[0001] This invention relates to a method of installing a pumped trap, in particular for
fixing to a screed covered floor and to which a water resistant floor covering material
can be clamped.
[0002] Recently, the use of 'wet-floor' type floor coverings has grown in popularity. These
typically make use of Altro
™, or some other type of stiff plastics material, which can be cold welded to provide
a seamless and water-resistant floor covering.
[0003] This type of flooring is especially useful in bathrooms for the disabled, invalid
or infirm who are largely unable to negotiate stepping into and out of a bath or shower
tray. By having a water resistant floor covering laid in the bathroom, a shower chair
or wheelchair can simply be placed beneath the shower head, and showering can commence
without being overly concerned with splash or spray. To enable suitable draining,
the water resistant floor covering is provided with a fall that acts to channel the
run-off water to a drain formed in the flooring.
[0004] A problem associated with the installation of a seamless water resistant floor covering
occurs when attempting to accommodate a suitable trap for drainage within the existing
floor. Often, a trap requires a relatively significant depth of floor to enable installation,
and an opening has to be formed in the floor in which the trap can be positioned.
The formation of an opening can often be troublesome, especially when the floor is
concrete. If the floor is screed covered, the opening has to be formed in both the
screed and the concrete floor.
[0005] A further difficulty arises during installation as often a former is laid by which
a fall is generated running towards the trap. The former has to be suitably supported
and its edges have to be coplanar with the rest of the floor to provide a level-entry
type access. The use of a former increases costs and its installation involves it
being recessed into the floor, which is troublesome with any type of flooring. If
a screed covered concrete floor is present, screed has to be removed and then re-formed
around the former.
[0006] It is known from
US6085779A to provide a draining gutter which is adapted to be placed in a floor space insides
a building. The draining gutter is utilised as an exhaust air means and a fan is included
to promote ventilation through the pipework, thereby inhibiting the growth of bacteria,
mould and fungus. However, pumped drainage is not provided.
[0007] DE3627807 discloses a gravity waste trap embedded in a concrete slab. No pumped waste is suggested.
[0008] FR8003798 concerns sewerage pumping, and discloses a pump located in a well located below the
foul water inlet pipe.
[0009] FR8100659 suggests an oderless siphon. The siphon fails if the liquid supply is interrupted.
The present invention is intended for wet-floor installations in shower rooms, and
this arrangement is thus unsuitable.
[0010] EP-A-620331 discloses a pump which is located below the waste of a step-in shower tray. This
is unsuitable for wet-floor applications in concrete.
[0011] GB-A-2310374 suggests an exposed suction device which draws waste water vertically upwards from
within a shallow sump. This arrangement is impractial for recessing in concrete, and
does not relate to wet-floor areas.
[0012] DE2714626 relates to overcoming back-pressure at sewer drains with shallow falls. A pump is
suggested to prevent backing up during high flow periods. This arrangement does not
relate to wet-floor shower room applications.
[0013] The present invention seeks to overcome the problem of installing a trap in or on
a screed covered concrete floor.
[0014] According to the present invention, there is provided a method for installing a pumped
trap in a floor which includes a screed covering and to which a water resistant floor
covering material can be attached. The trap comprises a sump, a waste water inlet
through which waste water enters the sump, a waste water outlet. Furthermore, a pump
is provided for drawing at least a portion of the said waste water from the sump through
the waste water outlet. The trap further comprises means for securing the floor covering
material to the sump, and one or more fixing elements by which the sump, in use, can
be secured to the floor.
[0015] The claimed method for installing the pumped trap in a floor having a screed covering,
comprises the steps of:
- a) removing screed to a depth sufficient to receive the pumped trap,
- b) installing the pumped trap in the opening created by the removal of the screed
in step (a), and
- c) re-forming the screed covering to include a fall forwards the trap (10).
[0016] Preferable and/or optional features of the present invention are set out in claims
2 to 7, inclusive.
[0017] The invention will now be more particularly described, by way of example, with reference
to the accompanying drawings, wherein :
Figure 1 is a perspective view from above of one embodiment of a pumped trap, used
in accordance with the present invention;
Figure 2 is an exploded perspective view of the pumped trap shown in Figure 1;
Figure 3 is a side sectional view of the pumped trap shown in Figure 1;
Figure 4 is a perspective view from beneath of the pumped trap shown in Figure 1;
and
Figure 5 is a side sectional view of the pumped trap shown in Figure 1, when in use.
