BACKGROUND OF THE INVENTION
Field of the Invention
[0001] The present invention relates to a method and apparatus for stable supply of natural
gas to gas demand sides in an LNG carrier. More particularly, the present invention
relates to a method and apparatus that enables an unstable operation of a natural
boil-off gas (NBOG) compressor for fuel supply caused by a low load operation of the
NBOG compressor resulting from generation of a low amount of natural boil-off gas
during ballast voyage of an LNG carrier to be stabilized via operation of a forcing
vaporizer under the situation of the parallel operation of the NBOG compressor and
the forcing vaporizer when supplying natural gas to a gas demand side in the LNG carrier,
and that can achieve stable release of the pressure at an outlet of the vaporizer
with regard to variation in load of the LNG carrier.
Description of the Related Art
[0002] An installation for drawing gas from a tank of liquefied natural gas (LNG) is disclosed
by document
JP 2001 056096.
[0003] A liquefied natural gas (LNG) tanker is typically propelled by one or more steam
turbines. Thus, the tanker is provided with a boiler to generate steam. In laden voyage,
about 50% of fuel is natural boil-off gas supplied from an LNG cargo tank of the tanker.
Since LNG has such a very low boiling point of about -162°C, although it is a small
ratio, continuous evaporation of LNG occurs inevitably within the tanker in spite
of thermal insulation of the cargo tank. Conventionally, some of the fuel required
for the boiler is sufficed by using such natural boil-off gas. The remaining fuel
is supplied from a stock of heavy hydrocarbon liquid fuel, which is also called "bunker
oil."
[0004] To increase the total amount of steam required for propulsion of the tanker, however,
it is necessary for the tanker to have the capability of generating sufficient thermal
energy through the combustion of the natural gas only. For this purpose, the tanker
is additionally provided with a forcing vaporizer, which is a device for supply of
natural gas to a burner associated with the boiler. Furthermore, the tanker is provided
with a compressor to maintain a constant pressure of the gas supplied to the burner.
[0005] As to supply of the natural boil-off gas and forced boil-off gas by the forcing vaporizer
to the burner, there are two well-known methods.
[0006] In one method, the forced boil-off gas and the natural boil-off gas is mixed upstream
of the compressor. For example, as set forth in Korean Utility Model Registration
No. 290726 entitled "Boil-off gas supply system" and Korean Utility Model Registration
No.
410367 entitled "Apparatus for supplying fuel in LNG carrier," natural boil-off gas within
the LNG tank is mixed with forced boil-off gas upstream of the compressor and then
supplied into the compressor.
[0007] In Korean Utility Model Registration No.
290726, gas supplied from a cargo tank 210 to a compressor 212 and a power propulsion apparatus
214 is classified into two kinds, as shown in Fig. 1. One kind of gas is natural boil-off
gas generated through natural vaporization of liquefied gas within the cargo tank
210, and the other is forced boil-off gas generated through forced vaporization thereof.
Both the natural boil-off gas and the forced boil-off gas are cooled to a suitable
temperature range by a gas cooler 216, and supplied to the compressor 212. Here, the
suitable temperature range is about -150 to -130 °C. Then, the gas is compressed in
the compressor 212 and supplied at a suitable discharge pressure to the power propulsion
device 214 through a discharge pipe 219.
[0008] Gas pipes 220 are positioned between the cargo tank 210 and the gas cooler 216 to
form flow paths of the natural boil-off gas and the forced boil-off gas. The gas pipes
220 comprises a natural boil-off gas pipe 220a to deliver the natural boil-off gas
from the cargo tank 210 to the gas cooler 216, a gas return pipe 220b to allow liquefied
gas to be returned to the cargo tank 210 via the gas cooler 216 after being pumped
by a gas pump 211 within the cargo tank 210, and a forced boil-off gas pipe 220c having
one end diverged from an initial segment H of the gas return pipe 220b and the other
end connected to the natural boil-off gas pipe 220a to deliver the forced boil-off
gas from the cargo tank 210 to the gas cooler 216. The forced boil-off gas pipe 220c
is provided with a vaporizer 224, which forcibly converts liquefied gas into a gaseous
state.
[0009] The natural boil-off gas within the cargo tank 210 flows into the natural boil-off
gas pipe 220a. Meanwhile, the liquefied gas having been pumped by the gas pump 211
flows into the gas return pipe 220b and the initial segment H of the forced boil-off
gas pipe 220c.
