a position directly
above well 3. The drill head (not shown here) is for instance first coupled to the
bottom side of the first drill pipe, whereafter each subsequently supplied drill pipe
is screwed onto the preceding one.
[0044] Once the drill pipe has thus been connected to either the drill head or the preceding
drill pipe, the upper carrier 5 is moved downward in controlled manner along mast
2. The drill pipe herein descends into well 3 through an opening in middle carrier
6 and through the normally opened valve system 12. The speed at which upper carrier
5 lowers the drill pipe into well 3 depends on the conditions in well 3. Simultaneously
with lowering thereof, the drill pipe - and with it the whole drill string suspended
thereunder - can be set into rotation by top drive 17. Due to the combination of the
weight of the drill string and the rotational movement thereof the drill head cuts
into the bottom of well 3, which is thereby deepened still further.
[0045] When upper carrier 5 has reached its lowest position 5', top drive 17 can be stopped
and the drill pipe is engaged by middle carrier 6, or optionally lower carrier 7,
which are provided for this purpose with engaging means (not shown here). Top drive
17 is then disconnected from the drill pipe which is then situated roughly at the
position of platform 8. Upper carrier 5 then takes over a subsequent drill pipe from
supply device 10 and moves upward in order to resume drilling.
[0046] When drilling is ended or interrupted, for instance in order to change the drilling
head, the above described operations are performed in reverse sequence. The drill
string is then lifted by upper carrier 5 per length of the drill pipes out of well
3 and held fast by middle carrier 6, whereafter the uppermost drill pipe is in each
case removed and stored.
[0047] Should a situation occur during the drilling process in which the formation pressure
in well 3 becomes greater than the hydrostatic pressure of the liquid column therein,
and should it be desirable to allow this situation to persist, the pressure ratio
in well 3 therefore becomes underbalanced. In that case the drilling process can be
interrupted and, by making determined modifications, the drilling rig and the assembly
12 of blowout preventers can be made suitable for this new operating situation. Use
is made for this purpose of the fact that the carrying means of drilling rig 1 according
to the invention are adapted not only to exert pulling or lifting forces, but also
provide the option of exerting pressing forces on the drill pipes.
[0048] The configuration of drilling rig 1 is then first modified by suspending the lower
carrier 7 from mast 2 (fig. 2). This carrier 7 is mounted at a suitable height on
mast 2 at the position of the top of valve system 12. This valve system 12 is usually
first expanded, compared to the normal operating state of drilling rig 1, by adding
one or more additional valves 18, 19, 20 which play a part in the controlled passage
of drill pipes. Compared to the previous situation, valve system 12 is here further
expanded with a bypass conduit 23 for drill fluid around the annular valve 15.
[0049] Due to the higher position of valve system 12 the lower carrier 7 thus comes to lie
higher above the ground G than the middle carrier 6 during normal use of drilling
rig 1 when the valve system 12 comprises fewer valves. The fact that the height of
lower carrier 7 can be adjusted is an advantage compared to conventional drilling
rigs, where the rig floor is placed at a fixed height above the ground and the space
below it is not usually sufficient for placing of the required additional blowout
preventers and hydraulic workover unit. In conventional drilling rigs a part of this
equipment must therefore be placed above the rig floor, which in turn has consequences
for the normal operating process of the drilling rig. (Under these conditions the
actual drilling rig can usually no longer be used at all, and all further operations
are carried out using the hydraulic workover unit.)
[0050] Before the drill pipes can be pressed again into well 3 in this operating situation,
lower carrier 7 is first connected to valve system 12. This carrier 7 is provided
for this purpose with flexible, pressure-tight connecting means (not shown here).
Due to the flexibility of these connecting means the well is disconnected mechanically
from the drilling rig. Loads occurring in drilling rig 1 during operations under pressure
are thus not transmitted into well 3, but are absorbed instead in the construction
of carriers 6, 7 and mast 2. These loads are eventually transmitted directly from
mast 2 to support 4 and the ground G.