[0018] Referring to the drawings, a pumped trap 10, which is typically injection moulded
from plastics material, is shown therein and comprises a sump 12, a waste water inlet
14, a waste water outlet 16, a pump (not shown), means for securing a water resistant
floor covering material to the trap 10, and a fixing element 20.
[0019] The sump 12 has a stepped profile which includes a skirt 22 that extends from the
top edge 24 of the stepped profile to a level which is below the internal bottom surface
26 of the sump 12. The fixing element 20 is in the form of an annular flange 28 which
is integrally formed on the bottom edge 30 of the skirt 22 and which extends outwardly
at a level which is also below the internal bottom surface 26 of the sump 12.
[0020] The annular flange 28 includes one or more openings 32 through which fixing, typically
screw-threaded, devices 29 (shown in Figure 5) can be inserted.
[0021] The sump 12 may also include one or more supporting elements 33 (shown in Figure
4) formed on or adjacent to the bottom surface 26 of the sump 12. The supporting elements
33 in use contact a supporting surface on which the trap 10 is mounted and aid in
maintaining the structural integrity of the trap 10 when subjected to a downward force,
such as that imparted by a person standing on the trap 10.
[0022] The waste water outlet 16 is, typically integrally, formed in a side of the sump
12. This enables the depth of the sump 12 to be reduced. The waste water outlet 16
has an opening 34 (shown in Figure 3) therethrough and is dimensioned to be engagable
with a discharge pipe 17, typically as an interference fit. A suitable adhesive may
be used to secure the discharge pipe 17 to the waste water outlet 16. The discharge
pipe 17 leads to the pump and may be flexible to aid installation.
[0023] The securing means is typically in the form of a clamp element 18 which, in use,
seats on a horizontal surface 36 of one of the steps of the stepped profile of the
sump 12. The horizontal surface 36 is above the bottom surface 26 of the sump 12.
The clamp element 18 is annular and has an upwardly inclined peripheral edge 38 which
lies in parallel or substantially in parallel with the inner surface of the skirt
22 of the sump 12. The clamp element 18 also includes an opening 40 which forms part
of the waste water inlet 14, and apertures 42 through which fastening, typically screw-threaded,
devices 44 can be used to mechanically secure the clamp element 18 with the sump 12.
[0024] The securing means could take the form of a suitable adhesive instead of the clamp
element 18. However, in use, the clamp element 18 tends to provide a more positive
fixing.
[0025] The pumped trap 10 further includes a removable cap 46 which is received within the
clamp element 18 and the sump 12 so that the internal bottom surface 26 of the sump
12 is covered or substantially covered. The cap 46 includes a plurality of apertures
48 which, along with the opening 40 of the clamp element 18, serve to define the waste
water inlet 14. The cap 46 also includes one or more apertures 50 through which respective
fastening, typically screw-threaded, device 52 can be inserted to secure the cap 46
to the sump 12.
[0026] To install the pumped trap 10 on or in a screed covered concrete floor, it is first
decided where the trap 10 should be positioned. The screed at, and in the vicinity
of, this position is then removed to a depth sufficient to receive the trap 10 to
a level which is below the top surface 54 (see Figure 5) of the pre-existing screed
covering 56. Typically, this will entail removing the screed 56 to the level of the
concrete floor 58 on which the screed 56 is laid. However, if the screed covering
56 is of insufficient depth, a recess (not shown) may also have to be formed in the
concrete of the concrete floor 58.
[0027] The trap 10 is then positioned within the generated opening and the fixing devices
are inserted through the openings 32 in the fixing element 20 and into the concrete
floor or the material supporting the trap 10, thereby fixing the trap 10 in place.
[0028] The discharge pipe, connected to the waste water outlet 18, is also positioned within
the opening generated by the removed screed, and is connected to the pump which is
typically at a position remote from the trap 10.
[0029] The screed covering, indicated at 60, is then re-formed in the opening. During the
re-forming, a fall is included towards the trap 10.
[0030] Stiff plastics water resistant material (not shown), typically being for example
Altro™, can then be laid over the screed covered floor. The water resistant material
is mechanically clamped between the sump 12 and the clamp element 18 by use of the
clamp element's fastening devices 44, and cold welded around the edges of the existing
floor to create a seamless covering.
[0031] The pump of the trap 10 operates to draw at least a portion of waste water, which
enters the sump 12 through the waste water inlet 14, through the opening 34 of the
waste water outlet 16 and along the discharge pipe 17 to a drain (not shown). The
pump or the discharge pipe 17 typically includes a non-return valve (not shown) to
prevent odours backing up through the waste water outlet 16, and the operation of
the pump is linked to the operation of, for example, a shower which is to be used
in conjunction with the water resistant floor covering.