[0010] Here, when the liquefied gas pumped by the gas pump 211 within the cargo tank 210
is forcibly vaporized through the vaporizer 224, it is mixed with the natural boil-off
gas in the natural boil-off gas pipe 220a and flows together into the gas cooler 216.
However, in the event that the gas pumped by the gas pump 211 is directed from the
initial segment H of the gas return pipe 220b not to the vaporizer 224 but directly
to the gas cooler 216, the gas is returned back to the cargo tank 210.
[0011] However, since this method is focused on temperature control of the gas upstream
and downstream of the compressor and requires simultaneous compression of the forced
boil-off gas and natural boil-off gas, there are shortcomings of large capacities
of the compressor and motor, a complicated control method, and requirement for a mist
separator (or cooler 216) to prevent liquid particles from entering the compressor.
[0012] In order to solve the problems, techniques are proposed by which the forced boil-off
gas and natural boil-off gas are mixed downstream of the compressor. For example,
such techniques are disclosed in Korean Patent Laid-open Nos.
2003-0017423 and
2003-0073975. The invention disclosed in Korean Patent Laid-open No.
2003-0073975 relates to a cargo tank adapted to generate boil-off gas vaporized from LNG stored
therein by heat transferred from an exterior during voyage of an LNG carrier. The
cargo tank comprises: a gas dome 30 positioned on the top of the cargo tank 20 such
that the boil-off gas within the cargo tank 20 is discharged through the gas dome
30; a first low duty compressor 50 connected to the gas dome 30 to raise the pressure
of the boil-off gas; a gas heater 60 connected to the first low duty compressor 50
to raise the temperature of the boil-off gas; a check valve 170 disposed between the
first low duty compressor 50 and the gas heater 60 to prevent a reverse flow of the
boil-off gas; a second low duty compressor 180 for preparation of overhauling and
inspection of the first low duty compressor 50; a constant velocity motor 40 to drive
both the first and second low duty compressors 50 and 180; a boiler 90 connected to
the gas heater 60 to burn the boil-off gas; a main valve 70 disposed between the gas
heater 60 and an engine room 80 where the boiler 90 is positioned; a strip spray pump
100 mounted at a lower portion of the cargo tank 20 to supply LNG for supplementing
gas shortage during combustion operation of the boiler 90; a flow rate control valve
120 into which a portion of LNG discharged by the strip spray pump 100 is transferred
through a pressure control valve 110; a recovery line 130 connected to the pressure
control valve 110 to recover LNG remaining after being transferred into the flow rate
control valve 120 to the cargo tank; a temperature control valve 140 connected to
the flow rate control valve 120; a vaporizer 150 connected to the flow rate control
valve 120 to convert the phase of LNG from a liquid state to a gaseous state; a mixer
160 connected to the vaporizer 150 and temperature control valve 140 to mix LNG in
the liquid state with LNG in the gaseous state within the mixer 160; and a boiler
90 connected to the mixer 160 to burn LNG in the gaseous state.
[0013] Details relating to pressure and temperature in the respective flow paths are shown
in Figs. 1 and 2 of Korean Patent Laid-open No.
2003-0017423.
[0014] The inventors of this invention have found that a stable operation of a natural boil-off
gas (NBOG) compressor cannot be secured in the event where less gas than required
for a minimum load of the NBOG compressor is induced into the NBOG compressor due
to generation of a low amount of natural boil-off gas during ballast voyage of an
LNG carrier, and, in the event where there is great variation in load at a gas demand
side, such as a boiler, in the LNG carrier.
[0015] There is no countermeasure that can solve such problems in the prior art.
SUMMARY OF THE INVENTION
[0016] Therefore, an object of the present invention is to allow gas to be supplied at a
predetermined pressure or more to a gas demand side in an LNG carrier. Another object
of the present invention is to allow an NBOG compressor used for supply of fuel to
the gas demand side in the LNG carrier to be operated at a relatively high load by
suitably maintaining the pressure of a cargo tank, stabilizing the operation of the
compressor.
[0017] In accordance with one aspect of the present invention, there is provided the method
for supplying natural gas at a predetermined pressure or more to a gas demand side
in an LNG carrier according to claim 1.
[0018] The gas demand side may be any one of a boiler, a double-fuel engine, and a gas turbine.
