EP 1918474 A1 20080507 - Method for pouring a structural floor, a structural floor and a hollowcore concrete slab and a strip-shaped element for such a structural floor
Title (en)
Method for pouring a structural floor, a structural floor and a hollowcore concrete slab and a strip-shaped element for such a structural floor
Title (de)
Verfahren zum Giessen eines Strukturbodens, Strukturboden und Hohlkernbetonplatte sowie streifenförmiges Element für einen derartigen Strukturboden
Title (fr)
Procédé pour couler un plancher structurel, plancher structurel et dalle de béton à âme alvéolaire et élément en forme de bande pour ledit plancher structurel
Publication
Application
Priority
NL 1032778 A 20061031
Abstract (en)
The invention relates to a method for pouring a structural floor, in the process of which hollowcore concrete slabs (3) are placed at least substantially united onto beams (1), after which the space between the hollowcore concrete slabs (3) is filled with a mortar. Before pouring, strips (5) made of a flexible material are placed in a number of selected spaces between the hollowcore concrete slabs (3).
IPC 8 full level
E04B 5/06 (2006.01)
CPC (source: EP)
E04B 5/043 (2013.01); E04B 5/06 (2013.01)
Citation (search report)
- [XA] FR 2540161 A1 19840803 - BOUYGUES SA [FR]
- [XA] FR 2383283 A2 19781006 - SARET [FR]
- [A] US 2005204671 A1 20050922 - HEUVEL JOHN S [US], et al
- [A] GB 538101 A 19410721 - ALFRED GEORGE ROWSE
Designated contracting state (EPC)
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR
Designated extension state (EPC)
AL BA HR MK RS
DOCDB simple family (publication)
DOCDB simple family (application)
EP 07119043 A 20071023; NL 1032778 A 20061031