[0032] The end of the waste water outlet 16 which opens into the sump 12 may also include
a partitioning element (not shown), which opens into the sump 12 at a level which
is below a level of waste water held in the sump 12. This also aids in the prevention
of odours.
[0033] In a modification to the embodiment, the fixing element 20 could be formed at a position
which is at the top edge 24 of the sump 12 and/or intermediate the top edge 24 and
the bottom internal surface 26. However, as will be apparent, one or more suitable
supporting elements (not shown), such as a spacer, may be required between the fixing
element 20 and the floor to provide stability.
[0034] In a further modification to the embodiment, the supporting elements 33 could be
removed, thereby enabling the bottom surface 26 of the sump 12 to be formed coplanar
or substantially coplanar with the fixing element 20.
[0035] It should be realised that the fixing element is not limited to an annular flange
28. The fixing element could also be formed projecting from the external bottom surface
27 of the sump 12, and may not require fixing devices as the re-forming of the screed
could be used to cover the fixing element and thereby hold the pumped trap in place.
[0036] A pumped trap can therefore be provided which, by the shallow depth of its sump,
can be installed within the level of screed covering a concrete floor, and which can
be fixed in place at a level which is at or below the level of the internal bottom
surface of its sump. It is also possible to generate the fall towards the installed
trap without the need for a former.
[0037] The embodiments described above are given by way of example only and various modifications
will be apparent to persons skilled in the art without departing from the scope of
the invention as defined in the appended claims.
1. A method of installing a pumped trap in a floor having a screed covering and to which
a water resistant floor covering material is attached, the method comprising the steps
of:
a) removing screed (56) to a depth sufficient to receive a pumped trap (10), the pumped
trap comprising a sump (12), a waste water inlet (14) through which water enters the
sump (12), a waste water outlet (16), means for securing the water resistant floor
covering material to the trap (10) and one or more fixing elements (20) by which the
trap (10) in use can be secured to the floor, the pumped trap being connected to a
pump for drawing at least a portion of the said waste water from the sump (12) through
the waste water outlet (16);
b) installing the pumped trap (10) in the opening created by the removal of the screed
(56) in step (a);
c) re-forming the screed covering to include a fall towards the trap (10).
2. A method as claimed in claim 1, wherein the depth of screed (56) removed in step (a)
is sufficient to receive the sump (12) to a level which is below the top surface (54)
of the pre-existing screed covering (56).
3. A method as claimed in claim 2, further comprising a step (d) between steps (a) and
(b) of forming a recess in the floor below the screed (56) to enable the pumped trap
(10) to be received to said level.
4. A method as claimed in any one of claims 1 to 3 further comprising a step (e) subsequent
to step (c) of laying a water resistant floor covering material over the screed (56,
60) and securing it to the sump (12) of the pumped trap (10) via the securing means.
5. A method as claimed in claim 4, wherein step (e) involves use of a clamp element (18)
by which the floor covering material can be clamped to the trap (10).
6. A method as claimed in any one of the preceding claims, further comprising attaching
a removable cap (46) which substantially covers the sump (12).
7. A method as claimed in claim 6, further comprising securing the removable cap (46)
in use, to the sump (12).
1. Verfahren zum Installieren eines Ablaufs mit Pumpe in einem Boden, der einen Estrichbelag
aufweist, und auf dem ein wasserbeständiges Fußbodenbelagmaterial angebracht ist,
wobei das Verfahren die folgenden Schritte aufweist:
a) Entfernen von Estrich (56) bis zu einer Tiefe, die ausreichend ist, um einen Ablauf
(10) mit Pumpe aufzunehmen, wobei der Ablauf mit Pumpe aufweist: einen Sammelbehälter
(12); einen Abwassereinlass (14), durch den Wasser in den Sammelbehälter (12) eintritt;
einen Abwasserauslass (16); ein Mittel für das Sichern des wasserbeständigen Fußbodenbelagmaterials
am Ablauf (10); und ein oder mehrere Befestigungselemente (20), mittels der der Ablauf
(10) bei Benutzung am Boden gesichert werden kann, wobei der Ablauf mit einer Pumpe
für das Ansaugen von mindestens einem Teil des Abwassers aus dem Sammelbehälter (12)
durch den Abwasserauslass (16) mit einer Pumpe verbunden ist;
b) Installieren des Ablaufs (10) mit Pumpe in der Öffnung, die durch das Entfernen
von Estrich (56) beim Schritt (a) gebildet wurde;
c) erneutes Ausbilden des Estrichbelags, um ein Gefälle in Richtung des Ablaufs (10)
einzuschließen.