[0019] According to one embodiment, it is necessary for the gas returned to the cargo tank
to have the predetermined pressure or more, and, for this purpose, the forced boil-off
gas or the mixed gas of the forced boil-off gas and natural boil-off gas is controlled
to have the predetermined pressure or more in a variety of ways. For example, the
forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off
gas may have the predetermined pressure or more by the forcing vaporizer. Alternatively,
a separate compressor is used to control the forced boil-off gas or the mixed gas
of the forced boil-off gas and natural boil-off gas to have the predetermined pressure
or more while being returned to the cargo tank or the gas header, if the forced boil-off
gas or the mixed gas of the forced boil-off gas and natural boil-off gas does not
have the predetermined pressure or more.
[0020] Furthermore, the forced boil-off gas may be mixed with the natural boil-off gas upstream
of the compressor. Preferably, the natural boil-off gas is compressed by the compressor,
and the forced boil-off gas is vaporized to have the predetermined pressure or more,
followed by being mixed with the natural boil-off gas compressed by the compressor.
[0021] According to the invention, since the gas having the predetermined pressure or more
is returned to the cargo tank, the natural boil-off gas is maintained at the predetermined
pressure or more within the cargo tank, enabling the compressor to be operated at
a relatively high load, so that the compressor can be operated stably. The pressure
of the gas returned to the cargo tank can be variously changed depending on the pressure
range according to the specification of the compressor. In one example described below,
the natural boil-off gas has an absolute pressure of about 1.06 bars in the cargo
tank and the forced boil-off gas has an absolute pressure of about 1.96 bars.
[0022] In accordance with another aspect of the invention, an apparatus for supplying natural
gas to a gas demand source in an LNG carrier is defined by claim 5.
[0023] The gas demand side may be any one of a boiler, a double-fuel engine, and a gas turbine.
[0024] The forced boil-off gas may be mixed with the natural boil-off gas before or after
compression of the natural boil-off gas. Preferably, the natural boil-off gas is compressed
by the compressor, and the forced boil-off gas is vaporized to have the predetermined
pressure or more and mixed with the natural boil-off gas compressed by the compressor.
[0025] A separate or another compressor may be installed on a pipe, through which the forced
boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas
is returned to the cargo tank or the gas header, to increase the pressure of the forced
boil-off gas returned alone or in a state of being mixed with the natural boil-off
gas to the cargo tank or the gas header if the pressure of the returning gas is less
than or equal to a predetermined value. In the case where the forced boil-off gas
is mixed with the natural boil-off gas downstream of the compressor, since the forced
boil-off gas has the predetermined pressure or more when being mixed therewith downstream
of the compressor, the separate compressor is not necessary.
[0026] The apparatus may further comprise a return pipe connected to downstream of the vaporizer
or to downstream of a pipe joined to the return pipe through which the forced boil-off
gas or the mixed gas of the forced boil-off gas and natural boil-off gas is returned
to the cargo tank, and a control valve on the return pipe to control returning of
the forced boil-off gas or the mixed gas by opening or closing the control valve.
Since the forced boil-off gas or the mixed gas returning to the cargo tank or the
header has the predetermined pressure or more, it is possible to control a returning
amount of the gas only by the opening and closing of the control valve.
BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The above and other objects, features and other advantages of the present invention
will be more clearly understood from the following detailed description taken in conjunction
with the accompanying drawings:
Fig. 1 is a schematic view of a natural gas supply apparatus of Korean Utility Model
Registration No. 290726;
Fig. 2 is a schematic view of a natural gas supply apparatus of Korean Patent Laid-open
No. 2003-73975;
Fig. 3 is a schematic view illustrating an apparatus for supplying natural gas to
a gas demand side in an LNG carrier according to one embodiment of the present invention;
and
Fig. 4 is a schematic view illustrating an apparatus for supplying natural gas to
a gas demand side in an LNG carrier according to another embodiment of the present
invention.
DESCRIPTION OF THE EMBODIMENTS
[0028] Exemplary embodiments will be described in detail with reference to the accompanying
drawings.
[0029] Fig. 3 is a schematic view illustrating an apparatus for supplying natural gas to
a gas demand side in an LNG carrier according to one embodiment of the present invention.
The construction and operation of the apparatus will be described hereinafter.
[0030] An LNG cargo tank 310 is filled with LNG 312 at a lower portion and natural boil-off
gas 313 at an upper portion. The natural boil-off gas 313 generated in the cargo tank
310 is compressed by an NBOG compressor 340 after passing through an exit (dome) at
the top of the cargo tank 310.
[0031] LNG 312 of the storage tank 310 is transferred to the outside of the tank by the
pump 320. Since an amount of LNG is small during ballast voyage of an LNG carrier,
the pump 320 is preferably a strip pump capable of pumping LNG at the bottom of the
cargo tank 310.