[0051] For the purpose of pressing drill pipes into the underbalanced well 3 use is made
according to the invention of the middle and lower carriers 6, 7. Upper carrier 5
plays no part in this operation and remains free for use in other operations, such
as supplying or removing drill pipes in co-action with supply device 10, rotating
the drill pipes and the like. Drilling rig 1 can hereby also be used in the normal
manner in this situation, so that no different procedures, with the associated safety
hazards, need be introduced. It is therefore also possible to continue working efficiently
and, above all, safely in this operating situation.
[0052] As stated, lower carrier 7 is fixed to mast 2 once it has been brought to the desired
height. Middle carrier 6 then performs all movements necessary for the process. In
order to enable the drill pipes to be pressed through the valve system 12 into the
well counter to the formation pressure, the middle and lower carriers 6, 7 are first
provided with holding elements or slips 21, 22 which engage on the outer side of the
drill pipes, and the diameter of which can be adjusted to that of the relevant drill
pipe.
[0053] When a drill pipe is clamped between the middle and lower carriers 6, 7, the diameter
of holding element 22 on lower carrier 7 is first enlarged so that the drill pipe
can move freely therein. Middle carrier 6 is then moved downward so that the drill
pipe is pressed through lower carrier 7 and through the valve system 12. Once the
drill pipe has been pressed far enough downward, holding element 22 is tightened so
that the drill pipe is fixed by the lower carrier. Holding element 21 on middle carrier
6 is then released so that the drill pipe can move freely therein, whereafter middle
carrier 6 is moved upward again so as to engage this or a subsequent drill pipe at
a higher point. By thus alternately tightening and loosening holding elements 21,
22 synchronously with displacements of middle carrier 6, the drill pipes are as it
were passed between carriers 6, 7.
[0054] A similar method as specified above is applied when drilling rig 1 is used to introduce
drill pipes of differing cross-sectional form or other components into the underbalanced
well 3 using a system 24 of telescopic sluice tubes or TDT (fig. 3). In this case
the bottom side of an outer stationary tube 25 is fastened to lower carrier 7 while
the inner tube 26 is fastened with its top side to middle carrier 6. While the lower
carrier 7 thus holds fast the TDT and transfers forces that occur into mast 2, the
middle carrier 6 moves up and downward synchronously with opening and closing of valves
27, 28 of the TDT in order to sluice drill pipes and other components through the
TDT into well 3. It is also the case here that upper carrier 5 is left free to carry
out other operations.
[0055] Using the new drilling rig design according to the invention different operations
occurring during a drilling process can thus be performed, wherein at least in respect
of the procedures carried out above ground no distinction need be made between drilling
in an overbalanced well and operation in an underbalanced well. It is also possible
to dispense with the use of separate equipment and external staff, which results in
considerable savings.
[0056] Although the invention has been elucidated above on the basis of an embodiment, it
will be apparent that it is not limited thereto. All described and shown components
of the drilling rig can thus be varied in form, dimensions and number. The different
new aspects of the described method and drilling rig can also be used in all manner
of combinations, even together with elements of conventional methods or drilling rigs,
while retaining the associated advantages.
[0057] The scope of the invention is therefore defined solely by the following claims.
1. Drifting rig (1), comprising:
- a mast (2) to be placed above or close to a well (3); and
- means connected to the mast (2) for carrying drill pipes (29) to be lowered into
the well (3);
- carrying means comprising at least three carriers (5,6,7) which are connected at
different heights to the mast (2)
characterised in that: the at least three carriers (5,6,7) are displaceable in height direction along the
mast (2) and are adapted to exert a pulling force or a pressing force as required
on the drill pipes (29).
2. Drilling rig as claimed in claim 1, characterized in that at least the upper carrier (5) has means (17) for rotatingly driving the drill pipes
(29).
3. Drilling rig (1) as claimed in claim 2, characterized in that the rotating drive means (17) of the upper carrier (5) are formed by a so-called
top drive.
4. Drilling rig as claimed in any of the foregoing claims, characterized in that the carriers are adapted to co-act during a drilling operation when the well is (over)balanced,
wherein the upper carrier is adapted to lower drill pipes in a downward movement into
the well, and the middle or lower carrier is adapted to take over and hold the drill
pipes fixedly at the end of the downward movement.
