(19) |
 |
|
(11) |
EP 3 059 058 A3 |
(12) |
EUROPEAN PATENT APPLICATION |
(88) |
Date of publication A3: |
|
19.10.2016 Bulletin 2016/42 |
(43) |
Date of publication A2: |
|
24.08.2016 Bulletin 2016/34 |
(22) |
Date of filing: 17.02.2016 |
|
(51) |
International Patent Classification (IPC):
|
|
(84) |
Designated Contracting States: |
|
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL
NO PL PT RO RS SE SI SK SM TR |
|
Designated Extension States: |
|
BA ME |
|
Designated Validation States: |
|
MA MD |
(30) |
Priority: |
18.02.2015 UA 201501381
|
(71) |
Applicant: Ganzha, Vitalii V. |
|
03169 Kylv (UA) |
|
(72) |
Inventor: |
|
- GANZHA, Vitalii V.
03169 Kyiv (UA)
|
(74) |
Representative: Jeck, Anton |
|
Klingengasse 2 71665 Vaihingen/Enz 71665 Vaihingen/Enz (DE) |
|
|
|
(54) |
METHOD FOR MANUFACTURING A STRUCTURAL MODULE WITH A FACADE LAYER AND THE STRUCTURAL
MODULE WITH A FACADE LAYER MANUFACTURED BY THIS METHOD |
(57) The invention relates to a construction sector, in particular, to a method of manufacturing
a structural module with a heat-insulating layer and a facade layer formed thereon
which performs protective and decorative functions (i.e. a module fully ready for
use in the construction) and design features of the structural module, thus manufactured.
The method of manufacturing the structural module comprises formation of a bearing
monolithic base followed by formation of the heat-insulating layer, the reinforcing
layer and the facade layer. Firstly, the facade layer is formed by placing a layer
of hydrophobic filler on the bottom of the mold, placing an adhesive mixture, the
reinforcing layer, the heat-insulating layer and bearing base thereon and the adhesive
mixture is then allowed to polymerize. Spreadability of the adhesive mixture is within
7 cm to 70 cm and adhesion of the adhesive mixture to the heat-insulating layer is
at least 0.5 MPa. To fix the heat-insulating layer on the bearing base, a fixing element
is used with a dead end buried in the heat-insulating layer before the bearing base
is formed followed by embedding an operating end of the fixing element in a layer
of the bearing base.
The structural module comprises the bearing monolithic base, the heat-insulating layer,
the reinforcing layer, the facade layer and the fixing element to fix the heat-insulating
layer on the bearing base. The facade layer is formed by pouring a layer of the adhesive
mixture onto the filler layer, and the facade layer is made so to achieve compressive
strength of at least 16 MPa. A dead end of the fixing element is buried in the heat-insulating
layer, while the operating end of the fixing element is embedded in the bearing base.