[0032] The LNG transferred by the pump 320 is vaporized by a forcing vaporizer 330. Forced
boil-off gas vaporized by the forcing vaporizer 330 is mixed with the natural boil-off
gas compressed by the compressor 340 and is supplied to a gas demand side 350, for
example, boilers, dual-fuel engines, gas turbines, etc.
[0033] Meanwhile, a portion of the forced boil-off gas vaporized by the forcing vaporizer
330 is returned to the cargo tank 310 through a return pipe on which a control valve
332 is disposed.
[0034] The natural boil-off gas 313 is maintained at an absolute pressure of about 1.06
bars in the cargo tank 310 and compressed to have an absolute pressure of about 1.96
bars by the compressor 340. LNG transferred from the cargo tank 310 by the pump 320
is vaporized to have an absolute pressure of about 1.96 bars by the vaporizer 330.
The forced boil-off gas and compressed natural boil-off gas are supplied to the gas
demand side 350 at an absolute pressure of about 1.96 bars.
[0035] Since the forced boil-off gas returning from the forced vaporizer 330 has the absolute
pressure of 1.96 bars and the natural boil-off gas in the cargo tank has the absolute
pressure of about 1.06 bars, a pressure difference between the forced boil-off gas
and the natural boil-off gas enables returning of the forced boil-off gas from the
forcing vaporizer 330 to be easily controlled by opening or closing the control valve
332. With such a control, it is possible to supply the gas having the predetermined
pressure or more required for the gas demand side. Furthermore, even when the gas
demand side 350 permits only pressure variation in a predetermined range and is changed
in quantity of gas demanded, it is possible to supply the gas in a predetermined pressure
range by controlling a return amount of the forced boil-off gas from the forcing vaporizer
330 by the opening or closing of the control valve 332.
[0036] For example, for the double-fuel engine among various gas demand sides, the pressure
must be strictly controlled to be in an allowable pressure range of ±0.2 bars. In
this case, by bypassing the forced boil-off gas supplied from the forcing vaporizer
330 to the return pipe while controlling an open or closed degree of the control valve,
it is possible to supply the gas at the pressure in the predetermined range permitted
at each gas demand side. Such a pressure control can be easily applied or modified
by the person skilled in the art with various sensors equipped in the tanks or to
various pipes of the LNG carrier.
[0037] In Fig. 3, the gas returning to the cargo tank 310 is illustrated as being the forced
boil-off gas with the pressure increased to the predetermined value or more via the
vaporizer 330. However, it is needless to say that mixed gas of the forced boil-off
gas and the natural boil-off gas which is compressed to have the predetermined pressure
or more by the compressor 340 may be returned to the cargo tank.
[0038] Furthermore, although the forced boil-off gas and the natural boil-off gas are illustrated
as being mixed with each other after having a predetermined pressure or more in Fig.
3, the natural boil-off gas may be mixed with the forced boil-off gas prior to compression
by the compressor 340. However, in this case, there are disadvantages in that a mist
drum is required to remove liquid droplets from the forced boil-off gas and that the
capacity of the compressor 340 increases. In order to return the forced boil-off gas
or the mixed gas of the forced boil-off gas and natural boil-off gas having pressure
lower than the predetermined degree, a separate compressor is provided to the returning
pipe with a control valve 332 positioned downstream of the separate compressor.
[0039] In addition, although the forced boil-off gas from the forcing vaporizer 330 is returned
to the cargo tank 310 in the embodiment shown in Fig. 3, the forced boil-off gas from
the forcing vaporizer 330 may be returned to the cargo tank 310 or to a gas header
370 connecting respective cargo tanks to one another other in another embodiment shown
in Fig. 4. If the forced boil-off gas is returned to the gas header 370, the forced
boil-off gas can be directly supplied to a compressor 340 (for example, LD compressor)
connected to the gas header 370 without being returned to the cargo tank 310 such
that the allowable gas pressure for the compressor can be maintained.