5. Drilling rig as claimed in any of the foregoing claims, characterized in that the lower carrier is connected releasably to the mast.
6. Drilling rig as claimed in claim 5, characterized in that the lower carrier has flexible means for connecting thereof to a blowout preventer
placed on the well.
7. Drilling rig as claimed in claim 6, characterized in that the middle and lower carrier are adapted to co-act during an operation when underbalancing
prevails in the well, wherein the middle carrier is adapted to urged components in
a downward stroke into the well, and the lower carrier remains in place and is adapted
to hold the components fast and to transfer forces that occur into the mast.
8. Drilling rig as claimed in any of the foregoing claims, characterized by at least one platform connected to the mast and displaceable therealong in height
direction.
9. Drilling rig as claimed in claim 8, characterized in that the platform is connected to one of the carriers.
10. Drilling rig as claimed in any of the foregoing claims, characterized by a device for supplying drill pipes which co-acts with the carrying means.
11. Drilling rig as claimed in claim 10, characterized in that the supply device has means for raising the drill pipes from a lying position and
transferring them to the carrying means.
12. Method for introducing one or more drill pipes (29) into an underbalanced well (3)
while making use of a drilling rig (1) as claimed in any of the foregoing claims,
comprising of suspending the drill pipe(s) (29) from the carrying means and urging
the pipe(s) (29) downward into the well (3) while exerting a pressing force.
13. Method as claimed in claim 12, characterized in that the lower carrier (7) is connected in flexible manner to a blowout preventer (12)
placed on the well (3) and fixed to the mast (2) prior to urging of the drill pipe(s)
(29) into the well (3).
14. Method as claimed in claim 13, characterized in that the middle carrier (6) urges the drill pipe(s) (29) in a downward stroke into the
well (3) and the lower carrier (7) remains in place, holds the drill pipe(s) (29)
fast and transfers forces which occur into the mast (2).
15. Method as claimed in claim 14, characterized in that between the middle and lower carrier there is arranged a system of telescopic sluice
tubes, of which a stationary outer sluice tube is fixed to the lower carrier and an
inner sluice tube is fixed to the middle carrier and moved thereby.
16. Method as claimed in any of the claims 12-15, characterized in that the drill pipe(s) are picked up and presented to the middle carrier by the upper
carrier.
17. Method as claimed in any of the claims 12-16, characterized in that the drill pipe(s) are driven rotatingly by the upper carrier.
1. Bohrgestell (1) mit:
- einem Mast (2) zum Platzieren oberhalb oder in der Nähe von einem Bohrloch (3);
und
- Mitteln, die mit dem Mast (2) verbunden sind, um in das Bohrloch (3) abzusenkende
Bohrrohre zu tragen;
- wobei die Trägermittel wenigstens drei Träger (5, 6, 7) aufweisen, die in unterschiedlichen
Höhen mit dem Mast (2) verbunden sind;
dadurch gekennzeichnet, dass wenigstens drei Träger (5, 6, 7) entlang dem Mast (2) in der Höhe verschiebbar sind
und auf die Bohrrohre (29) wie erforderlich eine Zugkraft oder eine Druckkraft ausüben
können.
2. Bohrgestell nach Anspruch 1, dadurch gekennzeichnet, dass wenigstens der obere Träger (5) Mittel (17) für den Drehantrieb der Bohrrohre (29)
hat.
3. Bohrgestell (1) nach Anspruch 2, dadurch gekennzeichnet, dass die Drehantriebsmittel (17) des oberen Trägers (5) durch einen sogenannten Oberantrieb
gebildet sind.
4. Bohrgestell nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Träger während eines Bohrvorganges zusammenwirken können, wenn das Bohrloch (über-)
druckentlastet ist, wobei der obere Träger Bohrrohre in einer Abwärtsbewegung in das
Bohrloch absenken kann, und der mittlere oder untere Träger übernehmen kann und die
Bohrrohre am Ende der Abwärtsbewegung fixiert halten kann.
5. Bohrgestell nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass der untere Träger mit dem Mast lösbar verbunden ist.
6. Bohrgestell nach Anspruch 5, dadurch gekennzeichnet, dass der untere Träger flexible Mittel zum Anschließen desselben an eine auf dem Bohrloch
platzierte Bohrlochabsperrungsvorrichtung aufweist.