2. Verfahren nach Anspruch 1, bei dem die Tiefe des beim Schritt (a) entfernten Estrichs
(56) ausreichend ist, um den Sammelbehälter (12) auf einem Niveau aufzunehmen, das
unterhalb der oberen Fläche (54) des vorher vorhandenen Estrichbelags (56) liegt.
3. Verfahren nach Anspruch 2, das außerdem einen Schritt (d) zwischen den Schritten (a)
und (b) zur Bildung einer Vertiefung im Boden unter dem Estrich (56) aufweist, um
das Aufnehmen des Ablaufs (10) mit Pumpe auf dem Niveau zu ermöglichen.
4. Verfahren nach einem der Ansprüche 1 bis 3, das außerdem einen Schritt (e), anschließend
an den Schritt (c), des Legens eines wasserbeständigen Fußbodenbelagmaterials über
dem Estrich (56, 60) und dessen Sichern am Sammelbehälter (12) des Ablaufs (10) mit
Pumpe mittels der Sicherungsmittel aufweist.
5. Verfahren nach Anspruch 4, bei dem der Schritt (e) die Benutzung eines Klemmelementes
(18) einschließt, mittels dessen das Fußbodenbelagmaterial am Ablauf (10) festgeklemmt
werden kann.
6. Verfahren nach einem der vorhergehenden Ansprüche, das außerdem den Schritt des Befestigens
einer entfernbaren Kappe (46) aufweist, die im Wesentlichen den Sammelbehälter (12)
bedeckt.
7. Verfahren nach Anspruch 6, das außerdem das Sichern der entfernbaren Kappe (46) am
Sammelbehälter (12) bei Benutzung aufweist.
1. Procédé d'installation d'un siphon à pompe dans un plancher comportant une chape de
revêtement, sur laquelle est fixé un matériau de revêtement du sol résistant à l'eau,
le procédé comprenant les étapes ci-dessous :
a) retrait de la chape (56) sur une profondeur suffisante pour recevoir un siphon
à pompe (10), le siphon à pompe comprenant un puisard (12), une entrée des eaux usées
(14), à travers laquelle l'eau rentre dans le puisard (12), une sortie des eaux usées
(16), un moyen pour fixer le matériau de revêtement du sol résistant à l'eau sur le
siphon (10) et un ou plusieurs éléments de fixation (20), permettant de fixer le siphon
(10) en service sur le plancher, le siphon à pompe étant connecté à une pompe destinée
à aspirer au moins une partie desdites eaux usées à partir du puisard (12) à travers
la sortie des eaux usées (16) ;
b) installation du siphon à pompe (10) dans l'ouverture formée par le retrait de la
chape (56) lors de l'étape (a) ;
c) remise en place de la chape de revêtement, de sorte à inclure une chute vers le
siphon (10).
2. Procédé selon la revendication 1, dans lequel la profondeur de la chape (56) retirée
lors de l'étape (a) est suffisante pour recevoir le puisard (12) à un niveau situé
au-dessous de la surface supérieure (54) de la chape de revêtement préexistante (56).
3. Procédé selon la revendication 2, comprenant en outre une étape (d) entre les étapes
(a) et (b), consistant à former un évidement dans le plancher au-dessous de la chape
(56) pour permettre la réception du siphon à pompe (10) à ce niveau.
4. Procédé selon l'une quelconque des revendications 1 à 3, comprenant en outre une étape
(e) après l'étape (c), consistant à poser un matériau de revêtement de sol résistant
à l'eau au-dessus de la chape (56, 60) et à le fixer sur le puisard (12) du siphon
à pompe (10) par l'intermédiaire du moyen de fixation.
5. Procédé selon la revendication 4, dans lequel l'étape (e) englobe l'utilisation d'un
élément de bride de serrage (18) permettant de fixer le matériau de revêtement du
sol sur le siphon (10).
6. Procédé selon l'une quelconque des revendications précédentes, comprenant en outre
l'étape de fixation d'un couvercle amovible (46) recouvrant pratiquement le puisard
(12).
7. Procédé selon la revendication 6, comprenant en outre l'étape de fixation en service
du couvercle amovible (46) sur le puisard (12).