[0040] The construction of the invention as described above provides various merits. For
the conventional technique, in the event where less gas than required for the minimum
operation load of the NBOG compressor for fuel supply is induced into the NBOG compressor
due to a low amount of natural boil-off gas during ballast voyage of the LNG carrier,
and, in the event where variation in load of the gas demand side is great, the stable
operation of the NBOG compressor cannot be ensured. In addition, for the conventional
technique, since the NBOG compressor for the fuel supply is operated below the minimum
operation load thereof during the ballast voyage of the LNG carrier, the pressure
of the cargo tank cannot be maintained efficiently. Furthermore, according to the
conventional technique, in the event where there is a rapid variation in load at the
gas demand side while the forcing vaporizer is operated in the ballast voyage or laden
voyage of the LNG carrier, it is likely that pressures at the outlet of the forcing
vaporizer and the inlet of the boiler will increase rapidly. Moreover, according to
the conventional technique, although it is possible to operate the compressor by increasing
the flow rate from the NBOG compressor using a surge control valve of the NBOG compressor,
there occurs a disadvantage in that, as the gas of high temperatures downstream of
the compressor circulates, the temperature of the outlet of the compressor continuously
increases, making it difficult to perform the stable operation of the NBOG compressor.
[0041] In this regard, according to the invention, the return pipe and control valve associated
with the return of gas to the cargo tank during the ballast voyage are provided to
increase the flow rate of gas returning to the cargo tank, so that the NBOG compressor
for the fuel supply can be operated at a relatively high load, enabling stable operation
of the compressor and thus maintaining a suitable pressure of the cargo tank. In addition,
according to the invention, since the forced boil-off gas through the forcing vaporizer
is returned to the cargo tank during the ballast voyage, the pressure of the cargo
tank can be properly maintained through an automatic operation via an additional pipe
for load adjustment even when the NBOG compressor is operated below the minimum operation
load. Furthermore, according to the invention, since the boil-off gas is returned
to the cargo tank, it is possible to smoothly maintain the pressure of the cargo tank
by the automatic operation thereof so as not to deteriorate the pressure of the cargo
tank. With such merits of the invention, it is possible to achieve automation of a
gas management system related to the boiler.
[0042] As apparent from the above description, according to the invention, gas to be supplied
to the gas demand side, in particular, forced boil-off gas to be supplied from a forcing
vaporizer thereto, is bypassed to a return pipe so that natural gas can be supplied
at a predetermined pressure or more required by a gas demand side, in particular,
at a pressure in a predetermined range permitted by the gas demand side. Furthermore,
since the gas having the predetermined pressure or more is returned to the cargo tank,
the natural boil-off gas is maintained at the predetermined pressure or more within
the cargo tank, enabling the compressor to be operated with a relatively high load,
so that the compressor can be operated stably.
[0043] It should be understood that the embodiments and the accompanying drawings have been
described for illustrative purposes, and the present invention is limited only by
the following claims.
1. A method for supplying natural gas at a predetermined pressure or more to a gas demand
side (350) in an LNG carrier during ballast voyage of the LNG carrier, where less
gas than required for a minimum load of a compressor (340) is induced into the compressor
(340) due to generation of a low amount of natural boil-off gas, the natural gas comprising
natural boil-off gas (313) generated in a cargo tank (310) or a plurality of cargo
tanks containing LNG (312) and forced boil-off gas generated by vaporizing LNG pumped
from the cargo tank or the plurality of cargo tanks,
wherein, in order to supply the natural gas at a predetermined pressure or more, the
forced boil-off gas or a mixed gas of the forced boil-off gas and natural boil-off
gas (313) having the predetermined pressure or more is returned to the cargo tank
(310) or to a gas header (370) connecting the plurality of the cargo tanks to one
another.
2. The method according to claim 1, wherein the gas demand side (350) is any one of a
boiler, a double-fuel engine, and a gas turbine.
3. The method according to claim 1 or 2, wherein the natural boil-off gas (313) is compressed
by the compressor (340), and the forced boil-off gas is vaporized to have the predetermined
pressure or more and mixed with the natural boil-off gas compressed by the compressor
(340).
4. The method according to any one of claims 1 to 3, wherein, when the forced boil-off
gas or the mixed gas of the forced boil-off gas and natural boil-off gas is returned
to the cargo tank (310) or the gas header (370), the forced boil-off gas or the mixed
gas is compressed by a separate compressor and returned at the predetermined pressure
or more to the cargo tank or the gas header.