7. Bohrgestell nach Anspruch 6, dadurch gekennzeichnet, dass der mittlere und untere Träger während eines Betriebes, bei dem im Bohrloch ein Unterdruck
vorherrscht, zusammenwirken können, wobei der mittlere Träger in einem Abwärtshub
in das Bohrloch an gezwängte Komponenten angepasst ist, und der untere Träger an Ort
und Stelle bleibt und so ausgebildet ist, dass er die Komponenten festhält und auftretende
Kräfte auf den Mast überträgt.
8. Bohrgestell nach einem der vorstehenden Ansprüche, gekennzeichnet durch wenigstens eine Plattform, die mit dem Mast verbunden ist und entlang diesem höhenverschiebbar
ist.
9. Bohrgestell nach Anspruch 8, dadurch gekennzeichnet, dass die Plattform mit einem der Träger verbunden ist.
10. Bohrgestell nach einem der vorstehenden Ansprüchen, gekennzeichnet durch eine Vorrichtung zum Zuführen von Bohrrohren, die mit den Trägermitteln zusammen
wirkt.
11. Bohrgestell nach Anspruch 10, dadurch gekennzeichnet, dass die Zuführvorrichtung Mittel zum Anheben der Bohrrohre aus einer liegenden Position
und Transferieren derselben auf die Trägermittel aufweist.
12. Verfahren zum Einführen von einem oder mehreren Bohrrohr(en) (29) in ein Unterdruck-Bohrloch
(3) unter Verwendung eines Bohrgestells (1) wie nach einem der vorstehenden Ansprüche
beansprucht, mit Anhängen des oder der Bohrrohre(s) (29) an die Tragmittel und Zwängen
des oder der Rohre(s) (29) in das Bohrloch (3) unter Ausüben einer Druckkraft.
13. Verfahren nach Anspruch 12, dadurch gekennzeichnet, dass der untere Träger (7) vor dem Zwängen des oder der Bohrrohre(s) (29) in das Bohrloch
(3) mit einer auf dem Bohrloch (3) platzierten Bohrlochabsperrungsvorrichtung (12)
flexibel verbunden wird und an dem Mast (2) fixiert wird.
14. Verfahren nach Anspruch 13, dadurch gekennzeichnet, dass der mittlere Träger (6) das oder die Bohrrohr(e) (29) in einem Abwärtshub in das
Bohrloch (3) zwängt und der untere Träger (7) an Ort und Stelle bleibt, das oder die
Bohrrohr(e) (29) festhält und auftretende Kräfte auf den Mast (2) überträgt.
15. Verfahren nach Anspruch 14, dadurch gekennzeichnet, dass zwischen dem mittleren und unteren Träger ein System aus teleskopartigen Gerinnerohren
angeordnet wird, wobei ein stationäres äußeres Gerinnerohr an dem unteren Träger und
ein inneres Gerinnerohr an dem mittleren Träger befestigt wird und dadurch bewegt wird.
16. Verfahren nach einem der Ansprüche 12 bis 15, dadurch gekennzeichnet, dass das oder die Bohrrohr(e) durch den oberen Träger aufgenommen und zum mittleren Träger
gebracht werden.
17. Verfahren nach einem der Ansprüche 12 bis 16, dadurch gekennzeichnet, dass das oder die Bohrrohr(e) durch den oberen Träger drehend angetrieben werden.
1. Installation de forage (1), comprenant :
- un mât (2) destiné à être placé par-dessus ou près d'un puits (3) ; et
- des moyens reliés au mât (2) pour supporter des tiges de forage (29) destinées à
être baissées dans le puits (3) ;
- des moyens de support comprenant au moins trois dispositifs de support (5, 6, 7)
qui sont reliés à des hauteurs différentes au mât (2)
caractérisée en ce que les au moins trois dispositifs de support (5, 6, 7) sont déplaçables dans le sens
de la hauteur le long du mât (2) et sont adaptés pour exercer une force de traction
ou une force de compression selon les besoins sur les tiges de forage (29).