5. An apparatus for supplying natural gas to a gas demand side in an LNG carrier, comprising:
a pump (320) suitable for pumping LNG from a cargo tank or a plurality of cargo tanks;
and
a vaporizer (330) to vaporize the pumped LNG to generate forced boil-off gas; and
a compressor (340) to compress natural boil-off gas generated from said cargo tank
(310) or said plurality of cargo tanks containing LNG;
the apparatus being characterized by being configured so that, when the apparatus is mounted in the LNG carrier with the
pump being connected to pump LNG from the cargo tank or from the plurality of cargo
tanks of the LNG carrier and less gas than required for a minimum load of the compressor
(340) is induced into the compressor (340) due to generation of a low amount of natural
boil-off gas during ballast voyage of the LNG carrier, the forced boil-off gas of
the vaporizer is mixed with the natural boil-off gas upstream or downstream of the
compressor and supplied at a predetermined pressure or more to the gas demand side,
and the forced boil-off gas or mixed gas of the forced boil-off gas and natural boil-off
gas having the predetermined pressure or more is returned to the cargo tank (310)
or a gas header (370) connecting the plurality of the cargo tanks to one another.
6. The apparatus according to claim 5, wherein the forced boil-off gas is mixed with
the natural boil-off gas before or after compression of the natural boil-off gas (313).
7. The apparatus according to claim 5 or 6, further comprising:
another compressor disposed on a pipe through which the forced boil-off gas or the
mixed gas of the forced boil-off gas and natural boil-off gas (313) is returned to
the cargo tank (310) or the gas header (370).
8. The apparatus according to any one of claims 5 to 7, further comprising:
a return pipe connected to downstream of the vaporizer or to downstream of a pipe
joined to the return pipe through which the forced boil-off gas or the mixed gas of
the forced boil-off gas and natural boil-off gas (313) is returned to the cargo tank
(310); and
a control valve (332) on the return pipe to control returning of the forced boil-off
gas or the mixed gas by opening or closing the control valve (332).
9. An LNG carrier, comprising an apparatus according to any one of claims 5 to 8, mounted
in the LNG carrier.
10. An LNG carrier according to claim 9, wherein the gas demand side (350) includes any
one of a boiler, a double-fuel engine, and a gas turbine.
1. Verfahren zum Zuführen von Erdgas mit einem vorbestimmten Druck oder mehr zu einer
Gasbedarfsseite (350) in einem Flüssigerdgastanker während einer Ballastfahrt des
Flüssigerdgastankers, wo infolge der Erzeugung einer geringen Menge an natürlichem
Boil-Off-Gas weniger Gas als für eine Mindestlast eines Kompressors (340) erforderlich
in den Kompressor (340) eingeführt wird, wobei das Erdgas natürliches Boil-Off-Gas
(313), das in einem Ladetank (310) oder mehreren Ladetanks, die Flüssigerdgas (312)
enthalten, und künstlich ausgedampftes Boil-Off-Gas, das durch Verdampfen von aus
dem Ladetank oder den mehreren Ladetanks gepumptem Flüssigerdgas erzeugt wird, umfasst,
wobei, um das Erdgas mit einem vorbestimmten Druck oder mehr zuzuführen, das künstlich
ausgedampfte Boil-Off-Gas oder ein Mischgas aus dem künstlich ausgedampften Boil-Off-Gas
und natürlichem Boil-Off-Gas (313) mit dem vorbestimmten Druck oder mehr zu dem Ladetank
(310) oder zu einer Gasverteilerleitung (370), welche die mehreren Ladetanks miteinander
verbindet, rückgeführt wird.
2. Verfahren nach Anspruch 1, wobei die Gasbedarfsseite (350) ein beliebiges von einem
Kessel, einem Zweistoffmotor und einer Gasturbine ist.
3. Verfahren nach Anspruch 1 oder 2, wobei das natürliche Boil-Off-Gas (313) durch den
Kompressor (340) verdichtet wird und das künstlich ausgedampfte Boil-Off-Gas verdampft
wird, um den vorbestimmten Druck oder mehr aufzuweisen, und mit dem natürlichen Boil-Off-Gas,
das durch den Kompressor (340) verdichtet wird, gemischt wird.
4. Verfahren nach einem beliebigen der Ansprüche 1 bis 3, wobei, wenn das künstlich ausgedampfte
Boil-Off-Gas oder das Mischgas aus dem künstlich ausgedampften Boil-Off-Gas und natürlichem
Boil-Off-Gas zu dem Ladetank (310) oder der Gasverteilerleitung (370) rückgeführt
wird, das künstlich ausgedampfte Boil-Off-Gas oder das Mischgas durch einen getrennten
Kompressor verdichtet wird und mit dem vorbestimmten Druck oder mehr zu dem Ladetank
oder der Gasverteilerleitung rückgeführt wird.
5. Vorrichtung zum Zuführen von Erdgas zu einer Gasbedarfsseite in einem Flüssigerdgastanker,
umfassend:
eine Pumpe (320), die zum Pumpen von Flüssigerdgas aus einem Ladetank oder mehreren
Ladetanks geeignet ist, und
einen Verdampfer (330), um das gepumpte Flüssigerdgas zu verdampfen, um künstlich
ausgedampftes Boil-Off-Gas zu erzeugen, und
einen Kompressor (340), um natürliches Boil-Off-Gas zu verdichten, das aus dem Ladetank
(310) oder den mehreren Ladetanks, die Flüssigerdgas enthalten, erzeugt wird,
wobei die Vorrichtung dadurch gekennzeichnet ist, dass sie derart ausgebildet ist, dass, wenn die Vorrichtung in dem Flüssigerdgastanker
angebracht ist, wobei die Pumpe angeschlossen ist, um Flüssigerdgas aus dem Ladetank
oder aus den mehreren Ladetanks des Flüssigerdgastankers zu pumpen, und infolge der
Erzeugung einer geringen Menge an natürlichem Boil-Off-Gas während einer Ballastfahrt
des Flüssigerdgastankers weniger Gas als für eine Mindestlast des Kompressors (340)
erforderlich in den Kompressor (340) eingeführt wird, das künstlich ausgedampfte Gas
des Verdampfers stromauf oder stromab des Kompressors mit dem natürlichen Boil-Off-Gas
gemischt wird und mit einem vorbestimmten Druck oder mehr der Gasbedarfsseite zugeführt
wird und das künstlich ausgedampfte Boil-Off-Gas oder das Mischgas aus dem künstlich
ausgedampften Boil-Off-Gas und natürlichem Boil-Off-Gas mit dem vorbestimmten Druck
oder mehr zu dem Ladetank (310) oder zu einer Gasverteilerleitung (370), welche die
mehreren Ladetanks miteinander verbindet, rückgeführt wird.
6. Vorrichtung nach Anspruch 5, wobei das künstlich ausgedampfte Boil-Off-Gas vor oder
nach der Verdichtung des natürlichen Boil-Off-Gases (313) mit dem natürlichen Boil-Off-Gas
gemischt wird.
7. Vorrichtung nach Anspruch 5 oder 6, ferner umfassend:
einen anderen Kompressor, der an einem Rohr angeordnet ist, durch welches das künstlich
ausgedampfte Boil-Off-Gas oder das Mischgas aus dem künstlich ausgedampften Boil-Off-Gas
und natürlichem Boil-Off-Gas (313) zu dem Ladetank (310) oder der Gasverteilerleitung
(370) rückgeführt wird.
8. Vorrichtung nach einem beliebigen der Ansprüche 5 bis 7, ferner umfassend:
ein Rückführrohr, das stromab des Verdampfers oder stromab eines Rohres angeschlossen
ist, das mit dem Rückführrohr verbunden ist, durch welches das künstlich ausgedampfte
Boil-Off-Gas oder das Mischgas aus dem künstlich ausgedampften Boil-Off-Gas und natürlichem
Boil-Off-Gas (313) zu dem Ladetank (310) rückgeführt wird, und
ein Regelventil (332) an dem Rückführrohr, um das Rückführen des künstlich ausgedampften
Boil-Off-Gases oder des Mischgases durch Öffnen oder Schließen des Regelventils (332)
zu regeln.
9. Flüssigerdgastanker, umfassend eine Vorrichtung nach einem beliebigen der Ansprüche
5 bis 8, die in dem Flüssigerdgastanker angebracht ist.
10. Flüssigerdgastanker nach Anspruch 9, wobei die Gasbedarfsseite (350) ein beliebiges
von einem Kessel, einem Zweistoffmotor und einer Gasturbine umfasst.
1. Procédé pour fournir du gaz naturel à une pression prédéterminée ou supérieure à un
côté de demande de gaz (350) dans un méthanier pendant un voyage sur lest du méthanier,
où l'on induit moins de gaz que nécessaire pour une charge minimum d'un compresseur
(340) dans le compresseur (340) en raison de la génération d'une faible quantité de
gaz d'évaporation naturel, le gaz naturel comprenant du gaz d'évaporation naturel
(313) généré dans une citerne de cargaison (310) ou une pluralité de citernes de cargaison
contenant du GNL (gaz naturel liquéfié) (312) et du gaz d'évaporation forcé généré
en faisant évaporer le GNL pompé dans la citerne de cargaison ou la pluralité de citernes
de cargaison,
dans lequel, afin de fournir le gaz naturel à une pression prédéterminée ou supérieure,
le gaz d'évaporation forcé ou un gaz mélangé composé du gaz d'évaporation forcé et
du gaz d'évaporation naturel (313) ayant la pression prédéterminée ou supérieure revient
dans la citerne de cargaison (310) ou dans un collecteur de gaz (370) raccordant la
pluralité de citernes de cargaison entre elles.