2. Installation de forage selon la revendication 1, caractérisée en ce qu'au moins le dispositif de support supérieur (5) possède des moyens (17) destinés à
entraîner les tiges de forage (29) de façon rotative.
3. Installation de forage (1) selon la revendication 2, caractérisée en ce que les moyens d'entraînement rotatifs (17) du dispositif de support supérieur (5) sont
formés par un entraînement dit par le haut.
4. Installation de forage selon l'une quelconque des revendications précédentes, caractérisée en ce que les dispositifs de support sont adaptés pour agir conjointement au cours d'une opération
de forage lorsque le puits est (sur)équilibré, dans laquelle le dispositif de support
supérieur est adapté pour baisser des tiges de forage dans un mouvement descendant
dans le puits, et le dispositif de support médian ou inférieur est adapté pour prendre
et retenir les tiges de forage de façon fixe à la fin du mouvement descendant.
5. Installation de forage selon l'une quelconque des revendications précédentes, caractérisée en ce que le dispositif de support inférieur est relié au mât de façon libérable.
6. Installation de forage selon la revendication 5, caractérisée en ce que le dispositif de support inférieur possède des moyens flexibles pour la liaison de
celui-ci à un obturateur anti-éruption placé sur le puits.
7. Installation de forage selon la revendication 6, caractérisée en ce que les dispositifs de support médian et inférieur sont adaptés pour agir conjointement
au cours d'une opération lorsqu'un sous-équilibrage prédomine dans le puits, dans
laquelle le dispositif de support médian est adapté pour pousser des composants dans
une course descendante dans le puits, et le dispositif de support inférieur reste
en place et est adapté pour retenir les composants solidement et pour transférer des
forces qui se produisent dans le mât.
8. Installation de forage selon l'une quelconque des revendications précédentes, caractérisée par au moins une plate-forme reliée au mât et déplaçable le long de celui-ci dans le
sens de la hauteur.
9. Installation de forage selon la revendication 8, caractérisée en ce que la plate-forme est reliée à un des dispositifs de support.
10. Installation de forage selon l'une quelconque des revendications précédentes, caractérisée par un dispositif destiné à distribuer des tiges de forage qui agit conjointement aux
moyens de support.
11. Installation de forage selon la revendication 10, caractérisée en ce que dispositif de distribution possède des moyens destinés à lever les tiges de forage
à partir d'une position allongée et les transférer aux moyens de support.
12. Procédé destiné à introduire une ou plusieurs tiges de forage (2g) dans un puits sous
équilibré (3) tout en utilisant une installation de forage (1) selon l'une quelconque
des revendications précédentes, consistant à suspendre le ou les tuyau(x) de forage
(2g) à partir des moyens de support et pousser la ou les tige(s) (2g) vers le bas
dans le puits (3) tout en exerçant une force de compression.
13. Procédé selon la revendication 12, caractérisé en ce que le dispositif de support inférieur (7) est relié de manière flexible à un obturateur
anti-éruption (12) placé sur le puits (3) et fixé au mât (2) avant de pousser le ou
les tuyau(x) de forage (2g) dans le puits (3).
14. Procédé selon la revendication 13, caractérisé en ce que le dispositif de support médian (6) pousse le ou les tuyau(x) de forage (2g) dans
une course descendante dans le puits (3) et le dispositif de support inférieur (7)
reste en place, retient le ou les tuyau(x) de forage (2g) solidement et transfère
des forces qui se produisent dans le mât (2).
15. Procédé selon la revendication 14, caractérisé en ce qu'entre les dispositifs de support médian et inférieur est agencé un système télescopique
de tubes de vidange, dont un tube de vidange extérieur stationnaire est fixé au dispositif
de support inférieur et un tube de vidange intérieur est fixé au dispositif de support
médian et déplacé par celui-ci.
16. Procédé selon l'une quelconque des revendications 12 à 15, caractérisé en ce que le ou les tuyau(x) de forage sont pris et présentés au dispositif de support médian
par le dispositif de support supérieur.
17. Procédé selon l'une quelconque des revendications 12 à 16, caractérisé en ce que le ou les tuyau(x) de forage sont entraînés de façon rotative par le dispositif de
support supérieur.