2. Procédé selon la revendication 1, dans lequel le côté de demande de gaz (350) est
l'un quelconque parmi une chaudière, un moteur à double carburant et une turbine à
gaz.
3. Procédé selon la revendication 1 ou 2, dans lequel le gaz d'évaporation naturel (313)
est comprimé par le compresseur (340) et le gaz d'évaporation forcé est vaporisé pour
avoir la pression prédéterminée ou supérieure et mélangé avec le gaz d'évaporation
naturel comprimé par le compresseur (340).
4. Procédé selon l'une quelconque des revendications 1 à 3, dans lequel, lorsque le gaz
d'évaporation forcé ou le gaz mélangé composé du gaz d'évaporation forcé et du gaz
d'évaporation naturel revient dans la citerne de cargaison (310) ou dans le collecteur
de gaz (370), le gaz d'évaporation forcé ou le gaz mélangé est comprimé par un compresseur
séparé et reconduit à la pression prédéterminée ou supérieure à la citerne de cargaison
ou au collecteur de gaz.
5. Appareil pour fournir du gaz naturel à un côté de demande de gaz dans un méthanier,
comprenant :
une pompe (320) appropriée pour pomper le GNL d'une citerne de cargaison ou d'une
pluralité de citernes de cargaison ; et
un vaporisateur (330) pour vaporiser le GNL pompé afin de générer du gaz d'évaporation
forcé ; et
un compresseur (340) pour comprimer le gaz d'évaporation naturel généré par ladite
citerne de cargaison (310) ou ladite pluralité de citernes de cargaison contenant
du GNL ;
l'appareil se caractérisant en ce qu'il est configuré de telle sorte que lorsque l'appareil est monté dans le méthanier
avec la pompe qui est raccordée pour pomper du GNL de la citerne de cargaison ou de
la pluralité de citernes de cargaison du méthanier, et qu'on induit moins de gaz que
nécessaire pour une charge minimum du compresseur (340) dans le compresseur (340)
en raison de la génération d'une faible quantité de gaz d'évaporation naturel pendant
le voyage sur lest du méthanier, le gaz d'évaporation forcé du vaporisateur est mélangé
avec le gaz d'évaporation naturel en amont ou en aval du compresseur et fourni à une
pression prédéterminée ou supérieure au côté de demande de gaz, et le gaz d'évaporation
forcé ou le gaz mélangé composé du gaz d'évaporation forcé et du gaz d'évaporation
naturel ayant la pression prédéterminée ou supérieure revient dans la citerne de cargaison
(310) ou dans un collecteur de gaz (370) raccordant la pluralité de citernes de cargaison
entre elles.
6. Appareil selon la revendication 5, dans lequel le gaz d'évaporation forcé est mélangé
avec le gaz d'évaporation naturel avant ou après la compression du gaz d'évaporation
naturel (313).
7. Appareil selon la revendication 5 ou 6, comprenant en outre :
un autre compresseur disposé sur un tuyau à travers lequel le gaz d'évaporation forcé
ou le gaz mélangé composé du gaz d'évaporation forcé et du gaz d'évaporation naturel
(313) revient dans la citerne de cargaison (310) ou dans le collecteur de gaz (370).
8. Appareil selon l'une quelconque des revendications 5 à 7, comprenant en outre :
un tuyau de retour raccordé en aval du vaporisateur ou en aval d'un tuyau raccordé
au tuyau de retour à travers lequel le gaz d'évaporation forcé ou le gaz mélangé composé
du gaz d'évaporation forcé et du gaz d'évaporation naturel (313) revient dans la citerne
de cargaison (310) ; et
une valve de commande (332) sur le tuyau de retour pour commander le retour du gaz
d'évaporation forcé ou du gaz mélangé en ouvrant ou en fermant la valve de commande
(332).
9. Méthanier comprenant un appareil selon l'une quelconque des revendications 5 à 8,
monté dans le méthanier.
10. Méthanier selon la revendication 9, dans lequel le côté de demande de gaz (350) comprend
l'un quelconque parmi une chaudière, un moteur à double carburant et une turbine à
gaz.